KR100580931B1 - Reinforcement structure for a foundation pile - Google Patents

Reinforcement structure for a foundation pile Download PDF

Info

Publication number
KR100580931B1
KR100580931B1 KR1020050068759A KR20050068759A KR100580931B1 KR 100580931 B1 KR100580931 B1 KR 100580931B1 KR 1020050068759 A KR1020050068759 A KR 1020050068759A KR 20050068759 A KR20050068759 A KR 20050068759A KR 100580931 B1 KR100580931 B1 KR 100580931B1
Authority
KR
South Korea
Prior art keywords
steel pipe
reinforcement
reinforcing bar
reinforcing
concrete
Prior art date
Application number
KR1020050068759A
Other languages
Korean (ko)
Other versions
KR20060048842A (en
Inventor
배정효
Original Assignee
배정효
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배정효 filed Critical 배정효
Publication of KR20060048842A publication Critical patent/KR20060048842A/en
Application granted granted Critical
Publication of KR100580931B1 publication Critical patent/KR100580931B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1685Shapes cylindrical
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0069Welding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Abstract

본 발명은 기초 공사용 강관(100)의 상단부 보강구조에 관한 것이다.The present invention relates to the upper end reinforcement structure of the steel pipe 100 for foundation work.

이같은 본 발명은 원형링과 원판(30)을 달대(10)로 연결한 부재를 지면에 타입된 강관말뚝 상단에 설치한 후 콘크리트를 유입시켜 간편하게 기초공사용 강관(100)의 상단부가 보강 되도록 한 기술이다. 본 발명의 부재는 보강철근 정착용 홀이나 홈이 없는 것을 특징으로 하여 확대기초 하부철근의 간섭을 완전히 피해 보강철근을 시공할 수 있음은 물론 초경량 일체시스템에 의한 간편한 시공과 공사비의 절감을 가능케 했으며 보다 안정적으로 강관말뚝 머리를 보강하여 강관(100)과 확대기초 콘크리트(500)가 강결합 되도록 한 기초공사용 강관(100)의 상단부 보강구조를 제공한다.The present invention is such that the circular ring and the disc 30 connected to the moon 10 to install a member on the top of the steel pipe pile type on the ground and then introduced concrete to easily reinforce the upper end of the basic public steel pipe 100 to be. The member of the present invention is characterized in that there are no holes or grooves for reinforcing reinforcing bar reinforcement to completely avoid the interference of the lower base reinforcing bar, as well as easy construction and reduction of construction cost by the ultra-light integrated system. Reinforcing the steel pipe pile head more stably provides a reinforcement structure of the upper end of the steel pipe 100 for the basic construction to be steel-coupled with the steel pipe 100 and the expanded base concrete 500.

기초공사, 보강구조 Foundation construction, reinforcement structure

Description

기초공사용 강관의 상단부 보강구조 {Reinforcement structure for a foundation pile}Reinforcement structure for a foundation pile}

도 1은 종래의 기초공사용 강관의 상단부 보강구조를 도시한 사시도.1 is a perspective view showing a reinforcing structure of the upper end of a conventional steel pipe for basic construction.

도 2는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 전체분해 사시도.Figure 2 is an exploded perspective view of the reinforcing structure of the upper end of the steel pipe for the basic construction as an embodiment of the present invention.

도 3은 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 조립도.Figure 3 is an assembly view of the steel pipe upper end reinforcement structure for the basic construction as an embodiment of the present invention.

도 4는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 단면도.Figure 4 is a cross-sectional view of the reinforcement structure of the upper end of the basic construction steel pipe as an embodiment of the present invention.

*도면 주요부분에 대한 부호의 설명** Explanation of symbols for main parts of drawing *

3 : 확대기초 바닥철근 5 : 속채움 콘크리트 6 :버림콘크리트 10 : 달대3: Expanding base floor 5: Filling concrete 6: Cast concrete 10: Moon stand

20 : 전단키 22 : 전단키 설치구멍 30 :원판 50 : 종래의원형링20: shear key 22: shear key mounting hole 30: disc 50: conventional circular ring

55 : 원형링 60 :지지로드 100 :강관 400 :보강철근 450 :띠철근55: circular ring 60: support rod 100: steel pipe 400: reinforcing bar 450: strip reinforcing bar

500: 확대기초 콘크리트500: Expanded foundation concrete

본 발명은 건축이나 토목의 기초공사에 있어서 지면으로부터 타입한 강관(100)말뚝의 머리를 보강하여 모든 외력에 대해 저항할 수 있도록 하기 위한 기초 공사용 강관의 상단부 보강구조에 관한 것으로 특히 지면으로부터 타입 된 강관(100)의 상단부에 원형링(55)과 원판(30)을 달대(10)로 연결한 부재를 설치하되 원판(30)의 직경은 강관(100)말뚝의 내경보다 적게 하여 강관(100)의 내 상단에 삽입되도록 하고 원형링(55)의 외경은 강관(100)말뚝의 외경보다 크게하여 강관(100)말뚝위에 걸쳐지도록 한 후 전단키(20)를 설치하고 확대기초의 하부철근(3)조립 후 확대기초의 하부철근(3)의 윗면 강관(100)말뚝 수직위치에 띠철근(450) 1개를 먼저 고정하고 띠철근(450)의 안쪽으로 보강철근(400)을 설치하되 확대기초 하부철근(3)의 간섭을 피해 설치하여 확대기초 콘크리트(500)타설시 본 발명의 부재설치로 인해 마련된 공간에 콘크리트가 유입되도록 한 기초공사용 강관의상단부 보강구조에 관한 것으로 원형링(55)은 확대기초콘크리트(500)의 수직지압응력집중을 완화시키는 기능을 담당하고 또 원형링(55)에 홀이나 홈을 형성하지 않음으로 보강철근이 원형링(55)에 구속되어 확대기초 하부철근(3)의 간섭받는 일이 없도록 했다. 전단키(20)는 인발하중에 저항하는 기능을 하며 확대기초 하부철근(3)의 윗부분 강관(100)과 수직된 위치에 고정된 1개의 띠철근(450)은 보강철근(400)을 결속하여 안정시키는 기능을 한다. 보강철근(400) 이 말굽형태와 양단에 갈고리모양을 갖추어 보강철근 2개를 한번에 정착하는 효과와 함께 부착력을 증대시켜 자재의 절감효과를 제공하고 확대기초콘크리트(500) 타설시 강관(100)내부로 유입되는 속채움 콘크리트(5)에 의하여 강관(100)과 확대기초콘크리트(500)가 강결합(일체화) 되도록 한 기초공사용 강관의 상단부 보강구조에 관한 것이다.The present invention relates to the reinforcing structure of the upper end portion of the steel pipe for the foundation construction for reinforcing the head of the steel pipe (100) pile type from the ground in the construction or civil engineering foundation so that it can resist against all external forces. Install a member connecting the circular ring 55 and the disc 30 to the moon 10 at the upper end of the steel pipe 100, but the diameter of the disc 30 is less than the inner diameter of the steel pipe 100, the steel pipe 100 The outer diameter of the circular ring 55 is to be inserted into the upper end of the larger than the outer diameter of the steel pipe (100) pile so as to span over the steel pipe (100) pile, then install the shear key 20 and the lower reinforcement of the expansion base (3) After assembly, fix one strip reinforcing rod 450 first at the vertical position of the upper steel pipe 100 of the lower reinforcing bar 3 of the expanding base, and install the reinforcing bar 400 inside the reinforcing bar 450, but Expanded foundation concrete by installing to avoid interference of rebar (3) (500) relates to the reinforcement structure of the upper end of the steel pipe for the basic construction to allow concrete to flow into the space provided by the installation of the member at the time of placing the circular ring 55 to reduce the vertical pressure stress concentration of the expanded basic concrete (500) In addition, the reinforcing bars were constrained to the circular ring 55 by not functioning and forming holes or grooves in the circular ring 55 so as not to be interfered with by the expansion base lower reinforcing bar 3. Shear key 20 functions to resist the draw load, and one strip of steel 450 fixed at a position perpendicular to the upper steel pipe 100 of the expanded base lower rebar 3 is stabilized by binding the reinforcing bar 400. To function. The reinforcing bar (400) has a horseshoe shape and a hook shape at both ends to provide the effect of fixing two reinforcing bars at once and increase the adhesive force to provide material saving effect and to expand the basic concrete (500). It relates to the reinforcing structure of the upper end of the steel pipe 100 and the basic public steel pipe to be a steel coupling (100) and the expanded basic concrete (500) by the inner filling concrete (5).

종래에는 지면으로부터 타입 된 강관(100)말뚝머리가 모든 외력에 안전하게 저항하도록 용접이나 볼트조립 방법 또는 여러 부재를 사용하여 콘크리트를 강관(100) 내 상단에 유입되도록 한 방법을 통하여 강관(100)상단부를 보강하는 것이 일반적 이었다. 그러나 종래의 방법들은 품질관리가 어렵고 시공이 불편할뿐더러 보강철근(400)의 설치 위치가 고정됨으로 확대기초 하부철근(3)과 보강철근(400)의 간섭을 완전히 피하지 못해 규격시공이 어려운 문제가 있었다.Conventionally, the upper end of the steel pipe (100) through the method to allow the concrete to flow into the upper end of the steel pipe (100) using a welding or bolt assembly method or several members to safely resist the type of steel pipe 100 from the ground It was common to reinforce it. However, the conventional methods are difficult to control quality and inconvenient in construction, and because the installation location of the reinforcing bar 400 is fixed, it is difficult to completely avoid the interference between the base reinforcing bar 3 and the reinforcing bar 400. there was.

따라서, 본 발명의 목적은 종래와 같은 용접이나 볼트 조임을 하지 않고 안정적으로 강관(100)의 상단부를 보강하여 모든 외력에 저항케 함은 물론 보강철근(400)의 설치 위치를 고정시키지 않고 유동성을 확보하므로 확대기초 하부철근(3)의 간섭을 피해 보강철근(400)의 시공을 용의하게 하는 기초공사용 강관의 상단부 보강구조를 제공하려는데 있는 것이다.Accordingly, an object of the present invention is to stably reinforce the upper end of the steel pipe 100 without welding or bolting as in the prior art to resist any external force, as well as to maintain the fluidity without fixing the installation position of the reinforcing bar 400 It is to provide a reinforcement structure of the upper end portion of the steel pipe for the basic construction to facilitate the construction of the reinforcement reinforcement (400) to avoid the interference of the expansion base lower reinforcement (3).

이하 첨부된 도면에 의거하여 본 발명의 바람직한 일실시예를 설명하면 다음과 같다. 참고로 이하에 참조되는 도면에 대하여는 설명의 편의상 종래와 동일한 부분에 대해서는 동일한 참조 번호를 부여하여 설명한다.Hereinafter, a preferred embodiment of the present invention will be described with reference to the accompanying drawings. For reference, the drawings referred to below will be described with the same reference numerals for the same parts as in the prior art for convenience of description.

도1은 종래방법의 분해사시도이고, 도2는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 분해사시도 이고, 도3은 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 조립도 이며 도4는 본 발명의 일실시예로 기초공사용 강관 상단부 보강구조의 완성단면도이다.Figure 1 is an exploded perspective view of the conventional method, Figure 2 is an exploded perspective view of the steel pipe upper end reinforcement structure of the basic construction as an embodiment of the present invention, Figure 3 is an assembly view of the steel pipe upper end reinforcement structure of the basic construction as an embodiment of the present invention 4 is a completed cross-sectional view of the reinforcing structure of the upper end of the steel pipe for basic construction as an embodiment of the present invention.

본 발명은 원형링(55)과 원판(30)을 달대(10)로 연결한 부재를 강관(100)말 뚝의 상단에 설치하되 원판(30)의 직경은 강관(100)말뚝의 내경보다 적게 하여 강관(100)의 내 상단에 삽입되도록 하고 원형링(55)의 외경은 강관(100)말뚝의 외경보다 크게 하고 강관(100)말뚝위에 걸쳐지도록 하여 강관(100)상단에 일정공간을 확보한 다음 콘크리트가 유입되도록 하고 원형링(55)은 축력작용 시 확대기초콘크리트(500)의 수직 지압응력집중을 완화하는 기능을 담당케 되며 강관(100)에 타공된 전단키설치구멍(22)을 통해 외주면 으로부터 강관(100)내부로 설치되는 전단키(20)는 축력의 일부와 인발에 대한 저항을 하도록 했으며, 본 발명은 확대기초 하부철근(3)조립 후 띠철근(450)1개를 확대기초 하부철근(3)윗면 강관(100)과 수직위치에 고정결속하고 띠철근(450) 안쪽에 수직으로 보강철근(400)을 세워 이미 고정된 띠철근(450)에 결속한다.The present invention is installed on the upper end of the steel pipe 100 pile the member connecting the circular ring 55 and the disk 30 to the moon 10, the diameter of the disk 30 is less than the inner diameter of the steel pipe 100 pile The outer diameter of the circular ring 55 is made larger than the outer diameter of the steel pipe 100 pile and is spread over the steel pipe 100 pile so as to secure a predetermined space at the top of the steel pipe 100. Next, the concrete is introduced and the circular ring 55 is responsible for alleviating the vertical pressure stress concentration of the expanded basic concrete 500 during the axial force, and the outer peripheral surface through the shear key installation hole 22 perforated in the steel pipe 100. Shear key 20 installed from the inside of the steel pipe 100 to the resistance to the part of the axial force and the draw, the present invention after the expansion base bottom reinforcement (3) assembled one band reinforcement (450) to expand the base bottom reinforcement (3) fixedly fixed in the vertical position with the upper steel pipe (100) and vertically inside the band reinforcement (450) Stand up reinforcement (400) is bound to the already fixed band reinforcement (450).

강관(100)말뚝머리에 외력이 작용할 때 보강철근(400)이 이탈하지 못하도록 하는 기능은 강관(100)이 속채움 콘크리트(5)를 구속하는 원리를 이용하여 강관(100)내부에 위치하는 보강철근(400)에는 띠철근(450)을 설치하지 않도록 하여 시공성과 경제성을 높였다.Reinforcing reinforcement 400 is a function to prevent the reinforcing reinforcement 400 when the external force is applied to the steel pipe 100 pile head reinforcement located inside the steel pipe 100 by using the principle of restraining the filling concrete (5) The reinforcing bar 400 was not provided with a band reinforcing bar 450 to improve construction and economics.

이상에서 설명한바 와같이 본 발명은 강관(100)의 내상단부에 원형링(55)과 원판(30)을 달대(10)로 연결한 부재를 용접이나 볼트 조임 없이 강관(100) 상단에 설치하여 효과적으로 강관(100)말뚝머리 보강을 하고 원형링(55)이 보강철근(400)을 구속하지 않음으로 보강철근(400)과 확대기초 하부철근(3)의 간섭 없이 규격시공이 기능한 효과를 제공한다.As described above, the present invention is installed on the upper end of the steel pipe 100 without welding or bolting the member connecting the circular ring 55 and the disc 30 to the moon 10 at the inner upper end of the steel pipe 100 Effectively reinforcing the steel pipe 100 pile head and circular ring 55 does not restrain the reinforcing bar 400, thereby providing the effect that the standard construction function without interference between the reinforcing bar 400 and the lower base reinforcement (3) do.

본 발명은 상술한 특정의 바람직한 실시예의 한정되지 아니하며 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 변형실시가 가능한 것을 물론이고 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the specific preferred embodiments described above, and any person having ordinary skill in the art to which the present invention pertains may make modifications without departing from the gist of the present invention as claimed in the claims. Such changes are intended to fall within the scope of the claims.

Claims (5)

확대기초 바닥철근(3)이 보강철근(400)보다 우선배근 됨을 전제로 강관(100)말뚝의 상단 부를 보강하여 확대기초콘크리트(500)와 강 결합(일체화)함에 있어,Reinforcing the upper part of the steel pipe 100 pile on the premise that the expansion base bottom reinforcement (3) prior to the reinforcement reinforcement (400) in the steel coupling (integrated) with the expansion foundation concrete 500, 다수의 전단키설치구멍(22)을 구비한 강관(100)말뚝의상단부에 외경이 강관(100)의 외경이상이고 내경이 강관(100)내경미만의 원형 링(55)과 하면의 직경이 강관(100)의 내경 미만인 원판(30)이 달대(10)에 의해 수직으로 상하 일체되는 부재를 설치하되, 부재의 하면 즉 원판(30)은 강관의 내부로 들어가게 하고 부재의 상면 즉 원형 링(55)은 강관(100)상단에 걸쳐지게 하여 강관(100) 내 상단에 일정공간을 형성한 후 강관(100)말뚝의 외주면 으로부터 전단키설치구멍(22)을 통과시켜 전단키(20)를 설치하고 확대기초 바닥철근(3)을 배근한 후 확대기초 바닥철근(3)의 상면 강관(100)과 수직되는 위치에 띠철근(450) 1개를 먼저 결속선(가는 철선)으로 고정설치하고 기 설치된 띠철근(450)의 안쪽에 기대어 보강철근(400)을 차례로 세우되 확대기초 바닥철근(3)을 피하여 일단이 원판(30)의 상면에 닿도록 설치하고, 보강철근(400)과 띠철근(450)이 만나는 부위는 결속 선으로 결속하여 고정하고, 강관(100)상단의 윗부분 즉 확대기초 콘크리트(500) 부위에 위치하는 보강철근(400)에 띠철근(450)모두 결속하여 마감하고 확대기초 콘크리트(500) 타설시 강관(100)내부에 유입될 속 채움 콘크리트(5)를 포함하여 확대기초바닥철근(3)과 보강철근(400)의 간섭을 완전히 방지함을 특징으로 하는 기초공사용 강관의 상단부보강구조.The upper end of the steel pipe 100 having a plurality of shear keying holes 22 has an outer diameter of more than the outer diameter of the steel pipe 100 and an inner diameter of the circular ring 55 and the lower diameter of the steel pipe 100 less than the inner diameter of the steel pipe ( The disc 30, which is less than the inner diameter of 100, is provided with a member vertically integrated up and down by the moon 10, but the lower surface of the member, that is, the disk 30 is to enter the inside of the steel pipe and the upper surface of the member, that is, the circular ring 55 The upper end of the steel pipe 100 to form a predetermined space in the upper end of the steel pipe 100 through the shear key installation hole 22 from the outer circumferential surface of the steel pipe 100 to install the shear key 20 and expand the base bottom After reinforcing the reinforcing bar (3), one band reinforcing bar (450) is fixed to the line (vertical steel wire) at a position perpendicular to the upper steel pipe (100) of the base foundation reinforcing bar (3), and then the pre-installed band reinforcing bar ( 450 reinforcement reinforcement (400) in turn leaning on the inner side of the reinforcement to avoid the bottom reinforcement (3) Installed so as to contact the upper surface of the disc 30, the reinforcing bar 400 and the band reinforcing bar 450 meets the binding line fixed and fixed, the upper portion of the upper portion of the steel pipe 100, that is, the expansion base concrete (500) The reinforcing bar 400 located in the reinforcing bar (450) are all bound and finished with expansion base concrete (500) when the base concrete reinforcement (3) including the filling concrete (5) to be introduced into the steel pipe (100) when placing (3) Reinforcement structure of the upper end of the steel pipe for the basic public, characterized in that completely prevent the interference of the reinforcing bars and). 1항에 있어서 강관(100)내부에 위치하는 보강철근(400) 부위에는 강관(100) 내면에 작용하는 반력을 이용, 띠철근(450)의 보강철근(400) 구속기능을 대체함을 특징으로 하는 기초공사용 강관의 상단부보강구조.In claim 1, the reinforcing bar 400 located in the steel pipe 100, using a reaction force acting on the inner surface of the steel pipe 100, characterized in that to replace the restraining function of the reinforcing bar 400 of the band reinforcement 450 Reinforcement structure of the upper part of the steel pipe for basic construction. 삭제delete 삭제delete 삭제delete
KR1020050068759A 2004-09-06 2005-07-28 Reinforcement structure for a foundation pile KR100580931B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020040071025 2004-09-06
KR1020040071025 2004-09-06

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2005-0022899U Division KR200400609Y1 (en) 2005-08-08 2005-08-08 Reinforcement structure for a foundation pile

Publications (2)

Publication Number Publication Date
KR20060048842A KR20060048842A (en) 2006-05-18
KR100580931B1 true KR100580931B1 (en) 2006-05-22

Family

ID=37149892

Family Applications (3)

Application Number Title Priority Date Filing Date
KR1020050068760A KR20060048843A (en) 2004-09-06 2005-07-28 Reinforcement structure for a foundation pile
KR1020050068759A KR100580931B1 (en) 2004-09-06 2005-07-28 Reinforcement structure for a foundation pile
KR1020050074753A KR20060050476A (en) 2004-09-06 2005-08-16 Reinforcement structure for a foundation pile

Family Applications Before (1)

Application Number Title Priority Date Filing Date
KR1020050068760A KR20060048843A (en) 2004-09-06 2005-07-28 Reinforcement structure for a foundation pile

Family Applications After (1)

Application Number Title Priority Date Filing Date
KR1020050074753A KR20060050476A (en) 2004-09-06 2005-08-16 Reinforcement structure for a foundation pile

Country Status (1)

Country Link
KR (3) KR20060048843A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100976310B1 (en) * 2009-10-12 2010-08-16 배정효 Reinforcement structure for a foundation pile
KR101068162B1 (en) * 2010-04-01 2011-09-27 (주)신영토건 Apparatus for reinforcing a head of steel tube pipe
KR101661274B1 (en) * 2016-02-05 2016-09-30 (주)현타 construction method of Reinforced PHC pile structure
CN113638435B (en) * 2021-08-20 2022-09-06 广东精特建设工程有限公司 Concrete pipe pile with transverse damage resistance and floating resistance functions and construction method

Also Published As

Publication number Publication date
KR20060048843A (en) 2006-05-18
KR20060050476A (en) 2006-05-19
KR20060048842A (en) 2006-05-18

Similar Documents

Publication Publication Date Title
KR100580931B1 (en) Reinforcement structure for a foundation pile
KR100923587B1 (en) Micro pile construction method using anchorage appratus of micro pile
KR101633289B1 (en) Head anchor device of micro pile and reinforced method of foundation concrete using the same
JP2007217931A (en) Drainage structure in slope stabilizing construction
KR101050493B1 (en) Embedded cone apparatus for supporting vertical concrete form, installation structure of form supporting assembly, and constructing method of vertical concrete
JP2007162266A (en) Two-step earth retaining wall and its construction method
KR200212743Y1 (en) Reinforcement structure for a foundation pile
KR100323112B1 (en) Reinforcement structure for a foundation pile
JP2006291657A (en) Supporting structure and supporting construction method for structure
JP4858843B2 (en) Reinforcement structure for tower structure foundation and method for reinforcement of tower structure foundation
KR101362173B1 (en) Fold type anchor reactive device and pile construction method therewith
KR200400609Y1 (en) Reinforcement structure for a foundation pile
KR101714464B1 (en) Composite pile and the construction method
KR20110103793A (en) Simple supported multiple reinforcement of steel pipe pile and reinforcing method using the same
JPH1018424A (en) Root wrapping reinforcing structure of column base of steel post or the like
KR100755164B1 (en) A steel pipe file head augmentation device which uses integral socket
KR20090080598A (en) Concrete Pile and Method for Constructing Concrete Pile
KR200414866Y1 (en) Head reforcement apparatus of steel pipe piles for foundation work
KR100458323B1 (en) The upper part reinforcement structure of a steel pipe for base construction
KR20220099010A (en) Foundation construction method with anchorage plate
KR100771837B1 (en) Reinforcing apparatus for head of steel pipe pile
KR100387751B1 (en) Reinforcement structure for a foundation pile
JPH0820945A (en) Foot protection at front end of foundation pile and device therefor
KR200392212Y1 (en) Reinforcement structure for a foundation pile
KR102184293B1 (en) Reinforcing device of pile head part and method of file structure construction method therewith

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130503

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140219

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150506

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20160503

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170626

Year of fee payment: 12

LAPS Lapse due to unpaid annual fee