KR100558596B1 - Slab Form System - Google Patents

Slab Form System Download PDF

Info

Publication number
KR100558596B1
KR100558596B1 KR1020030033296A KR20030033296A KR100558596B1 KR 100558596 B1 KR100558596 B1 KR 100558596B1 KR 1020030033296 A KR1020030033296 A KR 1020030033296A KR 20030033296 A KR20030033296 A KR 20030033296A KR 100558596 B1 KR100558596 B1 KR 100558596B1
Authority
KR
South Korea
Prior art keywords
support
yoke material
slab formwork
yoke
slab
Prior art date
Application number
KR1020030033296A
Other languages
Korean (ko)
Other versions
KR20040101625A (en
Inventor
구자환
Original Assignee
(주)나인
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)나인 filed Critical (주)나인
Priority to KR1020030033296A priority Critical patent/KR100558596B1/en
Publication of KR20040101625A publication Critical patent/KR20040101625A/en
Application granted granted Critical
Publication of KR100558596B1 publication Critical patent/KR100558596B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • E04G11/483Supporting heads
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/042Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

1. 청구범위에 기재된 발명이 속한 기술분야1. TECHNICAL FIELD OF THE INVENTION

본 발명은 슬래브 거푸집 시스템에 관한 것이다. The present invention relates to a slab formwork system.

2. 발명이 해결하려고 하는 기술적 과제2. The technical problem to be solved by the invention

콘크리트 하중에 충분히 대응할 수 있는 강성을 확보하고, 장선재와 멍에재 및 서포트의 설치와 해체가 용이하여 시공능률을 향상시키며, 자재비를 절감할 수 있는 슬래브 거푸집 시스템을 제공하도록 한다. It is to provide the slab formwork system to secure the rigidity that can cope with the concrete load, to improve the construction efficiency and to reduce the material cost by easy installation and dismantling of the wire and yoke materials and supports.

3. 발명의 해결방법의 요지3. Summary of Solution to Invention

본 발명에 따른 슬래브 거푸집 시스템은, 슬래브 거푸집 합판을 지지하는 장선재와, 상기 장선재의 하부에 직교방향으로 설치되며 그 양끝단부에는 벽체 거푸집 지지틀에 거치될 수 있도록 슬라이드 가이드빔이 슬라이드 삽입되는 멍에재, 및 상기 멍에재를 벽체 스팬에 맞게 연결고정하며 하부 서포트에 탈부착되는 드롭헤드 서포트를 구비하되, 상기 드롭헤드 서포트는 상부로는 거푸집 합판 지지부가 용접되고 하부로는 나선공이 용접된 상부 플레이트와, 상기 나선공에 삽지되며 상기 상부 플레이트와의 사이에 연결될 멍에재의 양측단부를 파지하는 하부 플레이트와, 상기 나선공과 나사결합하며 상기 하부 플레이트를 하부에서 승강조절하는 링형너트와, 상기 나선공의 최하단부에 용접되며 일반 서포트에 삽입고정되는 접지플레이트를 구비하는 것을 특징으로 한다.The slab formwork system according to the present invention, the yoke material for supporting the slab formwork plywood, and is installed in the orthogonal direction to the lower portion of the joist material, both ends of the yoke material that slide guide beam is slide-inserted to be mounted on the wall formwork support frame And a drop head support connecting and fixing the yoke material to a wall span and detachable to a lower support, wherein the drop head support has an upper plate welded with a formwork plywood support at the top and a spiral hole at the bottom; A lower plate which is inserted into the spiral hole and grips both end portions of the yoke material to be connected between the upper plate, a ring nut that is screwed with the spiral hole and adjusts the lower plate in a lower portion, and a lower end portion of the spiral hole; It is equipped with a ground plate that is welded and fixed to the general support. And that is characterized.

4. 발명의 중요한 용도4. Important uses of the invention

건축 구조물의 슬래브를 콘크리트로 성형 구축할 경우에 이용된다.It is used when forming slab of building structure into concrete.

슬래브 거푸집, 멍에재, 장선재, 서포트Slab formwork, yoke, Jang Sun-jae, support

Description

슬래브 거푸집 시스템{Slab Form System} Slab Form System

도 1은 종래 슬래브 거푸집 시스템의 시공단면도이다.1 is a construction cross-sectional view of a conventional slab formwork system.

도 2는 본 발명에 의한 슬래브 거푸집 시스템의 전체사시도이다.2 is an overall perspective view of a slab formwork system according to the present invention.

도 3은 본 발명에 의한 장선재 고정장치의 시공사시도이다.Figure 3 is a construction of a long wire rod fixing device according to the present invention.

도 4는 본 발명에 의한 멍에재의 단부 시공사시도이다.Figure 4 is an end construction of yoke material according to the present invention.

도 5는 본 발명에 의한 멍에재의 단부 시공단면도이다.5 is a cross-sectional end view construction of the yoke material according to the present invention.

도 6은 본 발명에 의한 드롭헤드 서포트의 분해사시도이다.6 is an exploded perspective view of the drop head support according to the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings

100 : 장선재 200 : 멍에재100: Jang Sunjae 200: Yoke

210 : 슬라이드 가이드빔 300 : 드롭헤드 서포트210: slide guide beam 300: drophead support

400 : 벽체 거푸집 지지틀 500 : 장선재 고정장치 400: wall formwork support frame 500: Jang wire rod fixing device

본 발명은 건축 구조물의 슬래브를 콘크리트로 성형 구축하기 위한 슬래브 거푸집 시스템에 관한 것이다.The present invention relates to a slab formwork system for forming and building a slab of a building structure into concrete.

일반적으로 종래 콘크리트 슬래브를 구축하기 위한 슬래브 거푸집 시스템은 각재를 사용한 장선재와 멍에재를 서포트(support)로 지지하고, 상기 장선재의 상부로 거푸집 패널인 합판을 일정 규격으로 설치하여 구축하고 있는데, 그 시공방법을 구체적으로 살펴보면 다음과 같다.In general, the slab formwork system for constructing a concrete slab is supported by supporting the joists and yoke materials using the lumber as a support, and is installed by installing a plywood, which is a formwork panel to the upper part of the joists, to a certain standard, the construction The method in detail is as follows.

종래의 거푸집 시공방법은, 도 1에 도시된 바와 같이, 지상에서 소요 길이로 가공한 각재를 벽체 스팬(wall span)에 맞게 연결하여 멍에재(20)를 제작하고, 상기 멍에재(20)의 양끝단부에는 상기 멍에재(20)가 벽체 거푸집(40)에 걸쳐질 수 있도록 임시 거치용 각재(50)를 못(51) 등을 이용하여 덧대어 연결한 후, 상기에 의해 연결된 멍에재(20)를 상부로 인양하여 동바리(30)로 지지시킨다.In the conventional formwork construction method, as shown in Figure 1, by connecting the lumber processed to the required length from the ground to fit the wall span (wall span) to produce the yoke material 20, the yoke material 20 On both ends, the yoke material 20 is attached to the temporary mounting angular material 50 so as to span the wall formwork 40 using nails 51, and then the yoke material 20 is connected by the above. ) Is lifted to the top and supported by the club (30).

이후, 상기 동바리(30)로 지지된 멍에재(20) 상부로 상기 멍에재(20)가 설치된 방향과 직교하는 방향으로 소정의 길이로 미리 가공된 각재를 얹어 놓고 중간 중간 못으로 가고정하여 장선재(10)를 연결한다.Subsequently, the pre-fabricated angle material is placed on the yoke material 20 supported by the copper bar 30 at a predetermined length in a direction orthogonal to the direction in which the yoke material 20 is installed, and then temporarily fixed with a middle middle nail. 10).

상기와 같이 멍에재(20)와 장선재(10)의 설치가 완료되면, 상기 멍에재(20)에 덧대어 벽체 거푸집(40)에 걸쳐놓은 임시 거치용 각재(50)를 제거하고, 상기 장선재(10) 상부에 합판(그림 미도시)을 설치한 후, 못 등으로 상기 장선재(10)와 합판을 고정하여 슬래브 거푸집을 완성한다. When the installation of the yoke material 20 and the Jangjae 10 as described above is completed, remove the temporary mounting angular material 50 placed on the wall formwork 40 to the yoke material 20, and the Jangjae ( 10) After installing the plywood (not shown) on the top, the slab formwork is completed by fixing the plywood and the plywood with nails and the like.

그러나, 상기와 같은 방법에 의한 슬래브 거푸집 구축방법은, 각재를 소정의 길이에 맞게 지상에서 가공하여야 하고, 또한 벽체 거푸집에 거치하기 위하여 별도의 임시 거치용 각재를 가공하여 부착후, 다시 해체해야 하는 번거로움이 있으며, 이밖에도 합판과 각재를 가공하여 사용함으로써 폐자재가 발생하여 경제적 손실을 초래하는 문제점이 있었다. However, in the slab formwork construction method according to the above method, the lumber is to be processed on the ground to a predetermined length, and in order to be mounted on the wall formwork, after processing and attaching a separate temporary mounting lumber to be attached, and then dismantled again There is a hassle, and besides, there is a problem in that waste materials are generated by processing plywood and lumber and causing economic losses.

또한, 콘크리트 타설후 콘크리트가 양생될 때까지 최대 휨모멘트가 작용하게 되는 슬래브의 중앙부에는 별도로 제작된 필러 죠인트용 합판(일반적으로 120 ×2400mm)을 따로 설치하고, 상기 필러 죠인트용 합판 하부로는 필러 서포트(Filler support)를 별도로 더 설치하게 되어, 작업이 복잡하고 번거로울 뿐만 아니라, 하부에 여러 개의 서포트가 배치되어 운반이나 후속공정을 수행하기 위한 공간에 제약이 따르는 문제점이 있었다. In addition, separately installed filler joint plywood (generally 120 × 2400 mm) is installed at the center of the slab where the maximum bending moment is applied until concrete is cured after the concrete is poured. Since the support (Filler support) is further installed, the work is complicated and cumbersome, and several supports are arranged at the bottom thereof, thereby limiting the space for carrying or carrying out subsequent processes.

따라서, 본 발명은 상기의 제반 문제점을 해결하기 위해 안출된 것으로서, 콘크리트 하중에 충분히 대응할 수 있는 강성을 확보하고, 장선재와 멍에재 및 서포트의 설치와 해체가 용이하여 시공속도를 향상시키며, 자재비를 절감할 수 있는 슬래브 거푸집 시스템을 제공하도록 한다.
Therefore, the present invention has been devised to solve the above problems, to ensure the rigidity that can sufficiently cope with the concrete load, to facilitate the installation and dismantling of the wire and yoke material and support to improve the construction speed, material cost Provide slab formwork systems that can be saved.

상기 목적을 달성하기 위해 본 발명에 따른 슬래브 거푸집 시스템은, 슬래브 거푸집 합판을 지지하는 장선재와, 상기 장선재의 하부에 직교방향으로 설치되며 그 양끝단부에는 벽체 거푸집 지지틀에 거치될 수 있도록 슬라이드 가이드빔이 슬라이드 삽입되는 멍에재, 및 상기 멍에재를 벽체 스팬에 맞게 연결고정하며 하부 서포트에 탈부착되는 드롭헤드 서포트를 구비하되, 상기 드롭헤드 서포트는 상부로는 거푸집 합판 지지부가 용접되고 하부로는 나선공이 용접된 상부 플레이트와, 상기 나선공에 삽지되며 상기 상부 플레이트와의 사이에 연결될 멍에재의 양측단부를 파지하는 하부 플레이트와, 상기 나선공과 나사결합하며 상기 하부 플레이트를 하부에서 승강조절하는 링형너트와, 상기 나선공의 최하단부에 용접되며 일반 서포트에 삽입고정되는 접지플레이트를 구비하는 것을 특징으로 한다.In order to achieve the above object, the slab formwork system according to the present invention includes a joist member supporting the slab formwork plywood and a slide guide beam installed at an orthogonal direction to the lower portion of the joist member to be mounted on a wall formwork support frame at both ends thereof. The yoke material to be inserted into the slide, and the yoke material is fixed to the wall span and provided with a drop head support detachable to the lower support, the drop head support is welded to the top of the formwork plywood support and spirally downward A welded upper plate, a lower plate which is inserted into the spiral hole and grips both ends of the yoke material to be connected between the upper plate, a ring nut that is screwed with the spiral hole and lifts and lowers the lower plate; Welded to the lowest end of the spiral hole and inserted into the general support It characterized in that it comprises a ground plate.

삭제delete

이하, 본 발명의 일실시예를 첨부도면을 참조하여 상세히 설명하면 다음과 같다. Hereinafter, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명에 의한 슬래브 거푸집 시스템의 전체사시도이고, 도 3은 본 발명에 의한 장선재 고정장치의 시공사시도이며, 도 4와 도 5는 본 발명에 의한 멍에재의 단부 시공사시도 및 단부 시공단면도이고, 도 6은 본 발명에 의한 드롭헤드 서포트의 분해사시도이다.Figure 2 is an overall perspective view of the slab formwork system according to the present invention, Figure 3 is a constructional view of the wire rod fixing device according to the present invention, Figure 4 and Figure 5 is an end construction and end construction cross-sectional view of the yoke material according to the present invention. 6 is an exploded perspective view of the drophead support according to the present invention.

도면에 도시된 바와 같이, 본 발명은 슬래브 거푸집 합판을 지지하는 장선재(100)와, 상기 장선재(100)의 하부에 직교방향으로 설치되며, 그 양끝단부에 는 벽체 거푸집 지지틀(400)에 거치될 수 있도록 슬라이드 가이드빔(210)이 슬라이드 삽입되는 멍에재(200), 및 상기 멍에재(200)를 벽체 스팬에 맞게 연결고정하며, 하부 서포트에 탈부착되는 드롭헤드 서포트(Drop-head support, 300)로 구성되어진다.As shown in the drawings, the present invention is installed in the orthogonal direction in the lower direction of the joist member 100 for supporting the slab formwork plywood, and mounted on the wall formwork support frame 400 at both ends thereof The yoke material 200 into which the slide guide beam 210 is slide-inserted and the yoke material 200 are fixed to the wall span, and the drop head support 300 is detached from the lower support so that the slide guide beam 210 can be inserted. It is composed of

상기 장선재(100)는 단면이 I 형상으로, 알루미늄 또는 철제를 사용하여 소정의 길이로 공장에서 미리 제작되어지며, 상기 멍에재(200)와 직각으로 만나게 되는 교점에서 장선재 고정장치로 상기 멍에재(200)와 일체로 위치고정된다. The joist material 100 is a cross-section is I-shaped, pre-fabricated in the factory using a predetermined length of aluminum or iron, and the yoke material as the joist material fixing device at the intersection that meets at right angles to the yoke material (200) 200) and are fixed in one piece.

도 3은 본 발명에 의한 장선재 고정장치(500)가 시공된 상태를 나타내는 시공사시도로서, 상기 장선재 고정장치(500)는 상기 장선재(100)와 멍에재(200)를 일체로 고정시켜 상부의 하중을 균일하게 하부로 전달하는 역할을 하게 된다.3 is a constructional view showing a state in which the wire rod fixing device 500 according to the present invention is constructed, the wire rod fixing device 500 is fixed to the wire rod 100 and the yoke material 200 integrally to load the upper It is to serve to uniformly lower the.

도면에 도시된 바와 같이, 상기 장선재 고정장치(500)는 중앙에 나사통공이 형성되고, 양측단부에는 원통형의 연결부(511)가 형성된 본체(510)와, 상기 연결부(511)에 삽지되어 회전작동하며, 상기 장선재(100)에 걸쳐질 수 있도록 양끝단부에는 걸침턱(521)이 형성된 ㄷ자 형상의 고정다리(520)와, 상기 본체(510)의 나사통공에 나사결합되며, 상하로 승강조절하여 상기 멍에재(200)와 장선재(100)를 긴결시키는 조절손잡이(530)를 구비한다.As shown in the drawing, the wire rod fixing device 500 has a screw hole formed in the center, and the main body 510 formed with a cylindrical connecting portion 511 at both ends, and is inserted into the connecting portion 511 and rotated to operate. And, it is coupled to the threaded hole of the U-shaped fixed leg 520 and the main body 510, the stepped jaw 521 is formed at both ends so as to span the Jangjae 100, and adjusts up and down It is provided with a control knob 530 for coupling the yoke material 200 and the Jang Sunjae 100.

상기 멍에재(200)는 도 4 및 도 5에 도시한 바와 같이, 상기 슬라이드 가이드빔(210)이 삽입되어 질 수 있도록, 단면이 ㅂ형상으로 속이 빈 알루미늄 또는 철제로 제조되어 지며, 상기 슬라이드 가이드빔(210)이 삽입되어지는 양 끝단부의 소정 위치에는 일정간격으로 다수의 삽입홀(201)이 형성된다.4 and 5, the yoke material 200 is made of hollow aluminum or iron in a cross-sectional shape so that the slide guide beam 210 can be inserted, the slide guide A plurality of insertion holes 201 are formed at predetermined intervals at predetermined positions of both ends into which the beam 210 is inserted.

이때, 상기 슬라이드 가이드빔(210)은, 박스형상으로 상기 멍에재(200)의 삽입홀(201)에 대응하여 양측면에 다수의 고정홀(212)이 형성되어 고정핀(202)으로 고정되는 슬라이드부(211)와, 상기 슬라이드부(211)와 일체로 연결되며, 상기 벽체 거푸집 지지틀(400)에 걸쳐지는 ㄷ형상의 걸침부(213)로 구성된다.At this time, the slide guide beam 210, a box-shaped slide in which a plurality of fixing holes 212 are formed on both sides corresponding to the insertion hole 201 of the yoke material 200 is fixed with a fixing pin 202 The unit 211 and the slide unit 211 are integrally connected to each other, and a c-shaped hanging portion 213 spans the wall formwork support frame 400.

상기 드롭헤드 서포트(300)는 도 6에 도시된 바와 같이, 크게 드롭헤드(310)와 일반서포트(320)로 구분되어지며, 상기 드롭헤드(310)는 거푸집 합판을 지지하기 위한 지지부(311)와, 중앙의 나선공(314)에 연결되어 상기 멍에재(200)의 양측 단부를 파지하기 위한 ㄷ자 형상의 상 · 하부 플레이트(312, 313)와, 상기 하부 플레이트(313)의 하부로 나선공에 나사결합되는 링형너트(315), 및 상기 나선공(314)의 최하단부에 용접되어 일반 서포트(320)에 삽입고정되는 접지플레이트(316)로 구성된다.As shown in FIG. 6, the drop head support 300 is largely divided into a drop head 310 and a general support 320, and the drop head 310 supports the formwork plywood 311. And a c-shaped upper and lower plates 312 and 313 connected to a central spiral hole 314 to grip both ends of the yoke material 200, and a spiral hole below the lower plate 313. Ring-type nut 315 is screwed into the, and the ground plate 316 welded to the lower end of the spiral hole 314 is inserted into the general support 320 is fixed.

이때, 상기 멍에재(200)의 연결 또는 해체는, 상기 하부 플레이트(313)의 하부에 있는 링형너트(315)를 승하강시켜 상기 상 · 하부 플레이트(312, 313)의 간격을 조절함으로써 가능하게 된다.At this time, the yoke member 200 can be connected or dismantled by adjusting the distance between the upper and lower plates 312 and 313 by raising and lowering the ring-shaped nut 315 under the lower plate 313. do.

이하, 본 발명의 일실시예에 의한 시공방법을 구체적으로 살펴보면 다음과 같다.Hereinafter, looking at the construction method according to an embodiment of the present invention in detail.

본 발명의 실시는, 먼저 기설치된 타설완료층에서 일정한 길이를 갖는 다수개의 멍에재(200)를 소정의 길이에 맞게 드롭헤드(310) 부분에 연결하고, 연결된 멍에재(200)의 양끝에는 벽체거푸집 거치용 슬라이드 가이드빔(210)을 상기 멍에재(200)에 삽입하고 고정핀(202)으로 고정하여 멍에재를 조립한다. The implementation of the present invention, first, a plurality of yoke material 200 having a predetermined length in the pre-installed finishing layer is connected to the drop head 310 portion to fit a predetermined length, and both ends of the yoke material 200 connected to the wall Insert the slide guide beam 210 for the formwork to the yoke material 200, and fixed with a fixing pin 202 to assemble the yoke material.

상기 조립된 멍에재(200)는 인양하여 양쪽 벽체 거푸집 지지틀(400)에 거치한 후, 상기 슬라이드 가이드빔(210)을 슬라이드시켜 유격을 조절하고, 상기 드롭헤드(310) 하부로 일반서포트(320)를 수직으로 설치하여 상기 멍에재를 지지한다. The assembled yoke material 200 is lifted and mounted on both wall formwork supporting frames 400, and then slides the slide guide beam 210 to adjust the clearance, and the general support (under the drop head 310) 320 is installed vertically to support the yoke material.

이렇게 하여 다수개의 멍에재(200)와 드롭헤드 서포트(300)의 설치가 끝나면 그 위에 소정의 길이로 미리 공장에서 제작된 장선재(100)를 일정 간격으로 멍에재(200) 위에 가로질러 설치하고, 상기 멍에재(200)와 장선재(100)를 장선재 고정장치(500)로 긴결한다.  In this way, after the installation of the plurality of yoke material 200 and the drop head support 300 is installed over the yoke material 200 at a predetermined interval there is a pre-fabricated Jangsunjae 100 at a predetermined length thereon, The yoke material 200 and the Jang Sunjae 100 is tightly connected to the Jang Sunjae fixing device 500.

이와 같은 방법으로 다수개의 정선재(100)의 설치가 끝나면 상기 장선재(100) 위에 합판(그림 미도시)을 깔고 장선재(100)와 합판을 못으로 고정하여 설치를 완료한다.After the installation of a plurality of the Jeong Seonjae 100 in this manner is laid on the plywood (not shown) on the Jang Seonjae 100, and fixed the Jang Seonjae 100 and plywood with a nail to complete the installation.

콘크리트를 타설하고 슬래브가 성형된 후, 슬래브 거푸집의 탈형은, 멍에재(200)의 양끝단에 장착된 벽체거푸집 거치용 슬라이드 가이드빔(210)의 고정핀(202)을 빼서 상기 슬라이드 가이드빔(210)이 멍에재(200) 안으로 삽입되도록 한다.After the concrete is poured and the slab is molded, the slab formwork is removed by removing the fixing pins 202 of the slide guide beam 210 for mounting the wall formwork mounted on both ends of the yoke material 200. 210 is inserted into the yoke material 200.

이후, 드롭헤드 서포트(300)의 링형너트(315)를 하강조절하여 상기 상 · 하부 플레이트(312, 313) 및 멍에재(200) 사이에 일정 공간이 형성되도록 긴결상태를 풀고, 슬래브 콘크리트의 소정 강도 발현시까지 지지하여야 하는 슬래브 중앙부위의 드롭헤드 서포트(300)를 제외한 나머지 드롭헤드 서포트(300)들을 해체한다. Thereafter, the ring head nut 315 of the drop head support 300 is adjusted downward to loosen the tightness state so that a predetermined space is formed between the upper and lower plates 312 and 313 and the yoke material 200, and predetermined slab concrete is formed. The remaining drophead supports 300 are dismantled except for the drophead support 300 at the center portion of the slab, which should be supported until the strength is developed.

드롭헤드 서포트(300)를 해체한 후 장선재와 멍에재 및 합판을 순서대로 해체한다. 이때에 중앙부에 위치한 드롭헤드 서포트(300)는 슬래브 콘크리트의 소정 강도 발현시까지 지지하도록 하여, 종래 필러 서포트의 기능을 하게 된다.After dismantling the drophead support 300, the disassembly of the Jangsunjae, yoke and plywood in order. At this time, the drop head support 300 located in the center portion is to be supported until the predetermined strength of the slab concrete, thereby functioning as a conventional pillar support.

상기와 같이 본 발명은, 슬라브 거푸집을 설치함에 있어, 멍에재를 드롭헤드 서포트로 간단히 연결하고, 멍에재의 양끝단부에는 벽체거푸집 거치용 슬라이드 가이드빔을 장착함으로써, 멍에재의 조립 및 해체가 간단할 뿐만 아니라. 그 위에 바로 별도의 가공없이 장선재를 설치할 수 있어 조립생산성을 향상시킬 수 있는 효과가 있다.As described above, the present invention, in installing the slab formwork, simply connect the yoke material to the drophead support, and by mounting the slide guide beam for mounting the wall formwork at both ends of the yoke material, the assembly and disassembly of the yoke material is simple. not. There is an effect that can improve the assembly productivity can be installed on the wire rod without additional processing directly thereon.

또한, 드롭헤드 서포트를 설치함으로써 종래의 필러 서포트를 별도로 설치할 필요가 없어 시공능률을 향상시키고, 하부에 여러 개의 서포트가 배치되던 것을 줄일 수 있게 되어, 운반이나 후속공정을 수행하기 위한 충분한 공간을 확보할 수 있게 된다. In addition, by installing the drophead support, there is no need to install a conventional filler support separately, thereby improving construction efficiency and reducing the number of support arrangements at the bottom, thereby ensuring sufficient space for carrying or carrying out subsequent processes. You can do it.

또한 각재 등이 불필요하며, 수회 반복 사용이 가능하여 자재비를 절감할 수 있는 효과뿐만 아니라 자원 절약의 효과가 있다In addition, it is not necessary to be angular materials, and can be used several times repeatedly, which not only saves material costs but also saves resources.

Claims (6)

삭제delete 삭제delete 삭제delete 슬래브 거푸집 시스템에 있어서, In the slab formwork system, 슬래브 거푸집 합판을 지지하는 장선재와,Jang Sun-jae supporting the slab formwork plywood, 상기 장선재의 하부에 직교방향으로 설치되며, 그 양끝단부에는 벽체 거푸집 지지틀에 거치될 수 있도록 슬라이드 가이드빔이 슬라이드 삽입되는 멍에재, 및It is installed in the orthogonal direction to the lower portion of the joist, the yoke material is inserted into the slide guide beam slides so that both ends are mounted on the wall formwork support frame, and 상기 멍에재를 벽체 스팬에 맞게 연결고정하며, 하부 서포트에 탈부착되는 드롭헤드 서포트를 구비하되, Fixing the yoke material to fit the wall span, and provided with a drop head support detachable to the lower support, 상기 드롭헤드 서포트는The drophead support 상부로는 거푸집 합판 지지부가 용접되고 하부로는 나선공이 용접된 상부 플레이트와,An upper plate welded to the formwork plywood support at the top and a spiral hole at the bottom; 상기 나선공에 삽지되며, 상기 상부 플레이트와의 사이에 연결될 멍에재의 양측단부를 파지하는 하부 플레이트와,A lower plate inserted into the spiral hole and holding both ends of the yoke material to be connected between the upper plate and the upper plate; 상기 나선공과 나사결합하며, 상기 하부 플레이트를 하부에서 승강조절하는 링형너트와,A ring nut that is screwed with the spiral hole and adjusts the lower plate in a lower portion, 상기 나선공의 최하단부에 용접되며, 일반 서포트에 삽입고정되는 접지플레이트를 구비하는 것을 특징으로 하는 슬래브 거푸집 시스템.A slab formwork system welded to the lowest end of the spiral hole and having a ground plate inserted into and fixed to a general support. 슬래브 거푸집 시스템에 있어서, In the slab formwork system, 슬래브 거푸집 합판을 지지하는 장선재와,Jang Sun-jae supporting the slab formwork plywood, 상기 장선재의 하부에 직교방향으로 설치되며, 그 양끝단부에는 벽체 거푸집 지지틀에 거치될 수 있도록 슬라이드 가이드빔이 슬라이드 삽입되는 멍에재, 및It is installed in the orthogonal direction to the lower portion of the joist, the yoke material is inserted into the slide guide beam slides so that both ends are mounted on the wall formwork support frame, and 상기 멍에재를 벽체 스팬에 맞게 연결고정하며, 하부 서포트에 탈부착되는 드롭헤드 서포트를 구비하되, Fixing the yoke material to fit the wall span, and provided with a drop head support detachable to the lower support, 상기 장선재는 The Jang Sunjae 알루미늄제 또는 철제로 미리 공장 제작되어지며, 상기 멍에재와 직각으로 만나게 되는 교점에 장선재 고정장치로 위치고정할 수 있도록 단면이 I 형상으로 형성되고, Prefabricated factory made of aluminum or iron, the cross section is formed in I shape so that it can be fixed by the long wire rod fixing device at the intersection where it meets at right angles to the yoke material, 상기 장선재 고정장치는The wire rod fixing device is 중앙에 나사통공이 형성되고, 양측단부에는 원통형의 연결부가 형성된 본체와,A screw hole is formed in the center, and both ends of the main body is formed with a cylindrical connection portion, 상기 연결부에 삽지되어 회전작동하며, 상기 장선재에 걸쳐질 수 있도록 양끝단부에는 걸침턱이 형성된 ㄷ자 형상의 고정다리와,Inserted into the connecting portion is rotated to operate, and the c-shaped fixed leg with a stepped jaw is formed at both ends so as to span the joists, 상기 본체의 나사통공에 나사결합되며, 상하로 승강조절하여 멍에재와 장선재를 긴결시키는 조절손잡이를 구비하는 것을 특징으로 하는 슬래브 거푸집 시스템.The slab formwork system is screwed to the threaded through-hole of the main body, and provided with an adjusting knob for tightening the up and down yoke material and the joist wire. 삭제delete
KR1020030033296A 2003-05-26 2003-05-26 Slab Form System KR100558596B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030033296A KR100558596B1 (en) 2003-05-26 2003-05-26 Slab Form System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030033296A KR100558596B1 (en) 2003-05-26 2003-05-26 Slab Form System

Publications (2)

Publication Number Publication Date
KR20040101625A KR20040101625A (en) 2004-12-03
KR100558596B1 true KR100558596B1 (en) 2006-03-13

Family

ID=37378293

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030033296A KR100558596B1 (en) 2003-05-26 2003-05-26 Slab Form System

Country Status (1)

Country Link
KR (1) KR100558596B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100788740B1 (en) 2007-03-15 2007-12-26 (주) 콘스텍 Coupling structure of dek for multistage slab execution using hanger
KR200469870Y1 (en) * 2013-03-13 2013-11-11 김진태 Joist and yoke fastening device
KR101514891B1 (en) 2013-09-30 2015-04-23 인하대학교 산학협력단 Structure of slab forms

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720355A (en) * 2012-06-01 2012-10-10 中建三局建设工程股份有限公司 Novel steel truss concrete slab form support system
CN106337559B (en) * 2016-10-13 2019-01-18 中国建筑股份有限公司 The morning of formwork-support tears support system and its application method open
KR101979745B1 (en) * 2017-12-22 2019-05-17 주식회사 포스코 Apparatus for supporting a formwork of floor concrete
CN111502254A (en) * 2019-01-30 2020-08-07 河南天丰绿色装配集团有限公司 Hanging type formwork support-free frame for construction of beam system steel structure floor slab
CN111502252B (en) * 2019-01-30 2022-04-19 河南天丰钢结构建设有限公司 Hanging type formwork-supporting-free system for beam system steel structure building floor and construction method
CN111502253A (en) * 2019-01-30 2020-08-07 河南天丰绿色装配集团有限公司 Jacking type formwork-supporting-free system for beam-concentrating system steel structure building floor and construction method
CN111058621B (en) * 2019-12-26 2024-06-04 江苏恒桂创科建筑工程科技有限公司 Early system of tearing open of floor template support-free
KR102260523B1 (en) * 2020-11-05 2021-06-03 (주)유니언이엔지 Support having pin holes
CN112854746A (en) * 2021-01-13 2021-05-28 北京拓翌建筑工程有限责任公司 Inverted hanging type supporting system for steel truss floor support plate and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100788740B1 (en) 2007-03-15 2007-12-26 (주) 콘스텍 Coupling structure of dek for multistage slab execution using hanger
KR200469870Y1 (en) * 2013-03-13 2013-11-11 김진태 Joist and yoke fastening device
KR101514891B1 (en) 2013-09-30 2015-04-23 인하대학교 산학협력단 Structure of slab forms

Also Published As

Publication number Publication date
KR20040101625A (en) 2004-12-03

Similar Documents

Publication Publication Date Title
KR100558596B1 (en) Slab Form System
KR20190008053A (en) An assembly type supporting beam mold using form-panel, and method for constructing this same
KR100769999B1 (en) Improved support, self-supported improved support and system form using the same
KR200326555Y1 (en) Drop-head support
EP1561874A1 (en) Connecting device and node for buildings with prefabricated elements
KR100946192B1 (en) Apparatus for removing and coupling forms
KR20070027432A (en) A fastener for fixing a reinforcing bar assembly, a mold panel, and a ceiling panel by fixing pin
KR20100123231A (en) Slid type mold panel easy construction and dismantle
KR200182815Y1 (en) an apparatus for constructing the floor horizontally
KR20090124721A (en) An assembling structure of building frame and construction method thereof
KR200298117Y1 (en) framable set mold for construction
KR102361789B1 (en) Supporter for installating horizontal member of supporting system
KR100361047B1 (en) Construction mold
KR20070073022A (en) Concrete mold for slab and construction method of slab using the same
KR200430300Y1 (en) Supporter suitable to matrix for slab using structure
KR200238510Y1 (en) Spacer supporting steel in steel concrete used in construction
JP2002339496A (en) Construction method of slab and construction method of ceiling
KR100840279B1 (en) Suspension hanger for slab form
JP2654935B2 (en) Construction method of ribbed slab and spacer for rib reinforcement
KR200292762Y1 (en) The fixers of a central supporting bar to construct Al-forms for a wall
KR102150222B1 (en) Truss support and formwork using same
KR0145358B1 (en) Method of building slabs
KR101576224B1 (en) Prefabricated precast concrete girder for building construction
KR200322141Y1 (en) Temporary apparatus support structure for pier of bridge
KR200172618Y1 (en) Panel brazing bracket for supporting bar constructing ceiling using concrete construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee