KR100540079B1 - Sea water seal apparatus for a vessel discharge pipe or vent hole - Google Patents
Sea water seal apparatus for a vessel discharge pipe or vent hole Download PDFInfo
- Publication number
- KR100540079B1 KR100540079B1 KR1020050054871A KR20050054871A KR100540079B1 KR 100540079 B1 KR100540079 B1 KR 100540079B1 KR 1020050054871 A KR1020050054871 A KR 1020050054871A KR 20050054871 A KR20050054871 A KR 20050054871A KR 100540079 B1 KR100540079 B1 KR 100540079B1
- Authority
- KR
- South Korea
- Prior art keywords
- hole
- vent hole
- blocking
- discharge pipe
- seawater
- Prior art date
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
- B63B17/0027—Tanks for fuel or the like ; Accessories therefor, e.g. tank filler caps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B13/00—Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
- B63B17/0018—Arrangements or devices specially adapted for facilitating access to underwater elements, e.g. to propellers ; Externally attached cofferdams or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B43/00—Improving safety of vessels, e.g. damage control, not otherwise provided for
- B63B43/02—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking
- B63B43/10—Improving safety of vessels, e.g. damage control, not otherwise provided for reducing risk of capsizing or sinking by improving buoyancy
- B63B43/16—Temporary equipment for stopping leaks, e.g. collision mats
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/40—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods
- B63B73/49—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by joining methods by means of threaded members, e.g. screws, threaded bolts or nuts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B81/00—Repairing or maintaining vessels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63J—AUXILIARIES ON VESSELS
- B63J2/00—Arrangements of ventilation, heating, cooling, or air-conditioning
- B63J2/02—Ventilation; Air-conditioning
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01F—MAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
- H01F7/00—Magnets
- H01F7/02—Permanent magnets [PM]
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B13/00—Conduits for emptying or ballasting; Self-bailing equipment; Scuppers
- B63B2013/005—Sea chests
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B17/00—Vessels parts, details, or accessories, not otherwise provided for
- B63B2017/0045—Caps, hoods, or the like devices for protective purposes, not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2231/00—Material used for some parts or elements, or for particular purposes
- B63B2231/02—Metallic materials
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2231/00—Material used for some parts or elements, or for particular purposes
- B63B2231/30—Magnetic materials
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B2231/00—Material used for some parts or elements, or for particular purposes
- B63B2231/40—Synthetic materials
- B63B2231/42—Elastomeric materials
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Power Engineering (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Pipe Accessories (AREA)
Abstract
본 발명은 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치에 관한 것으로, 보다 상세히는 핸들 조작에 의해 상하 이동되는 막음구에 의해 선체의 벤트홀 또는 디스차지 관으로부터 유입되는 해수를 차단하여 선체 내의 장치 및 배관 교체 또는 수리 작업이 용이하도록 한 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치에 관한 것이다.The present invention relates to a seawater inflow blocking device of a vent hole or discharge pipe for ships, and more specifically, to block the seawater flowing from the vent hole or discharge pipe of the hull by the blocking port which is moved up and down by the handle operation in the hull The present invention relates to a device for preventing the inflow of seawater in a ship vent hole or discharge pipe for facilitating replacement of equipment and piping.
본 발명은, 선체의 벤트홀 또는 디스차지 관을 밀폐하여 해수 유입을 차단하는 선박용 디스차지 관의 해수 유입구 막음 장치에 있어서, 상기 벤트홀 또는 디스차지 관보다 큰 면적을 가지는 탄성재질의 패킹과, 상기 패킹의 형상에 대응되는 금속재질의 커버로 이루어진 막음구, 내측 둘레를 따라 나사산이 형성된 관통 결합구가 중심부에 돌출형성되는 소정형상의 기판과, 상기 기판의 가장자리를 따라 복수개 구비되어 상기 막음구 가장자리의 외측에 배치되는 지지대와, 상기 지지대 단부에 결합되어 선체에 부착되는 영구자석으로 이루어진 지지구 및 상기 관통 결합구와 나사결합으로 상하 이동하며 하단부가 상기 막음구와 결합되는 볼트 형상의 로드와, 상기 로드 상단부에 구비된 핸들로 이루어진 압착구로 구성되어, 상기 핸들의 조작에 의하여 막음구가 상하 이동가능하게 되는 것을 특징으로 한다.The present invention, the seawater inlet port blocking device of the discharge pipe for ships to seal the vent hole or the discharge pipe of the hull to block the inflow of seawater, the packing of the elastic material having a larger area than the vent hole or discharge pipe, Blocking port made of a metal cover corresponding to the shape of the packing, a predetermined shape of the substrate formed through the threaded through-hole is formed protruding in the center and a plurality of the block along the edge of the substrate A support rod disposed on an outer side of the edge, a support made of a permanent magnet coupled to the end of the support, and a bolt-shaped rod moving up and down by screwing with the through coupling hole and having a lower end coupled with the blocking hole; Consists of a pressing hole made of a handle provided on the rod upper end, by the operation of the handle The blocking port is characterized in that it is movable up and down.
선박, 디스차지 관, 벤트홀, 해수, 막음구, 지지구, 압착구 Vessel, discharge pipe, vent hole, sea water, blocking hole, support hole, crimp hole
Description
도 1은 종래 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음구의 실시예를 나타낸 개념도1 is a conceptual diagram showing an embodiment of the seawater inlet blocking port of the conventional vessel vent hole or discharge tube
도 2는 도 1에 따른 종래 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음구의 전체적인 구성을 나타낸 개념도2 is a conceptual diagram showing the overall configuration of the seawater inlet blocking port of the conventional ship vent hole or discharge tube according to FIG.
도 3는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 전체적인 구성을 나타낸 사시도Figure 3 is a perspective view showing the overall configuration of the seawater inlet blocking device of the ship vent hole or discharge pipe according to the present invention
도 4는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 설치 실시예를 나타낸 개념도Figure 4 is a conceptual diagram showing an embodiment of the installation of the seawater inlet blocking device of the ship vent hole or discharge pipe according to the present invention
도 5는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 작동 실시예를 나타낸 개념도Figure 5 is a conceptual diagram showing an embodiment of the operation of the seawater inlet blocking device for vent holes or discharge pipe for ships according to the present invention
*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
10...막음구 11...패킹10 ...
12...커버 20...지지구12
21...관통 결합구 23...기판21 ... through
25...지지대 27...영구자석25
30...압착구 31...로드30 ...
33...핸들33.Handle
본 발명은 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치에 관한 것으로, 보다 상세히는 선체 내의 교체, 수리 등 제반 작업이 요구될 때 선박을 도크에 진입시키거나 대차에 올리는 번거로움없이 벤트홀 또는 디스차지 관을 간단한 조작만으로 상하 이동되는 막음구로 밀폐하여 교체, 수리 등 제반 작업이 원활하게 이루어지도록 한 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치에 관한 것이다.The present invention relates to a device for preventing the inflow of seawater in a ship vent hole or a discharge pipe, and more specifically, a vent hole or a hassle without the hassle of entering a vessel into a dock or loading a vehicle when various operations such as replacement and repair in a hull are required The present invention relates to a seawater inflow blocking device of a ship vent hole or a discharge pipe, in which a discharge pipe is sealed with a blocking port that is moved up and down by a simple operation so that various operations such as replacement and repair can be performed smoothly.
도 1은 종래 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음구의 실시예를 나타낸 개념도이다.1 is a conceptual view showing an embodiment of the seawater inlet blocking port of a conventional ship vent hole or discharge tube.
도시된 바와 같이 선박이 물에 잠기는 부분의 선수부터 선미에 이르기까지 선체(1)의 측면에 형성되는 시-체스트(5) 및 해수탱크(8)의 벽면에는 각각 다수개의 벤트홀(2, vent hole) 및 디스차지 관(7', discharge pipe)이 형성되며, 여기에 각종 밸브(6) 또는 펌프(7) 등의 장치가 연결된다.As shown, a plurality of vent holes (2, vent) are formed on the wall surfaces of the sea-chest (5) and the seawater tank (8) formed on the side of the hull (1) from the bow to the stern of the ship submerged. holes) and discharge pipes 7 'are formed, and devices such as
도 1에서 설명되지 않은 부호로, 3은 맨홀이며, 4는 격벽을 나타내고 있다.3 is a manhole and 4 has a partition which is not demonstrated in FIG.
장시간 운항시 해수의 유출입에 의해 상기 벤트홀(2), 디스차지 관(7'), 밸브(6) 및 펌프(7)에 부식이 발생하거나 상기 벤트홀(2) 및 디스차지 관(7') 내 또 는 입구에 따개비같은 해양 부착생물이 부착하여 막힘 현상 등이 나타나게 되므로 교체, 수리 등 제반 작업을 해 줄 필요가 있다.During long periods of time, corrosion of the
이 경우 선박을 조선소의 도크로 진입시키거나 대차 위에 올린 후 해수탱크(8) 안의 해수를 배출시킨 후 작업을 하는 것이 가장 바람직하지만, 운행 스케쥴이나 경제적 여건 등으로 선박을 조선소에 올리지 못할 경우가 종종 발생된다.In this case, it is most preferable to enter the ship into the dock of the shipyard or put it on the bogie, and then discharge the seawater in the seawater tank (8), but it is often impossible to bring the ship to the shipyard due to operational schedules or economic conditions. Is generated.
이때는 부득이 선박을 물 위에 띄운 상태에서 작업을 해야하는데, 시-체스트(5)에는 압력을 가진 해수가 항상 충진되어 있어서 밸브(6), 펌프(7) 또는 각종 배관을 분리할 경우 해수가 해수탱크(8) 내로 순식간에 유입되게 된다.In this case, it is inevitable to work while the ship floats on the water. The sea chest with pressure is always filled in the sea chest (5). When the valve (6), the pump (7) or various pipes are separated, the seawater tank (8) It is flowed into in a moment.
이 때문에 올바른 작업을 하기가 힘들고 작업 능률이 크게 저하될 뿐만 아니라 작업자가 위험에 노출되어 안전사고가 발생될 가능성이 높아진다.This makes it difficult to do the right job, greatly reduces work efficiency, and increases the likelihood that a worker may be exposed to a risk and cause a safety accident.
도 2는 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음구의 전체적인 구성을 나타낸 개념도이다.2 is a conceptual diagram showing the overall configuration of the seawater inlet blocking port of the ship vent hole or discharge pipe.
도시된 바와 같이, 해수 유입 막음구(90)는 고무 등과 같은 탄성재질의 패킹(91)과 금속재질의 링볼트(92)로 이루어진 간단한 구성으로, 상기 패킹(91)은 단부로 갈수록 내측으로 테이퍼진 형상이다.As shown, the seawater inlet blocking 90 is a simple configuration consisting of an
상기 패킹(91)은 선체(1)의 밴트홀(2) 및 디스차지 관(7') 지름에 맞는 다양한 사이즈로 제작되고, 도 1과 같이 상기 밴트홀(2) 또는 디스차지 관(7') 입구를 밀폐하여 교체, 수리 등 제반 작업을 실시하게 된다.The
그러나, 상기 밴트홀(2) 및 디스차지 관(7') 입구는 산소 토치 등에 의한 구멍 가공으로 형성되므로, 상기 밴트홀(2) 및 디스차지 관(7')의 내측 둘레에는 매 끄럽지 못하고 거친 면이 발생하게 되며 줄 가공등으로 다듬질을 하더라도 상기 패킹(91)의 경사면 형상에 대응되게 밀착되는 매끄러운 면을 얻을 수가 없다.However, since the inlet of the
그 결과, 상기 밴트홀(2) 또는 디스차지 관(7')과 패킹(91) 사이의 틈새로 누수가 발생하게 되어, 외부로부터 유입되는 해수 때문에 원활한 작업을 수행하기 힘들게 된다.As a result, leakage occurs in the gap between the
따라서, 상기 밴트홀(2) 및 디스차지 관(7')의 해수 유입을 차단하여 확실한 기밀 유지가 가능함은 물론, 선체(1) 내의 교체, 수리 등 제반 작업을 용이하게 할 수 있도록 하는 장치의 개발이 절실하다고 하겠다.Therefore, by blocking the inflow of the seawater of the vent hole (2) and the discharge pipe (7 '), it is possible to maintain a tight air tightness, as well as to facilitate the overall operation, such as replacement, repair, etc. in the hull (1) Development is urgent.
본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 교체, 수리 등 제반 작업에 필요한 번거로운 사전 준비가 필요없이 수중에서 간단히 선체의 벤트홀 또는 디스차지 관으로부터 유입되는 해수를 차단하여 확고한 기밀을 유지하고 작업자의 작업이 용이하도록 하는 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치를 제공하고자 하는데 목적이 있다.The present invention has been made to solve the above problems, it is possible to simply block the seawater flowing from the vent hole or discharge pipe of the hull in the water without the need for cumbersome preliminary work, such as replacement, repair, etc. It is an object of the present invention to provide a device for preventing the inflow of seawater in a ship vent hole or a discharge pipe for maintaining and facilitating a worker's work.
상기 목적을 달성하기 위한 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치는, 선체의 벤트홀 또는 디스차지 관을 밀폐하여 해수 유입을 차단하는 선박용 디스차지 관의 해수 유입구 막음 장치에 있어서, 상기 벤트홀 또는 디스차지 관보다 큰 면적을 가지는 탄성재질의 패킹과, 상기 패킹의 형상에 대응되는 금속재질의 커버로 이루어진 막음구, 내측 둘레를 따라 나사산이 형성된 관통 결합구가 중심부에 돌출형성되는 소정형상의 기판과, 상기 기판의 가장자리를 따라 복수개 구비되어 상기 막음구 가장자리의 외측에 배치되는 지지대와, 상기 지지대 단부에 결합되어 선체에 부착되는 영구자석으로 이루어진 지지구 및 상기 관통 결합구와 나사결합으로 상하 이동하며 하단부가 상기 막음구와 결합되는 볼트 형상의 로드와, 상기 로드 상단부에 구비된 핸들로 이루어진 압착구로 구성되어, 상기 핸들의 조작에 의하여 막음구가 상하 이동가능하게 되는 것을 특징으로 한다.Seawater inlet blocking device of the ship vent hole or discharge pipe according to the present invention for achieving the above object, the seawater inlet blocking device of the discharge pipe for ships to block the seawater inlet by sealing the vent hole or discharge pipe of the hull In the present invention, an elastic packing having an area larger than that of the vent hole or the discharge tube, a blocking hole made of a metal cover corresponding to the shape of the packing, and a through coupling hole formed with a thread along an inner circumference protrude in the center portion thereof. A support formed of a predetermined shape substrate, a plurality of supports provided along the edge of the substrate and disposed outside the edge of the blocking hole, a support made of a permanent magnet coupled to the end of the support and attached to the hull; A bolt-shaped rod that moves up and down by screwing and is coupled to the blocking hole at a lower end thereof; Group consists of port crimp made of a handle provided on the rod upper end, characterized in that the blocking sphere, by operation of the handle which is movable up and down.
이하, 본 발명에 따른 바람직한 실시예에 대하여 첨부된 도면을 참조하여 상세히 설명하기로 한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 3는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 전체적인 구성을 나타낸 사시도이다.Figure 3 is a perspective view showing the overall configuration of the seawater inlet blocking device of the ship vent hole or discharge pipe according to the present invention.
도 3에 도시된 바와 같이 본 발명은, 크게 막음구(10), 지지구(20) 및 압착구(30)로 구성된다.As shown in FIG. 3, the present invention is largely composed of a
도 3에서 설명되지 않은 부호로, 1은 선체를 나타내고 있다.The code | symbol which is not demonstrated in FIG. 3 has shown 1 to a hull.
상기 막음구(10)는 벤트홀(2, 도 1 참고) 또는 디스차지 관(7', 도 1 참고)보다 큰 면적을 가지는 것으로 내구성 및 내 해수성이 뛰어난 재질로 이루어지도록 하며, 크게 패킹(11)과 커버(12)의 이중 구조로 구성된다.The
상기 패킹(11)은 합성고무, 특히 이피디엠(EPDM:ethylene propylene rubber) 등과 같은 탄성재질로 제작되어 후술할 압착구(30)의 하강에 의하여 상기 벤트홀(2) 또는 디스차지 관(7') 입구에 밀착되어 해수 유입을 차단하고 기밀을 유지하는 역할을 담당하게 된다.The
상기 커버(12)는 상기 패킹(11)의 형상에 대응되는 것으로 패킹(11)의 상부에 접착, 나사 결합 등의 방법으로 결합되며 후술할 압착구(30)와 결합되어 상기 패킹(11)을 벤트홀(2) 또는 디스차지 관(7')에 밀착시켜 압착되도록 함과 동시에, 외부충격 및 마모로부터 패킹(11)이 보호되도록 하는 역할을 담당하게 된다.The
상기 지지구(20)는 크게 관통 결합구(21)가 구비된 기판(23)과, 상기 기판(23) 가장자리에 구비된 지지대(25) 및 상기 지지대(25) 단부에 결합된 영구자석(27)으로 이루어진다.The
상기 기판(23)의 중심부에는 내측 둘레를 따라 나사산이 형성되어 후술할 압착구(30)와 나사결합에 의하여 상하이동을 하게 되는 관통 결합구(21)가 돌출형성된다.A screw thread is formed along the inner circumference of the
여기서, 상기 관통 결합구(21)는 도시된 바와 같이 상부측 일부분에만 나사산을 형성하거나, 전체에 나사산을 형성하여 실시될 수 있음은 물론이다.Here, the through
상기 기판(23)은 상기 막음구(10) 가장자리에 배치되는 지지대(25) 및 영구자석(27)이 상기 막음구(10)와 겹치지 않을 정도의 크기와 형상으로 되도록 하며, 본 발명에서는 도 3과 같이 상기 기판(23)의 안정적인 지지가 가능하도록 삼각형상으로 구성되도록 하며, 기타 사각형상이나 원형상 등 다양한 형상으로의 구성도 가능하다.The
상기 지지대(25)는 상기 기판(23)의 가장자리, 즉 삼각형상의 각 꼭지점 부에 배치되는 것이며, 본 발명에서는 상기 기판(23)의 각 꼭지점 부에 제1 고정구(22)로 결합된 연결편(24)의 양단부에 제2 고정구(26)로 각각 결합된다.The
상기 지지대(25)는 막음구(10)의 두께와 상기 막음구(10)의 상하이동에 따른 위치이동 시 선체(1)와 상기 기판(23) 사이에 충분한 공간을 확보하여 이격될 수 있는 정도의 길이로 형성되도록 한다.The
상기 영구자석(27)은 상기 연결편(24)에 결합된 지지대(25)의 단부에 결합되어 선체(1)에 부착되는 것으로, 상기 막음구(10)에 의해 상기 벤트홀(2) 또는 디스차지 관(7')을 밀폐하기 전에 안정적인 위치를 잡아주기 위한 역할을 담당하게 된다.The
선체(1)에 부착되는 상기 영구자석(27)은 상기 막음구(10) 및 지지구(20)의 하중을 견딜 수 있는 정도의 자력을 지니면서도 교체, 수리 등 제반 작업 완료 시 상기 선체(1)로부터 용이하게 해제될 수 있을 정도의 자력을 지닌 것이 채택되는 것이 바람직하다.The
상기 압착구(30)는 크게, 로드(31) 및 핸들(33)로 구성된다.The
머리부(32)가 구비된 볼트 형상의 상기 로드(31)는 관통 결합구(21)와 나사 결합으로 상하 이동하며 상기 머리부(32) 반대측의 하단부가 상기 막음구(10), 더욱 자세히는 상기 커버(12)의 중심부와 결합되어, 상기 막음구(10)가 벤트홀(2) 또는 디스차지 관(7')에 압착되도록 하는 역할을 담당하게 된다.The bolt-
상기 핸들(33)은 로드(31)의 머리부(32)측에 너트(34)로 고정되며, 상기 로드(31)와 관통 결합구(21)와의 나사결합에 의한 상하 이동 조작이 보다 용이하도록 하는 역할을 담당하게 된다.The
상기 로드(31)의 하단부와 막음구(10)와의 결합은 용접, 볼트 체결 등 여러 가지 방법에 의하여 응용 및 변형이 가능함은 물론이다.Combination of the lower end of the
도 4는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 설치 실시예를 나타낸 개념도로서, 도 4(a)는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 평면도를, 도 4(b)는 도 4(a)의 A-A'단면을 나타낸 개념도이다.4 is a conceptual view showing an embodiment of the installation of the seawater inlet blocking device for the vessel vent hole or discharge tube according to the present invention, Figure 4 (a) is a seawater inlet blocking device for the vessel vent hole or discharge tube according to the present invention 4 (b) is a conceptual diagram showing the AA ′ cross section of FIG. 4 (a).
그리고, 도 5는 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치의 작동 실시예를 나타낸 개념도이다.And, Figure 5 is a conceptual diagram showing an embodiment of the operation of the seawater inlet blocking device of the vent hole or discharge pipe for ships according to the present invention.
도 4(a)와 같이 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입구 막음 장치를 적용하여 선체(1, 도 3 참고) 내의 교체, 수리 등 제반 작업을 실시하기 위하여 로드(31, 도 4(b) 참고)의 핸들(33)을 조작하여 상기 로드(31)와 연결된 커버(12)가 하강하게 된다.As shown in Fig. 4 (a) by applying the seawater inlet blocking device of the ship vent hole or discharge pipe according to the present invention rod (31, Fig. 3) in order to carry out various operations, such as replacement, repair in the hull (see Fig. 3) The
본 발명에서는 디스차지 관(7')에 적용되는 설치 실시예를 도 4(b)를 참고로 설명하고자 한다.In the present invention, an installation embodiment applied to the discharge tube 7 'will be described with reference to FIG. 4 (b).
선체(1)에 산소 토치 등으로 구멍 가공을 실시한 후 연통되는 디스차지 관(7')의 경우, 도시된 바와 같이 상기 디스차지 관(7')의 입구가 선체(1)의 면에 비해 다소 돌출되도록 연통하고 상기 디스차지 관(7')의 바깥 둘레와 선체(1)가 용접결합 등의 방법으로 고정되게 된다.In the case of the discharge tube 7 'which is communicated after the
우선, 상기 디스차지 관(7')의 입구에 패킹(11)이 밀착되도록 하되, 디스차지 관(7') 입구를 포함하는 선체(1) 면이 엄폐되도록 지지대(25) 및 영구자석(27)이 구비된 기판(23)과 상기 막음구(10)의 위치를 조준한 다음, 상기 지지대(25)에 연결된 영구자석(27)이 선체(1)에 부착되도록 한다.First, the packing 11 is in close contact with the inlet of the discharge tube 7 ', but the
다음으로, 로드(31)에 구비된 핸들(33)을 조작하여 관통 결합구(21)와 나사결합된 상기 로드(31)를 하강시키게 되면, 도 5와 같이 중심부가 상기 로드(31)와 결합된 막음구(10)가 연동하여 하강하게 된다.Next, when the
최종적으로, 상기 막음구(10)의 패킹(11)이 디스차지 관(7') 입구를 완전히 밀폐하여 해수 유입을 차단하고, 해수탱크(8, 도 1 참고) 내의 해수를 배출시킨 후 펌프(7, 도 1 참고)의 교체, 수리 등 제반 작업을 원활히 수행할 수 있게 된다.Finally, the packing 11 of the blocking
벤트홀(2, 도 1 참고)의 경우도 전술한 바와 같이 적용가능하며 교체, 수리 등 제반 작업이 완료되면, 상기 핸들(33)을 조작하여 막음구(10)를 상승시킨 후 선체(1)에 영구자석(27)으로 부착된 본 발명에 따른 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치를 해제하면 된다.Vent holes 2 (refer to FIG. 1) are applicable as described above, and when various operations such as replacement and repair are completed, the
이상에 살펴본 바와 같이, 본 발명에 의하면, 자석을 이용하여 선체에 간단히 부착함으로써 선체의 벤트홀 또는 디스차지 관을 밀폐하여 선체 내의 교체, 수리 등 제반 작업이 용이하도록 한 선박용 벤트홀 또는 디스차지 관의 해수 유입 막음 장치를 제공하는 것을 기본적인 기술적 사상으로 하고 있음을 알 수 있다.As described above, according to the present invention, a vessel vent hole or discharge tube which is easily attached to the hull by using a magnet to seal the vent hole or discharge tube of the hull to facilitate various operations such as replacement and repair in the hull. It is understood that the basic technical idea is to provide a device for preventing the inflow of seawater.
그리고, 본 발명에서는 기판을 삼각형상으로 하여 설명하고 있으나, 이와 같은 본 발명의 기본적인 기술적 사상의 범주 내에서, 당업계의 통상의 지식을 가진 자에게 있어서는 자석이 막음구 가장자리에 위치된다면 필요에 따라 상기 기판을 사각형상이나 원형상 등 다양한 형상으로 변경가능한 등 다른 많은 변형이 가능함은 물론이다.In the present invention, the substrate is described as a triangular shape, but within the scope of the basic technical idea of the present invention, for those of ordinary skill in the art, if the magnet is located at the edge of the blocking hole as needed Many other modifications are possible, such as changing the substrate into various shapes such as rectangular or circular.
본 발명에 의하면 다음과 같은 효과가 기대된다.According to the present invention, the following effects are expected.
우선, 핸들 조작에 의하여 상하이동되는 막음구로써 선체의 벤트홀 또는 디스차지 관을 확실히 밀폐하여 해수 유입을 차단함으로써 선체 내의 교체, 수리 등 제반 작업이 원활하게 이루어지게 된다.First of all, the vent hole or discharge tube of the hull is sealed by the handle operation so that the seawater inflow can be blocked to smoothly replace and repair the inside of the hull.
그리고, 불시에 발생하는 선체 내의 밸브 또는 펌프 등의 고장으로 도크에 선박을 진입시키거나 대차에 올리는 등의 번거로운 절차가 필요없이 간단하게 수중에서 작업이 가능하므로 시간과 비용 절감 측면에서 매우 효율적인 발명인 것이다.In addition, it is a very efficient invention in terms of time and cost savings because it is possible to simply work in the water without the troublesome procedure such as entering the ship into the dock or loading on the truck due to the failure of the valve or pump in the hull. .
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050054871A KR100540079B1 (en) | 2005-06-24 | 2005-06-24 | Sea water seal apparatus for a vessel discharge pipe or vent hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050054871A KR100540079B1 (en) | 2005-06-24 | 2005-06-24 | Sea water seal apparatus for a vessel discharge pipe or vent hole |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2005-0018286U Division KR200394545Y1 (en) | 2005-06-24 | 2005-06-24 | Sea water seal apparatus for a vessel discharge pipe or vent hole |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050074398A KR20050074398A (en) | 2005-07-18 |
KR100540079B1 true KR100540079B1 (en) | 2006-01-11 |
Family
ID=37263149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050054871A KR100540079B1 (en) | 2005-06-24 | 2005-06-24 | Sea water seal apparatus for a vessel discharge pipe or vent hole |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100540079B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200449443Y1 (en) | 2008-01-30 | 2010-07-09 | 현대중공업 주식회사 | Bottom plug installation Jig |
KR101197584B1 (en) | 2009-06-26 | 2012-11-06 | 강철규 | Liquid leakage blocking apparatus of ship |
US10011145B2 (en) | 2013-11-27 | 2018-07-03 | Em&I (Martime) Limited | Apparatus and method for inspecting flooded cavities in a floating offshore installation |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101616409B1 (en) * | 2014-06-18 | 2016-04-28 | 삼성중공업 주식회사 | A ship for reducing vibromotive force |
CN110015379A (en) * | 2019-04-24 | 2019-07-16 | 上海外高桥造船有限公司 | Drain plug device and discharge outlet open method and method for closing using it |
CN114248873A (en) * | 2021-12-02 | 2022-03-29 | 中船广西船舶及海洋工程有限公司 | Ship deck drainage plugging device |
CN114987687A (en) * | 2022-07-15 | 2022-09-02 | 上海外高桥造船有限公司 | Plugging device for submarine door for dock debugging and ship |
-
2005
- 2005-06-24 KR KR1020050054871A patent/KR100540079B1/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200449443Y1 (en) | 2008-01-30 | 2010-07-09 | 현대중공업 주식회사 | Bottom plug installation Jig |
KR101197584B1 (en) | 2009-06-26 | 2012-11-06 | 강철규 | Liquid leakage blocking apparatus of ship |
US10011145B2 (en) | 2013-11-27 | 2018-07-03 | Em&I (Martime) Limited | Apparatus and method for inspecting flooded cavities in a floating offshore installation |
Also Published As
Publication number | Publication date |
---|---|
KR20050074398A (en) | 2005-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100540079B1 (en) | Sea water seal apparatus for a vessel discharge pipe or vent hole | |
US3307574A (en) | Drain structure for venting leaked fluid from valve stem packing | |
JP4708947B2 (en) | Flange joint leakage prevention method and apparatus | |
JP2005239142A (en) | Sea chest seawater inflow hole sheathing board of vessel | |
CN204659988U (en) | Marine engineering equipment and suction box sealing arrangement thereof | |
US20090190994A1 (en) | Hydraulic cylinder contamination prevention system | |
KR101845072B1 (en) | Emergency liquid supply and discharging equipment in sunken ship's tanks | |
US11773557B2 (en) | Suction pile equipment | |
JP5203511B2 (en) | Ship propulsion shaft seal device and seal replacement method | |
KR100952461B1 (en) | Passage of marina and pontoon assembly using the marina | |
KR100818248B1 (en) | Sectional emergency for water structures caisson equipment, the water structure system using this, and repair reinforcement method of construction | |
KR200394545Y1 (en) | Sea water seal apparatus for a vessel discharge pipe or vent hole | |
KR101942560B1 (en) | Underwater working space forming device of ship | |
CN110949639B (en) | Method for repairing mooring state of sea valve of surface ship and plugging tool suitable for method | |
CN209833903U (en) | Novel plugging device for holes and holes of ship body | |
KR20100040436A (en) | Ship having a recovery pipe | |
CN112158317A (en) | Tool for underwater replacement of subsea door valve and use method thereof | |
CN218577990U (en) | Suspension type maintenance protective cover | |
KR100606142B1 (en) | Cover for Hole in Sea Chest of Ship | |
KR200403965Y1 (en) | blocking board for sea chest | |
EP1631488A1 (en) | Security valve | |
CN216382728U (en) | Underwater valve with good air tightness | |
CN111559462A (en) | Seabed door and leaking stoppage method thereof | |
JP6636767B2 (en) | Antifreeze type air valve | |
EP3186145B1 (en) | Valve for ventilation of a tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20121030 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20131017 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20141007 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20151020 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20161018 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20171016 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20191209 Year of fee payment: 15 |