KR100517312B1 KR1020050018075A KR20050018075A KR100517312B1 KR 100517312 B1 KR100517312 B1 KR 100517312B1 KR 1020050018075 A KR1020050018075 A KR 1020050018075A KR 20050018075 A KR20050018075 A KR 20050018075A KR 100517312 B1 KR100517312 B1 KR 100517312B1
Authority
KR
South Korea
Prior art keywords
culvert unit
culvert
unit
wing
fastening holes
Prior art date
Application number
KR1020050018075A
Other languages
Korean (ko)
Inventor
서상준
Original Assignee
리다산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 리다산업 주식회사 filed Critical 리다산업 주식회사
Priority to KR1020050018075A priority Critical patent/KR100517312B1/en
Application granted granted Critical
Publication of KR100517312B1 publication Critical patent/KR100517312B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Sewage (AREA)

Abstract

본 발명은 조립식암거 및 그 결합방법에 관한 것으로, 그 목적은 암거유닛의 양측으로 돌출 형성되는 날개부에 1차적으로 포스트텐션 방법으로 PC강연선을 이용 암거유닛의 결합을 하며 2차적으로 볼트 결합이 가능하도록 결합되는 구조로서 볼트 결합 및 강연선결합에 의해 접합력이 향상되어 부등침하에 대한 저항력이 상승되고 접합부 및 정착구를 통한 누수 방지 그리고 종방향 토사의 교란에도 저항할 수 있는 조립식암거 및 그 결합방법을 제공함에 있다.The present invention relates to a prefabricated culvert and a coupling method thereof, the object of which is to combine the culvert unit using a PC strand in the post-tension method to the wing portion protruding to both sides of the culvert unit, and the second bolt coupling is It is a structure that is combined to be able to be combined, and the bonding force is improved by bolting and stranded wire coupling to increase the resistance to uneven settlement, to prevent leakage through the joints and anchorages, and to prevent the disturbance of longitudinal soil, and the method In providing.

상기 목적달성을 위한 본 발명은 암거유닛의 공동구가 상호 연통되도록 맞대어져 연속적으로 결합되는 조립식암거에 있어서, 상기 암거유닛은 측벽의 양측면으로 돌출 형성되어 암거유닛이 결합되도록 하는 날개부와, 상기 날개부에 길이방향으로 천공되되, 입구부에 소정의 깊이로 함몰되는 설치홈이 구비된 다수개의 체결공과, 상기 날개부의 접합면에 오목한 형태로 형성되어 몰탈이 주입되는 그라우팅수용부를 포함하도록 구성되어; 상기 암거유닛과 인접하는 암거유닛의 최상단의 체결공 및 최하단의 체결공끼리 강선을 끼워 프리스트레스를 도입한 후 정착구를 통해 설치홈에 정착하는 한편, 나머지 체결공은 볼트를 삽입하고 상기 볼트의 양단에 너트를 결합하여 조립되는 것을 그 기술적 요지로 한다.The present invention for achieving the above object in the prefabricated culverts are coupled to each other so that the cavities of the culvert unit is in communication with each other, the culvert unit is formed by protruding to both sides of the side wall and the culvert unit is coupled, the wing It is configured to include a grouting hole which is formed in a concave shape formed in the concave shape in the joining surface of the wing portion and a longitudinally drilled in the longitudinal direction, the installation groove recessed to a predetermined depth in the inlet portion; The fastening holes at the top and the bottom fastening holes of the culvert unit adjacent to the culvert unit are fitted with steel wires to introduce prestresses, and are then fixed to the installation grooves through the fixing holes, while the other fastening holes are inserted into the bolts at both ends of the bolts. It is the technical gist of the nut to be assembled.

Description

조립식암거 및 그 결합방법{A fabricated closed conduit and its a construction method}A fabricated closed conduit and its a construction method

본 발명은 조립식암거 및 그 결합방법에 관한 것으로, 보다 상세하게는 프리캐스트 콘크리트 암거유닛의 외측에 날개부를 형성한 후 상기 날개부를 통해 프리스트레스 힘을 가하여 정착되도록 할 뿐만 아니라 볼트 결합까지 가능하도록 구성하여 볼트결합과 프리스트레스 도입에 의한 결합에 의해 접합력이 상승되고, 암거유닛의 측면에 형성된 날개부를 통해 결합하기 때문에 설치홈을 통해 누수가 되는 것을 방지해주는 조립식암거 및 그 결합방법을 제공함에 있다.The present invention relates to a prefabricated culvert and a coupling method thereof, and more particularly, to form a wing on the outside of the precast concrete culvert unit and to be fixed by applying prestressing force through the wing, as well as to enable bolt coupling. Bonding force is increased by the coupling by the bolt coupling and prestressing, and is provided through the wing formed on the side of the culvert unit to provide a prefabricated culvert that prevents the leakage through the installation groove and its coupling method.

통상 박스암거는 우수, 오수 및 농공업용수 등의 수로를 형성하거나, 인도 및 차도 등의 통행로를 만드는데 사용되며, 전기통신 및 온,냉열관로를 매설하기 위한 지하공동 또는 농수산물 저장창고 등의 제작에도 다양하게 사용되고 있다.The box culvert is usually used to form waterways such as rainwater, sewage and agricultural industrial water, or to create passageways such as sidewalks and roadways, and is also widely used in the production of underground joints or agricultural and fishery storage warehouses for laying telecommunications and hot and cold pipelines. Is being used.

이와 같은 박스암거로는 내부에 공동구가 형성된 박스형상의 암거유닛을 공장에서 다량으로 미리 제작하고, 현장에서 이들을 상호 조립하여 시공되는 프리캐스트 박스암거(PC암거)가 널리 이용되고 있다.As such box culverts, precast box culverts (PC culverts), which are prefabricated in large quantities at a factory in the form of box-shaped culvert units having hollow holes therein and are assembled by being assembled on site, are widely used.

그러나 상기와 같이 조립하여 사용되는 PC암거는 암거 상호간의 연결강도가 매우 약하기 때문에 지반이 연약하여 부등침하가 발생되는 경우 PC암거들 사이의 연결부위에서 하향우력모멘트가 발생하게 되어 박스 암거들 사이의 연결부위가 벌어져 쉽게 분리 이탈되어 수밀성이 저하되는 문제점이 있다. However, the PC culverts used as assembled above have very weak connection strengths between the culverts, so when the ground is weak and unequal settlement occurs, downward moment of moment occurs at the connection between the PC culverts. There is a problem that the parts are separated and easily separated and separated, thereby decreasing the watertightness.

따라서, 최근에는 프리캐스트 박스암거의 시공시 연결부위에 대한 보완방법으로 상, 하부 슬래브에 균일한 강선을 긴장 하여 시공하는 프리스트레스 강선을 이용한 정착구조가 널리 사용되고 있으나, 접합재료의 슬립(slip) 현상이 발생되며 PC강연선의 로스(Loss)량이 커지는 문제점이 있다.Therefore, in recent years, a fixing structure using prestressed steel wires, which are applied by tensioning uniform steel wires on upper and lower slabs, has been widely used as a complementary method for the connection of precast box culverts. There is a problem that the loss of the PC strand is increased (Loss).

본 발명은 상기와 같은 종래의 문제점을 해결하기 위하여 창출되는 것으로, 암거유닛의 양측으로 돌출 형성되는 날개부를 통해 강선에 의한 프리스트레스 도입 및 볼트결합이 가능하도록 결합되는 구조로서 볼트결합 및 강선결합에 의한 접합력이 향상되어 부등침하에 대한 저항력이 상승되고 토사의 교란에도 저항할 수 있으며 접합 시 부재의 로스(Loss)량을 줄여 경제적인 조립식암거 및 그 결합방법을 제공함을 목적으로 한다.The present invention is created to solve the conventional problems as described above, as a structure that is coupled to enable pre-stressed introduction and bolt coupling by the steel wire through the wing portion protruding to both sides of the culvert unit by bolt coupling and wire coupling It is aimed to provide economical prefabricated culverts and their joining methods by improving the bonding strength, increasing resistance to inequality and resisting earth and sand disturbances, and reducing the amount of loss during joining.

상기 목적을 달성하기 위한 본 발명은 암거유닛의 공동구가 상호 연통되도록 길이방향으로 맞대어져 연속적으로 결합되는 조립식암거에 있어서, 상기 암거유닛의 측벽의 양측면으로 외향돌출되는 날개부와, 상기 날개부의 길이방향으로 천공되되, 높이방향으로 다수개가 형성되며, 입구부에 소정의 깊이로 함몰되는 설치홈이 구비되는 체결공과, 상기 날개부의 접합면에 오목한 형태로 형성되어 몰탈이 주입되는 그라우팅수용부를 포함하도록 구성되어; 상기 암거유닛과 인접하는 암거유닛의 최상단의 체결공 및 최하단의 체결공끼리 강선을 끼워 프리스트레스를 도입한 후 정착구를 통해 설치홈에 정착하는 한편, 나머지 체결공은 볼트를 삽입하고 상기 볼트의 양단에 너트를 결합하여 조립되는 것을 특징으로 한다.The present invention for achieving the above object is a prefabricated culvert that is coupled to the longitudinal direction so that the cavities of the culvert unit is in communication with each other continuously, wing parts projecting outward to both sides of the side wall of the culvert unit, the length of the wing To be drilled in the direction, a plurality is formed in the height direction, the fastening hole is provided with an installation groove to be recessed to a predetermined depth in the inlet portion, and formed in a concave shape on the joining surface of the wing portion to include a grouting receiving portion is injected mortar Consists of; The fastening holes at the top and the bottom fastening holes of the culvert unit adjacent to the culvert unit are fitted with steel wires to introduce prestresses, and are then fixed to the installation grooves through the fixing holes, while the other fastening holes are inserted into the bolts at both ends of the bolts. It is characterized by being assembled by coupling the nut.

또한 본 발명은 측벽의 양측면에 외향돌출되는 날개부가 형성되고, 상기 날개부에 프리스트레스를 도입할 수 있는 다수의 체결공이 구비된 암거유닛을 결합하는 방법에 있어서, 소정의 위치에 설치된 암거유닛에 조립하고자 하는 암거유닛의 날개부가 서로 맞닿도록 밀착시켜 체결공이 연통되도록 하는 단계, 상기 암거유닛과 조립하고자 하는 암거유닛의 날개부에 형성된 최상단의 체결공 및 최하단의 체결공끼리 강선을 삽입한 후 정착구를 통해 정착하는 단계, 상기 날개부의 나머지 체결공의 일측으로 볼트를 삽입하여 인접하는 암거유닛의 체결공으로 돌출되도록 한 후 상기 볼트의 양단부에 너트를 결합하여 암거유닛을 결합하는 단계, 상기 강선을 강선인장기로 긴장시켜 상기 강선에 프리스트레스 힘을 도입하여 암거유닛을 최대한 밀착시키는 단계, 상기 밀착된 암거유닛의 너트를 최대한 더 조여 암거유닛이 완전히 접합되도록 한 후 강선인장기의 인장상태를 해제하여 암거유닛을 결합하는 단계로 이루어진 것을 특징으로 한다.In another aspect, the present invention is a method for coupling the culvert unit having a plurality of fastening holes capable of introducing a pre-stress is formed in the wing portion projecting outwardly on both sides of the side wall, assembled to a culvert unit installed at a predetermined position Close the wing parts of the culvert unit to be in contact with each other so that the fastening hole is in communication, insert the steel wires between the uppermost fastening hole and the lower end of the fastening holes formed in the wing of the culvert unit to assemble the fuser Fixing through the step, by inserting the bolt to one side of the remaining fastening hole of the wing to protrude into the fastening hole of the adjacent culvert unit, and then engaging the culvert unit by coupling the nut to both ends of the bolt, the wire wire tension Tension with a force introduces a prestressing force into the steel wire to close the culvert unit as closely as possible. Step, the nut of said contact characterized in that the culvert units possible tighten comprising the step of after the culvert units to be fully joined to the release liner of the long-term tension combining the culvert units.

이하, 본 발명에 대하여 구성 및 작용을 첨부도면과 연계하여 상세히 설명한다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명의 암거유닛의 사시도, 도 2 는 본 발명의 암거유닛의 정면단면도, 도 3 은 본 발명의 암거유닛의 평면도, 도 4 는 본 발명의 정착구의 구조를 나타낸 예시도로서,1 is a perspective view of a culvert unit of the present invention, Figure 2 is a front cross-sectional view of the culvert unit of the present invention, Figure 3 is a plan view of the culvert unit of the present invention, Figure 4 is an exemplary view showing the structure of the anchorage of the present invention,

본 발명의 조립식암거는 박스형상을 가지고 내부에 형성된 공동구(14)가 축선 방향을 따라 상호 연통되도록 길이방향으로 결합되는 복수의 암거유닛(10)을 가진다.The prefabricated culvert of the present invention has a plurality of culvert units 10 which are coupled in the longitudinal direction such that the cavity 14 formed therein has a box shape and communicates with each other along the axial direction.

상기 암거유닛(10)은 상부슬래브(11)와 하부슬래브(12) 및 상기 상부슬래브(11)와 하부슬래브(12)를 연결하여 공동구(14)가 형성되도록 하는 측벽(13)과, 상기 측벽(13)의 양측면에 돌출 형성되되, 공동구(14)의 입구부와 출구부에 각각 형성되는 날개부(20)로 구성된다.The culvert unit 10 has a side wall 13 to connect the upper slab 11 and the lower slab 12 and the upper slab 11 and the lower slab 12 to form a cavity 14, and the side wall Protrudingly formed on both sides of the (13), it is composed of a wing portion 20 formed in the inlet and outlet of the cavity 14, respectively.

상기 날개부(20)는 인접하는 암거유닛(10)과 결합시 볼트(40)와 너트(41)에 의한 결합 및 프리스트레스가 도입되는 강선(30)이 정착구(31)를 통해 정착이 가능하도록 길이방향으로 천공되는 다수개의 체결공(21)이 구비되며, 상기 체결공(21)의 입구부에는 소정의 깊이로 함몰되어 상기 정착구(31)가 정착되도록 하는 설치홈(22)이 형성되어 있다.The wing portion 20 has a length such that the steel wire 30 to which the coupling and prestress are introduced by the bolt 40 and the nut 41 when the adjacent culvert unit 10 is coupled to the anchorage unit 10 can be fixed through the fixing unit 31. A plurality of fastening holes 21 are provided to be drilled in a direction, and an inlet portion of the fastening hole 21 is provided with an installation groove 22 recessed to a predetermined depth so that the fixing unit 31 is fixed.

또한 상기 날개부(20)의 접합면에는 공동구(14)의 길이방향을 따라 접합면으로부터 소정의 깊이로 함몰된 그라우팅수용부(23)가 구비되어 있다.In addition, the joint surface of the wing portion 20 is provided with a grouting accommodating portion 23 recessed to a predetermined depth from the joint surface along the longitudinal direction of the cavity sphere 14.

또한 상기 암거유닛(10)의 전면에는 내측으로 오목하게 들어간 소켓부(15)가 형성되고, 후면으로는 외측으로 돌출되는 플러그부(16)가 형성되어 상호간 끼워 맞춤으로 조립하게 된다.In addition, the front portion of the culvert unit 10 is formed with a socket portion 15 recessed inwardly, the plug portion 16 is formed to protrude outwards to the rear is assembled by fitting to each other.

한편 상기 볼트(40)는 양단에 나사탭에 형성되어 있어 양측으로 너트(41)가 결합되도록 구성된다.On the other hand, the bolt 40 is formed on both ends of the screw tab is configured so that the nut 41 is coupled to both sides.

또한 상기 정착구(31)는 중앙에 콘 형상의 웨지홀(34)이 형성된 원통형의 웨지콘부재(33)와, 강선(30)의 단부에 체결되고 웨지콘부재(33)의 웨지홀(34)로 삽입되어 고정되도록 하는 웨지(32)로 구성된다. 보다 상세히 설명하면 웨지(32)가 강선(30)의 단부를 물고 있는 상태에서 상기 웨지홀(34)로 삽입되고, 상기 웨지(32)와 웨지홀(34)의 콘 형상에 의하여 강선의 단부가 더 이상 당겨지지 아니하고 웨지콘부재(33)에 견고하게 정착된다.In addition, the anchorage 31 is a cylindrical wedge cone member 33 having a cone-shaped wedge hole 34 in the center, the wedge hole 34 of the wedge cone member 33 is fastened to the end of the steel wire 30 It is composed of a wedge 32 is inserted into and fixed to. In more detail, the wedge 32 is inserted into the wedge hole 34 while the wedge 32 is biting the end of the steel wire 30, and the end of the steel wire is formed by the cone shape of the wedge 32 and the wedge hole 34. It is no longer pulled and firmly fixed to the wedge-con member 33.

이와 같이 구성된 암거유닛의 조립구조를 설명하면 다음과 같다.The assembly structure of the culvert unit configured as described above is as follows.

도 5 는 본 발명의 암거유닛의 결합과정을 나타낸 분해 사시도, 도 6 은 본 발명의 암거유닛의 결합상태를 나타낸 절개 사시도, 도 7 은 본 발명의 볼트결합 및 강선에 의한 연결상태를 나타낸 상세도, 도 8 은 본 발명의 암거유닛의 결합상태를 나타낸 측면도, 도 9 는 본 발명의 암거유닛의 결합상태를 나타낸 평면도로서,5 is an exploded perspective view showing a coupling process of the culvert unit of the present invention, Figure 6 is a cutaway perspective view showing a coupling state of the culvert unit of the present invention, Figure 7 is a detailed view showing a connection state by the bolt coupling and steel wire of the present invention 8 is a side view showing a coupled state of the culvert unit of the present invention, Figure 9 is a plan view showing a coupled state of the culvert unit of the present invention,

상기와 같이 구성된 암거유닛(10)을 공동구(14)가 연통되도록 길이방향으로 결합하기 위해서, 먼저 소정의 위치에 암거유닛(10)을 설치하고 상기 암거유닛(10)의 소켓부(15)에 조립하고자 하는 암거유닛(10)의 플러그부(16)가 끼워지도록 하고 날개부(20)가 최대한 밀착되도록 결합한다. 이때 상기 날개부(20)에 형성된 체결공(21)이 인접하는 날개부(20)의 체결공(21)과 연통되도록 밀착시켜 놓는다.In order to couple the culvert unit 10 configured as described above in the longitudinal direction such that the cavity sphere 14 communicates, the culvert unit 10 is first installed at a predetermined position and the socket part 15 of the culvert unit 10 is installed. The plug portion 16 of the culvert unit 10 to be assembled is fitted and coupled so that the wing portion 20 is as close as possible. At this time, the fastening hole 21 formed in the wing 20 is in close contact with the fastening hole 21 of the adjacent wing 20.

상기와 같이 상호 끼워진 암거유닛(10)을 고정하기 위하여 상기 날개부(20)의 최상단의 체결공(21)과 최하단의 체결공(21)을 통해 강선(10)을 삽입하여 인접하는 암거유닛(10)의 날개부(20)의 체결공(21)으로 강선(10)이 돌출되도록 한 후 상기 강선(10)의 양단부에 정착구(31)를 결합하고, 상기 정착구(31)가 날개부(20)에 형성된 설치홈(22)에 정착되도록 한 후 나머지 체결공(21)을 통해 볼트(40)를 삽입하여 이 볼트(40)가 인접하는 암거유닛(10)의 체결공(21)으로 돌출되도록 한 다음 상기 볼트(30)의 양단부에 너트(41)를 끼워 고정한다.In order to fix the culvert units 10 fitted as described above, the culvert unit is inserted by inserting the steel wire 10 through the fastening hole 21 of the uppermost end of the wing portion 20 and the fastening hole 21 of the lower end thereof ( After the steel wire 10 is protruded into the fastening hole 21 of the wing portion 20 of the 10, the fixing unit 31 is coupled to both ends of the steel wire 10, the fixing unit 31 is wing 20 After being fixed to the installation groove 22 formed in the) and inserting the bolt 40 through the remaining fastening hole 21 so that the bolt 40 is protruded into the fastening hole 21 of the adjacent culvert unit (10) Then, the nut 41 is fixed to both ends of the bolt 30.

한편 상기 볼트(30)와 너트(41)의 결합이나 정착구(31)의 결합시 와셔(42)를 추가적으로 설치하여 보다 견고히 조여지도록 한다.Meanwhile, when the bolt 30 and the nut 41 are coupled or the fixing unit 31 is coupled, the washer 42 is additionally installed to be tightened more firmly.

상기와 같이 볼트(30)와 너트(41) 및 강선(30)에 의해 암거유닛(10)과 인접하는 암거유닛(10)이 결합되면, 강선인장기(도시없음)로 상기 강선(30)을 긴장시켜 강선(30)에 프리스트레스 힘을 도입하여 암거유닛(10)을 최대한 밀착시킨다. 이때 암거유닛(10)이 최대한 밀착된 상태에서 상기 너트(41)를 최대한 더 조여 암거유닛(10)이 완전히 접합되도록 한 후 강선인장기의 인장상태를 해제하면 암거유닛(10)이 연결된다.When the culvert unit 10 adjacent to the culvert unit 10 is coupled by the bolt 30, the nut 41 and the steel wire 30 as described above, the steel wire 30 by a wire tensioner (not shown) Tension is introduced to the pre-stress force to the steel wire 30 to close the culvert unit 10 as close as possible. At this time, when the culvert unit 10 is as close as possible, tighten the nut 41 as much as possible so that the culvert unit 10 is completely bonded, and then release the tension state of the steel wire tensioner culvert unit 10 is connected.

상기와 같은 과정을 여러번 반복하여 다수개의 암거유닛(10)을 결합시키고, 강선(30)의 정착작업과 볼트결합이 완료되면 상기 설치홈(22)에 콘크리트 모르타르를 채워 정착구(31) 및 볼트(40)와 너트(41)의 결합부분이 풀려지지 않고 부식이 방지되도록 마감한다.By repeating the above process several times to combine a plurality of culvert unit 10, when the fixing operation and bolting of the steel wire 30 is completed, fill the concrete mortar in the installation groove 22, the fixing unit 31 and the bolt ( 40) and the coupling portion of the nut 41 is finished to prevent loosening and corrosion.

또한 상기 날개부(20)의 그라우팅수용부(23)에 콘크리트 모르타르를 채워 넣어 암거유닛(10)이 접합되도록 한다.In addition, the grouting unit 23 of the wing portion 20 is filled with concrete mortar so that the culvert unit 10 is joined.

상기와 같은 본 발명은 암거유닛(10)의 측면으로 돌출 형성된 날개부(20)를 통해 암거유닛(10)이 결합되기 때문에 설치홈(22)을 통해 공동구(14)의 내부로 발생되는 누수가 억제된다. 즉 암거유닛(10) 구조체의 외부에서 결합이 이루어져 결합면이나 정착구(31)가 정착되는 설치홈(22)을 통해 물이 스며드는 것을 방지할 뿐만 아니라, 암거유닛(10) 외부결합에 의한 볼트결합 및 강선(30)의 인장이 간편하여 시공속도가 상승된다.In the present invention as described above, because the culvert unit 10 is coupled through the wing portion 20 protruding to the side of the culvert unit 10 is leaked into the cavity 14 through the installation groove 22 Suppressed. That is, the coupling is made from the outside of the culvert unit 10 structure to prevent water from penetrating through the installation groove 22 in which the mating surface or the fixing unit 31 is fixed, as well as the bolt coupling by the culvert unit 10 external coupling. And the tension of the steel wire 30 is easy to increase the construction speed.

또한 프리스트레스가 도입되는 강선(30) 및 볼트(40)와 너트(41)의 결합에 의해 암거유닛(10)이 결합되기 때문에 결합되는 암거유닛(10)간의 접합력이 상승되어 부등침하에 의한 저항력이 상승된다. In addition, since the culvert unit 10 is coupled by the combination of the steel wire 30 and the bolt 40 and the nut 41 into which the prestress is introduced, the bonding force between the culvert units 10 to be coupled is increased, so that the resistance due to uneven settlement is increased. Is raised.

또한 암거유닛(10)의 측벽(13) 외부에 날개부(20)가 형성되어 있어, 상기 날개부가 되메우기 토사에 대한 종방향으로의 전단키 역할을 하여 토사의 교란에도 저항할 수 있다.In addition, the wing portion 20 is formed outside the side wall 13 of the culvert unit 10, the wing portion can act as a shear key in the longitudinal direction to the backfilling soil, it can also resist soil disturbance.

본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기재의 범위 내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims.

상기와 같은 구성 및 작용에 의해 기대할 수 있는 본 발명의 효과는, 암거유닛를 강선을 이용한 프리스트레스의 도입과 동시에 볼트결합을 해줌에 따라 암거유닛간의 접합력이 매우 상승되어 부등침하에 대한 저항력이 증가하고, 날개부에 의해 암거유닛의 외부에서 결합되는 구조로서 긴장력도입 및 볼트결합이 간편하여 시공이 용이하며 접합재료의 손실량이 감소되어 경제성이 우수하며, 날개부가 전단키 작용을 하여 토사의 교란에도 저항할 수 있는 매우 유용한 발명이다.The effect of the present invention can be expected by the configuration and action as described above, as the coupling of the culvert unit and the bolt at the same time as the introduction of the pre-stress using a steel wire, the bonding force between the culvert unit is very increased, the resistance to inequality is increased, It is a structure that is coupled from the outside of the culvert unit by the wing part, so it is easy to install due to the easy introduction of tension force and bolting, and the loss amount of bonding material is reduced, and the economic efficiency is excellent. That is a very useful invention.

도 1 은 본 발명의 암거유닛의 사시도,1 is a perspective view of the culvert unit of the present invention,

도 2 는 본 발명의 암거유닛의 정면단면도,2 is a front cross-sectional view of the culvert unit of the present invention;

도 3 은 본 발명의 암거유닛의 평면도,3 is a plan view of the culvert unit of the present invention;

도 4 는 본 발명의 정착구의 구조를 나타낸 예시도,Figure 4 is an exemplary view showing the structure of the fixing unit of the present invention,

도 5 는 본 발명의 암거유닛의 결합과정을 나타낸 분해 사시도,5 is an exploded perspective view showing a coupling process of the culvert unit of the present invention;

도 6 은 본 발명의 암거유닛의 결합상태를 나타낸 절개 사시도,6 is a perspective view showing a cut state of the culvert unit of the present invention,

도 7 은 본 발명의 볼트결합 및 강선에 의한 연결상태를 나타낸 상세도,7 is a detailed view showing a connection state by the bolted and steel wire of the present invention,

도 8 은 본 발명의 암거유닛의 결합상태를 나타낸 측면도,8 is a side view showing a coupling state of the culvert unit of the present invention;

도 9 는 본 발명의 암거유닛의 결합상태를 나타낸 평면도,9 is a plan view showing a coupled state of the culvert unit of the present invention,

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

(10) : 암거유닛 (11) : 상부슬래브(10): culvert unit (11): upper slab

(12) : 하부슬래브 (13) : 측벽(12): lower slab (13): side wall

(14) : 공동구 (15) : 소켓부(14): cavity ball (15): socket part

(16) : 플러그부 (20) : 날개부16: plug portion 20: wing portion

(21) : 체결공 (22) : 설치홈(21): Fastening hole (22): Installation groove

(23) : 그라우팅수용부 (30) : 강선(23): grouting accommodation (30): steel wire

(31) : 정착구 (32) : 웨지31: anchorage 32: wedge

(33) : 웨지콘부재 (34) : 웨지홀(33): wedge cone member (34): wedge hole

(40) : 볼트 (41) : 너트 40: bolt 41: nut

(42) : 와셔(42): washers

Claims (3)

삭제delete 암거유닛의 측벽의 양측면으로 외향돌출되는 날개부와, 상기 날개부의 길이방향으로 천공되되, 높이방향으로 다수개가 형성되며, 입구부에 소정의 깊이로 함몰되는 설치홈이 구비되는 체결공과, 상기 날개부의 접합면에 오목한 형태로 형성되어 몰탈이 주입되는 그라우팅수용부를 포함하도록 구성된 조립식 암거에 있어서,A wing hole projecting outwardly on both sides of the side wall of the culvert unit, a hole drilled in the longitudinal direction of the wing part, a plurality of which are formed in a height direction, and having an installation groove recessed to a predetermined depth in the inlet; In the prefabricated culvert formed in a concave shape on the joining surface of the negative portion and configured to include a grouting receiving portion in which mortar is injected, 상기 암거유닛과 인접하는 암거유닛의 최상단의 체결공 및 최하단의 체결공끼리 강선을 끼워 프리스트레스를 도입한 다음 정착구를 통해 설치홈에 정착하는 한편, 나머지 체결공은 볼트를 삽입하고 상기 볼트의 양단에 너트를 결합한 후 상기 설치홈에 몰탈을 주입하여 조립되는 것을 특징으로 하는 조립식 암거.The pre-stress is introduced by inserting the steel wires between the fastening holes at the top and the bottom fastening holes of the culvert unit adjacent to the culvert unit, and then settled in the installation groove through the anchorage, while the other fastening holes are inserted into the bolts at both ends of the bolt. Prefabricated culvert, characterized in that assembled by injecting mortar into the installation groove after coupling the nut. 측벽의 양측면에 외향돌출되는 날개부가 형성되고, 상기 날개부에 프리스트레스를 도입할 수 있는 다수의 체결공이 구비된 암거유닛을 결합하는 방법에 있어서,In the method for coupling the culvert unit is provided on both sides of the side wall protruding outwardly, a plurality of fastening holes are provided for introducing the prestress to the wing portion, 소정의 위치에 설치된 암거유닛에 조립하고자 하는 암거유닛의 날개부가 서로 맞닿도록 밀착시켜 체결공이 연통되도록 하는 단계,A step of allowing the fastening holes to communicate with each other by closely contacting wing parts of the culvert unit to be assembled to the culvert unit installed at a predetermined position so as to be in contact with each other, 상기 암거유닛과 조립하고자 하는 암거유닛의 날개부에 형성된 최상단의 체결공 및 최하단의 체결공끼리 강선을 삽입한 후 정착구를 통해 정착하는 단계,Inserting steel wires between the uppermost fastening holes and the lowermost fastening holes formed in the wing of the culvert unit to be assembled with the culvert unit and then fixing them through a fixing hole; 상기 날개부의 나머지 체결공의 일측으로 볼트를 삽입하여 인접하는 암거유닛의 체결공으로 돌출되도록 한 후 상기 볼트의 양단부에 너트를 결합하여 암거유닛을 결합하는 단계,Inserting a bolt into one side of the remaining fastening hole of the wing to protrude into a fastening hole of an adjacent culvert unit, and then engaging a culvert unit by coupling nuts to both ends of the bolt, 상기 강선을 강선인장기로 긴장시켜 상기 강선에 프리스트레스 힘을 도입하여 암거유닛을 최대한 밀착시키는 단계,Tensioning the steel wire with a steel wire tensile force to introduce a prestress force to the steel wire to bring the culvert unit into close contact with each other; 상기 밀착된 암거유닛의 너트를 최대한 더 조여 암거유닛이 완전히 접합되도록 한 후 강선인장기의 인장상태를 해제함으로써 암거유닛을 결합하는 단계로 이루어진 것을 특징으로 하는 조립식암거의 결합방법.And tightening the nut of the close culvert unit as much as possible so that the culvert unit is completely joined, and then releasing the tensile state of the steel wire tensioner to combine the culvert unit.
KR1020050018075A 2005-03-04 2005-03-04 A fabricated closed conduit and its a construction method KR100517312B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050018075A KR100517312B1 (en) 2005-03-04 2005-03-04 A fabricated closed conduit and its a construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050018075A KR100517312B1 (en) 2005-03-04 2005-03-04 A fabricated closed conduit and its a construction method

Publications (1)

Publication Number Publication Date
KR100517312B1 true KR100517312B1 (en) 2005-09-29

Family

ID=37305149

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050018075A KR100517312B1 (en) 2005-03-04 2005-03-04 A fabricated closed conduit and its a construction method

Country Status (1)

Country Link
KR (1) KR100517312B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101088157B1 (en) 2009-07-21 2011-12-02 유한회사 엘씨건설 separation-type culvert
KR101199930B1 (en) 2010-01-08 2012-11-09 (주)어쌤이앤씨 A culvert block for regulation of fluid-velocity
CN102943487A (en) * 2012-11-14 2013-02-27 宁波中科盛博建设有限公司 Construction method of prestress common pipe ditch
CN103912011A (en) * 2014-04-04 2014-07-09 北京城建设计发展集团股份有限公司 Open excavation prefabricated underground structure
CN108678002A (en) * 2018-05-02 2018-10-19 湘潭大学 A kind of precast assembly Pipe rack
KR102077960B1 (en) 2019-06-04 2020-02-14 동아산업(주) PC culvert box connected metal strap joint and construction method of the same
KR102597601B1 (en) * 2022-12-29 2023-11-02 뉴콘텍이앤씨(주) Prestressed box structure and its construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101088157B1 (en) 2009-07-21 2011-12-02 유한회사 엘씨건설 separation-type culvert
KR101199930B1 (en) 2010-01-08 2012-11-09 (주)어쌤이앤씨 A culvert block for regulation of fluid-velocity
CN102943487A (en) * 2012-11-14 2013-02-27 宁波中科盛博建设有限公司 Construction method of prestress common pipe ditch
CN103912011A (en) * 2014-04-04 2014-07-09 北京城建设计发展集团股份有限公司 Open excavation prefabricated underground structure
CN103912011B (en) * 2014-04-04 2016-01-06 北京城建设计发展集团股份有限公司 The prefabricated assembled underground structure of open cut
CN108678002A (en) * 2018-05-02 2018-10-19 湘潭大学 A kind of precast assembly Pipe rack
KR102077960B1 (en) 2019-06-04 2020-02-14 동아산업(주) PC culvert box connected metal strap joint and construction method of the same
KR102597601B1 (en) * 2022-12-29 2023-11-02 뉴콘텍이앤씨(주) Prestressed box structure and its construction method

Similar Documents

Publication Publication Date Title
KR100517312B1 (en) A fabricated closed conduit and its a construction method
KR100783009B1 (en) Precast culvert assembly for fastening insert
KR100799358B1 (en) Combined retaining wall and method for constructing thereof
KR101045038B1 (en) Connecting Apparatus and Connecting Method of Precast Concrete Elements and Precast Concrete Element comprising the Connecting Apparatus
KR101053688B1 (en) Connection device and connection construction method of prefabricated precast concrete member, and precast concrete member provided with connection device
KR20130095153A (en) A removable prestressing steel pipe soil nailing structure
KR20060069419A (en) This install structure and carrying out method with the watertight and flexible of the precast reinforced concrete box culverts
KR20060100790A (en) The structure of screw anchor for slope reinforcement construction and the method using thereof
KR20150131904A (en) Tension for both steel and precast concrete structures and its production and construction methods
KR101027078B1 (en) Assembly type precast concrete closed conduit
KR102108410B1 (en) Ground reinforcing method using compressive ground pressure type ground anchor
KR102140167B1 (en) Strengthening method of concrete structures by pretensioning
KR101012307B1 (en) Precast Concrete Box Culvert Assembly
KR101806326B1 (en) Prefabricated precast concrete culvert with integral anchor embedded
KR200407613Y1 (en) Precast concrete box with bolt connecting structure
KR100527797B1 (en) Prestressed concrete girder bridge construction method using the precast concrete segment
KR100536069B1 (en) Fabricated pc culvert reinforced with socket and bracket
KR20030044940A (en) Retaining wall structure composed of retaining-wall panel unit prestressed under interconnecting high intensity reinforcing rod installed in the panel unit with couplers so as to resist section strength and constructing method thereof
KR102114826B1 (en) Prefabricated pc tower foundation structure
KR20070106410A (en) The Assembled Precast Reinforced Concrete Culverts of Connectting with Steel Bar.
KR20060047233A (en) A combination bolt and welding headed stud
KR101357637B1 (en) Horizontal shear connector for precast concrete bridge pier
KR200464400Y1 (en) Precast Concrete Box Culvert
KR200193604Y1 (en) Precasted culvert
KR101201049B1 (en) power transmission manhole

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20100902

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee