KR100487405B1 - A construction and a carrying out method for plants a self-generation of a cover stone - Google Patents

A construction and a carrying out method for plants a self-generation of a cover stone Download PDF

Info

Publication number
KR100487405B1
KR100487405B1 KR10-2002-0042017A KR20020042017A KR100487405B1 KR 100487405 B1 KR100487405 B1 KR 100487405B1 KR 20020042017 A KR20020042017 A KR 20020042017A KR 100487405 B1 KR100487405 B1 KR 100487405B1
Authority
KR
South Korea
Prior art keywords
stone
trench
lake
slope
inclined surface
Prior art date
Application number
KR10-2002-0042017A
Other languages
Korean (ko)
Other versions
KR20040008385A (en
Inventor
김성환
김국일
Original Assignee
동부엔지니어링 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 동부엔지니어링 주식회사 filed Critical 동부엔지니어링 주식회사
Priority to KR10-2002-0042017A priority Critical patent/KR100487405B1/en
Publication of KR20040008385A publication Critical patent/KR20040008385A/en
Application granted granted Critical
Publication of KR100487405B1 publication Critical patent/KR100487405B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G13/00Protecting plants
    • A01G13/02Protective coverings for plants; Coverings for the ground; Devices for laying-out or removing coverings
    • A01G13/0256Ground coverings
    • A01G13/0268Mats or sheets, e.g. nets or fabrics
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G2/00Vegetative propagation

Landscapes

  • General Engineering & Computer Science (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Botany (AREA)
  • General Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Developmental Biology & Embryology (AREA)
  • Health & Medical Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 발명은 식물자생용 돌붙임에 관한 것으로, 호안의 토사면을 고르게 하여 준 후, 상기 토사면의 하단에 밑다짐을 위한 터파기 공사를 수행하고, 상기 터파기 부분 하단의 표고를 점검하는 하단부근고공을 수행하며, 상기 터파기 부분의 하단에 호안의 경사면을 보호하는 비탈멈춤공을 수행하고, 상기 터파기 부분에 밑다짐돌(1)을 채워 넣어준 다음, 상기 호안의 토사면 상에서 유실 우려가 있는 부분에 천연섬유망(2)을 설치하며, 사전에 선택된 돌붙임용 석재(3)를 상기 호안의 토사면에 맞물림을 하면서 부착하되, 상기 돌붙임용 석재(3)와 석재(3) 사이의 요철과 공극(4)을 인정하면서 작업을 수행하고, 상기 돌붙임용 석재(3)와 석재(3) 사이의 공극(4)을 메워주기 위해 석재 틈새로 보조기층재 또는 강자갈로 이루어진 잡석과 표토사를 1 : 1 비율로 섞어 주입하며, 상기 돌붙임용 석재(3)가 설치된 호안 경사면 상단을 다져준 후, 상기와 같이 돌붙임용 석재(3)가 배치된 호안의 경사면에 영양분이 함유된 표토를 뿌려주는 것으로서, 호안의 안정성과 생태계 보존을 극대화시킬 수 있고, 간단한 구조물을 이용하여 간편하게 시공함으로써 그 시공성을 높여줌과 더불어 저렴한 비용으로 경제적인 시공이 가능한 것이다.The present invention relates to a plant-growing stone, and evenly to the sediment surface of the revetment, the bottom of the sediment to carry out the digging work for the underlay, and to check the elevation of the lower portion of the trench Performing near altitude, performing a slope stop hole to protect the inclined surface of the lake at the bottom of the trench, filling the foundation stone (1) in the trench, and then lost on the soil surface of the lake A natural fiber network (2) is installed in the area of concern, and the stone (3) for pre-selected stone attachment (3) is attached while engaging the soil surface of the lake, but the stone (3) and stone (3) for stone attachment (3) are attached. The work is carried out while acknowledging the irregularities and voids (4) between the stones, and rubble composed of auxiliary base material or strong gravel as a stone gap to fill the voids (4) between the stone attachment stone (3) and the stone (3). Mix the topsoil with a 1: 1 ratio After filling the top of the rake slope with the stone stone (3) is installed, and spraying the topsoil containing nutrients on the rake surface of the lake where the stone stone (3) is disposed as described above, It is possible to maximize stability and preservation of the ecosystem, and it is possible to economically construct at low cost by increasing the constructability by simply constructing using simple structure.

Description

식물자생용 돌붙임 구조물 및 그 시공방법{A construction and a carrying out method for plants a self-generation of a cover stone}A construction and a carrying out method for plants a self-generation of a cover stone}

본 발명은 하천의 경사진 제방에 축조되는 식물자생용 돌붙임에 관한 것으로, 특히 호안의 경사면에 시공되는 돌붙임을 식물 자생조건에 유리하도록 개선함으로써 호안의 치수 안정성과 생태계 보존을 극대화시킴과 더불어 비교적 저비용으로 간편하게 시공할 수 있도록 한 식물자생용 돌붙임 구조물 및 그 시공방법에 관한 것이다.The present invention relates to a plant self-supporting stone attaching to an inclined bank of rivers, and in particular, to improve the plant attaching to the plant's inclined surface to favor the plant native conditions, and to maximize the dimensional stability and ecosystem conservation of the revetment The present invention relates to a plant self-supporting stone structure and its construction method which can be easily constructed at a relatively low cost.

일반적으로 하천의 제방 및 수로유실을 방지하기 위하여 호안 경사면에 콘크리트를 이용하여 옹벽을 시공하거나 혹은 콘크리트 블럭 및 다공질 블럭을 시공하게 되고, 또한 상기 블럭 대신에 석재를 호안의 경사면에 부착시키는 돌붙임(메붙임, 찰붙임) 시공을 하게 되는 것이다.In general, in order to prevent the bank's dike and waterway loss, the retaining wall is constructed using concrete on the slope of the lake, or the concrete block and the porous block are constructed, and instead of the block, a stone attaching stone to the slope of the lake ( Sticking, sticking) construction will be.

여기서, 하천 호안의 경사면에 상기 콘크리트 블럭이나 다공질 블럭을 이용하여 시공을 하게 되는 경우, 상기와 같은 호안 블럭은 특히 홍수로 인한 제방의 유실을 방지하기 위해 블럭의 시공면이 일정하면서 조밀한 상태가 되도록 시공하는 바, 제방의 상하측의 토질에 따라 시공된 블럭중에서 하나의 블럭이 유실되거나 이탈되며, 점차적으로 각 측면 및 저면이 밀착 고정된 각각의 호안 블럭은 시간이 진행됨에 있어 유실되거나 심지어는 붕괴되는 사고를 불러일으키는 문제가 있었다.Here, when the construction using the concrete block or the porous block on the inclined surface of the river lake, the above-described lake block, the construction surface of the block has a constant and dense state in order to prevent the loss of the embankment due to flooding As a result of construction, one block is lost or detached from the blocks constructed according to the soils of the upper and lower sides of the embankment, and gradually each of the revetment blocks having tightly fixed sides and bottoms is lost or even over time. There was a problem that caused the accident to collapse.

그리고, 상기 블럭의 조밀한 시공상태에 있어서 블럭의 유실은 우천시 제방과 근접되는 지면으로 스며든 물의 배출이 어렵게 되어 지반이 약화되기 때문에 유실의 진행이 빠르게 나타나며, 물의 배출이 원활하지 못한 관계에 따라 지반의 토양이 황폐화됨으로써 식물이 자생하기 어렵다는 단점이 있었다.In addition, in the compact construction state of the block, the loss of the block is difficult to discharge the water soaked to the ground close to the embankment during rainy weather because the ground is weakened, the progress of the loss appears quickly, according to the relationship that the water discharge is not smooth The soil was devastated, so it was difficult to grow plants.

또한, 상기 블럭 대신에 호안의 경사면에 돌붙임이 행해지는 경우도 있는 바, 종래의 돌붙임(메붙임, 찰붙임)은 그 배면부에 필터용 자갈층(메붙임) 또는 콘크리트나 모르탈(찰붙임) 등이 시공되기 때문에 식물의 자생이 어렵고, 시공시 비용이 많이 소요되기 때문에 경제적이지 못하다는 결점이 있으며, 호안 경사면이 자연스러운 상태의 형성이 어렵기 때문에 자연 생태계 보호에 미흡할 뿐만아니라 시공효과가 미흡하다는 문제가 있었다.In addition, instead of the block, stones may be applied to the inclined surface of the lake, and the conventional stones (sticking, sticking) have a filter gravel layer (concrete) or concrete or mortar (sticking) on the back surface. It is difficult to grow plants naturally because it is difficult to construct, and it is not economical because it requires a lot of cost in construction. There was a problem of lack.

이에 본 발명은 상기한 바의 문제점들을 해소하기 위해 안출된 것으로, 호안의 경사면에 시공되는 돌붙임을 식물 자생조건에 유리하도록 개선함으로써 호안의 치수 안정성과 생태계 보존을 극대화시킴과 더불어 비교적 저비용으로 간편하게 시공할 수 있도록 한 식물자생용 돌붙임 구조물 및 그 시공방법을 제공함에 그 목적이 있는 것이다.Accordingly, the present invention has been made to solve the above problems, by maximizing the dimensional stability and ecological preservation of the revetment by improving the stone attachment to be built on the slope of the revetment in favor of the plant native conditions, and at a relatively low cost The purpose of the present invention is to provide a plant self-supporting stone attaching structure and a construction method thereof.

상기한 바의 목적을 달성하기 위한 본 발명은, 석재를 돌붙임하고자 하는 호안의 토사면을 고르게 하여 주는 기초단계;와, 상기 토사면의 하단에 밑다짐을 위한 터파기 공사를 수행하고, 상기 터파기 부분 하단의 근고공을 수행하며, 상기 터파기 부분의 하단에 호안의 경사면을 보호하는 비탈멈춤공을 수행하고, 상기 터파기 부분에 밑다짐돌을 채워 넣어주는 호안 기초공사단계;와, 상기 호안의 토사면 상에서 유실 우려가 크다고 판단되는 부분에 코이어네트, 황마 등과 같은 천연재료로 이루어진 천연섬유망을 설치하는 천연섬유망 설치단계;와, 사전에 점검하여 선택된 돌붙임용 석재를 상기 호안의 토사면에 맞물림을 철저히 하면서 부착하되, 상기 돌붙임용 석재와 석재 사이의 요철과 공극을 인정하면서 작업을 수행하는 돌붙임 단계;와, 상기 돌붙임용 석재와 석재 사이의 공극을 메워주기 위해 석재 틈새로 보조기층용 깬자갈 또는 강자갈로 이루어진 잡석과 표토사를 1 : 1 비율로 섞어 주입하는 공극 메움 단계;와, 상기 돌붙임용 석재가 설치된 호안 경사면 상단을 다져주는 비탈머리 공사단계; 및, 상기와 같이 돌붙임용 석재가 배치된 호안의 경사면에 영양분이 함유된 표토를 뿌려줌과 더불어 필요부분에 삽목 또는 식물의 식재를 수행한 후 물을 뿌려주는 마무리 단계;를 거치도록 된 것이다.The present invention for achieving the object of the above, the base step to evenly the soil surface of the lake to be stoned stone; And, to carry out the digging work for laying under the bottom of the soil surface, Performing a rough hole at the bottom of the trench, and performing a slope stop protecting the inclined surface of the lake at the bottom of the trench, and providing a foundation stone at the trench to fill the foundation; A natural fiber network installation step of installing a natural fiber network made of a natural material such as coir net, jute, etc. on a part of the earth surface of the lake which is determined to have a high risk of loss; and checking the stone for stone attachment selected in advance. The stone attaching step of attaching while thoroughly engaging the soil surface of the lake, while acknowledging the irregularities and voids between the stone for gluing stone and stone; and, the stone Filling gaps of mixed stone and topsoil composed of crushed gravel or coarse gravel for sub-bases in a stone gap to fill gaps between stone for hire and stone; Sloped head construction step to chop the top; And, finishing the step of spraying water after the planting of plants or plants in the necessary portion, as well as spraying the topsoil containing nutrients on the inclined surface of the lakeside stone is placed as described above; .

그리고, 상기와 같이 식물자생용 돌붙임의 시공에 따른 호안 경사면의 구조는 호안의 경사면 하단에 터파기부가 형성되고, 상기 터파기부 저면에 경사면을 보호하기 위한 비탈멈춤부재가 설치되며, 상기 비탈멈춤부재를 고정함과 더불어 상기 터파기부를 메워주기 위한 밑다짐돌이 터파기부에 채워지고, 상기 호안의 경사면에 코이어네트 또는 황마 등과 같은 천연재료로 제작되어 일정 넓이를 가지면서 덮여져 고정되는 천연섬유망이 설치되며, 상기 호안의 경사면에 다수의 돌붙임용 석재가 맞물려져 공극을 형성하면서 고정설치되고, 상기 돌붙임용 석재의 공극에 잡석 및 표토사로 이루어진 뒷채움재가 채워져 고정되며, 상기 돌붙임용 석재가 고정된 호안의 경사면 상단에 돌붙임용 석재의 안정을 위한 비탈머리부재가 설치된 구조이다.And, as described above, the structure of the rake slope according to the construction of the plant self-supporting stone attachment is formed with a trench at the bottom of the slope of the rake, a slope stopping member for protecting the slope on the bottom of the trench is installed, the slope In addition to fixing the member, the foundation stone for filling the trench is filled in the trench, the natural fiber is made of a natural material such as coirnet or jute on the inclined surface of the lake is covered and fixed while having a certain width A mesh is installed, and a plurality of stone stones are interlocked on the inclined surface of the lake and fixedly formed while forming voids, and a back fill material composed of rubble and topsoil is filled and fixed in the pores of the stone stones. It is a structure in which a slope head member is installed on the top of an inclined surface of a lake in which a stone is fixed.

따라서, 상기 하천 호안의 토사면에 식물자생용 돌붙임을 시공하여 호안의 안정성과 생태계 보존을 극대화시킬 수 있고, 호안의 경사면에 다양한 식물재를 활착 및 성육시킴으로써 시각적으로 신선하고 자연스럽게 호안을 꾸며줌과 더불어 경사면의 추이대를 생태적으로 유리하게 가꿀 수 있으며, 간단한 구조물을 이용하여 간편하게 시공함으로써 그 시공성을 높여줌과 더불어 비교적 저렴한 비용으로 경제적인 시공이 가능한 것이다.Therefore, by planting stones for plant growth on the soil surface of the river raft, it is possible to maximize the stability of the raft and preservation of the ecosystem, and visually fresh and naturally decorate the raft by lubricating and growing various plant materials on the slope of the raft. In addition, it is possible to ecologically change the transition surface of the inclined surface, and it is possible to economically construct at a relatively low cost by increasing the constructability by simply constructing using a simple structure.

이하 본 발명을 첨부된 예시도면을 참조하여 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 식물자생용 돌붙임의 시공순서를 도시한 흐름도이고, 도 2는 본 발명에 따른 식물자생용 돌붙임의 시공상태를 도시한 상태도이며, 도 3은 도 2의 A부를 확대하여 도시한 요부 확대도이고, 도 4는 본 발명에 따른 식물자생용 돌붙임이 호안에 적용된 설치상태를 도시한 상태도이며, 도 5는 도 2의 식물배치를 도시한 평면도이다.1 is a flow chart showing the construction sequence of the plant native stone attachment according to the present invention, Figure 2 is a state diagram showing the construction state of the plant native stone attachment according to the present invention, Figure 3 is a part A of FIG. 4 is an enlarged view illustrating main parts of the present invention, and FIG. 4 is a state diagram illustrating an installation state in which the plant-growing stone attachment according to the present invention is applied to a lake, and FIG. 5 is a plan view illustrating the plant arrangement of FIG. 2.

상기한 도면들에 의해 본 발명을 설명하면, 석재를 돌붙임하고자 하는 호안의 토사면을 고르게 하여 준 후, 상기 토사면의 하단에 밑다짐을 위한 터파기 공사를 수행하고, 상기 터파기 부분 하단의 표고를 점검하는 하단부근고공을 수행하며, 상기 터파기 부분의 하단에 호안의 경사면을 보호하는 비탈멈춤공을 수행하고, 상기 터파기 부분에 밑다짐돌(1)을 채워 넣어준 다음, 상기 호안의 토사면 상에서 유실 우려가 크다고 판단되는 부분에 코이어네트, 황마 등과 같은 천연재료로 이루어진 천연섬유망(2)을 설치하며, 사전에 점검하여 선택된 돌붙임용 석재(3)를 상기 호안의 토사면에 맞물림을 철저히 하면서 부착하되, 상기 돌붙임용 석재(3)와 석재(3) 사이의 요철과 공극(4)을 인정하면서 작업을 수행하고, 상기 돌붙입용 석재(3)와 석재(3) 사이의 공극(4)을 메워주기 위해 석재 틈새로 보조기층용 깬자갈 또는 강자갈로 이루어진 잡석과 표토사를 1 : 1 비율로 섞어 주입하며, 상기 돌붙임용 석재(3)가 설치된 호안 경사면 상단을 다져준 후, 상기와 같이 돌붙임용 석재(3)가 배치된 호안의 경사면에 영양분이 함유된 표토를 뿌려줌과 더불어 필요부분에 삽목 또는 식물(5)의 식재를 수행한 후 물을 뿌려주는 것이다.When the present invention is described by the above drawings, even after the earth and sand surface of the lake to be stoned, evenly carried out a trench for the bottom of the soil surface, and the bottom of the trench part Performing the bottom portion of the altitude to check the elevation of, the slope stop to protect the inclined surface of the lake at the bottom of the trench, and fill the foundation stone (1) in the trench, and then A natural fiber network (2) made of natural materials such as coir nets and jute is installed on the part of the lake where there is a high risk of loss on the soil surface, and the selected stone for stone attachment (3) is checked in advance. It is attached while thoroughly engaging the soil surface, the work is performed while acknowledging the irregularities and voids (4) between the stone (3) and stone (3) for the stone, and the stone (3) and stone for stone (3) ) Gap between In order to fill the), mixed with rubble and topsoil composed of crushed gravel or coarse gravel for subbases into a stone gap at a ratio of 1: 1, and slicing the top of the sloping surface of the stony slope where the stone for stone attachment 3 is installed, As well as spraying the topsoil containing nutrients on the inclined surface of the lakeside where the stone for stone attachment (3) is placed, and after planting the planting or plant (5) in the necessary part is sprayed with water.

여기서, 상기와 같은 식물자생용 돌붙임의 시공방법은 제방사면과 고수경사면 및 저수로경사면 중에서 그 사면경사가 1 : 2.0 - 1 : 4.0 범위의 경사면에 시공되고, 또한 홍수시 유속이 2.0㎧ - 3.5㎧ 정도되는 지역에 시공되는 바, 그 시공순서는 우선 토사면을 고른 후 그 토사면에 근고공 또는 비탈멈춤공사를 수행하고, 필요시 상기 토사면에 천연섬유망(2)을 깔아주며, 이 상태에서 선택된 석재를 이용하여 돌붙임 시공을 하고, 돌붙임된 각 석재의 공극(4)을 뒷채움재(6)를 이용하여 메워준 후, 비탈머리공사를 수행한 다음 표토사를 뿌려주고 필요시 식물(5)을 식재하도록 하는 것이다.Here, the construction method of the plant-grown stone attaching as described above is the slope slope of the embankment slope, the high water slope and the low water slope inclined in the range of 1: 2.0-1: 4.0, and the flow rate during flooding is 2.0㎧-3.5 The construction procedure is to be installed in the area of about ,, first select the soil surface, and then carry out the high-altitude or slope stopping construction on the soil surface, and if necessary, lay the natural fiber network (2) on the soil surface. Using the selected stone in the state of stone construction, and filling the voids (4) of each stone attached with the backfill material (6), after the slope hair work and then sprinkled topsoil if necessary It is to plant the plant (5).

그리고, 상기 시공시에 지정된 석산의 돌붙임용 석재(3)의 압축강도, 색상, 균열정도 등을 사전에 점검하고, 석산으로부터 반입된 돌붙임용 석재(3)의 재질과 형상, 크기에 대한 적정재료인지를 인지함이 바람직하며, 돌붙임된 호안의 경사면에 수행되는 삽목 또는 식물(5)의 식재는 현지 생태계 특성 및 수리특성을 고려하여 도입하되, 필요부분에 대하여 자연스러운 군락 형성의 폐곡선 선형 개념으로 설계 및 시공하고, 상기 비탈멈춤공 및 밑다짐 공사, 근고공사는 현지의 여건 및 수리, 생태적인 특성을 고려하여 적정 도입하는 것이 바람직하다.Then, the compressive strength, color, cracking degree, etc. of the stone attaching stone 3 of the stone mountain designated at the time of construction are checked in advance, and the material, shape, and size of the stone attaching stone 3 brought from the stone mountain are checked. It is desirable to recognize whether it is a proper material, and the planting of the cuttings or plants (5) carried out on the slopes of the stone shores is introduced in consideration of the local ecosystem characteristics and the hydraulic characteristics, but the closed curve of natural colony formation is necessary for the required part. It is preferable to design and construct the concept, and to properly introduce the slope stop hole, the foundation work, and the construction work in consideration of local conditions, repair, and ecological characteristics.

한편, 상기 식물자생용 돌붙임 시공에 의해 시공된 호안의 구조는 도 2와 도 3에 도시된 바와 같이, 호안의 경사면 하단에 터파기부(7)가 형성되고, 상기 터파기부(7) 저면에 경사면을 보호하기 위한 비탈멈춤부재(8)가 설치되며, 상기 비탈멈춤부재(8)를 고정함과 더불어 상기 터파기부(7)를 메워주기 위한 밑다짐돌(1)이 터파기부(7)에 채워져 구비되고, 상기 호안의 경사면에 코이어네트 또는 황마 등과 같은 천연재료로 제작되어 일정 넓이를 가지면서 덮여져 고정되는 천연섬유망(2)이 설치되며, 상기 호안의 경사면에 다수의 돌붙임용 석재(3)가 맞물려져 공극(4)을 형성하면서 고정설치되고, 상기 돌붙임용 석재(3)의 공극(4)에 잡석 및 표토사로 이루어진 뒷채움재(6)가 채워져 고정되며, 상기 돌붙임용 석재(3)가 고정된 호안의 경사면 상단에 돌붙임용 석재(3)의 안정을 위한 비탈머리부재(9)가 설치된 구조이다.On the other hand, as shown in Figures 2 and 3, the structure of the revetment constructed by the plant native stone attaching construction, the trench 7 is formed on the bottom of the slope of the revetment, the bottom of the trench 7 A slope stopping member 8 is installed to protect the inclined surface, and the foundation stone 1 for fixing the slope stopping member 8 and filling the trench 7 is provided at the trench 7. Filled and provided, the natural fiber network (2) is made of a natural material such as coir net or jute on the inclined surface of the lake is covered and fixed to a certain width is installed, for attaching a number of stones to the inclined surface of the lake The stone 3 is interlocked and fixedly installed while forming the voids 4, and the backfill material 6 made of rubble and topsoil is filled and fixed in the voids 4 of the stone attaching stone 3, and the stone is attached. Stone for attaching to the top of the slope of the shore where the stone (3) is fixed It is a structure in which the slope head member 9 for stability of (3) was provided.

즉, 상기 호안의 경사면에 시공된 식물자생용 돌붙임 구조는 여러 가지의 재료가 이용되는 바, 이 시공재료들을 설명하면 다음과 같다.That is, a variety of materials are used for the plant-growing stone attachment structure constructed on the inclined surface of the lake, and the construction materials will be described below.

돌붙임용 석재(3); 사석, 야면석, 깬잡석, 견치석, 자연석, 가공석 등과 같은 돌을 이용하고, 그 규격은 평균적인 치수가 300-400mm인 돌이 적응도가 크고 한변의 최대길이는 전면에서 500mm 이하이고 뒷길이는 400mm 이하가 바람직하며, 그 색상은 다양한 것이 경관상 유리하지만 검은색에 가까울수록 복사열이 커 식물자생 및 파충류, 양서류 등 동물 서식과 이동에는 불리하기 때문에 다소 밝은 색상의 석재가 바람직하고, 상기 석재의 압축강도는 500㎏/㎠ 이상인 것이 적합하며, 석재의 형상은 어류가 접하는 호안 하단의 수변 또는 수중의 경우 예리한 모서리가 전면에 나타나지 않아야 하고 심한 균열이 없는 것이 바람직함.Stone sticking stones (3); It uses stones such as sandstone, rape stone, crushed stone, cantilever, natural stone, and processed stone, and the standard is 300-400mm of average size of stones, and the maximum length of one side is less than 500mm from the front and 400mm from the back The more preferable is the variety, and the color is more advantageous in landscape, but the closer to black, the greater the radiant heat, which is disadvantageous to the habitat and movement of animals such as native plants, reptiles, and amphibians, and thus the stone of lighter color is preferable, and the compression of the stone It is appropriate that the strength is more than 500㎏ / ㎠, and the shape of the stone should not have sharp edges in the waterfront or in the waterside at the bottom of the shore where the fish contact.

뒷채움재(6); 25mm-40mm의 보조기층용 깬자갈 또는 강자갈을 이용함.Backfill material 6; Use ground gravel or strong gravel for sub-base of 25mm-40mm.

표토사; 유기질의 현지 표토사 또는 식물자생에 유리한 토질로서 모래 또는 실트질이나 마사질이 아닌 토사가 바람직함.Topsoil; Preferred soil for organic local topsoil or vegetative growth is preferably sand or silt but not silt or sand.

천연섬유망(2); 유실 우려가 큰 곳의 배면 보호에 적용하는 것으로 코이어네트 또는 황마 등과 같은 천연재료로 제작하는 것이 바람직함.Natural fiber network (2); As it is applied to the backside protection where there is a high risk of loss, it is preferable to manufacture with natural materials such as coirnet or jute.

식물재료; 삽목용 - 저수부인 경우 갯버들, 키버들, 버드나무 등 삽목 가능한 수변용 식물재를 이용하고, 식재용 - 추이대의 특성에 따라 가급적 다년생 벼과식물종이 바람직하다.Plant material; For cutting-In case of water storage, it is preferable to use perishable plants such as muds, kibers, and willows, and for planting-perennial rice plant species, depending on the characteristics of the transition zone.

그리고, 상기 하천 호안의 돌붙임 시공면에 조성되는 식물의 배치는 도 5에 도시된 바와 같이, 상단부(a)의 경우 띠, 억새, 참억새, 수크령, 그령 등이 자라게 하는 것이 바람직하고, 중단부(b)의 경우 물억새, 억새, 띠, 참억새, 달뿌리풀 등이 자라게 하는 것이 바람직하며, 하단부(c) 수변의 경우 갈대, 줄풀, 흑삼릉, 달뿌리풀, 물억새, 창포류, 붓꽃류, 골풀류, 고랭이류, 사초류, 매자기, 방동사니류 등이 자라게 하고, 하단부(c) 수중의 경우 갈대, 창포류, 붓꽃류, 방동사니류, 부들류 등이 자라게 하는 것이 바람직한 것이다.And, as shown in Figure 5, the arrangement of the plant is formed on the stone construction surface of the river bank, the upper part (a), it is desirable to grow the band, silver grass, pampas grass, sukkyeong, age, etc. In case of part (b), it is desirable to grow pampas grass, pampas grass, girdle, pampas grass, moon root grass, etc., and in the lower part (c) the waterside, reeds, rope grass, black samreung, moon root grass, water grass, irises, irises, lobules It is desirable to grow, high-yields, herbaceous, barberry, roomworms, etc., and in the case of the lower portion (c) underwater reeds, irises, irises, roomworms, weeds and the like.

한편, 상기와 같이 시공된 식물자생용 돌붙임은 시공후 그 유지관리가 중요한 바, 우선 시공부분의 하도 변화, 공사부분 상/하류의 여건 변화 등에 의해 유실, 퇴적이 발생할 경우에는 이를 모니터링하여 필요시 보완할 수 있으나 치수안전도에 큰 문제가 없는 정도의 세굴 퇴적은 존치하는 것이 다양한 생태환경 유지에 유리한 것이다.On the other hand, the plant attachment stone planting as described above is important to maintain and maintain after construction. First of all, if loss or deposition occurs due to changes in the lower part of the construction part, or changes in conditions of up / down construction part, it is necessary to monitor it. It is advantageous to maintain various ecological environment by maintaining scour deposits to the extent that they can be supplemented at the same time.

그리고, 시공후 식물(5) 도입부는 필요한 살수를 적정 시행하여야 하고, 도입 식물부분의 다른 자생식물 출현은 도입식물의 성장을 방해할 수도 있기 때문에 환삼덩굴, 개망초, 소리쟁이, 명아주, 쑥 등과 같은 종류의 식물은 성육전 또는 열매맺기 전에 뿌리채 제거하여야 하며, 돌 틈 또는 표면에 부착되는 부유사는 제거하지 말아야 하고, 호안 경사면의 자생식물은 가급적 벼과식물 등 홍수시 조도계수를 증가시키지 않는 부드러운 식물 자생의 존치가 유리한 것이다.In addition, after the construction, the introduction part of the plant (5) should be appropriately sprayed, and the appearance of other native plants in the part of the introduced plant may impede the growth of the introduced plant, such as hwansam vine, Ganoderma lucidum, Mt. Kinds of plants should be removed from the roots before growing or bearing fruit. Floating sands attached to the cracks or surfaces should not be removed. Native plants on the shoreline of the coastal slopes tend to have no increase in the roughness coefficient during flooding, such as rice plants. Homegrowth is advantageous.

따라서, 상기와 같이 돌붙임용 석재가 자연재이기 때문에 시각적으로 자연스러우며 식물자생이 빠르고 돌의 공극(4)이 커 양서류, 파충류, 텃새 등의 서식이 가능하여 생태기능이 우수하고, 일반 블럭과 같이 화학적인 문제가 없기 때문에 수중 생태계에 유리하며, 조도가 적정하여 수리적인 문제점이 크지 않고, 돌붙임용 석재(3)에 굴요성이 있으므로 약간의 처짐에도 복귀가 가능하여 치수적으로 안전성을 확보할 수 있으며, 호안의 경사면을 계단형태로 설계할 경우에도 자연스러운 계단 기능을 갖게 되기 때문에 친수성이 높게 되는 것이다.Therefore, as the stone for attaching the stone is natural as described above, it is visually natural, the vegetation is fast and the space of the stone is large 4, which is able to inhabit amphibians, reptiles, birds, etc., and has excellent ecological function. As there is no chemical problem, it is advantageous to the aquatic ecosystem, and the appropriate roughness does not have a large hydraulic problem. When the slope of the lake is designed in the form of stairs, the hydrophilicity becomes high because it has a natural step function.

이상에서 설명한 바와 같이 본 발명에 따른 식물자생용 돌붙임 구조물 및 그 시공방법에 의하면, 하천 호안의 토사면에 식물자생용 돌붙임을 시공하여 호안의 안정성과 생태계 보존을 극대화시킬 수 있고, 호안의 경사면에 다양한 식물재를 활착 및 성육시킴으로써 시각적으로 신선하고 자연스럽게 호안을 꾸며줌과 더불어 경사면의 추이대를 생태적으로 유리하게 가꿀 수 있으며, 간단한 구조물을 이용하여 간편하게 시공함으로써 그 시공성을 높여줌과 더불어 비교적 저렴한 비용으로 경제적인 시공이 가능한 효과가 있는 것이다.As described above, according to the plant-growing stone attaching structure and the construction method thereof according to the present invention, plant-growing stones can be installed on the soil surface of the river shore to maximize the stability and ecosystem preservation of the lake. By planting and growing various plant materials on the slope, it is possible to decorate the fresh and natural revetment visually and to make the transition of the slope ecologically advantageous. Cost-effective construction is possible.

도 1은 본 발명에 따른 식물자생용 돌붙임의 시공순서를 나타낸 흐름도,1 is a flow chart showing the construction sequence of the plant native stone paste according to the present invention,

도 2는 본 발명에 따른 식물자생용 돌붙임의 시공상태를 나타낸 상태도,Figure 2 is a state diagram showing the construction state of plant native stone attachment according to the invention,

도 3은 도 2의 A부를 확대하여 나타낸 요부 확대도,3 is an enlarged view illustrating main parts of an enlarged part A of FIG. 2;

도 4는 본 발명에 따른 식물자생용 돌붙임이 호안에 적용된 설치상태를 나타낸 상태도,Figure 4 is a state diagram showing the installation state applied to the plant-grown stone attachment according to the present invention,

도 5는 도 2의 식물배치를 도시한 평면도이다.5 is a plan view showing the plant arrangement of FIG.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 : 밑다짐돌 2 : 천연섬유망1: foundation stone 2: natural fiber network

3 : 돌붙임용 석재 4 : 공극3: stone for attaching stone 4: voids

5 : 식물 6 : 뒷채움재5: plant 6: backfill

7 : 터파기부 8 : 비탈멈춤부재7: excavation portion 8: slope stopping member

9 : 비탈머리부재9: slope head member

a : 상단부 b : 중단부a: upper part b: interruption part

c : 하단부c: lower part

Claims (2)

석재를 돌붙임하고자 하는 호안의 토사면을 고르게 하여 주는 기초단계;와,Basic step to even the soil surface of the lake to be stoned; and, 상기 토사면의 하단에 밑다짐을 위한 터파기 공사를 수행하고, 상기 터파기 부분 하단의 근고공을 수행하며, 상기 터파기 부분의 하단에 호안의 경사면을 보호하는 비탈멈춤공을 수행하고, 상기 터파기 부분에 밑다짐돌(1)을 채워 넣어주는 호안 기초공사단계;와,Carry out the trench for the bottom to the bottom of the soil surface, and performs the high hole at the bottom of the trench, and performs a slope stop hole to protect the inclined surface of the lake at the bottom of the trench, Hoan foundation construction step to fill the foundation stone (1) in the trench; and, 상기 호안의 토사면 상에서 유실 우려가 크다고 판단되는 부분에 코이어네트, 황마 등과 같은 천연재료로 이루어진 천연섬유망(2)을 설치하는 천연섬유망 설치단계;와,A natural fiber network installation step of installing a natural fiber network (2) made of a natural material such as coir net, jute, etc. on the part of the earth determined to be lost on the surface of the lake; 사전에 점검하여 선택된 돌붙임용 석재(3)를 상기 호안의 토사면에 맞물림을 철저히 하면서 부착하되, 상기 돌붙임용 석재(3)와 석재(3) 사이의 요철과 공극(4)을 인정하면서 작업을 수행하는 돌붙임 단계;와,Checking in advance and attaching the selected stone for stone (3) while thoroughly engaging the soil surface of the lake, while acknowledging the irregularities and voids (4) between the stone for stone (3) and stone (3) Gluing step of performing the operation; and, 상기 돌붙입용 석재(3)와 석재(3) 사이의 공극(4)을 메워주기 위해 석재 틈새로 보조기층용 깬자갈 또는 강자갈로 이루어진 잡석과 표토사를 1 : 1 비율로 섞어 주입하는 공극 메움 단계;와,A gap filling step of mixing and mixing the rubble and the topsoil composed of crushed gravel or coarse gravel for the auxiliary base in a ratio of 1: 1 in order to fill the voids 4 between the stone sticking stone 3 and the stone 3; Wow, 상기 돌붙임용 석재(3)가 설치된 호안 경사면 상단을 다져주는 비탈머리 공사단계; 및,Slope head construction step of chopping the top of the rake inclined surface is installed stone stone (3); And, 상기와 같이 돌붙임용 석재(3)가 배치된 호안의 경사면에 영양분이 함유된 표토를 뿌려줌과 더불어 필요부분에 삽목 또는 식물(5)의 식재를 수행한 후 물을 뿌려주는 마무리 단계;를 거치도록 된 식물자생용 돌붙임의 시공방법.A finishing step of spraying water after spraying the topsoil containing nutrients on the inclined surface of the lakeside where the stone sticking stone 3 is disposed as described above and planting the plant 5 on the required portion; Construction method of plant native stone sticking through. 호안의 경사면 하단에 터파기부(7)가 형성되고, 상기 터파기부(7) 저면에 경사면을 보호하기 위한 비탈멈춤부재(8)가 설치되며, 상기 비탈멈춤부재(8)를 고정함과 더불어 상기 터파기부(7)를 메워주기 위한 밑다짐돌(1)이 터파기부(7)에 채워져 구비되고, 상기 호안의 경사면에 코이어네트 또는 황마 등과 같은 천연재료로 제작되어 일정 넓이를 가지면서 덮여져 고정되는 천연섬유망(2)이 설치되며, 상기 호안의 경사면에 다수의 돌붙임용 석재(3)가 맞물려져 공극(4)을 형성하면서 고정설치되고, 상기 돌붙임용 석재(3)의 공극(4)에 보조기층용 깬자갈 또는 강자갈로 이루어진 잡석과 표토사를 1 : 1 비율로 혼합된 뒷채움재(6)가 채워져 고정되며, 상기 돌붙임용 석재(3)가 고정된 호안의 경사면 상단에 돌붙임용 석재(3)의 안정을 위한 비탈머리부재(9)가 설치되고, 돌붙임용 석재(3)가 배치된 호안의 경사면에 영양분이 함유된 표토를 뿌려줌과 더불어 필요부분에 삽목 또는 식물(5)의 식재를 수행한 식물자생용 돌붙임의 구조물.A trench 7 is formed at the lower end of the inclined surface of the arc, and a slope stopping member 8 is installed on the bottom of the trench 7 to protect the slope, and the slope stopping member 8 is fixed. The foundation stone 1 for filling the trench 7 is filled with the trench 7, and is made of a natural material such as coirnet or jute on the inclined surface of the lake and covered with a predetermined width. A fixed natural fiber network 2 is installed, and a plurality of stone sticking stones 3 are meshed with the inclined surface of the lake to be fixed while forming voids 4, and the voids of the stone sticking stones 3 are installed. (4) is filled with a backfill material (6) mixed with rubble or topsoil composed of sub-base gravel or coarse gravel in a ratio of 1: 1, and is fixed to the top of the slope of the revetment where the stone for stone attachment (3) is fixed A slope head member 9 for stabilizing the stone attachment stone 3 is installed. Stone attaching stone (3) is sprayed with a nutrient contained in the slope of the breakwater placed topsoil zoom and a construction of a plant native stone Attachment for performing the planting of cuttings or plants (5) In addition to the necessary parts for.
KR10-2002-0042017A 2002-07-18 2002-07-18 A construction and a carrying out method for plants a self-generation of a cover stone KR100487405B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0042017A KR100487405B1 (en) 2002-07-18 2002-07-18 A construction and a carrying out method for plants a self-generation of a cover stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0042017A KR100487405B1 (en) 2002-07-18 2002-07-18 A construction and a carrying out method for plants a self-generation of a cover stone

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020020021484U Division KR200291057Y1 (en) 2002-07-18 2002-07-18 A construction for plants a self-generation of a cover stone

Publications (2)

Publication Number Publication Date
KR20040008385A KR20040008385A (en) 2004-01-31
KR100487405B1 true KR100487405B1 (en) 2005-05-10

Family

ID=37317450

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0042017A KR100487405B1 (en) 2002-07-18 2002-07-18 A construction and a carrying out method for plants a self-generation of a cover stone

Country Status (1)

Country Link
KR (1) KR100487405B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101036741B1 (en) 2009-02-16 2011-05-24 박공영 Method for manufacturing rock garden
KR101169023B1 (en) 2010-06-10 2012-07-30 (주)대우건설 Method for installing soil nailing and tunnel prevent hole for tidal plant
US20230175222A1 (en) * 2016-08-31 2023-06-08 Wilkinson Ecological Design Erosion control apparatus
US12043973B2 (en) 2017-08-31 2024-07-23 Wilkinson Ecological Design Erosion control apparatus

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043951B1 (en) * 2011-01-26 2011-06-28 김재형 Rfid data gathering system of home waste
CN102677682B (en) * 2011-11-18 2014-04-02 浙江大地交通工程有限公司 Ecological slope protection structure and construction method thereof
CN104179150A (en) * 2014-08-25 2014-12-03 郑丙辉 Ecological slope protection structure
CN109797712B (en) * 2019-03-13 2020-07-21 江西省水利水电建设有限公司 Hydraulic engineering slope
CN110016885A (en) * 2019-05-07 2019-07-16 中交上海航道勘察设计研究院有限公司 It is a kind of to reserve the bank protection structure and its construction method for forming man-made lake for hydraulic reclamation area

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074531U (en) * 1993-06-22 1995-01-24 昌司 行本 Natural stone joint block
JPH08158344A (en) * 1994-11-17 1996-06-18 Fukuhou:Kk Construction of revetment by use of natural stone

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH074531U (en) * 1993-06-22 1995-01-24 昌司 行本 Natural stone joint block
JPH08158344A (en) * 1994-11-17 1996-06-18 Fukuhou:Kk Construction of revetment by use of natural stone

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101036741B1 (en) 2009-02-16 2011-05-24 박공영 Method for manufacturing rock garden
KR101169023B1 (en) 2010-06-10 2012-07-30 (주)대우건설 Method for installing soil nailing and tunnel prevent hole for tidal plant
US20230175222A1 (en) * 2016-08-31 2023-06-08 Wilkinson Ecological Design Erosion control apparatus
US12043973B2 (en) 2017-08-31 2024-07-23 Wilkinson Ecological Design Erosion control apparatus

Also Published As

Publication number Publication date
KR20040008385A (en) 2004-01-31

Similar Documents

Publication Publication Date Title
CN103898870B (en) A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method
CN209628299U (en) Suitable for restoring the ecological revetment of bank water natural structure
KR100665965B1 (en) Vegetation mat for revetment block afforestation
KR100487405B1 (en) A construction and a carrying out method for plants a self-generation of a cover stone
KR101367848B1 (en) System for accelerating salt removal by artificial water supply and method for accelerating salt using the same
Greenway et al. Engineered approaches for limiting erosion along sheltered shorelines: a review of existing methods
CN216379381U (en) Ecological gabion of river course water distribution
KR100451982B1 (en) Shore line structure capable of natural habitants for various lives
KR100884017B1 (en) Method of Constructing Bank Walls with Recovering Natural Environment
KR100381254B1 (en) Methode for construction of vegetative streambank of stream using trench
KR101692041B1 (en) Gabion Structure for Inducing Sediment and Preventing Beach Erosion
KR200291057Y1 (en) A construction for plants a self-generation of a cover stone
KR200306402Y1 (en) Stone net bag for plants
Scoffin et al. The Recent development of the reefs in the Northern Province of the Great Barrier Reef
KR200163470Y1 (en) Block for naturally protecting an inclined plane
KR100509643B1 (en) Method for greening of slope by waist-tire
CN115059014B (en) Intertidal zone structure suitable for muddy coastal zone and arrangement method
KR100451983B1 (en) Shore line structure capable of natural habitants for various lives
KR102264637B1 (en) River bank Shore Erosion Prevention Structure Using Coated Biopolymer Porous on Concrete block, and Construction Method therefor
KR200356111Y1 (en) Embankment block
KR20130113058A (en) Multi-usable vegitation structure and method of constructing revetment with the same
KR100294272B1 (en) Riverside lake revetment Tetraport
KR100463572B1 (en) A plant embankment of a construction and a carrying out method for river
Brown The Coastal Challenges of Adaptation for Sea Level Rise in Kiribati
KR20020009397A (en) Method for planting water-side plants at the water-impacting portion of the banks

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130416

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140418

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20150420

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20160419

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20170420

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20180417

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20190418

Year of fee payment: 15