KR100471713B1 - Cover mounting system of slab concrete for appartment house - Google Patents
Cover mounting system of slab concrete for appartment house Download PDFInfo
- Publication number
- KR100471713B1 KR100471713B1 KR1020040085588A KR20040085588A KR100471713B1 KR 100471713 B1 KR100471713 B1 KR 100471713B1 KR 1020040085588 A KR1020040085588 A KR 1020040085588A KR 20040085588 A KR20040085588 A KR 20040085588A KR 100471713 B1 KR100471713 B1 KR 100471713B1
- Authority
- KR
- South Korea
- Prior art keywords
- boom
- hydraulic
- direction adjusting
- connecting portion
- support
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/246—Safety or protective measures preventing damage to building parts or finishing work during construction specially adapted for curing concrete in situ, e.g. by covering it with protective sheets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
- E04G21/30—Safety or protective measures preventing damage to building parts or finishing work during construction against mechanical damage or dirt, e.g. guard covers of stairs
Abstract
Description
본 발명은, 공동 주택의 바닥 콘크리트 양생막 설치에 관한 것으로서, 특히 기존 타워 크레인에 양생막 설치기를 설치하여 양생막 설치를 손쉽게 할 수 있도록 하는 공동 주택의 바닥 콘크리트 양생막 덮개 설치 시스템에 관한 것이다.The present invention relates to the installation of a floor concrete curing film of a multi-family house, and more particularly, to a floor concrete curing film cover installation system of a multi-family house to install a curing film installer on an existing tower crane to facilitate the installation of the curing film.
일반적으로 콘크리트를 타설하면 콘크리트 구조물의 내구성을 향상시키기 위해 양생막을 설치하여 양생을 도와주게 된다.In general, when concrete is poured, curing is helped by installing a curing film to improve the durability of the concrete structure.
그러나, 대부분의 공동 주택에서는 작업자들에 의한 양생막 설치 작업이 진행되는 관계로 정확한 작업이 어려운 단점이 있다.However, most apartment houses have a disadvantage in that precise work is difficult due to the progress of the curing film installation by the workers.
도 1은 종래의 바닥 콘크리트에 양생막을 설치하는 작업 상태를 나타내는 도면으로서, 바닥 콘크리트(50)에는 작업자들이 양생막 걸이대의 양측을 잡고, 양생막(60)을 설치하게 된다.1 is a view showing a working state to install a curing film in the conventional floor concrete, the floor concrete 50, workers hold both sides of the curing film hanger, and install the curing film 60.
상술한 양생막(60)을 설치하기 위한 작업은, 작업자들의 발자욱으로 콘크리트 표면이 고르지 못하여 양생막(60)이 정확하게 설치되지 못하여 바닥 콘크리트(50)에 하자가 발생되어 내구성이 저하되는 문제점이 있다.Work for installing the above-mentioned curing film 60, there is a problem that the surface of the concrete is uneven due to the workers' foot, the curing film 60 is not installed correctly, so that the floor concrete (50) has a defect and durability is lowered. .
본 발명은 상술한 내용을 감안하여 안출된 것으로서, 본 발명은, 정밀한 양생막 작업을 실시할 수 있고, 작업의 효율성을 향상시킬 수 있도록 하는 공동 주택의 바닥 콘크리트 양생막 덮개 설치 시스템을 제공함을 그 목적으로 한다.SUMMARY OF THE INVENTION The present invention has been made in view of the above-described contents, and the present invention provides a floor concrete curing film cover installation system of a multi-family house which can perform precise curing film work and improve the efficiency of the work. The purpose.
본 발명은 상술한 목적 달성을 위해, 본 발명은, 공동 주택의 바닥 슬래브를 시공하기 위해 콘크리트를 타설한 후 바닥 슬래브에 양생막을 설치하는 작업에 있어서, 크레인; ㄷ형틀; 양생막; 방향 조정틀; 방향 조정 유압붐; 방향 조정대; 및 수평 고정대;로 구성된 공동 주택의 바닥 콘크리트 양생막 덮개 설치 시스템을 제공한다.The present invention, in order to achieve the above object, the present invention, in the operation of installing a curing film on the floor slab after pouring concrete to construct the floor slab of the apartment house, the crane; C-frame; Curing membrane; Direction adjusting frame; Directional hydraulic boom; Direction adjuster; And a horizontal fixture; provides a floor concrete curing film cover installation system of a common house.
이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.
도 2는 본 발명의 바닥 콘크리트 양생막 설치기의 사용 상태도이고, 도 3은 본 발명의 바닥 콘크리트 양생막 설치기의 상세도이며, 도 4는 본 발명의 바닥 콘크리트 양생막 설치기의 방향 조정 유압붐과 방향 조정대의 분해 상태도이고, 도 5는 본 발명의 방향 조정대의 작동 상태를 나타내는 도면이다.Figure 2 is a state diagram of the floor concrete curing film installer of the present invention, Figure 3 is a detailed view of the floor concrete curing film installer of the present invention, Figure 4 is the directional control hydraulic boom and the direction of the floor concrete curing film installer of the present invention It is an exploded state diagram of an adjustment bar, and FIG. 5 is a figure which shows the operation state of the direction adjustment bar of this invention.
양생막 설치기(900)는, 콘크리트를 타설하여 바닥 콘크리트(100)를 시공하는 경우, 그 바닥 콘크리트(100)의 상부에 양생막(200)을 설치하는데 사용되는 장치로, 기존 크레인(200)의 타워 크레인붐(220)에 연결 설치된 양생막 설치기(900)를 이용하여 효율적인 양생막(200)을 설치하고자 하는 장치이다.The curing film installer 900 is a device used to install the curing film 200 on top of the floor concrete 100 when the concrete is poured to install the floor concrete, the existing crane 200 It is a device to install the efficient curing film 200 by using the curing film installer 900 connected to the tower crane boom 220.
상기 크레인(200)에는 수직 지지대(210)의 상부에 타워 크레인붐(220)이 설치되고, 상기 타워 크레인붐(220)의 상부에 조정실(230)이 설치되며, 상기 조정실(230)의 내부에 방향 조정식 모니터(240)가 설치되고, 상기 타워 크레인붐(220)의 하부에 설치되는 이동식 롤러(222)와 결합된 와이어(224)에 후크가 결착되어 그 후크에 양생막 설치기(900)가 결합된다.The crane 200 has a tower crane boom 220 is installed in the upper portion of the vertical support 210, the adjustment chamber 230 is installed on the top of the tower crane boom 220, the interior of the adjustment chamber 230 Directional monitor 240 is installed, the hook is attached to the wire 224 coupled with the movable roller 222 is installed on the lower portion of the tower crane boom 220, the curing film installer 900 is coupled to the hook do.
상기 방향 조정식 모니터(240)에는 케이블(250)이 연결되어 양생막 설치기(900)를 구성하는 작동 모터(560)에 연결되고, 상기 작동 모터(560)에는 측면에 유압 탱크(570)가 연결되고, 상기 작동 모터(560)의 작동에 따라 유압이 방향 조정 유압붐(500)에 전해지게 된다.The cable 250 is connected to the directional monitor 240 is connected to the operating motor 560 constituting the curing membrane installer 900, the hydraulic motor 560 is connected to the side of the operating motor 560, In accordance with the operation of the operation motor 560, the hydraulic pressure is transmitted to the direction adjustment hydraulic boom 500.
상기 양생막 설치기(900)는, 크게 ㄷ형틀(400), 방향 조정틀(480), 방향 조정 유압붐(500), 방향 조정대(600) 및 수평 고정대(700)로 형성된다.The curing membrane installer 900 is largely formed of a c-shaped mold 400, a direction adjusting frame 480, a direction adjusting hydraulic boom 500, a direction adjusting table 600 and a horizontal holder 700.
상기 ㄷ형틀(400)은, ㄷ형 몸체의 내측에 롤러 조정박스(430)가 설치되고, 그 롤러 조정박스(430)에 스프링(440)이 설치되어 슬로우 롤러(450)에 일정한 힘을 가하게 되는 한편, 상기 ㄷ형틀(400)은 상부에 방향 조정틀(480)이 체결 볼트(482)로 체결된다.The c-shaped frame 400, the roller adjustment box 430 is installed inside the c-shaped body, the spring 440 is installed on the roller adjustment box 430 to apply a constant force to the slow roller 450, , The c-shaped frame 400 is fastened to the upper direction adjusting frame 480 by a fastening bolt 482.
상기 ㄷ형틀(400)에는, 하부에 양생막 걸이봉(410)이 관통되어 양생막(300)이 결합된다.The c-shaped frame 400, the curing film hanger rod 410 is passed through the curing film 300 is coupled.
상기 방향 조정틀(480)에는, 일측에 작동 모터(560), 유압 탱크(57)가 안착되고, 중앙으로 수평 조정대(700)가 고정되게 되며, 타측에 베어링 볼트(540)가 결합된다.In the direction adjustment frame 480, the operating motor 560, the hydraulic tank 57 is seated on one side, the horizontal adjustment table 700 is fixed to the center, the bearing bolt 540 is coupled to the other side.
상기 방향 조정 유압붐(500)은, 유압 호스(518)를 통해 유압 지지대(510)에 유압이 인가되고, 그 유압 지지대(510)에 작동 붐대(520)가 연결되는 구조로, 유압력에 따라 작동 붐대(520)의 길이가 축소 및 확대된다.The directional hydraulic boom 500 has a structure in which the hydraulic pressure is applied to the hydraulic support 510 through the hydraulic hose 518, the operation boom 520 is connected to the hydraulic support 510, according to the hydraulic force The length of the working boom 520 is reduced and enlarged.
즉, 상기 방향 조정 유압붐(500)은, 유압 지지대(510)와 작동 붐대(520)가 결합되고, 그 유압 지지대(510)에 유압 호스(518)가 연결되며, 그 유압 지지대(510)의 끝에 지지대 연결부(512)가 형성되고, 그 작동 붐대(520)의 끝에 붐대 연결부(522)가 형성되며, 지지대 연결부(512)와 붐대 연결부(522)에 각각 볼트홀(514)(524)이 형성되고, 상기 붐대 연결부(522)의 볼트홀(524)에 베어링 볼트(520)가 체결되어 고정된다.That is, the directional hydraulic boom 500, the hydraulic support 510 and the operation boom 520 is coupled, the hydraulic hose 518 is connected to the hydraulic support 510, the hydraulic support 510 A support connecting portion 512 is formed at the end, and a boom connecting portion 522 is formed at the end of the working boom 520, and bolt holes 514 and 524 are formed in the supporting connecting portion 512 and the boom connecting portion 522, respectively. The bearing bolt 520 is fastened to and fixed to the bolt hole 524 of the boom connecting portion 522.
상기 방향 조정대(600)는, 조정대 몸체(606)의 일측에 ㄷ형 형태로 유압붐 연결부(610)가 형성되고, 그 유압붐 연결부(610)에 볼트홀(614)이 형성되며, 조정대 몸체(606)의 유압붐 연결부(610)가 형성된 대향측에 직사각형 형태로 사각홀(624)이 형성된다.The direction adjuster 600, the hydraulic boom connecting portion 610 is formed in the c-shape on one side of the adjuster body 606, the bolt hole 614 is formed in the hydraulic boom connecting portion 610, adjuster body 606 Square hole 624 is formed in a rectangular shape on the opposite side on which the hydraulic boom connecting portion 610 is formed.
상기 방향 조정 유압붐(500)은, 유압 지지대(510)의 지지대 연결부(512)가 방향 조정대(600)의 유압붐 연결부(610)에 삽입되어 다른 베어링 볼트로 체결되며, 상기 방향 조정대(600)의 사각홀(624)에 수평 고정대(700)의 사각부(740)가 밀착되어 너트로 체결되게 된다.The direction adjustment hydraulic boom 500, the support connecting portion 512 of the hydraulic support 510 is inserted into the hydraulic boom connecting portion 610 of the direction adjusting table 600 is fastened by another bearing bolt, the direction adjusting table 600 The square part 740 of the horizontal holder 700 is in close contact with the square hole 624 of the fastening with a nut.
상기 수평 고정대(700)는, 원통형 형태의 고정대 몸체(710)의 상부에 고리 연결부(720)가 형성되고, 그 고리 연결부(720)에 고리홀(724)이 형성되어 와이어 고리(770)가 고정되며, 또한 상기 수평 고정대(700)는 고정대 몸체(710)에 베어링 받침부(730)가 형성되고, 고정대 몸체(710)의 하부에 사각부(740)가 형성되며, 그 사각부(740)에 볼트부(750)가 일체로 형성된다.The horizontal holder 700, the ring connecting portion 720 is formed on the upper portion of the cylindrical body of the holder 710, a ring hole 724 is formed in the ring connecting portion 720 is fixed to the wire ring 770 In addition, the horizontal holder 700 has a bearing support 730 is formed in the holder body 710, a square portion 740 is formed on the lower portion of the holder body 710, the square portion 740 The bolt portion 750 is integrally formed.
상기 수평 고정대(700)는 사각부(740)가 방향 조정대(600)의 사각홀(624)에 밀착삽입되어 너트로 체결고정되게 된다.The horizontal holder 700 has a square portion 740 is tightly inserted into the square hole 624 of the direction adjuster 600 is fastened with a nut.
상술한 구성에서 알 수 있듯이, 상기 양생막 설치기(900)는, ㄷ형틀(400)과 방향 조정틀(480)을 방향 조정 유압붐(500)의 작동 붐대(520)가 도 5와 같이 회전가능하게 작동시키는 구조로, 방향 조정대(600) 및 수평 고정대(700)가 축으로 작동되며, 상기 방향 조정 유압붐(500)의 작동 붐대(520)의 작동에 따라 유압 호스(518)를 통해 유압이 전해지면 화살표 상방으로 ㄷ형틀(400)과 방향 조정틀(480)이 이동되고, 유압 호스(518)를 통해 유압이 빠져나가면 화살표 하방으로 ㄷ형틀(400)과 방향 조정틀(480)이 이동하여 ㄷ형틀(400)에 설치된 양생막(300)을 일정한 방향으로 설치할 수 있게 되는 것이다.As can be seen in the above-described configuration, the curing membrane installer 900, the c-shaped mold 400 and the direction adjustment frame 480, the operation boom 520 of the direction adjustment hydraulic boom 500 is rotatable as shown in FIG. In order to operate the structure, the direction adjuster 600 and the horizontal holder 700 is operated in the shaft, the hydraulic pressure through the hydraulic hose 518 in accordance with the operation of the operation boom 520 of the directional hydraulic boom 500 When the c-shaped frame 400 and the direction adjustment frame 480 is moved to the upper direction of the arrow, when the hydraulic pressure exits through the hydraulic hose 518, the c-shaped frame 400 and the direction control frame 480 is moved below the arrow It will be able to install the curing film 300 installed in the c-shaped frame 400 in a predetermined direction.
상술한 본 발명의 구성에 의한 효과를 하기에 설명한다.The effect by the structure of this invention mentioned above is demonstrated below.
본 발명은, 종래와는 다르게 크레인을 이용하여 양생막 설치기를 설치함과 동시에, 방향 조정식 모니터를 통해 작업자는 유압을 인가하거나 유압을 빼내 ㄷ형틀의 각도를 조절하므로, 양생막이 설치되는 방향을 일정하게 조절할 수 있게 되므로, 작업시 효율성을 향상시킬 수 있게 된다. The present invention, unlike the conventional installation of the curing film installer using a crane, and at the same time through the directional monitor to adjust the angle of the c frame by applying the hydraulic pressure or withdraw the hydraulic pressure, the direction of the curing film is fixed It can be adjusted to improve the efficiency of the work.
도 1은 종래의 바닥 콘크리트에 양생막을 설치하는 작업 상태를 나타내는 도면.1 is a view showing a working state for installing a curing film in a conventional concrete floor.
도 2는 본 발명의 바닥 콘크리트 양생막 설치기의 사용 상태도.Figure 2 is a state of use of the floor concrete curing film installer of the present invention.
도 3은 본 발명의 바닥 콘크리트 양생막 설치기의 상세도.Figure 3 is a detailed view of the floor concrete curing film installer of the present invention.
도 4는 본 발명의 바닥 콘크리트 양생막 설치기의 방향 조정 유압붐과 방향 조정대의 분해 상태도.Figure 4 is an exploded state diagram of the direction adjustment hydraulic boom and the direction adjuster of the floor concrete curing film installer of the present invention.
도 5는 본 발명의 방향 조정대의 작동 상태를 나타내는 도면.5 is a view showing an operating state of the direction adjuster of the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
100: 바닥 콘크리트 200: 크레인100: floor concrete 200: crane
300: 양생막 400: ㄷ형틀300: curing film 400: c-frame
500: 방향 조정 유압붐 600: 방향 조정대500: direction adjustment hydraulic boom 600: direction adjuster
700: 수평 고정대 900: 양생막 설치기700: horizontal holder 900: curing film installer
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040085588A KR100471713B1 (en) | 2004-10-26 | 2004-10-26 | Cover mounting system of slab concrete for appartment house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040085588A KR100471713B1 (en) | 2004-10-26 | 2004-10-26 | Cover mounting system of slab concrete for appartment house |
Publications (1)
Publication Number | Publication Date |
---|---|
KR100471713B1 true KR100471713B1 (en) | 2005-03-14 |
Family
ID=37228329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040085588A KR100471713B1 (en) | 2004-10-26 | 2004-10-26 | Cover mounting system of slab concrete for appartment house |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100471713B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101429063B1 (en) * | 2012-06-19 | 2014-08-13 | 한국건설기술연구원 | Apparatus and method for pouring concrete |
CN112160595A (en) * | 2020-09-30 | 2021-01-01 | 抚州市恒强达绿色建筑科技有限公司 | Light steel floor system of prefabricated building |
KR102359032B1 (en) * | 2021-05-26 | 2022-02-08 | 주식회사 에스티아이 한국 | An apparatus for covering vinyle on the curing concrete surface |
-
2004
- 2004-10-26 KR KR1020040085588A patent/KR100471713B1/en not_active IP Right Cessation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101429063B1 (en) * | 2012-06-19 | 2014-08-13 | 한국건설기술연구원 | Apparatus and method for pouring concrete |
CN112160595A (en) * | 2020-09-30 | 2021-01-01 | 抚州市恒强达绿色建筑科技有限公司 | Light steel floor system of prefabricated building |
KR102359032B1 (en) * | 2021-05-26 | 2022-02-08 | 주식회사 에스티아이 한국 | An apparatus for covering vinyle on the curing concrete surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112796458B (en) | Building ceiling mechanism | |
KR100471713B1 (en) | Cover mounting system of slab concrete for appartment house | |
CN213837309U (en) | Adjustable telescopic module applied to assembled decoration ceiling | |
CN210316009U (en) | Adjustable rotary type bearing node structure for connecting precast concrete external wall panel and steel beam | |
JP2006192841A (en) | Vibration compaction apparatus for concrete in closed space and vibration compaction method | |
KR20140125910A (en) | Support structure of building | |
JP4646679B2 (en) | Frame material support structure | |
JP4297806B2 (en) | Precast concrete column positioning jig and positioning method | |
CN212080347U (en) | Antidetonation support convenient to installation | |
CN115218040A (en) | Adjustable sliding rail support hanger | |
CN214034306U (en) | Prefabricated building house roof support | |
CN211371499U (en) | Metal pipeline support for steel structure engineering construction | |
CN210106756U (en) | Pipeline sleeve mounting and fixing device | |
JP2579591Y2 (en) | Hanging bolt mounting structure | |
KR20100006023A (en) | Device for fitting hydraulic nut to rudder stock and fitting method of hydraulic nut for rudder stock using the same | |
CN211594695U (en) | Elevator attaches wall girder steel connection structure | |
CN2260829Y (en) | Easy-to-mount push-button operated on lower cistern-lid | |
CN211004271U (en) | Outdoor service line installation training hoist device | |
CN219547580U (en) | Pier top adjusting device | |
CN220396728U (en) | Construction hanger for building engineering | |
CN214359684U (en) | Adjustable counterweight buffer block and elevator counterweight device | |
CN215483995U (en) | Corridor suspended ceiling unit | |
CN213710062U (en) | Furred ceiling telescopic machanism and furred ceiling | |
CN219102658U (en) | Building hanger for assembled building | |
CN220790290U (en) | Height-adjustable connecting piece for suspended ceiling of biosafety clean room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
A302 | Request for accelerated examination | ||
E701 | Decision to grant or registration of patent right | ||
N231 | Notification of change of applicant | ||
GRNT | Written decision to grant | ||
LAPS | Lapse due to unpaid annual fee |