JP2579591Y2 - Hanging bolt mounting structure - Google Patents
Hanging bolt mounting structureInfo
- Publication number
- JP2579591Y2 JP2579591Y2 JP1991112905U JP11290591U JP2579591Y2 JP 2579591 Y2 JP2579591 Y2 JP 2579591Y2 JP 1991112905 U JP1991112905 U JP 1991112905U JP 11290591 U JP11290591 U JP 11290591U JP 2579591 Y2 JP2579591 Y2 JP 2579591Y2
- Authority
- JP
- Japan
- Prior art keywords
- insert
- hardware
- floor slab
- insert hardware
- mounting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
【0001】[0001]
【産業上の利用分野】本考案は、天井設備類を吊下げ支
持するための吊りボルトの取付け構造に関するものであ
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a suspension bolt mounting structure for suspending and supporting ceiling equipment.
【0002】[0002]
【従来の技術】デッキプレートやキーストンプレート等
の床スラブ用打込み型枠を用いて構築される床スラブの
下方に、天井設備類(例えば、天井下地や、天井裏に設
置される空調用ダクト、排煙ダク卜給湯管、給水管、電
線管等の配管類)を吊下げ支持するための吊りボルトを
取り付けるにあたり、従来では、図3に示すような構造
が採用されていた。2. Description of the Related Art Under a floor slab constructed using a driving form for a floor slab such as a deck plate or a keystone plate, ceiling equipment (for example, an air-conditioning duct installed on a ceiling base or a ceiling space, Conventionally, a structure as shown in FIG. 3 has been adopted for attaching a suspension bolt for suspending and supporting a smoke exhaust duct hot water supply pipe, a water supply pipe, a conduit, and the like.
【0003】図3において、1はデッキプレートやキー
ストンプレート等の床スラブ用打込み型枠、2は吊りボ
ルト、3はインサート金物であり、中心部に吊りボルト
2の上端側ねじ部をねじ込むためのねじ穴3aが形成さ
れ、上端に大径鍔部3bが形成されている。4はインサ
ート金物3の下端部に嵌着した合成樹脂製スリーブで、
その外周面には複数の抜止め弾性片4aが周方向に適当
間隔おきに突設されている。5は、インサート金物3の
外周に前記大径鍔部3bと床スラブ用打込み型枠1との
間で圧縮された状態に套嵌されたコイルスプリングであ
る。In FIG. 3 , reference numeral 1 denotes a driving form for a floor slab such as a deck plate or a keystone plate, 2 denotes a suspension bolt, and 3 denotes an insert hardware. The upper end of the suspension bolt 2 is screwed into a central portion. A screw hole 3a is formed, and a large diameter flange 3b is formed at the upper end. Reference numeral 4 denotes a synthetic resin sleeve fitted to the lower end of the insert hardware 3.
A plurality of retaining elastic pieces 4a are provided on the outer peripheral surface at appropriate intervals in the circumferential direction. Reference numeral 5 denotes a coil spring fitted around the outer periphery of the metal insert 3 in a compressed state between the large-diameter flange portion 3b and the driving formwork 1 for floor slab.
【0004】インサート金物3の下端部に嵌着した前記
スリーブ4を床スラブ用打込み型枠1に形成した貫通孔
1aに上方から挿入した状態で、前記コイルスプリング
5がインサート金物3を上昇付勢することにより、前記
抜止め弾性片4aの上端が床スラブ用打込み型枠1の下
面と当接し、インサート金物3が床スラブ用打込み型枠
1に対して一定の取付け姿勢に維持されるようになって
いる。6は座金、7は床スラブ用打込み型枠1の上に打
設されるコンクリートを示し、このコンクリート7は床
スラブ用打込み型枠1とによって合成床スラブが構成さ
れている。The coil spring 5 urges the insert metal member 3 upward while the sleeve 4 fitted to the lower end of the insert metal member 3 is inserted from above into a through hole 1a formed in the driving frame 1 for floor slab. By doing so, the upper end of the retaining elastic piece 4a abuts against the lower surface of the floor slab driving form 1 so that the insert hardware 3 is maintained in a fixed mounting posture with respect to the floor slab driving form 1. Has become. Numeral 6 denotes a washer and numeral 7 denotes concrete cast on the floor slab driving form 1. The concrete 7 and the floor slab driving form 1 constitute a composite floor slab.
【0005】[0005]
【考案が解決しようとする課題】上記の従来構造では、
コンクリート7の打設前において、インサート金物3に
下方への荷重が加わると、コイルスプリング5が縮小し
てインサート金物2が下方へ移動し、コンクリート7に
対するインサート金物2の埋め込み深さが減少すること
になる。[Problems to be solved by the invention] In the above conventional structure,
When a downward load is applied to the insert hardware 3 before the concrete 7 is cast, the coil spring 5 contracts, the insert hardware 2 moves downward, and the embedding depth of the insert hardware 2 in the concrete 7 decreases. become.
【0006】このため、床スラブ用打込み型枠1の上に
打設したコンクリート7に所定の強度が発現して、イン
サート金物2がしっかりと固定されるまで、吊りボルト
2に荷重をかけることができず、下階の天井設備類を吊
下げ支持することができないので、下階の天井設備類の
工事を上階のコンクリート硬化後に行うことが必要にな
り、工期が長くなるという欠点があった。For this reason, it is possible to apply a load to the suspension bolts 2 until a predetermined strength is developed in the concrete 7 cast on the driving formwork 1 for the floor slab and the insert hardware 2 is firmly fixed. It is not possible to suspend and support the ceiling equipment on the lower floor, so it is necessary to perform the work on the ceiling equipment on the lower floor after the concrete on the upper floor is hardened, and there is a disadvantage that the construction period becomes longer. .
【0007】上記の従来欠点に鑑み、本考案は、上階の
床スラブ用コンクリートを打設する前に、下階の天井設
備類の工事を行って工期を短縮し得るようにした吊りボ
ルトの取付け構造を提供しようとするものである。[0007] In view of the above-mentioned conventional disadvantages, the present invention is directed to a suspension bolt which can shorten the construction period by constructing ceiling equipment on the lower floor before casting concrete for floor slab on the upper floor. It is intended to provide a mounting structure.
【0008】[0008]
【課題を解決するための手段】上記の目的を達成するた
めに、本考案が講じた技術的手段は次の通りである。即
ち、本考案による吊りボルトの取付け構造は、床スラブ
用打込み型枠に形成し た貫通孔にインサート金物の下端
部に嵌着した合成樹脂製スリーブを、当該スリーブに形
成した抜止め弾性片の上端が床スラブ用打込み型枠の下
面と対向する状態に挿入し、インサート金物の外周に、
インサート金物を上昇付勢するコイルスプリングと、イ
ンサート金物の大径鍔部との当接によりインサート金物
が一定以上下降することを阻止する鋼製スリーブとを套
嵌し、インサート金物のねじ穴に天井設備類の吊りボル
トの上端側ねじ部をねじ込んであることを特徴としてい
る。 The technical means taken by the present invention to achieve the above object are as follows. That is, the mounting structure of the suspension bolt according to the present invention is a floor slab.
The lower end of the insert hardware in the through hole formed in the
The synthetic resin sleeve fitted to the part
The upper end of the formed retaining elastic piece is below the driving form for the floor slab.
Insert in a state facing the surface, around the outer periphery of the insert hardware,
A coil spring that urges the insert hardware upward;
Insert hardware is brought into contact with the large diameter flange of the insert hardware.
With a steel sleeve that prevents the
Fit the hanging bolts of the ceiling equipment into the screw holes of the insert hardware.
The upper end of the screw is screwed in.
You.
【0009】[0009]
【作用】上記の構成によれば、吊りボルトにかかる荷重
により、インサート金具がコイルスプリングによる上昇
付勢力に抗してある程度引き下げられると、インサート
金具の大径鍔部が鋼製スリーブの上縁に当接して、それ
以上の下降が阻止される。従って、コンクリートに対す
るインサート金具の必要な埋込み深さが確保され、且
つ、前記荷重が床スラブ用打込み型枠で支持されること
になる。 According to the above arrangement, the load applied to the suspension bolt
As a result, the insert bracket is raised by the coil spring
When it is lowered to some extent against the bias, the insert
The large-diameter flange of the metal fitting contacts the upper edge of the steel sleeve,
The above descent is prevented. Therefore, for concrete
The necessary embedding depth of the insert metal fitting is secured, and
The load is supported by a driving form for the floor slab.
become.
【0010】[0010]
【実施例】図1、図2は本考案による吊りボルトの取付
け構造を示す。この取付け構造は、床スラブ用打込み型
枠1の貫通孔1aにインサート金物3の下端部に嵌着し
た合成樹脂製スリーブ4を、当該スリーブ4に形成した
抜止め弾性片4aの上端が床スラブ用打込み型枠1の下
面と対向する状態に上方から挿入し、インサート金物3
の外周に、インサート金物3を上昇付勢するコイルスプ
リング5と、インサート金物3の大径鍔部3bとの当接
によりインサート金物3が一定以上下降することを阻止
する鋼製スリーブ10とを套嵌し、インサート金物3の
ねじ穴3aに天井設備類の吊りボルト2の上端側ねじ部
をねじ込んだものである。 1 and 2 show a hanging bolt mounting structure according to the present invention. In this mounting structure, a synthetic resin sleeve 4 fitted into the through hole 1a of the floor slab driving form 1 at the lower end of the insert hardware 3 is attached to the floor slab. Insert from above into a state facing the lower surface of the driving formwork 1
A coil spring 5 that urges the insert hardware 3 upward and a steel sleeve 10 that prevents the insert hardware 3 from lowering by a certain amount due to contact with the large-diameter flange portion 3b of the insert hardware 3 are provided around the outer periphery of the insert. The upper end side screw portion of the suspension bolt 2 of the ceiling equipment is screwed into the screw hole 3a of the insert metal fitting 3.
【0011】 尚、吊りボルト2は、貫通孔1aに対する
合成樹脂製スリーブ4の挿入に先立って、予め、インサ
ート金物3のねじ穴3aにねじ込み連結しておき、型枠
上方からの作業によって図1に示す状態に取り付けられ
ることになる。抜止め弾性片4aは、図3に基づいて説
明した通り、合成樹脂製スリーブ4の外周に周方向適当
間隔おきに複数突設されている。そして、インサート金
物3を押し下げて、合成樹脂製スリーブ4を貫通孔1a
に抜止め弾性片4aの上端が貫通孔1aを通過するまで
挿入することにより、抜止め弾性片4aが弾性復元力に
よって拡径変形するように構成されている。従って、前
記コイルスプリング5がインサート金物3を上昇付勢す
ることにより、図1に示すように、前記抜止め弾性片4
aの上端が床スラブ用打込み型枠1の下面と当接し、イ
ンサート金物3が床スラブ用打込み型枠1に対して一定
の取付け姿勢に維持されることになる。 [0011] Incidentally, hanger rod 2, prior to insertion of the synthetic resin sleeve 4 with respect to the through-hole 1a, 1 preliminarily by threaded connection to the screw hole 3a of the insert fittings 3, by working from the mold above Will be installed in the state shown in FIG. As described with reference to FIG. 3 , a plurality of retaining elastic pieces 4a are provided on the outer periphery of the synthetic resin sleeve 4 at appropriate circumferential intervals. Then, the insert metal member 3 is pushed down, and the synthetic resin sleeve 4 is inserted into the through hole 1a.
Is inserted until the upper end of the retaining elastic piece 4a passes through the through hole 1a, so that the retaining elastic piece 4a is expanded and deformed by the elastic restoring force. Accordingly, as shown in FIG. 1 , the coil spring 5 urges the insert metal member 3 upward to urge the insert elastic piece 4.
The upper end of a is in contact with the lower surface of the floor slab driving form 1, and the insert hardware 3 is maintained in a fixed mounting posture with respect to the floor slab driving form 1.
【0012】 上記の構成によれば、吊りボルト2にかか
る荷重により、インサート金具3がコイルスプリング5
による上昇付勢力に抗して引き下げられると、図2に示
すように、インサート金具3の大径鍔部3bが鋼製スリ
ーブ10の上縁に当接して、それ以上の下降が阻止され
るので、コンクリート7に対するインサート金具3の必
要な埋込み深さが確保され、且つ、前記荷重が鋼製スリ
ーブ10を介して床スラブ用打込み型枠1で支持される
ことになる。 [0012] According to the above configuration, the load on the hanger rod 2, the insert fitting 3 is the coil spring 5
2 , the large-diameter flange portion 3b of the insert fitting 3 comes into contact with the upper edge of the steel sleeve 10 to prevent further lowering, as shown in FIG. As a result, the necessary embedding depth of the insert 3 in the concrete 7 is ensured, and the load is supported by the floor slab driving form 1 via the steel sleeve 10.
【0013】[0013]
【考案の効果】以上説明した通り、本考案によれば、吊
りボルトにかかる荷重によってインサート金物が一定以
上下降することを鋼製スリーブにより阻止し、コンクリ
ートに対するインサート金物の埋込み深さが確保される
ので、上階の床スラブ用コンクリートの打設前に下階の
天井設備類を吊りボルトで吊下げ支持することが可能で
あり、天井設備類の工事を先行することによって工期を
短縮し得るのである。 Ri has been described above through, according to the invention] According to the present invention, the descending insert hardware is constant or blocked by a steel sleeve by a load applied to the hanger rod, embedding depth of the insert fittings for concrete is ensured Therefore, it is possible to suspend and support the ceiling equipment on the lower floor with suspension bolts before the concrete for the floor slab on the upper floor is cast, and the construction period can be shortened by preceding the construction of the ceiling equipment. It is.
【図1】本考案に係る吊りボルトの取付け構造を示す断
面図である。FIG. 1 is a cross-sectional view illustrating a mounting structure of a suspension bolt according to the present invention.
【図2】吊りボルトに天井設備類の荷重がかかった状態
を示す断面図である。 FIG. 2 A state where the load of ceiling equipment is applied to the suspension bolt
FIG.
【図3】従来の吊りボルトの取付け構造を示す断面図で
ある。 FIG. 3 is a sectional view showing a conventional hanging bolt mounting structure.
is there.
【符号の説明】 1…床スラブ用打込み型枠、 1a…貫通孔、 2…吊りボルト、 3…インサート金物、 3a…ねじ穴、 3b…大径鍔部、 4…合成樹脂製スリーブ、 4a…抜止め弾性片、 5…コイルスプリング、 7…コンクリート、 10 …鋼製スリーブ。[Description of Signs] 1 ... Driving formwork for floor slab, 1a ... Through hole, 2 ... Hanging bolt, 3 ... Insert hardware, 3a ... Screw hole, 3b ... Large diameter flange, 4 ... Synthetic resin sleeve, 4a ... Retaining elastic piece, 5: coil spring, 7: concrete , 10 : steel sleeve.
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.6,DB名) E04B 1/41 502──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int.Cl. 6 , DB name) E04B 1/41 502
Claims (1)
にインサート金物の下端部に嵌着した合成樹脂製スリー
ブを、当該スリーブに形成した抜止め弾性片の上端が床
スラブ用打込み型枠の下面と対向する状態に挿入し、イ
ンサート金物の外周に、インサート金物を上昇付勢する
コイルスプリングと、インサート金物の大径鍔部との当
接によりインサート金物が一定以上下降することを阻止
する鋼製スリーブとを套嵌し、インサート金物のねじ穴
に天井設備類の吊りボルトの上端側ねじ部をねじ込んで
あることを特徴とする吊りボルトの取付け構造。 1. A through hole formed in a driving form for a floor slab.
Three synthetic resin fittings on the lower end of the insert hardware
The upper end of the retaining elastic piece formed on the sleeve
Insert the slab in such a way that it faces the lower surface of the
The insert hardware is urged upward on the outer periphery of the insert hardware.
Contact between the coil spring and the large diameter flange of the insert hardware
Prevents the insert metal from falling below a certain level due to contact
With a steel sleeve to be inserted and the screw holes in the insert hardware
Screw the upper end of the hanging bolt of the ceiling equipment into the
A mounting structure for hanging bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991112905U JP2579591Y2 (en) | 1991-12-26 | 1991-12-26 | Hanging bolt mounting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1991112905U JP2579591Y2 (en) | 1991-12-26 | 1991-12-26 | Hanging bolt mounting structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0554701U JPH0554701U (en) | 1993-07-23 |
JP2579591Y2 true JP2579591Y2 (en) | 1998-08-27 |
Family
ID=14598435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1991112905U Expired - Fee Related JP2579591Y2 (en) | 1991-12-26 | 1991-12-26 | Hanging bolt mounting structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2579591Y2 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5480039B2 (en) * | 2010-07-01 | 2014-04-23 | ジャパンライフ株式会社 | Slip-resistant ceramic insert |
JP6157859B2 (en) * | 2013-01-18 | 2017-07-05 | 株式会社ミツケンコーポレーション | insert |
JP6246575B2 (en) * | 2013-12-04 | 2017-12-13 | エヌパット株式会社 | Post-construction anchor, anchor tool and construction method |
JP6246576B2 (en) * | 2013-12-04 | 2017-12-13 | エヌパット株式会社 | Connecting bolt, tool and construction method |
JP2016048006A (en) * | 2014-08-28 | 2016-04-07 | エヌパット株式会社 | Insert metal fitting |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS54173509U (en) * | 1978-05-26 | 1979-12-07 |
-
1991
- 1991-12-26 JP JP1991112905U patent/JP2579591Y2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0554701U (en) | 1993-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6389761A (en) | Construction method for suspending building member | |
JP2579591Y2 (en) | Hanging bolt mounting structure | |
JP6748470B2 (en) | A suspending structure for mounting an insert on a deck plate with a reinforcing bar truss and suspending and supporting ceiling equipment on a lower floor under the deck, and a method for mounting ceiling equipment on a lower portion of a deck plate with a reinforcing bar truss using the insert. | |
JP3149454U (en) | Temporary column for handrail | |
US5393024A (en) | Water heater tank support | |
KR102523942B1 (en) | building hanger with anti-release and height control | |
JPH11151319A (en) | Structure for mounting sprinkler head in in-dwelling-unit sprinkler facility | |
JPH0884783A (en) | Method for construction of sprinkler | |
JP3015125U (en) | Suspended stand for unit bath | |
CN216475779U (en) | Screw and anchor bar combined embedded part system of unit curtain wall | |
CN220268655U (en) | Vibration isolation mounting structure of pipeline hanger | |
JPH0412915Y2 (en) | ||
CN216109254U (en) | Pre-buried structure of structure floor prestressing force pipeline | |
CN220366561U (en) | Auxiliary device for hanging plate house water heater | |
JP3038482U (en) | Hanger for grid member of system ceiling | |
JP3263907B2 (en) | Simple fastener | |
JPH071466Y2 (en) | Temporary columns for formwork support | |
JPH022808Y2 (en) | ||
JPH0163933U (en) | ||
JPH0215932Y2 (en) | ||
JP3061669U (en) | Main leg material installation device | |
JPH04174176A (en) | Assembly of pc slab | |
JP2586015Y2 (en) | Curtain wall fasteners | |
JPS6212736Y2 (en) | ||
JPH0712468Y2 (en) | Wall-mounted toilet mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |