JPH0215932Y2 - - Google Patents

Info

Publication number
JPH0215932Y2
JPH0215932Y2 JP1984195477U JP19547784U JPH0215932Y2 JP H0215932 Y2 JPH0215932 Y2 JP H0215932Y2 JP 1984195477 U JP1984195477 U JP 1984195477U JP 19547784 U JP19547784 U JP 19547784U JP H0215932 Y2 JPH0215932 Y2 JP H0215932Y2
Authority
JP
Japan
Prior art keywords
field edge
attached
hanging
metal fitting
hanging tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1984195477U
Other languages
Japanese (ja)
Other versions
JPS61108713U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1984195477U priority Critical patent/JPH0215932Y2/ja
Publication of JPS61108713U publication Critical patent/JPS61108713U/ja
Application granted granted Critical
Publication of JPH0215932Y2 publication Critical patent/JPH0215932Y2/ja
Expired legal-status Critical Current

Links

Landscapes

  • Building Environments (AREA)

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案は防音及び防振の目的のために、コンク
リートスラブ或いは梁から離して天井板を支持す
る構造に関する。
[Detailed Description of the Invention] (Industrial Field of Application) The present invention relates to a structure for supporting a ceiling plate away from a concrete slab or beam for the purpose of sound and vibration isolation.

(従来の技術) 従来から家屋或いはマンシヨンの天井板をコン
クリートスラブ或いは梁から離して支持すること
で上の階からの騒音及び振動等を減少せしめる構
造のものが知られている。
(Prior Art) Structures have been known in which the ceiling panels of houses or condominiums are supported away from concrete slabs or beams to reduce noise, vibration, etc. from the floors above.

具体的には第2図に示す如くスラブ20にアン
カーボルト21を螺着し、アンカーボルト21に
吊り具22と取付け、一方、野縁23の下面に天
井板24を貼り付け、この野縁23を野縁受け2
5に交叉する如く取付け、この野縁受け25を吊
り具22にスプリング26を介して挿通したボル
ト27下端部にて支持するようにしている。
Specifically, as shown in FIG. 2, an anchor bolt 21 is screwed onto a slab 20, a hanging tool 22 is attached to the anchor bolt 21, and a ceiling board 24 is attached to the lower surface of the field edge 23. Noen Uke 2
5, and the field edge receiver 25 is supported by the lower end of a bolt 27 inserted through the hanging tool 22 via a spring 26.

(考案が解決しようとする問題点) 上述した従来の吊り下げ構造にあつては吊り具
から下方に延びるボルトにて野縁受けを支持して
いるため、スラブ20と天井板24との間隔は少
なくとも吊り具22の高さ、ボルト21,27の
長さ及び野縁23、野縁受け25の高さを加えた
ものよりも大としなければならず、その結果スラ
ブ20と天井板24との間隔、つまり天井の懐が
大きくなり相対的に天井板24が下がることとな
り、部屋の容積が狭くなる問題がある。
(Problem to be solved by the invention) In the above-mentioned conventional hanging structure, since the frame support is supported by bolts extending downward from the hanging tool, the interval between the slab 20 and the ceiling board 24 is It must be at least greater than the height of the hanging fixture 22, the length of the bolts 21, 27, and the height of the edge 23 and edge support 25, and as a result, the height of the slab 20 and the ceiling board 24 The gap, that is, the ceiling width increases, and the ceiling plate 24 is relatively lowered, resulting in a problem that the volume of the room becomes smaller.

(問題点を解決するための手段) 上記問題点を解決すべく本考案に係る天井板の
吊り下げ構造は、吊り具の本体をコ字型に形成し
てその下部に挿通孔を形成し、この挿通孔と本体
内に装着した弾性体に設けられた貫通孔とを通し
て金具を取付け、この金具から水平方向に取付金
具を延出し、この取付金具に高さ方向において少
なくともその一部が前記吊り具と重なるように吊
り具の軸に対し偏心して配置した野縁受けを固着
し、この野縁受けに対し交叉する如く野縁を取付
け、この野縁の下面に前記天井板を取付けた。
(Means for Solving the Problems) In order to solve the above problems, the hanging structure of the ceiling board according to the present invention includes forming the main body of the hanging tool in a U-shape, forming an insertion hole in the lower part, A metal fitting is installed through this insertion hole and a through hole provided in an elastic body installed in the main body, and the mounting metal fitting is extended horizontally from this metal fitting, and at least a part of it in the height direction is attached to the above-mentioned hanging metal fitting. A field edge receiver placed eccentrically with respect to the axis of the hanger was fixed so as to overlap with the hanging tool, a field edge was attached so as to intersect with the field edge receiver, and the ceiling board was attached to the lower surface of this field edge.

(実施例) 以下に本考案の実施例を第1図に基いて説明す
る。
(Example) An example of the present invention will be described below based on FIG. 1.

第1図は本考案に係る吊り下げ構造の一部を破
断して示した側面図であり、図中1はコンクリー
トスラブ(梁を含む)であり、このスラブ1に吊
り具2を介して天井板3が吊り下げ支持される。
即ち、天井板3は野縁4下面に取付けられ、この
野縁4は交叉する如く配置された野縁受け5下面
に取付けられ、この野縁受け5が吊り具2の一部
をなす取付金具7にて支持される。
Fig. 1 is a partially cutaway side view of the suspension structure according to the present invention. In the figure, 1 is a concrete slab (including a beam), and a hanging device 2 is connected to the concrete slab 1. The board 3 is suspended and supported.
That is, the ceiling board 3 is attached to the lower surface of a field edge 4, and this field edge 4 is attached to the lower surface of the field edge receivers 5 arranged so as to intersect with each other. Supported by 7.

また、吊り具2の本体8は金属板をコ字型に折
曲してなり、上板部8a上面にはアンカーボルト
9が固着され、このアンカーボルト9をスラブ1
に埋設したホールインアンカー10に螺着するこ
とで吊り具2がスラブ1に取付けられる。そして
本体8の下板部8bにはボルト挿通孔11が形成
されるとともに、本体8内にはアダプター12を
設けた弾性体13が装填されている。弾性体13
は角ブロツク状をなし、グラスウール13aを圧
縮してなる成形体の表面をゴム13bにてコーテ
イングしてなり、中央部に前記ボルト挿通口11
と一致する貫通孔14が穿設され、この貫通孔1
4にアダプター12の筒部12aが嵌め込まれ
る。そしてアダプターの筒部12a内周面には雌
ネジ部が刻設され、筒部12aの上端部には円形
フウンジ部12bが設けられ、このフウンジ部1
2bが弾性体13の上面に当接する。
The main body 8 of the hanging tool 2 is formed by bending a metal plate into a U-shape, and an anchor bolt 9 is fixed to the upper surface of the upper plate portion 8a.
The hanging tool 2 is attached to the slab 1 by screwing into the hole-in anchor 10 buried in the slab. A bolt insertion hole 11 is formed in the lower plate portion 8b of the main body 8, and an elastic body 13 provided with an adapter 12 is loaded inside the main body 8. Elastic body 13
has a square block shape, and is made by compressing glass wool 13a and coating the surface with rubber 13b, and has the bolt insertion hole 11 in the center.
A through hole 14 corresponding to the through hole 1 is drilled, and this through hole 1
4 into which the cylindrical portion 12a of the adapter 12 is fitted. A female screw portion is carved into the inner peripheral surface of the cylindrical portion 12a of the adapter, and a circular flange portion 12b is provided at the upper end portion of the cylindrical portion 12a.
2b comes into contact with the upper surface of the elastic body 13.

また、アダプター12の筒部12aには下方か
らボルト15が螺着し、このボルト15の下端部
にダブルナツト16,16を介して前記取付金具
7の基端部が支持される。この取付金具7は板状
をなし、水平方向に延びてその先端部が野縁受け
5に形成した切欠5a内に入り込み、ビス6にて
野縁受け5の切欠5a上面を下方から支持する。
A bolt 15 is screwed into the cylindrical portion 12a of the adapter 12 from below, and the base end of the mounting bracket 7 is supported by the lower end of the bolt 15 via double nuts 16,16. The mounting bracket 7 has a plate shape, extends in the horizontal direction, and its tip fits into a notch 5a formed in the field edge receiver 5, and supports the upper surface of the notch 5a of the field edge receiver 5 from below with a screw 6.

ここで野縁受け5は吊り具2の真下位置から偏
心した位置に配置され、且つ野縁受け5の高さ方
向の位置は水平方向から見て少なくともその一部
が吊り具2に重なる位置とする。
Here, the field edge receiver 5 is arranged at a position eccentric from the position directly below the hanging tool 2, and the position of the field edge receiver 5 in the height direction is such that at least a part thereof overlaps with the hanging tool 2 when viewed from the horizontal direction. do.

尚、図示例にあつては野縁受け5に切欠5aを
形成し、この切欠5a内に取付金具7を臨ませる
ようにしたが、切欠5aを形成せず、直接取付金
具7を野縁受け5の下面に当ててビス等で野縁受
け5を支持するようにしてもよい。また取付金具
7の上下位置を微調整するにはダブルナツト1
6,16にて調整すればよく、調整量が大きい場
合にはボルト15の筒部12a内への進入量を調
整すればよい。
In the illustrated example, a notch 5a is formed in the field edge receiver 5, and the mounting bracket 7 is made to face inside this notch 5a, but the notch 5a is not formed and the mounting bracket 7 is directly inserted into the field edge receiver. The edge support 5 may be supported by screws or the like against the lower surface of the frame support 5. In addition, to finely adjust the vertical position of the mounting bracket 7, use the double nut 1.
6 and 16, and if the amount of adjustment is large, the amount of entry of the bolt 15 into the cylindrical portion 12a may be adjusted.

(考案の効果) 以上に説明した如く本考案によれば、コンクリ
ートスラブ又は梁に対し吊り具を介して天井板を
吊り下げ支持する構造において、天井板の野縁受
けの位置を吊り具の真下位置から側方へ偏心さ
せ、且つ水平方向から見て野縁受けの少なくとも
一部が吊り具に重なるようにし、この野縁受けを
吊り具から水平方向に延出した取付け金具で支持
するようにしたため、スラブ或いは梁と天井板と
の間隔、つまり天井の懐を狭くして天井板を吊り
下げ支持することができ、もつて防音・防振を図
りつつ天井板の位置を相対的に高くして部屋の容
積アツプが達成できる。
(Effects of the invention) As explained above, according to the invention, in a structure in which a ceiling board is suspended and supported from a concrete slab or a beam via a hanging tool, the position of the edge support of the ceiling board is set directly below the hanging tool. It is eccentric from the position to the side, and at least a part of the field edge receiver overlaps the hanging tool when viewed from the horizontal direction, and the field edge receiver is supported by a mounting bracket extending horizontally from the hanging tool. Therefore, the space between the slab or beam and the ceiling board, that is, the width of the ceiling, can be narrowed to allow the ceiling board to be suspended and supported, thereby increasing the relative height of the ceiling board while achieving sound and vibration isolation. It is possible to increase the volume of the room.

又、コ字型に折曲した吊り具本体内に装着され
た弾性体に天井板の荷重をかけて、弾性体を介し
て天井板の荷重を保持する防振構造であるので、
吊り具自体の耐久性が高く、また弾性体が地震等
の横方向の力に対しても脱落する虞れがなく、信
頼性が高い。
In addition, it has a vibration-proof structure in which the load of the ceiling plate is applied to the elastic body attached to the hanging body which is bent into a U-shape, and the load of the ceiling plate is maintained through the elastic body.
The hanging tool itself has high durability, and there is no risk that the elastic body will fall off even when subjected to lateral forces such as earthquakes, making it highly reliable.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案に係る吊り下げ構造の一部を破
断して示した図、第2図は従来の吊り下げ構造を
示す斜視図である。 尚図面中、1はコンクリートスラブ、2は吊り
具、3は天井板、4は野縁、5は野縁受け、7は
取付金具である。
FIG. 1 is a partially cutaway view of a suspension structure according to the present invention, and FIG. 2 is a perspective view of a conventional suspension structure. In the drawing, 1 is a concrete slab, 2 is a hanging tool, 3 is a ceiling board, 4 is a field edge, 5 is a field edge support, and 7 is a mounting bracket.

Claims (1)

【実用新案登録請求の範囲】 コンクリートスラブ或いは梁に対し吊り具を介
して天井板を支持する構造において、 前記吊り具の本体をコ字型に形成してその下部
に挿通孔を形成し、この挿通孔と本体内に装着し
た弾性体に設けられた貫通孔とを通して金具を取
付け、この金具から水平方向に取付金具を延出
し、この取付金具に高さ方向において少なくとも
その一部が前記吊り具と重なるように吊り具の軸
に対し偏心して配置した野縁受けを固着し、この
野縁受けに対し交叉する如く野縁を取付け、この
野縁の下面に前記天井板を取付けたことを特徴と
する天井板の吊り下げ構造。
[Claims for Utility Model Registration] In a structure in which a ceiling plate is supported on a concrete slab or beam via a hanging device, the main body of the hanging device is formed into a U-shape and an insertion hole is formed in the lower part thereof. A metal fitting is installed through the insertion hole and a through hole provided in an elastic body installed in the main body, and the mounting metal fitting is extended horizontally from the metal fitting, and at least a part of it in the height direction is attached to the hanging metal fitting. A field edge receiver arranged eccentrically with respect to the axis of the hanging tool is fixed so as to overlap with the field edge receiver, a field edge is attached so as to intersect with the field edge receiver, and the ceiling plate is attached to the lower surface of this field edge. Suspension structure of ceiling board.
JP1984195477U 1984-12-24 1984-12-24 Expired JPH0215932Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1984195477U JPH0215932Y2 (en) 1984-12-24 1984-12-24

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1984195477U JPH0215932Y2 (en) 1984-12-24 1984-12-24

Publications (2)

Publication Number Publication Date
JPS61108713U JPS61108713U (en) 1986-07-10
JPH0215932Y2 true JPH0215932Y2 (en) 1990-04-27

Family

ID=30753052

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1984195477U Expired JPH0215932Y2 (en) 1984-12-24 1984-12-24

Country Status (1)

Country Link
JP (1) JPH0215932Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284813A (en) * 2015-12-29 2017-01-04 浙江美尔凯特集成吊顶有限公司 Furred ceiling with damping device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55574U (en) * 1979-04-26 1980-01-05
JPS5550283B2 (en) * 1975-03-03 1980-12-17
JPS5940418B2 (en) * 1982-08-20 1984-09-29 ピ−タ−・バツトランド Method for producing natural fruit yandei

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52119706U (en) * 1976-03-09 1977-09-10
JPS5550283U (en) * 1978-09-29 1980-04-02
JPS58123111U (en) * 1982-02-17 1983-08-22 株式会社ブリヂストン Suspended vibration-proof ceiling structure
JPS5940418U (en) * 1982-09-09 1984-03-15 日本板硝子株式会社 Anti-vibration hanging structure for ceiling

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5550283B2 (en) * 1975-03-03 1980-12-17
JPS55574U (en) * 1979-04-26 1980-01-05
JPS5940418B2 (en) * 1982-08-20 1984-09-29 ピ−タ−・バツトランド Method for producing natural fruit yandei

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284813A (en) * 2015-12-29 2017-01-04 浙江美尔凯特集成吊顶有限公司 Furred ceiling with damping device
CN106284813B (en) * 2015-12-29 2018-10-02 浙江美尔凯特集成吊顶有限公司 Furred ceiling with damping device

Also Published As

Publication number Publication date
JPS61108713U (en) 1986-07-10

Similar Documents

Publication Publication Date Title
JPH0215932Y2 (en)
JPH0238965Y2 (en)
JP2023062637A (en) Ceiling fall prevention structure
JP3483699B2 (en) Exterior wall panel support structure
JPH10292548A (en) Ceiling support structure
JP3035241B2 (en) Ceiling support structure
JPH0319540Y2 (en)
JP3015125U (en) Suspended stand for unit bath
JP3607810B2 (en) Support device for lower end of outer wall panel
JP3013802U (en) Hanging parts for building materials
JP3458290B2 (en) Suspension structure and bracket for aluminum rail for moving wall
JP3330136B2 (en) Structure for attaching flat bar for supporting cable rack to hanging bolts and holding member for flat bar for supporting cable rack
JPS6137698Y2 (en)
JPS62107018U (en)
JPH0376957U (en)
JPH0540183Y2 (en)
JPS62115453U (en)
JPH06341191A (en) Ceiling metal hanger
JPH0235045Y2 (en)
JPS6310417Y2 (en)
JPH0161312U (en)
JPS6116327Y2 (en)
JPS6195807U (en)
JPH0416569Y2 (en)
JPS6324759Y2 (en)