KR100465433B1 - Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus - Google Patents

Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus Download PDF

Info

Publication number
KR100465433B1
KR100465433B1 KR10-2002-0069518A KR20020069518A KR100465433B1 KR 100465433 B1 KR100465433 B1 KR 100465433B1 KR 20020069518 A KR20020069518 A KR 20020069518A KR 100465433 B1 KR100465433 B1 KR 100465433B1
Authority
KR
South Korea
Prior art keywords
box
horizontal
bridge
vertical
support
Prior art date
Application number
KR10-2002-0069518A
Other languages
Korean (ko)
Other versions
KR20040041313A (en
Inventor
노윤근
박근화
Original Assignee
노윤근
박근화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노윤근, 박근화 filed Critical 노윤근
Priority to KR10-2002-0069518A priority Critical patent/KR100465433B1/en
Publication of KR20040041313A publication Critical patent/KR20040041313A/en
Application granted granted Critical
Publication of KR100465433B1 publication Critical patent/KR100465433B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 PC박스 교량의 PC박스 거더가 서로 연결되어 형성되는 PC박스 내측 연장부의 보강을 위하여 보강장치를 설치하여 PC 박스 교량을 보강하는 방법에 관한 것으로서, PC박스 내측 연장부가 서로 만나는 부분의 교량상부의 조인트 부분을 실링하고 그 하부에 세로 H빔을 교량의 길이방향으로 설치하여 세로 H빔 상부 플랜지와 PC박스 교량의 조인트 인근 부분을 앵커로 고정하며 형성된 틈을 에폭시로 충전하고, 세로 H빔 하부 플랜지에 다수개의 세로 H빔 인장 브라켓을 설치하고 강연선을 장착, 인장한 후에 정착구를 이용하여 강연선을 정착고정하며, 세로 H빔 하부 플랜지와 가로 H빔이 교차되는 부분에 탄성 고무패드를 장착하고, PC박스 교량의 일정간격마다 가로 H빔을 설치하되 양측의 PC박스 내측 연장부의 PC박스 내측벽에 내측 보강철판을 앵커로 고정설치하고 지지대를 내측 보강철판에 고정설치한 후에 가로 H빔을 지지대 위에 설치하되 가로 H빔과 지지대 사이에 탄성 고무패드와 높이조절장치를 설치하며, PC박스 교량의 일정간격마다 설치된 가로 H빔 하부에 가로 인장 브라켓을 설치하고 강연선을 장착, 인장한 후에 정착구를 이용하여 강연선을 정착고정하고, 가로 H빔 상부와 PC박스 내측 연장부와의 사이에 형성된 공간부에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔 상부가 밀착연결될 수 있게 앵커를 설치하는 것이다.The present invention relates to a method for reinforcing a PC box bridge by installing a reinforcement device for reinforcing the PC box inner extension is formed by connecting the PC box girder of the PC box bridge, the bridge of the portion where the PC box inner extension meet each other Seal the upper joint part and install vertical H beam at the bottom of the bridge in the longitudinal direction of the bridge to fix the vertical H beam upper flange and the vicinity of the joint of the PC box bridge with an anchor, and fill the formed gap with epoxy, and vertical H beam. Install a plurality of longitudinal H-beam tensioning brackets on the lower flanges, attach and stretch the strands, and fix the strands using anchorages. Install elastic rubber pads at the intersections of the vertical H-beam lower flanges and the horizontal H-beams. , Install horizontal H-beams at regular intervals of PC box bridge, but anchor internal reinforcing steel plate on inner wall of PC box of inner side of PC box extension After the fixed installation and the support is fixed to the inner reinforcing steel plate, the horizontal H beam is installed on the support, but the elastic rubber pad and the height adjusting device are installed between the horizontal H beam and the support, and the horizontal H beam is installed at regular intervals of the PC box bridge. Install the horizontal tension bracket at the bottom, install and tension the stranded wire, fix the stranded wire using the anchorage, and place the epoxy concrete in the space formed between the horizontal H-beam upper part and the inner side of the PC box. And to install the anchor so that the horizontal H-beam can be closely connected.

Description

피씨박스 교량의 피씨박스 내측 연장부에 설치된 보강장치 및 이를 이용한 보강공법{Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus}Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus}

본 발명은 PC박스 교량의 PC박스 거더가 서로 연결되어 형성되는 PC박스 내측 연장부의 보강을 위하여 보강장치를 설치하여 PC 박스 교량을 보강하는 방법에 관한 것으로서, PC박스 내측 연장부가 서로 만나는 조인트 부분을 실링하고 그 하부에 세로 H빔을 교량의 길이방향으로 설치하여 세로 H빔 상부 플랜지와 PC박스 교량의 조인트 인근 부분을 앵커로 고정하며, 형성된 틈을 에폭시로 충전하고, 세로 H빔 하부 플랜지에 다수개의 세로 H빔 인장 브라켓을 설치하고 강연선을 장착,인장한 후에 정착구를 이용하여 강연선을 정착고정하며, 세로 H 빔 하부 플랜지와 가로 H빔이 교차되는 부분에 탄성 고무패드를 장착하고, PC박스 교량의 폭방향으로 일정간격마다 가로 H빔을 설치하되 양측의 PC박스 내측 연장부의 PC박스 내측벽에 내측 보강철판을 앵커로 고정설치하고 지지대를 내측 보강철판에 고정설치한 후에 가로 H빔을 지지대 위에 설치하되 가로 H빔과 지지대 사이에 탄성 고무패드와 높이조절장치를 설치하며, PC박스 교량의 일정간격마다 설치된 가로 H빔 하부에 가로 H빔 인장 브라켓을 설치하고 강연선을 장착, 인장한 후에 정착구를 이용하여 강연선을 정착고정하고, 가로 H빔 상부와 PC박스 내측 연장부와의 사이에 형성된 공간부에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔 상부가 밀착연결될 수 있게 앵커를 설치하는 PC박스 교량의 PC박스 내측 연장부 보강장치 및 이를 이용한 보강공법에 관한 것이다.The present invention relates to a method for reinforcing a PC box bridge by installing a reinforcement device for reinforcing the PC box inner extension is formed by connecting the PC box girder of the PC box bridge, the joint portion where the PC box inner extension meet each other Seal and install the vertical H beam at the bottom of the bridge in the lengthwise direction of the bridge to fix the vertical H beam upper flange and the vicinity of the joint of the PC box bridge with anchors, fill the formed gaps with epoxy, After installing two longitudinal H-beam tensioning brackets and attaching and pulling the strands, fix the strands using anchorages, and install elastic rubber pads at the intersections of the vertical H-beam lower flanges and the horizontal H-beams. Install horizontal H-beams at regular intervals in the width direction of the After installing and fixing the support to the inner reinforcing steel plate, install the horizontal H beam on the support, but install the elastic rubber pad and height adjusting device between the horizontal H beam and the support, and lower the horizontal H beam installed at regular intervals of the PC box bridge. After installing the horizontal H beam tension bracket on the wire and attaching and tensioning the strand, fix the strand using the anchorage and pour epoxy concrete into the space formed between the upper part of the horizontal H beam and the inner part of the PC box. The present invention relates to a PC box inner extension reinforcing device of a PC box bridge in which an anchor is installed so that the concrete and horizontal H beams can be closely connected, and a reinforcement method using the same.

본 발명의 목적은 PC박스 교량의 PC박스 거더를 서로 연결하여 형성되는 PC박스 내측 연장부가 캔틸레버의 날개부로 되어 있어 교량 상부에 차량의 이동하중이 작용할때에 충격 및 진동에 의하여 PC박스 내측 연장부에 과도한 힘이 작용하게 되어 교량 파손의 주원인이 되어 왔으나 특별한 보강방법이 없어 차량의 통행을 제한하는 것 이외에는 보강하는 방법이 없었다. 따라서 본 발명에서는 이러한 PC박스 교량의 PC박스 내측 연장부의 보강을 위한 장치를 사용하여 보강을 하므로서 교량의 강성을 증진시켜 교량의 내구연한을 연장시키도록하는데 있다.An object of the present invention is the extension of the inner side of the PC box formed by connecting the PC box girder of the PC box bridge to the wing portion of the cantilever, so when the moving load of the vehicle is applied to the upper portion of the bridge by impact and vibration Excessive force has been applied to the bridge, which has been the main cause of bridge breakage, but there is no reinforcement method except restricting the traffic of the vehicle because there is no special reinforcement method. Therefore, in the present invention, by using the device for the reinforcement of the PC box inner extension of the PC box bridge to enhance the rigidity of the bridge to extend the durability of the bridge.

예를들면 한강의 노량대교와 같은 교량의 중앙부에는 차량의 통행을 제한 하거나 또는 차량의 차선을 바꾸지 않고 계속운행하도록 하여 교량을 보호하도록하고있는데 이러한 것은 일시적인 방법으로 이러한 교량의 보수보강을 위한 특별한 방법이 없는 것이 현재까지의 실정이다.For example, the central part of a bridge, such as the Noryang Bridge on the Han River, protects the bridge by restricting traffic or continuing without changing lanes. This is a temporary method to reinforce the bridge. The absence of this is to date.

본 발명은 이상과 같은 사항을 감안하여 제안된 것으로서, PC박스 교량의 PC박스 거더의 내측 연장부가 캔틸레버식으로 형성되어 있어 교량상부에서 작용하는 하중에 취약한 부분으로서 이러한 PC박스 내측 연장부가 서로 연결되어 있는 PC박스 내측 연장부의 하부에 가로 및 세로 H빔을 설치하고 각각의 H빔에 강연선을 장착한 후에 이들 강연선에 인장력을 주어 가로 및 세로 H빔 인장브라켓에 정착구를 이용하여 정착 고정시켜 가로 및 세로 H빔에 인장력을 도입하여 상부로 휘어지는 힘을 상기 PC박스 내측 연장부에 전달하도록 하여 교량의 상부에서 작용하는 하중에 대응하도록하는 PC박스 교량의 PC박스 내측 연장부를 보강하는 장치 및 이를 이용하여 보수보강을 하는 방법을 제공하는 것이다.The present invention has been proposed in view of the above matters, and the inner extension of the PC box girder of the PC box bridge is formed in a cantilever manner, and the inner extension of the PC box is connected to each other as a part vulnerable to the load acting on the bridge. The horizontal and vertical H beams are installed at the lower part of the inner side of the PC box, and the strands are attached to each of the H beams. Apparatus for reinforcing the PC box inner extension of the PC box bridge to introduce a tensile force to the H-beam to transmit the upper bending force to the PC box inner extension to correspond to the load acting on the top of the bridge and repair using it To provide a way to reinforce.

도 1은 본 발명의 PC박스 내측 연장부에 보강장치를 설치한 것을 보여 주는 도면.1 is a view showing that the reinforcing device is installed in the PC box inner extension of the present invention.

도 2는 본 발명의 PC박스 내측 연장부에 설치된 보강장치의 가로 H빔과 세로 H빔을 PC박스 교량 하부에 설치한 것을 보여 주는 도면.2 is a view showing that the horizontal H beam and the vertical H beam of the reinforcement device installed in the PC box inner extension of the present invention installed in the lower portion of the PC box bridge.

도 3은 본 발명의 세로 H빔을 보여주는 도면.3 shows a vertical H-beam of the present invention.

도 4는 본 발명의 PC박스 내측 연장부에 설치된 보강장치를 보여주는 상세도면.Figure 4 is a detailed view showing a reinforcement device installed in the PC box inner extension of the present invention.

도 5는 본 발명의 세로 H빔을 설치한 것을 보여주는 도면.5 is a view showing the installation of the vertical H-beam of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10.... PC박스 교량 11... 교량 상부10 ... PC Box Bridge 11 ... Bridge Top

12... PC박스 내측 연장부 13... 앵커12 ... inside extension of PC box 13 ... anchor

14... 아스콘 포장층 15... 조인트14 ... Ascon pavement 15 ... Joint

16... 강연선 17... 정착구16 ... stranded 17 ... anchorage

18... 공간부 19... 틈18 ... space 19 ... gap

20... PC박스 거더 21... PC박스 내측벽20 ... PC box girder 21 ... PC box inner wall

22... 내측 보강철판 23... H빔 연결부22 ... inner reinforcement plate 23 ... H beam connection

30... 교각 31... 탄성 고무패드30 ... Pier 31 ... Elastic Rubber Pad

40... 가로 H빔 41... 지지대40 ... H-beam 41 ... Support

42... 가로 H빔 인장 브라켓 43... 높이조절장치42 ... horizontal H-beam tensioning bracket 43 ... height adjustment

50... 세로 H빔 51... 세로 H빔 인장 브라켓50 ... H-beam 51 ... H-beam tension bracket

52... 세로 H빔 상부 플랜지 53... 세로 H빔 하부 플랜지52 ... vertical H beam upper flange 53 ... vertical H beam lower flange

상기의 목적을 달성하기 위하여 본 발명은 PC박스 교량(10)의 PC박스 거더(20)가 서로 연결되어 형성되는 PC박스 내측 연장부(12)의 보강을 위하여 PC 박스 내측 연장부(12)가 서로 만나는 조인트(15) 부분을 실링한 후에 조인트(15) 하부에 세로 H빔(50)을 교량의 길이방향으로 설치하고, 세로 H빔 상부 플랜지(52)와 PC박스 교량(10)의 조인트(15) 인근 부분을 앵커(13)로 고정하며 형성된 틈(19)을 에폭시로 충전하고, 세로 H빔 하부 플랜지(53)에 다수개의 세로 H빔 인장 브라켓(51)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하며, PC박스 내측 연장부(12)의 PC박스 내측벽(21) 양측에 내측 보강철판(22)을 앵커(13)로 고정설치하고 지지대(41)를 내측 보강철판(22)에 고정설치한 후에 지지대(41)위에 PC박스 교량(10)의 폭방향에 일정간격마다 가로 H빔(40)을 설치하되 가로 H빔(40)과 지지대(41) 사이에 탄성 고무패드(31)와 높이조절장치(43)를 설치하고, PC박스 교량(10)의 일정간격마다 설치된 가로 H빔(40) 하부에 가로 H빔 인장 브라켓(42)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(16)를 이용하여 강연선(16)을 정착고정하고, 가로 H빔(40) 상부와 PC박스 내측 연장부(12)와의 사이에 형성된 공간부(18)에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔(40) 상부가 밀착연결될 수 있게 앵커(13)를 설치하는 것이 특징이다.In order to achieve the above object, the present invention provides a PC box inner extension 12 for reinforcing the PC box inner extension 12 formed by connecting the PC box girder 20 of the PC box bridge 10 to each other. After sealing the portions of the joint 15 that meet each other, the vertical H beam 50 is installed in the longitudinal direction of the bridge under the joint 15, and the joint of the vertical H beam upper flange 52 and the PC box bridge 10 ( 15) Fill the gaps 19 formed by fixing the adjacent portions with the anchors 13 with epoxy, install a plurality of longitudinal H-beam tensioning brackets 51 on the vertical H-beam lower flanges 53, and connect the strand 16 After mounting and tensioning, the strand wire 16 is fixed and fixed using the fixing unit 17, and the inner reinforcing steel plate 22 is fixed to both sides of the inner side wall 21 of the inner side of the inner side of the PC box 12. And fixedly install the support 41 to the inner reinforcing steel plate 22, and then, in the width direction of the PC box bridge 10 on the support 41, a predetermined interval. The horizontal H beam 40 is installed every time, but the elastic rubber pad 31 and the height adjusting device 43 are installed between the horizontal H beam 40 and the support 41, and at regular intervals of the PC box bridge 10. After installing the horizontal H-beam tensioning bracket 42 under the installed horizontal H-beam 40 and mounting and tensioning the strand 16, the anchorage 16 is fixed and fixed using the anchorage 16, and the horizontal H-beam ( 40) Placing epoxy concrete in the space portion 18 formed between the upper portion and the inner side extending portion 12 of the PC box, but installing the anchor 13 so that the epoxy concrete and the horizontal H-beam 40 upper part can be closely connected. It is characteristic.

상기 보강장치를 이용하여 보강공사를 실시하는 방법은 PC박스 내측 연장부(12)가 서로 만나는 조인트(15) 부분을 실링하고, 그 하부에 세로 H빔(50)을 교량의 길이방향으로 다수개 설치하여 세로 H빔 상부 플랜지(52)와 PC박스 교량(10)의 조인트(15) 인근 부분을 앵커(13)로 고정하고, 형성된 틈(19)을 에폭시로 충전하며, 세로 H빔 하부 플랜지(53)에 다수개의 세로 H빔 인장 브라켓(51)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하며, 세로 H빔 하부 플랜지(53)와 가로 H빔(40)이 교차되는 부분에 탄성 고무패드(31)를 장착하고, PC박스 교량(10)의 일정간격마다 가로 H빔(40)을 설치하되 양측의 PC박스 내측 연장부(12)의 PC박스 내측벽(21)에 내측 보강철판(22)을 앵커(13)로 고정설치하고 지지대(41)를 내측 보강철판(22)에 고정설치한 후에 가로 H빔(40)을 지지대(41) 위에 설치하되 가로 H빔(40)과 지지대(41) 사이에 탄성 고무패드(31)와 높이 조절장치(43)를 설치하며, PC박스 교량(10)의 폭방향에 일정간격마다 설치된 가로 H빔(40) 하부에 가로 H빔 인장 브라켓(42)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하고, 가로 H빔(40) 상부와 PC박스 내측 연장부(12)와의 사이에 형성된 공간부(18)에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔(40) 상부가 밀착연결될 수 있게 앵커(13)를 설치하는 방법으로 시공하여 상기 PC박스 교량(10)의 PC박스 내측 연장부(12)를 보강하는 것을 특징으로 하고 있다.The reinforcement method using the reinforcement device is to seal the portion of the joint 15 where the PC box inner extension 12 meets each other, and a plurality of longitudinal H beams 50 in the lower portion of the bridge in the longitudinal direction of the bridge. By mounting the anchor (13) to secure the vicinity of the joint 15 of the vertical H beam upper flange 52 and the PC box bridge 10, and filling the formed gap 19 with epoxy, and the vertical H beam lower flange ( 53) a plurality of longitudinal H-beam tensioning brackets 51 are installed, the stranded wire 16 is mounted and tensioned, and then the anchored wire 16 is fixed and fixed using the anchorage 17, and the longitudinal H beam lower flange 53 is provided. The elastic rubber pad 31 is mounted at a portion where the horizontal H beam 40 intersects, and the horizontal H beam 40 is installed at predetermined intervals of the PC box bridge 10, but the inner side of the PC box extension 12 on both sides is installed. The inner reinforcing steel plate 22 is fixed to the inner reinforcing steel plate 22 by the anchor 13 on the inner wall 21 of the PC box After the horizontal H beam 40 is installed on the support 41, the elastic rubber pad 31 and the height adjusting device 43 is installed between the horizontal H beam 40 and the support 41, PC box bridge (10 After the horizontal H beam tension bracket 42 is installed at the lower portion of the horizontal H beam 40 installed at a predetermined interval in the width direction of the cross section, and the strand wire 16 is mounted and tensioned, the strand wire 16 is connected using the anchorage 17. Fixing and fixing the epoxy concrete in the space 18 formed between the horizontal H beam 40 and the PC box inner extension 12 so that the epoxy concrete and the horizontal H beam 40 can be closely connected. The construction by the method of installing the anchor 13 is characterized in that to reinforce the PC box inner extension 12 of the PC box bridge (10).

구체적으로 그 시공방법을 보면 다음과 같다.Specifically, the construction method is as follows.

a) 상기 PC 박스 내측 연장부(12)가 서로 만나는 조인트(15)를 실링하고, 그 하부에 세로 H빔(50)을 교량의 길이방향으로 다수개 설치하여 세로 H빔 상부 플랜지(52)와 PC박스 교량(10)의 조인트(15) 인근 부분을 앵커(13)로 고정하고, 형성된 틈(19)을 에폭시로 충전하는 단계;a) sealing the joint 15 where the PC box inner extension 12 meets each other, and a plurality of vertical H beams 50 are provided in the lower portion of the bridge in the longitudinal direction of the bridge, and the vertical H beam upper flange 52 and Fixing a portion near the joint 15 of the PC box bridge 10 with the anchor 13 and filling the formed gap 19 with epoxy;

b) 상기 세로 H빔 하부 플랜지(53)에 다수개의 세로 H빔 인장 브라켓(51)을 설치하고 강연선(16)을 장착하는 단계;b) installing a plurality of longitudinal H-beam tensioning brackets 51 and mounting strands 16 on the longitudinal H-beam lower flanges 53;

c) 상기 PC박스 교량(10)의 PC박스 내측 연장부(12)의 양측 PC박스 내측벽(21)에 내측 보강철판(22)을 앵커(13)로 고정설치하고 지지대(41)를 내측 보강철판(22)에 고정설치한 후에 지지대(41) 위에 높이조절장치(43)와 탄성고무패드(31)를 설치한 후에 가로 H빔(40)을 설치하는 단계;c) The inner reinforcing steel plate 22 is fixed to the anchors 13 on both side PC box inner walls 21 of the PC box inner extension 12 of the PC box bridge 10, and the support 41 is reinforced inside. Installing the horizontal H beam 40 after the height adjusting device 43 and the elastic rubber pad 31 are installed on the support 41 after the steel plate 22 is fixedly installed;

d) 상기 세로 H빔(50)과 가로 H빔(40)이 서로 교차되는 부분에 탄성 고무패드(31)를 설치하는 단계;d) installing an elastic rubber pad 31 at a portion where the vertical H beam 50 and the horizontal H beam 40 cross each other;

e) 상기 가로 H빔(40) 하부에 가로 H빔 인장 브라켓(42)을 설치하고 강연선(16)을 장착하는 단계;e) installing a horizontal H-beam tensioning bracket (42) below the horizontal H-beam (40) and mounting the strand (16);

f) 상기 가로 H빔(40) 상부와 PC박스 내측 연장부(12)와의 사이에 형성된 공간부(18)에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔(40) 상부가 밀착연결될 수 있게 가로 H빔(40) 상부에 앵커(13)를 설치하는 단계; 및f) Placing epoxy concrete in the space 18 formed between the horizontal H beam 40 and the PC box inner extension 12, the horizontal horizontal so that the epoxy concrete and the horizontal H beam 40 can be closely connected Installing an anchor 13 on the H beam 40; And

g) 상기 세로 H빔(50)과 가로 H빔(40) 하부에 설치된 강연선(16)에 인장력도입하여 세로 H빔과 가로 H빔 인장 브라켓(51,42)에 정착구(17)를 이용하여 정착하는 단계로 이루어지는 것을 특징으로 한다.g) The tensile force is introduced into the stranded line 16 installed below the vertical H beam 50 and the horizontal H beam 40 to be fixed to the vertical H beam and the horizontal H beam tension brackets 51 and 42 by using the fixing holes 17. It is characterized by consisting of steps.

이하 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 PC박스 내측 연장부에 설치된 보강장치를 보여 주는 도면으로서, 교각(30)위에 설치된 PC박스 거더(20)를 서로 길이방향으로 연결하여 PC박스 교량(10)을 설치하는 것으로서 이때 PC박스 거더(20)가 서로 연결되면서 형성되는 PC박스 내측 연장부(12)의 하부에 교량의 길이방향으로 세로 H빔(50)을 다수개 설치하고 그 하부에 교량의 폭을 가로지르는 가로 H빔(40)을 설치하고 상기 가로 및 세로 H빔(40,50) 하부에 가로 및 세로 H빔 인장 브라켓(42,51)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하여 가로 및 세로 H빔(40,50)에 인장력을 도입하여 이를 상기 PC박스 내측 연장부(12)에 전달되게 하는 것이다. 상기 가로 H빔(40)을 지지하게 하기위하여 PC박스 내측 연장부(12)의 PC박스 내측벽(21)에 지지대(41)를 앵커(13)로 고정설치하고 그 위에 가로 H빔(40)을 설치하는 것이다.1 is a view showing a reinforcement device installed in the PC box inner extension of the present invention, by connecting the PC box girders 20 installed on the bridge 30 in the longitudinal direction with each other to install the PC box bridge (10) At this time, a plurality of vertical H-beams 50 are installed in the longitudinal direction of the bridge in the lower portion of the PC box inner extension part 12 formed while the PC box girder 20 is connected to each other, and horizontally across the width of the bridge in the lower portion thereof. After the H beam 40 is installed and the horizontal and vertical H beam tension brackets 42 and 51 are installed below the horizontal and vertical H beams 40 and 50, and the strand wire 16 is mounted and tensioned, the anchorage 17 is installed. Fixing the strand (16) by using to introduce a tensile force to the horizontal and vertical H beams (40, 50) to be transmitted to the PC box inner extension (12). In order to support the horizontal H beam 40, the support 41 is fixed to the PC box inner wall 21 of the PC box inner extension part 12 with an anchor 13, and the horizontal H beam 40 is disposed thereon. To install it.

도 2는 본 발명의 PC박스 내측 연장부에 설치된 보강장치로서 가로 H빔(40)과 세로 H빔(50)을 PC박스 교량(10) 하부에 설치한 것을 보여 주는 도면으로서, 상기 PC박스 교량(10)을 하부에서 본 것으로서 세로 H빔(50)을 교량의 길이방향으로 설치하고 그 하부에 가로 H빔(40)을 교량의 폭방향으로 일정간격을 두고 설치한 후에 강연선(16)을 이용하여 인장력을 도입하여 상향으로 휘어진 상기 가로 및 세로 H빔(40,50)을 상기 PC박스 교량(10)의 PC박스 내측 연장부(12)에 설치하여 상기 가로 및 세로 H빔(40,50)이 지지할 수 있게 하는 보강방법인 것이다.FIG. 2 is a view showing that the horizontal H beam 40 and the vertical H beam 50 are installed under the PC box bridge 10 as a reinforcement device installed in the PC box inner extension of the present invention. (10) as seen from the bottom, the vertical H-beam 50 is installed in the longitudinal direction of the bridge and the horizontal H-beam 40 is installed at a predetermined interval in the width direction of the bridge at the lower portion using the strand 16 The horizontal and vertical H beams 40 and 50 that are bent upward by introducing a tensile force to the PC box inner extension part 12 of the PC box bridge 10 to the horizontal and vertical H beams 40 and 50. This is a reinforcement method that can be supported.

도 3은 본 발명의 세로 H빔을 보여주는 도면으로서 교량의 길이방향으로 설치되는 것으로서 세로 H빔 상부 플랜지(52)는 상기 PC박스 교량(10)의 조인트(15)에 설치되고 세로 H빔 하부 플랜지(53)에는 세로 H빔(50)에 인장력을 도입하기 위한 강연선(16)과 이를 고정장착할 수 있는 정착구(17)가 설치되는 세로 H빔 인장 브라켓(51)을 설치하게 되며 또한, 하부에 설치되는 가로 H빔(40)과 만나도록 설치되는 것이다.Figure 3 is a view showing the longitudinal H-beam of the present invention is installed in the longitudinal direction of the bridge, the vertical H-beam upper flange 52 is installed in the joint 15 of the PC box bridge 10 and the vertical H-beam lower flange 53 is provided with a longitudinal H-beam tensioning bracket 51 is provided with a strand 16 for introducing a tensile force to the longitudinal H-beam 50 and a fixing fixture 17 for fixing and mounting it. It is installed to meet the horizontal H beam 40 is installed.

도 4는 본 발명의 PC 박스 내측 연장부에 설치된 보강장치를 보여주는 상세도면으로서, PC 박스 내측 연장부(12)가 서로 만나는 조인트(15) 부분을 실링하고그 하부에 세로 H빔(50)을 교량의 길이방향으로 설치하여 세로 H빔 상부 플랜지(52)와 PC박스 교량(10)의 조인트(15) 인근 부분을 앵커(13)로 고정하며 형성된 틈(19)을 에폭시로 충전하고, 세로 H빔 하부 플랜지(53)에 다수개의 세로 H빔 인장 브라켓(51)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하며, 세로 H빔 하부 플랜지(53)와 가로 H빔(40)이 교차되는 부분에 탄성 고무패드(31)를 장착하고, PC박스 교량(10)의 일정간격마다 가로 H빔(40)을 설치하되 양측의 PC박스 내측 연장부(12)의 PC박스 내측벽(21)에 내측 보강철판(22)을 앵커(13)로 고정설치하고 지지대(41)를 내측 보강철판(22)에 고정설치한 후에 가로 H빔(40)을 지지대(41) 위에 설치하되 가로 H빔(40)과 지지대(41) 사이에 탄성 고무패드(31)와 높이조절장치(43)를 설치하며, PC박스 교량(10)의 일정간격마다 설치된 가로 H빔(40) 하부에 가로 H빔 인장 브라켓(42)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하고, 가로 H빔(40) 상부와 PC박스 내측 연장부(12)와의 사이에 형성된 공간부(18)에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔(40) 상부가 밀착연결될 수 있게 가로 H빔(40) 상부에 앵커(13)를 설치하는 것이다.Figure 4 is a detailed view showing the reinforcement device installed in the inner extension of the PC box of the present invention, sealing the portion of the joint (15) where the inner side of the PC box extension 12 meet each other and the vertical H beam 50 at the bottom thereof It is installed in the longitudinal direction of the bridge to fix the vertical H-beam upper flange 52 and the portion near the joint 15 of the PC box bridge 10 with the anchor 13, and fill the formed gap 19 with epoxy, and the vertical H After installing a plurality of longitudinal H-beam tensioning brackets 51 on the beam lower flange 53 and mounting and tensioning the strand 16, the anchor line 16 is fixed and fixed using the anchorage 17. The elastic rubber pad 31 is mounted at the intersection where the flange 53 and the horizontal H beam 40 intersect, and the horizontal H beam 40 is installed at regular intervals of the PC box bridge 10, but the inner side of the PC box is on both sides. The inner reinforcing steel plate 22 is fixed to the inner side of the PC box inner wall 21 of the extension part 12 by the anchor 13 and the support 41 is placed on the inner beam. After fixing the steel plate 22, the horizontal H beam 40 is installed on the support 41, but the elastic rubber pad 31 and the height adjusting device 43 are disposed between the horizontal H beam 40 and the support 41. The horizontal H beam tension bracket 42 is installed at the lower portion of the horizontal H beam 40 installed at a predetermined interval of the PC box bridge 10, and the strand wire 16 is mounted and tensioned. Fix the strand 16, and cast epoxy concrete in the space 18 formed between the horizontal H beam 40 and the PC box inner extension 12, but the epoxy concrete and the horizontal H beam 40 It is to install the anchor 13 on the horizontal H beam 40 so that the close contact.

조인트(15)부는 교량상부에서 발생되는 우수등이 유입되지 않게 실링처리를 하며, 조인트(15) 하부와 세로 H빔(50) 상부가 만나는 부분에 틈(19)이 발생되는데 여기에는 에폭시를 주입충전하여 틈(19)새가 없도록 하여 교량상부에서 누수가 발생되어 유입된 우수등이 침투되지 않게 한다. 또한, PC박스 내측 연장부(12)와 가로 H빔(40)에 의하여 형성되는 공간부(18)에는 에폭시 콘크리트를 타설충전하여 가로 H빔(40)에 도입된 상향의 인장력이 상기 PC박스 내측 연장부(12)에 완전히 전달될 수 있도록 하기 위함이다. 가로 H빔(40) 상부와 세로 H빔(50) 하부의 교차점에는 탄성 고무패드(31)를 설치하여 상기 세로 및 가로 H빔(50,40)에 도입되는 인장력으로 인하여 발생되는 가로 및 세로 H빔(40,50)의 신축력의 도입을 원활하게 하기 위함이다. 지지대(41)와 가로 H빔(40) 사이에 설치된 탄성 고무패드(31)는 가로 H빔(40)의 인장력도입시 가로 H빔(40)의 신축력도입을 원활하게 하기 위함이다. 탄성 고무패드(31)의 하부에 설치되며 지지대(41) 위에 설치되는 높이조절장치(43)는 가로 H빔(40)의 위치와 높이를 바로 잡아주기 위하여 설치한 것이다.The joint 15 is sealed to prevent rainwater generated from the upper part of the bridge, and a gap 19 is formed at a portion where the lower portion of the joint 15 and the upper portion of the vertical H beam 50 meet, where epoxy is injected. By filling it, there is no gap (19) so that water leak occurs in the upper part of the bridge so that rainwater, etc. introduced into the bridge do not penetrate. In addition, the space portion 18 formed by the PC box inner extension 12 and the horizontal H beam 40 is filled with epoxy concrete, and upward tension force introduced into the horizontal H beam 40 is applied to the inside of the PC box. This is to be able to be completely delivered to the extension (12). The elastic rubber pads 31 are installed at the intersections of the upper horizontal H beams 40 and the lower vertical H beams 50 so that the horizontal and vertical Hs generated due to the tensile force introduced into the vertical and horizontal H beams 50 and 40. This is to smoothly introduce the stretching force of the beams 40 and 50. The elastic rubber pad 31 installed between the support 41 and the horizontal H beam 40 is for smoothly introducing the elastic force of the horizontal H beam 40 when the tensile force of the horizontal H beam 40 is introduced. The height adjusting device 43 installed on the lower portion of the elastic rubber pad 31 and installed on the support 41 is installed to correct the position and height of the horizontal H beam 40.

도 5는 본 발명의 세로 H빔을 설치한 것을 보여주는 도면으로서 PC박스 교량(10)의 길이방향으로 설치되는 세로 H빔(50)을 보여주기 위한 것으로서 PC박스 내측 연장부(12)가 서로 만나는 조인트(15) 부분을 실링하고 그 하부에 세로 H빔(50)을 교량의 길이방향으로 설치하여 세로 H빔 상부 플랜지(52)와 PC박스 교량(10)의 조인트(15) 인근 부분을 앵커(13)로 고정하며 형성된 틈(19)을 에폭시로 충전하고, 세로 H빔 하부 플랜지(53)에 다수개의 세로 H빔 인장 브라켓(51)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하며, 세로 H빔 하부 플랜지(53)와 가로 H빔(40)이 교차되는 부분에 탄성 고무패드(31)를 장착하고, PC박스 교량(10)의 일정간격마다 가로 H빔(40)을 설치하되 양측의 PC박스 내측 연장부(12)의 PC박스 내측벽(21)에 내측 보강철판(22)을 앵커(13)로 고정설치하고 지지대(41)를 내측 보강철판(22)에 고정설치한 후에 가로 H빔(40)을 지지대(41) 위에 설치하되 가로 H빔(40)과 지지대(41) 사이에 탄성 고무패드(31)와 높이조절장치(43)를 설치하며, PC박스 교량(10)의 일정간격마다 설치된 가로 H빔(40) 하부에 가로 H빔 인장 브라켓(42)을 설치하고 강연선(16)을 장착, 인장한 후에 정착구(17)를 이용하여 강연선(16)을 정착고정하고, 가로 H빔(40) 상부와 PC박스 내측 연장부(12)와의 사이에 형성된 공간부(18)에 에폭시 콘크리트를 타설하는 것이다.5 is a view showing the installation of the vertical H-beam of the present invention to show the vertical H-beam 50 installed in the longitudinal direction of the PC box bridge (10) where the PC box inner extension 12 meet each other The joint 15 is sealed and a vertical H beam 50 is installed in the lower portion of the bridge in the longitudinal direction of the bridge to anchor a portion near the joint 15 of the vertical H beam upper flange 52 and the PC box bridge 10. 13) the gaps 19 fixed with epoxy are filled with epoxy, and a plurality of longitudinal H-beam tensioning brackets 51 are installed on the vertical H-beam lower flange 53, and the stranded wire 16 is mounted and tensioned. 17) fixation and fixation of the stranded wire 16, the elastic rubber pad 31 is mounted at a portion where the vertical H beam lower flange 53 and the horizontal H beam 40 intersect, and the PC box bridge 10 The horizontal H beam 40 is installed at regular intervals of the inner side of the PC box inner wall 21 of the PC box inner extension part 12 on both sides. The steel plate 22 is fixed to the anchor 13 and the support 41 is fixed to the inner reinforcing steel plate 22, and then the horizontal H beam 40 is installed on the support 41, but the horizontal H beam 40 and An elastic rubber pad 31 and a height adjusting device 43 are installed between the supports 41, and the horizontal H beam tension bracket 42 is disposed below the horizontal H beam 40 installed at regular intervals of the PC box bridge 10. After installing and tensioning the stranded wire 16, the tensioner 16 is fixed using the anchorage 17, the space formed between the horizontal H beam 40 and the PC box inner extension 12 The epoxy concrete is poured into the portion 18.

이상의 설명에서와 같이, 본 발명은 PC박스 교량에서 가장 취약부인 PC박스 거더가 서로 만나는 PC박스 내측 연장부에 상기의 보강장치를 이용하여 교량을 보강하는 방법에 관한 것으로서, 상기와 같은 보강장치를 이용하여 시공하므로서 교량의 강성을 향상시켜 교량의 내구연한을 연장시키므로서 교량의 이용도를 향상시키게되며 교량의 유지보수에 소요되는 인력 및 유지보수관리비를 절감할 수 있는 유용한 장치 및 보강방법인 것이다.As described above, the present invention relates to a method for reinforcing a bridge using the reinforcement device in the PC box inner extension where the PC box girder, which is the weakest part of the PC box bridge, meets each other, the reinforcement device as described above. It is a useful device and reinforcement method to improve the stiffness of the bridge by constructing it, thereby improving the usability of the bridge, thereby improving the utilization of the bridge, and reducing the manpower and maintenance management costs required for the maintenance of the bridge. .

Claims (6)

종래의 PC박스 교량의 PC박스 거더가 서로 연결되어 형성되는 PC박스 내측 연장부에 보강장치에 있어서,In the reinforcement device in the PC box inner extension that is formed by connecting the PC box girder of the conventional PC box bridge, 상기 PC박스 교량의 PC박스 거더가 서로 만나서 형성되는 PC박스 내측 연장부의 조인트를 실링한 후에 조인트 하부에 세로 H빔을 교량의 길이방향으로 설치하고, 세로 H빔 하부 플랜지에 다수개의 세로 H빔 인장 브라켓을 설치하고 강연선을 장착, 인장한 후에 정착구를 이용하여 강연선을 정착고정하며, 상기 세로 H빔 하부에 PC박스 교량의 폭방향으로 일정간격마다 가로 H빔을 설치하되 PC박스 내측벽 양측에 설치된 지지대위에 설치하고, 상기 가로 H빔 하부에 가로 H빔 인장 브라켓을 설치하고 강연선을 장착, 인장한 후에 정착구를 이용하여 강연선을 정착고정하는 것을 특징으로 하는 PC박스 교량의 PC박스 내측 연장부에 설치된 보강장치.After sealing the joint of the PC box inner extension formed by the PC box girder of the PC box bridge, the vertical H beam is installed in the longitudinal direction of the bridge under the joint, and the plurality of longitudinal H beam tensions on the vertical H beam lower flange After the bracket is installed and the stranded wire is mounted and tensioned, the stranded steel is fixed and fixed by using the anchorage. The horizontal H beam is installed at regular intervals in the width direction of the PC box bridge under the vertical H beam, but is installed on both sides of the inner wall of the PC box. Installed on the support, the horizontal H beam tension bracket is installed on the lower portion of the horizontal H beam is installed on the inner extension of the PC box bridge of the PC box bridge, characterized in that to fix the strand using the anchorage after the tension line is mounted and tensioned Reinforcement. 제 1항에 있어서,The method of claim 1, 상기 PC박스 교량의 조인트 하부에 설치된 세로 H빔을 PC박스 내측 연장부에 고정하기 위하여 앵커로 고정하며, 이로 인하여 형성된 틈은 에폭시로 충전하여 교량의 조인트에서 누수된 우수가 유입되는 것을 방지하는 것을 특징으로 하는 PC박스 교량의 PC박스 내측 연장부에 설치된 보강장치.The vertical H beam installed at the lower part of the joint of the PC box bridge is fixed with an anchor to fix the inner part of the PC box, and the gap formed therein is filled with epoxy to prevent the rainwater leaked from the joint of the bridge. Reinforcement device installed in the PC box inner extension of the PC box bridge characterized in that. 제 1항에 있어서,The method of claim 1, 상기 가로 H빔과 세로 H빔이 서로 교차되는 부분에 탄성 고무패드를 설치하여 상기 세로 및 가로 H빔에 도입되는 인장력으로 인하여 발생되는 가로 및 세로 H빔의 신축력의 도입을 원활하게 하기 위한 것임이 특징인 PC박스 교량의 PC박스 내측 연장부에 설치된 보강장치.The elastic rubber pad is installed at a portion where the horizontal H beam and the vertical H beam cross each other so as to smoothly introduce the stretching force of the horizontal and vertical H beams generated by the tensile force introduced into the vertical and horizontal H beams. Reinforcement device installed in the PC box inner extension of the PC box bridge. 제 1항에 있어서,The method of claim 1, 상기 PC박스 교량의 PC박스 내측 연장부의 일정한 간격을 두고 폭방향으로 설치되는 가로 H빔을 지지하기 위하여 설치되는 지지대를 PC박스 내측벽에 고정설치하기 위하여 내측 보강철판을 앵커로 PC박스 내측벽에 고정설치하고, 가로 H빔과 지지대 사이에 탄성 고무패드와 높이조절장치를 설치하는 것을 특징으로 하는 PC박스 교량의 PC박스 내측 연장부에 설치된 보강장치.An inner reinforcing steel plate is anchored to the inner side of the inner side of the PC box so as to fix the support on the inner side of the inner side of the PC box to support the horizontal H beams installed in the width direction at regular intervals of the inner side of the PC box bridge. Reinforcement device installed in the PC box inner extension of the PC box bridge, characterized in that the fixed installation, the elastic rubber pad and the height adjustment device is installed between the horizontal H beam and the support. 제 1항에 있어서,The method of claim 1, 상기 가로 H빔 상부와 PC박스 내측 연장부와의 사이에 형성된 공간부에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔 상부가 밀착연결될 수 있게 가로 H빔 상부에 앵커를 설치하는 것을 특징으로 하는 PC박스 교량의 PC박스 내측연장부에 설치된 보강장치.The PC is characterized in that the epoxy concrete is placed in the space formed between the horizontal H beam upper portion and the inner side of the PC box, the anchor is installed on the horizontal H beam so that the epoxy concrete and the horizontal H beam upper portion can be closely connected. Reinforcement device installed on the inner part of the PC box of the box bridge. 상기 PC박스 교량의 PC박스 내측 연장부에 보강장치를 설치하여 교량을 보강함에 있어서,In reinforcing the bridge by installing a reinforcing device in the PC box inner extension of the PC box bridge, a) 상기 PC 박스 내측 연장부가 서로 만나는 조인트를 실링하고, 그 하부에 세로 H빔을 교량의 길이방향으로 다수개 설치하여 세로 H빔 상부 플랜지와 PC박스 교량의 조인트 인근 부분을 앵커로 고정하고, 형성된 틈을 에폭시로 충전하는 단계;a) sealing the joints where the inner side of the PC box meets each other, and a plurality of vertical H beams are installed in the longitudinal direction of the bridge in the lower portion thereof to fix the vertical H beam upper flange and the vicinity of the joint of the PC box bridge with anchors; Filling the gaps formed with epoxy; b) 상기 세로 H빔 하부 플랜지에 다수개의 세로 H빔 인장 브라켓을 설치하고 강연선을 장착하는 단계;b) installing a plurality of longitudinal H-beam tensioning brackets and mounting strands on the longitudinal H-beam lower flanges; c) 상기 PC박스 교량의 PC박스 내측 연장부의 양측 PC박스 내측벽에 내측 보강철판을 앵커로 고정설치하고 지지대를 내측 보강철판에 고정설치한 후에 지지대 위에 높이조절장치와 탄성 고무패드를 설치한 후에 가로 H빔을 설치하는 단계;c) After fixing the inner reinforcing steel plate to the inner wall of both sides of the PC box inner extension of the PC box bridge with anchors and fixing the support to the inner reinforcing steel plate after installing the height adjusting device and the elastic rubber pad on the support Installing a horizontal H beam; d) 상기 세로 H빔과 가로 H빔이 서로 교차되는 부분에 탄성 고무패드를 설치하는 단계;d) installing an elastic rubber pad at a portion where the vertical H beam and the horizontal H beam cross each other; e) 상기 가로 H빔 하부에 가로 H빔 인장 브라켓을 설치하고 강연선을 장착하는 단계;e) installing a horizontal H beam tensioning bracket and mounting a strand under the horizontal H beam; f) 상기 가로 H빔 상부와 PC박스 내측 연장부와의 사이에 형성된 공간부에 에폭시 콘크리트를 타설하되 에폭시 콘크리트와 가로 H빔 상부가 밀착연결될 수 있게 가로 H빔 상부에 앵커를 설치하는 단계;f) placing epoxy concrete in the space formed between the horizontal H beam upper portion and the inner side of the PC box, and installing an anchor on the horizontal H beam upper portion to closely connect the epoxy concrete and the horizontal H beam upper portion; g) 상기 세로 H빔과 가로 H빔 하부에 설치된 강연선에 인장력도입하여 세로 H빔과 가로 H빔 인장 브라켓에 정착구를 이용하여 정착하는 단계로 이루어지는 것을 특징으로 하는 PC박스 교량의 PC박스 내측 연장부에 설치된 보강장치를 이용한 보강공법.g) PC box inner extension of the PC box bridge, comprising the step of introducing a tensile force to the strands installed below the vertical H beam and the horizontal H beam using a fixing fixture in the vertical H beam and the horizontal H beam tension bracket Reinforcement method using reinforcement device installed in
KR10-2002-0069518A 2002-11-11 2002-11-11 Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus KR100465433B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0069518A KR100465433B1 (en) 2002-11-11 2002-11-11 Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0069518A KR100465433B1 (en) 2002-11-11 2002-11-11 Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0033659U Division KR200305819Y1 (en) 2002-11-11 2002-11-11 Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge

Publications (2)

Publication Number Publication Date
KR20040041313A KR20040041313A (en) 2004-05-17
KR100465433B1 true KR100465433B1 (en) 2005-01-13

Family

ID=37338412

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0069518A KR100465433B1 (en) 2002-11-11 2002-11-11 Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus

Country Status (1)

Country Link
KR (1) KR100465433B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101467492B1 (en) * 2013-04-24 2014-12-01 (주)삼현피에프 Hybrid superstructure of continuous bridge for supressing out-of-plane bending moment on crossbeams which support stringer
KR101618085B1 (en) * 2015-06-12 2016-05-04 노경범 Connecting joint structures of a girder
KR20200059329A (en) 2018-11-16 2020-05-29 김홍노 The epoxy charging method of PC box type bridge
KR20200060176A (en) 2019-01-11 2020-05-29 김홍노 The epoxy charging device of the upper plate of bridge and method thereof
KR20210150159A (en) 2020-06-03 2021-12-10 김홍노 The epoxy charging method of the upper plate of bridge to use hose pump

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758021B (en) * 2013-12-31 2016-01-13 郑州大学 For the prefabricated case beam of stretch-draw transverse prestress
CN113047186B (en) * 2021-03-24 2022-08-30 华东交通大学 Bridge reinforcing apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101467492B1 (en) * 2013-04-24 2014-12-01 (주)삼현피에프 Hybrid superstructure of continuous bridge for supressing out-of-plane bending moment on crossbeams which support stringer
KR101618085B1 (en) * 2015-06-12 2016-05-04 노경범 Connecting joint structures of a girder
KR20200059329A (en) 2018-11-16 2020-05-29 김홍노 The epoxy charging method of PC box type bridge
KR20200060176A (en) 2019-01-11 2020-05-29 김홍노 The epoxy charging device of the upper plate of bridge and method thereof
KR20210150159A (en) 2020-06-03 2021-12-10 김홍노 The epoxy charging method of the upper plate of bridge to use hose pump

Also Published As

Publication number Publication date
KR20040041313A (en) 2004-05-17

Similar Documents

Publication Publication Date Title
KR100985139B1 (en) Reinforcement method and apparatus for upper concrete structure by using reinforcement members having reinforcement fibers thereon
KR100465433B1 (en) Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge and reinforcing method using the apparatus
KR100355091B1 (en) Method for reinforcing resistance force of a bridge using a prefabricated bracket
KR100757198B1 (en) Stress ribbon bridges carbon fiber plate and frp deck, and construction method thereof
KR200305819Y1 (en) Reinforcing appratus installed in inside extended region of prestressed concrete box of prestressed concrete box bridge
KR100441209B1 (en) Method and Structure for Reinforcing Structure Using Tendon and Saddle Apparatus therefor
JP2744955B2 (en) Reinforcement structure and reinforcement method of hinge part of gel bar bridge
KR100566653B1 (en) The middle point part continuous structure and the continuous method of prestressed concrete girder bridge
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
KR100516155B1 (en) Section increasing and reinforcing apparatus for reinforcing section of the lower part of slab between girder and cross beam in girder bridge and installing method thereof
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
KR100558089B1 (en) Apparatus for repairing and reinforcing box-typed concrete structures by increasing the section of concrete structures, and repairing and reinforcing method using the apparatus
KR100530024B1 (en) Apparatus for reinforcing slab installing the upper and lower cover plate and fixing device of tension materials in prelexed H-type beam, and method for reinforcing slab using the apparatus
KR20050011830A (en) Joint connecting apparatus for absorbing different expansion and contraction each other with installed at the connecting point between new bridge and old bridge and construction method thereof
KR100549986B1 (en) Fabricated repairing and reinforcing apparatus for reinforcing bearing force of beam in a bridge and construction method using the apparatus
KR200337841Y1 (en) Section increasing and reinforcing apparatus for reinforcing section of the lower part of slab between girder and cross beam in girder bridge
KR200340908Y1 (en) H-beam enlargement and reinforcing apparatus to the slab of girder bridge combining reinforcement of cross beam
KR100372808B1 (en) Continuous Slab Bridge Reinforcement Structure And Method Thereof
KR100509453B1 (en) Apparatus for reinforcing load force resistance in continuous slab bridge using steel twisted wire and reinforcing method thereof using the apparatus
KR200307124Y1 (en) Apparatus for reinforcing load force resistance in continuous slab bridge using steel twisted wire
KR100637849B1 (en) Beam reinforcement method and its reinforcing device using beam lower steel curve placement method
KR19990032977A (en) Repair reinforcement method and apparatus of bridge mold
JP2002256516A (en) Floor slab reinforcing structure
KR20040034970A (en) Prestressed reinforced concrete using prestressed concrete wire and T-shaped steel plate and method for constructing bridge using the same
CN210886915U (en) Caulking module with elastic telescopic member

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee