KR100461454B1 - Assembling apparatus and method of timing chain - Google Patents

Assembling apparatus and method of timing chain Download PDF

Info

Publication number
KR100461454B1
KR100461454B1 KR10-2002-0046968A KR20020046968A KR100461454B1 KR 100461454 B1 KR100461454 B1 KR 100461454B1 KR 20020046968 A KR20020046968 A KR 20020046968A KR 100461454 B1 KR100461454 B1 KR 100461454B1
Authority
KR
South Korea
Prior art keywords
sprocket
cam shaft
crankshaft
timing chain
shaft
Prior art date
Application number
KR10-2002-0046968A
Other languages
Korean (ko)
Other versions
KR20040013872A (en
Inventor
이종원
Original Assignee
현대자동차주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대자동차주식회사 filed Critical 현대자동차주식회사
Priority to KR10-2002-0046968A priority Critical patent/KR100461454B1/en
Publication of KR20040013872A publication Critical patent/KR20040013872A/en
Application granted granted Critical
Publication of KR100461454B1 publication Critical patent/KR100461454B1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16HGEARING
    • F16H7/00Gearings for conveying rotary motion by endless flexible members
    • F16H7/06Gearings for conveying rotary motion by endless flexible members with chains
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16HGEARING
    • F16H55/00Elements with teeth or friction surfaces for conveying motion; Worms, pulleys or sheaves for gearing mechanisms
    • F16H55/02Toothed members; Worms
    • F16H55/30Chain-wheels

Abstract

본 발명은 엔진의 크랭크 샤프트의 동력을 캠 샤프트에 전달하여 밸브 타이밍을 조절하는 타이밍 체인의 조립방법을 개선하므로서 엔진의 연비성능이 향상되도록 하는 타이밍 체인의 조립구조 및 그 조립방법에 관한 것으로,The present invention relates to an assembly structure of a timing chain for improving fuel efficiency of an engine while improving an assembly method of a timing chain for adjusting valve timing by transmitting power of a crank shaft of an engine to a cam shaft, and an assembly method thereof.

엔진의 밸브타이밍에 맞추어 크랭크 샤프트의 동력이 캠 샤프트에 전달되도록 하기 위해, 크랭크 샤프트 스프로켓과, 캠 샤프트 스프로켓 간에 타이밍 체인이 장착되는 구조에 있어서,In a structure in which a timing chain is mounted between the crankshaft sprocket and the camshaft sprocket so that the power of the crankshaft is transmitted to the camshaft in accordance with the valve timing of the engine,

실린더 블럭의 전방측으로 크랭크 샤프트 스프로켓이 축지되는 크랭크 샤프트와;A crank shaft on which a crank shaft sprocket is axially stored in front of the cylinder block;

실린더 헤드의 전방측으로 일단이 돌출되는 캠 샤프트와;A cam shaft having one end protruding toward the front side of the cylinder head;

상기한 캠 샤프트의 일단에 끼우기 위한 축공이 형성되고, 상기 축공의 외주에 캠 샤프트 스프로켓이 체결되기 위한 다수의 체결공이 형성되는 플랜지와;A flange having a shaft hole for fitting to one end of the cam shaft, and a plurality of fastening holes for fastening the cam shaft sprocket on the outer circumference of the shaft hole;

외주면에 상기한 플랜지의 보스에 끼우기 위한 축공이 형성되고, 상기 축공의 외주에 상기 체결공과 체결하는 과정에서 각도조절이 가능하도록 장공이 형성되고, 그 외주면에는 타이밍 체인이 채워지기 위한 이가 형성되는 캠 샤프트 스프로켓과;A shaft hole is formed on the outer circumferential surface for fitting to the boss of the flange, and a long hole is formed on the outer circumference of the shaft hole so that the angle can be adjusted in the process of fastening with the fastening hole. A shaft sprocket;

상기한 크랭크 샤프트의 구동력이 상기한 캠 샤프트에 전달될 수 있도록 캠 샤프트 스프로켓에 채워지는 타이밍 체인; 을 포함하여 구성되어지되,A timing chain filled in the camshaft sprocket so that the driving force of the crankshaft can be transmitted to the camshaft; Consists of including

상기한 캠 샤프트의 일단에 플랜지를 압입하고, 상기한 플랜지의 일측에 캠샤프트 스프로켓을 가조립 한 후, 타이밍 체인의 장력이 조절되어진 상태에서 캠 샤프트 스프로켓을 완조립하도록 구성되는 것을 특징으로 한다.After pressing the flange to one end of the cam shaft, and temporarily assembling the cam shaft sprocket on one side of the flange, characterized in that it is configured to complete the cam shaft sprocket in a state in which the tension of the timing chain is adjusted.

Description

타이밍 체인의 조립구조와 지그 및 조립방법{Assembling apparatus and method of timing chain}Assembling apparatus and method of timing chain

본 발명은 타이밍 체인의 조립구조와 지그 및 그 조립방법에 관한 것으로서, 보다 상세하게는 크랭크 샤프트의 동력을 캠 샤프트에 전달하여 밸브 타이밍을 조절하는 타이밍 체인의 조립방법을 개선하므로서 엔진의 연비성능이 향상되도록 하는 타이밍 체인의 조립구조와 지그 및 그 조립방법에 관한 것이다.The present invention relates to an assembling structure of a timing chain, a jig, and an assembling method thereof. More particularly, the fuel economy performance of an engine is improved by improving the assembling method of a timing chain for adjusting valve timing by transmitting power of a crankshaft to a cam shaft. An assembly structure, a jig, and an assembly method of a timing chain to be improved.

일반적으로 크랭크 샤프트는 크랭크 케이스 안에 설치된 메인 베어링으로 지지되어 있고, 각 실린더의 동력 행정에서 발생한 피스톤의 직선동력을 커넥팅 로드를 통해 바꾸고, 반대로 다른 행정에서는 피스톤에 운동을 가해 연속하여 동력을 발생하는 기능을 하는 것이다.In general, the crankshaft is supported by the main bearing installed in the crankcase, and converts the linear power of the piston generated in the power stroke of each cylinder through the connecting rod, and on the other hand, generates the power continuously by applying the movement to the piston in the other stroke. To do.

이렇게 크랭크 샤프트에서 발생된 회전동력은 대부분은 트랜스 밋션을 통해 차량을 구동하기 위한 동력으로 작용되어지고, 일부의 동력은 타이밍 체인을 통해연료의 연소에 필요한 흡기밸브 및 배기밸브를 작동시키는 캠 샤프트 및 보기류에 전달되어 엔진의 시동이 연속적으로 이루어지도록 한다.Most of the rotational power generated from the crankshaft is operated as a power for driving the vehicle through the transmission, and some of the power is driven through the timing chain to operate the intake valve and the exhaust valve required for combustion of the fuel, and It is transmitted to the accessory to allow the engine to be started continuously.

특히, 캠 샤프트의 구동장치는 일반적으로 크랭크 케이스의 앞부분에 설치되어 있으며, 타이밍 기어식, 타이밍 체인식, 타이밍 벨트식으로 분류되지만, 타이밍 기어식은 사용도중에 마모로 인하여 소음이 커지는 등의 이유로 최근에는 거의 사용하지 않고 있다. 그리고 타이밍 벨트식의 경우에는 스프로켓과 벨트의 조립공차에 의해 항상 캠위상의 공차폭이 기어보다 커지게 되는 단점이 있었다.In particular, the driving mechanism of the camshaft is generally installed at the front of the crankcase, and is classified into a timing gear type, a timing chain type, and a timing belt type. I rarely use it. In the case of the timing belt type, the tolerance width of the cam phase is always larger than that of the gear due to the assembly tolerance of the sprocket and the belt.

한편, 최근의 엔진에는 타이밍 장치로써 타이밍 체인이 많이 사용되고 있는데, 상기한 타이밍 체인이 적용되는 엔진의 경우에 체인스프라켓과 체인 간의 조립공차에 의해 캠 위상이 미소 변경되므로서 일반적으로 어느 정도의 밸브타이밍 공차가 발생된다는 것은 주지의 사실이다.On the other hand, in recent engines, many timing chains are used as timing devices. In the case of the engine to which the timing chain is applied, the timing of the valve is generally changed by a slight change in the cam phase due to the assembly tolerance between the chain sprocket and the chain. It is well known that tolerances occur.

도 12는 일반적인 엔진의 타이밍 체인이 장착된 모습을 도시한 도면이다. 도면에서와 같이, 실린더 헤드의 전방측에 일단이 돌출형성되는 캠 샤프트(10)의 끝단에는 캠 샤프트 스프로켓(11)이 각각 장착된다. 그리고 도면에는 도시가 생략되었지만 크랭크 샤프트의 일단에는 크랭크 샤프트 스프로켓이 장착된다. 또한, 상기한 크랭크 샤프트 스프로켓 과 두 개의 캠 샤프트 스프로켓(11) 간에는 타이밍 체인(12)이 연결된다.12 is a view illustrating a state in which a timing chain of a general engine is mounted. As shown in the figure, a cam shaft sprocket 11 is mounted at each end of the cam shaft 10, one end of which is formed at the front side of the cylinder head. Although not shown in the drawings, one end of the crankshaft is mounted with a crankshaft sprocket. In addition, a timing chain 12 is connected between the crankshaft sprocket and the two camshaft sprockets 11.

한편, 엔진을 조립하는 과정에서 상기한 타이밍 체인(12)을 장착할 때에는, 엔진성능이 좌우되는 밸브 타이밍을 맞추기 위해서 각각의 캠 샤프트 스프로켓(11)에 표시된 타이밍 마크(15)의 위치를 체인 케이스(13) 측면에 표시된 기준 타이밍마크(16)에 일치시켜야 한다. 또한, 타이밍 체인(12)의 타이밍 마크(17)는 주변과 색깔이 다르게 표시된다. 따라서 엔진을 조립하는 과정에서 작업자는 체인 케이스(13)의 측면에 표시된 기준 타이밍 마크(16)와, 캠 샤프트 스프로켓(11)에 표시된 타이밍 마크(15)와, 체인에 색깔로 표시된 타이밍 마크(17)의 위치를 일치시킨 상태에서 조립하도록 구성되어 있다.On the other hand, when mounting the above-described timing chain 12 in the process of assembling the engine, in order to match the valve timing on which the engine performance depends, the position of the timing mark 15 indicated on each camshaft sprocket 11 is changed to the chain case. (13) Match the reference timing mark 16 indicated on the side. In addition, the timing mark 17 of the timing chain 12 is displayed differently from the surroundings. Therefore, in the process of assembling the engine, the operator may refer to the reference timing mark 16 displayed on the side of the chain case 13, the timing mark 15 displayed on the camshaft sprocket 11, and the timing mark 17 displayed in color on the chain. It is configured to assemble in a state where the position of) is matched.

그러나 상기한 같이 밸브타이밍을 조절하는 장치로써 타이밍 체인을 적용하는 경우는 타이밍 기어를 적용하는 경우보다 밸브타이밍의 편차가 커지게 되는 문제가 있었다. 왜냐하면, 타이밍 체인을 조립하는 과정에서 캠 샤프트 스프로켓이 조립된 상태에서 타이밍 체인을 조립하므로 설계상으로는 기준 타이밍 마크(참조마크)와, 스프라켓의 타이밍 마크를 정확하게 설계하였다 하더라도, 타이밍 체인의 변형 및 체인 자체의 편차, 체인의 긴장 및 이완에 따른 편차 등으로 인해서 실제로 설계된 위상각에 정확히 조립할 수 없는 문제점가 있었기 때문이다.However, in the case of applying the timing chain as a device for adjusting the valve timing as described above, there is a problem in that the deviation of the valve timing becomes larger than when the timing gear is applied. Because the timing chain is assembled while the cam shaft sprocket is assembled during the timing chain assembly, even if the reference timing mark (reference mark) and the timing mark of the sprocket are correctly designed, the timing chain deformation and the chain itself are This is because there is a problem that cannot be accurately assembled at the designed phase angle due to the deviation of the chain, the tension of the chain, and the relaxation.

따라서 본 발명은 상기와 같은 문제점을 해결하기 위해서 안출된 것으로서, 엔진의 크랭크 샤프트의 동력을 캠 샤프트에 전달하여 밸브 타이밍을 조절하는 타이밍 체인의 조립방법을 개선하므로서 엔진의 연비성능이 향상되도록 하는 타이밍 체인의 조립구조와 지그 및 그 조립방법을 제공하는 데 목적이 있다.Therefore, the present invention has been made to solve the above problems, the timing to improve the fuel efficiency of the engine by improving the assembly method of the timing chain for adjusting the valve timing by transmitting the power of the engine crankshaft to the cam shaft An object of the present invention is to provide an assembly structure, a jig, and an assembly method of the chain.

본 발명은 상기와 같은 목적을 달성하기 위한 수단으로서,The present invention as a means for achieving the above object,

엔진의 밸브타이밍에 맞추어 크랭크 샤프트의 동력이 캠 샤프트에 전달되도록 하기 위해, 크랭크 샤프트 스프로켓과, 캠 샤프트 스프로켓 간에 타이밍 체인이장착되는 구조에 있어서,In a structure in which a timing chain is mounted between the crankshaft sprocket and the camshaft sprocket so that the power of the crankshaft is transmitted to the camshaft in accordance with the valve timing of the engine.

실린더 블럭의 전방측으로 크랭크 샤프트 스프로켓이 축지되는 크랭크 샤프트와;A crank shaft on which a crank shaft sprocket is axially stored in front of the cylinder block;

실린더 헤드의 전방측으로 일단이 돌출되는 캠 샤프트와;A cam shaft having one end protruding toward the front side of the cylinder head;

상기한 캠 샤프트의 일단에 끼우기 위한 축공이 형성되고, 상기 축공의 외주에 캠 샤프트 스프로켓이 체결되기 위한 다수의 체결공이 형성되는 플랜지와;A flange having a shaft hole for fitting to one end of the cam shaft, and a plurality of fastening holes for fastening the cam shaft sprocket on the outer circumference of the shaft hole;

외주면에 상기한 플랜지의 보스에 끼우기 위한 축공이 형성되고, 상기 축공의 외주에 상기 체결공과 체결하는 과정에서 각도조절이 가능하도록 장공이 형성되고, 그 외주면에는 타이밍 체인이 채워지기 위한 이가 형성되는 캠 샤프트 스프로켓과;A shaft hole is formed on the outer circumferential surface for fitting to the boss of the flange, and a long hole is formed on the outer circumference of the shaft hole so that the angle can be adjusted in the process of fastening with the fastening hole. A shaft sprocket;

상기한 크랭크 샤프트의 구동력이 상기한 캠 샤프트에 전달될 수 있도록 캠 샤프트 스프로켓에 채워지는 타이밍 체인; 을 포함하여 구성되어지되,A timing chain filled in the camshaft sprocket so that the driving force of the crankshaft can be transmitted to the camshaft; Consists of including

상기한 캠 샤프트의 일단에 플랜지를 압입하고, 상기한 플랜지의 일측에 캠 샤프트 스프로켓을 가조립 한 후, 타이밍 체인의 장력이 조절되어진 상태에서 캠 샤프트 스프로켓을 완조립하도록 구성되는 것을 특징으로 한다.After pressing the flange to one end of the cam shaft, and temporarily assembling the cam shaft sprocket on one side of the flange, characterized in that it is configured to complete the cam shaft sprocket in a state in which the tension of the timing chain is adjusted.

도 1은 본 발명에 의해 타이밍 체인이 조립된 상태의 정면도.1 is a front view of a state in which a timing chain is assembled according to the present invention.

도 2는 도 1의 A-A선 단면도.2 is a cross-sectional view taken along the line A-A of FIG.

도 3은 본 발명에 의해 형성되는 플랜지의 사시도.3 is a perspective view of a flange formed by the present invention.

도 4는 본 발명에 의해 형성되는 캠 샤프트 스프로켓의 정면도.4 is a front view of a camshaft sprocket formed by the present invention.

도 5는 본 발명에 의한 크랭크 샤프트 고정용 지그의 사시도.5 is a perspective view of a crankshaft fixing jig according to the present invention.

도 6은 본 발명에 의해 크랭크 샤프트를 고정하는 상태를 도시한 도면.6 is a view showing a state of fixing the crankshaft according to the present invention.

도 7은 본 발명에 의한 캠 샤프트 고정용 지그의 사시도.7 is a perspective view of a cam shaft fixing jig according to the present invention.

도 8은 본 발명에 의해 캠 샤프트를 고정하는 상태의 도면.8 is a view of a state of fixing the cam shaft according to the present invention.

도 9 내지 도 10은 본 발명에 의해 타이밍 체인이 조립되는 단계를 설명하기 위한 도면.9 to 10 are diagrams for explaining the step of assembling the timing chain according to the present invention.

도 11은 본 발명에 의해 타이밍 체인이 조립되는 과정을 설명하기 위한 플로우차트.11 is a flowchart for explaining a process of assembling a timing chain according to the present invention.

도 12는 종래의 기술을 설명하기 위한 도면.12 is a diagram for explaining a conventional technology.

※ 도면의 주요부분에 대한 부호의 설명※ Explanation of code for main part of drawing

20 : 체인 케이스 21 : 크랭크 샤프트20: chain case 21: crankshaft

22 : 캠 샤프트 23 : 크랭크 샤프트 스프로켓22: camshaft 23: crankshaft sprocket

24 : 캠 샤프트 스프로켓 25 : 타이밍 체인24: camshaft sprocket 25: timing chain

26 : 실린더 블럭 27 : 다웰 핀26: cylinder block 27: dowel pin

28 : 체인 가이드 29 : 체인 텐셔너28: chain guide 29: chain tensioner

30 : 플랜지 32 : 체결공30: flange 32: fastening hole

35 : 볼트 36 : 와셔35: bolt 36: washer

40 : 크랭크 샤프트 고정용 지그 50 : 캠 샤프트 고정용 지그40: crankshaft fixing jig 50: camshaft fixing jig

이하, 본 발명에 의한 체인의 조립구조 및 방법에 따른 바람직한 실시예를 첨부한 도면과 함께 상세하게 설명한다.Hereinafter, a preferred embodiment according to the assembly structure and method of the chain according to the present invention will be described in detail with the accompanying drawings.

도 1은 본 발명에 의해 타이밍 체인이 조립된 상태의 정면도이고, 도 2는 도 1의 A-A선 단면도이며, 도 3은 본 발명에 의해 형성되는 플랜지의 사시도이고, 도4는 본 발명에 의해 형성되는 캠 샤프트 스프로켓의 정면도이고, 도 5는 본 발명에 의한 크랭크 샤프트 고정용 지그의 사시도이고, 도 6은 본 발명에 의해 크랭크 샤프트를 고정하는 상태를 도시한 도면이고, 도 7은 본 발명에 의한 캠 샤프트 고정용 지그의 사시도이고, 도 8은 본 발명에 의해 캠 샤프트를 고정하는 상태의 도면이며, 도 9 내지 도 10은 본 발명에 의해 타이밍 체인이 조립되는 단계를 설명하기 위한 도면이고, 도 11은 본 발명에 의해 타이밍 체인이 조립되는 과정을 설명하기 위한 플로우차트이다.1 is a front view of a state in which a timing chain is assembled according to the present invention, FIG. 2 is a sectional view taken along line AA of FIG. 1, FIG. 3 is a perspective view of a flange formed by the present invention, and FIG. 4 is formed by the present invention. 5 is a perspective view of a crankshaft fixing jig according to the present invention, FIG. 6 is a view showing a state of fixing a crankshaft according to the present invention, and FIG. 7 is according to the present invention. 8 is a perspective view of a cam shaft fixing jig, FIG. 8 is a view of a cam shaft fixed according to the present invention, and FIGS. 9 to 10 are views for explaining a step of assembling a timing chain according to the present invention. 11 is a flowchart for explaining a process of assembling a timing chain according to the present invention.

도면 중에 표시되는 도면부호 20은 본 발명에 의해 엔진에 조립되는 체인 케이스를 지시하는 것으로서, 상기한 체인 케이스(20)는 엔진의 실린더 블럭 및 실린더 헤드의 전방측에 돌출형성되는 크랭크 샤프트(21) 및 캠 샤프트(22)의 일단을 수용하게 된다.Reference numeral 20 shown in the drawing indicates a chain case assembled to the engine according to the present invention, wherein the chain case 20 is a crank shaft 21 protruding to the front side of the cylinder block and the cylinder head of the engine. And one end of the cam shaft 22.

그리고 상기한 크랭크 샤프트(21)에는 종래와 같이 크랭크 샤프트 스프로켓(23)이 장착되는데, 타이밍 체인(25)을 장착하기에 앞서서 상기한 크랭크 샤프트(21)의 리어측에는 크랭크 샤프트 고정용 지그(40)가 끼워진다.And the crankshaft 21 is mounted on the crankshaft sprocket 23 as in the prior art, the crankshaft fixing jig 40 to the rear side of the crankshaft 21 prior to mounting the timing chain 25 Is fitted.

상기한 크랭크 샤프트 고정용 지그(40)는 크랭크 샤프트 스프로켓(23)에 타이밍 체인(25)을 장착하기 전에 크랭크 샤프트(21)가 피스톤의 하사점 위치인 상태에서 회전되지 않도록 하기 위한 것으로서, 플라이 휠이 장착되는 크랭크 샤프트(21)의 끝단에 원반(41)이 말착되도록 형성되고, 상기 원반(41)이 회전되지 않도록 상기 원반(41)의 하측으로 실린더 블럭(26)의 하부면과 밀착되는 고정판(42)이 형성되며, 크랭크 샤프트(21)의 끝단에 일반적으로 돌출형성되는 다웰 핀(27)이 걸리도록 하기 위한 걸림돌기(43)가 상기 원반(41)의 일측에 형성된다. 즉, 상기한 크랭크 샤프트 고정용 지그(40)의 걸림돌기(43)에 상기한 다웰 핀(27)이 걸리게 된 상태가 피스톤이 하사점이 된 상태가 되도록 구성되는 것이다.The crankshaft fixing jig 40 is for preventing the crankshaft 21 from rotating in the state of the bottom dead center of the piston before the timing chain 25 is mounted on the crankshaft sprocket 23. The disc 41 is formed on the end of the crankshaft 21 is mounted, the fixing plate is in close contact with the lower surface of the cylinder block 26 to the lower side of the disc 41 so that the disc 41 is not rotated A 42 is formed, and a locking protrusion 43 is formed at one side of the disc 41 to catch the dowel pin 27 which is generally protruded at the end of the crankshaft 21. That is, the state in which the dowel pins 27 are caught by the engaging protrusion 43 of the crankshaft fixing jig 40 is configured such that the piston becomes a bottom dead center.

그리고 상기한 캠 샤프트(22)의 전방측 끝단에는 캠 샤프트 스프로켓(24)의 체결각도를 조정하면서 고정하기 위한 플랜지(30)가 결합된다. 상기 플랜지(30)는 캠 샤프트(22)의 일단에 끼우기 위한 축공(31)이 형성되고, 상기 축공(31)의 외주에 캠 샤프트 스프로켓(24)이 체결되기 위한 다수의 체결공(32)이 형성된다. 특히, 상기한 플랜지(30)의 축공(31)을 보강하기 위한 보스(33)와 체결공(32) 사이의 면은 살빼기되는 것이 바람직하다.And the flange 30 for fixing while adjusting the fastening angle of the cam shaft sprocket 24 is coupled to the front end of the cam shaft 22. The flange 30 has a shaft hole 31 for fitting to one end of the cam shaft 22, a plurality of fastening holes 32 for fastening the cam shaft sprocket 24 to the outer circumference of the shaft hole 31 Is formed. In particular, the surface between the boss 33 and the fastening hole 32 for reinforcing the shaft hole 31 of the flange 30 is preferably to lose weight.

그리고 상기한 플랜지(30)의 체결공(32)과 캠 샤프트 스프로켓(24)의 장공(24b)은 볼트(35)에 의해 결합되는데, 상기 볼트(35)의 축력이 상기 두 부재에 완전히 미치지 못하는 것을 보완하기 위해서 상기 캠 샤프트 스프로켓(24)의 외측면에는 링형상의 와셔(36)가 개재되는 것이 바람직하다.In addition, the fastening hole 32 of the flange 30 and the long hole 24b of the cam shaft sprocket 24 are coupled by the bolt 35, and the axial force of the bolt 35 does not completely reach the two members. In order to compensate for this, it is preferable that a ring-shaped washer 36 is interposed on the outer surface of the cam shaft sprocket 24.

한편, 상기와 같이 플랜지(30)가 장착된 캠 샤프트(22)는 별도로 형성되는 캠 샤프트 고정용 지그(50)에 의해서 고정된다. 이를 위해 상기 캠 샤프트(22)의 중간부 도중에는 지그 장착면(22a)이 평면가공된다. 상기한 지그 장착면(22a)이 가공되는 위치는 피스톤이 상사점 혹은 하사점에 위치되는 위치가 되도록 오차없이 정밀하게 가공되는 것이다.On the other hand, the cam shaft 22, the flange 30 is mounted as described above is fixed by the cam shaft fixing jig 50 is formed separately. To this end, a jig mounting surface 22a is planarized in the middle of the camshaft 22. The position where the jig mounting surface 22a is processed is precisely processed without error so that the piston is located at the top dead center or the bottom dead center.

상기한 캠 샤프트 고정용 지그(50)는 상기 지그 장착면(22a)에 끼워지기 위한 'n'자 형상의 끼움부(51)와, 상기 끼움부(51)가 회전되지 않도록 실린더 헤드의상면에 걸리기 위한 걸림부(52)가 상기 끼움부(51)의 상측에 일체로 형성된다. 따라서 상기한 캠 샤프트 고정용 지그(50)가 상기 지그 장착면(22a)에 정확하게 끼워진 상태가 피스톤이 상사점 혹은 하사점이 된 상태가 되는 것이다.The cam shaft fixing jig 50 has an 'n' shaped fitting portion 51 for fitting to the jig mounting surface 22a and an upper surface of the cylinder head so that the fitting portion 51 is not rotated. A catching portion 52 for catching is integrally formed on an upper side of the fitting portion 51. Therefore, the state in which the cam shaft fixing jig 50 is correctly fitted to the jig mounting surface 22a is such that the piston becomes a top dead center or a bottom dead center.

상기와 같이 캠 샤프트(22)가 기준에 맞게 고정된 상태에서는 상기 플랜지(30)의 외측면에 캠 샤프트 스프로켓(24)을 가조립하게 된다. 캠 샤프트 스프로켓(24)은 도 4에서와 같이 외주연에 소정의 피치를 갖는 다수의 이가 규칙적으로 배열되고, 중앙으로는 상기한 플랜지(30)의 보스(33)에 끼우기 위한 축공(24a)이 일반적인 스프로켓과 같이 형성된다. 그리고 상기한 축공(24a)의 외주에 플랜지(30)의 체결공(31)과 체결되는 과정에서 각도조절이 가능하도록 장공(24b)이 일정한 각도 간격으로 형성된다.In the state in which the cam shaft 22 is fixed to the reference as described above, the cam shaft sprocket 24 is temporarily assembled to the outer surface of the flange 30. Camshaft sprocket 24 is a plurality of teeth having a predetermined pitch on the outer periphery as shown in Figure 4 is arranged regularly, the shaft hole 24a for fitting to the boss 33 of the flange 30 in the center is It is formed like a normal sprocket. And the long hole (24b) is formed at a constant angle interval so that the angle can be adjusted in the process of engaging with the fastening hole 31 of the flange 30 to the outer circumference of the shaft hole (24a).

상기와 같이 캠 샤프트 스프로켓(24)의 가조립이 끝난 다음에는, 상기 크랭크 샤프트 스프로켓(23)과 캠 샤프트 스프로켓(24) 간에 타이밍 체인(25)을 장착한다.After the provisional assembly of the cam shaft sprocket 24 is completed as described above, the timing chain 25 is mounted between the crank shaft sprocket 23 and the cam shaft sprocket 24.

그리고 타이밍 체인(25)의 회전궤도를 안내하기 위한 체인 가이드(28) 및 체인 텐셔너(29)가 적당한 위치에 장착되고, 작업자의 체인 텐셔너(29)를 조절에 의해서 타이밍 체인(25)의 장력을 조절된다.The chain guide 28 and the chain tensioner 29 for guiding the rotational track of the timing chain 25 are mounted at appropriate positions, and the tension of the timing chain 25 is adjusted by adjusting the chain tensioner 29 of the operator. Adjusted.

이상과 같이 타이밍 체인(25)의 장력조절이 끝나게 되면 타이밍 체인(25)에 장력이 가해진 상태에서 가조립되었던 캠 샤프트 스프로켓(24)을 완조립하게 된다.When the tension adjustment of the timing chain 25 is completed as described above, the cam shaft sprocket 24, which has been temporarily assembled in the state where the tension is applied to the timing chain 25, is completed.

그런데 도면에서와 같이 캠 샤프트(21)가 2개인 경우에는 긴장측 캠 샤프트 스프로켓을 먼저 완조립한 다음에 이완측 캠 샤프트 스프로켓을 완조립하는 것이바람직하다.However, in the case of two cam shafts 21, as shown in the drawing, it is preferable to complete assembling the tension side cam shaft sprocket first and then assembling the relaxation side cam shaft sprocket.

이상과 같이 설명한 타이밍 체인의 조립단계는 도 11을 참고하면 된다.Refer to FIG. 11 for the assembling step of the timing chain described above.

본 발명에서는 캠 샤프트 스프로켓(24)을 직접 고정하는 대신에 플랜지(30)를 캠 샤프트(22)의 일단에 고정하고 타이밍 체인(25)의 조립시에 장력이 가해진 긴장측 캠 샤프트 스프로켓(22)부터 고정해나가면 된다.In the present invention, instead of directly fixing the camshaft sprocket 24, the tension side camshaft sprocket 22 to which the flange 30 is fixed to one end of the camshaft 22 and tension is applied when the timing chain 25 is assembled. You can fix it.

따라서 종래의 기술에서와 같이, 체인 케이스와 캠 샤프트 스프로켓과 타이밍 체인에 표시된 각각의 타이밍 마크를 맞춰야 할 필요가 없게 된다.Thus, as in the prior art, there is no need to match the respective timing marks marked on the chain case and camshaft sprocket and timing chain.

그리고 상기와 같이 타이밍 체인(25)의 조립 방법을 개선하게 되므로서, 정확한 밸브 타이밍에 맞춰 엔진이 작동되므로서 연비 성능 향상 및 배기가스 저감 기술의 실현이 가능하게 된다.As described above, the method of assembling the timing chain 25 is improved, so that the engine is operated according to the correct valve timing, thereby improving fuel efficiency and reducing the exhaust gas.

이상과 같이 구성된 본 발명은 타이및 체인을 장착하는 방법이 크게 개선되므로서 체인 케이스와 캠 샤프트 스프로켓과 타이밍 벨트에 표시된 각각의 타이밍 마크를 맞춰야 할 필요가 없게 될 뿐만 아니라, 정확한 밸브 타이밍에 맞춰 엔진이 작동되므로서 엔진의 연비 성능이 향상되어지고 배기가스 저감 측면에서 큰 효과가 있는 것이다.The present invention configured as described above greatly improves the method of mounting the tie and the chain so that each timing mark shown on the chain case, the camshaft sprocket and the timing belt need not be matched, and the engine is adjusted to the correct valve timing. This operation improves the fuel efficiency of the engine and has a great effect in terms of exhaust gas reduction.

Claims (7)

엔진의 밸브타이밍에 맞추어 크랭크 샤프트의 동력이 캠 샤프트에 전달되도록 하기 위해, 크랭크 샤프트 스프로켓과, 캠 샤프트 스프로켓 간에 타이밍 체인이 장착되는 구조에 있어서,In a structure in which a timing chain is mounted between the crankshaft sprocket and the camshaft sprocket so that the power of the crankshaft is transmitted to the camshaft in accordance with the valve timing of the engine, 실린더 블럭(26)의 전방측으로 크랭크 샤프트 스프로켓(23)이 축지되는 크랭크 샤프트(21)와;A crank shaft 21 on which the crank shaft sprocket 23 is axially stored toward the front side of the cylinder block 26; 실린더 헤드의 전방측으로 일단이 돌출되는 캠 샤프트(22)와;A cam shaft 22 whose one end protrudes toward the front of the cylinder head; 상기한 캠 샤프트(22)의 일단에 끼우기 위한 축공(31)이 형성되고, 상기 축공(31)의 외주에 캠 샤프트 스프로켓(24)이 체결되기 위한 다수의 체결공(32)이 형성되는 플랜지(30)와;A shaft hole 31 for fitting to one end of the cam shaft 22 is formed, and a flange having a plurality of fastening holes 32 for fastening the cam shaft sprocket 24 to the outer circumference of the shaft hole 31 ( 30); 외주면에 상기한 플랜지(30)의 보스(33)에 끼우기 위한 축공(24a)이 형성되고, 상기 축공(24a)의 외주에 상기 체결공(32)과 체결하는 과정에서 각도조절이 가능하도록 장공(24b)이 형성되고, 그 외주면에는 타이밍 체인(25)이 채워지기 위한 이가 형성되는 캠 샤프트 스프로켓(24)과;A shaft hole 24a is formed on the outer circumference to fit the boss 33 of the flange 30, and the long hole is formed so that the angle can be adjusted in the process of fastening with the fastening hole 32 on the outer circumference of the shaft hole 24a. A camshaft sprocket (24) formed thereon, the outer circumferential surface thereof having teeth formed for filling the timing chain (25); 상기한 크랭크 샤프트(21)의 구동력이 상기한 캠 샤프트(22)에 전달될 수 있도록 캠 샤프트 스프로켓(24)에 채워지는 타이밍 체인(25); 을 포함하여 구성된 것을 특징으로 하는 타이밍 체인의 조립구조.A timing chain 25 filled in the cam shaft sprocket 24 so that the driving force of the crank shaft 21 can be transmitted to the cam shaft 22; Assembly structure of the timing chain, characterized in that configured to include. 제 1 항에 있어서,The method of claim 1, 상기한 플랜지(30)의 체결공(32)과 캠 샤프트 스프로켓(24)의 장공(24b)은 볼트(35)에 의해 결합되어지되, 상기 두 부재의 결합력이 향상되도록 상기 캠 샤프트 스프로켓(24)의 외측면에는 링형상의 와셔(36)가 개재되는 것을 특징으로 하는 타이밍 체인의 조립구조.The fastening hole 32 of the flange 30 and the long hole 24b of the camshaft sprocket 24 are coupled by bolts 35, but the camshaft sprocket 24 is improved so that the coupling force between the two members is improved. Assembly structure of the timing chain, characterized in that the ring-shaped washer 36 is interposed on the outer surface of the. 제 1 항에 있어서,The method of claim 1, 상기한 플랜지(30)의 보스(33)와 체결공(32) 사이의 면은 살빼기되는 것을 특징으로 하는 타이밍 체인의 조립구조.Assembly structure of the timing chain, characterized in that the surface between the boss 33 and the fastening hole 32 of the flange 30 is to lose weight. 엔진의 밸브타이밍에 맞추어 크랭크 샤프트의 동력이 캠 샤프트에 전달되도록 하기 위해, 크랭크 샤프트 스프로켓과 캠 샤프트 스프로켓 간에 타이밍 체인이 장착되는 방법에 있어서,In a method in which a timing chain is mounted between the crankshaft sprocket and the camshaft sprocket so that the power of the crankshaft is transmitted to the camshaft in accordance with the valve timing of the engine, 크랭크 샤프트 고정용 지그를 크랭크 샤프트에 끝단에 끼워 크랭크 샤프트의 회전을 고정하는 단계와;Fixing the crankshaft fixing jig to the crankshaft at the end to fix rotation of the crankshaft; 캠 샤프트의 끝단에 캠 샤프트 스프로켓이 결합될 플랜지를 압입하는 단계와;Pressing a flange to which a cam shaft sprocket is coupled to an end of the cam shaft; 상기한 캠 샤프트의 중간부에 캠 샤프트 고정용 지그를 끼워 캠 샤프트의 회전을 고정시키는 단계와;Fixing a rotation of the cam shaft by inserting a cam shaft fixing jig in an intermediate portion of the cam shaft; 상기한 플랜지의 외측으로 캠 샤프트 스프로켓을 가조립하는 단계와;Temporarily assembling a camshaft sprocket to the outside of the flange; 크랭크 샤프트 스프로켓과 캠 샤프트 스프로켓의 외주연으로 타이밍 체인을 장착하는 단계와;Mounting a timing chain around the outer periphery of the crankshaft sprocket and the camshaft sprocket; 체인 가이드 및 체인 텐셔너를 장착하는 단계와;Mounting a chain guide and a chain tensioner; 체인 텐셔너를 조절하여 상기한 타이밍 체인의 장력을 조절하는 단계와;Adjusting the tension of the timing chain by adjusting a chain tensioner; 캠 샤프트 스프로켓을 완조립하는 단계; 로 조립이 이루어지는 것을 특징으로 타이밍 체인의 조립방법.Assembling the cam shaft sprocket; Assembly method of the timing chain, characterized in that the assembly is made. 제 4 항에 있어서,The method of claim 4, wherein 캠 샤프트 스프로켓을 완조립하는 단계에서, 긴장측 캠 샤프트 스프로켓를 완조립한 다음에 이완측 캠 샤프트 스프로켓을 완조립하는 단계; 를 더 포함하여 조립이 이루어지는 것을 특징으로 하는 타이밍 체인의 조립방법.In assembling the cam shaft sprocket, after assembling the tension side cam shaft sprocket, and then assembling the relaxed cam shaft sprocket; Assembly method of a timing chain, characterized in that the assembly is made further comprising. 제 4항에 의한 방법으로 타이밍 체인이 조립되는 과정에서 사용되는 캠 샤프트 고정용 지그에 있어서,In the cam shaft fixing jig used in the process of assembling the timing chain by the method according to claim 4, 일부가 평면가공된 캠 샤프트(22)의 중단 도중에 형성된 지그 장착면(22a)에 끼워지기 위한 'n'자 형상의 끼움부(51)와, 상기 끼움부(51)가 회전되지 않도록 실린더 헤드의 상면에 걸리기 위한 걸림부(52)가 상기 끼움부(51)의 상면에 일체로 형성되는 것을 특징으로 캠 샤프트 고정용 지그.An 'n' shaped fitting portion 51 to be fitted to the jig mounting surface 22a formed during the interruption of the camshaft 22, which is partially machined, and the cylinder portion of the cylinder head so that the fitting portion 51 is not rotated. A cam shaft fixing jig, characterized in that the engaging portion (52) for catching the upper surface is formed integrally on the upper surface of the fitting portion (51). 제 4항에 의한 방법으로 타이밍 체인이 조립되는 과정에서 사용되는 크랭크 샤프트 고정용 지그에 있어서,In the crankshaft fixing jig used in the process of assembling the timing chain by the method according to claim 4, 상기 크랭크 샤프트(21)의 끝단을 감싸기 위한 원반(41)이 형성되고, 상기 원반(41)이 회전되지 않도록 상기 원반(41)의 하측으로 실린더 블럭(26)의 하부면과 밀착되는 고정판(42)이 형성되며, 크랭크 샤프트(21)의 끝단에 돌출형성되는 다웰 핀(27)이 걸리도록 하기 위한 걸림돌기(43)가 상기 원반(41)의 일측에 형성되는 것을 특징으로 하는 크랭크 샤프트 고정용지그.A disk 41 is formed to surround the end of the crankshaft 21, and the fixing plate 42 is in close contact with the lower surface of the cylinder block 26 to the lower side of the disk 41 so that the disk 41 does not rotate. C) is formed, and a locking projection 43 is formed on one side of the disc 41 to catch the dowel pin 27 protruding from the end of the crankshaft 21, the crankshaft fixing paper That.
KR10-2002-0046968A 2002-08-09 2002-08-09 Assembling apparatus and method of timing chain KR100461454B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0046968A KR100461454B1 (en) 2002-08-09 2002-08-09 Assembling apparatus and method of timing chain

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0046968A KR100461454B1 (en) 2002-08-09 2002-08-09 Assembling apparatus and method of timing chain

Publications (2)

Publication Number Publication Date
KR20040013872A KR20040013872A (en) 2004-02-14
KR100461454B1 true KR100461454B1 (en) 2004-12-14

Family

ID=37321139

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0046968A KR100461454B1 (en) 2002-08-09 2002-08-09 Assembling apparatus and method of timing chain

Country Status (1)

Country Link
KR (1) KR100461454B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101134707B1 (en) * 2005-01-03 2012-04-13 현대자동차주식회사 Jig for installing a timing chain at an engine
KR101134833B1 (en) * 2005-01-10 2012-04-13 현대자동차주식회사 Jig for installing a timing chain at an engine
IT202100026867A1 (en) * 2021-10-19 2023-04-19 Cnh Ind Italia Spa CROWN ASSEMBLY AND CHAIN ASSEMBLY FOR A WORK VEHICLE INCLUDING SUCH CROWN ASSEMBLY

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5783238U (en) * 1980-11-08 1982-05-22
JPH03106101A (en) * 1989-09-20 1991-05-02 Fujitsu Ltd Waveguide/coaxial line converter
JPH05280372A (en) * 1992-04-01 1993-10-26 Mazda Motor Corp Assembly method for timing belt and pulley
KR19990027961A (en) * 1997-09-30 1999-04-15 양재신 Camshaft Structure for Engine Timing Belt Installation
KR20020049107A (en) * 2000-12-19 2002-06-26 류정열 Cam shaft pully fixing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5783238U (en) * 1980-11-08 1982-05-22
JPH03106101A (en) * 1989-09-20 1991-05-02 Fujitsu Ltd Waveguide/coaxial line converter
JPH05280372A (en) * 1992-04-01 1993-10-26 Mazda Motor Corp Assembly method for timing belt and pulley
KR19990027961A (en) * 1997-09-30 1999-04-15 양재신 Camshaft Structure for Engine Timing Belt Installation
KR20020049107A (en) * 2000-12-19 2002-06-26 류정열 Cam shaft pully fixing device

Also Published As

Publication number Publication date
KR20040013872A (en) 2004-02-14

Similar Documents

Publication Publication Date Title
KR101827096B1 (en) Sprocket structure of engine
KR100461454B1 (en) Assembling apparatus and method of timing chain
KR20040028512A (en) Cam chain detachment preventive structure for internal combustion engine
EP1426583B1 (en) Cam chain detachment preventive structure
US5184401A (en) Method of assembling valve drive mechanism to engine
US4951623A (en) Double overhead camshaft engine
JPS5929766A (en) Method for driving fuel injection pump of diesel engine
KR100986457B1 (en) Continuously variable valve lift device of engine for vehicle
JP2008075624A (en) Timing confirming mechanism for internal combustion engine
JP2006200449A (en) Timing matching device
JPH06272519A (en) Camshaft for engine
JPH0673520U (en) Structure of bearing part of fuel injection pump
KR200167146Y1 (en) Valve timing control device of camshaft
KR200155937Y1 (en) Backlash adjuster
JPS632682Y2 (en)
KR200245545Y1 (en) Timing Drive
KR950005824B1 (en) Inlet & outlet valve systemof internal combustion engine
KR0167928B1 (en) Driving device of dohc type cam shaft using link method
JPH0738751Y2 (en) Belt tensioning device for internal combustion engine
JP2570277Y2 (en) Timing gear lubrication device
JP2560634B2 (en) Camshaft positioning structure
JP2001050058A (en) Timing chain device for internal combustion engine
US5038729A (en) Distributor driving apparatus for engines
JPH0326406Y2 (en)
JP2000248956A (en) Endless transmitting member assembly structure for ohc engine

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20081202

Year of fee payment: 5

LAPS Lapse due to unpaid annual fee