KR100425922B1 - Boundary wall construction structure and constructing method thereof - Google Patents
Boundary wall construction structure and constructing method thereof Download PDFInfo
- Publication number
- KR100425922B1 KR100425922B1 KR10-2000-0065404A KR20000065404A KR100425922B1 KR 100425922 B1 KR100425922 B1 KR 100425922B1 KR 20000065404 A KR20000065404 A KR 20000065404A KR 100425922 B1 KR100425922 B1 KR 100425922B1
- Authority
- KR
- South Korea
- Prior art keywords
- boundary wall
- foundation
- construction
- road
- foundation structure
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/222—Raised kerbs, e.g. for sidewalks ; Integrated or portable means for facilitating ascent or descent
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/006—Foundations for pavings made of prefabricated single units
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F15/00—Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
- E01F15/02—Continuous barriers extending along roads or between traffic lanes
- E01F15/08—Continuous barriers extending along roads or between traffic lanes essentially made of walls or wall-like elements ; Cable-linked blocks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/12—Paving elements vertically interlocking
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C2201/00—Paving elements
- E01C2201/14—Puzzle-like connections
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
Abstract
본 발명은 도로의 경계벽 구조물 및 그 시공방법에 관한 것으로서, 도로와 도로, 또는 도로와 인도를 경계짓는 경계벽의 기초를 시공하는데 있어 미리 경계벽의 기초구조물을 제작한 뒤에 굴착한 기초지반에 이미 제작된 그 기초구조물을 시공함으로써 도로 공사시 여유시간을 활용하여 용이하게 작업할 수 있어 시공시간을 단축하여 전체 공사 기간를 단축시키며, 공사비를 절감할 수 있는 매우 뛰어난 효과가 있다.The present invention relates to a boundary wall structure of a road and a construction method thereof, and in the construction of a foundation of a road and a road, or a boundary wall that borders a road and a sidewalk, the fabrication of the foundation structure of the boundary wall in advance and then already made on the foundation ground excavated By constructing the basic structure, it is possible to easily work by taking advantage of the spare time during road construction, which shortens the construction time and shortens the overall construction period, and has a very excellent effect of reducing construction costs.
Description
본 발명은 도로 공사시 도로와 도로, 도로와 인도사이에 설치하는 경계벽 구조물 및 그 시공방법에 관한 것으로서, 더욱 상세하게는 공장에서 미리 제작한 경계벽의 기초구조물을 제작하여 현장에 설치함으로써 린 폼설치, 린 콘크리트 타설 및 양생의 절차가 전혀 필요없어 도로 작업시 여유시간을 활용하여 작업능률을 향상시킬 수 있는 신개념의 경계벽 구조물 및 그 시공방법이다.The present invention relates to a boundary wall structure installed between a road and a road, a road and a sidewalk during construction of a road, and a construction method thereof. More specifically, a lean foam installation is performed by manufacturing a foundation structure of a boundary wall pre-fabricated in a factory and installing it on a site. It is a new concept of boundary wall structure and its construction method that can improve work efficiency by utilizing spare time during road work because there is no need for concrete concrete pouring and curing.
도 1에 도시된 종래의 경계벽은 경계벽의 기초구조물을 제작하기 위해 린 폼설치, 린 콘크리트 타설 및 양생, 철근 조립 및 거푸집 설치, 콘크리트 타설, 양생등의 일련의 작업을 현장에서 하였다.In the conventional boundary wall shown in FIG. 1, a series of operations such as lean foam installation, lean concrete placement and curing, reinforcing steel assembly and formwork installation, concrete placement, and curing were performed in the field to manufacture the foundation structure of the boundary wall.
하지만, 이러한 종래 기술은 도로 작업과 병행하여 설치하므로 도로 공정에 간섭을 받아 산발적인 작업을 하는 문제점이있었다.However, such a prior art is installed in parallel with the road work, there was a problem in that sporadic work by interference with the road process.
또한, 굴착후 협소한 장소에서의 철근 조립 및 거푸집 설치 작업으로 작업 능률의 저하를 야기하는 문제점이 있었다.In addition, there is a problem that causes a decrease in work efficiency by the reinforcing bar assembly and formwork installation work in a narrow place after excavation.
따라서, 이러한 종래의 문제점을 해소하기 위해 본 발명을 안출한 것으로써, 여유시간을 활용하며 작업능률을 향상시킬 수 있는 신개념의 경계벽 구조물 및 그 시공방법을 제공하는데 그 목적이 있다.Accordingly, an object of the present invention is to provide a new concept of boundary wall structure and a construction method thereof that can utilize the spare time and improve work efficiency.
이러한 목적을 달성하기 위해 본 발명은 기초지반을 굴착하고, 일측은 오목하고 타측은 블록한 형태의 경계벽의 기초구조물을 미리 제작하고, 그 제작된 경계벽의 기초구조물를 굴착된 기초지반내에 시공하고, 상기 시공된 경계벽의 기초구조물 위에 경계벽을 시공함으로써 그 목적을 달성하였다.In order to achieve the object of the present invention, the present invention excavates the foundation ground, one side is concave and the other side is prepared in advance the foundation structure of the boundary wall of the block type, the construction of the foundation structure of the manufactured boundary wall in the excavated foundation ground, The purpose was achieved by constructing the boundary wall on the foundation structure of the constructed boundary wall.
도 1은 종래 기술에 의한 경계벽 구조물을 도시한 사시도,1 is a perspective view showing a boundary wall structure according to the prior art,
도 2는 본 발명의 바람직한 실시예에 의한 경계벽 구조물의 시공방법을 도시한 공정도,2 is a process chart showing a construction method of a boundary wall structure according to a preferred embodiment of the present invention;
도 3은 본 발명의 바람직한 실시예에 의한 경계벽 구조물의 시공방법을 도시한 사시도,3 is a perspective view showing a method of constructing a boundary wall structure according to a preferred embodiment of the present invention;
도 4는 본 발명의 경계벽의 기초구조물을 도시한 사시도,4 is a perspective view showing the foundation structure of the boundary wall of the present invention,
도 5는 본 발명의 경계벽의 기초구조물을 도시한 측면도이다.5 is a side view showing the foundation structure of the boundary wall of the present invention.
* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings
10 : 경계벽의 기초구조물 15 : 아이볼트10: foundation structure of the boundary wall 15: eye bolt
20 ; 경계벽 30 : 고정 콘크리트20; Boundary wall 30: fixed concrete
이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 2는 본 발명의 바람직한 실시예에 의한 경계벽 구조물의 시공방법을 도시한 공정도이고, 도 3은 본 발명의 바람직한 실시예에 의한 경계벽 구조물의 시공방법을 도시한 사시도이고, 도 4는 본 발명의 경계벽의 기초구조물을 도시한 사시도이고, 도 5는 본 발명의 경계벽의 기초구조물을 도시한 측면도이다.2 is a process chart showing the construction method of the boundary wall structure according to a preferred embodiment of the present invention, Figure 3 is a perspective view showing the construction method of the boundary wall structure according to a preferred embodiment of the present invention, Figure 4 is It is a perspective view showing the foundation structure of the boundary wall, Figure 5 is a side view showing the foundation structure of the boundary wall of the present invention.
먼저, 도 2에 도시된 바와 같이, 본 발명은 기초지반을 굴착하는 굴착단계 (S1)과, 경계벽의 기초구조물을 제작하는 제작단계(S2)와, 상기 제작된 경계벽의 기초구조물을 굴착된 기초지반에 시공하는 기초구조물 시공단계(S3)와, 상기 시공된 기초구조물 상단의 "ㄷ"형태의 홈에 경계벽을 시공하는 경계벽 시공단계(S4)로 구성되었다.First, as shown in Figure 2, the present invention is excavation step (S1) for excavating the foundation ground, manufacturing step (S2) for producing the foundation structure of the boundary wall, and the foundation to excavate the foundation structure of the manufactured boundary wall Foundation structure construction step (S3) for construction on the ground, and the boundary wall construction step (S4) for constructing the boundary wall in the "c" shaped grooves on the top of the constructed foundation structure.
상기 굴착단계(S1)에서는 기초구조물을 시공하기 적합하게 적당한 넓이와 깊이로 굴착한다.In the excavation step (S1) is excavated to a suitable width and depth suitable for the construction of the foundation structure.
상기 제작단계(S2)에서는 도 4와 도 5에 도시된 바와 같이, 상기 경계벽의 기초구조물(10)은 상단에는 경계벽(20)이 시공될 수 있도록 "ㄷ"형태의 홈(45)이 형성되었고, 그 홈(45)의 양측에 길이 방향의 소정 간격으로 아이볼트(15)가 삽입되어 이동시 간편하게 이동할 수 있고, 길이 방향의 일측은 오목부(11)와 타측은 블록부(12)가 형성되어 각 경계벽의 기초들이 일렬로 접합될 수 있게 구성되었다.In the manufacturing step (S2), as shown in Figure 4 and 5, the foundation structure 10 of the boundary wall has a groove (45) of the "c" shape was formed so that the boundary wall 20 can be constructed at the top The eye bolts 15 are inserted at both sides of the groove 45 at predetermined intervals in the longitudinal direction, so that the eye bolts 15 can be easily moved during movement, and one side of the longitudinal direction is formed with a concave portion 11 and the other side with a block portion 12. The foundations of each boundary wall were configured to be joined in a line.
상기 기초구조물 시공단계(S3)는 경계벽의 기초구조물(10)을 굴토된 기초지반에 안착시킨 후 별도로 제작한 삼각형 형상의 고정 콘크리트(30)를 상기 경계벽의 기초와 기초지반 사이의 틈새에 삽입시킨뒤에 일반토로 매설한다.In the step of constructing the foundation structure (S3), the foundation structure 10 of the boundary wall is seated on the foundation of the excavated foundation, and then the triangular fixed concrete 30, which is manufactured separately, is inserted into the gap between the foundation of the boundary wall and the foundation ground. Laying in general soil later.
상기 경계벽 시공단계(S4)는 시공된 기초구조물의 상단홈에 경계벽을 삽입시킨후 접합하여 시공한다.In the boundary wall construction step (S4), the boundary wall is inserted into the upper groove of the constructed foundation structure and then joined.
이상 구성에 따른 본 발명의 작용을 설명하면, 본 발명은 미리 제작된 조립이 가능한 경계벽의 기초구조물을 이용하여 시공함으로써 시공성이 매우 뛰어난 특징이 있고, 고정 콘크리트에 의해 경계벽의 기초구조물을 견고히 접합되는 작용으로 충격에 매우 강한 특징이 있는 것이다.Referring to the operation of the present invention according to the above configuration, the present invention is characterized by the excellent construction work by using the prefabricated assembling foundation structure of the prefabricated boundary wall, it is firmly bonded to the foundation structure of the boundary wall by fixed concrete It is very strong in impact.
본 발명은 상기 실시예를 통해 설명한 바와 같이, 미리 제작된 경계벽의 기초구조물을 적용함으로써 도로 작업시 여유시간을 활용하여 경계벽을 시공할 수 있어 시공 시간을 단축하여 전체 공사 기간을 단축하며, 공사비를 절감시킬 수 있는 매우 뛰어난 효과가 있으므로 도로건설 산업상 매우 유용한 발명인 것이다.The present invention, as described through the above embodiment, by applying the foundation structure of the pre-fabricated boundary wall can be used to construct the boundary wall by using the spare time during the road work to shorten the construction time to shorten the overall construction period, It is a very useful invention for the road construction industry because it has a very good effect to reduce.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0065404A KR100425922B1 (en) | 2000-11-04 | 2000-11-04 | Boundary wall construction structure and constructing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0065404A KR100425922B1 (en) | 2000-11-04 | 2000-11-04 | Boundary wall construction structure and constructing method thereof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020000031010U Division KR200220920Y1 (en) | 2000-11-06 | 2000-11-06 | Boundary wall construction structure for roadway |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020035217A KR20020035217A (en) | 2002-05-11 |
KR100425922B1 true KR100425922B1 (en) | 2004-04-08 |
Family
ID=19697277
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0065404A KR100425922B1 (en) | 2000-11-04 | 2000-11-04 | Boundary wall construction structure and constructing method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100425922B1 (en) |
-
2000
- 2000-11-04 KR KR10-2000-0065404A patent/KR100425922B1/en active IP Right Grant
Also Published As
Publication number | Publication date |
---|---|
KR20020035217A (en) | 2002-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100640716B1 (en) | Precast concrete block for cantilever retaining wall and construction method using the same | |
KR102195504B1 (en) | Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method | |
KR102208793B1 (en) | Under ground structure using column wall and construction method thereof | |
JP2007154413A (en) | Soldier pile type earth retaining anchor type retaining wall and its construction method | |
KR100938395B1 (en) | The Construction Method of Underpass using Steel-Concrete Composite Wall Pile | |
KR20070075506A (en) | Construction method of underground structure using concrete filled pipe roof and concrete wall | |
KR102195510B1 (en) | Construction method for earth self-retaining wall using reinforcing member and PHC pile | |
KR20080034424A (en) | A constructing method of underground structure with supporting beam for steel pipe | |
JP3829319B2 (en) | Construction method of underground hollow structure and its underground hollow structure | |
KR101902791B1 (en) | Under ground structure construction method using composite steel pile and under ground structure therewith | |
KR20030065963A (en) | A method of constrution method for tunnel of structure pipe | |
JP3896351B2 (en) | Construction method of underground wall and construction method of underpass | |
KR100562686B1 (en) | The underground structure and it's construction method is using sheet pile and cast in a place concrete | |
JP3125288B2 (en) | Construction method of tunnel invert and precast plate for tunnel invert | |
KR100425922B1 (en) | Boundary wall construction structure and constructing method thereof | |
KR200220920Y1 (en) | Boundary wall construction structure for roadway | |
KR200420394Y1 (en) | Precast concrete block for cantilever retaining wall | |
KR20060110138A (en) | H pile use wall constitution structure and construction process | |
KR102195496B1 (en) | Pile for earth self-retaining wall using cast in place concrete pile with double I beam | |
KR20090042395A (en) | Retainning wall and its construction method | |
KR102194388B1 (en) | Construction method for earth self-retaining wall using reinforcing member and Soil retaining plate construction method | |
KR100355513B1 (en) | Shaft construction system using pc steel wire | |
KR101516746B1 (en) | Construction method for girder and construction method for underground structure without temporary structure using the same | |
KR20040023915A (en) | Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof | |
KR102194394B1 (en) | Construction method for earth self-retaining wall using reinforcing member and SCW construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130102 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20131224 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20141226 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20151229 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20170105 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20180103 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20191220 Year of fee payment: 17 |