KR100399279B1 - Bridge expansion joint and repairing method for using the same - Google Patents

Bridge expansion joint and repairing method for using the same Download PDF

Info

Publication number
KR100399279B1
KR100399279B1 KR10-2000-0034570A KR20000034570A KR100399279B1 KR 100399279 B1 KR100399279 B1 KR 100399279B1 KR 20000034570 A KR20000034570 A KR 20000034570A KR 100399279 B1 KR100399279 B1 KR 100399279B1
Authority
KR
South Korea
Prior art keywords
expansion joint
expansion
joint device
bridge
support steel
Prior art date
Application number
KR10-2000-0034570A
Other languages
Korean (ko)
Other versions
KR20020001952A (en
Inventor
박중길
이두성
Original Assignee
주식회사 일원티이씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 일원티이씨 filed Critical 주식회사 일원티이씨
Priority to KR10-2000-0034570A priority Critical patent/KR100399279B1/en
Publication of KR20020001952A publication Critical patent/KR20020001952A/en
Application granted granted Critical
Publication of KR100399279B1 publication Critical patent/KR100399279B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/02Arrangement or construction of joints; Methods of making joints; Packing for joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

본 발명은 교량의 상판과 같은 도로구조물에 설치되는 신축이음장치 및 그 보수공법에 관한 것이다.The present invention relates to an expansion joint device installed on a road structure such as a bridge deck and a repair method thereof.

본 발명의 신축이음장치는 신축수단(20), 내부지지강재(30)로 구성된다. 상기 신축이음장치 보수공법은 교량상부 구조물인 상판의 연결부 사이에 서로 마주보도록 설치된 신축이음장치의 신축수단(20)을 제거한 후, 신축이음장치의 내부의 이물질을 제거하고 방식처리하고 상기 신축이음장치의 신축수단(20)과 내부지지강재(30)가 맞닿는 부분에 코킹재를 도포하며 상기 신축이음장치의 내부지지강재(30) 사이에 새로운 신축수단(20)을 설치하고 상기 신축수단(20)의 마름모형 중공에 충진재를 삽입하는 단계로 구성된다. 본 발명의 신축이음장치 및 그 보수공법은 신축이음장치 양 옆에 타설되는 무수축콘크리트를 파쇄하지 않고 손상된 기존의 신축수단을 분리·제거하고 새로운 신축수단을 간단하게 설치함으로서 보수작업을 신속하게 완료할 수 있다.The expansion joint device of the present invention is composed of the expansion means 20, the inner support steel (30). The expansion joint repairing method is to remove the expansion means 20 of the expansion joint is installed so as to face each other between the connecting portion of the upper plate of the bridge upper structure, remove the foreign matter inside the expansion joint device, anticorrosive treatment and the expansion joint The caulking material is applied to the portion where the expansion means 20 and the inner support steel 30 of the expansion and the new expansion means 20 is installed between the inner support steel 30 of the expansion joint device and the expansion means 20 It consists of inserting a filler in the rhombus hollow. The expansion joint device and the repair method of the present invention can quickly complete the repair work by separating and removing the existing expansion means damaged and simply installing new expansion means without crushing the non-concrete concrete placed on both sides of the expansion joint device. can do.

Description

교량 신축이음장치 및 그 보수공법{Bridge expansion joint and repairing method for using the same}Bridge expansion joint and repairing method for using the same}

본 발명은 교량용 신축이음장치 및 그 보수공법에 관한 것이다. 보다 구체적으로, 본 발명의 신축이음장치와 상기 신축이음장치 양 옆에 타설되어 신축이음장치를 교량 상판에 고정시키는 무수축콘크리트가 신축이음장치를 구성하고 있는 내부지지강재의 상부키로 분리되어 있어 상기 무수축콘크리트를 파쇄하지 않고 신축이음장치를 보수할 수 있는 교량용 신축이음장치 및 그 보수공법에 관한 것이다.The present invention relates to an expansion joint device for bridges and a repair method thereof. More specifically, the non-concrete concrete, which is placed on both sides of the expansion joint device and the expansion joint device of the present invention to fix the expansion joint device to the bridge top plate, is separated by an upper key of the inner supporting steel constituting the expansion joint device. The present invention relates to a bridge expansion joint device capable of repairing expansion joint devices without shredding non-concrete concrete, and a repair method thereof.

교량구조물은 온도변화와 하중에 따라 팽창하고 수축되므로 일정길이 이상으로 설치되는 교량의 상부구조물은 팽창·수축으로 인한 교량의 상부구조물의 손상을 막기 위해 적정한 간격을 두고 설치된다. 상기 교량의 상부구조물의 간격을 이어주는 장치가 교량용 신축이음장치이며 통상 교면에 일치하는 표면지지강재(11)와 일체화된 내부지지강재(12), 교량의 표면수 및 이물질이 신축이음장치를 통하여 교량의 하부로 흘러가지 못하도록 상기 내부지지강재 사이에 열융착 또는 접착재로설치되는 신축고무(13) 및 신축이음장치를 교량 상부구조물에 고정시키기 위해 신축이음장치 양 옆에 타설되는 무수축콘크리트(14)로 구성된다. 상기 종래의 신축이음장치는 도1A에 도시된 바와 같이 내부지지강재와 신축고무(13)가 교통하중, 교량의 신축 또는 이물질에 의해 상기 내부지지강재 및 무수축콘크리트보다 조기에 손상 탈락되어 우수 시에 신축이음장치에 유입된 표면수가 교량의 하부로 흘러 들어가 교량의 거더(16), 교좌장치(17) 및 교각(18)에까지 해로운 영향을 주게되는 문제점이 있다. 따라서 신축고무가 손상된 신축이음장치를 보수하기 위해 종래에는 신축이음장치 양 옆에 타설된 무수축콘크리트(14) 및 내부철근(15)을 모두 파쇄·절단한 뒤 신축이음장치 전체를 교체하기 때문에 교량용 신축이음장치의 보수작업공기가 길어지고 작업공정이 복잡하며 비경제적이라는 문제점이 있다. 또한 도1B에 도시된 바와 같이 내부지지강재(19)와 신축고무(13)가 서로 분리되어 있는 신축이음장치인 경우 신축이음장치를 보수하기 위해 양 옆에 설치되어 있는 무수축콘크리트를 파쇄하지 않아도 된다는 장점은 있으나 내부지지강재 사이에 설치되는 신축고무(13)를 신축이음장치의 옆에서 밀어 넣으면서 설치하기 때문에 교량 폭에 따라 보수작업에 어려움이 많다는 문제점이 있다.As the bridge structure expands and contracts according to temperature change and load, the upper structure of the bridge installed over a certain length is installed at appropriate intervals to prevent damage to the upper structure of the bridge due to expansion and contraction. The device that bridges the gap of the upper structure of the bridge is the expansion joint device for bridges, and the inner support steel 12, which is integrated with the surface support steel 11, which is generally matched to the bridge, the number of surfaces of the bridge and foreign matter through the expansion joint device Non-concrete concrete 14 which is placed on both sides of the expansion joint to fix the expansion rubber 13 and the expansion joint to be installed to the upper structure of the bridge by heat-sealing or adhesive material between the inner support steel to prevent flow to the lower portion of the bridge It is composed of In the conventional expansion joint device, as shown in FIG. 1A, the inner support steel and the elastic rubber 13 are damaged and dropped earlier than the inner support steel and the non-concrete concrete due to traffic load, expansion or contraction of a bridge, and the like. There is a problem in that the surface water introduced into the expansion joint device flows into the lower portion of the bridge and adversely affects the girder 16, the bridge device 17, and the bridge 18 of the bridge. Therefore, in order to repair the expansion joints in which the expansion rubber is damaged, conventionally, the expansion joints are replaced because all the expansion joints are replaced after crushing and cutting all the non-concrete concretes 14 and the inner reinforcing bars 15 placed on both sides of the expansion joints. There is a problem that the maintenance work air of the expansion joint device for long, the work process is complicated and uneconomical. In addition, as shown in FIG. 1B, in the case of the expansion joint device in which the internal support steel 19 and the expansion rubber 13 are separated from each other, the non-concrete concrete installed on both sides of the expansion joint device does not have to be broken. There is an advantage, but there is a problem in that it is difficult to repair work depending on the width of the bridge because it is installed while pushing the expansion rubber 13 installed between the inner support steel in the expansion joint.

본 발명의 목적은 신축이음장치와 상기 신축이음장치 양 옆에 타설되는 무수축콘크리트를 본 발명의 신축이음장치의 내부지지강재에 형성된 외주면 키 로 분리하여 무수축콘크리트를 파쇄하지 않고 신축이음장치를 보수할 수 있는 교량용 신축이음장치 및 그 보수공법을 제공하는 것이다.An object of the present invention is to separate the expansion joint device and the non-concrete concrete placed on both sides of the expansion joint device by the outer peripheral surface key formed on the inner support steel of the expansion joint device of the present invention to expand the expansion joint device without breaking the non-concrete concrete It is to provide a renovable expansion joint device for bridge and its repair method.

본 발명의 다른 목적은 신축이음장치 옆에서 신축고무를 삽입하여 설치하지 않고 신축이음장치 위에서 신축수단을 신축이음장치의 내부지지강재에 설치함으로 교량폭이 길더라도 쉽게 손상된 신축이음장치를 보수할 수 있는 교량용 신축이음장치 및 그 보수공법을 제공하는 것이다.Another object of the present invention is to install the expansion means on the inner support steel of the expansion joint device without installing the expansion rubber next to the expansion joint device can easily repair damaged expansion joint device even if the bridge width is long It is to provide a new expansion joint for bridge and its repair method.

도1A 및 도1B는 종래의 신축이음장치 및 상기 종래의 신축이음장치가 설치된 교량의 입면도이다.1A and 1B are elevation views of a bridge in which a conventional expansion joint and a conventional expansion joint are installed.

도2A는 본 발명의 신축이음장치의 사시도 이다.Figure 2A is a perspective view of the expansion joint device of the present invention.

도2B는 본 발명의 신축이음장치가 설치된 교량 상판의 입면도이다.Fig. 2B is an elevation view of the bridge deck provided with the expansion joint of the present invention.

도3은 본 발명의 신축이음장치의 결합도이다.3 is a coupling diagram of the expansion joint device of the present invention.

도4는 본 발명의 신축수단의 사시도이다.Figure 4 is a perspective view of the expansion means of the present invention.

도5는 본 발명의 신축수단 변형례1의 사시도이다.5 is a perspective view of a first and second modification means of the present invention.

<도면의 부호에 대한 간단한 설명><Short description of the symbols in the drawings>

1: 신축이음장치 11: 표면지지강재1: expansion joint 11: surface supporting steel

12: 내부지지강재 13: 신축고무12: internal support steel 13: expansion rubber

14: 무수축콘크리트 15: 내부철근14: non-concrete concrete 15: internal reinforcing bar

16: 거더 17: 교좌장치16: girder 17: stave device

18: 교각 19: 내부지지강재18: Pier 19: Internal support steel

20: 신축수단 21: 몸통부20: extension means 21: trunk

22: 머리부 23: 수평부22: head part 23: horizontal part

24: 수직부 30: 내부지지강재24: vertical portion 30: internal support steel

31: 내부지지강재 수직부 32: 내부지지강재 수평부31: vertical portion of internal supporting steel 32: horizontal portion of internal supporting steel

34: 외주면 키 61: 수평원형강34: outer peripheral key 61: horizontal circular steel

도면에 따라 본 발명을 설명한다.The present invention will be described with reference to the drawings.

본 발명의 신축이음장치는 도2A에 도시된 바와 같이 신축수단(20), 내부지지강재(30)으로 구성된다.The expansion joint device of the present invention is composed of the expansion means 20, the inner support steel 30 as shown in Figure 2A.

상기 신축수단(20)은 탄성을 가진 몸체를 가지며 타 부재와 결합을 위해 양단에 머리부(22)를 가진다.The expansion means 20 has an elastic body and has a head 22 at both ends for coupling with other members.

상기 신축수단(20)은 전체적으로 단면이 수평부(23)와 수직부(24)로 이루어진 T자 형상으로, 상기 수평부(23)의 상부면에는 중앙에 반원형 홈이 부재의 길이 방향으로 연속하여 형성되고 중앙으로부터 좌우로 상기 반원형 홈보다 작은 홈이 다수개 형성되며, 상기 수평부(23)의 양단의 밑에서 머리부(22)가 형성되고 머리부(22)의 단면형상은 도4 내지 도5에 도시된 바와 같이 중공을 가진 마름모형 또는 중공을 가진 마름모가 상기 수평부(23)의 양단의 밑으로부터 떨어져 있어 연결을 위한 수직 연장부를 더 가지는 형 중의 하나로 형성되고, 상기 수직부(24)는 몸통부(21)의 대부분을 차지하며 단면의 내부 중앙에 한 개 또는 다수 개의 원형중공이 있고 밑면 중앙에 한 개 또는 다수 개의 반원형 홈이 부재의 길이 방향으로 연속하여 형성되는 고무이다.The stretching means 20 is a T-shaped cross section consisting of a horizontal portion 23 and a vertical portion 24 as a whole, the semi-circular groove in the center of the upper surface of the horizontal portion 23 in the longitudinal direction of the member A plurality of grooves are formed and smaller than the semi-circular groove from the center to the left and right, and the head portion 22 is formed under both ends of the horizontal portion 23, and the cross-sectional shape of the head portion 22 is shown in Figs. As shown in the figure, the hollow rhombus or the hollow rhombus is formed from one of the types having a vertical extension for connection by being separated from the bottom of both ends of the horizontal portion 23, and the vertical portion 24 is It is a rubber that occupies most of the body portion 21 and has one or more circular hollows in the inner center of the cross section and one or more semicircular grooves are formed continuously in the longitudinal direction of the member in the center of the bottom surface.

상기 신축수단(20)은 내부에 섬유소재를 면상으로 편직한 보강재가 삽입될 수도 있다.The stretching means 20 may be inserted into the reinforcing material knitted into the fiber material on the inside.

전체적으로 상기 신축수단(20)은 도3에 도시된 바와 같이 내부지지강재(30)와 필렛(50) 사이에서 압착되어 신축이음장치의 상부로부터 유입되는 표면수 및 이물질이 신축이음장치 내부로 흘러 들어가지 못하도록 하는 작용을 한다.Overall, the expansion means 20 is compressed between the internal support steel 30 and the fillet 50, as shown in Figure 3 and the surface water and foreign matter flowing from the upper portion of the expansion joint device flows into the expansion joint device It prevents you from going.

상기 내부지지강재(30)는 도2B에 도시된 바와 같이 전체적으로 단면이 L자형으로 이루어진 부재로 좌우 대칭으로 설치되며, 상기 신축수단(20)과 결합한다.As shown in FIG. 2B, the inner supporting steel 30 is formed in an L-shaped cross section and is symmetrically installed, and is coupled to the expansion and contraction means 20.

수직부(31)와 수평부(32)로 이루어진 상기 L자형 부재의 상기 수직부(31)는 상기 L자형 부재의 고착을 위한 다수개의 외주면 키(34)가 형성되고, 상기 L자형 부재의 상기 수평부(32)는 상기 수직부(31)와 만나는 부분에서부터 안쪽으로 연장되며 아래 외주면에는 상기 L자형 부재의 고착을 위한 다수개의 외주면 키(34)가 다시 형성되고, 상기 신축수단의 머리부(22)의 형상에 따라 머리부(22)가 압착되면서 암수결합할 수 있도록 형성된다.The vertical portion 31 of the L-shaped member including the vertical portion 31 and the horizontal portion 32 is formed with a plurality of outer peripheral keys 34 for fixing the L-shaped member, The horizontal portion 32 extends inward from the portion that meets the vertical portion 31, and a plurality of outer circumferential keys 34 for fixing the L-shaped member are formed on the lower outer circumferential surface again, and the head portion of the stretching means ( According to the shape of 22, the head 22 is formed to be male and female coupling while being compressed.

상기 내부지지강재(30)의 상기 수직부(31)의 외주면으로부터 수평하게 형성되며 부재의 길이방향으로 연속되는 다수개의 수평원형강(61)을 설치할 수도 있다.A plurality of horizontal circular steels 61 formed horizontally from the outer circumferential surface of the vertical portion 31 of the inner supporting steel 30 and continuous in the longitudinal direction of the member may be provided.

상기 수평원형강(61)은 상기 내부지지강재(30)가 구조체에 안정적으로 고착되게 하는 작용을 한다.The horizontal circular steel 61 serves to stably fix the internal supporting steel material 30 to the structure.

본 발명의 신축이음장치 보수공법은 교량상부 구조물인 상판의 연결부 사이에 서로 마주보도록 설치된 신축이음장치의 신축수단(20)을 제거한 후, 신축이음장치의 내부의 이물질을 제거하고 방식처리하는 단계, 상기 신축이음장치의 신축수단(20)과 내부지지강재(30)가 맞닿는 부분에 코킹재를 도포하는 단계, 상기 신축이음장치의 내부지지강재(30) 사이에 새로운 신축수단(20)을 설치하는 단계, 상기 신축수단(20)의 마름모형 중공에 충진재를 삽입하는 단계로 구성된다.Repairing and expansion method of the expansion joint device of the present invention after removing the expansion means 20 of the expansion joint device installed to face each other between the connecting portion of the upper plate which is the upper structure of the bridge, removing foreign matter inside the expansion joint device and anticorrosive treatment, Applying a caulking material to a portion where the expansion means 20 and the inner support steel 30 of the expansion joint device abut, installing new expansion means 20 between the inner support steel 30 of the expansion joint device; Step, inserting the filler in the rhombus hollow of the expansion means 20.

상기 내부지지강재(30)가 녹이 슬지 않는 합금강재로 되어있는 경우에는 방식처리가 불필요하며, 코킹처리 후 코킹재가 응고되기 전에 신축수단(20)을 설치한다.If the internal support steel 30 is made of an alloy steel that does not rust, anticorrosive treatment is unnecessary, and the expansion means 20 is installed before the caulking material is solidified after the caulking treatment.

본 발명의 신축이음장치 및 그 보수공법은 신축이음장치 양 옆에 타설되는 무수축콘크리트를 파쇄하지 않고 신축이음장치의 기존 신축수단을 제거하고 새로운 신축수단을 간단하게 설치함으로 보수작업을 신속하게 완료할 수 있다. 따라서 보수작업공기가 단축되어 공사중 중단되었던 차량의 통행을 신속하게 개통시킬 수 있고 나아가 공사비를 절감할 수 있으며 장기적인 교량유지관리비가 절감된다.The expansion joint device and the repairing method of the present invention quickly complete the repair work by removing the existing expansion means of the expansion joint device and simply installing new expansion means without crushing the non-concrete concrete placed on both sides of the expansion joint device. can do. Therefore, the maintenance work air is shortened, the traffic of the vehicle suspended during construction can be opened quickly, and further construction costs can be reduced, and long-term bridge maintenance costs are reduced.

Claims (6)

L형 단면의 내부지지강재(30)에 탄성체로 된 신축부재(20)를 걸쳐 잇도록 된 교량 신축이음장치에 있어서, 상기 내부지지강재(30)에서 수직부(31)와 수평부(32)가 만난 곳에는 마름모꼴 머리 삽입부(35)를 형성하고, 신축부재(20)의 폭방향 양단 가에는 머리 삽입부(35)에 끼워지는 중공 마름모꼴 머리부(22)를 형성한 것을 특징으로 하는 교량 신축이음장치.In the bridge expansion joint device for extending the elastic member 20 made of an elastic body to the inner support steel 30 of the L-shaped cross-section, the vertical portion 31 and the horizontal portion 32 in the inner support steel material (30) Where the rhombic head insertion part 35 is formed, and the hollow lozenge head part 22 fitted to the head insertion part 35 is formed in the width direction both ends of the expansion-contraction member 20. Expansion joint. 삭제delete 삭제delete 제 1항에 있어서, 상기 내부지지강재(30)의 외측면에는 교량 상판에 대하여 앵커로 작용하는 수평원형강(61)이 부착된 것을 특징으로 하는 교량 신축이음장치.The bridge expansion and contraction apparatus according to claim 1, wherein a horizontal circular steel (61) acting as an anchor with respect to the bridge top plate is attached to an outer surface of the inner supporting steel (30). 삭제delete 교량상부 구조물인 상판의 연결부 사이에 서로 마주보도록 설치된 상기 제1항의 신축이음장치의 신축수단(20)을 제거한 후, 신축이음장치의 내부의 이물질을 제거하고 방식처리하는 단계와 상기 신축이음장치의 신축수단(20)과 내부지지강재(30)가 맞닿는 부분에 코킹재를 도포하는 단계 및 상기 신축이음장치의 내부지지강재(30) 사이에 새로운 신축수단(20)을 설치하는 단계로 이루어진 신축이음장치 보수공법에 있어서,After removing the expansion means 20 of the expansion joint device of claim 1 installed so as to face each other between the connecting portion of the upper plate which is the bridge upper structure, removing foreign matter inside the expansion joint device and anticorrosive treatment and the expansion joint of the expansion joint Expansion joint consisting of applying a caulking material to the portion where the expansion means 20 and the inner support steel 30 abuts and installing a new expansion means 20 between the inner support steel 30 of the expansion joint device In the apparatus repair method, 상기 신축수단(20)의 마름모형 중공에 충진재를 삽입하는 단계로 구성되는 것을 특징으로 하는 신축이음장치 보수공법.The expansion joint repair method, characterized in that consisting of the step of inserting a filler in the rhombus hollow of the expansion means (20).
KR10-2000-0034570A 2000-06-22 2000-06-22 Bridge expansion joint and repairing method for using the same KR100399279B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0034570A KR100399279B1 (en) 2000-06-22 2000-06-22 Bridge expansion joint and repairing method for using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0034570A KR100399279B1 (en) 2000-06-22 2000-06-22 Bridge expansion joint and repairing method for using the same

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000018160U Division KR200212394Y1 (en) 2000-06-26 2000-06-26 Bridge expansion joint

Publications (2)

Publication Number Publication Date
KR20020001952A KR20020001952A (en) 2002-01-09
KR100399279B1 true KR100399279B1 (en) 2003-09-26

Family

ID=19673301

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0034570A KR100399279B1 (en) 2000-06-22 2000-06-22 Bridge expansion joint and repairing method for using the same

Country Status (1)

Country Link
KR (1) KR100399279B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100868342B1 (en) 2007-03-13 2008-11-12 (주)영광산업개발 expansion jointing unit for without concrete breaking construction
KR101726725B1 (en) * 2016-04-08 2017-04-14 주식회사 상원그린콘 Construction method for a sidewalk enlargement installation

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100879160B1 (en) * 2008-09-05 2009-01-19 (주)하이로드 Expansion joint for underground driveways
CN108951411A (en) * 2018-07-17 2018-12-07 江苏平山交通设施有限公司 A kind of novel maintenance-free noise abatement bridge extension joint

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5687502U (en) * 1979-12-05 1981-07-13
KR200184726Y1 (en) * 2000-01-04 2000-06-01 박중길 Finger-type bridge expansion joint

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5687502U (en) * 1979-12-05 1981-07-13
KR200184726Y1 (en) * 2000-01-04 2000-06-01 박중길 Finger-type bridge expansion joint

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100868342B1 (en) 2007-03-13 2008-11-12 (주)영광산업개발 expansion jointing unit for without concrete breaking construction
KR101726725B1 (en) * 2016-04-08 2017-04-14 주식회사 상원그린콘 Construction method for a sidewalk enlargement installation

Also Published As

Publication number Publication date
KR20020001952A (en) 2002-01-09

Similar Documents

Publication Publication Date Title
KR100936970B1 (en) Apparatus for preventing water leakage of bridge
KR101784721B1 (en) bridge-type expansion joint device and its construction method which can easily replace a drainage sheet
KR101317926B1 (en) Bridge expansion joint and repairing method for using the same
KR100707484B1 (en) Exchangeable equipment system with leak stop for expansion joint
KR200411577Y1 (en) Exchangeable equipment system with leak stop for expansion joint
KR100399277B1 (en) Bridge expansion joint and repairing method for using the same
KR100399279B1 (en) Bridge expansion joint and repairing method for using the same
KR100412778B1 (en) Expansion joint for connecting slabs of a bridge structure
KR102220544B1 (en) Bridge expansion joints with the improved installation and method thereof
KR100399278B1 (en) Bridge expansion joint and repairing method for using the same
WO2007021078A1 (en) Replaceable drainage device of expansion joint
KR200453460Y1 (en) Buried rail type expanasion joint system for a part of flexible coupling in bridge
KR200212394Y1 (en) Bridge expansion joint
KR20010068280A (en) Finger-type bridge expansion joint and repairing method for using the same
KR200184726Y1 (en) Finger-type bridge expansion joint
KR200212393Y1 (en) Bridge expansion joint
KR200212392Y1 (en) Bridge expansion joint
KR101531148B1 (en) Repair reinforcement method of bridge with exclusion of a mechanical expansion joint
KR200184728Y1 (en) Finger-type bridge expansion joint
KR200212391Y1 (en) Bridge expansion joint
KR20010068282A (en) Finger-type bridge expansion joint and repairing method for using the same
KR200184729Y1 (en) Rail-type bridge expansion joint
KR20020000281A (en) Bridge expansion joint and repairing method for using the same
KR20100026917A (en) Bridge having expansion joint and method of setting expansion joint
KR20200039908A (en) Expansion Joints of the integral abutment bridge and the installation method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110909

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20120815

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee