KR100707484B1 - Exchangeable equipment system with leak stop for expansion joint - Google Patents

Exchangeable equipment system with leak stop for expansion joint Download PDF

Info

Publication number
KR100707484B1
KR100707484B1 KR1020050097436A KR20050097436A KR100707484B1 KR 100707484 B1 KR100707484 B1 KR 100707484B1 KR 1020050097436 A KR1020050097436 A KR 1020050097436A KR 20050097436 A KR20050097436 A KR 20050097436A KR 100707484 B1 KR100707484 B1 KR 100707484B1
Authority
KR
South Korea
Prior art keywords
slab
expansion joint
fixing
fixed
fixing groove
Prior art date
Application number
KR1020050097436A
Other languages
Korean (ko)
Other versions
KR20070029535A (en
Inventor
박민철
Original Assignee
박종수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=38105213&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100707484(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 박종수 filed Critical 박종수
Publication of KR20070029535A publication Critical patent/KR20070029535A/en
Application granted granted Critical
Publication of KR100707484B1 publication Critical patent/KR100707484B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 신축이음부 누수방지 장치에 관한 것으로서 종래에 도로교 철도교 등은 슬래브 유간 상부에 설치되는 신축이음 장치에서 누수방지를 하고 있으나, 콘크리트와 신축이음장치와의 접착문제, 콘크리트의 파손, 차량 통행에 의한 신축이음장치의 파손 등으로 누수의 경로가 다양하여, 대부분의 교량에서 누수가 발생하여 구조물의 내구성을 저하 시키는 문제가 발생하고 있는바, 이에 본 발명은 슬래브 유간 하부나 측면에 고정 홈을 구비한 고정 받침대를 매립, 부착하고 방수 재질의 신축부재를 고정 홈에 고정되고 교량 끝단에서 밀어서 넣고 뺄 수 있게 철제 고정대와 결합시켜 슬래브 유간에 U 자형으로 설치되게 구성하여, 슬래브 유간에서의 어떠한 누수라도 모두 방지하고, 신축부재는 교체가 가능하여, 유지관리가 용이한 경제적인 신축이음 누수방지장치를 제공한다.The present invention relates to a leakproof device for expansion joints. In the past, road bridges and railway bridges prevent leakage from expansion joints installed on upper slab rails, but problems of adhesion between concrete and expansion joints, breakage of concrete, and vehicle traffic. Leakage of the expansion joint due to the damage caused by various expansion paths, the leakage occurs in most of the bridges to reduce the durability of the structure, the present invention has a problem that the fixing groove in the lower or side slab clearance Any fixed water leak in the slab spacing is constructed by embedding and attaching the fixing pedestal, and installing the U-shape between the slab spacing by combining the waterproof member with the steel fixture so that it is fixed in the fixing groove and can be pushed in and out of the bridge end. All of them can be prevented, and new members can be replaced, and economical new construction is easy to maintain. It provides a sound leak preventing unit.

고정받침대, 신축부재 고정대, 신축부재, 고정홈 Fixing base, extension member holder, extension member, fixing groove

Description

교체용 신축이음 누수방지 장치 {Exchangeable equipment system with leak stop for expansion joint}Replacement expansion joint leak prevention device {Exchangeable equipment system with leak stop for expansion joint}

도 1은 종래에 슬래브 상부에 고무재를 사용한 신축이음을 나타내는 정면도1 is a front view showing a conventional expansion joint using a rubber material on the upper slab

도 2는 종래에 슬래브 유간에 내부 봉함재를 사용한 신축이음을 나타내는 정면도Figure 2 is a front view showing a conventional expansion joint using the inner sealing material in the slab clearance.

도 3은 본 발명의 신축이음 누수방지 장치를 나타내는 정면도Figure 3 is a front view showing the expansion joint leakage preventing device of the present invention

도 4는 본 발명의 신축이음 누수방지 장치가 슬래브 하부 유간에 설치된 상태를 나타내는 정면도Figure 4 is a front view showing a state in which the expansion joint leakage preventing device of the present invention is installed on the lower slab flow

도 5는 본 발명의 신축이음 누수방지 장치를 나타내는 사시도5 is a perspective view showing the expansion joint leak prevention apparatus of the present invention

도 6은 본 발명에 의한 신축이음 누수방지 장치를 분리해서 나타내는 사시도Figure 6 is a perspective view separately showing the expansion joint leakage preventing device according to the present invention

도 7a, 7b, 7c, 7d는 본 발명에 의한 신축이음 누수방지 장치의 여러 가지 모양을 나타내는 정면도 7A, 7B, 7C, and 7D are front views illustrating various shapes of the expansion joint leakage preventing device according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1: 내부고무재 2: 철판1: internal rubber material 2: iron plate

3: 볼트,너트 3: bolt, nut

5: 교좌장치 6: 하부구조물5: Chair system 6: Substructure

7: 유간봉함재 8: 슬래브7: spanning rod material 8: slab

9: 빔 10: 고정받침대9: beam 10: fixed base

11: 고정홈 12: 스터드볼트11: fixing groove 12: stud bolt

14: 고정 받침대 뒷면 15: 슬래브 철근14: back of fixing base 15: slab rebar

20: 고정대 21: 볼트, 너트20: holder 21: bolt, nut

22: 신축부재 23: 보강재
33: 덮개판
22: stretching member 23: reinforcing material
33: cover plate

본 발명은 교량의 신축이음 누수방지 장치에 관한 것으로, 특히 슬래브 유간 측면, 하면에 고정홈이 구비된 받침대를 매립, 또는 부착하고 신축부재를 고정대에 고정시켜 받침대 고정홈에 삽입하여 U자 형태의 신축부재를 설치하여 상부에서 발생되는 신축이음의 모든 누수를 방지하면서도 교체가 용이한 장치에 관한 것이다. The present invention relates to a device for preventing leakage of expansion joints of a bridge, and in particular, embedding or attaching a pedestal having fixing grooves on the side and bottom surfaces of the slab flow path, and fixing the elastic member to the holder to insert the U-shaped member into the pedestal fixing groove. It relates to a device that is easy to replace while installing all the elastic members to prevent any leakage of the expansion joint generated from the top.

일반적으로 슬래브 신축이음부 유간은 온도변화, 건조수축, CREEP 등으로 인한 슬래브의 신축을 수용하는 기능을 하며, 슬래브 유간으로의 누수를 방지하여 구조물의 내구력을 유지 시키는데 있으나, 대부분의 구조물에서 누수가 발생하고 그로 인한 구조물의 내구성의 손상으로 막대한 예산이 소요되고 있다. Generally, the slab expansion joint spacing functions to accommodate the expansion and contraction of the slab due to temperature change, dry shrinkage, and creep, and to maintain the durability of the structure by preventing leakage to the slab clearance. And the resulting damage to the durability of the structure is enormous budget.

현재의 신축이음의 누수 경로는 도로교의 경우도 1과 같이 기존 콘크리트와 후 타설 콘크리트의 사이에 균열이 발생하거나, 신축이음과 후 타설 콘크리트와의 사이에 균열이 발생하여 이 균열 사이로 누수가 발생되고 철도교의 경우도 2와 같 이 신축이음 사이에 설치되어 있는 방수 봉함재가 시간이 경과되면 콘크리트와 봉함재의 사이에 접착력이 약해져서 누수가 발생한다. 따라서 종래에는 신규설치시 신축이음 본체에 철판을 용접하여 철판과 방수 신축부재를 볼트로 고정 시켰으나 볼트 고정 지점의 신축부재 파단과 노후화에 의한 누수 발생시, 하부구조물 및 유간의 협소로 상부 신축이음 장치의 철거 없이 방수재만 별도 교체가 불가하여, 많은 예산이 소요되고 적기에 보수를 하지 못하여 구조물에 영향을 주고 있는 실정이다. The leakage path of the current expansion joint is a crack between the existing concrete and the post-pouring concrete as in the case of the road bridge, or a crack occurs between the new joint and the post-pouring concrete, causing leakage between the cracks. As in the case of the railway bridge, as the watertight sealing material installed between the expansion joints, the adhesive force between the concrete and the sealing material weakens and leaks. Therefore, in the conventional installation, the steel plate is welded to the expansion joint body to fix the steel plate and the waterproof expansion and contraction member with bolts, but when the expansion member breaks and the aging of the expansion member occurs at the bolt fixing point, Since it is impossible to replace only the waterproofing material without demolition, a lot of budget is required and timely repair is not possible, thus affecting the structure.

이에 본 발명은 상기한 바와 같은 제 문제점을 해결하기 위하여 발명된 것으로서, 모든 누수는 슬래브 상부에서 발생되어 유간으로 유출되므로, 슬래브 유간 측면이나 하면에 신축부재를 고정할 수 있는 고정 받침대에 고정홈을 구비하고 부착되는 한 쌍의 받침대와, 상기 고정홈에 삽입. 고정. 교환이 가능한 한 쌍의 고정대에 신축부재를 고정시켜, 유간의 내부에 U 자 형으로 설치되어 모든 누수를 방지할 수 있게 하며, 신축부재 노후시 신축부재만 교량 유간 양끝에서 밀어 넣고 뺄 수 있도록 구성하여 경제적이면서도, 유지관리가 용이하여 교량의 내구성을 유지 시키는데 목적이 있다. Therefore, the present invention was invented to solve the above problems, all leaks are generated in the upper slab and flows out into the oil gap, so that the fixing groove in the fixing pedestal for fixing the expansion and contraction member on the side or bottom of the slab oil passage. A pair of pedestals provided and attached, and inserted into the fixing grooves. fixing. The extension member is fixed to a pair of exchangeable brackets, and it is installed in a U-shape inside the rail to prevent any leakage, and when the extension member is old, only the extension member can be pushed in and removed from both ends of the bridge rail. Economical and easy to maintain, the purpose is to maintain the durability of the bridge.

본 발명은 신설교량과 기존 교량 모두에 적용 가능한 것으로서 그 구조를 살펴 보면 다음과 같다.
먼저 교량의 상부 슬래브(8)와 슬래브(8) 사이(유간)에 설치되는 신축이음장치에 있어서, 상기 각각의 슬래브(8) 측면에 고정홈(11)을 구비한 한 쌍의 고정받침대(10)가 매립되거나 돌출되어 설치되고, 상기 각각의 고정홈(11)에는 고정대(20)가 끼워지면서 고정되며, 상기 각각의 고정대(20)에는 신축부재(22)의 양단이 결합되므로서 상기 신축부재(22)가 슬래브(8)와 슬래브(8) 사이의 유간에서 U자형으로 설치되어 누수가 방지되게 한 것을 특징으로 한다.
또한 상기 고정받침대(10)의 고정홈(11)은 원형, 정사각형, 직사각형, ㄱ형,

Figure 112006014288812-pat00010
형 중 어느 하나로 형성되고, 상기 고정받침대(10)는 내구성이 강한 철재로 구성됨을 특징으로 한다.
또한 상기 고정홈(11)을 구비한 한 쌍의 고정받침대(10)가 슬래브(8) 하면에 매립되게 한 것을 특징으로 한다.
또한 신축부재(22)는 고무재질이고 내구성을 위해서 내부에 보강재(23)를 삽입하여 구성됨을 특징으로 한다.
또한 상기 신축부재(22)는 철재판(편철)으로 구성됨을 특징으로 한다.
또한 상기 고정받침대(10)와 고정대(20)는 알루미늄 재질로 압출 성형 되는 것을 특징으로 한다.
또한 상기 고정대(20)에 리벳을 결합하여, 상기 신축부재(22)가 고정대(20)에 고정되게 한 것을 특징으로 한다.
또한 상기 신축부재(22)는 상기 고정대(20)에 말아져 압착 고정되는 것을 특징으로 한다.
또한 상기 고정대(20)에 상기 신축부재(22)를 높은 열로 압착 고정시키는 것을 특징으로 한다.
또한 상기 슬래브(8) 상부에 덮개판(33)이 설치되어 이물질이 낙하 되는 것을 방지하고, 상기 덮개판(33)은 알루미늄 재질로 압출 성형 되는 것을 특징으로 한다. The present invention is applicable to both new and existing bridges and looks at the structure as follows.
First, in the expansion joint device installed between the upper slab (8) and the slab (inflow) of the bridge, a pair of fixed support (10) having a fixing groove (11) on each side of the slab (8) ) Is embedded or protruded, the fixing groove 20 is fixed to each of the fixing grooves (11) are fitted, and each of the fixing members 20, both ends of the elastic member 22 is coupled to the expansion member (22) is characterized in that the U-shape is installed in the clearance between the slab (8) and the slab (8) to prevent leakage.
In addition, the fixing groove 11 of the fixing support 10 is circular, square, rectangular, a-shaped,
Figure 112006014288812-pat00010
It is formed of any one of the mold, the fixed support 10 is characterized by consisting of a durable steel.
In addition, it is characterized in that the pair of fixing pedestal 10 having the fixing groove 11 is embedded in the lower surface of the slab (8).
In addition, the elastic member 22 is made of a rubber material and is configured by inserting a reinforcement 23 therein for durability.
In addition, the stretching member 22 is characterized in that it is composed of a steel plate (knitted iron).
In addition, the fixing base 10 and the fixing stand 20 is characterized in that the extrusion molding of aluminum.
In addition, the rivet is coupled to the holder 20, characterized in that the elastic member 22 is fixed to the holder 20.
In addition, the elastic member 22 is characterized in that it is rolled and fixed fixed to the holder 20.
In addition, it is characterized in that the elastic member 22 is fixed by pressing in a high heat to the fixture 20.
In addition, the cover plate 33 is installed on the slab 8 to prevent foreign matter from falling, and the cover plate 33 is characterized in that the extrusion molding of aluminum material.

상기와 같이 구성되는 받침대(10)는 견고한 강재 재질이며 고정홈(11)은 "

Figure 112006014288812-pat00011
" "
Figure 112006014288812-pat00012
" 등 여러 형태로 구성할 수 있으며, 신축부재(22)를 고정시키는 고정대(20)의 형상은 고정홈(11)과 같은 형상으로 고정. 교환이 가능 하도록 구성할 수 있다. Pedestal 10 is configured as described above is a solid steel material and the fixing groove 11 is "
Figure 112006014288812-pat00011
""
Figure 112006014288812-pat00012
It can be configured in various forms, such as, the shape of the fixing table 20 for fixing the elastic member 22 can be configured to be fixed and exchanged in the same shape as the fixing groove (11).

신설 교량에서는 실시 예에 따라 각각의 고정받침대(10) 뒷면(14)에 스터드 볼트(12)를 일정 간격으로 부착하고, 상기 스터드볼트(12)는 슬래브 철근(15)에 용접하여 견고하게 부착할 수 있다. In the new bridge, the stud bolts 12 are attached to the fixed base 10 on the rear surface 14 at regular intervals, and the stud bolts 12 are welded to the slab reinforcement 15 to be firmly attached. Can be.

기존 교량에서는 슬래브 하부나 블록 아웃 한 상부에서 고정홈(11)이 있는 받침대(10)를 고정할 수 있다.In the existing bridge can be fixed to the pedestal 10 with the fixing groove 11 in the slab bottom or the upper block out.

상기 신축부재(22)와 고정대(20)는 ,볼트 너트(21)로 고정되며 고정대(20)는 여러 형태의 고정홈(11)과 같은 형상으로 제작되어 삽입, 고정, 교환이 가능한 형태로 구성할 수 있다.The elastic member 22 and the holder 20 is fixed by a bolt nut 21 and the holder 20 is manufactured in the same shape as the fixing groove 11 of the various forms are configured to be inserted, fixed, exchangeable can do.

상기 신축부재(22)는 고무부재의 방수성 재료를 사용하며, 이물질 유입에 의한 하중에도 견딜 수 있도록 내부에 보강재(23)를 삽입하며, 이음 없이 연속되게 하여 슬래브 유간에 유입되는 모든 누수를 방지하도록 한다. The stretchable member 22 uses a waterproof material of a rubber member, inserts a reinforcement 23 therein to withstand the load caused by the inflow of foreign matter, and prevents any leakage that flows into the slab flow by continuing without a joint. do.

본 발명의 실시 예에 의한 신축이음 누수방지 장치를 도 1, 2, 3, 4, 5, 6, 7을 사용하여 설명한다.The expansion joint leakage preventing device according to an embodiment of the present invention will be described using FIG. 1, 2, 3, 4, 5, 6, 7.

도 1은 종래의 슬래브 유간 상부에 설치되는 신축이음 장치 내부에 고무재(1)를 부착하고 하부에 누수를 방지하는 상태를 나타내는 정면도이며, 1 is a front view showing a state in which the rubber material 1 is attached to the inside of the expansion joint device installed in the upper portion of the slab flow path in the related art and prevents water leakage at the lower portion thereof.

도 2는 종래에 슬래브 유간에 내부 봉함재(2)를 설치하여 누수를 방지하는 신축이음 장치를 나타내는 정면도이며, Figure 2 is a front view showing a conventional expansion joint device for preventing leakage by installing the inner sealing material (2) in the slab flow path,

도 3은 본 발명에 의한 누수방지 장치를 나타내는 정면도이며, 3 is a front view showing a leak prevention apparatus according to the present invention,

도 4는 본 발명에 의한 누수방지 장치를 슬래브 유간 하면에 설치된 상태를 나타내는 정면도이며, 4 is a front view showing a state of being installed on the lower surface of the slab clearance between the leak prevention apparatus according to the present invention,

도 5는 본 발명에 의한 신축이음 누수방지 장치를 나타내는 사시도 이며,5 is a perspective view showing the expansion joint leak prevention apparatus according to the present invention,

도 6은 본 발명에 의한 신축 이음 누수 방지장치를 분리해서 나타내는 사시도이다.
도 7a, 7b, 7c, 7d는 고정홈(11)과 신축부재(22)를 고정하는 고정대(20)의 여러 가지 형태를 나타내는 정면도이다.
Fig. 6 is a perspective view showing the expansion joint leakage preventing device according to the present invention separately.
7A, 7B, 7C, and 7D are front views illustrating various forms of the holder 20 for fixing the fixing groove 11 and the elastic member 22.

상기와 같이 구성되는 신축이음 누수방지 장치를 상세히 살펴보면, 먼저 슬래브(8)의 측면에 매립되거나 돌출되어 설치되는 고정받침대(10)가 구성되고, 상기 고정받침대(10)의 전면에는 고정홈(11)이 길이 방향을 따라 형성되며, 상기 고정받침대(10)의 뒷면(14)에는 슬래브철근(15)에 용접되는 스터드볼트(12) 다수개가 길이 방향을 따라 동일한 간격으로 설치된다.
상기 고정홈(11)에는 지지역할을 하는 고정대(20)가 끼워져 결합 되고, 상기 고정대(20)에는 누수를 방지하는 신축부재(22)의 일단부가 결합 되는데, 이때 상기 고정대(20)에는 볼트,너트(21)가 결합 되어 상기 신축부재(22)의 끝단부를 고정시키므로서, 상기 신축부재(22)가 슬래브(8)와 슬래브(8) 사이에서 "U"자형으로 고정 설치되어 있게 한다.
상기와는 달리 신축부재(22)를 설치하는 방법에 있어서는, 상기 고정대(20)에 리벳을 결합하여 상기 신축부재(22)가 고정대(20)에 고정되어 있게 하거나, 상기 신축부재(22)를 고정대(20)에 말아서 고열로 압착하여 고정시킬 수 있다.
상기와 같이 설치되는 신축부재(22)는 고무재질 또는 철재판(편철)으로 형성할 수 있다.
그리고 상기 고정받침대(10)와 고정대(20)는 철재로 구성할 수도 있고, 알루미늄 재질로 압출 성형할 수도 있다.
계속하여 상기 슬래브(8) 상부에는 덮개판(33)이 설치되어 이물질이 낙하 되는 것을 방지하는데, 이때 상기 덮개판(33)을 알루미늄 재질로 압출 성형 한다.
한편 상기 고정받침대(10)와 고정대(20)의 다양한 실시 예를 살펴 보면 다음과 같다.
먼저 도 7a에 도시된 바와 같이 고정받침대(10)의 고정홈(11)은 원형으로 오목하게 형성되고, 고정대(20)는 고정홈(11)에 끼여져 걸려질 수 있도록 원형으로 볼록하게 형성된다.
그리고 도 7b에 도시된 바와 같이 고정받침대(10)의 고정홈(11)은 "ㄱ"형으로 형성되고, 상기 고정대(20)는 고정홈(11)에 끼여져 걸려질 수 있도록 "ㄱ"형으로 형성된다.
또한 도 7c에 도시된 바와 같이 고정받침대(10)의 고정홈(11)은 "

Figure 112006014288812-pat00013
"형으로 형성되고, 상기 고정대(20)는 고정홈(11)에 끼여져 걸려질 수 있도록 "
Figure 112006014288812-pat00014
"형으로 형성된다.
그리고 도 7d에 도시된 바와 같이 고정받침대(10)의 고정홈(11)은 직사각형 또는 정사각형으로 형성되고, 상기 고정대(20)는 고정홈(11)에 끼여져 걸려질 수 있도록 다단으로 절곡 형성된다. Looking at the expansion joint leakage preventing device configured as described above in detail, first is a fixed support 10 is embedded or protruded to the side of the slab (8) is configured, the fixing groove (10) in the front of the fixing groove (11) ) Is formed along the longitudinal direction, and a plurality of stud bolts 12 welded to the slab reinforcement 15 are installed on the rear surface 14 of the fixing base 10 at equal intervals along the longitudinal direction.
The fixing groove 20 is fitted into the fixing groove 11 is coupled, and one end of the expansion and contraction member 22 to prevent leakage is coupled to the fixing member 20, in which the bolt 20, The nut 21 is coupled to fix the end of the elastic member 22, so that the elastic member 22 is fixed to the "U" shape between the slab (8) and the slab (8).
Unlike the above, in the method of installing the elastic member 22, the elastic member 22 is fixed to the fixing member 20 by coupling the rivet to the fixing member 20, or the elastic member 22 is It can be rolled up to the fixing stand 20 and pressed and fixed with high heat.
The elastic member 22 installed as described above may be formed of a rubber material or an iron plate (cladding).
In addition, the fixing base 10 and the fixing table 20 may be made of iron, or may be extruded from aluminum.
Subsequently, a cover plate 33 is installed on the slab 8 to prevent foreign matters from falling down. At this time, the cover plate 33 is extruded from an aluminum material.
Meanwhile, the various embodiments of the fixing base 10 and the fixing stand 20 will be described.
First, as shown in FIG. 7A, the fixing groove 11 of the fixing stand 10 is formed to be concave in a circular shape, and the fixing stand 20 is formed to be convex in a circular shape so as to be caught by the fixing groove 11. .
And as shown in Figure 7b the fixing groove 11 of the fixing base 10 is formed in a "b" shape, the fixing stand 20 is "a" type to be hooked into the fixing groove (11). Is formed.
In addition, as shown in Figure 7c the fixing groove 11 of the fixing stand 10 is "
Figure 112006014288812-pat00013
"Formed in the form, so that the fixing stand 20 can be caught in the fixing groove (11)"
Figure 112006014288812-pat00014
Is formed into a shape.
As shown in FIG. 7D, the fixing groove 11 of the fixing stand 10 is formed in a rectangular or square shape, and the fixing stand 20 is bent in multiple stages so as to be caught by the fixing groove 11. .

본 발명의 일 실시 예로서의 슬래브(8)를 만들기 위해서는 먼저 거푸집을 설치하여 슬래브철근(15)을 배근하고, 콘크리트를 타설하기 전에 도 3과 같이 본 발명의 받침대(10)를 슬래브(8) 유간의 하부에 맞추고, 이후로 고정받침대(10)의 뒷면(14)에 부착된 스터드볼트(12)와 슬래브철근(15)을 용접하여 완전히 고정시킨다.
계속하여 콘크리트가 양생 되고 거푸집이 철거되면, 도 4에서와 같이 받침대(10)의 고정홈(11)에 신축부재(22)를 삽입, 고정하기 위해서는, 먼저 한 쌍의 고정대(20) 사이에 신축부재(22)를 끼워 넣고 결합한 다음, 상기 결합부분에 원형 구멍을 뚫어 볼트, 너트(21)로 견고하게 고정하거나 리벳으로 고정하고, 이후로 교량의 한쪽 끝에서 받침대(10)의 고정홈(11)에 고정대(20)를 밀어 넣게 되면, 상기 신축부재(22)는 슬래브(8) 사이에서 "U"자형으로 설치되어 있게 된다.
따라서 상기와 같이 설치되는 신축부재(22)는 슬래브(8)의 유간에서 누수되는 물이 교량 하부구조물로 유입되어 손상 입히는 것을 완전 차단하게 된다.
In order to make the slab 8 as an embodiment of the present invention, first install the formwork to reinforce the slab reinforcing bar 15, and before pouring concrete, the pedestal 10 of the present invention as shown in FIG. Fit to the bottom, and then completely fixed by welding the stud bolt 12 and the slab reinforcing bar (15) attached to the rear side 14 of the fixing base (10).
After the concrete is cured and the formwork is demolished, in order to insert and fix the expansion and contraction member 22 in the fixing groove 11 of the pedestal 10, as shown in Figure 4, first between the pair of fixing rods 20 Insert and join the member 22, and then drills a circular hole in the joining portion to be firmly fixed with bolts and nuts 21 or fixed with rivets, and then fixing grooves 11 of the pedestal 10 at one end of the bridge. When the holder 20 is pushed in the), the elastic member 22 is installed in the "U" shape between the slab (8).
Therefore, the elastic member 22 installed as described above completely blocks the water leaking from the flow of the slab 8 into the bridge substructure to be damaged.

이상 설명된 내용은 본 발명의 실시 예에 의하여 일례로 설명하였으나, 상기 한 실시 예에 한정되지 아니하며 본 발명의 기술 사상은 다양한 변경 및 수정이 가능함을 알 수 있다.The above description has been described as an example by the embodiment of the present invention, but is not limited to the above embodiment and it can be seen that the technical idea of the present invention can be variously changed and modified.

이상에서 살펴본 바와 같이, 슬래브 유간에 설치되는 신축이음 장치는 슬래브 상부로 통과하는 차량, 기차, 사람 등의 안전을 위하여 슬래브 상부에 설치할 수밖에 없으며, 누수방지 또한 상부에서 이루어지고 있다. 그러나 누수의 원인은 다양하며 대표적으로는, 콘크리트의 파손 및 균열과 신축이음장치와 신축이음장치의 이음과 노후화에 따른 균열, 방수 봉함재의 동결에 의한 부착력저하 등으로 발생되는 누수이며, 따라서 신축이음에서 비배수 형식의 완전 누수 방지는 불가한 실정이다. 종래의 기술에서 유간에 누수방지재를 일부 설치하고 있으나 노후화 시, 교체를 위해서는 하부구조물과 유간의 협소로 상부 시설을 모두 해체, 철거하여야 하는 단점이 있어 많은 비용이 요구되고 있다. 본 발명은, 반영구적인 고정홈에 신축부재를 교량 양끝에서 밀어 넣고 뺄 수 있는 구조로, 유지관리가 용이하면서도 교량의 모든 누수를 완벽히 방지할 수 있어 경제적인 누수방지 장치이다.As described above, the expansion joint device installed in the slab flow can not only be installed on the upper part of the slab for the safety of vehicles, trains, people, etc. passing through the upper part of the slab, and leakage prevention is also made at the upper part. However, the causes of leaks are various and are representative of leaks caused by breakage of concrete and cracks, expansion joints and expansion joints and cracks due to aging, and deterioration of adhesion by freezing waterproof sealant. In the non-drainage type, complete leak prevention is impossible. In the prior art, some leakage preventing material is installed in the oil reservoir, but when it is aging, there is a disadvantage in that the upper structure is dismantled and dismantled due to the narrow structure of the lower structure and the oil to replace it. The present invention is a structure that can be pushed in and pulled out from both ends of the bridge in the semi-permanent fixing groove, easy to maintain, yet completely prevent any leakage of the bridge is an economical leak prevention device.

Claims (13)

교량의 상부 슬래브(8)와 슬래브(8) 사이(유간)에 설치되는 신축이음장치에 있어서,     In the expansion joint device provided between the upper slab (8) and the slab 8 (flow) of the bridge, 상기 각각의 슬래브(8) 측면에 고정홈(11)을 구비한 한 쌍의 고정받침대(10)가 매립되고, 상기 각각의 고정홈(11)에는 고정대(20)가 끼워지면서 고정되며, 상기 각각의 고정대(20)에는 신축부재(22)의 양단이 결합되므로서 상기 신축부재(22)가 슬래브(8)와 슬래브(8) 사이의 유간에서 U자형으로 설치되어 누수가 방지되게 한 것을 특징으로 하는 교체용 신축이음 누수방지 장치. A pair of fixing pedestal 10 having a fixing groove 11 is embedded in the side of each slab (8), and each of the fixing groove 11 is fixed while being fitted with a fixing table 20, respectively Both ends of the elastic member 22 is coupled to the fixture 20 of the elastic member 22, characterized in that the elastic member 22 is installed in a U-shape between the slab 8 and the slab 8 to prevent leakage. Replacement expansion joint leak prevention device. 제 1 항에 있어서, The method of claim 1, 상기 고정받침대(10)의 고정홈(11)은 원형, 정사각형, 직사각형, ㄱ형,
Figure 112006014288812-pat00015
형 중 어느 하나로 형성되고, 상기 고정받침대(10)는 내구성이 강한 철재로 구성됨을 특징으로 하는 교체용 신축이음 누수방지 장치.
The fixing groove 11 of the fixing support 10 is circular, square, rectangular, a-shaped,
Figure 112006014288812-pat00015
Is formed of any one of the type, the fixed support 10 is a replacement expansion joint leakage prevention device, characterized in that consisting of a durable steel.
제 1 항에서, In claim 1, 상기 고정홈(11)을 구비한 한 쌍의 고정받침대(10)가 슬래브(8) 하면에 매립되게 한 것을 특징으로 하는 교체용 신축이음 누수방지 장치. Replaceable expansion joint leakage preventing device, characterized in that the pair of fixed support (10) having the fixing groove 11 is embedded in the lower surface of the slab (8). 삭제delete 제1항에서, 신축부재(22)는 고무재질이고 내구성을 위해서 내부에 보강재(23)를 삽입하여 구성됨을 특징으로 하는 신축이음 누수방지 장치. In claim 1, the expansion and contraction member 22 is made of rubber material, the expansion joint leakage preventing device, characterized in that configured by inserting a reinforcement (23) therein for durability. 제 1 항에 있어서, The method of claim 1, 상기 신축부재(22)는 철재판(편철)으로 구성됨을 특징으로 하는 교체용 신축이음 누수방지 장치. The expansion member 22 is a replacement expansion joint leakage prevention device, characterized in that consisting of a steel plate (cladding). 제 1 항 또는 제 3 항에 있어서, The method according to claim 1 or 3, 상기 고정받침대(10)와 고정대(20)는 알루미늄 재질로 압출 성형 되는 것을 특징으로 하는 교체용 신축이음 누수방지 장치. The stationary support 10 and the fixed base 20 is a replacement expansion joint leakage prevention device, characterized in that the extrusion molding of aluminum material. 제 1 항에 있어서, The method of claim 1, 상기 고정대(20)에 리벳을 결합하여, 상기 신축부재(22)가 고정대(20)에 고정되게 한 것을 특징으로 하는 교체용 신축이음 누수방지 장치. Replaceable expansion joint leakage preventing device, characterized in that the elastic member 22 is fixed to the fixture 20 by coupling the rivet to the fixture 20. 제 1 항에 있어서, The method of claim 1, 상기 신축부재(22)는 상기 고정대(20)에 말아져 압착 고정되는 것을 특징으로 한 교체용 신축이음 누수방지 장치. The expansion and contraction member 22 is a replacement expansion joint leakage prevention device, characterized in that the roll is fixed to the fixed 20. 삭제delete 제 1 항에 있어서,      The method of claim 1, 상기 슬래브(8) 상부에 덮개판(33)이 설치되어 이물질이 낙하 되는 것을 방지하고, 상기 덮개판(33)은 알루미늄 재질로 압출 성형 되는 것을 특징으로 하는 교체용 신축이음 누수방지 장치. Cover plate 33 is installed on the top of the slab (8) to prevent foreign matter from falling, and the cover plate 33 is a replacement expansion joint leakage prevention device, characterized in that the extrusion molding of aluminum material. 삭제delete 교량의 상부 슬래브(8)와 슬래브(8) 사이(유간)에 설치되는 신축이음장치에 있어서, In the expansion joint device provided between the upper slab (8) and the slab 8 (flow) of the bridge, 상기 각각의 슬래브(8) 측면에 고정홈(11)을 구비한 한 쌍의 고정받침대(10)가 돌출되어 설치되고, 상기 각각의 고정홈(11)에는 고정대(20)가 끼워지면서 고정되며, 상기 각각의 고정대(20)에는 신축부재(22)의 양단이 결합되므로서 상기 신축부재(22)가 슬래브(8)와 슬래브(8) 사이의 유간에서 U자형으로 설치되어 누수가 방지되게 한 것을 특징으로 하는 교체용 신축이음 누수방지 장치. A pair of fixing pedestal 10 having a fixing groove 11 protrudes from the side of each slab 8, and is fixed to each of the fixing grooves 11 while being fitted with a fixing table 20. Both ends of the elastic member 22 are coupled to each of the fixing members 20 so that the elastic member 22 is installed in a U-shape between the slabs 8 and the slab 8 to prevent leakage. Replacement expansion joint leak prevention device characterized in that.
KR1020050097436A 2005-09-10 2005-10-17 Exchangeable equipment system with leak stop for expansion joint KR100707484B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR2020050026123 2005-09-10
KR2020050026123 2005-09-10

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR2020050029421U Division KR200411577Y1 (en) 2005-08-19 2005-10-17 Exchangeable equipment system with leak stop for expansion joint

Publications (2)

Publication Number Publication Date
KR20070029535A KR20070029535A (en) 2007-03-14
KR100707484B1 true KR100707484B1 (en) 2007-04-16

Family

ID=38105213

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050097436A KR100707484B1 (en) 2005-09-10 2005-10-17 Exchangeable equipment system with leak stop for expansion joint

Country Status (1)

Country Link
KR (1) KR100707484B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100987062B1 (en) 2009-10-26 2010-10-11 림버스산업 주식회사 Expansion joint for bridges and this construction technique capable of a drainage sheet change
KR200453460Y1 (en) * 2008-12-23 2011-05-09 박종수 Buried rail type expanasion joint system for a part of flexible coupling in bridge
KR101229000B1 (en) * 2012-01-19 2013-02-04 하나더이앤씨(주) Expansion joint for bridges, and its production and installation methods
KR101229001B1 (en) * 2012-01-19 2013-02-04 하나더이앤씨(주) Expansion joint for railroad bridges, and its production and installation methods
KR101375825B1 (en) * 2012-07-18 2014-04-01 피엔에이건설 주식회사 The Joint Of Road Bridge
KR101678604B1 (en) 2015-07-24 2016-11-23 주식회사 베스탑 Water leakage prevention device constructing method for bridge
KR20170029720A (en) 2015-09-07 2017-03-16 주식회사 베스탑 Exchangeable equipment system with leak stop
CN110195407A (en) * 2019-07-02 2019-09-03 绍兴欢歌智能科技有限公司 A kind of waste and old waterstop detaching equipment of bridge expanssion joint

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102327748B1 (en) * 2019-06-26 2021-11-19 주식회사 경호엔지니어링 종합건축사사무소 Expansion and contraction joint apparatus for bridge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200453460Y1 (en) * 2008-12-23 2011-05-09 박종수 Buried rail type expanasion joint system for a part of flexible coupling in bridge
KR100987062B1 (en) 2009-10-26 2010-10-11 림버스산업 주식회사 Expansion joint for bridges and this construction technique capable of a drainage sheet change
KR101229000B1 (en) * 2012-01-19 2013-02-04 하나더이앤씨(주) Expansion joint for bridges, and its production and installation methods
KR101229001B1 (en) * 2012-01-19 2013-02-04 하나더이앤씨(주) Expansion joint for railroad bridges, and its production and installation methods
KR101375825B1 (en) * 2012-07-18 2014-04-01 피엔에이건설 주식회사 The Joint Of Road Bridge
KR101678604B1 (en) 2015-07-24 2016-11-23 주식회사 베스탑 Water leakage prevention device constructing method for bridge
KR20170029720A (en) 2015-09-07 2017-03-16 주식회사 베스탑 Exchangeable equipment system with leak stop
CN110195407A (en) * 2019-07-02 2019-09-03 绍兴欢歌智能科技有限公司 A kind of waste and old waterstop detaching equipment of bridge expanssion joint

Also Published As

Publication number Publication date
KR20070029535A (en) 2007-03-14

Similar Documents

Publication Publication Date Title
KR100707484B1 (en) Exchangeable equipment system with leak stop for expansion joint
KR200411577Y1 (en) Exchangeable equipment system with leak stop for expansion joint
KR100936970B1 (en) Apparatus for preventing water leakage of bridge
KR100662035B1 (en) Method for manufacturing, installing and changing a rubber seal in expansion and contraction joint
KR101761476B1 (en) Change construction method of bridge expansion joint for quick construction
KR200418580Y1 (en) Exchangeable flexible joint for preventing water leakage
KR102008773B1 (en) Elastic form precast joint member and quick construction method of bridge expansion joint using of the same
CN205347972U (en) A simple and easy board -like expansion joint device for little span bridge
KR101784721B1 (en) bridge-type expansion joint device and its construction method which can easily replace a drainage sheet
KR100558373B1 (en) The expansion joint for bridge
KR200410256Y1 (en) Exchangable expansion joint with leak stop
KR101229001B1 (en) Expansion joint for railroad bridges, and its production and installation methods
KR101596689B1 (en) Expansion joint for connecting slabs of a bridge structure and method for construction the same
KR101506118B1 (en) Expansion joint for bridge and installing and repairing method for using the same
KR101352893B1 (en) Bridge expansion joints are leak-proof device and its construction method
KR101599823B1 (en) Exchangeable elastic joint apparatus for a bridge structure
KR20070067307A (en) Exchangable expansion joint with leak stop
KR102220544B1 (en) Bridge expansion joints with the improved installation and method thereof
WO2007021078A1 (en) Replaceable drainage device of expansion joint
KR100954597B1 (en) Expansion joint and manufacturing method and construciting method
KR20070029534A (en) Exchangeable equipment system with leak stop for expansion joint
KR101229000B1 (en) Expansion joint for bridges, and its production and installation methods
KR20060074048A (en) Rail expansion joint for bridge
KR20010068280A (en) Finger-type bridge expansion joint and repairing method for using the same
KR101084668B1 (en) Mono cell type flexible connecting device with excellent adhesive power

Legal Events

Date Code Title Description
A108 Dual application of patent
N231 Notification of change of applicant
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J206 Request for trial to confirm the scope of a patent right
J204 Invalidation trial for patent
J301 Trial decision

Free format text: TRIAL NUMBER: 2009100000158; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20090123

Effective date: 20100329

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20090123

Effective date: 20100329

J301 Trial decision

Free format text: TRIAL NUMBER: 2009100000545; TRIAL DECISION FOR INVALIDATION REQUESTED 20090309

Effective date: 20110225

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20090309

Effective date: 20110225

J204 Invalidation trial for patent
J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL NUMBER: 2012100002068; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20120727

Effective date: 20130430

Free format text: TRIAL NUMBER: 2012100002041; TRIAL DECISION FOR INVALIDATION REQUESTED 20120725

Effective date: 20130430

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20120727

Effective date: 20130430

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20120725

Effective date: 20130430

J2X1 Appeal (before the patent court)

Free format text: TRIAL NUMBER: 2013200004046; CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE

Free format text: TRIAL NUMBER: 2013200004053; INVALIDATION

Free format text: INVALIDATION

Free format text: CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE

J202 Request for trial (for correction)
J301 Trial decision

Free format text: TRIAL NUMBER: 2013105000048; TRIAL DECISION FOR CORRECTION REQUESTED 20130516

Effective date: 20130628

Free format text: TRIAL DECISION FOR CORRECTION REQUESTED 20130516

Effective date: 20130628

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2013200004053; JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20130513

Effective date: 20131025

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION REQUESTED 20130513

Effective date: 20131025

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2013200004046; JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20130513

Effective date: 20131025

Free format text: JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20130513

Effective date: 20131025

J301 Trial decision

Free format text: TRIAL NUMBER: 2013130000178; TRIAL DECISION FOR INVALIDATION REQUESTED 20131113

Effective date: 20131125

Free format text: TRIAL NUMBER: 2013130000181; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20131120

Effective date: 20131125

Free format text: TRIAL DECISION FOR INVALIDATION REQUESTED 20131113

Effective date: 20131125

FPAY Annual fee payment

Payment date: 20141107

Year of fee payment: 9

J301 Trial decision

Free format text: TRIAL DECISION FOR INVALIDATION OF CORRECTION REQUESTED 20140812

Effective date: 20150925

Free format text: TRIAL NUMBER: 2014100001975; TRIAL DECISION FOR INVALIDATION OF CORRECTION REQUESTED 20140812

Effective date: 20150925

J2X1 Appeal (before the patent court)

Free format text: INVALIDATION OF CORRECTION

Free format text: TRIAL NUMBER: 2015200007209; INVALIDATION OF CORRECTION

FPAY Annual fee payment

Payment date: 20151230

Year of fee payment: 10

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR INVALIDATION OF CORRECTION REQUESTED 20151105

Effective date: 20160512

FPAY Annual fee payment

Payment date: 20161229

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20171221

Year of fee payment: 12

J122 Written withdrawal of action (patent court)
FPAY Annual fee payment

Payment date: 20191226

Year of fee payment: 14