KR100397536B1 - Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles - Google Patents
Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles Download PDFInfo
- Publication number
- KR100397536B1 KR100397536B1 KR10-2000-0061398A KR20000061398A KR100397536B1 KR 100397536 B1 KR100397536 B1 KR 100397536B1 KR 20000061398 A KR20000061398 A KR 20000061398A KR 100397536 B1 KR100397536 B1 KR 100397536B1
- Authority
- KR
- South Korea
- Prior art keywords
- pile
- shift
- soft ground
- sheet pile
- soft
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Abstract
본발명은 연약지반 지역에 축조되는 교대를 안정시키기 위한 것에 관한 것으로서, 교대배면의 뒷채움 성토하중에 의해 발생하는 연약지반층의 측방유동압을 유연하게 차단토록 함으로써 교대의 측방이동을 방지하여 주는데 목적이 있으며, 이 목적을 달성하기 위해 본발명은 연약지반 지역에서 교대(1)의 연직하중을 받아주도록 연약층(2)을 지나 견고한 기반층(3)에 정착되는 말뚝기초(4)를 설치하고 그 말뚝기초(4)위에 교대(1)를 축조하도록 설계된 교량을 시공함에 있어서, 교대(1) 배면 뒤채움 성토재(5)의 하부가 되는 지점에 강재(鋼材)로 만들어진 시트파일(s)을 연이어 타입하는 작업을 통해, 상기 말뚝기초(4)의 옆에 파형(波形)의 평면형태를 이루면서 일연체로 연이어진 시트파일(s) 울타리를 적어도 1개소이상 설치하여서, 그 시트파일(s) 울타리로 하여금 교대 배면 뒤채움 성토재(5)의 하중에 의해 발생되는 연약층(2)의 측방유동압을 유연하게 차단토록 함을 기술 구성상의 특징으로 하며, 공기가 대폭적으로 단축되고, 공사비가 크게 절감되며, 교량구조물의 안정성을 확실하게 보장하여 줄 뿐만 아니라, 연약지반에 건설되는 여타 구조물에도 다양하게 응용시킬 수 있는 장점이 있다.The present invention relates to stabilizing shifts constructed in soft ground areas, and aims to prevent lateral movement of shifts by flexibly blocking the lateral flow pressure of soft ground layers caused by backfill embankment loads on the back of shifts. In order to achieve this purpose, the present invention is to install a pile foundation (4) that is settled in a solid base layer (3) through the soft layer (2) to receive the vertical load of the shift (1) in the soft ground area In constructing the bridge designed to build the shift 1 on the pile foundation 4, the sheet pile s made of steel is successively connected to the lower portion of the back fill fill material 5 of the shift 1 Through the work of type, at least one seat pile (s) fence is connected to the pile foundation (4) to form a corrugated plane form and connected in series, and the sheet pile (s) fence By It is characterized by the technical configuration that allows to flexibly block the lateral flow pressure of the soft layer (2) generated by the load of the alternating backfill fill material (5), the air is significantly shortened, the construction cost is greatly reduced, Not only ensures the stability of the bridge structure, but also has the advantage that can be applied to a variety of other structures built on the soft ground.
Description
본발명은 연약지반 지역에 축조되는 교대를 안정시키기 위한 것에 관한 것으로, 특히 교대의 말뚝기초 옆에 시트파일을 타입하고 이것으로 하여금 교대배면의 뒷채움 성토하중에 의해 발생하는 연약지반층의 측방유동압을 미리 차단토록 함으로써, 교대의 측방이동을 방지하기 위한 공법에 관한 것이다.The present invention relates to stabilizing shifts constructed in soft ground areas, in particular the sheet piles next to the pile foundations of the shifts, which causes the lateral hydraulic pressures of the soft ground layers caused by the backfill fill loads on the back of the shifts. By blocking the in advance, relates to a method for preventing the shift of the lateral shift.
최근에는 교량을 지지하기 위한 교대, 도로의 노반 등이 연약지반상에 구축되는 경우가 많아지고 있다.In recent years, shifts to support bridges and roadbeds on roads are often built on soft ground.
그러나 이러한 구조물이 연약지반상에 축조될 경우, 교대의 배면 뒷채움이나 도로의 성토 등이 하부지반의 편재하중으로 작용하여 지반의 측방유동을 유발시키게 된다.However, when these structures are constructed on the soft ground, alternating back fills or road fills act as ubiquitous loads on the lower ground, causing lateral flow of the ground.
주지된 바와 같이 측방유동(側方流動)이란, 연약지반(soft layer)위에 성토를 하여 둑쌓기(embankment)를 하거나 교대 배면에 뒷채움 성토를 하는 경우처럼편재하중이 작용하면 연약지반 내의 응력(應力)과 간극수압(間隙水壓)이 증가되면서 체적이 수축되어 지반의 침하(settlement)를 일으키고, 더욱 하중이 증가하면 과잉간극수압의 급증에 따라 강도가 떨어지고 소성영역(sliding circle)이 확대되면서 토립자의 자립이 어렵게 되어 횡방향으로 소성적인 유동이 발생됨으로써 측방변위(lateral deflection)를 일으키게 되며, 지표면은 융기(heaving)되고 결국에는 지반의 활동파괴를 유발하게 되는 현상을 말한다. (도1. 성토에 의한 연약지반 측방유동과 파괴패턴 참조)As is well known, lateral flow refers to stress in the soft ground when localized loads act, such as when embankment occurs on the soft layer or backfills on the back of the alternating surface. ) As the pore water pressure increases, the volume shrinks, causing sediment of the ground, and as the load increases, the stiffness drops as the excess pore water pressure increases, and the sliding circle expands. This is a phenomenon in which lateral deflection is caused by the plastic flow in the lateral direction due to the independence of the surface, and the ground surface is raised and eventually causes the ground to break down. (See Figure 1. Soft Ground Lateral Flow and Fracture Patterns by Filling)
이와 같이 측방유동이 발생될 가능성이 보이는 연약지반에 교대의 기초말뚝이 설치되어 있으면 말뚝은 지반으로부터 측방유동압을 받게 된다. 통상적으로 말뚝이 수평으로 이동하려면 지반으로부터 저항을 받게 된다. 그러나 불안한 사면지반에서는 기초말뚝이 측방유동압에 저항하여 줄 수 있는 지반의 저항력도 크게 부족하게 되어 상부구조물은 수평으로 이동할 수밖에 없게 된다.Thus, if the foundation pile is installed in the soft ground where lateral flow is likely to occur, the pile is subjected to lateral flow pressure from the ground. Typically, the piles will receive resistance from the ground to move horizontally. However, in unstable slopes, the ground piles that the foundation piles can resist against lateral flow pressure also greatly lack, and the upper structure is forced to move horizontally.
즉, 도2의 도시와 같이, 연약지반상에 말뚝기초를 박고 그 위에 교대를 건설할 경우, 교대배면의 뒤채움 성토하중에 의해 하부 연약층이 침하하면서 교대방향으로 측방유동압이 발생되고, 이 측방유동압이 말뚝기초 위의 교대를 측방으로 이동시키게 된다.That is, as shown in Fig. 2, when the pile foundation is built on the soft ground and shifts are constructed thereon, the lateral fluid pressure is generated in the alternating direction while the lower soft layer is settled by the backfill fill load of the alternating back surface. Lateral fluid pressure causes the shifts on the pile foundation to move laterally.
결국 이러한 현상은 교량 구조물에 막대한 피해를 입히게 되며, 그 피해사례가 많이 보고되고 있는 실정이다.As a result, such a phenomenon causes enormous damage to the bridge structure, and many cases of damage have been reported.
이러한 교량의 피해는 크게 2가지로 구분된다.These bridges can be classified into two types.
하나는 도3a의 도시와 같이, 연약지반층의 측방유동압에 의해 교대가 말뚝기초와 함께 교량의 상부구조물쪽으로 수평이동하여 교량의 상부구조물을 압박함으로써 교량의 상부구조물이 파괴되는 경우이며,One is a case in which the upper structure of the bridge is destroyed by moving the horizontally toward the upper structure of the bridge with the pile foundation by the lateral flow pressure of the soft ground layer, as shown in FIG. 3A.
다른 하나는 도3b의 도시와 같이, 연약지반층의 측방유동압에 의해 교대가 뒤로 기울어져 교량의 상부구조물이 교대로부터 탈락하는 경우이다.The other is a case in which the shift is inclined backward by the lateral flow pressure of the soft ground layer so that the upper structure of the bridge falls from the shift as shown in FIG. 3B.
종래 위와 같은 교대측방이동에 의한 교량의 피해를 방지하기 위해 몇 가지 대책공법들이 사용되고 있는 바, 이를 유형별도 구분해 보면,Conventionally, several countermeasures have been used to prevent damage to the bridges caused by shifts such as shifts.
a) 도4a의 도시와 같이, 뒤채움 성토재를 EPS, 경량골재, 박스(box), 관 등의 경량재로 사용하여 성토하중을 경감시키는 공법이 있고,a) As shown in Figure 4a, there is a method for reducing the fill load by using the backfill fill material as a lightweight material, such as EPS, lightweight aggregate, box, tube,
b) 도4b의 도시와 같이, 샌드드레인(sand drain), 페이퍼드레인(paper drain) 등을 연약지반상에 설치하여서, 연약지반을 고결시키는 공법이 있으며,b) As shown in FIG. 4B, sand drain, paper drain, etc. are installed on the soft ground, and there is a method of solidifying the soft ground,
c) 도4c의 도시와 같이, 뒤채움 성토재가 위치하는 연약지반상에 말뚝기초를 설치하고 그 위에 슬래브를 형성하여서, 성토하중을 연약지반 상부에서 차단시키는 공법이 있고,c) As shown in Fig. 4c, there is a method of installing pile foundations on the soft ground where the backfilling fill material is located and forming a slab thereon to block the fill load on the soft ground,
d) 도4d의 도시와 같이, 교대내측에 앞채움 성토를 하거나, 인접교각에 지지되는 콘크리트 구조체를 설치하여서, 교대이동을 구조적으로 억제시키는 공법이 있다.d) As shown in FIG. 4D, there is a method of structurally suppressing shift movement by providing a front fill fill in the shift or installing a concrete structure supported by an adjacent pier.
위와 같은 공법들 중에서 우리나라의 경우, a) EPS를 이용해 성토하중을 경감시키는 공법과, b) 샌드드레인(sand drain)을 이용해 연약지반을 고결시키는 공법을 주로 사용하고 있다.Among the above methods, Korea mainly uses a) a method of reducing embankment load using EPS, and b) a method of solidifying soft ground using sand drain.
그러나, a) EPS를 이용해 성토하중을 경감시키는 공법은 시공속도가 빠르고 공사소음이 없는 장점은 있으나, 지하수위가 높을 시 성토재의 부력문제가 발생하고, 공사비가 고가이며, 연약지반의 침하에 따른 대책이 요구되는 등의 문제점이 있었다.However, a) the method of reducing the fill load by using EPS has the advantages of fast construction speed and no construction noise. However, when the groundwater level is high, buoyancy problem occurs, the cost of construction is high, and the soft ground subsidence There was a problem that a countermeasure was required.
그리고, b) 샌드드레인(sand drain)을 이용해 연약지반을 고결시키는 공법은 상기한 공법들 중에서 가장 확실한 공법이기는 하나, 지반압밀에 장시간이 소요되어 본공사가 지연되고, 공사비가 고가이며, 공사소음이 크게 발생되는 문제점이 있었다.B) The method of solidifying the soft ground by using sand drain is the most reliable method among the above methods, but it takes a long time to consolidate the ground and delays the construction work, and the cost of construction is high. There was a problem that occurred greatly.
한편으로, 상기한 c) 성토하중을 연약지반 상부에서 차단시키는 공법과, d) 교대이동을 구조적으로 억제시키는 공법은 시공경험이 부족하고 지형적인 조건에 제약을 많이 받게 되어 우리나라에서 적용하기에는 곤란할 뿐만 아니라, 공사기간이 길게 소요되고 공사비도 많이 소요되어 현실적으로 채택되지 않는 공법에 불과 하였다.On the other hand, the c) method of blocking the embankment load on the soft ground, and d) the method of structurally suppressing the shift movement is difficult to apply in our country because of lack of construction experience and a lot of restrictions on the topographical conditions. Rather, it took only a long period of time to construct and cost a lot of construction, which was only a method that is not realistically adopted.
이에 따라, 본발명은 연약지반 지역에 설치되는 교대의 측방이동을 방지하는데 있어 종래 공법들에서 나타나는 제반 문제점을 해소하기 위해 안출한 것이다.Accordingly, the present invention has been devised to solve various problems in the conventional construction methods in preventing lateral movement of shifts installed in the soft ground region.
따라서, 본발명의 목적은 연약지반상에 설치되는 교대의 말뚝기초 옆에 시트파일을 설치하는 간단한 공사를 통해, 교대배면의 뒷채움 성토하중에 의해 발생하여 교대의 말뚝기초에 영향을 끼치는 연약지반층의 측방유동압을 미리 유연하게 차단토록 하여 측방유동압에 의한 교대의 측방이동을 방지함으로써, 교량구조물의 안정성을 보장하여 주기 위한 시트파일을 이용한 교대측방이동 방지공법을 제공하는데 있다.Therefore, the purpose of the present invention is to provide a soft ground layer that is caused by the backfill embankment load on the back of the shift, through the simple construction of installing a pile pile next to the pile foundation on the soft ground. By preventing the lateral flow pressure of the flexible in advance to prevent the lateral movement of the shift by the lateral flow pressure, to provide an alternate side movement prevention method using a sheet pile to ensure the stability of the bridge structure.
도1은 성토에 의한 연약지반 측방유동과 파괴패턴을 나타낸 도면1 is a view showing lateral flow and fracture patterns of soft ground due to fill
도2는 연약지반상에 구축된 교대의 측방이동 상태를 나타낸 도면2 is a view showing the lateral movement of the shifts built on the soft ground
도3a는 교대의 측방이동에 의해 교량 상부구조물이 파괴된 예시도Figure 3a is an exemplary view of the bridge superstructure destroyed by the lateral movement of the shift
도3b는 교대의 측방이동에 의해 교량 상부구조물이 탈락된 예시도3b is an exemplary view in which the bridge superstructure is dropped by shifting sideways
도4a는 종래 교대 배면의 성토하중을 경감시키는 공법에 의한 시공예시도Figure 4a is a construction example by the construction method to reduce the fill load on the back of the conventional shift
도4b는 종래 교대 배면의 연약지반을 고결시키는 공법에 의한 시공예시도Figure 4b is a construction example by the construction method to solidify the soft ground of the conventional alternating back
도4c는 종래 교대 배면의 성토하중을 차단시키는 공법에 의한 시공예시도Figure 4c is a construction example by the construction method for blocking the fill load on the back of the conventional shift
도4d는 종래 교대이동을 구조적으로 억제시키는 공법에 의한 시공예시도Figure 4d is a construction example by a method for structurally suppressing the conventional shift movement
도5는 본발명의 교대측방이동 방지공법에 의한 일 시공예시도Figure 5 is a construction example by the shift side shift prevention method of the present invention
도6은 도5의 일 시공예 중 교대부근의 평면구조도Figure 6 is a plan view of the shift near the construction example of Figure 5
도7은 본발명의 교대측방이동 방지공법에 의한 다른 시공예시도Figure 7 is another construction example by the shift side shift prevention method of the present invention
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
1:교대 2:연약층1: shift 2: weak layer
3:기반층 4:말뚝기초3: foundation 4: pile foundation
5:성토재 6:밑바닥선5: landfill material 6: bottom line
s:시트파일s: sheet file
상기 목적을 달성하기 위한 본발명의 시트파일을 이용한 교대측방이동 방지공법은, 연약지반 지역에서 교대의 연직하중을 받아주도록 연약층을 지나 견고한 기반층에 정착되는 말뚝기초를 설치하고 그 말뚝기초위에 교대를 축조하도록 설계된 교량을 시공함에 있어서; 교대 배면 뒤채움 성토재의 하부가 되는 지점에 강재(鋼材)로 만들어진 시트파일을 연이어 타입하는 작업을 통해, 상기 말뚝기초의 옆에 파형(波形)의 평면형태를 이루면서 일연체로 연이어진 시트파일 울타리를 적어도 1개소이상 설치하여서, 그 시트파일 울타리로 하여금 교대 배면 뒤채움 성토재의 하중에 의해 발생되는 연약층의 측방유동압을 유연하게 차단토록 하되; 상기 시트파일은 교대로부터 옆으로 일정부분 이격시킨 지점에 위치시켜 연약층을 지나 견고한 기반층에 그 하단의 일부가 관입될때까지 타입하고, 시트파일의 상단 머리부분은 상부 성토재의 수평토압을 받지 않도록 교대 밑바닥선 이하로 위치되게 설치하며, 상기 시트파일 울타리는 측방유동압을 원활하게 분산하도록 교대의 양 단부쪽에 위치하는 부분들을 교대쪽으로 경사지면서 구부러지는 평면형태로 설치함을 기술구성상의 특징으로 한다.The shift lateral movement prevention method using the seat pile of the present invention for achieving the above object is to install a pile foundation that is settled in a solid base layer past the soft layer to receive the alternating vertical load in the soft ground area, and shifts on the pile foundation In constructing a bridge designed to build a bridge; Sheet pile fences connected in series while forming a corrugated plane form next to the pile foundation through the operation of successively type sheet piles made of steel at the lower portion of the alternating backfill soil At least one or more places to allow the sheet pile fence to flexibly block the lateral flow pressure of the soft layer caused by the load of the alternating backfill fill material; The sheet pile is located at a point spaced apart from the alternating portion by a side until it passes through the soft layer until a part of the lower portion of the sheet pile is infiltrated, and the upper head of the sheet pile is shifted so as not to receive horizontal earth pressure of the upper fill material. It is installed to be below the bottom line, the sheet pile fence is characterized in that the technical configuration is installed in a planar shape that is bent while inclined toward the alternating parts located on both ends of the shift to smoothly distribute the lateral flow pressure.
이하, 본발명의 기술구성을 본발명의 시공예들에 의한 첨부도면을 참조하여 구체적으로 설명한다.도5, 도6 및 도7은 연약지반상에 설치되는 교대 구조물에 본발명의 시트파일을 이용한 교대측방이동 방지공법이 적용된 시공예들을 나타내고 있는 것으로서, 도5 및 도7은 정면상태의 입면구조를 나타내고 있고, 도6은 도5의 일 시공예 중 교대부근의 평면구조를 나타내고 있다.Hereinafter, the technical configuration of the present invention will be described in detail with reference to the accompanying drawings by the construction examples of the present invention. FIGS. 5, 6 and 7 show the seat pile of the present invention in an alternating structure installed on a soft ground. 5 and 7 show elevational structures in the front state, and FIG. 6 shows a planar structure near the shift in one construction example of FIG. 5.
이들 시공예에서 보여주고 있는 바와 같이 본발명은, 연약지반 지역에서 교대(1)의 연직하중을 받아주도록 연약층(2)을 지나 견고한 기반층(3)에 정착되는 말뚝기초(4)를 설치하고 그 말뚝기초(4)위에 교대(1)를 축조하도록 설계된 교량을 시공함에 있어서,As shown in these construction examples, the present invention provides a pile foundation (4) that is settled on a solid foundation (3) through the soft layer (2) to receive the vertical load of the shift (1) in the soft ground area In constructing a bridge designed to build shifts 1 on the pile foundation 4,
교대(1) 배면 뒤채움 성토재(5)의 하부가 되는 지점에 강재(鋼材)로 만들어진 시트파일(s)을 연이어 타입하는 작업을 통해, 상기 말뚝기초(4)의 옆에 파형(波形)의 평면형태를 이루면서 일연체로 연이어진 시트파일(s) 울타리를 적어도 1개소이상 설치하여서, 그 시트파일(s) 울타리로 하여금 교대 배면 뒤채움 성토재(5)의 하중에 의해 발생되는 연약층(2)의 측방유동압을 유연하게 차단토록 한다.The pile pile s made of steel is successively connected to the lower portion of the backfill fill material 5 on the rear side of the backfill, and the corrugated wave form is formed next to the pile foundation 4. Soft layer (2) generated by loads of alternating backfill soil (5) by installing at least one sheet pile (s) fence connected in series in a planar form It is possible to flexibly block the lateral flow pressure of.
상기와 같이 시공된 교량에서, 교대(1)의 연직하중은 말뚝기초(4)에 의하여 견고한 기반층(3)에 지지된다. 그리고, 교대 배면 뒤채움 성토재(5)로 인한 상재하중도 말뚝기초(4)의 횡방향 지지력에 의해 지지된다.In the bridge constructed as above, the vertical load of the shift 1 is supported on the solid foundation layer 3 by the pile foundation 4. In addition, the floor load due to the alternating backfill fill material 5 is also supported by the lateral bearing force of the pile foundation 4.
시트파일(s)은 흙막이와 차수공법으로 사용되는 구조물로서 일반 토목공사에 많이 사용되고 있기 때문에 자재취득과 시공이 용이하며, 연성이 비교적 좋아서 측방유동압에 유연하게 대처하여 주는 장점이 있다.Sheet pile (s) is a structure that is used as a soil barrier and the order method, because it is widely used in general civil engineering, it is easy to acquire and construct materials, and has a relatively good ductility, which has the advantage of flexibly coping with lateral flow pressure.
본발명의 공법에서 사용되는 시트파일(s)이 지지해야 할 하중은 연약지반내에서 발생되는 측방유동압 뿐이므로 이에 대하여 시트파일(s)의 종류와 규격을 설계하면 된다.Since the load to be supported by the seat pile (s) used in the construction method of the present invention is only the lateral flow pressure generated in the soft ground, the type and specification of the seat pile (s) may be designed.
시트파일(s)의 시공깊이는 연약층(2)을 지나 견고한 기반층(3)에 그 하단의 일부가 관입될 때까지 한다. 이때 N치(N-value, 중량 63.5kg의 망치를 75㎝ 높이에서 자유낙하시켜 30㎝박는데 필요한 타격횟수) 30∼50까지 시공 가능하다.The construction depth of the sheet pile (s) passes through the soft layer (2) until a part of the lower end is introduced into the solid base layer (3). At this time, it is possible to construct up to 30 ~ 50 N-values (the number of hits required to hit 30cm by freely dropping the hammer weighing 63.5kg at 75cm height).
그리고, 시트파일(s)은 그 상단 머리부분이 상부 성토재(5)의 수평토압을 받지 않도록 교대(1) 밑바닥선(6) 이하로 위치되게 설치하는 것이 바람직하다.And, the sheet pile (s) is preferably installed so that the upper head portion is positioned below the bottom line 6 of the shift (1) so as not to receive the horizontal earth pressure of the upper fill material (5).
또한, 교대와 가장 가까운 거리에 위치하는 시트파일(s) 울타리는 시트파일 (s)의 상단 머리부분의 변위를 고려하여 교대(1)로부터 옆으로 일정부분 이격시킨 위치에 설치한다. 이때 교대(1)와의 가장 적당한 이격거리는 15㎝정도이다.In addition, the sheet pile (s) fence located at the closest distance to the shift is installed in a position spaced apart from the alternating portion 1 in consideration of the displacement of the upper head of the sheet pile (s). At this time, the most suitable distance from the shift (1) is about 15cm.
상기 시트파일(s) 울타리는 측방유동압을 원활하게 분산하도록 교대의 양 단부쪽에 위치하는 선단부들을 교대쪽으로 경사지면서 구부러지는 평면형태로 설치한다. 이때 경사도는 135°를 유지시키는 것이 측방유동압을 원활히 분산시키는데 가장 유리하다.The seat pile (s) fence is installed in a planar shape that is bent while inclined toward the end of the front end portions located on both ends of the shift to smoothly distribute the lateral flow pressure. At this time, maintaining the inclination of 135 ° is most advantageous to smoothly distribute the lateral flow pressure.
본발명을 실시함에 있어서 시트파일(s) 울타리는 도5의 도시와 같이 1열만 매설하여도 측방유동압을 충분히 차단시킬 수도 있으나, 경우에 따라서는 도7의 도시와 같이 2열(또는 다열)로 매설하여서 측방유동압에 대처하는 능력을 배가시킬 수도 있다.In carrying out the present invention, the sheet pile (s) fence may sufficiently block the lateral flow pressure even if only one row is embedded as shown in FIG. 5, but in some cases, two rows (or multiple rows) as shown in FIG. 7. May be added to increase the ability to cope with lateral flow pressure.
한편, 본발명의 공법은 교대 말뚝기초(4)와 동시에 상기 시트파일(s)을 시공할 수 있기 때문에 공사기간이 아주 짧게 소요된다.On the other hand, the construction method of the present invention takes a very short construction period because it is possible to construct the sheet pile (s) at the same time as the alternating pile foundation (4).
이상과 같이 시공되는 본발명은 측방유동을 원천적으로 방지하는 공법이 아니고 측방유동을 허용하되, 이 측방유동압을 말뚝기초 바로 앞에서 시트파일 울타리라는 구조체에서 의하여 유연하게 차단시킴으로써, 짧은 시간에 경제적으로 교대의 측방이동을 방지하여 주는 공법이다.The present invention constructed as described above is not a method for preventing lateral flow inherently, but permits lateral flow, but by flexibly blocking the lateral flow pressure by a structure called a sheet pile fence in front of the pile foundation, It is a construction method that prevents shifting of lateral movement.
상기와 같이 이루어지는 본발명은 시트파일을 이용하여 교대의 말뚝기초로 가해지는 측방유동압을 유연하게 차단시켜 교대의 측방이동을 방지하여 줌으로써 다음과 같은 효과가 있다.The present invention made as described above has the following effects by preventing the lateral movement of the shift by flexibly blocking the lateral flow pressure applied to the alternating pile foundation by using the sheet pile.
첫째, 시공이 간단하고 교대의 말뚝기초와 동시에 공사를 진행시킬 수 있음으로써 공기가 대폭적으로 단축되는 효과가 있다.First, the construction is simple, and the construction can proceed with the pile foundation at the same time, there is an effect that the air is significantly shortened.
둘째, 값싸고 구하기 쉬운 시트파일을 이용함으로써 공사비가 크게 절감된다.Second, construction cost is greatly reduced by using cheap and easy to obtain sheet piles.
셋째, 교량구조물의 안정성을 확실하게 보장하여 줄 뿐만 아니라, 연약지반에 건설되는 여타 토목구조물에도 다양하게 응용시킬 수 있는 장점이 있다.Third, it not only ensures the stability of the bridge structure, but also has the advantage that can be applied to a variety of other civil structures built on the soft ground.
이상과 같이 본발명은 연약지반 지역에 건설되는 교대 등의 토목구조물의 안정성을 빠르고 간단하면서 저렴한 비용으로 확보하여 주는 매우 유용한 발명이다.As described above, the present invention is a very useful invention that secures the stability of civil structures, such as shifts, constructed in the soft ground region at a fast, simple and low cost.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0061398A KR100397536B1 (en) | 2000-10-18 | 2000-10-18 | Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0061398A KR100397536B1 (en) | 2000-10-18 | 2000-10-18 | Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020030533A KR20020030533A (en) | 2002-04-25 |
KR100397536B1 true KR100397536B1 (en) | 2003-09-19 |
Family
ID=19694200
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0061398A KR100397536B1 (en) | 2000-10-18 | 2000-10-18 | Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100397536B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936875A (en) * | 2012-11-29 | 2013-02-20 | 福州大学 | Buffering and absorbing device of vertical temperature deformation of whole bridge and construction method thereof |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100436896B1 (en) * | 2001-07-19 | 2004-06-23 | (주)내경엔지니어링 | Construction method for back-fill area of abutment |
CN109914173B (en) * | 2019-03-26 | 2020-03-27 | 山东大学 | Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof |
CN110184952B (en) * | 2019-06-26 | 2024-01-16 | 中铁八局集团第二工程有限公司 | Modification structure of existing bridge abutment and construction method thereof |
CN112095468A (en) * | 2020-05-09 | 2020-12-18 | 如皋市规划建筑设计院有限公司 | High-filling method for bridge abutment |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19980057750U (en) * | 1997-02-12 | 1998-10-15 | 김영철 | Sheet pile (SHEET PILE) |
-
2000
- 2000-10-18 KR KR10-2000-0061398A patent/KR100397536B1/en not_active IP Right Cessation
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19980057750U (en) * | 1997-02-12 | 1998-10-15 | 김영철 | Sheet pile (SHEET PILE) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102936875A (en) * | 2012-11-29 | 2013-02-20 | 福州大学 | Buffering and absorbing device of vertical temperature deformation of whole bridge and construction method thereof |
CN102936875B (en) * | 2012-11-29 | 2015-04-15 | 福州大学 | Buffering and absorbing device of vertical temperature deformation of whole bridge and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
KR20020030533A (en) | 2002-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5697736A (en) | Seawalls and shoreline reinforcement systems | |
US5131791A (en) | Retaining wall system | |
Wong et al. | Effects of jet grouting on adjacent ground and structures | |
AU2017246937B2 (en) | Interlocking stabilization system for stabilizing slope, unrestrained earth or the like | |
KR100397536B1 (en) | Lateral Movement Prevention Construction Method of Bridge Abutment for using Sheet piles | |
JP4987652B2 (en) | Reinforcement structure and method of embankment and linear embankment | |
CN109487748A (en) | Nearby Structure depth riverbed quaywall supporting construction and construction method | |
KR200220890Y1 (en) | Lateral Movement Prevention Structure of Bridge Abutment for using Sheet piles | |
KR100433653B1 (en) | Constructing method for the filling out abutement of bridge | |
JP7183819B2 (en) | Levee body seepage failure prevention structure | |
CN109338909B (en) | Integral pier reinforcing structure and construction method thereof | |
CN211735258U (en) | Pile type rock-fill angle bead | |
KR100493516B1 (en) | Micro pile and assembly foundation reinforcement structure member and its method for pier | |
JP4183137B2 (en) | Seismic structure | |
JP2003321826A (en) | Earthquake resisting property reinforced structure of levee body such as earth filling dam or the like | |
CN210887125U (en) | Pier body anti-collision structure on side slope of adjacent river | |
CN219973068U (en) | Navigation wall structure | |
JP7469608B2 (en) | Support structure, gravity breakwater and construction method of gravity breakwater | |
KR100487140B1 (en) | Y-shaped structure element, construction methods of deep foundations and retaining structures by using the Y-shaped structure element | |
JPH10131208A (en) | Construction method for preventing ground from lateral flow | |
JP2023145098A (en) | embankment | |
Murashev et al. | Geotechnical issues associated with development on Wellington's waterfront | |
Naeem et al. | Optimization of Seawall Design at Alameda Marina | |
Chen | Stabilization of a failed slope with reinforced soil wall | |
KR200315293Y1 (en) | Micro pile and assembly foundation reinforcement structure member for pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
N231 | Notification of change of applicant | ||
FPAY | Annual fee payment |
Payment date: 20110808 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |