KR100396838B1 - Built-up type temporary levee protector - Google Patents

Built-up type temporary levee protector Download PDF

Info

Publication number
KR100396838B1
KR100396838B1 KR10-2000-0041631A KR20000041631A KR100396838B1 KR 100396838 B1 KR100396838 B1 KR 100396838B1 KR 20000041631 A KR20000041631 A KR 20000041631A KR 100396838 B1 KR100396838 B1 KR 100396838B1
Authority
KR
South Korea
Prior art keywords
well
temporary
base
prefabricated
basin
Prior art date
Application number
KR10-2000-0041631A
Other languages
Korean (ko)
Other versions
KR20020008241A (en
Inventor
김광렬
Original Assignee
주식회사 제일엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 제일엔지니어링 filed Critical 주식회사 제일엔지니어링
Priority to KR10-2000-0041631A priority Critical patent/KR100396838B1/en
Publication of KR20020008241A publication Critical patent/KR20020008241A/en
Application granted granted Critical
Publication of KR100396838B1 publication Critical patent/KR100396838B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/22Caisson foundations made by starting from fixed or floating artificial islands by using protective bulkheads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0084Production methods for working underwater using pneumatical means

Abstract

우물통 기초의 상측에 설치되어 교각 설치시 물이 유입되는 것을 차단하기 위한 조립식 가물막이 구조가 개시된다.Disclosed is a prefabricated temporary membrane structure that is installed on the upper side of the well basin to block the inflow of water during the pier installation.

종래에 우물통 기초의 상측에 설치되는 철근이 배근된 우물막이는 철거시 잔해로 인하여 수질을 오염시킬 뿐만 아니라 우물통 상단의 표면 마무리가 어려워 하자 발생 요인이 많고, 부식 등으로 인하여 수명이 짧게 되는데, 이를 해결하기 위하여, 우물통 기초의 상측에 설치되는 가물막이에 있어서, 상기 가물막이는 분리 가능케 조립되는 복수 개의 분할판과, 상기 우물통 기초의 외주면과 가물막이의 내주면과의 기밀을 유지시키는 공기 튜브가 구비된 것을 특징으로 하는 조립식 가물막이 구조가 제공된다.Conventionally, well reinforcing bars installed on the upper side of the well basin are not only contaminated with water quality due to debris at the time of dismantling, but also difficult to finish the surface of the top of the well, causing many factors, and shortening the lifespan due to corrosion. In order to solve this problem, in the temporary clogging provided above the well basin base, the temporary clogging is to maintain the airtightness of the plurality of dividers that are detachably assembled, the outer circumferential surface of the well base and the inner circumferential surface of the temporary faucet There is provided a prefabricated temporary film structure, characterized in that the air tube is provided.

따라서, 가물막이가 강재의 복수 개로 분리 가능케 조립됨에 따라 시공이 편리하고, 재사용이 가능하여 제작 및 시공 등의 코스트가 현저하게 절감되며, 종래에 우물통 기초의 상단 표면 마무리가 어려워 발생되는 하자 발생 요인을 사전에 방지하므로 품질이 현저하게 향상됨과 동시에 수명이 연장되고, 철거시 잔해가 발생되지 않으므로 수질 오염이 방지됨과 동시에 철거 비용이 절감된다.Therefore, as the clamper is assembled to be separated into a plurality of steel materials, the construction is convenient and reusable, so that the cost of manufacturing and construction is remarkably reduced, and defects are generated that are difficult to finish the upper surface of the well base in the prior art. By preventing the factors in advance, the quality is markedly improved, the service life is extended, and debris is not generated during demolition, thereby preventing water pollution and reducing the cost of demolition.

Description

조립식 가물막이 구조{Built-up type temporary levee protector}Prefabricated clamshell structure {Built-up type temporary levee protector}

본 발명은 조립식 가물막이 구조에 관한 것으로서, 보다 상세하게는 교각의 기반이 되는 우물통 기초의 상단에 교각 기둥 공사를 할 때 임시적으로 물을 막기 위하여 설치되는 조립식 가물막이 구조에 관한 것이다.The present invention relates to a prefabricated façade structure, and more particularly, to a prefabricated façade structure that is installed to temporarily block the water when constructing a pier pillar on the top of the well basin base that is the foundation of the pier.

일반적으로 교량을 건설할 때에는 도 1 에 도시한 바와 같이 최하측에는 내부에 철근을 배근한 후 콘크리트를 타설하여 우물통 기초(10)가 형성되고, 상기 우물통 기초(10)의 상측에는 콘크리트 구조로 역시 내부에 철근이 배근된 교각(11)이 설치되며, 상기 교각(11)의 상측에는 스라브(12)가 설치되어 교량을 완성하게 되는 것이다.Generally, when constructing a bridge, as shown in FIG. 1, the bottom of the well is placed in the bottom, and concrete is poured to form a well base 10, and the upper side of the well base 10 has a concrete structure. In addition, the reinforcement is reinforced bar pier 11 is installed inside, the upper side of the pier 11 is provided with a slab 12 to complete the bridge.

그리고, 상기 우물통 기초(10)는 도 2 에 도시한 바와 같이 최하측이 암반 등으로 이루어지는 지지층(13) 내에 매설되고, 그 상측은 하상(14) 내에 매설되어 지지되며, 상기 우물통 기초(10)의 높이는 평수위(15)보다 높게 형성되는데, 상기 우물통 기초(10)의 상측에 교각(11)을 설치할 때에는 만조 수위(15a)보다 높도록 하여 물이 내측으로 유입되는 것을 방지하기 위한 가물막이(16)가 설치된다.And, as shown in Fig. 2, the well base 10 is buried in the supporting layer 13 of which the lowermost part is made of rock or the like, and the upper side thereof is embedded and supported in the lower bed 14, The height of 10) is formed higher than the flat water level 15, when installing the piers 11 on the upper side of the well basin 10, so that the water to be higher than the high water level (15a) to prevent water from entering the inside The membrane 16 is installed.

상기 가물막이(16)는 우물통 기초(10)의 설치시 함께 설치되는데, 교각(11)의 설치 후에는 철거하게 된다.The temporary barrier 16 is installed at the time of installation of the well base 10, and after installation of the piers 11, it is demolished.

그러나, 이와 같은 가물막이 구조는 내부에 철근이 배근됨에 따라 철거시 우물통 기초의 상단 표면을 마무리하는 것이 어렵고, 마무리된 표면이 거칠어 미관이 불량할 뿐만 아니라 절단된 철근 등이 노출됨에 따라 물과 항상 접하는 철근이 쉽게 부식됨으로써 우물통 덮개의 이탈 및 들뜸 등으로 인한 손상이 발생되며, 또한 철거된 잔해들이 물속에 유입되어 수질을 오염시키고, 설치후 철거하면 재사용이불가능하여 코스트를 상승시킨다고 하는 등의 여러 가지 문제점들이 내재되어 있었다.However, such a cladding structure is difficult to finish the top surface of the well basin foundation when dismantling due to the reinforcement of the reinforcement inside, and the surface is rough as the finished surface is not only poor appearance, but also cut and exposed as the rebar is exposed. Rebar is easily corroded at all times, causing damage due to detachment and lifting of the well cover, and demolition debris enters the water, contaminating the water quality, and if removed after installation, it is impossible to reuse and raises the cost. Several problems were inherent.

따라서, 본 발명은 상술한 종래 기술의 문제점들을 해결하기 위하여 발명된 것으로서, 본 발명의 목적은 조립 및 분리가 가능토록 하여 제작비 및 코스트를 절감하고, 우물통 기초의 철근이나 콘크리트의 부식 등의 하자 발생 요인을 사전에 을 방지하여 수명을 연장시킴과 동시에 품질을 더욱 향상시킬 수 있는 조립식 가물막이 구조를 제공하는데 있다.Therefore, the present invention has been invented to solve the above-described problems of the prior art, the object of the present invention is to be assembled and separated to reduce the manufacturing cost and cost, and to trouble such as corrosion of reinforcing steel or concrete of the well base It is to provide a prefabricated façade structure that can prolong the life by preventing occurrence factors and improve the quality at the same time.

본 발명의 다른 목적은 하천의 수질 오염을 방지하고 철거 비용을 절감할 수 있는 조립식 가물막이 구조를 제공하는데 있다.Another object of the present invention is to provide a prefabricated temporary screen structure that can prevent water pollution of the river and reduce the removal cost.

도 1 은 일반적인 교각 기둥의 설치 상태를 나타내는 개략도이다.1 is a schematic view showing an installation state of a general pier pillar.

도 2 는 종래의 우물통 기초의 상단에 설치되는 가물막이의 설치 상태를 나타내는 개략도이다.It is a schematic diagram which shows the installation state of the temporary film | membrane provided in the upper end of the well well base of the prior art.

도 3 은 본 발명에 의한 조립식 가물막이 구조를 나타내는 사시도이다.3 is a perspective view showing a structure of a prefabricated temporary shield according to the present invention.

도 4 는 본 발명의 설치 상태를 나타내는 일부 절개 단면도이다.4 is a partial cutaway sectional view showing an installation state of the present invention.

도 5 는 도 4 의 "A"부 확대 단면도이다5 is an enlarged cross-sectional view of portion “A” of FIG. 4.

도 6 은 본 발명에 의한 조립식 가물막이 구조의 횡단면도이다.6 is a cross-sectional view of a prefabricated temporary clam structure according to the present invention.

도 7 은 도 6 의 "B"부 확대 단면도이다.FIG. 7 is an enlarged cross-sectional view of a portion “B” of FIG. 6.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

30: 가물막이 40: 분할판30: temporary curtain 40: partition plate

41: 측벽 42: 수평 보강재41: side wall 42: horizontal reinforcement

43: 수직 보강재 44: 체결부재43: vertical reinforcement 44: fastening member

45: 걸림부 46,47: 공기 튜브45: hook 46,47: air tube

이와 같은 목적을 달성하기 위한 본 발명에 따른 조립식 가물막이 구조는, 우물통 기초의 상측에 설치되는 가물막이에 있어서, 상기 가물막이는 분리 가능케 조립되는 복수 개의 분할판과, 상기 우물통 기초의 외주면과 가물막이의 내주면과의 기밀을 유지시키는 공기 튜브가 구비된 것을 특징으로 한다.The prefabricated clamshell structure according to the present invention for achieving the above object, in the clamshell provided on the upper side of the well basin, the faucet screen is a plurality of dividers that are detachably assembled and the outer peripheral surface of the basin base And an air tube for maintaining airtightness with the inner circumferential surface of the temporary curtain.

따라서, 본 발명에 의하면, 가물막이가 강재의 복수 개로 분리 가능케 조립됨에 따라 시공이 편리하고, 재사용이 가능하여 제작 및 시공 등의 코스트가 현저하게 절감되며, 종래에 우물통 기초의 상단 표면 마무리가 어려워 발생되는 하자 발생 요인을 사전에 방지하므로 품질이 현저하게 향상됨과 동시에 수명이 연장되고, 철거시 잔해가 발생되지 않으므로 수질 오염이 방지됨과 동시에 철거 비용이절감되는 것이다.Therefore, according to the present invention, as the clamshell is assembled to be separated into a plurality of steel, construction is convenient and reusable, so that the cost of manufacturing and construction is remarkably reduced. As it prevents defects that are difficult to occur in advance, the quality is remarkably improved and the life is extended, and since debris is not generated during demolition, water pollution is prevented and demolition costs are reduced.

이하, 본 발명의 바람직한 실시예를 첨부된 도면에 의하여 더욱 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings.

도 3 은 본 발명에 의한 조립식 가물막이 구조를 나타내는 사시도로서, 부호 (30)은 가물막이를 나타내고 있다.3 is a perspective view showing the structure of a prefabricated temporary closure according to the present invention, wherein reference numeral 30 denotes a temporary closure.

상기 가물막이(30)는 강재로 이루어지는 복수 개의 분할판(40)이 서로 조립, 분리 가능케 형성된다.The temporary membrane 30 is formed so that a plurality of partition plates 40 made of steel are assembled and separated from each other.

본 실시예에서는 3개의 분할판(40)으로 도시하고 있으나 이에 한정하는 것은 아니며, 우물통 기초(10)의 크기 등에 따라 2개 이상의 복수 개로 형성될 수 있음은 물론이다.In this embodiment, but shown as three partition plates 40, but is not limited to this, of course, may be formed of two or more pieces depending on the size of the well base 10, etc.

상기 분할판(40)은 내측면에 수직으로 측벽(41)이 형성되어 있고, 그 외측면에는 종, 횡방향으로 복수 개의 수평 및 수직 보강재(42)(43)가 돌출 형성되어 있다.The partition plate 40 has sidewalls 41 formed perpendicularly to the inner side thereof, and a plurality of horizontal and vertical reinforcement members 42 and 43 protrude from the outer side thereof in the longitudinal and transverse directions.

그리고, 상기 분할판(40)의 각 선단에는 볼트 또는 볼트와 너트로 이루어지는 체결부재(44)에 의해 체결되어 있으며, 교각(11)의 설치 후에는 분리할 수 있도록 구성된다.In addition, each end of the partition plate 40 is fastened by a fastening member 44 made of a bolt or a bolt and a nut, and is configured to be separated after installation of the piers 11.

상기 측벽(41)의 내부에는 우물통 기초(10)의 상부 가장자리에 얹혀지는 상태로 설치되는 걸림부(45)가 내측을 향하여 돌출 형성되어 있다.In the interior of the side wall 41, the engaging portion 45 is installed to be mounted on the upper edge of the well base 10 is protruded toward the inside.

한편, 상기 걸림부(45)의 하측에는 우물통 기초(10)의 외주면과의 사이에 물이 가물막이(30)의 내측으로 유입되는 것을 차단하는 복수 개의 공기 튜브(46)(47)가 설치된다.On the other hand, a plurality of air tubes 46 and 47 are installed below the locking portion 45 to block water from flowing into the interior of the temporary barrier 30 between the outer circumferential surface of the well base 10. do.

상기 공기 튜브(46)(47)는 하나 또는 복수 개로 설치될 수 있으며, 내부에 공기를 주입함에 따라 팽창되어 측벽(41)과 우물통 기초(10)의 외주면과의 사이에 기밀이 유지되도록 하게 된다.One or a plurality of air tubes 46 and 47 may be installed and expanded by injecting air therein to maintain airtightness between the side wall 41 and the outer circumferential surface of the well base 10. do.

상기 공기 튜브(46)(47)는 물이 침투되는 것을 차단할 수 있을 정도면 되는데, 탄성력을 갖는 고무링이나 합성수지도 사용될 수 있다.The air tubes 46 and 47 need only be able to block the penetration of water, and rubber rings or synthetic resins having elasticity may be used.

이와 같이 구성된 본 발명에 의한 조립식 가물막이 구조는, 도 4 에 도시한 바와 같이 우물통 기초(10)의 상측에 설치된다.As shown in FIG. 4, the assembled temporary barrier film structure according to the present invention configured as described above is provided above the well base 10.

즉, 도 5 에 도시한 바와 같이 걸림부(45)를 우물통 기초(10)의 상부 가장자리에 위치시키고, 상기 걸림부(45)의 하측 즉, 우물통 기초(10)의 외주면과 분할판(40)의 측벽(41)과의 사이에 공기 튜브(46)(47)를 개재시킨 상태에서 도 6 에 도시한 바와 같이 복수 개의 분할판(40)을 각각 볼트 및 너트 등의 체결부재(44)로 체결하면 조립이 완료된다.That is, as shown in FIG. 5, the locking portion 45 is positioned at the upper edge of the well base 10, and the lower side of the locking portion 45, that is, the outer circumferential surface of the well base 10 and the partition plate ( As shown in FIG. 6, a plurality of divider plates 40 are fastened to the side walls 41 of the side wall 41, respectively, such as bolts and nuts. Assembly is completed.

이때에는 물의 수위가 평수위(15) 상태에서 조립 작업을 행하게 되며, 조립 완료 후에는 각각의 공기 튜브(46)(47) 내에 공기를 주입하면 우물통 기초(10)의 외부면과 측벽(41)와의 사이에는 완전한 기밀이 이루어짐으로써 만조 수위(15a)에서도 물이 가물막이(30)의 내측으로 유입되는 것이 방지되고, 이에 따라 교각(11)의 설치 작업이 가능케 되는 것이다.At this time, the water level of the assembly is performed in the state of the flat water level (15), and after the completion of the assembly, when the air is injected into each air tube 46, 47, the outer surface and the side wall 41 of the well base 10 By being completely airtight between and the water is prevented from flowing into the interior of the temporary film 30 even in the high water level (15a), thereby enabling the installation work of the pier (11).

상기 가물막이(30)가 완전히 조립된 상태에서는 강재로 이루어지고, 측벽(41)의 외측면에 수평 및 수직 보강재(42)(43)가 형성됨에 따라 수상 바지선이나 골재 등의 운반 수송선이 충돌하여도 가물막이(30)가 손상되는 것이 최소화된다.In the state in which the temporary curtain 30 is completely assembled, made of steel, the horizontal and vertical reinforcement (42, 43) is formed on the outer surface of the side wall 41, the transport transport ship, such as water barges or aggregates collide with Damage to the temporary curtain 30 is minimized.

그리고, 교각(11)의 설치 후에는 가물막이(30)에 체결된 체결부재(44)를 분리하는 것으로 조립 상태가 해체되며, 해체된 후에는 복수 개로 분할됨에 따라 운반 등의 작업이 용이하게 되고, 해체된 각각의 분할판(40)들은 재사용이 가능케 됨으로써 코스트가 현저하게 절감되고, 조립 및 해체 작업이 편리할 뿐만 아니라 작업 시간이 단축된다.Then, after installation of the pier 11, the assembly state is dismantled by separating the fastening member 44 fastened to the temporary film 30, and after dismantling, the operation such as transportation is facilitated by being divided into a plurality of pieces. By disassembling each of the divided plates 40, the cost can be remarkably reduced, and the assembling and disassembling work is convenient as well as the working time is shortened.

상술한 바와 같이 본 발명에 의하면, 가물막이가 강재의 복수 개로 분리 가능케 조립됨에 따라 시공이 편리하고, 재사용이 가능하여 제작 및 시공 등의 코스트가 현저하게 절감되며, 종래에 우물통 기초의 상단 표면 마무리가 어려워 발생되는 하자 발생 요인을 사전에 방지하므로 품질이 현저하게 향상됨과 동시에 수명이 연장되고, 철거시 잔해가 발생되지 않으므로 수질 오염이 방지됨과 동시에 철거 비용이 절감되는 등의 여러 가지 효과를 가지게 된다.As described above, according to the present invention, as the façade is assembled to be separated into a plurality of steel, construction is convenient and reusable, thereby significantly reducing the cost of manufacturing and construction, and conventionally the upper surface of the well base It prevents defects caused by difficult finishing in advance, which greatly improves the quality and prolongs its lifespan, and prevents debris from occurring during demolition, thus preventing water pollution and reducing demolition costs. do.

본 발명은 구체적인 실시예에 대해서만 상세히 설명하였지만 본 발명의 기술적 사상의 범위 내에서 변형이나 변경할 수 있음은 본 발명이 속하는 분야의 당업자에게는 명백한 것이며, 그러한 변형이나 변경은 본 발명의 특허청구범위에 속한다 할 것이다.Although the present invention has been described in detail only with respect to specific embodiments, it will be apparent to those skilled in the art that modifications and variations can be made within the scope of the technical idea of the present invention, and such modifications or changes belong to the claims of the present invention. something to do.

Claims (2)

분리 가능케 조립되는 복수 개의 분할판(40)과, 상기 분할판(40)은 수직으로 형성된 강재의 측벽(41)과, 상기 측벽(41)의 외측에 돌출 형성된 수평 및 수직보강재(42)(43)로 구성된 가물막이(30)를 우물통 기초(10)의 상측에 설치하고, 상기 우물통 기초(10)의 외주면과 가물막이(30)의 내주면과의 기밀을 유지시키는 공기튜브(46)(47)로 구성한 것에 있어서,The plurality of partition plates 40 are detachably assembled, and the partition plates 40 include sidewalls 41 of vertically formed steel, and horizontal and vertical reinforcing members 42 and 43 protruding outside the sidewalls 41. Air tube 46 for installing the temporary membrane 30 composed of the upper side of the well base 10, and maintaining the airtightness between the outer peripheral surface of the well base 10 and the inner peripheral surface of the temporary membrane 30 ( 47), 상기 우물통 기초(10)의 상단 주연에 걸쳐지도록 측벽(41)의 내측에 걸림부(45)를 돌출형성한 것을 특징으로 하는 조립식 가물막이 구조.Prefabricated clam structure, characterized in that the projection 45 is formed to protrude from the inner side of the side wall 41 so as to span the upper periphery of the well base (10). 삭제delete
KR10-2000-0041631A 2000-07-20 2000-07-20 Built-up type temporary levee protector KR100396838B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0041631A KR100396838B1 (en) 2000-07-20 2000-07-20 Built-up type temporary levee protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0041631A KR100396838B1 (en) 2000-07-20 2000-07-20 Built-up type temporary levee protector

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020000021071U Division KR200212403Y1 (en) 2000-07-24 2000-07-24 Built-up type temporary levee protector

Publications (2)

Publication Number Publication Date
KR20020008241A KR20020008241A (en) 2002-01-30
KR100396838B1 true KR100396838B1 (en) 2003-09-06

Family

ID=19678963

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0041631A KR100396838B1 (en) 2000-07-20 2000-07-20 Built-up type temporary levee protector

Country Status (1)

Country Link
KR (1) KR100396838B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200453495Y1 (en) * 2008-07-31 2011-05-17 덕창시스템 주식회사 Steel sump
KR20210057357A (en) 2019-11-12 2021-05-21 디엘이앤씨 주식회사 Sealing Cover and Sealing Method for Waterproof of Flange Connection between Steel Pipe, and Cofferdam constructed by such Method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100433991B1 (en) * 2002-02-15 2004-06-04 배석동 Wall Maintenance and Reinforce Engineering Method of Wall On the Water

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51109908U (en) * 1975-03-03 1976-09-04
JPH09242081A (en) * 1996-03-13 1997-09-16 Penta Ocean Constr Co Ltd Dry work method and work box or vessel used therefor
JPH09310310A (en) * 1996-05-23 1997-12-02 Penta Ocean Constr Co Ltd Dry execution method and working caisson therefor
JPH1193140A (en) * 1997-09-25 1999-04-06 Hec:Kk Cut-off structure of caisson and caisson temporary closing method using cut-off structure
KR20000007036A (en) * 1999-11-20 2000-02-07 배석동 Pier repair for caisson
KR20000012299A (en) * 1999-11-20 2000-03-06 배석동 Pier repair for caisson

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51109908U (en) * 1975-03-03 1976-09-04
JPH09242081A (en) * 1996-03-13 1997-09-16 Penta Ocean Constr Co Ltd Dry work method and work box or vessel used therefor
JPH09310310A (en) * 1996-05-23 1997-12-02 Penta Ocean Constr Co Ltd Dry execution method and working caisson therefor
JPH1193140A (en) * 1997-09-25 1999-04-06 Hec:Kk Cut-off structure of caisson and caisson temporary closing method using cut-off structure
KR20000007036A (en) * 1999-11-20 2000-02-07 배석동 Pier repair for caisson
KR20000012299A (en) * 1999-11-20 2000-03-06 배석동 Pier repair for caisson

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200453495Y1 (en) * 2008-07-31 2011-05-17 덕창시스템 주식회사 Steel sump
KR20210057357A (en) 2019-11-12 2021-05-21 디엘이앤씨 주식회사 Sealing Cover and Sealing Method for Waterproof of Flange Connection between Steel Pipe, and Cofferdam constructed by such Method

Also Published As

Publication number Publication date
KR20020008241A (en) 2002-01-30

Similar Documents

Publication Publication Date Title
JP5012355B2 (en) Underwater structure reinforcement method, underwater structure
KR100396838B1 (en) Built-up type temporary levee protector
CN113585351A (en) Soil covering plane settlement post-cast strip prefabrication advanced reverse order closed construction method
KR200212403Y1 (en) Built-up type temporary levee protector
KR101708218B1 (en) Hybrid underground pit structures and its construction method
KR20060096706A (en) Deck suspension top-down method of sub-structure
KR100394780B1 (en) A Repair ethod and Repair tructure of Bridge Pier Mould Construction
KR200232748Y1 (en) Steel caisson working a basic constructing of bridge
KR102105771B1 (en) Water proofing plate installed with forms
JPH11241314A (en) Reinforcing construction method of underwater structure
KR100345018B1 (en) A method and struture of bridge pier mould construction repair
CN112096156A (en) Reinforced concrete silo, protection method for silo wall of silo and material storage station
KR100949868B1 (en) The enlargement construction method for base of bridge with guides and molds in the shape of pipes
JP2009013660A (en) Method of reinforcing outside of underground structure
KR100570230B1 (en) The bridge pier construction method of having used prefabricated steel-materials well foundation and this
KR100939380B1 (en) Precast concrete box culvert, structure and method of constructing the same
KR102410140B1 (en) Culvert structure base plate repair and reinforcement method
KR100433991B1 (en) Wall Maintenance and Reinforce Engineering Method of Wall On the Water
KR200167417Y1 (en) Reinforcement pipe for cap of steel plate mold
CN218291971U (en) Inner supporting structure for foundation pit
JP6941761B1 (en) Grating receiving frame and its installation method
KR101253089B1 (en) A structure and method of underwater construction repair
KR100981148B1 (en) Method for establishing the wall of the well and curb shoe for it and the upper form
KR200253526Y1 (en) A repair struture of bridge pier mould construction
KR200230257Y1 (en) A Repair Structure of Bridge Pier Mould Construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120816

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130814

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140818

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150812

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160802

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170727

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190807

Year of fee payment: 17