KR100386775B1 - Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same - Google Patents

Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same Download PDF

Info

Publication number
KR100386775B1
KR100386775B1 KR10-2001-0015880A KR20010015880A KR100386775B1 KR 100386775 B1 KR100386775 B1 KR 100386775B1 KR 20010015880 A KR20010015880 A KR 20010015880A KR 100386775 B1 KR100386775 B1 KR 100386775B1
Authority
KR
South Korea
Prior art keywords
mechanical equipment
plate
mounting base
holes
concrete
Prior art date
Application number
KR10-2001-0015880A
Other languages
Korean (ko)
Other versions
KR20020075999A (en
Inventor
박향제
Original Assignee
주식회사 평화티씨엠 건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 평화티씨엠 건축사사무소 filed Critical 주식회사 평화티씨엠 건축사사무소
Priority to KR10-2001-0015880A priority Critical patent/KR100386775B1/en
Publication of KR20020075999A publication Critical patent/KR20020075999A/en
Application granted granted Critical
Publication of KR100386775B1 publication Critical patent/KR100386775B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • E02D5/805Ground anchors with deformable anchoring members

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

본 발명은 기계장비 설치용 마운팅 베이스에 대한 것으로, 특히 지지다리 (11)의 하단에 앵커볼트(31)가 결합되는 구멍(12a)들이 다수개 형성된 푸팅판(12)이 하단에 구비되는 통상의 기계장비(10)를 설치함에 있어서, 상기 푸팅판(12)의 구멍(12a)과 상응하는 구멍(21a)들이 다수개 형성되는 스틸플레이트(21)와, 상기 스틸플레이트(21)의 하부면 중앙에 그 일단이 접합되고, 그 타단은 콘크리트 바닥면에 지지되는 지지대(22)로 이루어지는 마운팅 베이스(20)의 스틸플레이트(21)와 푸팅판(12)을 맞대어 스틸플레이트의 구멍(21a)과 푸팅판의 구멍(12a)들을 일치시킨 후, 앵커볼트(31)를 관통시켜 너트(33)로 그 상단부를 체결하는 단계와, 상기 마운팅 베이스(20)가 푸팅판(12)의 하부에 체결된 기계장비(10)를 콘크리트 바닥면에 가안착시키는 단계와, 상기 기계장비(10)의 푸팅판(12) 주위에 거푸집을 설치하는 단계와, 상기 거푸집 내에 콘크리트를 채워 기초패드콘크리트(40)를 성형하는 단계를 순차적으로 시행하여 시공성이 용이하며, 구조적인 안정성을 갖는 등의 여러 효과를 갖는 매우 유용한 발명이다.The present invention relates to a mounting base for installing mechanical equipment, and in particular, a conventional machine having a footing plate 12 having a plurality of holes 12a formed at the bottom of the support leg 11 to which the anchor bolts 31 are coupled. In installing the equipment 10, the steel plate 21 is formed of a plurality of holes (12a) and the corresponding holes (21a) of the footing plate 12, in the center of the lower surface of the steel plate 21 One end thereof is joined, and the other end thereof faces the steel plate 21 and the mounting plate 12 of the mounting base 20 formed of the support 22 supported on the concrete floor surface, and thus the hole 21a and the footing plate of the steel plate. After the holes (12a) of the matched, through the anchor bolt 31 to fasten the upper end with the nut 33, and the mounting base 20 is fastened to the bottom of the footing plate 12 (10) temporarily seating on the concrete floor surface, and the loosening of the mechanical equipment (10) Steps of installing the formwork around the plate 12, and the step of forming the foundation pad concrete 40 by filling the concrete in the formwork in order to facilitate the construction, having a variety of effects, such as having a structural stability It is a very useful invention.

Description

기계장비 설치용 마운팅 베이스 및 그것을 이용한 설치방법{Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same}Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same}

본 발명은 기계장비 설치용 마운팅 베이스에 대한 것으로, 특히 마운팅 베이스를 기계장비의 푸팅판에 체결한 후에 콘크리트를 타설하여 기초패드콘크리트를 형성함으로써, 앵커볼트를 스틸플레이트의 구멍과 푸팅판의 구멍들에 용이하게 관통시켜 너트로 체결하여 시공성이 용이하며, 완전히 고정된 앵커볼트에 콘크리트를 타설함으로써, 앵커볼트의 지지력 및 체결력을 높여, 구조적인 안정성을 갖는 기계장비 설치용 마운팅 베이스와 그것을 이용한 설치방법에 관한 것이다.The present invention relates to a mounting base for the installation of mechanical equipment, in particular by anchoring the mounting base to the footing plate of the machine equipment to form a foundation pad concrete by placing concrete, so that the anchor bolt to the holes of the steel plate and the holes of the footing plate Easily penetrates with a nut and is easy to install, and by placing concrete on a fully anchored anchor bolt, increasing the bearing and clamping force of the anchor bolt, and a mounting base for installing mechanical equipment having structural stability and an installation method using the same will be.

일반적으로 건축물 등에 설치되는 기계장비에는 냉각탑(cooling tower), 펌프류 등이 있으며, 이 기계장비를 설치하기 위한 방법을 도1을 참조하여 설명하면, 먼저 콘크리트 바닥면의 상부에 거푸집을 설치하고, 그 내측에 콘크리트를 타설하여 기초패드콘크리트(40)를 형성한다.In general, mechanical equipment installed in buildings, such as a cooling tower (cooling tower), pumps, etc. Referring to the method for installing this mechanical equipment with reference to Figure 1, first install the formwork on the concrete floor surface, and Concrete is poured inside to form the foundation pad concrete 40.

이때, 상기 거푸집의 내부에는 소정크기를 갖는 삽입구멍(41)이 형성되며, 펌프류와 같이 구동시 진동이 심하게 발생하는 기계장비(10)인 경우에는 그 진동을 방지하기 위해 방진스프링을 설치한다.In this case, an insertion hole 41 having a predetermined size is formed inside the formwork, and in the case of the mechanical equipment 10 that vibrates severely when driving, such as pumps, a dustproof spring is installed to prevent the vibration.

그리고, 상기 삽입구멍(41)에 앵커볼트(31)를 삽입한 후, 상기 앵커볼트(31)의 상단에 기계장비(10)의 푸팅판(12)을 위치시킨다. 이 푸팅판(12)에는 기계장비 (10)를 고정하기 위한 구멍(12a)들이 다수개 형성되며, 그 중앙 상단면에는 기계장비 (10)의 지지다리(11)가 부착 고정되어 있다.Then, after the anchor bolt 31 is inserted into the insertion hole 41, the footing plate 12 of the mechanical equipment 10 is placed on the upper end of the anchor bolt 31. The footing plate 12 is formed with a plurality of holes 12a for fixing the mechanical equipment 10, the support leg 11 of the mechanical equipment 10 is fixed to the center top surface.

상기 푸팅판(12)의 구멍(12a)들과 그 하부에 위치한 앵커볼트(31)의 끝단을 일치되도록 상기 기계장비와 앵커볼트(31)를 움직여 구멍(12a)들과 앵커볼트(31)를 일치시킨 후, 상기 앵커볼트(31)의 끝단을 상기 구멍(12a)들에 관통시키고, 그 상부에 너트(33)를 체결하여 기계장비(10)를 상기 기초패드콘크리트(40) 상단에 가안착시킨다.The holes 12a and the anchor bolt 31 are moved by moving the mechanical equipment and the anchor bolt 31 to coincide with the ends of the holes 12a of the footing plate 12 and the anchor bolts 31 positioned below the footing plate 12. After matching, the end of the anchor bolt 31 is penetrated through the holes 12a, and the nut 33 is fastened to the upper part thereof to temporarily attach the mechanical equipment 10 to the top of the base pad concrete 40. Let's do it.

이때, 상기 삽입구멍(41)에는 콘크리트(40a)를 충진하며, 상기 삽입구멍(41)에 충진된 콘크리트(40a)가 완전히 양생된 후, 상기 앵커볼트(31)의 상부에 체결되어 있는 너트(33)를 완전히 조여 기계장비(10)를 기초패드콘크리트(40)의 상부에 고정한다.At this time, the insertion hole 41 is filled with concrete 40a, and the concrete 40a filled in the insertion hole 41 is completely cured, and then the nut fastened to the upper portion of the anchor bolt 31 ( Tighten 33) to secure the machine 10 to the top of the foundation pad concrete 40.

이와 같이 시공되는 종래의 기계장비 고정용 앵커볼트 시공방법은 기계장비의 사양에 따라 기초패드콘크리트에 지지플레이트의 구멍들과 동일한 위치에 다수개의 삽입구멍을 형성함으로써, 상기 삽입구멍의 위치를 측정하여 형성하기가 힘들었으며, 그 내측에 콘크리트를 충진하면서 기계장비를 가안착하여 시공성에 문제점이 있었다.The conventional anchoring bolt fixing method for the construction of mechanical equipment, which is constructed as described above, measures the position of the insertion hole by forming a plurality of insertion holes in the same position as the holes of the support plate in the base pad concrete according to the specifications of the machine equipment. It was difficult to form, and there was a problem in workability by temporarily mounting the mechanical equipment while filling the concrete inside.

그리고, 앵커볼트와 너트를 완전히 조이지 못한 상태에서 삽입구멍에 콘크리트를 타설하여 그 콘크리트가 양생된 후 너트를 조임으로써, 앵커볼트와 너트의 고정상태가 불량하며, 기초패드콘크리트와 그 내측 삽입구멍에 충진된 콘크리트와의 접합부가 발생하여 구조적인 안정성에 문제점이 있었다.In addition, when the anchor bolt and the nut are not completely tightened, the concrete is placed in the insertion hole, and the concrete is cured, and then the nut is tightened. There was a problem in the structural stability due to the junction with the filled concrete.

또한, 상기 삽입구멍과 지지플레이트의 구멍을 맞추기 위한 작업공정이 복잡하여 도2에 도시된 바와 같이, 단순히 바닥면의 상부에 거푸집을 설치하고, 그 내측에 콘크리트를 타설하여 기초패드콘크리트(40)를 형성한 후, 그 상부에 기계장비 (10)를 안착하여 수평보기를 하고, 푸팅판(12)의 구멍(12a)에 드릴로 구멍(41a)들을 천공한 후 앵커볼트(32)를 상기 구멍(41a)들에 설치하고, 너트(33)로 체결한다.In addition, the work process for fitting the insertion hole and the hole of the support plate is complicated, as shown in Figure 2, simply install the formwork on the top of the bottom surface, and the concrete is placed inside the base pad concrete 40 After forming the, the machine 10 mounted on the top of the horizontal view, and drilled the holes (41a) in the hole (12a) of the footing plate 12 by drilling the anchor bolt 32 to the hole It installs to 41a and fastens with the nut 33.

이 또한, 천공된 구멍들에 앵커볼트를 설치하여 그 앵커볼트의 지지력으로 기계장비를 고정함으로써, 앵커볼트와 기초패드콘크리트의 체결력이 미약하고 앵커볼트의 고정상태가 불량하여 구조적인 안정성에 커다란 문제점이 있었다.In addition, by installing the anchor bolt in the perforated holes to fix the mechanical equipment by the anchor bolt's support force, the anchor bolt and the base pad concrete, the fastening force of the anchor bolt is poor and the anchor bolt is in a poor state of structural stability is a big problem in structural stability There was this.

이에 따라 본 발명은 상기한 종래 시공방법의 문제점을 해소하고자 발명한 것으로, 본 발명의 목적은 기계장비의 푸팅판에 앵커볼트를 용이하게 체결하기 위해 마운팅 베이스를 이용하여, 푸팅판의 구멍들과 마운팅 베이스의 구멍들을 용이하게 일치시킴으로써, 시공의 단순화, 표준화를 기할 수 있는 기계장비 설치용 마운팅 베이스를 제공하는데 있다.Accordingly, the present invention has been invented to solve the above problems of the conventional construction method, an object of the present invention by using a mounting base to easily fasten the anchor bolt to the footing plate of the mechanical equipment, and the holes of the footing plate and By easily matching the holes of the mounting base, to provide a mounting base for the installation of machinery that can simplify the construction, standardization.

본 발명의 또다른 목적은 마운팅 베이스를 이용하여 기계장비의 푸팅판에 앵커볼트를 완전히 체결한 후에 콘크리트를 타설하여 기초패드콘크리트를 형성함으로써, 앵커볼트가 푸팅판의 구멍들에 용이하게 관통되고, 너트로 체결하여 시공성이 용이하며, 앵커볼트의 지지력 및 체결력을 높여, 구조적인 안정성을 갖는 마운팅베이스를 이용한 기계장비의 설치방법을 제공하는데 있다.Another object of the present invention by anchoring the anchor bolt to the footing plate of the machine equipment using the mounting base to form the foundation pad concrete by placing concrete, the anchor bolt is easily penetrated through the holes of the footing plate, It is easy to install by fastening with a nut, and to increase the supporting force and fastening force of the anchor bolt, to provide a method of installing mechanical equipment using a mounting base having a structural stability.

상기 목적을 달성하기 위한 본 발명은 지지다리의 하단에 앵커볼트가 결합되는 구멍들이 다수개 형성된 푸팅판이 하단에 구비되는 통상의 기계장비를 설치함에 있어서, 상기 푸팅판의 구멍들과 상응하는 구멍들이 다수개 형성되는 스틸플레이트와, 상기 스틸플레이트의 하부면 중앙에 그 일단이 접합되고, 그 타단은 바닥면에 지지되는 지지대로 이루어지는 기계장비 설치용 마운팅 베이스를 제공한다.The present invention for achieving the above object in the installation of the conventional mechanical equipment is provided with a footing plate is formed on the bottom of the support plate is formed with a plurality of holes in the bottom of the support legs, holes corresponding to the holes of the footing plate A plurality of steel plates are formed, one end of which is joined to the center of the lower surface of the steel plate, and the other end thereof provides a mounting base for installing mechanical equipment consisting of a support supported on the bottom.

또다른 목적을 달성하기 위한 본 발명은 상기 마운팅 베이스의 스틸플레이트와 푸팅판을 맞대어 스틸플레이트의 구멍들과 푸팅판의 구멍들을 일치시킨 후, 앵커볼트를 관통시켜 너트로 그 상단부를 체결하는 단계와, 상기 마운팅 베이스가 푸팅판의 하부에 체결된 기계장비를 콘크리트 바닥면에 가안착시키는 단계와, 상기 기계장비의 푸팅판 주위에 거푸집을 설치하는 단계와, 상기 거푸집 내에 콘크리트를 채워 기초패트콘크리트를 성형하는 단계를 순차적으로 시행하여 마운팅 베이스를 이용한 기계장비의 설치방법을 제공한다.According to another aspect of the present invention, a steel plate of a mounting base and a footing plate are matched to each other to match holes in the steel plate and holes in the footing plate, and then through the anchor bolt, fastening an upper end thereof with a nut. And temporarily mounting the mechanical equipment fastened to the lower portion of the footing plate on the bottom of the footing plate, and installing the formwork around the footing plate of the mechanical equipment, and filling the concrete in the formwork to form the foundation concrete. Provides a method of installing the mechanical equipment using the mounting base by performing the molding step sequentially.

도1은 종래 기계장비의 설치방법을 이용하여 설치한 상태의 단면도1 is a cross-sectional view of the installation state using a conventional method for installing mechanical equipment

도2는 종래 기계장비의 또다른 설치방법을 이용하여 설치한 상태의 단면도Figure 2 is a cross-sectional view of the installation state using another installation method of the conventional mechanical equipment

도3은 본 발명에 의한 마운팅 베이스를 나타낸 분해사시도Figure 3 is an exploded perspective view showing a mounting base according to the present invention

도4는 본 발명에 의해 기계장비를 마운팅 베이스를 이용하여 설치한 상태의 단면도Figure 4 is a cross-sectional view of the installation state of the mechanical equipment using the mounting base in accordance with the present invention

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10:기계장비 11:지지다리 12:푸팅판10: machinery 11: support leg 12: foot plate

12a:구멍 20:마운팅 베이스 21:스틸플레이트12a: Hole 20: Mounting base 21: Steel plate

21a:구멍 22:지지대 30:체결수단21a: hole 22: support 30: fastening means

31,32:앵커볼트 33:너트 34:와셔31, 32: anchor bolt 33: nut 34: washer

40:기초패드콘크리트 40a:콘크리트 42:구멍40: foundation pad concrete 40a: concrete 42: hole

이하, 본 발명의 기술구성을 첨부도면을 참조하여 구체적으로 설명한다.Hereinafter, the technical configuration of the present invention will be described in detail with reference to the accompanying drawings.

도3은 본 발명에 의한 마운팅 베이스를 나타낸 분해사시도, 도4는 본 발명에 의해 기계장비를 마운팅 베이스를 이용하여 설치한 상태의 단면도이다.Figure 3 is an exploded perspective view showing a mounting base according to the present invention, Figure 4 is a cross-sectional view of a state in which the machine is installed using the mounting base in accordance with the present invention.

이들 도면에서 부호 10은 기계장비이다. 이 기계장비(10)는 다수개의 지지다리(11)를 구비하며, 그 지지다리(11)의 하단에 앵커볼트(31)가 결합되는 구멍(12a)들이 다수개 형성된 푸팅판(12)이 하단에 구비된다.In these figures, reference numeral 10 denotes mechanical equipment. The machine 10 has a plurality of support legs 11, the footing plate 12 formed with a plurality of holes (12a) to which the anchor bolt 31 is coupled to the lower end of the support leg 11 Is provided.

부호 20은 마운팅 베이스이다. 이 마운팅 베이스(20)는 상기 푸팅판(12)의 구멍(12a)과 상응하는 구멍(21a)들이 다수개 형성되는 스틸플레이트(21)가 구비되며, 상기 스틸플레이트(21)의 하부면 중앙에 그 일단이 접합되고, 그 타단은 콘크리트 바닥면에 지지되는 지지대(22)가 구비된다.Reference numeral 20 is a mounting base. The mounting base 20 is provided with a steel plate 21 in which a plurality of holes 21a corresponding to the holes 12a of the footing plate 12 are formed, and in the center of the lower surface of the steel plate 21. One end thereof is joined, and the other end thereof is provided with a support 22 supported on the concrete floor surface.

이때, 상기 지지대(22)는 원통형의 스틸파이프로 형성되며, 기계장비의 설치높이를 감안하여 그 길이를 정하고, 상기 스틸플레이트(21)에 용착된다.At this time, the support 22 is formed of a cylindrical steel pipe, the length is determined in consideration of the installation height of the mechanical equipment, and is welded to the steel plate 21.

부호 30은 체결수단이다. 이 체결수단(30)에는 하단부는 'U'자형으로 형성되고 상단부에는 볼트가 형성된 앵커볼트(31)가 구비되고, 상기 앵커볼트(31)의 상단부 볼트와 이맞물림되는 너트(32)로 구성된다.Reference numeral 30 is a fastening means. The fastening means 30 is provided with an anchor bolt 31 having a lower end formed in a 'U' shape and a bolt formed at an upper end thereof, and comprising a nut 32 engaged with the upper end bolt of the anchor bolt 31. .

이때, 상기 너트(32)는 상기 스틸플레이트(21)의 하부면에 위치하는 것과, 상기 푸팅판(12)의 상부면에 위치하는 것으로 각각 나누어져서 구비되며, 스틸플레이트(21) 및 푸팅판(12)과 너트(33) 사이에는 와셔(34)가 구비된다.In this case, the nut 32 is divided into being located on the lower surface of the steel plate 21, and located on the upper surface of the footing plate 12, respectively provided, the steel plate 21 and the footing plate ( A washer 34 is provided between the 12 and the nut 33.

부호 40은 기초패드콘크리트이다.Reference numeral 40 is the base pad concrete.

상술한 바와 같이 구성되는 본 발명의 설치방법을 설명하면 다음과 같다.Referring to the installation method of the present invention configured as described above are as follows.

먼저, 다수개의 구멍(21a)들이 형성된 스틸플레이트(21)의 하부면 중앙에 지지대(22)의 일단을 용착하여 마운팅 베이스(20)를 구비한다.First, one end of the support 22 is welded to the center of the lower surface of the steel plate 21 in which the plurality of holes 21a are formed, and the mounting base 20 is provided.

상기 마운팅 베이스(20)의 스틸플레이트(21)와 기계장비(10)의 푸팅판(12)을맞대어 스틸플레이트 구멍(21a)과 푸팅판 구멍(12a)들을 일치시킨 후, 앵커볼트 (31)를 상단부를 관통시켜 너트(33)와 와셔(34)로 그 상단부를 체결하며, 상기 스틸플레이트(21)의 하부면에는 별도의 너트(33)와 와셔(34)를 체결한다.After the steel plate 21 of the mounting base 20 and the footing plate 12 of the mechanical equipment 10 are aligned to match the steel plate hole 21a and the footing plate hole 12a, the anchor bolt 31 is The upper end portion penetrates the upper end portion with the nut 33 and the washer 34, and a separate nut 33 and the washer 34 are fastened to the lower surface of the steel plate 21.

그리고, 상기 마운팅 베이스(20)가 푸팅판(12)의 하부에 체결된 기계장비 (10)를 콘트리트 바닥면에 가안착시킨다. 이때, 상기 기계장비(10)의 하중을 상기 지지대(22)가 지지한다.Then, the mounting base 20 is temporarily seated on the concrete bottom surface of the mechanical equipment 10 is fastened to the lower portion of the footing plate (12). At this time, the support 22 supports the load of the mechanical equipment (10).

상기 기계장비(10)의 푸팅판(12) 주위에 상기 마운팅 베이스(20)의 스틸플레이트(21)가 매설될 수 있는 소정의 높이를 갖도록 거푸집을 설치한 후, 상기 거푸집 내에 콘크리트를 채워 기초패드콘크리트(40)를 성형하고, 상기 기초패드콘크리트(40)가 완전히 양생된 후에 거푸집을 제거한다.After the formwork is installed so as to have a predetermined height at which the steel plate 21 of the mounting base 20 can be buried around the footing plate 12 of the mechanical equipment 10, the base pad is filled with concrete in the formwork. The concrete 40 is molded, and formwork is removed after the foundation pad concrete 40 is completely cured.

상기 마운팅 베이스(20)의 설치위치에 기초패드콘크리트(40) 정착용 노출 철근을 선시공 후 기계장비의 안착작업을 시행하는 것이 바람직하다 할 것이다.It will be desirable to perform the mounting work of the mechanical equipment after pre-installed exposed reinforcing bars for fixing the base pad concrete 40 to the installation position of the mounting base 20.

이는 콘크리트 바닥과 기초패드콘크리트를 하나의 구조체로 만들어 향후 기계장비의 운영에 따른 콘크리트 바닥과 기초패드콘크리트가 분리되는 것을 방지한다.This makes the concrete floor and the foundation pad concrete into one structure to prevent the concrete floor and the foundation pad concrete from being separated by the operation of the future machine equipment.

상기한 바와 같이 구성되어 설치되는 본 발명의 기계장비 설치용 마운팅 베이스와 그것을 이용한 기계장비의 설치방법에 의하면, 마운팅 베이스를 이용하여 기계장비의 푸팅판에 앵커볼트를 완전히 체결한 후에 콘크리트를 타설하여 기초패드콘크리트를 형성함으로써, 앵커볼트가 푸팅판의 구멍들에 용이하게 관통되고, 너트로 체결하여 시공성이 용이하며, 앵커볼트의 지지력 및 체결력을 높여, 구조적인 안정성을 갖게 된다.According to the mounting method of the machine equipment installation base and the machine equipment using the same according to the present invention configured and installed as described above, after the anchor bolt is completely fastened to the footing plate of the machine equipment using the mounting base, By forming the pad concrete, the anchor bolt is easily penetrated through the holes of the footing plate, is fastened by a nut and easy to install, and increases the holding force and fastening force of the anchor bolt, thereby having structural stability.

이상에서 살펴본 바와 같이, 본 발명은 시공성이 용이하며, 구조적인 안정성을 갖는 등의 여러 효과를 갖는 매우 유용한 발명이다.As described above, the present invention is a very useful invention having various effects such as easy construction and structural stability.

Claims (3)

지지다리(11)의 하단에 앵커볼트(31)가 결합되는 구멍(12a)들이 다수개 형성된 푸팅판(12)이 하단에 구비되는 통상의 기계장비(10)를 설치함에 있어서,In installing the conventional mechanical equipment 10 in which the footing plate 12 formed with a plurality of holes 12a to which the anchor bolt 31 is coupled to the bottom of the support leg 11 is provided at the bottom thereof, 상기 푸팅판(12)의 구멍(12a)과 상응하는 구멍(21a)들이 다수개 형성되는 스틸플레이트(21)와,A steel plate 21 in which a plurality of holes 21a corresponding to the holes 12a of the footing plate 12 are formed; 상기 스틸플레이트(21)의 하부면 중앙에 그 일단이 접합되고, 그 타단은 콘크리트 바닥면에 지지되는 지지대(22)로 이루어지는 것을 특징으로 하는 기계장비 설치용 마운팅 베이스.One end is joined to the center of the lower surface of the steel plate 21, the other end of the mounting base for the mechanical equipment, characterized in that consisting of a support (22) supported on the concrete floor. 제1항에 있어서, 상기 지지대(22)는 원통형의 스틸파이프로 형성되며, 상기 스틸플레이트(21)와 용접에 의해 접합되는 것을 특징으로 하는 기계장비 설치용 마운팅 베이스.The mounting base of claim 1, wherein the support (22) is formed of a cylindrical steel pipe and joined to the steel plate (21) by welding. 제1항에 의한 마운팅 베이스(20)의 스틸플레이트(21)와 푸팅판(12)을 맞대어 스틸플레이트의 구멍(21a)과 푸팅판의 구멍(12a)들을 일치시킨 후, 앵커볼트(31)를 관통시켜 너트(33)로 그 상단부를 체결하는 단계와,After the steel plate 21 of the mounting base 20 according to claim 1 and the footing plate 12 are brought into contact with each other, the holes 21a of the steel plate and the holes 12a of the footing plate coincide with each other. Fastening the upper end with the nut 33 by 상기 마운팅 베이스(20)가 푸팅판(12)의 하부에 체결된 기계장비(10)를 콘크리트 바닥면에 가안착시키는 단계와,Temporarily mounting the mechanical equipment 10 fastened to the bottom of the mounting plate 12 by the mounting base 20 to the concrete floor; 상기 기계장비(10)의 푸팅판(12) 주위에 거푸집을 설치하는 단계와,Installing formwork around the footing plate 12 of the machine 10; 상기 거푸집 내에 콘크리트를 채워 기초패드콘크리트(40)를 성형하는 단계를 순차적으로 시행하여 이루어지는 것을 특징으로 하는 마운팅 베이스를 이용한 기계장비의 설치방법.Filling concrete in the formwork, the installation method of the mechanical equipment using a mounting base, characterized in that the step of sequentially forming the foundation pad concrete 40.
KR10-2001-0015880A 2001-03-27 2001-03-27 Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same KR100386775B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0015880A KR100386775B1 (en) 2001-03-27 2001-03-27 Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0015880A KR100386775B1 (en) 2001-03-27 2001-03-27 Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010009636U Division KR200236592Y1 (en) 2001-04-06 2001-04-06 Mounting Base for Setting of Mechanical Equipment

Publications (2)

Publication Number Publication Date
KR20020075999A KR20020075999A (en) 2002-10-09
KR100386775B1 true KR100386775B1 (en) 2003-06-18

Family

ID=27698828

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0015880A KR100386775B1 (en) 2001-03-27 2001-03-27 Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same

Country Status (1)

Country Link
KR (1) KR100386775B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949154B (en) * 2010-09-29 2012-04-25 赵正义 Structure of perpendicular positioning connection system for tower type machine underframe and base
CN115288182A (en) * 2022-07-13 2022-11-04 宣化钢铁集团有限责任公司 Installation method of roller bed foundation integral seat pulp backing plate

Also Published As

Publication number Publication date
KR20020075999A (en) 2002-10-09

Similar Documents

Publication Publication Date Title
KR101409418B1 (en) Steel socket and apparatus connecting steel pile steel column using the same
JP4499006B2 (en) Seismic isolation device mounting structure, construction method thereof, and base plate for seismic isolation device mounting
JP2012067524A (en) Base isolation foundation and construction method therefor
US20020170244A1 (en) Height-adjustable concrete mold supporting system and method for constructing concrete building
JP2003055984A (en) Column base connecting structure
JPH11229409A (en) Installation of machinery base
KR100996724B1 (en) Means for solidarity reinforcement bar of head part in steel pipe pile and method of foundation structure using thereof
KR101421212B1 (en) Basement Structure for power mono rail
KR100386775B1 (en) Mounting Base for Setting of Mechanical Equipment and Mechanical Equipment Setting Method Using the Same
KR100814442B1 (en) Concrete mold for flat plate slab/flat slab and construction method using the same
KR100655654B1 (en) Device for standing in line pc steel wire and pre-stressing method of psc box girder bridge using the same
KR200236592Y1 (en) Mounting Base for Setting of Mechanical Equipment
JP2017061803A (en) Positioning jig for anchor bolt for column, and construction method for steel column base part
KR102361789B1 (en) Supporter for installating horizontal member of supporting system
JPH09158215A (en) Construction method for installing large-sized machine
JP4180779B2 (en) Turbine mount and method of installing turbine / generator
KR200362839Y1 (en) Fixing structure for big-size concrete form
KR200281867Y1 (en) An iron reinforcing bar prop
KR102221019B1 (en) Leveling support method of tower
KR200322141Y1 (en) Temporary apparatus support structure for pier of bridge
JPH01278620A (en) Installation method for anchor bolt and anchor bolt supporting device used therefor
JP4774268B2 (en) Column base hardware
JP3354749B2 (en) Composite anchor bolt for equipment installation
JP3762898B2 (en) Template removal device
KR200352893Y1 (en) fixing structure for fence

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110527

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee