KR100378090B1 - plate have a birdge and a method of construction therof - Google Patents
plate have a birdge and a method of construction therof Download PDFInfo
- Publication number
- KR100378090B1 KR100378090B1 KR10-2000-0061474A KR20000061474A KR100378090B1 KR 100378090 B1 KR100378090 B1 KR 100378090B1 KR 20000061474 A KR20000061474 A KR 20000061474A KR 100378090 B1 KR100378090 B1 KR 100378090B1
- Authority
- KR
- South Korea
- Prior art keywords
- slab
- auxiliary
- bridge
- grooves
- connecting portion
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Abstract
본 발명은 하중을 잘 견디고 조립이 편리하도록 하는 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 관한 것으로, 상부가 횡으로 길이를 어느 정도 갖고, 하부로 지반에 기초 설치되어 일정간격으로 세워지는 교각이 설치되고, 상기 상부에 양방향 베어링이 설치된 교량에 있어서, 상기 베어링상에 일정간격 종방향으로 수직되며 양측면에 복수개의 홈과 상기 홈간에 횡방향으로 적어도 하나 이상 홀을 갖는 PC 빔을 형성하는 단계와, 상기 홈간에는 홈의 횡으로 관통한 복수개의 전단블록을 끼우는 단계와, 상기 전단블록 및 상기 PC 빔 홈의 홀에 강선을 삽입 고정한 후, 인장하는 단계와, 상기 PC 빔의 상부 양측에 형성된 걸림턱에 걸쳐지도록 암연결부와 수연결부를 갖는 복수개의 보조슬래브를 일렬로 배설 형성하는 단계를 포함하여 이루어짐을 특징으로 한다.The present invention relates to a bridge having an auxiliary slab to withstand loads and to facilitate the assembly, and to a method of assembling the bridge, the upper portion having a length horizontally, the lower portion is installed based on the ground and erected at regular intervals In a bridge provided with a pier and a bidirectional bearing installed on the upper portion, the bridge is vertically vertically spaced on the bearing to form a PC beam having a plurality of grooves on both sides and at least one hole in the transverse direction between the grooves. And inserting a plurality of shear blocks that penetrate laterally between the grooves, inserting and fixing a steel wire into the holes of the shear blocks and the PC beam grooves, and tensioning the wires. And arranging a plurality of auxiliary slabs having a female connecting portion and a male connecting portion in a line so as to span the formed locking jaw. And a gong.
Description
본 발명은 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 관한 것으로,특히 하중을 잘 견디고 조립이 편리하도록 하는 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 관한 것이다.The present invention relates to a bridge having an auxiliary slab and a method for assembling the bridge, and more particularly, to a bridge having an auxiliary slab for enduring a load and making the assembly easy, and a method for assembling the bridge.
통상적으로 프리스트레스트 콘크리트 빔(Prestressed Concrete beam : PC 빔)은 차량 등 외부 하중에 재하되는 철근 콘크리트 상부 슬래브와, 상부 슬래브의 하부에 소정 간격으로 배치되어 상부 슬래브를 지지하며 교량의 주형을 이루는 하나 이상의 PC 빔으로 구성된다.Typically, a prestressed concrete beam (PC beam) is a reinforced concrete upper slab that is applied to an external load such as a vehicle, and one or more arranged at predetermined intervals below the upper slab to support the upper slab and form a bridge of the bridge. It consists of a PC beam.
PC 빔 교량은 차량 등 외부 하중에 재하되는 철근 콘크리트 상부 슬래브와, 상기 상부 슬래브의 하부에 소정 간격으로 배치되어 상기 상부 슬래브를 지지하며 교량의 주형을 이루는 하나 이상의 PC 빔으로 구성된다.The PC beam bridge is composed of a reinforced concrete upper slab loaded to an external load such as a vehicle, and one or more PC beams disposed at predetermined intervals below the upper slab to support the upper slab and form a bridge of the bridge.
이하, 첨부된 도면을 참조하여 종래의 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 대하여 설명하면 다음과 같다.Hereinafter, a bridge with a conventional auxiliary slab and a method for assembling the bridge will be described with reference to the accompanying drawings.
도 1은 종래의 보조슬래브를 구비한 교량을 나타낸 도면이다.1 is a view showing a bridge having a conventional auxiliary slab.
도 1에 도시한 바와 같이 PC 빔(10)은 양측면에 일정간격 종(綜) 방향으로 복수개의 홈(20)을 수직되게 형성하고, 상기 홈(20)간에는 보울트공(도면에 도시하지 않았음)을 천공한다. 그리고 상기 홈(20)간에는 홈(20)의 보울트공에 대응하게 보울트공을 횡으로 관통한 복수개의 전단블록(30)을 끼운다. 그리고 상기 PC 빔(20)의 상부 양측에 형성된 걸림턱에 걸쳐지도록 복수개의 보조슬래브(40)를 형성한다.As shown in FIG. 1, the PC beam 10 has a plurality of grooves 20 formed vertically in a longitudinal direction at regular intervals on both sides thereof, and a bolt hole (not shown in the drawings) is formed between the grooves 20. Perforate). Then, the plurality of shear blocks 30 penetrating the bolt hole transversely corresponding to the bolt hole of the groove 20 is inserted between the grooves 20. In addition, a plurality of auxiliary slabs 40 are formed to span the locking projections formed on both upper sides of the PC beam 20.
이때, 상기 전단블록(30)과 상기 PC 빔(20)이 일체가 되도록 보울트(50)를 이용하여 조립 형성하고, 상기 보조슬래브(40)는 단순히 서로 맞닿도록 연결한다.At this time, the front block 30 and the PC beam 20 is assembled using the bolt 50 so as to be integral, and the auxiliary slab 40 is simply connected to each other.
그러나 상기와 같은 종래의 교량용 보조슬래브 및 이를 구비한 교량 조립공법에 있어서는 다음과 같은 문제점이 있었다.However, in the conventional bridge auxiliary slab and the bridge assembly method provided with the same, there are the following problems.
PC 빔 걸림턱에 걸쳐지도록 보조슬래브를 형성할 때 상기 복수의 보조슬래브가 단순 연결되어 있으므로 추후 하중이 부족하게 된다.When the auxiliary slab is formed to span the PC beam engaging jaw, the plurality of auxiliary slabs are simply connected, so that the load is insufficient later.
그리고 전단블록 설치에 있어서 보울트를 이용하여 조립하므로 추후 보울트가 느슨해지는 문제점이 발생하였다.And since the assembly using the bolt in the shear block installation there is a problem that the bolt later loosened.
본 발명은 상기와 같은 문제점을 해결하기 위하여 안출한 것으로 서로 끼워지도록 연결하는 방식으로 연속하여 복수의 보조슬래브를 형성하므로 추후 하중에 잘 견디고, 보다 편리하게 시공할 수 있는 보조슬래브를 구비한 교량 및 이 교량의 조립공법을 제공하는데 그 목적이 있다.In order to solve the problems as described above, the present invention forms a plurality of auxiliary slabs in a continuous manner in such a manner as to be connected to each other so as to be able to withstand loads later, and a bridge having auxiliary slabs which can be constructed more conveniently. The purpose is to provide an assembly method for this bridge.
도 1은 종래의 보조 슬래브를 구비한 교량을 나타낸 도면1 is a view showing a bridge with a conventional secondary slab
도 2는 본 발명의 실시예에 따른 보조슬래브를 구비한 교량을 나타낸 도면2 is a view showing a bridge having an auxiliary slab according to an embodiment of the present invention.
도 3은 본 발명의 일실시예에 따른 보조슬래브를 구비한 교량 조립공법을 나타낸 도면3 is a view showing a bridge assembly method having an auxiliary slab according to an embodiment of the present invention
도 4 내지 도 6은 본 발명의 실시예에 따른 보조슬래브를 나타낸 단면도4 to 6 are cross-sectional views showing an auxiliary slab according to an embodiment of the present invention.
<도면의 주요 부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
100 : 교각 110 : 상부100: pier 110: upper
120 : 베어링 130 : PC 빔120: bearing 130: PC beam
140 : 홈 150 : 전단블럭140: groove 150: shear block
170 : 홀 180 : 강선170: hole 180: steel wire
190 : 보조슬래브190: auxiliary slab
상기와 같은 목적을 달성하기 위한 본 발명의 보조슬래브를 구비한 교량 조립공법은 상부가 횡으로 길이를 어느 정도 갖고, 하부로 지반에 기초 설치되어 일정간격으로 세워지는 교각이 설치되고, 상기 상부에 양방향 베어링이 설치된 교량에 있어서, 상기 베어링상에 양측면에 일정간격 종방향으로 수직되며 복수개의 홈과 상기 홈간에 횡방향으로 적어도 하나 이상 홀을 갖는 PC 빔을 형성하는 단계와, 상기 홈간에는 홈의 횡으로 관통한 복수개의 전단블록을 끼우는 단계와, 상기 전단블록 및 상기 PC 빔 홈의 홀에 강선을 삽입 고정한 후, 인장하는 단계와, 상기 PC 빔의 상부 양측에 형성된 걸림턱에 걸쳐지도록 암연결부와 수연결부를 갖는 복수개의 보조슬래브를 일렬로 배설 형성하는 단계를 포함하여 이루어짐을 특징으로 한다.Bridge assembly method provided with the auxiliary slab of the present invention for achieving the above object has a length of the upper side to the side, the lower part is installed on the ground based on the pier is installed at a predetermined interval, the upper A bridge having a bidirectional bearing, comprising: forming a PC beam having a plurality of grooves and at least one hole in a transverse direction between the grooves and vertically at regular intervals on both sides on the bearing; Inserting a plurality of transversely extending shear blocks, inserting and fixing a steel wire into the holes of the shear block and the PC beam groove, and tensioning them, and connecting the female connection portions to span the engaging jaw formed on both sides of the upper portion of the PC beam; And a step of forming a plurality of auxiliary slabs having a male connector in a row.
상기 특징의 바람직한 실시예는 상기 보조슬래브는 일단에 암연결부, 타단에 수연결부가 형성되고, 상기 복수의 보조슬래브가 일렬로 배설되도록 상기 타단의 수연결부에 다른 보조슬래브의 암연결부가 연결되도록 형성하는 것을 특징으로 한다.According to a preferred embodiment of the present invention, the auxiliary slab is formed such that a female connecting portion is formed at one end and a male connecting portion is formed at the other end, and the female connecting portion of the other auxiliary slab is connected to the male connecting portion of the other end so that the plurality of auxiliary slabs are arranged in a line. Characterized in that.
상기 특징의 바람직한 실시예는 상기 보조슬래브는 일단 및 타단에 형성된 암연결부 및 수연결부가 단차를 갖도록 형성하고, 암연결부 및 수연결부가 서로 凹, 凸과 같은 형태로 형성하여 일렬로 배설 연결하는 것을 특징으로 한다.According to a preferred embodiment of the above features, the auxiliary slab is formed such that the female connecting portion and the male connecting portion formed at one end and the other end have a step, and the female connecting portion and the male connecting portion are formed in a shape such as 서로 and 서로 mutually arranged in a row. It features.
상기 특징의 바람직한 실시예는 상기 홈과 전단블럭에 형성된 홀에 강선을 삽입시 그로우팅 공법을 이용하여 인장하는 것을 특징으로 한다.The preferred embodiment of the above features is characterized in that the tension using the grooving method when inserting the steel wire into the hole formed in the groove and the shear block.
상기 특징의 바람직한 실시예는 상기 보조슬래브내부는 종 방향으로 강선이 적어도 하나에서 셋 이상, 와이어매쉬를 갖는 콘크리트로 형성하는 특징으로 한다.According to a preferred embodiment of the present invention, the auxiliary slab may be formed of concrete having wire mesh in at least one to three or more wires in the longitudinal direction.
또한, 상기와 같은 목적을 달성하기 위한 본 발명의 보조슬래브를 구비한 교량은 상부가 횡으로 길이를 어느 정도 갖으며 하부로 지반에 기초 설치되어 일정간격으로 세워지는 교각이 설치되고, 상기 상부에 양방향 베어링이 설치된 교량에 있어서, 상기 베어링상에 일정간격 종방향으로 수직되며 양측에 복수개의 홈과, 상기 홈간에 횡방향으로 적어도 하나 이상 홀을 갖는 PC 빔과, 상기 홈간에는 홈의 횡으로 관통하는 복수개의 전단블록과, 상기 전단블록 및 상기 PC 빔 홈의 홀에 삽입 고정한 후, 인장하는 강선과, 상기 PC 빔의 상부 양측에 형성된 걸림턱에 걸쳐지도록 일단의 암연결부와 다른 일단의 수연결부가 일렬 배설로 형성하는 복수개의 보조슬래브를 구비하는 것을 특징으로 한다.In addition, the bridge provided with the auxiliary slab of the present invention for achieving the above object has a length of the upper side horizontally and is installed on the ground based on the ground to the lower part of the bridge is installed at a predetermined interval, the upper In a bridge provided with a bidirectional bearing, a PC beam having a plurality of grooves on both sides and at least one hole in the transverse direction between the grooves, vertically vertically spaced on the bearing, and penetrating laterally between the grooves. A plurality of front end blocks, a plurality of front end blocks, and one end of the female connection part and the other end of the male connection part so as to span the tension wires and the locking jaws formed on both sides of the upper part of the PC beam after being fixed to the holes of the front block and the PC beam groove. It characterized in that it comprises a plurality of auxiliary slab which is formed in a series of excretion.
상기 특징의 바람직한 실시예는 상기 보조슬래브는 일단 및 타단에 형성된 암연결부 및 수연결부가 서로 단차를 갖도록 형성하여 서로 일렬 배설 연결 및 암연결부 및 수연결부가 서로 凹, 凸과 같은 형태로 형성하여 일렬로 배설 연결하는 것을 특징으로 한다.According to a preferred embodiment of the above feature, the auxiliary slab is formed such that the female connecting portion and the male connecting portion formed at one end and the other end have a step difference from each other, so that the serial excrement connection and the female connecting portion and the male connecting portion are formed in a shape such as 서로, 서로 with each other. It is characterized by connecting excretory.
상기 특징의 바람직한 실시예는 상기 보조슬래브내부는 종 방향으로 강선이 적어도 하나에서 셋 이상 및 와이어매쉬를 갖는 콘크리트로 형성됨을 특징으로 한다.According to a preferred embodiment of the present invention, the auxiliary slab may be formed of concrete having a wire mesh in at least one to three or more wires in a longitudinal direction.
이하, 첨부된 도면을 참조하여 본 발명의 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 대하여 보다 상세히 설명하면 다음과 같다.Hereinafter, a bridge with an auxiliary slab of the present invention and an assembly method of the bridge will be described in detail with reference to the accompanying drawings.
도 2는 본 발명의 실시예에 따른 보조슬래브를 구비한 교량을 나타낸 도면이고, 도 3은 본 발명의 일실시예에 따른 보조슬래브를 구비한 교량의 조립공법을 나타낸 도면이다.2 is a view showing a bridge having an auxiliary slab according to an embodiment of the present invention, Figure 3 is a view showing an assembly method of a bridge having an auxiliary slab according to an embodiment of the present invention.
그리고 도 4 내지 도 6은 본 발명의 실시예에 따른 보조슬래브를 나타낸 단면도이다.4 to 6 are cross-sectional views illustrating the auxiliary slab according to the embodiment of the present invention.
도 2 및 도 3에 도시한 바와 같이 상부(110)가 횡으로 길이를 어느 정도 갖고, 하부로 지반에 기초 설치되어 세워지는 교각(100)이 일정간격으로 세워 설치되고, 상기 교각(100)들의 상부(110) 사이 각각에는 일정간격으로 콘크리트 PC 빔(130)이 종설되며, 상기 PC 빔(130) 하부의 상부(110)에 양방향 베어링(120)을설치한다. 그리고 상기 PC 빔(130) 상부에 상판(도면에 도시하지 않았음)이 장착되어 교량을 이룬다.As shown in Figure 2 and 3, the upper portion 110 has a horizontal length to some extent, the pier 100 which is installed based on the ground to the lower side is installed at a predetermined interval, the pier 100 Concrete PC beams 130 are arranged at regular intervals between the upper portions 110, and bidirectional bearings 120 are installed at upper portions 110 of the lower portions of the PC beams 130. In addition, an upper plate (not shown) is mounted on the PC beam 130 to form a bridge.
여기서, 상기 PC 빔(130)은 양측면에 일정간격 종(縱)방향으로 복수개의 홈(140)을 수직되게 형성하고, 상기 홈(140)간에는 홈(140)의 횡으로 관통한 복수개의 전단블록(150)을 끼운다. 그리고 상기 홈(140)간 및 상기 전단블럭(150)에 횡(橫)방향으로 적어나 하나이상의 홀(170)이 천공되고, 상기 홀(170)에 강선(180)을 삽입 고정하여 인장한다. 이때, 상기 홀(170)에 강선(180)을 삽입시 그로우팅(grouty) 공법을 이용하여 인장한다.Here, the PC beam 130 forms a plurality of grooves 140 vertically on both sides in the longitudinal direction at regular intervals, and a plurality of shear blocks penetrating the grooves 140 laterally between the grooves 140. Insert 150. In addition, less than one hole 170 is drilled in the transverse direction between the grooves 140 and the front end block 150, and the steel wire 180 is inserted into and fixed in the hole 170. At this time, when the steel wire 180 is inserted into the hole 170, it is tensioned using a grouty method.
이어, 상기 PC 빔(130)의 상부 양측에 형성된 걸림턱에 걸쳐지도록 복수개의 보조슬래브(190)를 일렬로 배설 형성한다. 이때, 상기 보조슬래브(190)는 일단에 암연결부, 타단에 수연결부가 형성되고, 상기 복수의 보조슬래브(190)가 일렬로 배설되도록 상기 일단의 암연결부에 다른 보조슬래브의 수연결부가 연결(200)되도록 형성한다.Subsequently, a plurality of auxiliary slabs 190 are disposed in a line so as to span the locking step formed on both sides of the upper portion of the PC beam 130. At this time, the auxiliary slab 190 has a female connecting portion at one end and a male connecting portion at the other end, and the male connecting portion of the other auxiliary slab is connected to the female connecting portion at one end so that the plurality of auxiliary slabs 190 are disposed in a line. 200) to form.
도 4와 같이 상기 보조슬래브(190)의 일단 및 타단에 형성된 암연결부와 수연결부는 단차를 갖도록 형성되고, 도 5와 같이 상기 보조슬래브(190)의 일단 및 타단에 형성된 암연결부와 수연결부는 서로 凹, 凸과 같은 형태로 형성되어 일렬로 배설 연결된다.The female connecting portion and the male connecting portion formed at one end and the other end of the auxiliary slab 190 as shown in FIG. 4 are formed to have a step, and the female connecting portion and the male connecting portion formed at one end and the other end of the auxiliary slab 190 as shown in FIG. It is formed in the form of 凹, 凸 and mutually excreted in a row.
그리고 상기 보조슬래브(190)내부는 종 방향으로 강선이 적어도 하나에서 셋 이상 갖는다.In addition, the auxiliary slab 190 has at least one to three or more steel wires in the longitudinal direction.
또한, 도 6과 같이 상기 보조슬래브(190) 내부는 와이어매쉬를 갖는 콘크리트이다.In addition, as shown in FIG. 6, the auxiliary slab 190 is concrete having a wire mesh.
이와 같이 상기 보조슬래브(190) 내부에 강선을 넣어 형성하므로 추후에 하중에 잘 견딜 수 있다.As such, the steel wire is put into the auxiliary slab 190 so that it can withstand the load later.
이상에서 설명한 바와 같이 본 발명의 보조슬래브를 구비한 교량 및 이 교량의 조립공법에 있어서는 다음과 같은 효과가 있다.As described above, in the bridge provided with the auxiliary slab of the present invention and the assembly method of the bridge, the following effects are obtained.
보조슬래브의 일단 및 타단을 단차 및 凹, 凸과 같은 형상으로 형성한 후, 복수개의 보조슬래브를 일렬로 배설 연결하므로 추후 하중에 잘 견딜 수 있다.One end and the other end of the auxiliary slab is formed in the shape of the step and 凹, 凸, and then a plurality of auxiliary slabs are arranged in a row to withstand later loads well.
그리고 적어도 하나에서 셋 이상의 강선 및 와이어매쉬을 내부에 갖는 콘크리트 보조슬래브이므로 추후 하중이 좋다.In addition, since the concrete auxiliary slab having at least one or more steel wires and wire meshes therein, the future load is good.
또한, PC 빔 홈간 및 전단블럭에 횡(橫)방향으로 적어나 하나이상의 천공된 홀에 강선을 삽입 고정한 후, 인장하므로 현장조립에 의한 전단블럭 형성시 그 시공이 보다 더 간편하고 시공기간을 단축시킬 수 있다.In addition, since the steel wire is inserted into and fixed in one or more perforated holes after being stretched in the lateral direction between the PC beam grooves and the shear block, the construction is simpler and shorter the construction time when forming the shear block by field assembly. You can.
그리고 강선으로 전단블럭을 고정하므로 더욱 안전하다.And the shear block is fixed with steel wire, so it is safer.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0061474A KR100378090B1 (en) | 2000-10-19 | 2000-10-19 | plate have a birdge and a method of construction therof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2000-0061474A KR100378090B1 (en) | 2000-10-19 | 2000-10-19 | plate have a birdge and a method of construction therof |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR2020000029131U Division KR200220893Y1 (en) | 2000-10-19 | 2000-10-19 | plate have a bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20020030953A KR20020030953A (en) | 2002-04-26 |
KR100378090B1 true KR100378090B1 (en) | 2003-04-07 |
Family
ID=19694256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2000-0061474A KR100378090B1 (en) | 2000-10-19 | 2000-10-19 | plate have a birdge and a method of construction therof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100378090B1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100669860B1 (en) | 2005-04-08 | 2007-01-16 | 이영희 | Asymmetry Pretensioning Precast Beam Girder- APP Beam Girder |
KR101071642B1 (en) | 2009-09-21 | 2011-10-11 | 브릿지테크놀러지(주) | Through bridge construction method by psc side beam and slab |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030028225A (en) * | 2001-09-27 | 2003-04-08 | (주)신성엔지니어링 | Method of construction for building prestressed concrete beam bridge using precast concrete block for cross beam |
KR100836079B1 (en) * | 2008-01-08 | 2008-06-09 | 주식회사 지구코퍼레이션 | Structure of precast half slab-girder unit and method constructing the slab of a bridge with it |
KR101033173B1 (en) * | 2010-01-21 | 2011-05-11 | 주식회사 태광피엔에스 | Movable stand for plate displayer |
-
2000
- 2000-10-19 KR KR10-2000-0061474A patent/KR100378090B1/en active IP Right Grant
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100669860B1 (en) | 2005-04-08 | 2007-01-16 | 이영희 | Asymmetry Pretensioning Precast Beam Girder- APP Beam Girder |
KR101071642B1 (en) | 2009-09-21 | 2011-10-11 | 브릿지테크놀러지(주) | Through bridge construction method by psc side beam and slab |
Also Published As
Publication number | Publication date |
---|---|
KR20020030953A (en) | 2002-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100986207B1 (en) | Precast psc t-type girder bridge and its construction method | |
KR100924746B1 (en) | Method for constructing precast coping by using multi-step tensioning | |
CN111321824B (en) | Prefabricated assembled concrete shear force wall of cross | |
JP2007262746A (en) | Bridge fall preventing structure | |
KR100378090B1 (en) | plate have a birdge and a method of construction therof | |
KR102040363B1 (en) | Slab joint construction method for bridges | |
KR101582599B1 (en) | Bridge construction method for forming continuous point part of pier using copping for connecting girder | |
KR100911148B1 (en) | Lightened Coping for bridge | |
JP2005256341A (en) | Corrugated steel-plate web u component bridge | |
KR101326170B1 (en) | Psc girder segment with connecting anchor block, psc girder and modular psc girder bridge construction method using the same | |
KR200220893Y1 (en) | plate have a bridge | |
KR101329443B1 (en) | Precast concrete frame and its construction method for buildings using precast concrete slab continued by post tensioning | |
KR20100007300A (en) | A steel composite bridge having steel plates connected by using concrete cross beams and its constructing method | |
KR100563787B1 (en) | Retaining wall structure composed of retaining-wall panel unit prestressed under interconnecting high intensity reinforcing rod installed in the panel unit with couplers so as to resist section strength and constructing method thereof | |
KR101824963B1 (en) | Hybrid composite girder and construction method therewith | |
CN214061942U (en) | Assembled beam column connection structure | |
KR100565359B1 (en) | Continuous Bridge Construction Method | |
KR200203448Y1 (en) | A pre-cast retaining wall | |
US20030061672A1 (en) | Bridge construction method and composite girder for use in same | |
KR102471342B1 (en) | Steel-concrete girder and construction method thereof | |
CN216238179U (en) | Be used for reinforced (rfd) precast anchor block structure of bridge case roof beam | |
KR100901499B1 (en) | Lightened Coping for bridge | |
KR200340935Y1 (en) | Composite Beam Stiffened with Prestressed Concrete Panel Having Embedded Lower Flange and Stepped Jacking Structure | |
KR20030013138A (en) | Filling crushed stone type retainingwall | |
CN215211529U (en) | Steel structure node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130409 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20140107 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20150112 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20170817 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20180411 Year of fee payment: 16 |
|
FPAY | Annual fee payment |
Payment date: 20190312 Year of fee payment: 17 |