KR100344236B1 KR1019990041630A KR19990041630A KR100344236B1 KR 100344236 B1 KR100344236 B1 KR 100344236B1 KR 1019990041630 A KR1019990041630 A KR 1019990041630A KR 19990041630 A KR19990041630 A KR 19990041630A KR 100344236 B1 KR100344236 B1 KR 100344236B1
Authority
KR
South Korea
Prior art keywords
anchor bolt
bridge
anchor
base plate
fastening
Prior art date
Application number
KR1019990041630A
Other languages
Korean (ko)
Other versions
KR19990084208A (en
Inventor
김선평
Original Assignee
리플래시기술 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 리플래시기술 주식회사 filed Critical 리플래시기술 주식회사
Priority to KR1019990041630A priority Critical patent/KR100344236B1/en
Publication of KR19990084208A publication Critical patent/KR19990084208A/en
Application granted granted Critical
Publication of KR100344236B1 publication Critical patent/KR100344236B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A method for installing and repairing a bridge seat by using an anchor bolt is provided to easily maintain and repair a bridge seat by only changing the damaged portion of an anchor bolt. CONSTITUTION: An anchor bolt(14) of a bridge seat is formed by connecting an upper anchor bolt(5) and a lower anchor bolt(6). A base plate(8) is inserted to a threaded portion of the upper anchor bolt. A washer(10) and a nut(9) are connected to the threaded portion of the upper anchor bolt. A bridge support(11) and an upper structure(12) of a bridge are installed on the base plate. When the bridge seat needs repairing, the support concrete is removed partially and only the upper anchor bolt is changed.

Description

상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법{Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt}Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt}

본 발명은 교량의 상판을 지지하는 교각 또는 교대의 상부에 설치되어 상판의 하중과 변형을 막아주는 교좌장치의 설치 및 보수공법에 관한 것이다. 더욱 구체적으로는 교좌장치의 앵커볼트를 상부 앵커볼트와 하부 앵커볼트가 서로 체결되도록 제작함으로서 어떠한 손상에 의하여 상기 교좌장치의 앵커볼트를 교체할 필요가 있는 경우 손상된 부분만 교체할 수 있도록 하여 교좌장치의 유지 및 보수가 용이하도록 한 교좌장치의 설치 및 보수공법에 관한 것이다.The present invention relates to a method for installing and repairing a bridge device installed on top of a bridge or a bridge supporting a top plate of a bridge to prevent load and deformation of the top plate. More specifically, by manufacturing the anchor bolt of the teaching device so that the upper anchor bolt and the lower anchor bolt are fastened to each other, when the anchor bolt of the teaching device is required to be replaced by any damage, only the damaged part can be replaced. The present invention relates to a method for installing and repairing a teaching device that facilitates maintenance and repair.

교좌장치는 교량의 상부, 하부 구조물의 접점으로서 보수점검이 행해지기 어려운 장소에 위치하는 것이 대부분이며 이에 따라 유지관리를 소홀히 하여 교좌장치의 손상을 그대로 방치하면 단순히 교좌장치 자체의 손상에 그치지 않고 상부, 하부구조물까지 악영향을 미치게되어, 교좌장치의 설치 및 그 보수가 매우 중요하다. 이러한 교좌장치의 손상을 피해 형태별로 보면 교좌장치용 앵커볼트의 인발, 굴곡, 전단에 의한 경우가 주종을 이룬다.Most of the device is located in a place where maintenance inspection is difficult to be performed as the contact point of the upper and lower structures of the bridge. Accordingly, if the neglect of the device is left unnecessarily due to neglect of maintenance, the device is not simply damaged by the device itself. As a result, the lower structure is adversely affected, so the installation and repair of the teaching device are very important. In order to avoid damage of such a device, the type of anchor bolt for the device is mainly caused by drawing, bending, and shearing.

도1A는 종래의 교좌장치의 설치 및 보수공법의 구체예를 나타낸 구성도로서, 교대나 교각의 코핑부의 상부 면에 기 형성된 다수개의 구멍에 종래의 교좌장치용 앵커볼트를 삽입한 후 무수축 몰탈로 받침콘크리트(7)를 타설하고, 교좌장치의 베이스 플레이트(8)를 상기 앵커볼트에 삽입하고, 상기 베이스 플레이트 상부에 와샤 및 너트(9)를 상기 앵커볼트에 체결시켜 교좌장치를 설치한다.Figure 1A is a configuration diagram showing a specific example of the installation and repair method of the conventional stabilization device, the conventional shrinkage mortar after inserting the conventional anchor bolt for the stabilization device in a plurality of holes formed in the upper surface of the coping portion of the alternating or piers The bearing concrete 7 is poured into the base plate, and the base plate 8 of the seating device is inserted into the anchor bolt, and the washer and nut 9 are fastened to the anchor bolt on the base plate to install the seating device.

상기 종래의 교좌장치의 보수공법은 교좌장치용 앵커볼트(1)가 매립된 받침콘크리트(7) 전체를 깨고, 손상된 앵커볼트를 새로운 종래의 앵커볼트로 교체하고, 받침 콘크리트를 타설하여 교좌장치를 보수한다. 이러한 보수공법은 기존의 매립된 철근을 손상시킴으로서 교각 또는 교대의 코핑부에 구조적 결함이 생기는 치명적인 문제점이 있어 현재는 거의 사용되지 않는 공법이다.The repairing method of the conventional teaching apparatus breaks the entire support concrete (7) in which the anchor bolt (1) for the teaching apparatus is embedded, replaces the damaged anchor bolt with a new conventional anchor bolt, and installs the supporting apparatus by pouring the supporting concrete. Repair. This repair method is a method that is rarely used at present because there is a fatal problem of structural defects in the coping portion of the bridge or alternating by damaging the existing buried rebar.

도1B는 종래의 교좌장치의 설치 및 보수공법의 다른 구체예를 나타낸 구성도로서, 그 설치방법은 도1A에서 도시된 바와 동일하다.Figure 1B is a configuration diagram showing another specific example of the installation and maintenance method of the conventional teaching apparatus, the installation method is the same as shown in Figure 1A.

상기 종래의 교좌장치의 보수공법은 교좌장치용 앵커볼트가 매립된 받침콘크리트(7)전체가 아닌 소량만 깨고, 손상된 앵커볼트(1) 일부분만을 절단하여 제거하고, 그 절단부 상부에 새로운 종래의 앵커볼트를 용접하고, 받침 콘트리트를 타설하여 교좌장치를 보수한다. 이러한 보수공법은 받침 콘크리트를 소량 제거하고 기존의 매립된 앵커볼트를 이용한다는 점에서는 장점이 있다.The conventional repairing method of the teaching device is broken only a small amount of the anchor concrete (7), the anchor bolt for the seating device is not embedded, and only a portion of the damaged anchor bolt (1) is cut off and removed, the new conventional anchor on the cut portion Weld bolts and cast bearing concrete to repair the bridge system. This repair method has advantages in that it removes a small amount of supporting concrete and uses existing embedded anchor bolts.

도1C는 종래의 교좌장치의 설치 및 보수공법의 또 다른 구체예를 나타낸 구성도로서, 그 설치방법은 도1A에서 도시된 바와 동일하다.Figure 1C is a configuration diagram showing another specific example of the installation and maintenance method of the conventional teaching apparatus, the installation method is the same as shown in Figure 1A.

상기 종래의 교좌장치의 보수공법은 교좌장치용 앵커볼트가 매립된 받침콘크리트 (7)전체가 아닌 소량만 깨고, 손상된 앵커볼트(1) 일부분만을 절단하여 제거하고, 그 절단부위에 보강철판(2)과 보강철근(3)을 설치하고, 상기 보강철판(2)과 보강철근(3)에 기존의 앵커볼트 및 새로운 앵커볼트를 용접하여 연결하고, 받침 콘크리트를 타설하여 교좌장치를 보수한다. 이러한 보수공법은 받침 콘크리트를 소량 제거하고 기존의 매립된 앵커볼트를 이용하면서 새로운 앵커볼트의 설치위치를 조정할 수 있다는 점에 장점이 있다.The conventional repairing method of the teaching device is broken only a small amount, not the whole of the supporting concrete (7) in which the anchor bolt for the teaching device is embedded, cut only a portion of the damaged anchor bolt (1) and remove the reinforcing steel plate (2) ) And the reinforcing bar (3), the existing anchor bolt and the new anchor bolt to the reinforcing steel plate (2) and the reinforcing bar (3) is connected, and the supporting concrete is repaired by pouring the supporting concrete. This repair method has an advantage in that it is possible to adjust the installation position of the new anchor bolt while removing a small amount of supporting concrete and using the existing buried anchor bolt.

상기 세가지 종래의 교좌장치의 보수공법은 새로이 설치되는 앵커볼트가 사실상 수직으로 설치되기 어렵다. 기존의 앵커볼트(1)에 새로운 앵커볼트를 용접하여 설치하거나 앵커볼트 전체를 새로 설치할 때 정확하게 수직상태를 유지하기 어렵기 때문이다. 따라서 새로운 교좌장치를 교체할 때 앵커볼트를 절곡하는 경우가 많아 상부구조물(12)을 지지하는 지점이 달라져 보수한 교좌장치 뿐만 아니라 상·하부 구조물에 구조적으로 악영향을 끼칠 우려가 있으며, 교좌장치 보수작업의 특성상 작업공간이 협소하여 받침콘크리트를 깨는 양이 많아 보강철근을 많이 이용해야할 경우 또는 무수축 몰탈 타설량이 많을 경우 보수작업 자체가 어려운 문제점이 있다.In the repairing method of the three conventional teaching apparatus, the anchor bolt newly installed is virtually difficult to install vertically. This is because when the new anchor bolt is installed by welding to the existing anchor bolt (1) or when the entire anchor bolt is newly installed, it is difficult to maintain the vertical state exactly. Therefore, the anchor bolt is often bent when replacing a new chair, and the point of supporting the upper structure 12 is changed, which may structurally adversely affect the upper and lower structures as well as the repaired chair. Due to the nature of the work, there is a problem that the repair work itself is difficult when there is a large amount of breaking the supporting concrete due to the narrow working space or when a large amount of rebar is used or when the amount of non-contraction mortar is poured.

본 발명의 목적은 교좌장치용 앵커볼트의 자체의 설계, 제작, 시공 및 유지관리가 미비하거나 지진 또는 하부구조의 예상 밖의 변위 등 뜻밖의 재해가 원인이 되어 상기 교좌장치용 앵커볼트가 손상되는 경우, 그 손상부위가 받침 콘크리트 철거면 부위가 되도록 하여 앵커볼트의 보수작업을 용이하게 하고 앵커볼트의 정밀시공이 가능한 교좌장치의 설치 및 보수공법을 제공하는 것이다. 즉, 본 발명의 교좌장치용 앵커볼트의 상부 앵커볼트와 하부 앵커볼트가 체결되는 부위의 대략 중간부분이 받침 콘크리트 철거면에 걸치도록 설치하여 상기원인에 의한 교좌장치용 앵커볼트의 손상부위를 받침 콘크리트 철거면에 가깝도록 하는 것이다. 결국 기존의 받침 콘크리트를 깨어야 할 부분을 최소화하고, 기존의 철근 손상을 최소화하고, 새로 설치해야할 앵커볼트의 길이를 최소화함으로서 앵커볼트를 최대한 수직으로 설치할수 있게 하여 앵커볼트의 정밀한 시공을 제공하는 것이다. 손상된 상부 앵커볼트만을 교체하고 상기 하부 앵커볼트는 기존의 것을 그대로 이용하는 경우에 고강도의 특수강을 이용하면 하부 앵커볼트를 반영구적으로 이용할 수 있을 뿐 만 아니라 상기 하부 앵커볼트의 최하단에 돌기를 설치하여 앵커볼트의 인발을 최소화 할 수 있다.An object of the present invention is the case that the anchor bolt for the chair device is damaged due to the design, manufacture, construction and maintenance of the anchor bolt for the chair device is insufficient or an unexpected disaster such as an earthquake or unexpected displacement of the substructure. In order to facilitate the repair work of the anchor bolts and to provide a method for installing and repairing the anchoring device, it is possible to facilitate the repair work of the anchor bolts, so that the damaged part becomes the portion of the concrete demolished surface. In other words, the middle part of the part anchoring the upper anchor bolt and the lower anchor bolt of the anchor bolt for the seating device of the present invention is installed so as to span the supporting concrete demolition surface to support the damaged part of the anchor bolt for the seating device due to the above cause. It is to be close to the concrete demolished surface. As a result, it is possible to install anchor bolts as vertically as possible by minimizing the part to break existing supporting concrete, minimizing damage of existing rebar, and minimizing the length of anchor bolts to be newly installed, thereby providing precise construction of anchor bolts. will be. If only the damaged upper anchor bolt is replaced and the lower anchor bolt uses the existing one as it is, using high-strength special steel not only can use the lower anchor bolt semi-permanently, but also installs a projection at the bottom of the lower anchor bolt to anchor bolt. Minimize the drawing.

본 발명의 다른 목적은 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치 설치 후 어떠한 손상에 의하여 앵커볼트를 교체할 필요가 있는 경우, 손상 부위가 주로 상부·하부 앵커볼트 체결부이기 때문에 상기 상부 앵커볼트만 교체하고 상기 하부 앵커볼트는 그대로 이용할 수 있게 함으로서 작업공간 협소에 의한 보수작업의 지연을 최대한 단축하고 공사비를 절감하기 위한 것이다.Another object of the present invention is that if the anchor bolt needs to be replaced by any damage after the installation of the chair using the anchor bolt fastened to the upper and lower anchor bolts of the present invention, the damaged part is mainly the upper and lower anchor bolt fastening parts. This is to replace only the upper anchor bolt and to use the lower anchor bolt as it is to shorten the delay of the maintenance work by the narrow working space as much as possible to reduce the construction cost.

본 발명의 또 다른 목적은 종래의 앵커볼트로 설치된 교좌장치의 보수시 본발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용하여 보수하는 수단을 제공하는 것이다. 기 설치된 앵커볼트 보수시 손상된 부분까지만 앵커볼트를 절단한 뒤 그 절단 부위에 수나사산을 형성하여 본 발명의 앵커볼트의 암나사산이 형성된 새로운 상부 앵커볼트에 체결함으로서 용이한 보수작업을 제공하는 것이다. 상기 수나사산을 작업공간의 협소로 인하여 형성하기 어려운 경우에는 본 발명의 암나산이 형성되지 않은 새로운 상부 앵커볼트에 손상된 부분이 절단된 종래의 앵커볼트를 삽입한 후 연결부위를 용접할 수 있다.Still another object of the present invention is to provide a means for repairing using anchor bolts to which upper and lower anchor bolts of the present invention are fastened when repairing a device installed with a conventional anchor bolt. The anchor bolt is cut only to the damaged part when repairing the previously installed anchor bolt to form a male thread on the cutting site to provide easy repair work by fastening to the new upper anchor bolt in which the female thread of the anchor bolt of the present invention is formed. When it is difficult to form the male thread due to the narrow working space, the connection part may be welded after inserting a conventional anchor bolt in which a damaged part is cut into a new upper anchor bolt in which the female thread of the present invention is not formed.

도1A는 종래의 앵커볼트를 이용한 교좌장치의 설치 및 보수공법에 관한 제1구체예를 나타낸 구성도이다Figure 1A is a configuration diagram showing a first specific example of the installation and maintenance method of the bridge device using a conventional anchor bolt.

도1B는 종래의 앵커볼트를 이용한 교좌장치의 설치 및 보수공법에 관한 제2구체예를 나타낸 구성도이다Figure 1B is a configuration diagram showing a second embodiment of the installation and maintenance method of the bridge device using a conventional anchor bolt.

도1C는 종래의 앵커볼트를 이용한 교좌장치의 설치 및 보수공법에 관한 제3구체예를 나타낸 구성도이다Figure 1C is a configuration diagram showing a third embodiment of the installation and maintenance method of the bridge device using a conventional anchor bolt

도2는 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법의 구체예를 나타낸 구성도이다.Figure 2 is a block diagram showing a specific example of the installation and repair method of the bridge device using the anchor bolt fastened the upper and lower anchor bolt of the present invention.

도3은 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치 를 구성하는 상부 앵커볼트 및 하부 앵커 볼트의 구체예의 단면도이다.Figure 3 is a cross-sectional view of a specific example of the upper anchor bolt and the lower anchor bolt constituting the bridge device using the anchor bolt fastened to the upper and lower anchor bolt of the present invention.

도4는 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치를 구성하는 상부 앵커볼트 및 하부 앵커 볼트의 다른 구체예의 단면도이다.Figure 4 is a cross-sectional view of another embodiment of the upper anchor bolt and the lower anchor bolt constituting the chair apparatus using the anchor bolt fastened to the upper and lower anchor bolt of the present invention.

도5A 및 도5B는 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한교좌장치를 구성하는 상부 앵커볼트의 앵커체결부의 구체예를 나타낸 측면도, 평면도 및 사시도이다.Figures 5A and 5B are side, top and perspective views showing a specific example of the anchoring portion of the upper anchor bolt constituting the assembly device using the anchor bolt fastened to the upper and lower anchor bolt of the present invention.

<도면의 부호에 대한 간단한 설명><Short description of the symbols in the drawings>

5: 상부 앵커볼트 6: 하부 앵커볼트5: Upper anchor bolt 6: Lower anchor bolt

7: 받침 콘크리트 8: 베이스 플레이트7: supporting concrete 8: base plate

11: 교량받침 12: 교량의 상부구조물11: bridge bearing 12: superstructure of bridge

본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법의 구체예를 도면을 참조로 상세히 설명한다.Specific examples of the installation and repair method of the teaching apparatus using the anchor bolt fastened to the upper and lower anchor bolt of the present invention will be described in detail with reference to the drawings.

도2는 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법의 구체예를 나타낸 구성도로서, 본 발명의 교좌장치는 수직으로 기 형성된 다수개의 구멍(4), 상기 구멍(4)에 매입된 앵커볼트(14), 받침 콘크리트(7), 베이스 플레이트(8), 와샤(10)와 너트(9), 교량받침(11) 및 교량의 상부구조물(12)로 구성된다.Figure 2 is a configuration diagram showing a specific example of the installation and repair method of the teaching apparatus using the anchor bolt fastened the upper and lower anchor bolts of the present invention, the teaching apparatus of the present invention is a plurality of pre-formed holes (4) Anchor bolts 14, support concrete (7), base plate (8), washer (10) and nut (9), bridge support (11) and bridge superstructure (12) embedded in the hole (4) It consists of.

상기 구멍(4)은 교대 또는 교각의 코핑부(13)의 상부에 기 형성된 것이며 상기 앵커볼트(14)를 삽입하여 고정하기 위한 것이다. 단지간의 교량인 경우에는 하나의 교좌장치당 2개 또는 장지간의 교량인 경우에는 6개 이하로 형성된다. 상기 교대 또는 교각은 교량의 상부구조물(12)을 지지하는 교량의 하부구조물로서 원형또는 타원형의 형상이다.The hole 4 is pre-formed in the upper portion of the coping portion 13 of the alternating or pier to insert and fix the anchor bolt (14). In the case of bridges between complexes, the number of bridges is 2 or less than 6 per bridge device. The alternating or pier is circular or oval shaped as the substructure of the bridge supporting the superstructure 12 of the bridge.

상기 앵커볼트(14)는 교좌장치의 베이스 플레이트(8)를 받침 콘크리트(7)에 고정시키기 위한 것이며, 상부 앵커볼트(5)와 하부 앵커볼트(6)로 구성된다. 상기 상부 앵커볼트(5)는 나사부(15)와 앵커체결부(22)로 연속하여 형성되고, 상기 하부 앵커볼트(6)는 수나사산이 형성되어 있는 상단부(18)와 교대 또는 교각의 다수개의 구멍(4)에 삽입되는 앵커바 형상의 하단부(19)로 구분된다.The anchor bolt 14 is for fixing the base plate (8) of the stapling device to the supporting concrete (7), and consists of an upper anchor bolt (5) and a lower anchor bolt (6). The upper anchor bolt (5) is formed continuously in the threaded portion 15 and the anchor fastening portion 22, the lower anchor bolt 6 is a plurality of alternating or piers with the upper end 18, the male thread is formed The lower portion 19 of the anchor bar shape is inserted into the hole (4).

상기 나사부(15)는 외주면에 수나사산이 형성된다. 상기 앵커체결부(22)는 상기 나사부(15)에 연속하여 형성되고, 상기 나사부(15)보다 큰 직경을 지니고, 단부에는 상기 하부 앵커볼트(6)가 삽입되어 체결될수 있도록 암나사산이 형성된 중공(17)이 형성된다.The screw portion 15 is formed with a male thread on the outer peripheral surface. The anchor fastening portion 22 is formed continuously to the screw portion 15, has a larger diameter than the screw portion 15, the end of the hollow formed with a female thread so that the lower anchor bolt 6 can be inserted and fastened ( 17) is formed.

상기 받침 콘크리트(7)는 교좌장치를 지지하기 위한 것이며 주로 무수축 몰탈이 이용되며 상기 상부 앵커볼트(5)의 앵커체결부(22) 까지 소정의 형상으로 타설된다.The supporting concrete (7) is for supporting the stabilization device and mainly non-shrink mortar is used and is poured in a predetermined shape up to the anchor fastening portion 22 of the upper anchor bolt (5).

상기 베이스 플레이트(8)는 교량받침(11)의 하부 플레이트와 일체로 형성되어 받침 콘크리트(7)에 교량받침(11)을 고정시키기 위한 것으로 원형 또는 4각형으로 형성된다.The base plate 8 is formed integrally with the lower plate of the bridge support 11 to fix the bridge support 11 to the support concrete 7 and is formed in a circular or quadrangular shape.

상기 너트(9)는 상기 베이스 플레이트(8)를 상기 받침 콘크리트(7)에 고정하기 위한 것으로 상기 상부 앵커볼트(5)의 나사부(15)에 체결되며 소정의 각형으로 형성된다.The nut (9) is for fixing the base plate (8) to the supporting concrete (7) is fastened to the screw portion 15 of the upper anchor bolt (5) is formed in a predetermined square.

상기 와샤(10)는 상기 너트(9) 하부의 나사부(15)에 삽입되며 통상 원형으로형성된다.The washer 10 is inserted into the threaded portion 15 below the nut 9 and is usually formed in a circular shape.

상기 교량받침(11)은 교량의 상부구조물의 변위, 진동을 완료시키기 위한 것이며, 하부 플레이트, 중간재, 상부 플레이트, 소울 플레이트(Sole plate)로 구성된다. 상기 하부 플레이트는 베이스 플레이트(8) 와 중간재를 일체화시키기 위해 그 사이에 삽입되고, 상기 하부 세팅볼트로 체결되며 원형 또는 소정의 각형으로 형성된다. 상기 중간재는 교량받침이 포트베어링 타입 또는 패드슈 타입인가에 따라 달라지며 통상 패드슈 타입이 이용된다. 상기 상부 플레이트는 상기 중간재와 일체로 형성되어 교량의 주행에 교량받침을 고정시키기 위한 것으로 원형 또는 소정의 각형으로 형성된다. 상기 소울 플레이트는 상기 상부 플레이트와 교량의 바닥 슬래브 밑에 설치되는 주행을 일체화시키기 위해 그 사이에 삽입되고 상부 세팅 볼트로 체결되며 원형 또는 소정의 각형으로 형성된다.The bridge support 11 is for completing the displacement and vibration of the upper structure of the bridge, and consists of a lower plate, an intermediate material, an upper plate, and a sole plate. The lower plate is inserted therebetween to integrate the base plate 8 and the intermediate member, is fastened with the lower setting bolt, and is formed in a circular or predetermined square shape. The intermediate material depends on whether the bridge bearing is a port bearing type or a pad shoe type, and a pad shoe type is usually used. The upper plate is formed integrally with the intermediate member to fix the bridge support to the running of the bridge is formed in a circular or predetermined square. The soul plate is inserted therebetween and fastened with an upper setting bolt to form a circle or a predetermined square to integrate the run installed under the bottom slab of the bridge with the top plate.

상기 교량의 상부구조물(12)은 교량의 바닥 슬래브를 지지하기 위한 주로 PC 보 또는 강재보가 이용되는 주행(Girder)으로서 상기 바닥 슬래브 하부에 설치된다. 통상 상기 바닥 슬래브를 플랜지로 하는 T형 단면의 형상이다.The superstructure 12 of the bridge is installed under the floor slab as a guide (Girder) in which a PC beam or steel beam is mainly used for supporting the floor slab of the bridge. Usually, it is a shape of T-shaped cross section which uses the said bottom slab as a flange.

도3은 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치를 구성하는 앵커볼트의 구체예의 단면도이다. 상기 앵커볼트는 상부·하부 앵커볼트로 구성된다.Figure 3 is a cross-sectional view of a specific example of the anchor bolt constituting the bridge device using the anchor bolt fastened to the upper and lower anchor bolt of the present invention. The anchor bolt is composed of an upper, lower anchor bolt.

상기 상부 앵커볼트(5)는 일정한 길이와 동일한 방향을 이루면서 형성되는 원통체로서, 이분하여 일 단부에는 나사부(15)가 형성되고, 타 단부에는 원통형상의 앵커체결부(22)가 형성된다.The upper anchor bolt (5) is a cylindrical body formed in the same direction as a predetermined length, divided into two screw portion 15 is formed at one end, a cylindrical anchoring portion 22 is formed at the other end.

상기 나사부(15)는 대체적으로 전체 길이의 1/3 정도를 차지하게 되며, 외주면에 수나사산이 형성된다. 또한 교좌장치의 베이스 플레이트(8)를 조이기 위해 너트(9) 및 와샤(10)가 형성된다.The screw portion 15 generally occupies about one third of the total length, and male threads are formed on the outer circumferential surface. A nut 9 and washer 10 are also formed to tighten the base plate 8 of the pedestal device.

상기 원통형상의 앵커체결부(22)는 상기 나사부(15)보다 큰 직경을 이루고, 상기 나사부(15)의 일 측면에 동심원상을 이루면서 연속하여 형성되며, 전체 길이의 2/3 정도를 차지하여 형성된다. 또한 상기 원통형상의 앵커체결부(22)의 끝단에는 하부 앵커볼트(6)가 삽입되어 체결할 수 있도록 일정한 길이와 내경을 지니고, 상기 나사부(15)와 동심원상을 이루고, 내주면에는 암나사산이 형성되어 있는 중공(17)이 형성된다.The cylindrical anchoring portion 22 has a larger diameter than the screw portion 15, is formed continuously in a concentric shape on one side of the screw portion 15, and occupies about 2/3 of the total length do. In addition, the end of the cylindrical anchoring portion 22 has a constant length and inner diameter so that the lower anchor bolt 6 is inserted into and fastened, forming a concentric shape with the screw portion 15, the internal thread is formed with a female thread Hollow 17 is formed.

상기 하부 앵커볼트(6)는 일정한 길이와 동일한 방향을 이루며 상기 상부 앵커볼트(5)와 동심원상을 이루며 형성된다. 이분하여 상단부(18)는 상기 원통형상의 앵커체결부(22)와 체결될수 있도록 외주면에 수나사산이 형성되고, 하단부(19)는 앵커바 형상이며 교각 또는 교대의 코핑부(13) 와 받침 콘크리트(7)에 매립된다.The lower anchor bolt 6 forms the same direction as a predetermined length and is formed concentrically with the upper anchor bolt 5. The upper portion 18 is formed with a male thread on the outer circumferential surface to be fastened to the cylindrical anchoring portion 22, and the lower portion 19 is an anchor bar shape, the pier or alternating coping portion 13 and the supporting concrete ( Buried in 7).

도4는 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치를 구성하는 앵커볼트의 다른 구체예의 단면도이다. 상기 앵커볼트는 상부·하부 앵커볼트로 구성된다.Figure 4 is a cross-sectional view of another embodiment of the anchor bolt constituting the bridge device using the anchor bolt fastened to the upper and lower anchor bolt of the present invention. The anchor bolt is composed of an upper, lower anchor bolt.

상기 상부 앵커볼트(5)는 일정한 길이와 동일한 방향을 이루면서 형성되는 원통체로서, 이분하여 일 단부에는 나사부(15)가 형성되고, 타 단부에는 원통형상의 앵커체결부(22)가 형성된다. 나사부(15)는 도3에서 도시된 바와 같다.The upper anchor bolt (5) is a cylindrical body formed in the same direction as a predetermined length, divided into two screw portion 15 is formed at one end, a cylindrical anchoring portion 22 is formed at the other end. The threaded portion 15 is as shown in FIG.

상기 원통형상의 앵커체결부(22)는 상기 나사부(15) 보다 큰 직경을 이루고, 상기 나사부(15)의 일 측면에 동심원상을 이루면서 연속하여 형성되며, 전체 길이의 2/3 정도를 차지하여 형성된다.The cylindrical anchoring portion 22 has a larger diameter than the screw portion 15, and is continuously formed while forming concentric circles on one side of the screw portion 15, and occupies about 2/3 of the total length. do.

상기 원통형상의 앵커체결부(22)의 끝단에는 상기 하부 앵커볼트(6)가 삽입되어 체결할 수 있도록 일정한 길이와 내경을 지니고, 상기 나사부(15)와 동심원상을 이루고, 내주면에는 암나사산이 형성되지 않은 중공(17)이 형성된다. 기존의 앵커볼트를 본 발명의 앵커볼트(14)를 이용하여 보수 시, 작업공간의 협소로 인하여 상기 기존의 앵커볼트의 상단부에 수나사산을 형성하기 어려운 경우에 이용되며 그 연결부위는 용접된다. 하부 앵커볼트(6)는 도3에서 도시된 바와 같다.The lower end of the cylindrical anchoring portion 22 has a predetermined length and inner diameter so that the lower anchor bolt (6) is inserted and fastened, forming a concentric circle with the screw portion 15, the inner thread surface is not formed with a female thread Hollow 17 is formed. When repairing the existing anchor bolt using the anchor bolt 14 of the present invention, it is used in the case that it is difficult to form a male thread on the upper end of the existing anchor bolt due to the narrowing of the working space and the connection portion is welded. The lower anchor bolt 6 is as shown in FIG.

도5A 및 도5B는 상부 앵커볼트(5)의 앵커체결부(22)의 수평단면형상이 원통형상 이외의 4각 또는 소정의 각형으로 형성된 구체예를 나타낸 측면도, 평면도 및 사시도이다. 또한 상기 상부 앵커볼트(5)의 앵커체결부(22)의 외주면 양단부중 어느 한 단부에 상부 앵커볼트(5)를 하부 앵커볼트(6)에 체결할 수 있도록 볼트머리가 소정의 각형으로 형성될 수 있다. 통상 상기 상부 앵커볼트(5)의 앵커체결부(22)에 형성된 볼트머리를 렌치로 돌려 상부 앵커볼트(5)를 하부 앵커볼트(6)에 체결시키며 효과적인 체결을 위해 상기 앵커체결부(22)의 형상을 소정의 각형으로 형성할 수 있다.5A and 5B are a side view, a plan view, and a perspective view showing a specific example in which the horizontal cross-sectional shape of the anchoring portion 22 of the upper anchor bolt 5 is formed in a quadrangular or predetermined square other than a cylindrical shape. In addition, the bolt head may be formed in a predetermined square so as to fasten the upper anchor bolt 5 to the lower anchor bolt 6 at either end of the outer peripheral surface of both ends of the anchor fastening portion 22 of the upper anchor bolt 5. Can be. In general, the bolt head formed on the anchor fastening portion 22 of the upper anchor bolt 5 is fastened by a wrench to fasten the upper anchor bolt 5 to the lower anchor bolt 6, and the anchor fastening portion 22 for effective fastening. The shape of can be formed into a predetermined square.

본 발명의 교좌장치용 앵커볼트(14)의 설치는 도2에서 도시된 바와 같이, 교대 및 교각의 상부면에 수직으로 기 형성된 구멍(4)에 앵커볼트(14)를 삽입한다. 상기 앵커볼트(14)가 수직으로 설치되도록 하부 앵커볼트(6)를 먼저 상기 구멍(4)에 삽입하고, 무수축몰탈로 고정시키고, 상부 앵커볼트(5)를 체결한다. 상기 상부 앵커볼트(5)에는 외주면에 볼트머리(16)가 형성되어 있어 체결하기가 용이하다.Installation of the anchor bolt 14 for the stabilization device of the present invention, as shown in Figure 2, the anchor bolt 14 is inserted into the hole (4) pre-formed perpendicular to the upper surface of the alternating and piers. The anchor bolt 14 is first inserted into the hole 4 so that the anchor bolt 14 is installed vertically, fixed with non-shrink mortar, and the upper anchor bolt 5 is fastened. The upper anchor bolt 5 has a bolt head 16 is formed on the outer circumferential surface to facilitate fastening.

상기 상부 앵커볼트(5)의 앵커체결부(22)까지 받침 콘크리트(7)를 타설한다.Place the supporting concrete (7) up to the anchoring portion (22) of the upper anchor bolt (5).

상기 상부 앵커볼트(5)의 앵커체결부(22)의 대략 중간부위가 받침 콘크리트 철거면(20)에 걸치도록 시공 해야한다. 받침 콘크리트 철거면(20)에 상기 상부 앵커볼트(5)의 앵커체결부(22)가 걸치도록 하면 상기 앵커볼트(14)가 앵커볼트의 자체의 하자 또는 지진 등으로 손상되는 경우 그 손상부위가 앵커볼트의 구조상 주로 상기 상부 앵커볼트(5)의 앵커체결부(22)의 대략 중간부위가 되기 때문에 소량의 받침 콘크리트(7)만 철거하고 상기 상부 앵커볼트(5)를 교체할 수 있기 때문이다.Roughly the middle portion of the anchor fastening portion 22 of the upper anchor bolt (5) should be constructed so as to span the supporting concrete demolition surface (20). When the anchor fastening portion 22 of the upper anchor bolt 5 is supported on the concrete demolition surface 20, the damaged part is damaged when the anchor bolt 14 is damaged by the defect or the earthquake of the anchor bolt itself. This is because the structure of the anchor bolt is mainly about the middle part of the anchor fastening portion 22 of the upper anchor bolt 5, so that only a small amount of the supporting concrete 7 can be removed and the upper anchor bolt 5 can be replaced. .

받침 콘크리트(7)가 소정의 강도에 도달하면 교좌장치의 베이스 플레이트(8)를 상부 앵커볼트(5)의 나사부(15)에 삽입하고 상기 너트(9) 및 와샤(10)로 고정시킨다.When the supporting concrete 7 reaches the predetermined strength, the base plate 8 of the stabilization device is inserted into the threaded portion 15 of the upper anchor bolt 5 and fixed with the nut 9 and the washer 10.

상부 플레이트, 중간재 및 하부 플레이트가 일체로 형성된 교량받침(11)을 상기 베이스 플레이트(8)에 하부 세팅볼트로 고정시킨다.The bridge support 11 in which the upper plate, the intermediate member and the lower plate are integrally fixed to the base plate 8 with the lower setting bolt.

통상 상부 플레이트 상부에 직접 교량의 주행(Girder)을 거치시키고 상부 세팅볼트로 고정시키지만, 상기 교량이 경사지거나 굴곡이 된 경우에는 사이에 소울 플레이트(Sole plate)를 삽입하여 상기 주행과 상기 상부 플레이트가 밀착되어 일체가 되도록 한다.Normally, the bridge (Girder) is mounted directly on the upper plate and fixed with the upper setting bolt. However, when the bridge is inclined or curved, a sole plate is inserted between the driving and the upper plate. To be in close contact with one another.

본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 보수공법은, 주행(Girder) 받침용 보강재 및 임시받침을 설치하고, 상기 주행을 유압식 잭으로 들어올리고, 기존의 교좌장치 및 소울 플레이트(Sole plate)를 철거하고, 받침 콘크리트를 콘크리트 철거면 까지 소량 철거한다. 따라서 기존에 매립된 철근의 손상을 최소화 할 수 있으며 보강철근을 배근 하여 상기 철근의 손상을 보완할 수 있다. 손상된 상부 앵커볼트만을 제거하고, 암나사산이 중공에 형성된 새로운 상부 앵커볼트를 기존의 하부 앵커볼트에 체결한다. 이러한 보수공법은 교체작업이 용이하고, 새로운 앵커볼트의 길이를 최소화 할 수 있어 수직으로 설치하기가 용이하여 앵커볼트의 정밀시공이 가능하고, 받침 콘크리트(7)를 소량만 철거하므로 보수작업 공기가 단축되고 공사비도 절감할 수 있다.Repair method of the teaching apparatus using the anchor bolt fastened to the upper and lower anchor bolts of the present invention, by installing a reinforcement for the support (Girder) and the temporary support, lifting the driving with a hydraulic jack, the existing teaching apparatus and Remove the Sole plate and a small amount of supporting concrete to the concrete demolition surface. Therefore, damage to the existing reinforcement can be minimized, and reinforcing bars can be reinforced to compensate for the damage of the reinforcing bars. Only the damaged upper anchor bolt is removed, and a new upper anchor bolt with a female thread formed in the hollow is fastened to the existing lower anchor bolt. This repair method is easy to replace, and the length of the new anchor bolt can be minimized, so it is easy to install vertically, so that the anchor bolt can be precisely installed, and only a small amount of supporting concrete (7) is removed to repair air. It can be shortened and construction cost can be reduced.

상기 새로운 상부 앵커볼트(5)의 앵커체결부(22)까지 받침 콘크리트를 타설하고 소정의 강도를 가질 때까지 양생한 후 베이스 플레이트(8)를 설치하고, 너트(9) 및 와샤(10)로 상기 베이스 플레이트(8)를 고정시킨다. 새로운 받침을 설치한 후 주행을 내려 보수작업을 완료한다.After placing the supporting concrete to the anchoring portion 22 of the new upper anchor bolt 5 and curing it until it has a predetermined strength, the base plate 8 is installed, and the nut 9 and the washer 10 are installed. The base plate 8 is fixed. After installing the new feet, drive down to complete the maintenance work.

종래의 앵커볼트로 설치된 교좌장치의 보수시 본 발명의 앵커볼트를 이용하는 보수공법은 먼저 주행 받침용 보강재 및 임시받침을 설치하고, 상기 주행을 유압식 잭으로 들어올리고, 기존의 교량받침 및 소울 플레이트(Sole plate)를 철거하고, 받침 콘크리트를 앵커볼트 손상부위까지 철거한다.Repairing method using the anchor bolt of the present invention when repairing the bridge device installed with a conventional anchor bolt, first install the reinforcement and temporary support for the driving support, lifting the run with a hydraulic jack, the existing bridge support and soul plate ( Remove the sole plate and remove the supporting concrete to the anchor bolt damage area.

손상된 종래의 앵커볼트를 손상부위 까지만 절단하고, 절단된 종래의 앵커볼트의 상단부에 수나사산을 형성시킨 후 단부에 암나사산이 형성된 새로운 상부 앵커볼트(5)를 체결하거나, 상기 상단부에 수나사산을 형성하기 어려운 경우에는 절단된 종래의 앵커볼트의 상부를 그라인더로 표면처리 한 뒤 단부에 암나사산이 형성되지 않은 새로운 상부 앵커볼트(5)에 삽입한 후 상기 상부 앵커볼트의 앵커체결부(22)의 연결부위는 용접한다. 이러한 보수공법은 교체작업이 용이하고, 새로운 앵커볼트를 수직으로 재 설치하기가 용이하여 앵커볼트의 정밀시공이 가능하다. 이때 기존의 철근의 손상이 큰 경우 보강철근을 설치한다.The damaged conventional anchor bolt is cut only to the damaged part, and a male thread is formed at the upper end of the conventional anchor bolt, and a new upper anchor bolt 5 having a female thread formed at the end is fastened, or the male thread is formed at the upper end. If it is difficult to do so, the upper surface of the conventional anchor bolt is cut with a grinder and then inserted into a new upper anchor bolt 5 having no female thread formed at the end thereof, and then the anchoring portion 22 of the upper anchor bolt is connected. The site is welded. This repair method is easy to replace the work, it is easy to re-install a new anchor bolt vertically possible to the precise construction of the anchor bolt. At this time, if the damage of the existing rebar is large, install the reinforcing bar.

상기 새로운 상부 앵커볼트(5)의 앵커체결부(22)까지 받침 콘크리트를 타설하고 소정의 강도를 가질 때까지 양생한 후 베이스 플레이트(8)를 설치하고, 너트(9) 및 와샤(10)로 상기 베이스 플레이트(8)를 고정시킨다. 새로운 교량받침(11)을 설치한 후 주행을 내려 보수작업을 완료한다.After placing the supporting concrete to the anchoring portion 22 of the new upper anchor bolt 5 and curing it until it has a predetermined strength, the base plate 8 is installed, and the nut 9 and the washer 10 are installed. The base plate 8 is fixed. After installing the new bridge support (11), go down to complete the maintenance work.

본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법을 이용하면 기존의 받침 콘크리트 철거량을 최소화하여 기존의 철근 손상을 최소화하고, 앵커볼트를 최대한 수직으로 설치할 수 있어 앵커볼트의 정밀한 시공을 할 수 있다. 또한 상기 하부 앵커볼트를 그대로 유지하면서 상부 앵커볼트만 교체할수 있어 보수작업 공기를 단축하고, 공사비도 절감할 수 있다.Using the installation and repair method of the bridge device using the anchor bolt fastened to the upper and lower anchor bolt of the present invention to minimize the existing concrete demolition amount to minimize the existing reinforcement damage, anchor bolts can be installed as vertically as possible This enables precise construction of anchor bolts. In addition, it is possible to replace only the upper anchor bolt while maintaining the lower anchor bolt intact, shorten the repair work air, it can also reduce the construction cost.

또한 본 발명의 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치를 이용하면 기존의 교좌장치의 보수작업시 기 설치된 앵커볼트의 손상된 부분까지만 앵커볼트를 절단한 뒤, 그 절단부위에 수나사산을 형성하여 본 발명의 암나사산이 형성된 새로운 상부 앵커볼트에 체결함으로서 보수작업이 용이하고, 앵커볼트를 최대한 수직으로 설치할 수 있어 앵커볼트의 정밀한 시공을 할 수 있고, 보수작업공기단축 및 공사비 절감이 가능하다.In addition, if the upper and lower anchor bolt of the present invention using the anchoring device using the anchor bolt is fastened to the anchor bolt only to the damaged portion of the existing anchor bolt installed during maintenance work of the existing teaching device, the male thread on the cutting part By forming a fastening bolt to the new upper anchor bolt formed with a female thread of the present invention, the repair work is easy, and the anchor bolt can be installed vertically as much as possible to precisely install the anchor bolt, and to shorten the repair work air and reduce the construction cost. Do.

Claims (4)

교대 및 교각의 상부 면에 수직으로 기형성된 구멍(4)에 수나사산이 형성된 상단부(18)와 앵커바 형상의 하단부(19)로 구분된 하부 앵커볼트(6)를 소정의 위치에 고정하고;Fixing the lower anchor bolt 6 divided into the upper end 18 and the anchor bar-shaped lower end 19 formed with a male thread in a hole 4 vertically formed in the upper surface of the alternating and piers at a predetermined position; 상기 하부 앵커볼트(6)의 상단부(18)에, 수나사산이 형성된 나사부(15)와 단부에 암나사산이 형성된 중공(17)이 형성된 원통체이며 상기 나사부(15)보다 큰 직경으로 형성된 앵커체결부(22)로 구분된 상부 앵커볼트(5)를 체결하고;Anchor fastening portion formed in the upper end portion 18 of the lower anchor bolt 6, a cylindrical portion formed with a threaded portion (15) having a male thread and a hollow (17) formed with a female thread at an end thereof, and having a diameter larger than that of the screw portion (15). Fastening the upper anchor bolt (5) divided by (22); 상기 상부 앵커볼트(5)의 앵커체결부(22) 까지 받침콘크리트(7)를 타설하고;Pouring the supporting concrete (7) up to the anchoring portion (22) of the upper anchor bolt (5); 상기 상부 앵커볼트(5)의 나사부(15)를 관통하여 베이스플레이트(8)를 설치하고;A base plate (8) is installed through the threaded portion (15) of the upper anchor bolt (5); 상기 베이스 플레이트(8)에 돌출 된 상기 상부 앵커볼트(5)의 나사부(15)에 와샤(10)를 삽입하고;Inserting a washer (10) into the threaded portion (15) of the upper anchor bolt (5) protruding from the base plate (8); 상기 와샤(10)의 상부에 너트(9)를 체결하고;Fastening a nut (9) to an upper portion of the washer (10); 상기 베이스 플레이트(8)의 상부에 교량받침(11)을 설치하고; 그리고Installing a bridge support (11) on top of the base plate (8); And 상기 교량받침(11) 상부에 교량의 상부 구조물(12)을 거치하는 단계;Mounting an upper structure (12) of the bridge on top of the bridge bearing (11); 로 구성되는 것을 특징으로 하는 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법.Installation and repair method of the bridge device using the anchor bolt fastened to the upper and lower anchor bolts, characterized in that consisting of. 상부·하부 앵커볼트가 체결된 앵커볼트(14)가 설치된 받침 콘크리트(7)의 상부를 일정두께로 깨어 제거하고;Removing the upper part of the support concrete 7 on which the anchor bolt 14 to which the upper and lower anchor bolts are fastened is awakened to a predetermined thickness; 손상된 상기 상부 앵커볼트를 제거하고;Remove the damaged upper anchor bolt; 손상된 상부 앵커볼트가 제거된 상기 하부 앵커볼트의 상단부(18)에, 수나사산이 형성된 나사부(15)와 단부에 암나사산이 형성된 중공(17)이 형성된 원통체이며 상기 나사부(15)보다 큰 직경으로 형성된 앵커체결부(22)로 구분된 새로운 상부 앵커볼트(5)를 체결하고;The upper end portion 18 of the lower anchor bolt from which the damaged upper anchor bolt is removed, a cylindrical body formed with a threaded portion 15 formed with a male thread and a hollow 17 formed with a female thread formed at an end thereof, and having a larger diameter than the threaded portion 15. Fastening a new upper anchor bolt (5) divided by the formed anchor fastening portion (22); 상기 상부 앵커볼트(5)의 앵커체결부(22) 까지 받침콘크리트(7)를 타설하고;Pouring the supporting concrete (7) up to the anchoring portion (22) of the upper anchor bolt (5); 상기 상부 앵커볼트(5)의 나사부(15)를 관통하여 베이스 플레이트(8)를 설치하고;A base plate (8) is installed through the threaded portion (15) of the upper anchor bolt (5); 상기 베이스 플레이트(8)에 돌출된 상기 상부 앵커볼트(5)의 나사부(15)에 와샤(10)를 삽입하고;Inserting a washer (10) into the threaded portion (15) of the upper anchor bolt (5) protruding from the base plate (8); 상기 와샤(10)의 상부에 너트(9)를 체결하고;Fastening a nut (9) to an upper portion of the washer (10); 상기 베이스 플레이트(8)의 상부에 교량받침(11)을 설치하고; 그리고Installing a bridge support (11) on top of the base plate (8); And 상기 교량받침(11) 상부에 교량의 상부 구조물(12)을 거치하는 단계;Mounting an upper structure (12) of the bridge on top of the bridge bearing (11); 로 구성되는 것을 특징으로 하는 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법.Installation and repair method of the bridge device using the anchor bolt fastened to the upper and lower anchor bolts, characterized in that consisting of. 종래의 앵커볼트가 설치된 받침 콘크리트의 상부를 일정두께로 깨어 제거하고;Removing the upper part of the support concrete with a conventional anchor bolt installed to a certain thickness; 상기 종래의 앵커볼트의 손상된 부위를 제거하고;Removing the damaged part of the conventional anchor bolt; 상기 손상된 부위가 제거된 종래의 앵커볼트의 상단부에 수나사산이 형성된 나사부(15)와 단부에 중공(17)이 형성된 원통체이며 상기 나사부(15)보다 큰 직경으로 형성된 앵커체결부(22)로 구분된 새로운 상부 앵커볼트(5)를 체결하고;The anchor portion 22 formed with a larger diameter than the screw portion 15 and a cylindrical body formed with a hollow portion 17 at the end of the threaded portion is formed on the top end of the conventional anchor bolt removed the damaged site Fastening the divided new upper anchor bolt (5); 상기 상부 앵커볼트(5)의 앵커체결부(22) 까지 받침콘크리트(7)를 타설하고;Pouring the supporting concrete (7) up to the anchoring portion (22) of the upper anchor bolt (5); 상기 상부 앵커볼트(5)의 나사부(15)를 관통하여 베이스 플레이트(8)를 설치하고;A base plate (8) is installed through the threaded portion (15) of the upper anchor bolt (5); 상기 베이스 플레이트(8)에 돌출된 상기 상부 앵커볼트(5)의 나사부(15)에 와샤(10)를 삽입하고;Inserting a washer (10) into the threaded portion (15) of the upper anchor bolt (5) protruding from the base plate (8); 상기 와샤(10)의 상부에 너트(9)를 체결하고;Fastening a nut (9) to an upper portion of the washer (10); 상기 베이스 플레이트(8)의 상부에 교량받침(11)을 설치하고; 그리고Installing a bridge support (11) on top of the base plate (8); And 상기 교량받침(11) 상부에 교량의 상부 구조물(12)을 거치하는 단계;Mounting an upper structure (12) of the bridge on top of the bridge bearing (11); 로 구성되는 것을 특징으로 하는 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법.Installation and repair method of the bridge device using the anchor bolt fastened to the upper and lower anchor bolts, characterized in that consisting of. 제 3항에서, 새로운 상부 앵커볼트(5)를 종래의 앵커볼트의 상단부에 체결하는 방법은, 손상된 부위가 제거된 종래의 앵커볼트의 상단부에 원통체결부(22)의 중공(17)에 암나사산이 형성된 새로운 상부 앵커볼트를 나사식으로 체결하는 방법 또는 손상된 부위가 제거된 종래의 앵커볼트의 상단부에 새로운 상부 앵커볼트를 삽입하여 용접하는 방법인 것을 특징으로 하는 상부·하부 앵커볼트가 체결된 앵커볼트를 이용한 교좌장치의 설치 및 보수공법.The method of fastening the new upper anchor bolt (5) to the upper end of the conventional anchor bolt is a female screw in the hollow (17) of the cylindrical fastening portion (22) to the upper end of the conventional anchor bolt from which the damaged part is removed. Anchor to which the upper and lower anchor bolts are fastened by a method of screwing a new upper anchor bolt in which a mountain is formed or a method of welding by inserting a new upper anchor bolt into an upper end of a conventional anchor bolt from which a damaged part is removed. How to install and repair the device using bolts.
KR1019990041630A 1999-09-28 1999-09-28 Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt KR100344236B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990041630A KR100344236B1 (en) 1999-09-28 1999-09-28 Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990041630A KR100344236B1 (en) 1999-09-28 1999-09-28 Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt

Publications (2)

Publication Number Publication Date
KR19990084208A KR19990084208A (en) 1999-12-06
KR100344236B1 true KR100344236B1 (en) 2002-07-22

Family

ID=37488523

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990041630A KR100344236B1 (en) 1999-09-28 1999-09-28 Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt

Country Status (1)

Country Link
KR (1) KR100344236B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100865752B1 (en) * 2007-12-17 2008-10-29 코레일트랙 주식회사 Shift method of bridge bearing of railroad

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100701025B1 (en) * 2005-11-09 2007-03-29 주식회사 에스코테크놀로지 Bridge-bearing supporter
KR100809065B1 (en) * 2006-06-02 2008-03-03 유니슨 주식회사 The earthquake resistant reinforcement method for preexistence bridges

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100865752B1 (en) * 2007-12-17 2008-10-29 코레일트랙 주식회사 Shift method of bridge bearing of railroad

Also Published As

Publication number Publication date
KR19990084208A (en) 1999-12-06

Similar Documents

Publication Publication Date Title
US6904636B2 (en) Deck-to-girder connections for precast or prefabricated bridge decks
KR100837608B1 (en) J.K Bracket Method
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
KR102145521B1 (en) Bridge bearing for replacement and replacement method.
JP5367297B2 (en) Bridge with precast cross girder and precast girder and its construction method
KR101564721B1 (en) Construction method for replacing bridge bearing without damaging of lower structure
KR102024665B1 (en) System For Lifting Bridge Upper Plate
KR102262951B1 (en) Precast floor plate having level correction unit and construction method of the same
KR100344236B1 (en) Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt
JP2017150289A (en) Reinforcement/repair structure and method for steel structure
KR100840190B1 (en) I-beam segment connection method equipped with prestress steel synthetic concrete upper flange for continuous bridge
KR102490192B1 (en) Bridge upper structure and the method constructing bridge upper structure using the same
KR19990084207A (en) Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt
KR200172177Y1 (en) The structure of a bridge bearing device using anchor bolt which is composed of a lower anchorbolt and a upper anchorbolt
KR100403988B1 (en) Method for forming continuous p.s.c beams with steel plate girder splice and apparatus thereof
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
CN210194433U (en) Temporary prestress structure for prefabricated section assembled bridge
KR100469638B1 (en) Support construction for slab of prestressed concrete beam of bridge
JP2002332645A (en) Foundation structure of rail for ground-traveling crane and laying method for foundation
KR200378428Y1 (en) Bridge bearing one body
KR100564093B1 (en) A flexible connection structure of a bridge using expandable rubber
KR100195786B1 (en) Coupling structure between existing concrete girder and steel beam, and executing method of it
KR200224501Y1 (en) Joint structure using a prominence and depression anchor bolt of bridge
CN219909908U (en) Novel cantilever frame mounting structure of job site

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
N231 Notification of change of applicant
FPAY Annual fee payment

Payment date: 20111020

Year of fee payment: 10

LAPS Lapse due to unpaid annual fee