KR100314779B1 - Concrete-pile construction method - Google Patents

Concrete-pile construction method Download PDF

Info

Publication number
KR100314779B1
KR100314779B1 KR1019990010361A KR19990010361A KR100314779B1 KR 100314779 B1 KR100314779 B1 KR 100314779B1 KR 1019990010361 A KR1019990010361 A KR 1019990010361A KR 19990010361 A KR19990010361 A KR 19990010361A KR 100314779 B1 KR100314779 B1 KR 100314779B1
Authority
KR
South Korea
Prior art keywords
pile
concrete
foundation
base
external
Prior art date
Application number
KR1019990010361A
Other languages
Korean (ko)
Other versions
KR19990046528A (en
Inventor
최철
Original Assignee
최철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최철 filed Critical 최철
Priority to KR1019990010361A priority Critical patent/KR100314779B1/en
Publication of KR19990046528A publication Critical patent/KR19990046528A/en
Application granted granted Critical
Publication of KR100314779B1 publication Critical patent/KR100314779B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/08Removing obstacles

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

PURPOSE: A process for treating head part of a concrete base pile is provided to solve cracking problem caused during arrangement of the head part when the concrete base pile is inserted under a ground to produce a concrete foundation structure. CONSTITUTION: The process comprises several steps of cutting(A) upper end of the base pile(1) to obtain same length of protruded parts of the base piles after completing insertion state of the piles; setting(B) additional pile(2) having joint reinforcing bar(2a) to cover the base pile; fixing(C) the additional pile by securing together the base and the additional piles by introducing a base concrete(4) from top portion of the base ground(3) up to top side of the additional pile; and forming(D) a foundation by introducing another base concrete(6) while arranging a base reinforcing bar(5) by using the joint bar(2a).

Description

콘크리트 기초파일의 두부처리공법 {CONCRETE-PILE CONSTRUCTION METHOD}Tofu treatment method of concrete foundation pile {CONCRETE-PILE CONSTRUCTION METHOD}

본 발명은 콘크리트 기초파일의 지중 관입 후 콘크리트기초를 형성하기 위해행하는 콘크리트 기초파일의 두부처리공법에 관한 것으로, 상세히는 콘크리트기초파일을 지중에 관입시킨 후 상부면을 커팅제거하고,외부파일을 사용하여 두부를 정리하고 기초를 형성하는 두부처리공법에 관한 것이다.The present invention relates to a tofu treatment method of concrete foundation piles to form a concrete foundation after the ground penetration of the concrete foundation piles, and in detail, the upper surface is cut off after the concrete foundation piles are inserted into the ground, and the outer pile is used. It relates to a tofu treatment method to organize the tofu to form a base.

콘크리트 기초파일은 구조물의 중량을 지중에 전달하기 위한 것으로 통상의 경우 기초터파기를 마친 상태에서 콘크리트 파일을 타격 또는 관입시키는 방법으로 지중의 암반층까지 박아 사용하며,지중관입을 마친 상태에서 두부정리 후 콘크리트 기초와 연속되게 시공된다.The concrete foundation pile is used to transfer the weight of the structure to the ground, and in general, it is used to drive the rock pile to the rock layer of the ground by striking or injecting the concrete pile after completion of the foundation breakthrough. Constructed in series with the foundation.

기초파일의 두부정리는 콘크리트기초와 기초파일이 구조적으로 연속성을 유지할 수 있도록 연결시키기 위한 것으로 도2에 도시된 바와 같이 파일두부의 콘크리트부위를 제거하고 내부철근을 노출시켜 콘크리트 기초내부에 배근하는 철근과 기초파일의 철근을 이음하여 연속되게 하기 위한 것이다.The head arranging of the foundation pile is for connecting the concrete foundation and the foundation pile to maintain structural continuity. As shown in FIG. 2, the reinforcing bar is removed in the concrete foundation by removing the concrete part of the pile head and exposing the internal reinforcing bars. This is to connect the reinforcing bar of the foundation file and to make it continuous.

통상적으로 포크레인등에 집게발을 부착하여 철근을 감싸고 있는 콘크리트피복을 벗겨내고 과도하게 노출되는 철근을 잘라내며,철근을 바르게 교정하는 수작업을 통하여 이루어지게 된다.In general, the claws are attached to the fork-lane to peel off the concrete covering that surrounds the rebar, cut off the excessively exposed rebar, and the rebar is corrected by hand.

따라서, 콘크리트 피복을 제거하는 과정에서 파일압축강도 저하의 주원인이 되는 크랙이 발생하며,콘크리트 파일의 그라인더 컷팅작업,철근의 절단 및 교정작업,콘크리트 상면의 정지작업등 많은 부수작업이 수행되어야 하기 때문에 인력이 많이 소요될 뿐 아니라 작업과정중에 각종 안전사고의 우려가 매우 높고,두부정리 과정중에 과도한 크랙이 발생시에는 파일을 철거해야 하는 문제점을 갖고, 기초파일의 지나치게 돌출될 경우(암반층이 기초지반과 매우 가까이 있는 경우) 대부분의기초파일 돌출부를 제거하여야 하기 때문에 콘크리트파쇄에 따른 노력이 많이 소요 될 뿐만 아니라 다량의 건축페기물을 발생시키고, 고가의 기초파일을 낭비하는 문제점이 발생된다.Therefore, in the process of removing concrete cladding, cracks, which are the main causes of the reduction of pile compressive strength, occur, and many additional operations such as grinder cutting of concrete piles, cutting and straightening of reinforcing steel, and stopping of concrete upper surfaces must be performed. Not only does it require a lot of manpower, but there is also a high risk of various safety accidents during the work process, and in case of excessive cracking during the head cleanup process, the file must be removed. If the base pile projecting part must be removed, it takes much effort due to the concrete crushing, generates a large amount of construction waste, and wastes expensive foundation piles.

본 발명은 기존의 콘크리트두부정리공법이 갖는 제반문제점을 해결함과 아울러 두부정리에 유용한 외부파일의 구조를 새로이 제시할 목적으로 안출된 것이다.The present invention was devised to solve the problems of the existing concrete tofu cleanup method and to present a new structure of an external pile useful for tofu cleanup.

상세히는 콘크리트파일의 지중 관입후 잉여 돌출부위를 커팅하여 제거하고 돌출된 철근을 기형성시킨 외부파일을 콘크리트파일의 외부에 씌어 기초와 일체로 시공하는 콘크리트두부정리공법을 새로이 제시함으로서 종래 두부정리공법에서의 크랙발생을 원척적으로 방지하여 제조시 추구되었던 압축강도가 두부정리 후에도 유지될 수 있도록 하고,두부정리작업중에 나타나는 폐콘크리트의 처리비용을 감소시키며,공정의 처리시간을 획기적으로 감축시키 위한 것이다.In detail, the conventional tofu clean-up method is proposed by newly presenting the concrete tofu clean-up method which cuts and removes the excess protruding part after underground penetration of concrete pile, and constructs the integral pile with the foundation by applying the external pile formed by protruding reinforcement to the outside of the concrete pile. In order to prevent cracks from occurring, the compressive strength pursued during manufacturing can be maintained even after tofu cleaning, to reduce the processing cost of waste concrete during tofu cleaning, and to drastically reduce the processing time of the process. will be.

또한,강도의 저하 없이 신속하고 편리하게 두부정리공법을 실시할 수 있도록 새로운 구조의 외부파일을 아울러 제시하고자 한다.In addition, a new structure of the external file will be presented together so that the tofu clean-up method can be carried out quickly and conveniently.

본 발명의 구성 및 작용효과를 상세히 설명하면 다음과 같다.Referring to the configuration and effect of the present invention in detail.

도1은 본 발명에 의한 두부처리 공정도1 is a tofu processing process according to the present invention

도2는 종래 콘크리트 기초파일의 두부처리공정도2 is tofu processing process diagram of a conventional concrete foundation pile

도3는 두부처리장치의 실시례도Figure 3 is an embodiment of the tofu processing device

도4는 두부처리장치의 단면구성도4 is a cross-sectional view of the tofu treatment device

도5는 본발명에 의한 두부처리장치를 사용하여 파일의 두부를 처리한 상태도Figure 5 is a state of processing the tofu of the file using the tofu processing apparatus according to the present invention

*주요부호의 설명* Description of the major symbols

1.기초파일 2.외부파일 2a.이음철근 2b.콘크리트체1.Basic file 2.External file 2a.Rebar 2b.Concrete body

2c.보강철판 3.기초지반 4.바닥콘크리트 5.기초철근2c.Reinforcement steel plate 3. Foundation ground 4. Floor concrete 5. Foundation rebar

6.기초콘크리트6. Foundation Concrete

도1은 본 발명에 의한 콘크리트기초파일의 두부정리공법을 각 공정 단계별로 표현한 것으로,본 발명은 콘크리트기초파일(1)의 지중관입이 종료된 상태에서 각콘크리트 기초파일의 돌출길이가 기초지반으로부터 일정길이가 되도록 기초파일의 상단부를 컷팅하는 커팅공정(A)과, 이음철근(2a)이 외부로 돌출된 구조의 외부파일(2)을 기초파일(1)에 씌우는 외부파일셋팅공정(B)과,기초지반(3)상부에서 외부파일의 상부표면까지 바닥콘크리트(4)를 타설하여 기초파일과 외부파일을 일체로 고정하는 외부파일 고정화 공정(C)과,외부파일로 부터 돌출되는 이음철근(2a)을 이용하여 기초철근(5)을 배근하고 기초콘크리트(6)를 타설하여 기초를 형성하는 기초형성공정(D)으로 구성된다.1 is a representation of the process of the tofu of the concrete foundation pile according to the present invention in each step, the present invention is the projected length of each concrete foundation pile in the state of underground penetration of the concrete foundation pile (1) from the foundation ground Cutting process (A) for cutting the upper end of the foundation pile to a certain length, and external pile setting process (B) for covering the foundation pile (1) with the external pile (2) of the structure in which the joint reinforcing bar (2a) protrudes outward And an external file fixation process (C) for placing the bottom concrete (4) from the upper part of the foundation ground (3) to the upper surface of the external file to fix the foundation file and the external file integrally; and a joint reinforcing bar protruding from the external file. It consists of a foundation forming process (D) which arranges the foundation reinforcement 5 and casts the foundation concrete 6 to form the foundation using (2a).

상기에서 커팅공정(A)는 기초지반(3)에 관입시킨 다수의 기초파일(1)을 각기 일정한 높이를 유지하도록 커팅하는 공정으로 각 기초파일의 커팅높이는 외부파일에 형성된 이음철근의 최소길이를 포함하여 콘크리트기초의 설계높이가 되도록 정하여 진다.The cutting process (A) is a process for cutting a plurality of foundation piles 1 inserted into the foundation ground 3 so as to maintain a constant height. The cutting height of each foundation pile is the minimum length of the reinforcing bars formed in the external pile. It is determined to be the design height of the concrete foundation.

즉,기초지반으로부터의 기초파일 커팅위치(10)는 형성시킬 콘크리트 기초의 높이에서 외부파일에 형성된 이음철근의 높이를 뺀 길이가 되도록 함으로서 후술하는 바와 같이 외부파일상부로 돌출된 이음철근위에 콘크리트기초가 형성되어 기초의 설계높이를 달성할 수 있게 된다.That is, the foundation pile cutting position 10 from the foundation ground is the length of the concrete foundation to be formed by subtracting the height of the joint reinforcement formed on the external pile, so as to be described later, the concrete foundation on the protruding steel protruding portion above the outer pile as described below. Can be formed to achieve the design height of the foundation.

외부파일(2)은 도3 내지 도5에 도시된 바와 같이,원통형 콘크리트체(2b)내부에 보강철근(2d)를 형성시키고 수직보강철근이 콘크리트체의 상부로 돌출되어 이음철근(2a)가 되도록 형성시킨 구조를 기본 구조로 하여 상부에 보강철판(2c)을 부착시킨 구조이다.As shown in Figs. 3 to 5, the outer pile 2 forms a reinforcing bar 2d in the cylindrical concrete body 2b, and the vertical reinforcing bar protrudes to the upper part of the concrete body so that the joint reinforcing bars 2a are formed. It is a structure in which the reinforcing iron plate 2c is attached to the upper part with the structure formed as a basic structure.

상기 외부파일의 내경은 기초파일의 내경보다 다소 크게 하여 기초파일에 세팅하였을 때 기초파일과 외부파일사이에 환형태의 공간이 형성되게 하며,상기 공간부에 콘크리트가 채워짐으로서 후술하는 바와 같이 기초파일과 외부파일이 일체로 고정되게 된다.The inner diameter of the outer file is slightly larger than the inner diameter of the base file, so that when the base file is set to the base file, an annular space is formed between the base file and the external file, and the concrete is filled in the space, so that the base file will be described later. And external files are fixed together.

외부파일의 높이는 돌출된 이음철근까지 고려하였을 때 대략 콘크리트기초의 설계높이가 되도록 하며,이음철근의 돌출높이는 표준시방서에 규정된 이음철근의 최소길이가 되도록 구성된다.The height of the external pile is to be approximately the design height of the concrete foundation, taking into account the protruding joint reinforcement, and the protrusion height of the joint rebar is configured to be the minimum length of the joint reinforcement specified in the standard specification.

외부파일셋팅공정(B)은 상기한 바와 같은 구조의 외부파일을 기초파일의 돌출부에 씌우는 공정으로 기초지반을 평탄하게 정지된 상태에서 외부파일을 기초파일의 돌출부에 씌우므로서 간단하게 완료된다.The external file setting step (B) is a step of covering the external file having the structure as described above with the protrusion of the base file, and is simply completed by covering the external file with the protrusion of the base file in a state where the foundation ground is flat.

외부파일고정화공정(C)은 기초지반위에 일정높이로 콘크리트를 타설(바닥콘크리트)하여 기초파일과 외부파일이 고정되도록 하는 공정으로 통상적인 경우 기초콘크리트바닥부의 정리목적으로 콘크리트를 타설하기 때문에 별도의 철근을 배근하지 않고 콘크리트만 타설함으로서 종료되며,타설높이는 외부파일의 콘크리트체 높이까지 행한다.The external pile fixing process (C) is a process of placing concrete at a certain height on the foundation ground (floor concrete) so that the foundation pile and external piles are fixed.In general, the concrete pile is placed for the purpose of cleaning the foundation concrete floor. It is finished by placing concrete only without reinforcing reinforcing bars, and the placing height is up to the height of the concrete body of the external pile.

콘크리트는 외부파일과 기초파일사이의 공간부에도 타설하여 외부파일과 기초파일이 일체로 고정되도록 하며, 바닥콘크리트가 완전히 굳은 후에 외부파일 상부로 돌출된 이음철근을 이용하여 가로.세로로 철근을 배근하여 콘크리트를 타설함으로서 최종적으로 기초형성공정(D)이 완료 된다.The concrete is also placed in the space between the external pile and the foundation pile so that the external pile and the pile pile are fixed together, and the reinforcement is reinforced horizontally and vertically by using the joint reinforcing bar that protrudes to the upper side after the floor concrete is completely hardened. By pouring concrete, the foundation forming process (D) is finally completed.

상기 각공정의 수행과정에서 기초파일은 크랙생성이 전혀 없이 원형 그대로 유지되어 제조과정에서 추구하였던 압축강도등이 그대로 유지되며,종래 기초파일의두부정리시 발생하였던 각종 문제점- 크랙의 발생에 따른 압축강도의 저하, 콘크리트파쇄 철근교정에 따르는 안전사고와 인력의 소비등-이 전혀 없이 깔끔하고 정밀한 기초공사가 이루어 지게 된다.In the process of performing the above process, the base pile is maintained in its original form without any crack generation, and thus the compression strength pursued in the manufacturing process is maintained as it is, and various problems that occurred during the head cleanup of the conventional pile file are compressed according to the occurrence of cracks. Clean and precise foundation work is achieved without any deterioration in strength, safety accidents due to reinforcement of concrete crushed steel, and consumption of manpower.

도면중 미설명부호 11은 압입장치,12는 집게포크레인,13은 크랙,14는 파일내부철근을 표시한 것이다.In the drawings, reference numeral 11 denotes a press-fit device, 12 a tong fork crane, 13 a crack, and 14 a file internal reinforcing bar.

본 발명은 기존의 콘크리트두부정리공법에 비하여 다음과 같은 효과를 발휘한다.The present invention has the following effects as compared to the conventional concrete curd method.

첫째,콘크리트파일의 잉여부가 커팅에 의해 제거됨으로 종래 파쇄방식과 달리 전혀 크랙 발생이 없다.First, since the surplus of the concrete pile is removed by cutting, there is no crack at all unlike the conventional shredding method.

따라서 크랙에 의한 압축강도의 저하문제가 전혀 없으며,기초파일의 생산단게에서 추구되었던 강도를 그대로 유지할 수 있어 견고한 기초공사가 가능한 장점을 갖는다.Therefore, there is no problem of deterioration of the compressive strength due to cracks, and it is possible to maintain the strength pursued at the production stage of the base pile as it has a merit of solid foundation work.

둘째,커팅에 의해 두부가 정리되고 외부파일에 의해 이음철근이 형성됨으로 종래 두부정리시 집게포크레인에 의한 콘크리트의 파쇄과정이나 철근의 컷팅,철근의 교정 및 파일상부면의 정리등 많은 작업공정을 생략할 수 있고, 작업인력을 절감할 수 있으며, 공정 수행에 따른 각종 안전사고를 예발할 수 있는 장점이 있으며 무엇보다도 기초형성공정을 매우 신속하고 빠르게 수행할 수 있는 잇점을 갖는다.Second, because the head is arranged by cutting and the joint reinforcement is formed by external pile, many work processes such as concrete crushing process by reinforcing tong fork, cutting of reinforcing steel, correction of reinforcing steel, and clean up of pile are omitted. It has the advantage of being able to reduce the labor force, foresee various safety accidents according to the process, and most of all, it has the advantage of performing the basic forming process very quickly and quickly.

셋째,기초파일의 잉여부는 커팅에 의해 말끔히 제거됨으로 종래에 비하여 파쇄에 따른 페기물이 거의 발생하지 않고, 커팅된 파일 도막은 원형이 거의 그대로 유지됨으로 재활용할 수 있는 잇점이 있다.Third, since the excess portion of the foundation pile is neatly removed by cutting, almost no waste due to crushing is generated, and the cut pile coating is recycled since the original form is almost maintained.

이상에서와 같이 본 발명은 기초파일과 기초콘크리트의 연계시공시 소요되는 각종 공정을 획기적으로 감소시키고 정밀하고 견고한 기초공사를 수행할 수 있도록하는 효과를 갖는다.As described above, the present invention has the effect of drastically reducing various processes required during the linkage construction of the foundation pile and the foundation concrete and performing precise and solid foundation construction.

Claims (2)

콘크리트기초파일(1)의 지중관입이 종료된 상태에서 각 콘크리트 기초파일의 돌출길이가 기초지반으로부터 일정길이가 되도록 기초파일의 상단부를 컷팅하는 커팅공정(A)과, 이음철근(2a)이 외부로 돌출된 구조의 외부파일(2)을 기초파일(1)에 씌우는 외부파일셋팅공정(B)과,기초지반(3)상부에서 외부파일의 상부표면까지 바닥콘크리트(4)를 타설하여 기초파일과 외부파일을 일체로 고정하는 외부파일 고정화 공정(C)과,외부파일로 부터 돌출되는 이음철근(2a)을 이용하여 기초철근(5)을 배근하고 기초콘크리트(6)를 타설하여 기초를 형성하는 기초형성공정(D)으로 구성되는 것을 특징으로 하는 콘크리트 기초파일의 두부처리공법.The cutting process (A) for cutting the upper end of the foundation pile so that the protruding length of each concrete foundation pile is a certain length from the foundation ground in the state of underground penetration of the concrete foundation pile (1), and the joint reinforcing bars (2a) are external The external pile setting process (B) for covering the external pile (2) of the projecting structure on the basic pile (1), and the bottom concrete (4) from the upper part of the foundation ground (3) to the upper surface of the external pile And external pile fixation process (C) to integrally fix the external pile and the external pile, and reinforce the foundation reinforcement (5) using the joint reinforcing bars (2a) protruding from the external pile to form the foundation by pouring the foundation concrete (6). Tofu treatment method of the concrete foundation pile, characterized in that consisting of the foundation forming process (D). 제1항에 있어서,외부파일(2)은 원통형 콘크리트체(2b)내부에 보강철근(2d)을 형성시키고 수직보강철근이 콘크리트체의 상부로 돌출되어 이음철근(2a)이 되도록 형성시킨 구조의 것을 사용한 것을 특징으로 하는 콘크리트 기초파일의 두부처리공법.According to claim 1, The outer pile (2) is formed of a reinforcing bar (2d) inside the cylindrical concrete body (2b) of the structure formed so that the vertical reinforcing bar is projected to the upper portion of the concrete body to be a joint reinforcing bar (2a) Tofu treatment method of the concrete foundation pile, characterized in that used.
KR1019990010361A 1999-03-25 1999-03-25 Concrete-pile construction method KR100314779B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019990010361A KR100314779B1 (en) 1999-03-25 1999-03-25 Concrete-pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019990010361A KR100314779B1 (en) 1999-03-25 1999-03-25 Concrete-pile construction method

Publications (2)

Publication Number Publication Date
KR19990046528A KR19990046528A (en) 1999-07-05
KR100314779B1 true KR100314779B1 (en) 2001-11-17

Family

ID=37531488

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019990010361A KR100314779B1 (en) 1999-03-25 1999-03-25 Concrete-pile construction method

Country Status (1)

Country Link
KR (1) KR100314779B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294819A (en) * 2014-11-04 2015-01-21 昆明学院 Construction method of cast-in-place pile
KR20190030084A (en) 2017-09-13 2019-03-21 최종선 Basic file construction method of soft ground and thereof foundation file device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100726115B1 (en) * 2006-09-08 2007-06-12 삼성물산 주식회사 Round pre-concreting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294819A (en) * 2014-11-04 2015-01-21 昆明学院 Construction method of cast-in-place pile
CN104294819B (en) * 2014-11-04 2016-04-27 昆明学院 A kind of construction method of castinplace pile
KR20190030084A (en) 2017-09-13 2019-03-21 최종선 Basic file construction method of soft ground and thereof foundation file device

Also Published As

Publication number Publication date
KR19990046528A (en) 1999-07-05

Similar Documents

Publication Publication Date Title
CN106677355A (en) Floor slab hole plugging device and method
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN106760004A (en) A kind of construction method of the uniform joint bar in guide trough structure surface
KR100314779B1 (en) Concrete-pile construction method
CN103590599A (en) Self-compaction mode locking device and using method
CN204492180U (en) A kind of cast-in-place board-like stair construction joint assembled template device
CN206844138U (en) A kind of bar construction of domatic isolated footing
CN103696437A (en) Construction method for cutting latticed column
JPS6047119A (en) Vibration and noise-free breaking of head of cast-in-place pile
CN107217865B (en) A kind of increasing reinforced construction method of the flat beam section of main body frame
JPH0220769B2 (en)
CN105781103A (en) Capital inverted-triangular formwork erecting and pouring method
JPS6354093B2 (en)
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
KR940002454A (en) Repair method of concrete structure
JP3589095B2 (en) Concrete splicing method
CN106863581B (en) A kind of production technology of the round table-like absolute altitude concrete block for floor
JP2003166352A (en) Method for reinforcing concrete column, and reinforced concrete column
CN211114871U (en) Special stool for floor thickness control
CN213417801U (en) Pile head repairing structure of pile foundation
CN110344428A (en) A kind of construction method of pin dress formula prefabricated board substitution cushion cap brick mold
KR100458139B1 (en) Pile head removing apparatus and pile head removing method
CN213898233U (en) Underground construction reinforced structure
JP2002089051A (en) Crack reinforcing method for concrete structure and crack reinforcing structure
CN108798003A (en) A kind of trapezoidal horse tooth trough Constructional Col-umn Construction method of building block