KR100239171B1 - Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule - Google Patents

Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule Download PDF

Info

Publication number
KR100239171B1
KR100239171B1 KR1019970002760A KR19970002760A KR100239171B1 KR 100239171 B1 KR100239171 B1 KR 100239171B1 KR 1019970002760 A KR1019970002760 A KR 1019970002760A KR 19970002760 A KR19970002760 A KR 19970002760A KR 100239171 B1 KR100239171 B1 KR 100239171B1
Authority
KR
South Korea
Prior art keywords
clock
atm
processing unit
layer processing
subscriber
Prior art date
Application number
KR1019970002760A
Other languages
Korean (ko)
Other versions
KR19980066955A (en
Inventor
양승엽
Original Assignee
윤종용
삼성전자주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤종용, 삼성전자주식회사 filed Critical 윤종용
Priority to KR1019970002760A priority Critical patent/KR100239171B1/en
Publication of KR19980066955A publication Critical patent/KR19980066955A/en
Application granted granted Critical
Publication of KR100239171B1 publication Critical patent/KR100239171B1/en

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/42Loop networks
    • H04L12/427Loop networks with decentralised control
    • H04L12/433Loop networks with decentralised control with asynchronous transmission, e.g. token ring, register insertion

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

이중화구조에 따른 클럭을 공급받는 ATM교환기에서 클럭의 절단 후 클럭이 다시 공급되는 경우에 가입자 정합장치의 여러 자원들을 클럭이 절단되기 이전의 상태와 동일한 상태로 유지되도록 처리하는 클럭 복구 장치가 개시되어 있다. 이러한 본 발명에 따르면, 모니터링 회로는 이중화 구조에 따라 공급되는 제1클럭 또는 제2클럭을 모니터링하고 그 모니터링 결과를 출력한다. 복구부는 상기 모니터링 회로에 의해 상기 제1클럭 및 상기 제2클럭의 공급이 모두 절단된 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킬 준비를 행한다. 상기 복구부는 다시 상기 제1클럭과 상기 제2클럭중 어느 한 클럭이 복구되어 공급되는 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킨다.Disclosed is a clock recovery apparatus that processes various resources of a subscriber matching device to be kept in the same state as before the clock was cut when the clock is supplied again after the clock is cut in the ATM switch receiving the clock according to the redundant structure. have. According to the present invention, the monitoring circuit monitors the first clock or the second clock supplied according to the redundant structure and outputs the monitoring result. The recovery unit prepares to initialize the resources of the physical layer processing unit and the ATM layer processing unit when it is monitored by the monitoring circuit that both the supply of the first clock and the second clock are disconnected. The recovery unit initializes the resources of the physical layer processing unit and the ATM layer processing unit when it is monitored that one of the clocks of the first clock and the second clock is restored and supplied.

Description

이중화구조에 따른 클럭을 공급받는 ATM 가입자 정합장치의 클럭 복구 장치 및 방법{Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule}Clock Recovery Apparatus and Method of ATM Subscriber Interface Device with Clock Supply in Redundancy Structure {Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule}

본 발명은 이중화구조에 따른 클럭을 공급받는 ATM교환기의 가입자 정합장치에 관한 것으로, 특히 클럭의 절단 후 클럭이 다시 공급되는 경우에 가입자 정합장치의 여러 자원들을 클럭이 절단되기 이전의 상태와 동일한 상태로 유지되도록 처리하는 클럭 복구 장치 및 방법에 관한 것이다.The present invention relates to a subscriber matching device of an ATM switch receiving a clock according to a duplex structure. In particular, when a clock is supplied again after cutting the clock, various resources of the subscriber matching device are identical to the state before the clock is cut. The present invention relates to a clock recovery apparatus and a method for processing to be maintained as.

일반적으로 ATM(Asynchronous Transfer Mode)교환기에서 가입자 정합장치(이하 "ATM 가입자 정합장치"라 칭함)는 가입자로부터 광신호 또는 전기신호로 ATM셀을 받아들이고, 이 받아들인 ATM셀을 스위치를 통하여 다른 가입자나 다른 교환기로 전달하는 동작을 수행한다.Generally, in an ATM (Asynchronous Transfer Mode) exchange, a subscriber matching device (hereinafter referred to as an "ATM subscriber matching device") receives an ATM cell as an optical signal or an electric signal from a subscriber, and the ATM cell receives the ATM cell through another switch. Performs the transfer to another exchange.

도 1은 본 발명이 적용되는 ATM 가입자 정합장치의 연결구성을 보여주는 도면으로, 이러한 ATM 가입자 정합장치 20은 클럭 분배장치 10으로부터 인가되는 클럭 Clock에 동기되어 전술한 바와 같은 동작을 수행한다. 이때 클럭 분배장치 10으로부터 제공되는 클럭은 Clock A와, Clock B로 이중화되어 있기 때문에, 한쪽 클럭 분배장치, 예를 들어 10A로부터 클럭 Clock A를 공급하는 중에 이 클럭의 공급이 중단되면 다른 한쪽 클럭 분배장치 10B로부터 클럭 Clock B를 받아들이는 이중화 절체 능력을 가지고 있다. 즉, 클럭 분배장치 10은 이중화 구조로 설계되어 ATM 가입자 정합장치의 동작을 위한 클럭을 제공하고 있다.1 is a view showing a connection configuration of an ATM subscriber matching device to which the present invention is applied. The ATM subscriber matching device 20 performs the operation as described above in synchronization with a clock clock applied from the clock distributor 10. At this time, since the clock provided from the clock distributor 10 is dualized with Clock A and Clock B, if the supply of this clock is stopped while supplying Clock Clock A from one clock distributor, for example, 10A, the other clock is divided. Redundant switching capability to accept clock Clock B from device 10B. That is, the clock distributor 10 is designed in a redundant structure to provide a clock for the operation of the ATM subscriber matching device.

도 2는 도 1에 도시된 클럭 분배장치 10에 대한 상태 다이어그램(State Diagram)을 보여주는 도면이다.FIG. 2 is a diagram illustrating a state diagram of the clock distribution device 10 shown in FIG. 1.

도 2에서 상태 A는 클럭 Clock A가 선택되었음을 나타내며, 상태 B는 클럭 Clock B가 선택되었음을 나타낸다. 번호가 붙은 화살표는 상태 천이(transition)를 위한 사건(event)을 나타낸다. 사건 1은 클럭 Clock B가 활성화(Active)되어 있을 때 클럭 Clock A가 활성화 상태에서 절단(Fail)상태로의 사건을 나타낸다. 사건 2는 클럭 Clock A가 활성화되어 있을 때 클럭 Clock B가 활성화 상태에서 절단상태로의 사건을 나타낸다.In FIG. 2, state A indicates that clock Clock A is selected and state B indicates that clock Clock B is selected. Numbered arrows indicate events for state transitions. Event 1 represents the event that clock Clock A goes from active to failed when clock Clock B is active. Event 2 represents an event from clock clock B active to truncated when clock clock A is active.

상기와 같은 이중화 구조를 가지는 클럭 분배장치 10으로부터 클럭을 공급받는 가입자 정합장치 20은 도 3에 도시된 바와 같이 물리층 처리부 22와, ATM층 처리부 24와, 제어부 26으로 이루어진다. 이때 물리층 처리부 22와 ATM층 처리부 24의 자원으로는 FIFO(First-In First-Out), DPRAM(Dual Port Random Access Memory) 등이 있으며, 이 물리층 처리부 22와 ATM층 처리부 24는 클럭 분배장치 10으로부터 제공되는 46MHz의 클럭을 입력하여 19.44MHz와 23MHz, 12MHz를 생성한 후 사용하고 있다.As shown in FIG. 3, the subscriber matching device 20 that receives the clock from the clock distribution device 10 having the redundant structure includes a physical layer processor 22, an ATM layer processor 24, and a controller 26. At this time, the resources of the physical layer processor 22 and the ATM layer processor 24 include first-in first-out (FIFO) and dual port random access memory (DPRAM). The physical layer processor 22 and the ATM layer processor 24 are provided from the clock distributor 10. By inputting the 46MHz clock provided, it is used after generating 19.44MHz, 23MHz, and 12MHz.

전술한 바와 같이 본 발명이 적용되는 ATM 가입자 정합장치에 클럭을 공급하는 클럭 분배장치는 이중화 구조를 갖기 때문에 두 클럭 분배장치중 어느 한 클럭 분배장치가 절단되더라도 ATM 가입자 정합장치 20은 계속 그 동작을 유지하는 효과가 있다.As described above, since the clock distribution device for supplying the clock to the ATM subscriber matching device to which the present invention is applied has a redundant structure, the ATM subscriber matching device 20 continues to operate even if one of the clock distribution devices is disconnected. It is effective to maintain.

그러나 두 클럭 분배장치가 모두 절단되는 경우에는 물리층 처리부 22와 ATM층 처리부 24가 이상상태에 빠지게 되기 때문에 물리층 처리부 22와 ATM층 처리부 24의 자원에 막대한 영향을 미치게 된다. 이렇게 되면 클럭 분배장치 10이 다시 정상으로 돌아온다하더라도 물리층 처리부 22와 ATM층 처리부 24의 자원에 이미 이상한 데이터가 저장되기 때문에 교환기 제어장치 50의 가입자장치 30을 제어하기 위한 데이터와 일치하지 않게 되고, 또한 잘못 생성된 ATM셀을 스위치 40과 교환기 제어장치 50에 전송하는 문제점이 있다.However, when both clock distribution apparatuses are disconnected, the physical layer processor 22 and the ATM layer processor 24 are in an abnormal state, which greatly affects the resources of the physical layer processor 22 and the ATM layer processor 24. In this case, even when the clock distribution device 10 returns to normal again, abnormal data is already stored in the resources of the physical layer processor 22 and the ATM layer processor 24, and thus the data is not matched with the data for controlling the subscriber device 30 of the switch controller 50. There is a problem in transmitting the incorrectly generated ATM cell to the switch 40 and the switch controller 50.

이러한 문제점을 해결하기 위해서는 ATM교환기 운용자가 직접 가입자 정합장치 20을 재시동하여 가입자 정합장치의 물리층 처리부 22와 ATM층 처리부 24의 자원을 복구하여야 하나, 이는 운용자에게 매우 커다란 불편함을 초래하는 요소이다.In order to solve this problem, the ATM switch operator must directly restart the subscriber matching device 20 to recover resources of the physical layer processing unit 22 and the ATM layer processing unit 24 of the subscriber matching device, but this causes a great inconvenience for the operator.

따라서 본 발명의 목적은 ATM 가입자 정합장치로 공급되는 클럭이 절단됨에 따라 야기되는 ATM교환기의 오동작을 방지하는 데 있다.Accordingly, an object of the present invention is to prevent a malfunction of an ATM switch caused by a truncation of a clock supplied to an ATM subscriber matching device.

본 발명의 다른 목적은 ATM 가입자 정합장치로 공급되는 클럭이 절단된 후 복구될 시 가입자 정합장치의 상태를 클럭이 절단되기 이전의 상태와 동일하게 유지되도록 하는 데 있다.Another object of the present invention is to maintain the state of the subscriber matching device as it was before the clock was cut when the clock supplied to the ATM subscriber matching device is cut off and then recovered.

본 발명의 또다른 목적은 ATM 가입자 정합장치의 불필요한 재시동을 없애 운용의 편리성을 극대화시키는 데 있다.Another object of the present invention is to maximize the convenience of operation by eliminating unnecessary restart of the ATM subscriber matching device.

본 발명의 또다른 목적은 ATM교환기의 제어장치와 가입자 장치 제어용의 데이터와 가입자 정합장치의 데이터를 항상 동일하게 유지시키는 데 있다.It is another object of the present invention to always keep the data for controlling the ATM switch and the subscriber device and the data of the subscriber matching device the same.

이러한 목적들을 달성하기 위한 본 발명에 따르면, ATM교환기에서 물리층 처리부, ATM층 처리부 및 가입자장치 제어부를 구비하는 가입자 정합장치를 위한 클럭 복구 장치는, 이중화 구조에 따라 공급되는 제1클럭 또는 제2클럭을 모니터링하고 그 모니터링 결과를 출력하는 모니터링 회로와. 상기 모니터링 회로에 의해 상기 제1클럭 및 상기 제2클럭의 공급이 모두 절단된 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킬 준비를 행하고, 다시 상기 제1클럭과 상기 제2클럭중 어느 한 클럭이 복구되어 공급되는 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시키는 복구부로 이루어진다.According to the present invention for achieving these objects, the clock recovery device for the subscriber matching device having a physical layer processing unit, ATM layer processing unit and subscriber unit control unit in the ATM switch, the first clock or the second clock supplied according to the redundant structure With monitoring circuitry to monitor and output its monitoring results. When it is monitored by the monitoring circuit that both the supply of the first clock and the second clock are disconnected, the controller prepares to initialize the resources of the physical layer processing unit and the ATM layer processing unit, and again the first clock and the second clock. When any one of the clocks are monitored to be recovered and supplied, the physical layer processing unit and the ATM layer processing unit of the recovery unit for initializing the resources.

본 발명에 따르면, ATM교환기에서 물리층 처리부, ATM층 처리부 및 가입자장치 제어부를 구비하는 가입자 정합장치를 위한 클럭 복구 방법은, 이중화 구조에 따라 공급되는 제1클럭 또는 제2클럭을 모니터링하고 그 모니터링 결과를 출력하는 (a)과정과. 상기 모니터링 회로에 의해 상기 제1클럭 및 상기 제2클럭의 공급이 모두 절단된 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킬 준비를 행하는 (b)과정과, 상기 (b)과정을 수행한 후 상기 제1클럭과 상기 제2클럭중 어느 한 클럭이 복구되어 공급되는 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시키는 (c)과정으로 이루어진다.According to the present invention, a clock recovery method for a subscriber matching device having a physical layer processing unit, an ATM layer processing unit, and a subscriber unit control unit in an ATM switch includes: monitoring a first clock or a second clock supplied according to a redundant structure and monitoring the result; (A) process of outputting and. (B) preparing to initialize the resources of the physical layer processing unit and the ATM layer processing unit when it is monitored that the supply of the first clock and the second clock is cut off by the monitoring circuit; and (b) After performing the process, if it is monitored that one of the clocks of the first clock and the second clock is recovered and supplied, the process of (c) initializing the resources of the physical layer processor and the ATM layer processor.

도 1은 본 발명이 적용되는 ATM 가입자 정합장치의 연결구성을 보여주는 도면.1 is a view showing a connection configuration of the ATM subscriber registration apparatus to which the present invention is applied.

도 2는 도 1에 도시된 클럭 분배장치의 상태 다이어그램을 보여주는 도면.FIG. 2 shows a state diagram of the clock distribution device shown in FIG.

도 3은 도 1에 도시된 가입자 정합장치의 구성을 보여주는 도면.3 is a view showing the configuration of the subscriber registration device shown in FIG.

도 4는 본 발명에 따른 ATM 가입자 정합장치의 구성을 보여주는 도면.4 is a diagram illustrating a configuration of an ATM subscriber registration device according to the present invention.

도 5는 도 4에 도시된 클럭 이중화 및 복구부의 상태 다이어그램을 보여주는 도면.FIG. 5 is a diagram illustrating a state diagram of the clock redundancy and recovery unit illustrated in FIG. 4.

이하 본 발명의 바람직한 실시예의 상세한 설명이 첨부된 도면들을 참조하여 설명될 것이다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한한 동일한 부호를 가지도록 하고 있음에 유의해야 한다. 또한 하기에서 본 발명을 설명함에 있어, 관련된 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다. 그리고 후술되는 용어들은 본 발명에서의 기능을 고려하여 정의내려진 용어들로서 이는 사용자 또는 칩설계자의 의도 또는 관례 등에 따라 달라질 수 있으므로, 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.DETAILED DESCRIPTION A detailed description of preferred embodiments of the present invention will now be described with reference to the accompanying drawings. First of all, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are used as much as possible even if displayed on different drawings. In addition, in the following description of the present invention, if it is determined that a detailed description of a related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted. In addition, the terms to be described below are terms defined in consideration of functions in the present invention, which may vary according to the intention or custom of the user or chip designer, and the definitions should be made based on the contents throughout the present specification.

도 4는 본 발명에 따른 ATM 가입자 정합장치의 구성을 보여주는 도면으로, 도 3에 도시된 종래 기술에 따른 ATM 가입자 정합장치와 동일하게 물리층 처리부 22와 ATM층 처리부 24, 그리고 가입자 장치 제어부 26을 포함하여 이루어진다. 그러나 본 발명에 따른 ATM 가입자 정합장치의 특징적인 요소는 클럭 모니터링회로 60과, 클럭 이중화 및 복구부 70을 더 구비한다는 사실이다.4 is a block diagram illustrating an ATM subscriber matching device according to the present invention, and includes a physical layer processor 22, an ATM layer processor 24, and a subscriber device controller 26 in the same manner as the ATM subscriber matcher according to the related art illustrated in FIG. 3. It is done by However, a characteristic element of the ATM subscriber matching device according to the present invention is the fact that the clock monitoring circuit 60 and the clock redundancy and recovery unit 70 are further provided.

도 4에서 클럭 모니터링회로(Clock Monitoring Circuit) 60은 도 1에 도시된 이중화구조를 가지는 클럭 분배장치 10으로 공급되는 클럭 Clock A 및 Clock B를 입력받아 이 클럭의 상태를 모니터링한 후 그 모니터링 결과를 출력한다. 이러한 클럭 모니터링회로 60은 상용의 칩으로 구현될 수 있다. 상기 클럭 모니터링회로 60은 클럭 Clock A의 상태가 절단된 경우 A_Fail을 출력하고, 클럭 Clock B의 상태가 절단된 경우 B_Fail을 출력하고, 클럭 Clock A,B의 상태가 모두 절단된 경우 A&B_Fail을 출력한다. 이러한 모니터링 결과는 클럭 이중화 및 복구부 70을 거쳐 가입자장치 제어부 26에 통보된다. 가입자장치 제어부 26은 상기 모니터링결과를 주기적으로 검사하여 A&B_Fail이 출력되는 경우, 즉 클럭 Clock A,B의 상태가 모두 절단된 경우에 자원 초기화 준비상태로 돌입한다. 이러다가 클럭 Clock A나 Clock B가 다시 복구되면 클럭이중화 및 복구부 70은 자원초기화신호를 발생하여 가입자 정합장치 20의 물리층 처리부 22와, ATM층 처리부 24의 자원을 초기화시키는 동작을 수행한다. 상기와 같이 물리층 처리부 22와, ATM층 처리부 24의 자원에 대한 초기화의 동작이 종료되면, 가입자장치 제어부 26은 교환기 제어장치 50과 통신하여 교환기 제어장치 50으로부터 가입자 장치 30을 제어하기 위한 데이터를 전송받아 자원을 재시동함으로써 정합장치의 상태를 클럭 절단 이전의 상태와 일치시킨다.In FIG. 4, the clock monitoring circuit 60 receives clocks Clock A and Clock B supplied to the clock distribution device 10 having the redundant structure shown in FIG. Output The clock monitoring circuit 60 may be implemented as a commercial chip. The clock monitoring circuit 60 outputs A_Fail when the state of the clock Clock A is cut, outputs B_Fail when the state of the clock Clock B is cut, and outputs A & B_Fail when all of the states of the clocks A, B are cut. . The monitoring result is notified to the subscriber station control unit 26 via the clock duplication and recovery unit 70. The subscriber station controller 26 periodically checks the monitoring result and enters the resource initialization ready state when A & B_Fail is output, that is, when the clock clocks A and B are all disconnected. When the clock Clock A or Clock B is restored, the clock redundancy and recovery unit 70 generates a resource initialization signal to initialize the resources of the physical layer processor 22 and the ATM layer processor 24 of the subscriber matching device 20. When the initialization operation for the resources of the physical layer processor 22 and the ATM layer processor 24 ends as described above, the subscriber station controller 26 communicates with the switch controller 50 to transmit data for controlling the subscriber device 30 from the switch controller 50. In response, the resources are restarted to match the state of the matching device to that before the clock cut.

도 5는 도 4에 도시된 본 발명에 따른 ATM 가입자 정합장치의 상태 다이어그램을 보여주는 도면이다.FIG. 5 is a diagram illustrating a state diagram of an ATM subscriber matching device according to the present invention shown in FIG. 4.

도 5에서 상태 A는 클럭 Clock A가 선택되었음을 나타내고, 상태 B는 클럭 Clock B가 선택되었음을 나타내고, 상태 C는 클럭 Clock A, Clock B가 모두 절단되었음을 나타낸다. 번호가 붙은 화살표는 상태 천이를 위한 사건을 나타낸다. 사건 1은 Clock A가 활성화되어 있을 때 Clock B가 활성화상태에서 절단상태로 천이하는 사건을 나타낸다. 사건 2는 Clock B가 활성화되어 있을 때 Clock A가 활성화상태에서 절단상태로 천이하는 사건을 나타낸다. 사건 3은 Clock B가 절단상태일 때 Clock A가 활성화상태에서 절단상태로 천이하는 사건을 나타낸다. 사건 4는 Clock A,B 모두가 절단된 상태에서 Clock A가 활성화되는 사건을 나타낸다. 사건 5는 Clock A가 절단된 상태일 때 Clock B가 활성화상태에서 절단상태로 천이하는 사건을 나타낸다. 사건 6은 Clock A,B가 모두 절단된 상태에서 Clock B가 활성화상태로 천이되는 사건을 나타낸다. 사건 7은 상태 C에서 상태 A로 천이된 후 자원을 초기화하는 사건을 나타낸다. 사건 8은 상태 C에서 상태 B로 천이된 후 자원을 초기하는 사건을 나타낸다.In FIG. 5, state A indicates that clock Clock A is selected, state B indicates that clock Clock B is selected, and state C indicates that clocks Clock A and Clock B are both disconnected. Numbered arrows indicate events for state transitions. Event 1 represents an event in which Clock B transitions from active to disconnected when Clock A is active. Event 2 represents an event in which Clock A transitions from active to disconnected when Clock B is active. Event 3 represents an event in which Clock A transitions from the active state to the cut state when Clock B is cut. Event 4 represents an event in which Clock A is activated with both Clocks A and B disconnected. Event 5 represents an event in which Clock B transitions from the active state to the cut state when Clock A is cut. Event 6 represents an event in which Clock B transitions to the active state when both Clocks A and B are disconnected. Event 7 represents an event that initiates a resource after transitioning from state C to state A. Event 8 represents an event that initiates a resource after transitioning from state C to state B.

다시 도 4를 참조하면, 클럭 이중화 및 복구부 70은 평상시 상태 A나 상태 B에 머무르다가 Clock A,B가 모두 절단되면 상태 C로 천이되며, 이때 주변 자원(물리층 자원 및 ATM층 자원)에 대한 초기화 준비를 하게 된다. 그 후에 클럭 Clock이 복구되어 상태 A나 상태 B로 천이되면 클럭 이중화 및 복구부 70은 자원초기화신호를 생성하여 주변 자원, 즉 ATM층 처리부 24의 자원과 물리층 처리부 22의 자원을 초기화시키는 자원 초기화부로서의 역할을 수행한다. 가입자장치 제어부 26은 자원초기화신호가 생성됨에 응답하여 교환기 제어장치 50과의 통신을 재개하여 가입자 장치 제어용 데이터를 교환기 제어장치 50으로부터 전송받아 가입자 정합장치 20의 자원에 저장한다. 가입자 정합장치 20의 상태를 클럭이 절단되기 이전의 상태로 복구시킨다.Referring back to FIG. 4, the clock redundancy and recovery unit 70 stays in the state A or state B normally and transitions to the state C when the clocks A and B are both disconnected. You are ready to initialize. After that, when the clock is recovered and transitioned to state A or state B, the clock redundancy and recovery unit 70 generates a resource initialization signal to initialize the surrounding resources, that is, the resources of the ATM layer processor 24 and the resources of the physical layer processor 22. It serves as. In response to the resource initialization signal being generated, the subscriber station control unit 26 resumes communication with the switch controller 50 and receives the subscriber device control data from the switch controller 50 and stores the data for the subscriber matching device 20 in the resource of the subscriber matching device 20. Restore the state of the subscriber matching device 20 to the state before the clock was disconnected.

상술한 바와 같이 본 발명은 가입자 정합장치의 클럭 절단 후 복구시 가입자 정합장치의 상태를 클럭을 절단하기 이전과 동일하게 유지할 수 있는 이점이 있다. 또한 불필요한 운용자의 가입자 정합장치 재시동을 없애 교환시스템 운용의 편리성의 극대화시키는 이점이 있다. 그리고 또한 교환기 제어장치의 가입자 제어용 데이터와 가입자 정합장치의 데이터를 항상 동일하게 유지시킬 수 있으므로 교환기의 오동작을 예방할 수 있는 이점이 있다.As described above, the present invention has an advantage of maintaining the state of the subscriber matching device as before cutting the clock when recovering after clock cutting of the subscriber matching device. In addition, there is an advantage of maximizing the convenience of operating the exchange system by eliminating unnecessary operator registration device restart. In addition, since the subscriber control data of the switch controller and the data of the subscriber matching device can be kept the same at all times, there is an advantage of preventing malfunction of the switch.

한편 본 발명의 상세한 설명에서는 구체적인 실시예에 관해 설명하였으나, 본 발명의 범위에서 벗어나지 않는 한도내에서 여러가지 변형이 가능함은 물론이다. 그러므로 본 발명의 범위는 설명된 실시예에 국한되어 정해져서는 않되며 후술하는 특허청구의 범위뿐만 아니라 이 특허청구의 범위와 균등한 것들에 의해 정해져야 한다.Meanwhile, in the detailed description of the present invention, specific embodiments have been described, but various modifications may be made without departing from the scope of the present invention. Therefore, the scope of the present invention should not be limited to the described embodiments, but should be defined not only by the scope of the following claims, but also by the equivalents of the claims.

Claims (3)

ATM교환기에서 물리층 처리부, ATM층 처리부 및 가입자장치 제어부를 구비하는 가입자 정합장치를 위한 클럭 복구 장치에 있어서,A clock recovery apparatus for a subscriber matching device having a physical layer processing unit, an ATM layer processing unit, and a subscriber unit control unit in an ATM switch, 이중화 구조에 따라 공급되는 제1클럭 또는 제2클럭을 모니터링하고 그 모니터링 결과를 출력하는 모니터링 회로와.A monitoring circuit for monitoring the first clock or the second clock supplied according to the redundant structure and outputting the monitoring result. 상기 모니터링 회로에 의해 상기 제1클럭 및 상기 제2클럭의 공급이 모두 절단된 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킬 준비를 행하고, 다시 상기 제1클럭과 상기 제2클럭중 어느 한 클럭이 복구되어 공급되는 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시키는 복구부로 이루어짐을 특징으로 하는 장치.When it is monitored by the monitoring circuit that both the supply of the first clock and the second clock are disconnected, the controller prepares to initialize the resources of the physical layer processing unit and the ATM layer processing unit, and again the first clock and the second clock. And a recovery unit for initializing the resources of the physical layer processing unit and the ATM layer processing unit when one of the clocks is monitored to be recovered and supplied. ATM교환기에서 물리층 처리부, ATM층 처리부 및 가입자장치 제어부를 구비하는 가입자 정합장치를 위한 클럭 복구 방법에 있어서,A clock recovery method for a subscriber matching device including a physical layer processing unit, an ATM layer processing unit, and a subscriber station control unit in an ATM switch, 이중화 구조에 따라 공급되는 제1클럭 또는 제2클럭을 모니터링하고 그 모니터링 결과를 출력하는 (a)과정과.(A) monitoring the first clock or the second clock supplied according to the redundant structure and outputting the monitoring result; 상기 모니터링 회로에 의해 상기 제1클럭 및 상기 제2클럭의 공급이 모두 절단된 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시킬 준비를 행하는 (b)과정과,(B) preparing to initialize the resources of the physical layer processor and the ATM layer processor when the monitoring circuit detects that the supply of the first clock and the second clock has been cut off; 상기 (b)과정을 수행한 후 상기 제1클럭과 상기 제2클럭중 어느 한 클럭이 복구되어 공급되는 것으로 모니터링되는 경우 상기 물리층 처리부 및 상기 ATM층 처리부의 자원을 초기화시키는 (c)과정을 포함함을 특징으로 하는 방법.(C) initializing the resources of the physical layer processor and the ATM layer processor when one of the first clock and the second clock is monitored to be supplied after being restored after the step (b). Characterized in that. 제2항에 있어서, 상기 물리층 처리부 및 상기 ATM층 처리부의 자원이 초기화된 이후에 상기 가입자장치 제어부가 상기 ATM교환기의 제어장치와 통신을 재개하여 가입자장치 제어용 데이터를 전송받아 상기 가입자 정합장치를 클럭 절단 이전의 상태로 복구시키는 과정을 더 포함함을 특징으로 하는 방법.3. The terminal of claim 2, wherein after the resources of the physical layer processing unit and the ATM layer processing unit are initialized, the subscriber station control unit resumes communication with the control unit of the ATM switch and receives the subscriber device control data to clock the subscriber matching unit. Further comprising restoring to a state prior to cutting.
KR1019970002760A 1997-01-30 1997-01-30 Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule KR100239171B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019970002760A KR100239171B1 (en) 1997-01-30 1997-01-30 Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019970002760A KR100239171B1 (en) 1997-01-30 1997-01-30 Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule

Publications (2)

Publication Number Publication Date
KR19980066955A KR19980066955A (en) 1998-10-15
KR100239171B1 true KR100239171B1 (en) 2000-01-15

Family

ID=19495947

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019970002760A KR100239171B1 (en) 1997-01-30 1997-01-30 Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule

Country Status (1)

Country Link
KR (1) KR100239171B1 (en)

Also Published As

Publication number Publication date
KR19980066955A (en) 1998-10-15

Similar Documents

Publication Publication Date Title
CN101867468A (en) Hot reboot processing method for power over Ethernet switch and power over Ethernet switch
KR100759915B1 (en) State synchronization in redundant systems
KR100239171B1 (en) Clock Recovery Apparatus and Method of ATM Subscriber Interface Mudule
KR100251680B1 (en) Method and apparatus for error control on atm system
JP2007110599A (en) Communication controller
KR100533135B1 (en) Remote Power Control Method and Apparatus in Distributed Communication System
KR100735435B1 (en) Data processing method in duplicated boards
JP2606144B2 (en) Redundant device
KR100291033B1 (en) Clock redundancy management device and method of network system
US7590717B1 (en) Single IP address for redundant shelf processors
KR100313756B1 (en) Dual apparatus of base station control card of communication system and method thereof
JPH11284638A (en) Communication system
KR0155331B1 (en) Interconnection network manager in cdma mobile system
JPH08251197A (en) Relieving system for atm permanent virtual channel (pvc) link
JP3262247B2 (en) Clock signal working spare switching method
KR0169253B1 (en) Atm brm conserving method
JPH09162910A (en) Multiplex communication equipment and its control method
KR950023071A (en) Network connection device of internal communication network of mobile communication system with redundant communication board
KR970068431A (en) Seventh module (NO.7) duplication device of message transferring section level 2 processing circuit pack in common line signaling method and its implementation method
KR19980027421A (en) Synchronous signal monitoring circuit for synchronous control in redundant control system
JP2003174403A (en) Radio base station device and method for restoring the same device
JPH1093617A (en) Standby switching system for communication processing device
JPH0433036A (en) Data processing system
JPH08171495A (en) Duplex operation system
JP2001144791A (en) Optical transmission system and its alarm processing method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070910

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee