KR100221473B1 - Simulation system - Google Patents
Simulation system Download PDFInfo
- Publication number
- KR100221473B1 KR100221473B1 KR1019970021160A KR19970021160A KR100221473B1 KR 100221473 B1 KR100221473 B1 KR 100221473B1 KR 1019970021160 A KR1019970021160 A KR 1019970021160A KR 19970021160 A KR19970021160 A KR 19970021160A KR 100221473 B1 KR100221473 B1 KR 100221473B1
- Authority
- KR
- South Korea
- Prior art keywords
- power generation
- control
- control logic
- power plant
- generation facility
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Abstract
발전설비 모의실험시스템은 발전설비의 제어로직을 모의실험하기 위한 분산제어수단을 구비한다. 본 발명은 대상이 되는 발전설비를 가상으로 모델링하는 가상발전설비구축수단을 구비하며, 분산제어수단과 발전설비구축수단간의 데이터교환이 실시간으로 이루어지도록 네트워크로 연결한다. 발전설비구축수단에서는 실제 대상이 되는 발전설비를 모델링한 가상의 발전설비프로그램이 실행되고, 분산제어수단에서는 이를 이용해 제어로직을 테스트함으로써 마치 실제 발전설비를 제어하는 것과 동일한 결과를 얻을 수 있다. 따라서, 본 발명은 실제 발전설비를 테스트하기 어려운 여러 가지 조건에서의 모의실험이 가능하며, 실제 발전설비를 건설 또는 시운전하기전에 여러 가지 조건에 맞는 테스트를 사전에 해보고 제어로직 및 운전방법 등에 대한 사전검증, 제어에 관련된 제어파라미터들을 결정함으로써 에러요소를 사전에 차단하고, 시운전기간을 줄일 수 있으며, 실제 분산제어수단과 동일한 시스템을 구축하여 운전원의 설비운전 훈련용으로도 활용이 가능한 효과를 제공한다.The power plant simulation system includes distributed control means for simulating the control logic of the power plant. The present invention includes a virtual power generation facility building means for virtually modeling a target power generation facility, and is connected to a network so that data exchange between the distributed control means and the power generation facility building means is performed in real time. In the power generation facility building means, a virtual power generation program that models the actual power generation facility is executed. In the distributed control means, the control logic is used to test the control logic to obtain the same result as if the actual power generation facility is controlled. Therefore, the present invention can be simulated under various conditions that are difficult to test the actual power generation equipment, and before the actual construction or commissioning of the actual power generation equipment, the test for various conditions is performed in advance, and the control logic and operation method, etc. By determining the control parameters related to verification and control, it is possible to cut off the error factor in advance, reduce the trial run period, and build the same system as the actual distributed control means to provide the effect that can be used for the training of facility operation of the operator. .
Description
본 발명은 발전설비를 모의실험(simulation)하기 위한 모의실험시스템에 관한 것으로, 특히 가상의 발전설비를 구축한 가상발전설비구축수단과의 연결을 통해 분산제어수단(DCS;Distributed Control System)의 제어로직을 모의실험하는 발전설비 제어용 모의실험시스템에 관한 것이다.The present invention relates to a simulation system for simulating power generation facilities, and in particular, control of a distributed control system (DCS) through connection with a virtual power generation facility building means for constructing a virtual power generation facility. The present invention relates to a simulation system for power plant control that simulates logic.
기존에는 발전설비(plant)를 제어하는 분산제어수단의 제어로직을 테스트하기 위해서는 소규모의 시험설비(pilot plant)를 건설하여 직접적으로 제어로직 검증을 실시하거나, 소형 입출력장치를 직접 연결하여 일부분만을 선별적으로 테스트하여 분산제어수단의 동작을 검증하였다.Conventionally, in order to test the control logic of the distributed control means that control the plant, a small pilot plant can be constructed to directly verify the control logic, or a small input / output device can be directly connected to select only a part of the logic. The test was performed to verify the operation of the distributed control means.
그러나, 상술한 바와같은 분산제어수단의 제어로직을 검증하는 방법은 아래와 같은 문제점을 가져왔다. 전자의 경우에는 실제 발전설비를 설치하여 분산제어수단의 제어로직을 검증함으로 인한 설치비용이 많이 요구되며, 형태가 다른 발전설비에서는 또 다시 새로운 형태에 맞게 재구성해야하므로 다른 발전설비에서는 그대로 적용할 수가 없다는 단점이 있다. 한편, 후자의 경우에는 일부분의 테스트에 한정되어 있음으로 인해 전체적인 테스트가 불가능하고, 정확한 제어로직 검증이 불가능하다는 단점이 있었다.However, the method of verifying the control logic of the distributed control means as described above has the following problems. In the former case, the installation cost is required by verifying the control logic of the distributed control means by installing the actual power generation equipment, and in other power generation facilities, it is necessary to reconfigure it to the new shape, so that it is not applicable to other power generation facilities. There is a disadvantage. On the other hand, the latter case is limited to a part of the test, the entire test is impossible, there is a disadvantage that the accurate control logic verification is impossible.
따라서, 본 발명의 목적은 위와같은 단점을 해결하기 위해 실제 대상이 되는 발전설비를 가상으로 모델링한 가상발전설비구축수단과의 연결을 통해 분산제어수단의 제어로직을 테스트함으로써 마치 실제 발전설비를 제어하는 것과 동일한 결과를 얻을 수 있는 발전설비 제어용 모의실험시스템을 제공함에 있다.Accordingly, an object of the present invention is to control the actual power generation facilities by testing the control logic of the distributed control means through the connection with the virtual power generation facility construction means that virtually modeled the actual power generation facilities to solve the above disadvantages. It is to provide a simulation system for power plant control that can achieve the same result.
도 1은 본 발명에 따른 발전설비 제어용 모의실험시스템을 나타낸 구성도.1 is a block diagram showing a simulation system for controlling a power plant according to the present invention.
* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols for the main parts of the drawings
10 : 가상발전설비구축수단20 : 분산제어수단10: virtual power plant construction means 20: distributed control means
21 : 제어부22 : 사용자인터페이스부21: control unit 22: user interface unit
23 : 디스플레이부24 : 데이터통신부23: display unit 24: data communication unit
25 : 데이타저장부26 : 외부기기접속부25: data storage unit 26: external device connection unit
27 : 감시진단부28 : 운전기록부27: monitoring diagnostic unit 28: driving record
30 : 제어로직 개발수단30: control logic development means
위와같은 목적을 달성하기 위한 본 발명의 특징은 발전설비를 모의실험(simulation)하기 위한 모의실험시스템에 있어서, 상기 발전설비를 제어하기 위한 제어로직을 개발하는 제어로직개발수단, 대상이 되는 실제 발전설비(plant)를 수학적인 모델링방법을 통해 가상으로 구축하는 가상발전설비구축수단 및 상기 가상발전설비구축수단과 실시간으로 데이터를 교환할 수 있도록 통신선을 통해 상호접속되어 상기 가상의 발전설비를 이용해 상기 제어로직개발수단으로부터 인가되는 제어로직을 모의실험하는 분산제어수단을 포함하는 발전설비 제어용 모의실험시스템에 있다.A characteristic of the present invention for achieving the above object is in the simulation system for simulating a power plant, the control logic development means for developing a control logic for controlling the power plant, the actual power generation The virtual power plant building means for constructing a plant virtually through a mathematical modeling method and the virtual power plant building means are interconnected through a communication line to exchange data in real time with the virtual power plant using the virtual power plant. A simulation system for power plant control including a distributed control means for simulating a control logic applied from a control logic development means.
이하, 첨부한 도면을 참조하여 본 발명의 바람직한 일 실시예를 상세히 설명하겠다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명에 따른 발전설비 제어용 모의실험시스템을 나타낸 구성도이다. 본 발명의 발전설비 제어용 모의실험시스템은 크게 가상 발전설비를 구축하는 가상발전설비구축수단(10)과, 발전설비제어를 위한 제어로직을 개발하는 제어로직개발수단(30) 및 개발된 제어로직을 모의실험(simulation)하는 분산제어수단(20)을 구비한다. 여기서, 분산제어수단(20)의 제어로직은 실제 발전설비(plant)제어에 이용되는 것과 동일한 내용으로 구성된다.1 is a configuration diagram showing a simulation system for controlling a power plant according to the present invention. The simulation system for power plant control of the present invention is largely based on the virtual power plant building means (10) for constructing the virtual power plant, the control logic development means (30) for developing the control logic for power plant control, and the developed control logic. Dispersion control means 20 for simulating is provided. Here, the control logic of the distributed control means 20 is composed of the same contents as used for the actual power plant (plant) control.
분산제어수단(20)은 가상발전설비구축수단(10)과 네트워크를 통해 연결하는 데이터통신부(24)를 구비한다. 또한, 실제 제어로직이 입력되어 실행되는 제어부(21)를 구비한다. 그리고, 사용자인터페이스부(22)는 사용자로부터 운전(operating)에 관계되는 데이타를 입력받아 시스템버스(system bus)를 통해 각 기기들로 인가한다. 디스플레이부(23)는 현재 수행중인 운전상황 등을 운전화면에 표시한다. 데이터저장부(25)는 제어로직개발수단(30)에서 개발된 제어로직들을 입력받아 저장한다. 또한, 분산제어수단(20)은 외부기기등(예 : PLC;Programmable Logic Controller)을 접속할 수 있는 외부기기접속부(26)를 구비한다. 감시진단부(27)는 사용자인터페이스부(22)로부터 입력되는 데이터에 따라 내부 파라미터를 수정 및 분석한다. 운전기록부(28)는 제어로직을 모의실험할 때 발생되는 각종 운전데이타를 저장하고, 제어로직모의실험시에 발생하는 분산제어수단(20)의 문제상황 등을 저장한다. 상술한 바와같은 분산제어수단(20)을 구성하는 각 기기들은 시스템 버스(bus)를 통해 데이터를 주고받는다.The distributed control means 20 has a
이와같이 구성된 본 발명의 발전설비 제어용 모의실험시스템을 좀더 자세히 설명하겠다.The simulation system for generating power plant control of the present invention configured as described above will be described in more detail.
제어로직개발수단(30)은 발전설비제어수단(20)에서 수행되는 제어로직을 개발하여 분산제어수단(20)으로 인가한다. 데이터저장부(25)는 제어로직개발수단(30)으로부터 인가되는 제어로직을 저장한다. 한편, 가상발전설비구축수단(10)은 대상이 되는 발전설비(plant)를 수학적인 모델링방법을 통해 가상의 발전설비를 소프트웨어적으로 구축한다.The control logic development means 30 develops and applies the control logic performed by the power generation facility control means 20 to the distributed control means 20. The
분산제어수단(20)의 데이터통신부(24)는 네트워크를 통해 가상발전설비구축수단(10)과 연결된다. 가상발전설비구축수단(10)은 대상이 되는 실제 발전설비(plant)를 가상으로 구성한 가상의 발전설비프로그램을 실행한다. 제어부(21)는 제어로직개발수단(30)에서 개발된 제어로직을 검증하기 위해 가상의 발전설비를 이용해 제어로직을 모의실험(simulation)한다. 즉, 제어부(21)는 가상의 발전설비프로그램을 통해 마치 실제 발전설비를 제어하는 것과 동일한 결과를 얻을 수 있다. 디스플레이부(23)는 제어부(21)의 제어로직 실행상황을 모니터링할 수 있도록 각종 제어로직 수행화면을 디스플레이하며, 사용자인터페이스부(22)는 실제 운전상황과 동일하게 자동 또는 수동전환 조작을 할 수 있다.The
또한, 형태가 다른 발전설비를 모의실험할 경우에는 또 다른 모의용 모델을 채용함으로써 모의실험이 가능하게 한다. 즉, 가상발전설비구축수단(10)에 다양한 형태의 가상 발전설비들을 사전에 구축해두면 유사한 형태의 어떤 발전설비에도 적용이 가능하다. 그리고, 분산제어수단(20)은 실제 제어로직을 테스트할 뿐만 아니라, 내부의 파라미터를 수정 및 분석하는 과정을 통해 새로운 개념의 제어로직을 개발하고 테스트, 검증하는 것이 가능하다.In addition, in the case of simulating power generation facilities having different shapes, the simulation can be performed by adopting another simulation model. That is, if the virtual power generation facilities of various forms in the virtual power generation facility building means 10 in advance can be applied to any power generation facilities of a similar type. In addition, the distributed control means 20 may not only test the actual control logic, but also develop, test, and verify a new concept of control logic through a process of modifying and analyzing internal parameters.
상술한 바와같이 구성된 본 발명의 발전설비 제어용 모의실험시스템은 가상의 발전설비를 구축하고, 이를 이용하여 실제 설비에서 테스트하기 어려운 여러 가지 환경에서의 모의실험이 가능하며, 유사한 형태의 다른 설비에도 구성기기를 추가 혹은 삭제하여 구조를 바꾸고 설비사양에 맞는 데이터를 입력함으로써 새로운 발전설비를 구축하여 제어로직 및 운전방법에 관한 다양한 형태의 모의실험을 할 수 있다.The simulation system for generating power plant control of the present invention configured as described above can be simulated in various environments that are difficult to test in a real facility by using a virtual power generation facility, and can be configured in other facilities of a similar type. By adding or deleting equipment, changing the structure and inputting data according to equipment specifications, new power generation facilities can be constructed to simulate various types of control logic and operation methods.
이상과 같은 시물레이션방법을 통해 실제 설비를 건설 또는 시운전하기 전에 여러 가지 조건들을 사전에 테스트함으로써 제어로직 및 운전방법에 대한 사전검증, 제어에 관련된 제어파라미터를 결정하여 에러요소를 사전에 차단, 시운전기간을 상당히 줄일 수 있음은 물론, 실제 제어시스템과 동일한 시스템을 구축하여 운전원의 설비운전 훈련용으로도 활용이 가능한 효과를 제공한다.Through the above simulation method, various conditions are tested in advance before the actual construction or commissioning of the facility, and the control logic and the control parameters related to the control are determined in advance. In addition, the system can be reduced considerably, and the same system as the actual control system can be constructed to provide an effect that can be used for training the operation of the facility.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019970021160A KR100221473B1 (en) | 1997-05-28 | 1997-05-28 | Simulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019970021160A KR100221473B1 (en) | 1997-05-28 | 1997-05-28 | Simulation system |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19980085165A KR19980085165A (en) | 1998-12-05 |
KR100221473B1 true KR100221473B1 (en) | 1999-09-15 |
Family
ID=19507435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019970021160A KR100221473B1 (en) | 1997-05-28 | 1997-05-28 | Simulation system |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100221473B1 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100847116B1 (en) * | 2008-02-22 | 2008-07-18 | 황창성 | Comprehensive test equipment for emergency trip system of electric power plant |
KR100952557B1 (en) * | 2008-06-19 | 2010-04-12 | 한국전력공사 | Control, storage and retrieval device of MMI information for power plant simulator system and method thereof |
KR101030589B1 (en) * | 2009-10-30 | 2011-04-21 | 한국전력공사 | System and method for verifiing integrated distributed control system |
KR101646142B1 (en) * | 2010-02-04 | 2016-08-05 | 엘지전자 주식회사 | Facilities control system and operating method of the same |
KR101496647B1 (en) * | 2013-10-08 | 2015-03-02 | 한국남부발전(주) | Integrated simulator for distributed control system of a power plant |
KR101401597B1 (en) * | 2013-11-14 | 2014-06-02 | 김운해 | Simulation of generator by using water |
KR101676926B1 (en) * | 2014-12-31 | 2016-11-16 | 주식회사 포스코아이씨티 | System and Method for Verifying Prediction Algorithm of Energy Management System Using Virtual Environment |
KR102558632B1 (en) * | 2020-12-14 | 2023-07-24 | 한국수력원자력 주식회사 | Simulation system of power plant for applying virtualization technique |
-
1997
- 1997-05-28 KR KR1019970021160A patent/KR100221473B1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
KR19980085165A (en) | 1998-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7257523B1 (en) | Integrated distributed process control system functionality on a single computer | |
JP5692877B2 (en) | Test device for testing control programs for robotic devices | |
Süß et al. | Test methodology for virtual commissioning based on behaviour simulation of production systems | |
CN109597374A (en) | I/O for debugging is virtualized | |
JP5937209B2 (en) | Failure effect evaluation system and evaluation method | |
KR20050083751A (en) | Device and method for checking railway logical software engines for commanding plants, particularly station plants | |
Vergnano et al. | Interactive simulation-based-training tools for manufacturing systems operators: an industrial case study | |
US8954920B2 (en) | Apparatus for developing embedded software and a process for making the same | |
KR100221473B1 (en) | Simulation system | |
WO2000041050A1 (en) | Testing device for industrial control systems | |
CN113260935A (en) | Method and device for computer-aided simulation of a modular technical system | |
KR100935777B1 (en) | Virtual operating and test commander apparatus for experience accumulation test of unproven man machine interface system technology and the control method | |
US4914567A (en) | Design system using visual language | |
CN111308910B (en) | Simulation teaching platform for electric power system | |
JPH11282335A (en) | Failure diagnostic training system | |
EP0508619A2 (en) | Bi-directional socket stimulus interface for a logic simulator | |
KR20090021999A (en) | Plant controlling device simulation system | |
JP2005010915A (en) | Simulator of parallel type controller and parallel type controller system | |
CN114019921A (en) | Production line equipment control method, device, equipment and medium based on combined model | |
RU2699688C1 (en) | Training complex for training of operating personnel of automated process control systems | |
CA1298915C (en) | Design system using visual language | |
KR102614431B1 (en) | Integrated simulation apparatus | |
RU2282248C1 (en) | Device for training operating personnel of energy equipment | |
KR101006024B1 (en) | Simulator and its control method for turbine control system | |
Carrasco et al. | Simulation aids in the automation of industrial processes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20070622 Year of fee payment: 9 |
|
LAPS | Lapse due to unpaid annual fee |