KR100201539B1 - Unit steel-frame staircase and its construction method - Google Patents
Unit steel-frame staircase and its construction method Download PDFInfo
- Publication number
- KR100201539B1 KR100201539B1 KR1019960041418A KR19960041418A KR100201539B1 KR 100201539 B1 KR100201539 B1 KR 100201539B1 KR 1019960041418 A KR1019960041418 A KR 1019960041418A KR 19960041418 A KR19960041418 A KR 19960041418A KR 100201539 B1 KR100201539 B1 KR 100201539B1
- Authority
- KR
- South Korea
- Prior art keywords
- staircase
- unit steel
- steel
- side wall
- mounting plate
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
- E04F11/022—Stairways; Layouts thereof characterised by the supporting structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2201/00—Joining sheets or plates or panels
- E04F2201/05—Separate connectors or inserts, e.g. pegs, pins, keys or strips
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
본 발명은 철골구조물로서 시공되는 건출물의 상하층 수직동선을 연결하여 주는 철골계단에 관한 것으로서, 본 발명은 양측단에 대향하는 1쌍의 경사측벽판(10a)들을 가지며 그 경사측벽판(10a)들 사이에 직각을 이루는 단(10b)이 상하로 연속 형성되는 계단장(10)과, 상기 계단장(10) 양측의 경사측벽판(10a)들 상하부 끝부분에서 각기 수평하게 연결되는 수평측벽판(20a)(30a)들과 그 수평측벽판(20a)(30a)들과 직각으로 맞대어지는 수평막이판(20b)(30b)의 내부에 바닥판(20c)(30c)들을 형성하여서 된 상,하부계단참(20)(30)으로 구성되는 것에 있어서, 상기 상,하부계단참(20)(30) 들의 양측 끝부분에서 각기 일직선상의 외측으로 돌출된 하부에 단차지는 걸침부(22)(32)을 형성하여서 된 거치판(21)(31)들을 부착 고정하며, 상기 상,하부계단참(20)(30)에 일체로 형성된 거치판(21)(31)들의 내면 일정위치에 결착고정되는 브라켓(23)(33)에 상하높이조절이 가능한 높이 조절구(24)(34)들을 구비하여서 되는 유니트 철골계단 및; a) 계단받침 설치단계와, b) 유니트 철골계단 양중단계와, c) 유니트 철골계단의 거치단계와, d) 유니트 철골계단의 위치조정단계와, e) 유니트 철골계단 고정 단계를 순차적으로 수행하여서 되는 유니트 철골계단의 설치방법이다.The present invention relates to a steel staircase that connects the upper and lower vertical copper wires of a building to be constructed as a steel structure, the present invention has a pair of inclined side wall plate (10a) facing both ends and the inclined side wall plate (10a) Steps 10b formed at right angles between them are continuously formed up and down, and horizontal side wall plates connected horizontally at upper and lower ends of the inclined side wall plates 10a on both sides of the stairs 10, respectively. The image formed by forming the bottom plates 20c and 30c in the inside of the horizontal barrier plates 20b and 30b perpendicularly to the 20a and 30a and the horizontal side wall plates 20a and 30a. In the lower staircase (20, 30), the upper and lower step (20) (30) stepped on each of the lower ends of the step portion 22, 32 is stepped on the lower side protruding in a straight line, respectively Attached and fixed to the mounting plate (21) (31) formed, the mounting plate 21 formed integrally with the upper and lower step (20) (30) A unit steel staircase provided with brackets 23 and 33 which are fastened and fixed to a predetermined position on the inner surface of the 31 and having height adjustment holes 24 and 34 capable of adjusting the height; a) the installation of the staircase, b) the lifting of the unit steel stairs, c) the mounting of the unit steel stairs, d) the adjustment of the position of the unit steel stairs, and the e) the fixing of the unit steel stairs. How to install the unit steel stairway.
Description
제1도는 본 발명 유니트 철골계단의 일부절결 사시도.1 is a partially cutaway perspective view of the present invention steel frame staircase.
제2도는 본 발명 유니트 철골계단의 거치부발췌 사시도.Figure 2 is a perspective view of the mounting portion of the present invention steel frame staircase.
제3도는 제2도의 정단면도.3 is a front cross-sectional view of FIG.
제4도는 본 발명의 거치판이 변형된 실시예를 나타낸 일부 단면도.Figure 4 is a partial cross-sectional view showing an embodiment in which the mounting plate of the present invention is modified.
제5도는 본 발명의 거치판이 변형된 다른 실시예를 나타낸 일부 단면도.5 is a partial cross-sectional view showing another embodiment in which the mounting plate of the present invention is modified.
제6도는 본 발명 유니트 철골계단의 단계별 설치공정을 예시한 사시도로서,6 is a perspective view illustrating the step-by-step installation process of the unit steel staircase of the present invention,
(a)도는 유니트 철골계단을 지지하는 계단받침 설치단계의 사시도.(a) is a perspective view of a step support installation step for supporting the unit steel staircase.
(b)도는 유니트 철골계단을 양중단계를 나타내는 사시도.(b) is a perspective view showing the lifting stage of the unit steel staircase.
(c)도는 유니트 철골계단의 거치단계를 나타내는 사시도.(c) is a perspective view showing the mounting step of the unit steel staircase.
(d)도는 유니트 철골계단의 위치조정단계를 나타내는 사시도.(d) is a perspective view showing the position adjustment step of the unit steel staircase.
(e)도는 유니트 철골계단의 고정단계를 나타내는 사시도.(e) is a perspective view showing the fixing step of the unit steel staircase.
제7도는 본 발명에 따라 설치된 유니트 철골계단의 사시도.7 is a perspective view of a unit steel staircase installed in accordance with the present invention.
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
10 : 계단장 20, 30 : 상, 하부 계단참10: staircase 20, 30: upper, lower landing
21, 31 : 거치판 22, 32 : 걸침부21, 31: mounting plate 22, 32: hanger
22, 32 : 브라켓 22a, 32a : 걸림고리22, 32: bracket 22a, 32a: hook
22b, 32b : 미끄럼방지턱 24, 34 : 높이조절구22b, 32b: non-slip jaw 24, 34: height adjustment
[산업상 이용분야][Industrial use]
본 발명은 철골구조물로서 시공되는 건축물의 상하층 수직동선을 연결하여 주는 철골계단에 관한 것으로, 특히 철골계단의 설치시에 요구되는 부속수단을 구비하여서 설치작업을 능률적으로 수행할 수 있도록 하는 유니트 철골계단 및 그 설치 방법에 관한 것이다.The present invention relates to a steel staircase that connects vertical copper wires of upper and lower floors of a building to be constructed as a steel structure, and in particular, a unit steel frame having an accessory means required for installing the steel staircase to efficiently perform the installation work. It relates to a staircase and its installation method.
[종래기술][Private Technology]
일반적으로 고층건축물에는 상하층 수직동선을 연결하기 위하여 계단을 설치하게 되며, 이러한 계단은 좁은 공간내에서 상하층 슬라브와 연결되도록 시공되어야 하는 관계로 슬라브나 벽체와 같은 구조물과는 달리 작업조건이 까다로운 구조물로서 인식되어 있다.In general, high-rise buildings have a stairway to connect the upper and lower vertical copper lines, and the stairs must be constructed to connect with upper and lower slabs in a narrow space. It is recognized as a structure.
최근에 신축되는 대부분의 고층건축물은 철골구조물로서 시공되고 있으며, 이러한 건축물 시공상의 변화에 부응하여 슬라브의 수직동선을 연결하여 주는 계단을 철골로서 하나의 단위체를 이루도록 제작조립된 유니트 철골계단의 사용이 보편화되고 있다.Recently, most new high-rise buildings are being constructed as steel structures, and in response to these changes in construction, the use of unit steel staircases manufactured and assembled to form a unit as steel frames is a step that connects the vertical lines of slabs. It is becoming universal.
상기한 바와 같이 유니트 철골계단의 전형적인 것으로는, 양측단에 대향되는 1쌍의 경사측벽판들을 가지며 그 경사측벽판들 사이에 직각을 이루는 단이 상하로 연속형성되는 계단장과, 상기 계단장 양측 경사측벽판들의 상하부 끝부분에서 수평하게 연결되는 수평측벽판들과 그 각각의 수평측벽판들과 직각으로 맞대어지는 수평막이판의 내부에 바닥판들을 형성하여서 되는 상, 하부계단참으로 구성되었다.As described above, a typical unit steel frame staircase includes a staircase having a pair of inclined side wall plates opposite to both side ends and a stage formed at right angles between the inclined side wall plates and continuously formed up and down; The upper and lower staircases are formed by forming bottom plates in the horizontal side wall plates which are horizontally connected at the upper and lower ends of the inclined side wall plates and the horizontal wall plates which are perpendicular to the respective horizontal side wall plates.
이러한 유니트 철골계단을 타워크레인과 같은 양중장비로서 양중시켜서 기시공된 슬라브에 확보된 계단통으로 이동시킨 후에, 유니트 철골계단의 상부계단참부분은 상부 층간슬라브를 받쳐주는 철골보의 상부면에 수평하게 고정시키는 동시에, 하부계단참 부분은 상하층 슬라브 사이의 계단통에 조립 설치된 계단받침에 수평으로 고정시켜 설치하였다.After lifting the unit steel staircase as a lifting device such as tower crane and moving it to the stairwell secured to the constructed slabs, the upper stair part of the unit steel staircase is fixed horizontally to the upper surface of the steel slab supporting the upper interlayer slab. At the same time, the lower step part was installed by horizontally fixed to the step support installed in the stairwell between the upper and lower slabs.
이와 같은 종래의 유니트 철골계단은 계단장과 상, 하부계단참을 하나의 단위체로서 제작되었기 때문에, 이전의 철근콘크리트계단에 비하여 획기적으로 작업공정을 단순화하여 주는 장점을 가지는 것은 사실이다.Since the conventional unit steel staircase is manufactured as a single unit of the staircase and the upper and lower staircases, it is true that it has a merit that simplifies the working process significantly compared to the previous reinforced concrete stairs.
[종래기술의 문제점][Problems with Prior Art]
그러나, 이러한 종래의 유니트 철골계단은 그 자체에 설치작업시 요구되는 부속수단이 배려되어 있지 못한 관계로, 그 유니트 철골계단의 설치작업을 효율적으로 수행할 수 없는 결점을 수반하게 되었다.However, such a conventional unit steel staircase is accompanied with a drawback in that it is not possible to efficiently perform the installation work of the unit steel staircase because the associated means required for the installation work is not considered in itself.
즉, 첫째, 유니트 철골계단을 양중장비로서 양중시켜서 슬라브의 철골보와 상하층 슬라브 사이의 계단통에 설치되는 계단받침에 위치시킨 후에, 가접학작업과 고정작업이 완료되는 시점까지 양중장비를 지원하게 되어 고가인 양중장비를 효율적으로 운용할 수 없는 문제점과, 둘째, 유니트 철골계단은 정밀하게 설치되지 못하면 이후의 후속공정을 수행하는데 악영향을 끼치게 되어 정밀한 위치고정작업이 요구되고 있으나 현실적으로 슬라브의 철골보와 상하층 슬라브 사이에 설치되는 받침보는 정확한 수평상태를 기대할 수 없어, 유니트 철골계단의 높이 및 수평상태를 정밀하게 맞추어 고정하는데 세심한 주의와 노력이 요구되는 만큼 작업능률이 저하되는 문제점과, 셋째, 유니트 철골계단을 양중장비로서 양중한 상태로 그 유니트 철골계단의 위치고정작업을 수행하게 되는 과정에서 양중장비와 작업자 상호간의 유기적인 협동이 이루어지기 어려워 작업인원의 안전을 확보할 수 없는 문제점이 있었다.That is, first, the unit steel stairway is lifted as lifting equipment, placed on the stairwell installed in the stairway between the steel slabs of the slab and the upper and lower slabs, and then the lifting equipment is supported until the temporary work and the fixing work are completed. Secondly, it is not possible to operate expensive heavy lifting equipment efficiently. Secondly, if the unit steel stairway cannot be installed precisely, it will adversely affect the subsequent process. The support beam installed between the upper and lower slabs cannot expect the exact horizontal state, and the work efficiency is deteriorated as careful attention and effort is required to precisely fix the height and horizontal state of the unit steel stairs. The steel staircase is lifted as lifting equipment. The problem was hit harder being a positive work carried out between the amount of organic co-worker and heavy equipment in the process of being done that can not ensure the safety of the working personnel.
[발명의 목적][Purpose of invention]
따라서, 본 발명은 유니트 철골계단의 상, 하계단참에 거치판과 함께 높이조절구를 구비하여서, 첫째, 양중장비의 사용을 최소한으로 하여서 양중장비 운영상의 효율성과 경제성을 제고하여 주며, 둘째, 유니트 철골계단을 미세조정하여서 설치할 수 있도록하여 보다 정밀한 시공을 보장하여 주며, 셋째, 계속적인 양중장비의 지원없이 인력으로서 설치작업을 용이하게 수행할 수 있도록하여 주며, 넷째, 유니트 철골계단 설치에 따른 작업공정의 단순화를 꾀하여 공사기간을 대폭적으로 단축하여 주는 유니트 철골계단 및 그 설치방법을 제공하는데 그 목적이 있다.Therefore, the present invention is provided with a height adjusting opening with a mounting plate in the upper and lower landings of the unit steel staircase, firstly, to minimize the use of the lifting equipment to improve the efficiency and economic efficiency of lifting equipment operation, second, the unit Third, the steel frame staircase can be installed with fine adjustment to guarantee more precise construction. Third, the installation work can be easily performed as a manpower without continuous support of heavy lifting equipment. The purpose of the present invention is to provide a unit steel staircase and its installation method which greatly shorten the construction period by simplifying the process.
[발명의 구성][Configuration of Invention]
이하, 본 발명의 기술적 구성을 도면을 참조하여 상세히 설명하면 다음과 같다.Hereinafter, the technical configuration of the present invention with reference to the drawings in detail.
본 발명은 양측단에 대향되는 1쌍의 경사측벽판(10a)들을 가지며 그 경사측벽판(10a)들 사이에 직각을 이루는 단(10b)이 상하로 연속형성되는 계단장(10)과, 상기 계단장(10) 양측의 경사측벽판(10a)들 상하부 끝부분에서 각기 수평하게 연장되는 수평측벽판(20a)(30a)들과 그 수평측벽판(20a)(30a)들과 직각으로 맞대어지는 수평막이판(20b)(30b)의 내부에 바닥판(20c)(30c)들을 형성하여서 된 상,하부계단참(20)(30)으로 구성되는 점에 있어서는 종래의 것과 기술적 개념을 같이 한다.The present invention is a staircase (10) having a pair of inclined side wall plate (10a) opposed to both side ends and a step (10b) formed at right angles between the inclined side wall plate (10a) is formed continuously up and down, and The horizontal side wall plates 20a and 30a extending horizontally from the upper and lower ends of the inclined side wall plates 10a on both sides of the stairs 10, and the horizontal side wall plates 20a and 30a are perpendicular to each other. When the bottom plate (20c, 30c) formed by forming the bottom plate (20c, 30c) in the horizontal barrier plate (20b, 30b) is composed of the same technical concept as the conventional one.
그러나, 본 발명의 유니트 철골계단(1)은 제1도 및 제3도에 도시되는 바와 같이, 상기 상,하부계단참(20)(30)들의 양측 끝부분에서 각기 일직선상의 외측으로 돌출된 하부에 단차지는 걸침부(22)(32)를 형성하여서 된 거치판(21)(31)들을 부착 고정하며, 상기 상,하부계단참(20)(30)에 일체로 형성된 거치판(21)(31)들의 내면 일정위치에 결착고정되는 브라켓(23)(33)에 상하높이조절이 가능한 높이조절구(24)(34)들을 구비하여서 됨을 기술적 구성상의 특징으로 한다.However, the unit steel frame staircase 1 of the present invention, as shown in Figures 1 and 3, at the lower end protruding outward in a straight line at both ends of the upper and lower landings 20, 30, respectively. The step difference is fixed to the mounting plate (21) (31) formed by forming the hook portion (22) (32), the mounting plate (21) (31) formed integrally with the upper and lower steps (20, 30) It is characterized by the technical configuration that the brackets (23, 33) to be fixed to a fixed position on the inner surface of the height of the height adjustment holes 24, 34 capable of adjusting the height.
이와 같이 구성되는 본 발명은 유니트 철골계단(1)의 설치작업시에 요구되는 부속수단들이 배려되어 있지 못하여 설치작업을 효율적으로 수행할 수 없는 종래의 것과는 달리, 본 발명의 유니트 철골계단(1)은 제6도에 도시되는 양중장치(6)로서 양중시켜서 그 상부계단참(20) 양측에 돌출 형성된 거치판(21)으로는 상층 슬라브(2)의 철골보(3)에 얹혀지도록 하고, 그 하부계단참(30)의 양측에 돌출 형성된 거치판(31)으로는 상하층 슬라브(2) 사이의 계단통(4)에 설치되는 계단받침(5)의 계단보(5b)에 얹혀지도록 하는 것으로서 유니트 철골계단을 용이하게 거치할 수 있게 되는 것이다.The present invention constituted as described above is different from the conventional method in which the installation means cannot be efficiently carried out because the necessary means required for the installation work of the unit steel staircase 1 can not be efficiently performed. Is lifted by the lifting device 6 shown in FIG. 6 so that the mounting plate 21 protruding on both sides of the upper stairwell 20 is placed on the cheolgolbo 3 of the upper slab 2, and the lower stairwelling As the mounting plate 31 protruding on both sides of the 30, it is to be mounted on the stair beam 5b of the stair support 5 installed in the stairwell 4 between the upper and lower slabs 2, and the unit steel staircase It will be easy to mount.
특히, 유니트 철골계단(1)이 안치된 후에는 상,하부계단참(20)(30) 각각의 거치판(21)(31) 내측의 브라켓(23)(33)에 결착되는 높이조절구(24)(34)를 조절하여서 유니트 철골계단(1)의 높이와 수평상태를 미세하게 조정하여서 유니트 철골계단(1)을 보다 정밀하게 설치할 수 있는 등의 장점을 기대할 수 있는 것이다.In particular, after the unit steel staircase 1 is settled, the height adjusting opening 24 is fastened to the brackets 23 and 33 inside the mounting plates 21 and 31 of the upper and lower landings 20 and 30 respectively. By adjusting the (34), the height and the horizontal state of the unit steel staircase 1 can be expected to have an advantage such that the unit steel staircase 1 can be installed more precisely.
본 발명의 유니트 철골계단(1)을 이루는 계단장(10)과, 그 계단장(10)의 상하부에 수평하게 연결 형성되는 상, 하부계단참(20)(30)들의 구성은 가장 바람직한 예를 적용한 것이며, 이러한 계단장(10)과 상, 하부계단참(20)(30)들의 구성은 다른 형태의 것을 적용할 수도 있음을 밝혀 둔다.The configuration of the staircase 10 forming the unit steel frame staircase 1 of the present invention and the upper and lower staircases 20 and 30 horizontally connected to the upper and lower portions of the staircase 10 apply the most preferred example. It is to be noted that the configuration of the stairs 10 and the upper and lower stairs 20, 30 may be applied to other forms.
본 발명의 실시예에서 상기 상.하부계단참(20)(30)의 양측단에 각기 부착 고정되는 거치판(21)(31)들은 소정의 폭과 길이로서 연장되는 하단을 단차지도록 하여서 걸침부(22)(32)를 형성한 것을 나타내고 있다.In the embodiment of the present invention, the mounting plates 21 and 31 which are attached to both sides of the upper and lower steplocks 20 and 30, respectively, are fixed by stepping the lower end extending as a predetermined width and length. 22) and 32 are formed.
이러한 각각의 거치판(21)(31)들은 상,하부계단참(20)(30)의 양측단에 각기 용접접합으로 부착 고정되며, 필요에 따라서는 볼트접합으로 고정할 수도 있음을 밝혀 둔다.Each of these mounting plates (21) (31) is attached to both sides of the upper and lower engagement (20, 30) is fixed by welding, respectively, it is clear that it may be fixed by a bolted joint if necessary.
상기 거치판(21)(31)들의 내면에 각기 부착 고정되는 브라켓(23)(33)들은 대략 L자형의 단면형상을 가지는 형강으로서 형성된다.The brackets 23 and 33, which are respectively attached and fixed to the inner surfaces of the mounting plates 21 and 31, are formed as shaped steels having an approximately L-shaped cross section.
이러한 브라켓(23)(33)들은 거치판(21)(31)에 직각으로 대접시켜 부착 고정하여 돌출된 수평면의 중앙에 나사결합되는 각각의 높이조절구(24)(34)들로서 유니트 철골계단(1)의 높이와 수평상태를 미세조정하게 된다.These brackets (23) and (33) are mounted at right angles to the mounting plates (21) (31) to attach and fix the unit steel staircases (steps 24, 34) respectively screwed to the center of the horizontal surface protruding Fine adjustment of height and horizontal condition of 1).
여기에서, 제4도에 도시되는 바와 같이, 상기 상, 하부계단참(20)(30)에 각기 부착 고정되는 거치판(21)(31)들 각각의 걸침부(22)(32) 하단의 끝부분에서 직각으로 하향절곡 형성되는 걸림고리(22a)(32a)를 형성함이 바람직하다.Here, as shown in Figure 4, the upper end, the lower end of each of the latching portion (22) 32 of the mounting plate (21) (31) respectively attached and fixed to the lower step (20) (30) It is preferable to form the engaging ring (22a) (32a) formed bent downward at a right angle at the portion.
그 이유는, 유니트 철골계단(1)이 거치된 상태에서 완전하게 정착 고정되기 이전에 돌발적인 충격이나 하중에 의하여 거치판(21)(31)들이 철골보(3)나 계단받침(5)의 계단보(5a)로부터 이탈됨을 미연에 방지하여 주기 위함이다.The reason for this is that the staircases of the steel plate 3 or the staircase 5 are supported by the sudden impact or load before the unit steel frame stairs 1 are completely fixed and fixed. This is to prevent departure from the beam 5a in advance.
또한, 제5도에 도시되는 바와 같이, 상기 상,하부계단참(20)(30)에 각기 부착 고정되는 거치판(21)(31)들 각각의 걸침부(22)(32)의 내측 꺽임부위에 직각으로 돌출 형성되는 미끄럼방지턱(22b)(32b)을 형성하여서, 유니트 철골계단(1)이 안치된 상태에서 완전하게 정착 고정되기 이전에 돌발적인 충격이나 하중에 의하여 일측으로 밀리면서 유동되는 것을 방지하여 주도록 할 수도 있음을 밝혀 둔다.In addition, as shown in Figure 5, the inner bending portion of the engaging portion 22, 32 of each of the mounting plate (21) 31 is fixed to each of the upper and lower engagement (20, 30) By forming a non-slip jaw (22b, 32b) protruding at right angles to the unit, the unit steel staircase (1) is flowed while pushing to one side by an unexpected impact or load before being completely fixed in the settled state Be aware that it can be prevented.
이하, 본 발명의 유니트 철골계단(1)의 설치방법을 단계별로 설명하면 다음과 같다.Hereinafter, a step-by-step description of the installation method of the unit steel frame staircase 1 of the present invention.
제6도의 (a)도는 유니트 철골계단을 지지하는 계단받침의 설치상태를 나타낸 것으로, 먼저 상층 슬라브(2)는 유니트 철골계단(1)이 설치되는 위치의 계단통(4) 상의 철골보(3) 부분이 노출되도록 선시공하게 된다.Figure 6 (a) shows the installation of the stair support for supporting the unit steel stair step, first the upper slab (2) is the cheolgolbo (3) on the stairwell tube (4) at the position where the unit steel stair step (1) is installed Pre-installed to expose the part.
이와 같이 선시공된 상하층 슬라브(2) 사이에 지지되도록 수직으로 세워지는 1쌍의 계단기둥(5a)과 그 계단기둥(5a)의 중간부를 횡방향으로 연결한 계단보(5b)로서 조립되는 계단받침(5)을 설치하여서 된다.Steps assembled as a pair of stair columns 5a vertically erected so as to be supported between the pre-constructed upper and lower floor slabs 2 and the stair beams 5b connecting the middle portions of the stair columns 5a in the transverse direction. The support 5 is provided.
이때, 상기 계단받침(5)의 상부는 철근콘크리트타설된 상층 슬라브(2)에 접지되도록 하되 그 계단받침(5)의 하부는 하층 슬라브(2)의 상부면에 접지되어 견고하게 고정되도록 설치하게 된다.At this time, the upper part of the step support (5) is to be grounded to the reinforced concrete slab upper slab (2), but the lower part of the step support (5) is grounded to the upper surface of the lower slab (2) to be installed firmly fixed do.
제6도의 (b)도는 유니트 철골계단의 양중단계를 나타낸 것이며, 제작된 유니트 철골계단(1)을 견인와이어로서 양중장치(6)에 연결 결박하고, 양중장치(6)를 작동하여서 설정된 상층 슬라브(2) 사이의 계단통(4)으로 양중시켜 준다.(B) of FIG. 6 shows the lifting stage of the unit steel stair step, the upper unit slab set by connecting the manufactured unit steel stair step 1 to the lifting device 6 as a traction wire and operating the lifting device 6. We lift with stairs stairway (4) between (2).
제6도는 (c)도는 유니트 철골 거치단계를 나타낸 것으로, 양중장치(6)로서 상하층 슬라부(2) 사이의 계단통(4)에 위치된 상태인 유니트 철골계단(1)의 상부계단참(20)은 상하층 슬라브(2)에 노출된 철골보(3)에 거치판(21)으로서 거치시키고, 그 하부계단참(30)은 슬라브(2) 사이의 계단통(4)에 설치된 계단받침(5)의 계단보(5b)에 거치판(31)으로서 거치시켜서 된다.Figure 6 (c) shows the unit steel mounting step, the upper staircase of the unit steel staircase (1) in a state located in the stairwell (4) between the upper and lower slab (2) as a lifting device (6) 20 is mounted on the cheolgolbo (3) exposed to the upper and lower slab (2) as a mounting plate 21, the lower staircase 30 is a staircase (5) installed in the stairwell (4) between the slabs (2) It can be made to mount as the mounting plate 31 to the stepped beam 5b of ().
이때, 양중장치(6)는 유니트 철골계단(1)이 거치되는 것과 동시에 지원을 종료하고 다른 양중작업을 지원하게 되어 양중장비를 효율적으로 운영할 수 있게 된다.At this time, the lifting device (6) is to end the support at the same time as the unit steel staircase (1) is mounted and supports other lifting operations to efficiently operate the lifting equipment.
제6도의 (d)도는 유니트 철골계단(1)의 위치조정단계를 나타내는 것으로, 유니트 철골계단(1)이 상층 슬라브(2)의 철골보(3)와 상하층 슬라브(2) 사이의 계단통(4)에 설치된 계단받침(5)에 수평하게 거치된 상태에서, 상기 상부계단참(20)의 거치판(21)에 브라켓(23)으로서 결착된 높이조절구(24)와, 그 하부계단참(30)의 거치판(31)에 브라켓(33)으로서 결착된 높이조절구(34)를 각기 상하로 조절하여서 유니트 철골계단(1) 전체의 높이와 수평상태를 정밀하게 조정하게 된다.(D) of FIG. 6 shows a position adjustment step of the unit steel stair step 1, wherein the unit steel stair step 1 is a stairway between the steel slab 3 of the upper slab 2 and the upper slab 2 ( In the state mounted horizontally to the step support 5 installed in the 4), the height adjustment port 24 is fixed as a bracket 23 to the mounting plate 21 of the upper stair 20, and the lower stair 30 By adjusting the height adjustment hole 34, which is attached to the mounting plate 31 of the bracket as the bracket 33, up and down, respectively, the height and the horizontal state of the entire unit steel staircase 1 are precisely adjusted.
이러한 유니트 철골계단(1)의 위치조정단계를 수행할 때에, 상, 하부계단참(20)(30)에 구비된 높이조절구(24)(34)로서 양중장비의 지원없이도 인력으로 미세조정이 가능하여서, 유니트 철골계단(1)을 보다 정밀하게 위치조정할 수 있게 되는 것이다.When performing the position adjustment step of the unit steel staircase (1), it is possible to fine-adjust by manpower without the support of lifting equipment as the height adjusting holes (24, 34) provided in the upper and lower stairs (20, 30) By doing so, it is possible to precisely position the unit steel staircase (1).
제6도의 (e)도는 유니트 철골계단(1)의 고정단계를 나타낸 것으로, 유니트 철골계단(1)을 위치조정한 상태에서, 상부계단참(20) 양측단의 거치판(21)들과 상층 슬라브(2)의 철골보(3) 상호간을 정착철물(A)로서 연결 접합하여서 고정시키고, 그 하부계단참(30) 양측단의 거치판(31)들과 슬라브(2)들 사이에 설치된 계단받침(5)의 계단보(5b) 상호간을 정착철물(A)로서 연결 접합하여 고정시켜서 유니트 철골계단(1)의 설치작업을 완료하게 되는 것이다.Figure 6 (e) shows the fixing step of the unit steel stair step 1, in the state of adjusting the position of the unit steel stair step 1, the mounting plate 21 and the upper slab at both ends of the upper stairwell 20 Steel stabilization beams (2) of (2) by fixing the connection between each other as a fixing steel (A), the staircases installed between the slab (2) and the mounting plates 31 of both sides of the lower step (30) Steps (5b) of the step is to complete the installation work of the unit steel staircase (1) by connecting and fixing each other as a fixing hardware (A).
이와 같이 설치된 유니트 철골계단(1)은 계단통(4)을 기준으로 상향되게 설치된 것으로 예시되어 있으며, 이후에 다른 유니트 철골계단(1)을 하향지게 설치하여서 전체적으로 U턴형의 건축물 계단으로서 시공하게 되는 것이다.The unit steel staircase (1) installed as described above is illustrated as being installed upward with respect to the stairwell tube (4), after which the other unit steel staircase (1) is installed downward to be constructed as a U-turn type building stairs as a whole. will be.
본 발명의 실시예에서 상기 계단받침(5)은 슬라브(2) 사이에 수직으로 세워지는 1쌍의 계단기둥(5a)과 그 계단기둥(5a)의 중간부를 횡방향으로 연결한 계단보(5b)로서 설치하여서 된 것으로 나타내고 있으나, 제7도에 도시되는 바와 같이, 유니트 철골계단(1)이 설치될 위치에 상층 슬라브(2)를 받쳐주는 콘크리트기둥(7)이 시공되어 있는 경우에는, 상기 유니트 철골계단(1)을 받쳐 주는 계단받침(5)은 그 계단보(5b)의 일측을 상층 슬라브(2)를 받쳐 주는 콘크리트기둥(7)의 중간에 횡방향으로 고정시키고, 그 계단보(5b)의 타측은 상하층 슬라브(2)에 접지되어 수직하게 세워지는 계단기둥(5a)에 수평으로 연결 조립하여서 설치할 수도 있음을 밝혀 둔다.In the embodiment of the present invention, the stair support 5 is a pair of stair columns 5a erected vertically between the slabs 2 and the stair beams 5b connecting the middle portions of the stair columns 5a in the transverse direction. As shown in FIG. 7, the concrete pillar 7 supporting the upper slab 2 is constructed at the position where the unit steel frame stairs 1 are to be installed. The stair support 5 supporting the unit steel staircase 1 fixes one side of the stair beam 5b laterally in the middle of the concrete column 7 supporting the upper slab 2, It is noted that the other side of 5b) may be installed by connecting horizontally to the stair column 5a vertically grounded to the upper and lower slabs 2 to be installed.
[발명의 효과][Effects of the Invention]
이와 같이 구성되고 실시되는 본 발명 유니트 철골계단의 효과를 종합하여 보면 다음과 같다.Looking at the effects of the present invention unit steel frame stairs constructed and implemented as described above are as follows.
즉, 본 발명은 첫째, 상,하부계단참에 각기 거치판들을 구비하여서 유니트 철골계단을 단순히 설치위치로 양중시켜 거치함으로써 양중장비의 지원을 종료하게 되어 양중장치를 다른 작업에 효율적으로 운용할 수 있으며, 둘째, 상, 하부계단참에 구비된 높이조절구들에 상하높이를 조절하여 줌으로써 슬라브의 철골보와 상하층 층간슬라브 사이에 설치되는 계단받침의 수평상태와 관계없이 유니트 철골계단의 정밀한 시공을 보장하여 주며, 셋째, 유니트 철골계단을 위치조정하고 정착 고정시키는 작업을 인력으로서도 가능하게 함으로써 설치작업을 용이하게 수행할 수 있도록 하여 주며, 넷째, 유니트 철골계단이 거치된 상태에서 양중장비와의 유기적인 지원없이도 이후의 모든 작업을 인력으로 수행할 수 있게 되는 만큼 작업시간을 단축하면서도, 안정적인 설치작업을 수행할 수 있도록 하여 주는 등의 효과가 있다.That is, the present invention, first, equipped with a mounting plate in the upper and lower stairs, respectively, simply by lifting the unit steel staircase to the installation position to terminate the support of the lifting equipment can efficiently operate the lifting device for other tasks. Second, by adjusting the height of the upper and lower stairway height adjustment knobs to ensure the precise construction of the unit steel stairway regardless of the horizontal state of the stair support installed between the slab steel beam and the upper and lower floor interlayer slab. Third, it enables the installation and fixing of the unit steel staircase as a manpower so that the installation work can be easily performed. Fourth, without the organic support of the heavy lifting equipment, the unit steel staircase is mounted. You can shorten the working time by being able to do all the work afterwards, It has the effect of allowing stable installation work.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019960041418A KR100201539B1 (en) | 1996-09-21 | 1996-09-21 | Unit steel-frame staircase and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1019960041418A KR100201539B1 (en) | 1996-09-21 | 1996-09-21 | Unit steel-frame staircase and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR19980022312A KR19980022312A (en) | 1998-07-06 |
KR100201539B1 true KR100201539B1 (en) | 1999-06-15 |
Family
ID=19474707
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1019960041418A KR100201539B1 (en) | 1996-09-21 | 1996-09-21 | Unit steel-frame staircase and its construction method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100201539B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100755213B1 (en) | 2002-04-02 | 2007-09-04 | 가부시키가이샤 요코모리 세이사쿠쇼 | Connector and stair assembly |
CN106988529A (en) * | 2017-05-02 | 2017-07-28 | 闫相明 | A kind of stair template structure and the stair construction method using the formwork structure |
JP2021008744A (en) * | 2019-07-01 | 2021-01-28 | 株式会社横森製作所 | Steel staircase and attachment method of steel staircase |
-
1996
- 1996-09-21 KR KR1019960041418A patent/KR100201539B1/en not_active IP Right Cessation
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100755213B1 (en) | 2002-04-02 | 2007-09-04 | 가부시키가이샤 요코모리 세이사쿠쇼 | Connector and stair assembly |
CN106988529A (en) * | 2017-05-02 | 2017-07-28 | 闫相明 | A kind of stair template structure and the stair construction method using the formwork structure |
CN106988529B (en) * | 2017-05-02 | 2018-12-25 | 闫相明 | A kind of stair template structure and the stair construction method using the formwork structure |
JP2021008744A (en) * | 2019-07-01 | 2021-01-28 | 株式会社横森製作所 | Steel staircase and attachment method of steel staircase |
JP7329992B2 (en) | 2019-07-01 | 2023-08-21 | 株式会社横森製作所 | steel stairs |
Also Published As
Publication number | Publication date |
---|---|
KR19980022312A (en) | 1998-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6422352B1 (en) | Procedure and apparatus for the installation of an elevator | |
KR100201539B1 (en) | Unit steel-frame staircase and its construction method | |
EP1181423B1 (en) | Inner stairs for building and method of constructing it | |
KR200394640Y1 (en) | B.T safety parapet for adjusting the height thereof | |
KR100500306B1 (en) | assembly type steel frame ladder of reinforcement concrete building and construction method thereof | |
CN114382170A (en) | Construction method for upper-layer prefabricated vertical component | |
JP3177735B2 (en) | An erect scaffold used to reinforce the perimeter of existing buildings | |
JP3351927B2 (en) | Elevator structure | |
JPH11148213A (en) | Step plate device for curved stairway | |
RU2809450C1 (en) | Bracket for installing canopy platform | |
JP3732888B2 (en) | Temporary staircase with landing | |
JPH06305657A (en) | Elevator and its elevator shaft | |
JPS5836142B2 (en) | Method and device for installing supports for stair construction | |
JP2611882B2 (en) | Construction method of stairs | |
JP3394846B2 (en) | Elevator landing unit mounting structure | |
JP2553747Y2 (en) | Elevator ramp | |
JPH1162215A (en) | Handrail frame for temporary footing | |
JPH06305656A (en) | Work execution of elevator shaft | |
JPH11200478A (en) | Installing structure of veranda handrail wall | |
JPH07324449A (en) | Stair installing structure | |
JPH07103653B2 (en) | Landing structure of stairs | |
JPH08199796A (en) | Temporary staircase with landing and multi-stage construction method of temporary staircase with landing in shaft | |
JP2612646B2 (en) | How to build stairs | |
KR200288515Y1 (en) | assembly type steel frame ladder of reinforcement concrete building | |
JPH11200480A (en) | Verandah handrail wall mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20110302 Year of fee payment: 13 |
|
LAPS | Lapse due to unpaid annual fee |