KR0148135B1 - Climing device and method of a crane - Google Patents

Climing device and method of a crane

Info

Publication number
KR0148135B1
KR0148135B1 KR1019930023412A KR930023412A KR0148135B1 KR 0148135 B1 KR0148135 B1 KR 0148135B1 KR 1019930023412 A KR1019930023412 A KR 1019930023412A KR 930023412 A KR930023412 A KR 930023412A KR 0148135 B1 KR0148135 B1 KR 0148135B1
Authority
KR
South Korea
Prior art keywords
crane
cage
mast
tower mast
tower
Prior art date
Application number
KR1019930023412A
Other languages
Korean (ko)
Other versions
KR950013970A (en
Inventor
박만춘
Original Assignee
박만춘
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박만춘 filed Critical 박만춘
Priority to KR1019930023412A priority Critical patent/KR0148135B1/en
Publication of KR950013970A publication Critical patent/KR950013970A/en
Application granted granted Critical
Publication of KR0148135B1 publication Critical patent/KR0148135B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • B66C23/283Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels with frameworks composed of assembled elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/18Control systems or devices
    • B66C13/20Control systems or devices for non-electric drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/03Cranes with arms or jibs; Multiple cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Automation & Control Theory (AREA)
  • Jib Cranes (AREA)

Abstract

본발명은 크레인에 있어서 구조물이 높아짐에 따라 톱크레인의 높이를 높이고, 작업이 끝났을 경우 타워마스트를 해체하지 않고 톱크레인을 하강시키고 분리시킬수 있는 것을 특징으로 하는 클라이밍 장치에 관한 것이다.The present invention relates to a climbing device, characterized in that to increase the height of the top crane as the structure in the crane, the top crane can be lowered and separated without dismantling the tower mast when the operation is finished.

종래의 크레인에 있어서 클라이밍 방법은 타워마스트의 조립과 분해에 의해서 이루어졌으며 이러한 방법은 크레인 장치의 설치와 분리가 어려웠으며 타워마스트를 별도로 이용하기 위해서는 다시 타워마스트를 적층 조립해야 하는 단점이 있었다. 또한 톱크레인을 완전분해하지 않고는 이동설치나 저장이 어려워서 이들의 분해와 재조립에 소요되는 시간과 노동력이 많았다.In the conventional crane, the climbing method was performed by assembling and disassembling the tower mast, and this method was difficult to install and separate from the crane device, and in order to use the tower mast separately, there was a disadvantage that the tower mast was laminated and assembled again. In addition, it is difficult to move or install and store the top crane without complete disassembly.

본발명은 타워크레인을 케이지에 탑재시킨 상태에서 타워마스트를 승강할 수 있고, 크레인의 설치와 분리가 용이하고, 타워크레인을 분해하지 않고 일체를 케이지로부터 분리시켜 운반, 저장할 수 있으며, 톱크레인을 분리시킨후 케이지만을 운항할 수도 있어 경량화물를 운반하는 데 편리한 운반수단을 제공할 수가 있으며 본발명의 클라이밍 장치를 설치한 크레인은 고층구조물을 설치 건설하는 현장에서 유용하게 이용될 수 있으며 경비를 절약할 수 있는 편리한 크레인이다.According to the present invention, the tower mast can be lifted and lifted with the tower crane mounted on the cage, and the crane can be easily installed and separated, and the whole crane can be transported and stored without disassembling the tower crane. It is possible to operate the cage only after it is separated, so that it can provide a convenient means of transporting light cargo, and the crane equipped with the climbing device of the present invention can be usefully used in the construction of high-rise structures and save money. It is a convenient crane.

Description

톱크레인을 탑재한 케이지를 상하로 승강시킬 수 있는 크레인의 클라이밍 장치 및 원리Climbing device and principle of the crane that can raise and lower the cage equipped with the top crane

제1도는 본발명에 따른 클라이밍 장치를 장착한 크레인의 조립 사시도,1 is an assembled perspective view of a crane equipped with a climbing device according to the present invention,

제2도는 본발명의 베이스와 마스트의 분해 사시도,2 is an exploded perspective view of the base and mast of the present invention,

제3도는 본발명의 타워마스트 지지대와 하층케이지의 평면도,3 is a plan view of the tower mast support and the lower cage of the present invention,

제4도는 본발명의 클라이밍을 위한 구동부 및 케이지와 마스트의 결합 단면도,4 is a cross-sectional view of the drive unit and cage and mast for climbing of the present invention,

제5도는 마스트로부터 분리한 케이지의 분해 사시도,5 is an exploded perspective view of the cage separated from the mast,

제6도는 케이지 구동 부분의 정밀 사시도,6 is a precise perspective view of the cage driving portion,

제7도는 래크와 피니언의 조립 사시도,7 is an assembled perspective view of the rack and pinion,

제8도는 스윙베드의 조립 사시도,8 is an assembled perspective view of the swing bed,

제9도는 스윙베드의 분해 사시도,9 is an exploded perspective view of a swing bed,

제10도는 비작업 위치에서 마스트를 적층하는 상태의 크레인 사시도,10 is a perspective view of the crane in the state of stacking the mast in the non-working position,

제11도는 클라이밍되는 상태의 톱크레인 사시도,11 is a top crane perspective view of the climbed state,

제12도는 작업완료 상태의 톱크레인 사시도,12 is a perspective view of the top crane in the state of work completed,

제13도는 운반, 저장을 위해 붐을 접은 상태의 톱크레인 사시도,13 is a perspective view of the top crane with the boom folded for transportation and storage,

*도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

100:톱크레인 장치 200:케이지100: top crane device 200: cage

300:지지대 400:타워마스트300: support 400: tower mast

500:베이스500: base

본 발명은 고층구조물 건설 현장에서 다용도로 이용되는 크레인에 있어서, 특히 구조물이 높아짐에 따라 톱크레인의 높이를 임의대로 조절할 수 있는 클라이밍 장치와 원리에 관한 것이다.The present invention relates to a crane and a principle that can be used to control the height of the top crane arbitrarily as the structure is increased in the crane used in multi-purpose construction site.

크레인에 있어서 종래의 클라이밍 방법은 타워 마스트를 적재 적층하여 톱크레인의 위치를 상승시킬 수 있었고, 그 결과 마스트를 어떻게 용이하게 쌓아갈 수 있는가에 대해서만 궁리를 하여왔다.Conventional climbing methods for cranes have been able to raise the position of the top cranes by stacking tower masts, and as a result have been devised only how the masts can be easily stacked.

그리하여 톱크레인의 용도가 없어졌을 경우 타워 마스트의 높이를 줄이는 방법이외에는 톱크레인을 제거 할 수 있는 방법이 없었다. 건설현장에서 타워마스트는 크레인의 지지대로서 뿐만 아니라 승강기를 설치하여 경화물 용으로도 이용되고 있는바 종래의 크레인장치로서는 마스트의 조립과 분해 그리고 또다시 조립을 해야하는 번거로움이 있었다. 이 과정에서 로프를 이용한 승강 방법을 채택하고 있는 기존의 타워마스트는 최상단의 마스트에 로프풀리(rope pulley)가 달려 있어야 되기 때문에 위로부터 두 번째에 새로운 마스트를 삽입 결합하여 마스트의 높이를 늘려야 되고, 타워마스트의 높이를 줄일 때에는 위에서 두 번째의 마스트를 분리 제거해야 되기 때문에 많은 어려움과 복잡한 부속시설이 추가되어야 했다. 한편 유압실린더에 의한 클라이밍 방법에 있어서는 유압 유니트가 별도로 필요하고 실린더의 행정길이 만큼의 별도의 공간이 기본적으로 필요하였다.Thus, when the top crane was no longer used, there was no way to remove the top crane other than reducing the height of the tower mast. At the construction site, the tower mast is used not only as a support for crane but also as a hardened product by installing a lift. As a conventional crane device, there is a need to assemble, disassemble and reassemble the mast. In this process, the existing tower mast adopting the rope lifting method should have a rope pulley attached to the uppermost mast, so the new mast must be inserted into the second from the top to increase the mast height. Reducing the height of the tower mast required the removal of the second mast from above, which required a lot of difficulty and complex attachments. On the other hand, in the climbing method by the hydraulic cylinder, the hydraulic unit was required separately, and the separate space as much as the stroke length of the cylinder was basically required.

본 발명은 마스트를 순차적으로 적재 적층할 수 있도록 하였으며 마스트를 분해하지 않고 톱크레인을 보관, 이동, 재 설치 시킬수 있도록 한 것으로 마스트에 랙기어를 수직으로 부착하여 마스트를 적재 적층하여 조립하게 되면 연속된 직선상의 랙기어가 형성되고 마스트를 따라 수직으로 승강할 수 있는 케이지(cage)는 부속실에 피니언기어를 구동할 수 있는 구동부를 달아주어 마스트의 랙기어와 케이지의 피니언기어에 의해 케이지를 운행시킬수 있으며 케이지 상단에 톱크레인을 탑재한 상태에서 케이지의 상하 이동이 가능하다.The present invention allows the stacking and stacking of the masts sequentially and the top crane can be stored, moved and re-installed without disassembling the mast. Cage that can form a linear rack gear and vertically move up and down along the mast attaches a driving part to drive the pinion gear in the attached room so that the cage can be operated by the rack gear of the mast and the pinion gear of the cage. The cage can be moved up and down with the top crane mounted on the top of the cage.

본발명은 마스트를 적층시킬 경우와 케이지를 승강시킬 경우 톱크레인은 비작업 위치로 이동시킬 수 있도록 하였고 톱크레인의 보수나 기능점검을 할 경우 타워마스트를 분해하지 않고 톱크레인을 비작업 위치로이동시킨 상태에서 케이지를 지상 높이까지 하강시켜 톱크레인을 수리할 수 있을 뿐만 아니라 초기조립시 또는 제작조립후에 시운전을 해볼수 있기 때문에 크레인의 완벽한 기능을 수행할 수 있도록 하기까지의 점검시간을 절약할수 있고, 톱크레인이 탑재된 케이지를 타워마스트로부터 쉽게 분리할 수 있어서 타워마스트를 크레인 이외의 다른 용도로 이용하기가 편리한 크라이밍 장치를 제공하는 것이 본 발명의 목적으로 첨부 도면에 의하여 실시예를 구체적으로 검토하면 다음과 같다.In the present invention, when stacking masts and lifting cages, the top crane can be moved to the non-working position.When repairing or checking the top crane, the top crane is moved to the non-working position without disassembling the tower mast. In this state, the cage can be lowered to the ground level to repair the top crane, and during the initial assembly or after assembling, the trial run can be performed, thus reducing the inspection time until the crane can perform its full function. It is an object of the present invention to provide a climbing device which can be easily removed from the tower mast cage can be easily removed from the tower mast for other purposes than the crane specifically described with reference to the accompanying drawings The review is as follows.

제1도는 본발명에 따른 클라이밍 장치를 장착한 크레인의 조립사시도를 도시하고 있으며 크레인은 각종 중량물을 운반하는 톱크레인(100), 크레인을 탑재할 수 있고 타워마스트를 따라 승강할수 있는 구동부를 구비하고 있는 케이지(200), 타워마스트의 좌굴을 방지해주며 타워마스트를 지지하고 있는 지지대(300), 지상의 베이스로부터 적층되어 높이 쌓아지고 지지대로 지지되어 케이지가 승강할수 있는 중심 기둥역할을 하며 톱크레인을 받쳐주기도 하는 타워마스트(400), 크레인의 모든 구조물을 받쳐주고 수평을 유지하고 있는 베이스(500)등으로 크게 구분할수 있다.Figure 1 shows an assembly perspective view of a crane equipped with a climbing device according to the present invention, the crane is equipped with a top crane 100 for carrying a variety of heavy goods, a crane that can be mounted and a drive unit that can be elevated along the tower mast The cage 200, which prevents the buckling of the tower mast, and the support 300 for supporting the tower mast, stacked from the base of the ground is stacked high and supported by the support to act as a center pillar for the cage can be elevated and top crane The tower mast 400, which also supports the support, can be largely divided into a base 500 that supports and maintains all the structures of the crane.

톱크레인(100)은 중량물을 견인하는 주요 장치로 스윙베드, 턴테이블, 로프, 붐등으로 구성되어 있으며 그 구조를 살펴보면 양측에 로울러가 설치된 사각판상체구조를 한 스윙베드(133)위에 크레인을 수평방향으로 회전시킬수 있는 원판상의 턴테이블(132)이 설치되어 있고 턴테이블(132) 위에 대략 ㄷ형의 프레임(135)이 결착되어 있어 이 프레임(135)위에는 하단붐(128)의 기저부가 힌지핀으로 결합되어 있고, 붐각(붐이 상하로 회전하여 수평선과 이루는 각)을 조절할수 있는 붐 케이블(121)을 보지하는 포스트(123)가 3개 부착되어 있고, 붐케이블(121)을 감고 있는 붐케이블 윈치드럼(118)과 호이스트 케이블(115)을 감고 있는 호이스트 케이블 윈치드럼(116)이 브라켓으로 연결되어 부착되어 있다.The top crane 100 is composed of a swing bed, a turntable, a rope, and a boom as a main device for towing a heavy object. Looking at the structure, the crane is placed on a swing bed 133 having a rectangular plate-like structure with rollers installed on both sides. The turntable 132 of the disc which can be rotated is installed and the frame 135 of the approximately c-shaped is bound on the turntable 132, and the base of the lower boom 128 is coupled with the hinge pin on the frame 135. Boom cable (3) holding the boom cable 121 that can adjust the boom angle (angle of the horizontal line by rotating the boom up and down) is attached, and the boom cable winch drum winding the boom cable 121 ( 118 and the hoist cable winch drum 116 wound around the hoist cable 115 are connected by a bracket and attached.

붐은 하단붐(128)과 상단붐(126)으로 구분되어 있으며 각각 2개의 힌지핀(127)과 체결볼트로 연결되어 있다. 붐의 상하 회전운동은 붐케이블 윈치구동모터(119)에 의하여 구동되는 붐케이블 윈치드럼(118)에 감겨있는 붐케이블(121)이 감기도 풀림에 따라 포스트(123) 끝에 매달려 있는 붐고정활차(120)와 붐이동활차(122)의 사이가 가까워졌다 멀어졌다 하며 한쪽 끝은 붐이동활차(122)에 다른한쪽은 붐선단의 브라켓(130)에 연결된 붐고정케이블(125)에 의하여 붐의 상하 방향의 회전을 조절한다.The boom is divided into a lower boom 128 and an upper boom 126 and is connected with two hinge pins 127 and fastening bolts, respectively. The up and down rotation of the boom is a boom fixed pulley that is hung on the end of the post 123 as the boom cable 121 wound around the boom cable winch drum 118 driven by the boom cable winch driving motor 119 is unwinded. 120) and the boom moving pulley 122 is closer and farther apart, one end is the boom moving pulley 122, the other is connected to the bracket 130 of the boom front end boom fixed cable 125 by the boom Adjust the rotation of the direction.

호이스트 윈치 구동모터(117)로 구동되는 호이스트 윈치드럼(116)에 감겨있는 호이스트케이블(125)은 호이스트보조활차(114)와 호이스트고정활차(113)를 통과하여 호이스트이동활차(111)를 휘감고 웨이트(112)의 중앙을 통과하여 붐의 선단에 고정되어 있으며 호이스트윈치드럼(116)에 감겼다 풀렸다 함으로써 물건을 걸고 있는 갈고리가 달린 호이스트이동활차(111)을 올렸다 내렸다 하며 물건을 견인하다.The hoist cable 125 wound around the hoist winch drum 116 driven by the hoist winch driving motor 117 passes through the hoist auxiliary pulley 114 and the hoist fixed pulley 113 to wind the hoist movable pulley 111 and the weight. It is fixed to the tip of the boom through the center of the 112 and wound around the hoist winch drum 116 by lifting and unloading the hoist moving pulley 111 with the hook hanging on the object.

브라켓(130)에 달려 있는 과권방지기(131)는 호이스트 이동활차(111)가 위로 올라와 웨이트(112)를 건드리면 리미트스위치에 의하여 즉시 호이스트케이블(115)이 중지할수 있도록 제어하는 것이다. 고층에서 작업하는 크레인은 붐의 선단에 있는 브라켓(130)에 낙뢰 방지용 피뢰침(129)이 부착되어 있다. 이 피뢰침은 피뢰선에 의하여 땅속 깊이 묻혀있는 금속판과 연결되어 방전시 고압의 전류를 흡수해주어 크레인의 파손을 방지해 준다.The over-preventing device 131 which depends on the bracket 130 is to control the hoist cable 115 to stop immediately by a limit switch when the hoist moving pulley 111 rises and touches the weight 112. The crane working on the high floor has a lightning protection rod 129 for preventing lightning on the bracket 130 at the tip of the boom. This lightning rod is connected to the metal plate buried deep in the ground by the lightning rod and absorbs the high voltage current during discharge to prevent damage to the crane.

톱크레인(100)을 승강시키기 위해서는 제2도에 있는 베이스(500)를 1m두께 이상의 콘크리트 바닥위에 설치하여야 하며 콘크리트 바닥과 베이스(500)가 일체가 되면 더욱 좋다. 일반적인 방법으로는 바닥에 앵커볼트(512)를 묻어서 콘크리트를 양생시킨 다음 베이스판(511)을 볼트구멍(513)에 맞추어 앵커볼트(512)에 삽입하고 블록이나 와셔를 이용하여 베이스판(511)이 수평이 되도록 조절한 다음 와셔(514)와 너트(515)를 이용하여 체결 고정한다.In order to elevate the top crane 100, the base 500 in FIG. 2 should be installed on a concrete floor of 1 m or more, and the concrete floor and the base 500 may be more integrated. In general, the anchor bolt 512 is buried in the floor to cure concrete, and then the base plate 511 is inserted into the anchor bolt 512 in accordance with the bolt hole 513 and the base plate 511 using a block or a washer. After adjusting so as to be horizontal, using a washer 514 and a nut 515 is fastened and fixed.

마스트는 베이프판 위에 2-3개를 미리 적층 조립하여 놓는 데 단위 마스트는 같은 길이의 4개의 중공 파이프로된 기둥(411)이 있고 상·중·하단에 각각 4개의 가로대(412)로 지지되어 있으며 상단과 하단가로대에는 수직방향으로 구멍(420)이 형성되어 있으며 적재 적층시킬 경우 상·하단을 볼트와 같은 체결수단(417)으로 고정시킬수가 있다.The mast is pre-laminated and assembled 2-3 pieces on the bape plate. The unit mast has four hollow pipe pillars 411 of the same length and is supported by four cross bars 412 at the upper, middle and lower ends. The upper and lower side rails are formed with a hole 420 in the vertical direction, and when stacked to be stacked, the upper and lower ends may be fixed by fastening means 417 such as bolts.

가로대의 한쪽면에는 동일 수직선상에 볼트구멍(419)이 수평방향으로 뚫어져 있어서 각봉(角棒)에 기어의 이가 형성되어 있는 래크(414;rack)를 볼트와 같이 체결수단(418)으로 마스트에 고정한다.On one side of the crosspiece, a bolt hole 419 is drilled in the horizontal direction on the same vertical line, so that a rack 414 in which teeth of a gear are formed on each rod is fastened to the mast by a fastening means 418 like a bolt. Fix it.

또한 상·하 가로대 사이에는 브레이스(413)를 달아서 마스트가 하증을 받아 뒤틀리거나 좌굴되는 것을 방지하도록 하였다. 마스트(400)를 적층할 때에는 기둥(411)의 상단에 있는 구멍(416)에 다른 마스트 기둥의 하단에 연결된 돌출부(415)가 삽입되어 위치를 결정해주고 상측 가로대와 하측 가로대를 볼트와 같은 체결수단(417)으로 고정 해준다.In addition, a brace 413 is attached between the upper and lower rungs to prevent the mast from twisting or buckling. When stacking the mast 400, the protrusion 415 connected to the bottom of the other mast pillar is inserted into the hole 416 at the top of the pillar 411 to determine the position and fastening means such as bolts to the upper cross bar and the lower cross bar Fix it to (417).

제3도에는 마스트가 높아질 경우 자중과 톱크레인 하중등에 의해 발생되는 좌굴현상을 방지하기 위해 지지대(300)를 각층의 건축물 바닥에서 마스트의 가로대(412)로 연결하였으며 지지대(300)는 건축물의 각층 바닥에 브라켓(314)를 박고 브라켓에 부착된 암나사부(315)와 지지대 파이프(311)의 암나사부 사이에 체결된 스터드볼트(316)로 지지대(300)의 길이를 조절하여 마스트의 균형을 잡아준다. 마스트 쪽의 지지대 파이프(311)는 연결판(312)에 부착된 브라켓(314)에 핀으로 체결되어 있다.In FIG. 3, in order to prevent buckling caused by self weight and top crane load when the mast is increased, the support 300 is connected to the mast crossbar 412 on the floor of each building, and the support 300 is each floor of the building. Balance the mast by adjusting the length of the support 300 with a stud bolt 316 fastened between the female threaded portion 315 attached to the bracket and the female threaded portion of the support pipe 311 attached to the bracket. give. The support pipe 311 on the mast side is fastened with a pin to the bracket 314 attached to the connecting plate 312.

케이지(200)는 부속실이 있는 하층과 톱크레인(100)이 설치된 상층으로 구분되어 있으며 하층에는 바닥판(217)이 있으며 바닥판(217)위에 복수개의 받침대(215)를 세워 상층을 이루는 톱크레인 적재판(214)을 받치고 있으며 받침대(215)에 평판(218)을 부착하고 평판(218)에 메인모터(219)를 부착하여 케이지(200)를 구동하는 주동력원으로 이용하고 메인모터(219)의 축에 감속기(221)를 달아 회전수를 조절한 다음 감속기(221)에 연결된 2개의 피니언(222)이 회전하면서 래크(414)위를 이동하게 된다(제6도와 제7도 참조).The cage 200 is divided into a lower floor with an accessory room and an upper floor in which the top crane 100 is installed. The lower floor includes a bottom plate 217 and a plurality of pedestals 215 formed on the bottom plate 217 to form an upper floor. It supports the loading plate 214 and attaches the plate 218 to the pedestal 215 and attaches the main motor 219 to the plate 218 to serve as the main power source for driving the cage 200 and the main motor 219. After adjusting the rotation speed by attaching the reducer 221 to the axis of the two pinions 222 connected to the reducer 221 is moved over the rack 414 (see Fig. 6 and 7).

래크(414)와 두 피니언(222)의 접촉을 일정하게 유지해주기 위해 평판(218)에 축이 고정된 텐션로라(223)가 2개의 피니언(222) 중간위치에 설치되어 있다.In order to keep the contact between the rack 414 and the two pinions 222 constant, a tension roller 223 fixed to an axis of the plate 218 is provided at an intermediate position between the two pinions 222.

메인모터(219)에 이상이 생겼을 경우 케이지(200)의 추락을 방지할 수 있도록 보조모터(220)가 메인모터(219) 하단에 설치되어 있고 보조모터(220)에도 감속기(224)와 피니언(225)이 연속적으로 연결되어 있으며 피니언(225)과 수평으로 텐션로라(226)가 있어서 래크(414)와 보조모터의 피니언(225)이 항상 일정한 접촉면을 유지하도록 형성되어 있다.When the main motor 219 is abnormal, the auxiliary motor 220 is installed at the bottom of the main motor 219 to prevent the fall of the cage 200, and the reducer 224 and pinion ( 225 is connected continuously and the tension roller 226 horizontally with the pinion 225 is formed so that the rack 414 and the pinion 225 of the auxiliary motor always maintain a constant contact surface.

케이지(200)는 하층 바닥판(217)의 윗면과 상층 적재판(214)의 아랫면에 4개조의 가이드로라가 있어서 마스트의 기둥(411)을 타고 케이지(200)가 상·하로 움직일 때 일탈하는 것을 방지하며 마찰력을 감소시켜 케이지가 순조롭게 승강할 수 있도록 해준다.The cage 200 has four guide rollers on the upper surface of the lower floor plate 217 and the lower surface of the upper loading plate 214, so that the cage 200 deviates when the cage 200 moves up and down on the mast pillar 411. To reduce the friction and allow the cage to rise and fall smoothly.

한 조의 가이드로라는 세 개의 로라(228, 229, 230)로 구성되어 있으며 이중 두 개의 홀딩로라(228, 229)는 힌지핀(231)에 의해 회전될 수 있는 브라켓(232)에 부착형성되어 있고 다른 한 개의 로라(230)는 케이지의 바닥(214, 217)에 연결 고정되어 있다.A set of guide rollers is composed of three rollers 228, 229 and 230, of which two holding rollers 228 and 229 are attached to a bracket 232 which can be rotated by a hinge pin 231. The other Laura 230 is fixedly connected to the bottom 214, 217 of the cage.

힌지핀에 의해 회전 될수 있는 브라켓(232)은 하층에 2개 상층에 2개가 있으며 톱크레인(100)이 탑재된 케이지(200)를 현장에 설치하거나 작업이 끝나고 타워 마스트(400)로부터 케이지(200)를 분리시킬 때 두 개의 로라가 부착된 브라켓을 회전시켜 케이지(200)를 타워마스트(400)로부터 분리시킬 수 있다.The bracket 232 that can be rotated by the hinge pin has two upper floors and two upper floors. The cage 200 on which the top crane 100 is mounted is installed in the field or the work is completed and the cage 200 from the tower mast 400. When the two separate rollers are attached to the rotating bracket can be separated from the cage 200 from the tower mast 400.

베이스판(511)위에 마스트가 적층되고 케이지가 결합되면 케이지는 메인모터의 구동으로 상승되어 타워마스트의 최상단까지 올라가고 비작업 위치에 있던 톱크레인(200)의 중심을 타워마스트(400)의 최상단 중심으로 이동시킨다. 이상태가 작업을 하기위한 크레인의 정상적인 모습이다. 제8도와 제9도는 스윙베드(133)를 작업위치와 비작업 위치에서 그린 사시도이다. 스윙베드(133)은 케이지(200)의 상층적재판(214)위에 형성된 프레임(213) 위에 설치되는데 톱크레인(100)이 비작업위치에서 작업위치로 이동할수 있는 것은 프레임(213)의 수평보에 부착된 베어링하우징(137)과 스윙베드(133)의 밑에 부착 형성된 너트(139)에 결합된 리드 스크류(138)의 회전에 의해 스윙베드(133)가 진퇴하는 왕복운동을 한다.When the mast is stacked on the base plate 511 and the cage is coupled, the cage is lifted up by the driving of the main motor to the top of the tower mast, and the center of the top crane 200 in the non-working position is centered on the top of the tower mast 400. Move to. This is the normal appearance of the crane to work. 8 and 9 are perspective views of the swing bed 133 in a working position and a non-working position. The swing bed 133 is installed on the frame 213 formed on the upper stacking plate 214 of the cage 200. The top crane 100 can move from the non-working position to the working position in the horizontal beam of the frame 213. The swing bed 133 moves forward and backward by rotation of the bearing housing 137 attached to the lead screw 138 coupled to the nut 139 attached to the bottom of the swing bed 133.

이렇게 스윙베드(133)의 직선운동은 리드스크류(138)와 너트(139)에 의하여 이루어지며 동력은 모너(136)로부터 얻는다. 케이지(200)의 상층을 이루는 톱크레인의 적재판(214)의 프레임(213)사이에 수평하게 연결시킨 파이프레일(212)을 따라 스윙베드(133)의 양측면에 부착되어 있는 이동로라(134)가 구르게 됨으로서 톱크레인(100)은 타워마스트(400)의 최상단 중심부로 이동하게 되며 이동로라(134)의 마찰계수에 의하여 적은 동력으로 톱크레인(100)은 쉽게 이동될수 있다. 작업 높이까지 타워마스트(400)가 적층되면 스윙베드(133)를 이동시켜 타워마스트(400)의 중심으로 위치시킨 다음 마스트(400)의 기둥(411) 상단 구멍과 스윙베드(133)의 저면 4귀퉁이에 부착형성된 연결파이프(141)의 선단을 일치시킨후 케이지(200)를 하강시키어 마스트(400)의 4개의 기둥(411) 상단 구멍에 스윙베드(133)의 연결파이프(141)의 하단이 끼워지도록 하고 마스트(400)의 최상단 가로대(412)와 스윙베드(133)의 가로대(140)를 볼트등과 같은 체결수단으로 고정하였다.The linear movement of the swing bed 133 is made by the lead screw 138 and the nut 139 and the power is obtained from the moner 136. Moving rollers 134 attached to both sides of the swing bed 133 along the pipe rails 212 horizontally connected between the frames 213 of the stacking plate 214 of the top crane forming the upper layer of the cage 200. As the top crane 100 is rolled, the top crane 100 moves to the top center of the tower mast 400, and the top crane 100 can be easily moved with little power by the friction coefficient of the moving roller 134. When the tower mast 400 is stacked to the working height, the swing bed 133 is moved to be positioned at the center of the tower mast 400, and then the top hole of the pillar 411 of the mast 400 and the bottom 4 of the swing bed 133. The lower end of the connection pipe 141 of the swing bed 133 in the upper hole of the four pillars 411 of the mast 400 by lowering the cage 200 after matching the front end of the connection pipe 141 formed on the corner. The upper end 412 of the mast 400 and the rung 140 of the swing bed 133 were fixed with fastening means such as bolts.

제9도에서와 같이 파이프 레일(212)의 한쪽은 고정 파이프(212B)와 분할 파이프(212A)로 구분 제작되어 형성되어 있으며 분해와 결합을 할수 있어서 스윙베드(133)를 케이지(200)로부터 분리하거나 합치시킬수 있는 체결수단으로 이동될수 있다.As shown in FIG. 9, one side of the pipe rail 212 is formed and manufactured as a fixed pipe 212B and a split pipe 212A, and can be disassembled and combined to separate the swing bed 133 from the cage 200. Or can be moved to a fastening means that can be mated.

제10도는 고층건물 작업중 크레인을 더높이 클라이밍 시키고자 톱크레인을 비작업위치로 이동시키고 단위마스트를 지상으로 부터 들어올려 적층하려고하는 작업 광경을 도시한 사시도이다. 짧은 시간에 가단한 조치로 클라이밍하는 실시예이다.FIG. 10 is a perspective view showing a working scene in which a top crane is moved to a non-working position and a unit mast is lifted from the ground in order to climb a crane higher during a high-rise building work. It is an embodiment that climbs with a short measure in a short time.

제11도는 새로 적층한 마스트의 가로대를 체결수단으로 체결한후의 사시도로서 제10도의 연속된 과정이다.FIG. 11 is a perspective view of the newly stacked masts with the crossbars fastened by means of fastening.

제12도는 케이지(200)로부터 톱크레인(100)을 분리시킨 상태의 사시도로서 톱크레인(100)은 케이지(200)에 탑재된 채로 지상의 높이까지 하강시킨 다음 포스트(123)와 붐의 중간을 연결하고 있는 스토퍼(124)에 의해 정지하는 포인트까지 붐을 수평이 되도록 조절한 상태이다. 이러한 상태는 붐을 2단으로 접기 직전의 준비 상태이다. 제13도와 같이 붐을 2단으로 접어서 길이를 축소시키면 이동이나 저장시 완전분해를 하지 않고 톱크레인(100)을 취급할수 있어서 부품의 손망실이 적고 이동설치, 저장에 소요되는 시간을 절약할수 있다.12 is a perspective view of the top crane 100 separated from the cage 200. The top crane 100 is lowered to the ground level while being mounted on the cage 200, and then the middle of the post 123 and the boom is removed. The boom is horizontally adjusted to the point where the stopper 124 is connected to stop. This state is ready just before folding the boom into two stages. By reducing the length by folding the boom in two stages as shown in FIG. 13, the top crane 100 can be handled without disassembling completely during movement or storage, thereby reducing the loss of parts and the time required for mobile installation and storage. .

Claims (3)

타워마스트에 톱크레인을 설치한 크레인에 있어서, 적층 조립한 타워마스트(400)에 상층과 하층으로 형성된 케이지(200)를 홀딩로라(228, 229)로 결합하여 타워마스트의 래크(414)와 케이지(200)의 구동부에 의해 구동되는 피니언(222, 225)에 의하여 수직방향으로 승강될 수 있으며, 홀딩로라(228, 229)를 회전시켜 타워마스트(400)로부터 분리할 수 있도록 한 것을 특징으로 하는 톱크레인을 탑재한 케이지를 상하로 승강시킬 수 있는 크레인의 클라이밍 장치.In the crane provided with the top crane in the tower mast, the cage 200 formed in the upper and lower layers is laminated to the tower mast 400 which is laminated and assembled by holding rollers 228 and 229, and the rack 414 and cage of the tower mast. It can be lifted in the vertical direction by the pinions (222, 225) driven by the drive of the 200, it characterized in that the holding rollers 228, 229 to be separated from the tower mast 400 by rotating Climbing device for a crane that can raise and lower a cage equipped with a top crane. 제1항에 있어서, 타워마스트를 적층하거나 케이지(200)가 승강할 경우 톱 크레인(100)을 작업위치에서 비작업 위치로 이동할 수 있도록 리드 스크류와 너트가 형성되어 있고 스윙베드의 이동로라(134)가 케이지(200)의 파이프 레일(212)을 따라 구를 수 있도록 형성되며, 톱 크레인(100)을 비작업 위치로 이동하여 케이지(200)에 탑재한후 지상으로 하강시킬수 있는 것을 특징으로 하는 톱크레인을 탑재한 케이지를 상하로 승강시킬수 있는 크레인의 클라이밍 장치.According to claim 1, Lead screw and nut is formed so as to move the top crane 100 from the working position to the non-working position when the tower mast is laminated or the cage 200 is lifted moving roller of the swing bed 134 ) Is formed to be rolled along the pipe rail 212 of the cage 200, the top crane 100 is moved to a non-working position and mounted on the cage 200, characterized in that it can be lowered to the ground Climbing device for a crane that can raise and lower a cage equipped with a top crane. 제1항에 있어서, 톱크레인(100)을 정밀 분해하지 않고 케이지(200)의 상층에 있는 파이프 레일(212)의 분할 파이프(212A)를 분할하여 스윙베드(133)이상의 톱크레인(100)전체를 분리 할수 있는 것을 특징으로 하는 톱크레인을 탑재한 케이지를 상하로 승강시킬 수 있는 크레인의 클라이밍 장치.The top crane 100 of the above-described swing bed 133 is divided by dividing the split pipe 212A of the pipe rail 212 on the upper layer of the cage 200 without precisely disassembling the top crane 100. Climbing device of the crane that can be lifted up and down the cage equipped with a top crane, characterized in that it can be separated.
KR1019930023412A 1993-11-05 1993-11-05 Climing device and method of a crane KR0148135B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019930023412A KR0148135B1 (en) 1993-11-05 1993-11-05 Climing device and method of a crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019930023412A KR0148135B1 (en) 1993-11-05 1993-11-05 Climing device and method of a crane

Publications (2)

Publication Number Publication Date
KR950013970A KR950013970A (en) 1995-06-15
KR0148135B1 true KR0148135B1 (en) 1998-08-17

Family

ID=19367388

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019930023412A KR0148135B1 (en) 1993-11-05 1993-11-05 Climing device and method of a crane

Country Status (1)

Country Link
KR (1) KR0148135B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101489287B1 (en) * 2013-04-05 2015-02-04 (주)범강 Apparatus for installing or dismantling lift for construction and method of installing or dismantling lift for construction
KR102340628B1 (en) * 2021-06-30 2021-12-16 김무경 Safety equipments for lifter used in construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101489287B1 (en) * 2013-04-05 2015-02-04 (주)범강 Apparatus for installing or dismantling lift for construction and method of installing or dismantling lift for construction
KR102340628B1 (en) * 2021-06-30 2021-12-16 김무경 Safety equipments for lifter used in construction

Also Published As

Publication number Publication date
KR950013970A (en) 1995-06-15

Similar Documents

Publication Publication Date Title
US11028651B2 (en) Drilling rig
US9032689B2 (en) Jacking tower
US4125193A (en) Climbing device for climbing crane
JP4987313B2 (en) Construction method and dismantling method of scaffold for high-rise building
US20160200552A1 (en) Escalator lifting frame and method of using the same
CN214734024U (en) Indoor material conveying device in high-rise building construction process
KR0148135B1 (en) Climing device and method of a crane
CN108928783B (en) Shear type climbing hoisting machine for existing building additionally installed elevator
CN216807824U (en) Pipeline mobile device for hydraulic engineering
JP2006207327A (en) Apparatus for working at mechanical parking device and its working method
JPS59158794A (en) Crane for assembling steel tower
KR102204933B1 (en) Apparatus for elevating work table
CN113175222A (en) Installation method of embedded prefabricated external wall panel component
JP2951625B2 (en) Installation equipment and installation method for structural members
JP2001213584A (en) Large-scale elevation stage and lifting method and reversely driving technique using the same
JP4108076B2 (en) Construction method and dismantling method of scaffold for high-rise building
JP2008214062A (en) Lifting device and structural material mounting method
CN215974668U (en) Building construction material lifting device
CN217921266U (en) Building engineering material lifting device
CN110668332A (en) High stability cantilever crane for building
JP6510212B2 (en) Method for disassembling construction elevator, assembling method, and disassembling and assembling apparatus
CN219670049U (en) Automatic hoister for turnover materials
CN115419249B (en) Integrated intelligent climbing multifunctional platform, installation method and climbing method
CN117886229B (en) Multifunctional integrated rail type lifting mechanism
CN220165711U (en) Elevator convenient to it is fixed

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee