KR0132715Y1 - Rock packing - Google Patents

Rock packing Download PDF

Info

Publication number
KR0132715Y1
KR0132715Y1 KR2019960002292U KR19960002292U KR0132715Y1 KR 0132715 Y1 KR0132715 Y1 KR 0132715Y1 KR 2019960002292 U KR2019960002292 U KR 2019960002292U KR 19960002292 U KR19960002292 U KR 19960002292U KR 0132715 Y1 KR0132715 Y1 KR 0132715Y1
Authority
KR
South Korea
Prior art keywords
gabion
wire mesh
conical
steel wires
gravel
Prior art date
Application number
KR2019960002292U
Other languages
Korean (ko)
Other versions
KR970051924U (en
Inventor
김춘웅
Original Assignee
김춘웅
금강와이어메쉬산업 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김춘웅, 금강와이어메쉬산업 주식회사 filed Critical 김춘웅
Priority to KR2019960002292U priority Critical patent/KR0132715Y1/en
Publication of KR970051924U publication Critical patent/KR970051924U/en
Application granted granted Critical
Publication of KR0132715Y1 publication Critical patent/KR0132715Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/08Structures of loose stones with or without piles

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

[목적][purpose]

돌을 담기 수월하고, 담긴 돌이 빠져나가지 못하게 입을 얽어매기 편하며, 돌망테의 정형화에 의한 축성 및 축성 후의 견고성, 현장제작성 및 형태유지성이 우수하며, 저렴한 원추형 돌망테를 제공하기 위한 것이다.It is easy to hold the stone, easy to tie the mouth so that the stone does not escape, it is intended to provide a cheap conical gabion, excellent in layering and rigidity after the buildup, on-site manufacturing and shape maintenance by the standardization of the gabion.

[구성][Configuration]

원추형 성형틀(20)내에 높이에 따라 거기에 부합되는 지름을 가진 상단 링(12)과 하단 링(13)을 예치하고 이 원추형 성형틀(20)위에 소정의 규격으로 재단한 철망(11)에 그것보다도 긴 복수의 강선(14a, b)을 철망의 중심에서 교차하도록 끼은 것을 상기 성형틀(20)위에 놓고서 철망(11)위에 돌, 자갈(30)을 부어 그 무게로 성형틀(20)을 닮은 예비돌망테(10')로 만든 다음 성형틀(20) 위로 솟은 철망(11)과 강선(14a, b)의 여분(14c)을 가운데로 접어 모아 봉하고, 상기 강선(14a, b)의 여분(14c) 밑으로 복수의 보조강선(16a, b)을 방사상으로 끼워 돌망테(10)의 상면부에 묶어 만든 원추형 돌망테이다.The upper ring 12 and the lower ring 13 having a diameter corresponding thereto according to the height in the conical forming die 20 are deposited, and the conical forming die 20 is cut into a wire mesh 11 cut to a predetermined standard. A plurality of steel wires 14a and b longer than that are intersected at the center of the wire mesh, placed on the forming mold 20, and stones and gravel 30 are poured on the wire mesh 11 to form the forming mold 20 at the weight thereof. Made of a resembling preliminary gabion (10 ') and then fold and seal the wire mesh (11) and the excess (14c) of the steel wires (14a, b) raised above the forming mold (20) to the center, and the excess of the steel wires (14a, b) (14c) It is a conical gabion made by binding a plurality of auxiliary steel wires 16a and b radially under the upper surface of the gabion 10.

Description

원추형 돌망테Conical Gabion

제1도는 철망의 중심에서 교차하도록 강선을 끼운 상태의 평면도.1 is a plan view of the steel wire sandwiched in the center of the wire mesh.

제2도는 강선이 끼워지는 위치를 나타낸 망선교차점 부위의 단면확대도.2 is an enlarged cross-sectional view of a network intersection showing the position where the steel wire is fitted.

제3도는 형틀내에 상, 하 링을 예치하고 철망을 깐 다음 철망 위로 자갈, 돌을 쏟아부은 후에 일어난 변화를 나타낸 단면도.3 is a cross-sectional view showing the changes that occurred after depositing the upper and lower rings in the mold, covering the wire mesh, and pouring gravel and stones onto the wire mesh.

제4도는 본 고안에 의해 완성된 돌망테의 사시도.4 is a perspective view of the gabion completed by the present invention.

제5도는 종래의 원통형 돌망테의 사시도.5 is a perspective view of a conventional cylindrical gabion.

제6도는 종래의 복주머니형 돌망테의 사시도.6 is a perspective view of a conventional lucky bag type gabion.

* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings

10 : 원추형 돌망테 10' : 예비돌망테10: conical gabion 10 ': spare gabion

11 : 철망 12 : 상단 링11: wire mesh 12: top ring

13 : 하단 링 14a,b : 강선13: lower ring 14a, b: steel wire

14c : 여분 16a,b : 보조강선14c: spare 16a, b: auxiliary steel wire

본 고안은 강, 하천이나 해안의 방조제를 구축할 때 또는 기축성된 호안용 제방을 강우, 파도로 부터 완벽하게 보호하기 위한 돌망테의 개량에 관한 것이며, 특히 돌을 담기 수월하고, 담긴 돌이 빠져나가지 못하게 입을 얽어매기 편하며, 돌망테의 정형화에 의한 축성 및 축성 후의 견고성, 현장 제작성 및 형태 유지성이 우수하며, 저렴한 원추형 돌망테에 관한 것이다.The present invention relates to the improvement of gabions for the construction of river, river or coastal embankments, or to protect the sheltered embankments from rain and waves, in particular for easy loading of stones, The present invention relates to a conical gabion that is easy to entangle the mouth so as not to go out, and has excellent rigidity, field fabrication, and shape retention after layering and shaping by morphology of the gabion.

본 고안과 비교된느 종래의 제방축조용 돌망테로 제5도에 예시한 바와 같이 원통모양으로 둘러만 철망(1)의 내측에 상, 중, 하부에 강선골재(2)를 끼워 대고 바닥에 밑뚜껑(3)을 대어 망통으로 조립하고 입부분으로는 굵은 돌이나 자갈을 채워넣은 다음에 윗뚜껑(4)을 대고 철사같은 것으로 얽어매어 봉한 원통형 돌망테가 있다.Compared with the present invention, as shown in FIG. 5, the steel masonry gabion is surrounded by a cylindrical shape, and the steel wire aggregate 2 is inserted into the upper, middle, and lower portions of the wire mesh 1, Put the cap (3) to assemble into a mangong and fill the mouth with coarse stones or gravel, and then the upper lid (4) is a cylindrical gabion enclosed by a wire-like seal.

그러나, 이러한 종래의 돌망테는 규격이 따로 정해져 있지 않고 현장에서 제방의 실정에 맞춰 그때그때 임시변통으로 자체 제작하는 것으로, 돌망테 하나를 제작하는데 드는 노력과 시간소요가 많아 비능률적이고, 개당 제조원가도 높다. 또, 돌망테의 생김새가 시각적으로 거슬리기 때문에 축조된 제방 호안의 외관이 보기에도 아주 좋지 못했다.However, these conventional gabions are not defined in a specific way, and are manufactured by themselves as temporary makeshifts in accordance with the situation of the dike at the site, and it is inefficient because of the effort and time required to produce one gabion, and the production cost per piece is also inefficient. high. Also, because the appearance of the gabion was visually annoying, the appearance of the revetment bank was not very good to see.

또, 제6도에 예시한 복주머니형 돌망테(a)는 상기한 종래의 원통형 돌망테의 단점을 보완한 것이라고는 하지만 돌이나 자갈을 담은 후에 나타나는 생김새가 꼭지가 선명한 물방울형으로서 기중기로 들어올렸을 때와 바닥에 바로 세워 놓았을 때 및 옆으로 뉘었을 때의 형상이 제각기 달라 일정한 형상으로의 유지가 곤란하여 튼튼한 호안구조를 얻기 어렵고, 호안에 쌓은 돌망테간의 공간이 적어 돌과 자갈의 양이 추가 추입해야 하는 단점이 있었다.In addition, the lucky bag-type gabion (a) illustrated in FIG. 6 compensates for the shortcomings of the conventional cylindrical gabion described above. However, the appearance after the stone or gravel is contained may be lifted into the crane as a clear water droplet. When standing upright and on the floor and lying on the side, the shape is different, so it is difficult to maintain a certain shape, so it is difficult to obtain a strong revetment structure. There was a drawback to the extra input.

뿐만아니라 해안매립지용 방조제의 경우 돌이 가득 담긴 돌망테 하나의 무게는 수 톤이나 나가는데, 이렇게 무거운 돌망테를 바지선에 싣고 현장에서 하역할 때에 입(b)이 터지는 수가 흔해서 소중한 자재를 허비하기 십상이었고, 공기지연은 물론 막대한 공사비를 축내는 결과도 빚기 십상이었다.In addition, coastal landfills have a weight of several tons of gabions filled with stones, and when the heavy gabions are loaded onto barges and unloaded from the site, their mouths (b) are common. In addition, delays in the air as well as the huge cost of construction was likely to result.

따라서, 본 고안의 목적은 정형화된 돌망테의 제작과 돌이 가득 담긴 후의 모습이 대체로 일정한 형태로 유지가 가능해 단위면적당 돌, 자갈과 돌망테의 수요를 감축할 수 있어 경제적이고 공기가 단축되며, 입이 터지지 않는 튼튼한 새로운 구조의 돌망테를 제공하는 것이다.Therefore, the purpose of the present invention is that the production of a standard gabion and the appearance after full of stones can be generally maintained in a certain form, which can reduce the demand of stones, gravel and gabions per unit area, and economical and shorten the air. It is to provide a durable new structure of gabions that will not burst.

본 고안의 원추형 돌망테는 다음과 같이 제작한다. 소정의 체적을 감안하여 크기를 정해 철낭을 재단하고, 이 철망의 중심에서 직각으로 교차하도록 강선을 끼우고, 상광하협형 성형홈을 가진 성형틀 내의 상, 하단부에는 강선으로 된 상단 링과 하단 링을 예치한 다음 상기 올려놓은 다음 상기 철망을 성형틀 위에 중심이 일치하도록 놓고, 이 철망의 한복판에 돌이나 자갈을 붓는다. 이때, 철망은 돌이나 자갈의 무게에 못이겨 성형틀내로 내려앉아 원추형 바켓트의 형태를 띈 예비돌망테로 변한다. 돌, 자갈은 성형틀의 상단 만큼 채운다.The conical gabion of the present invention is manufactured as follows. Cut the iron bag to a certain size in consideration of the predetermined volume, insert the steel wire to cross at right angles from the center of the wire mesh, and the upper and lower rings of steel wires on the upper and lower ends in the forming frame having the upper and lower narrow grooves. After depositing and placing the wire mesh so that the center of the wire mesh on the molding frame, pour stones or gravel in the middle of the wire mesh. At this time, the wire mesh is settled into the mold to the weight of the stone or gravel to change the shape of the cone-shaped basket into a preliminary gabion. Fill stones and gravel with the top of the mold.

상기 에비돌망테는 성형틀 위로 솟아오른 가장자리를 한데 모아 접고 강선과 별도의 보조강선을 방자상으로 얽어 상판으로 바뀐 입언저리에 묶는다. 묶음줄은 나일론 로우프, 와이어 로우프, 굵은 철사 등이다. 이로써 소망하는 바의 원추형 돌망테가 얻어지는 것이다.The Ebidolmante folds together the edges raised above the molding frame and ties the steel wires and the separate auxiliary steel wires into a magnetic stripe and binds them to the mouthpiece changed into a top plate. Strings are nylon ropes, wire ropes, and thick wires. As a result, the desired conical gabion can be obtained.

이하, 바람직한 실시예를 토대로 작성한 제1도 내지 제4도의 첨부도면을 주시하면서 본 고안의 바람직한 실시예에 대하여 더욱 구체적으로 설명한다.Hereinafter, preferred embodiments of the present invention will be described in more detail with reference to the accompanying drawings of FIGS. 1 to 4 created based on the preferred embodiments.

제1도에 나타난 바와 같이 소정의 체적을 고려하여 크기를 정한대로 재단하여 철망(11)으로 한다. 이 철망(11)에는 한복판에서 교차하도록 두개의 곧은 강선(14a, b)을 끼운다. 강선(14a, b)은 철망(11)의 폭보다도 긴 것을 사용한다. 철망(11) 밖으로 삐져나온 여유분은 나중에 돌망테의 입을 보강하여 마무리할 때에 보강재로서 유용하게 활용된다. 이들 강선(14a, b)은 제2도에 나타난 바와같이 두 가닥의 망선(15a, b)이 엇갈리는 곳에 끼운다. 그러면 강선(14a, b)은 선재의 지름방향으로의 위치변동은 않게 된다.As shown in FIG. 1, the wire mesh 11 is cut to a predetermined size in consideration of a predetermined volume. The wire mesh 11 is fitted with two straight steel wires 14a and b so as to intersect in the middle. The steel wires 14a and b use what is longer than the width of the wire mesh 11. The extra amount protruding out of the wire mesh 11 is usefully used as a reinforcing material when the mouth of the gabion is later reinforced and finished. These wires 14a, b are sandwiched between two strands of wires 15a, b as shown in FIG. Then, the steel wires 14a and b do not change their position in the radial direction of the wire rod.

제3도는 상기 철망(11)와 성형틀(20)을 이용하여 예비돌망테(10')를 만든 장면을 나타낸 단면도이다 원추통으로 된 성형틀(20)내에 강선제 상단 링(12)과 하단 링(13)을 예치한다. 상, 하단(12, 13)은 강선, 피아노선 등으로 만든 원형 링이며, 상단 링(12)의 반경은 하단 링(13)의 반경 보다도 크다. 상단 링(12)과 하단 링(13)은 성형틀(20)의 바닥으로 부터 대략 2/3, 1/3 높이에 걸쳐지도록 반경을 정하는 것으로 한다.3 is a cross-sectional view showing a preliminary gabion 10 'using the wire mesh 11 and the forming mold 20. The upper wire 12 and the lower ring of the steel wire in the conical forming mold 20 are formed. Deposit (13). The upper and lower ends 12 and 13 are circular rings made of steel wire, piano wire, and the like, and the radius of the upper ring 12 is larger than the radius of the lower ring 13. The upper ring 12 and the lower ring 13 are supposed to define a radius so as to extend approximately 2/3, 1/3 height from the bottom of the mold 20.

이렇게 준비하고, 성형틀(20) 위 중심에 상기 철망(11)의 중심이 오도록 반듯하게 올려놓는다. 철망(11)의 복판에 돌이나 자갈(30)을 퍼붓는다. 이때, 철망(11)과 강선(14a, b)은 돌, 자갈의 무게에 못 이겨 주저앉아 제3도와 같은 바구니모양으로 형체가 바뀐다. 돌, 자갈은 대략 성형틀(20)의 높이까지 마저 채운다. 이로써 예비돌망테(10')로 된다.Prepare this way, and place the center of the wire mesh 11 in the center on the forming mold 20 straight. The stone or gravel 30 is poured into the middle of the wire mesh 11. At this time, the wire mesh 11 and the steel wires (14a, b) is not crushed by the weight of the stone, gravel, the shape changes to the basket shape as shown in FIG. The stones and gravel are even filled up to the height of the molding die 20. This makes the preliminary gabion 10 '.

상기 돌, 자갈(30) 층 위로 솟은 예비돌망테(10')의 철망 부분과 강선 부분을 가운데로 가즈런히 모아 접는다. 이때, 각 강선(14a, b)의 여분(14c)은 돌망테의 상면에서 +자상으로 교차시키고 그 밑으로 돌망테 상면의 반경과 동일 또는 그보다 약간 작은 보조강선(16a, b)을 방자상으로 끼운 다음에 모든 강선의 가닥을 나일론 로우프, 와이어 로우프, 굵은 철사 같은 것으로 철망(11)에 얽어맨다. 그리고 성형틀(20)에서 돌망테(10)를 들어내면 원추형 돌망테(10)가 얻어진다. 성형틀(20)에서 돌망테(10)를 들어내면 상, 하단 링(12, 13)과 강선(14a, b) 사이의 철망부위는 돌, 자갈의 무게때문에 팽출된다. 이는 다시 말해서 위 아래 및 좌우의 팽출된 철망부분 사이에는 상, 하단 링(12, 13)과 강선(14a, b)이 벌어지지 않음으로써 골이 생긴다. 이 골에 상, 하단 링(12, 13)이 갇힌 꼴이 되므로 철사 등으로 얽어매지 않아도 온전하게 제 위치를 지키게 된다.The wire mesh portion and the steel wire portion of the preliminary gabion 10 'which rises above the stone and gravel 30 layer are collected and folded in the center. At this time, the excess 14c of each steel wire 14a, b intersects + shape on the upper surface of the gabion, and below the radially the auxiliary steel wires 16a, b smaller than or equal to the radius of the upper surface of the gabion. After insertion, the strands of all the wires are entangled in the wire mesh 11 with things such as nylon ropes, wire ropes, and thick wires. And when the gabion 10 is lifted out of the shaping | molding die 20, the conical gabion 10 is obtained. When the gabion 10 is lifted from the mold 20, the wire mesh portions between the upper and lower rings 12 and 13 and the steel wires 14a and b swell due to the weight of stones and gravel. In other words, the upper and lower rings 12 and 13 and the steel wires 14a and b do not open between the upper and lower sides and the expanded wire mesh portions. Since the upper and lower rings 12 and 13 are trapped in this valley, they are kept in place without being tied up with wires or the like.

만약, 상단 링(12)과 하단 링(13)의 자세가 불안정하다고 판단될 시에는 이들이 가로지나는 곳의 철망(11)이나 강선(14a, b)과 철사 등으로 얽어매서 안정시킨다.If it is determined that the postures of the upper ring 12 and the lower ring 13 are unstable, they are stabilized by being entangled with wire mesh 11 or steel wires 14a, b and wires where they cross.

이상 설명한 바를 종합하면 본 고안에 의해 새로 제안된 제방축조용 원추형 돌망테는 별도로 만든 뚜껑으로 원형 철망통의 양쪽 입부분을 봉할 필요가 없어 제작성이 우수하다. 더구나 이 원추형 돌망테는 현장에서 콘크리트로 성형틀을 만들거나 또는 철구조물제 성형틀을 현장으로 운반하여 비치하고 그 자리에서 돌, 자갈의 무게를 이용하여 예비돌망테로 만들고 이어서 입을 마무리하는 것으로 아주 신속하고 편리하게 원추형 돌망테를 제작할 수 있으므로 현장적응력이 탁월하다.To sum up the bar described above, the conical gabion for newly constructed embankment by the present invention is excellent in manufacturability because there is no need to seal both mouths of the circular wire mesh with a lid made separately. Furthermore, this conical gabion is made very quickly by making a mold from concrete on site or by transporting a mold made of steel structure to the site and then using a weight of stone and gravel to make a spare gabion and then finishing the mouth. It is excellent in field adaptability because it can make conical gabion easily and conveniently.

또, 원추형 돌망테는 입이 완전히 그리고 튼튼하게 봉해지므로 속에 채운 돌, 자갈이 쏟아질 염려가 없음은 물론 운반, 축성시 입이 터지 않으므로 자재훼실, 공기지연, 공사비증가와 같은 불이익도 말끔히 사라진다.In addition, the cone-shaped gabion is completely and firmly sealed, so there is no fear of spilled stones and gravel, and the mouth is not opened during transportation and construction, so disadvantages such as material loss, air delay, and construction cost are eliminated.

또한 돌, 자갈을 채운 후 탈형한 뒤에 돌망테의 형태 및 축성 후의 돌망테의 형태는 거의 변화가 없으므로 차량 또는 운반선에의 적재면적감소로 보다 많은 양의 돌망테를 수송할 수 있는 것은 물론 호안 축성시 돌망테간의 공간이 많이 남아 다른 토사로 채울 수 있는 여지가 충분히 확보되므로 돌, 자갈 및 돌망테의 현장 수요의 감축이 가능할 뿐 아니라 더욱 튼튼하고 경제적인 호안 공사를 진행할 수 있는 장점이 제공되는 등 매우 실용적인 돌망테이다.In addition, since the shape of the gabion after the demoulding after filling the stone and gravel and the shape of the gabion after the formation are almost unchanged, it is possible to transport a larger amount of gabion by reducing the loading area on a vehicle or a carrier, as well as to build a raft. Since there is a lot of space between the city's gabions, there is enough room to fill them with other soils, which not only reduces the demand for stones, gravel and gabions, but also provides the advantages of more robust and economical revetment work. It is a very practical gabion.

Claims (1)

원추형 성형틀(20)내에 높이에 따라 거기에 부합되는 지름을 가진 상단 링(12)과 하단 링(13)을 예치하고 이 원추형 성형틀(20) 위에 소정의 규격으로 재단한 철망(11)에 그것보다도 긴 복수의 강선(14a, b)을 철망의 중심에서 교차하도록 끼운 것을 상기 성형틀(20)위에 놓고서 철망(11) 위에 돌, 자갈(30)을 부어 그 무게로 성형틀(20)을 닮은 예비돌망테(10')로 만든 다음 성형틀(20) 위로 솟은 철망(11)과 강선(14a, b)의 여분(14c)을 가운데로 접어 모아 봉하고, 상기 강선(14a, b)의 여분(14c) 밑으로 복수의 보조강선(16a, b)을 방사상으로 끼워 돌망테(10)의 상면부에 묶은 것을 특징으로 하는 원추형 돌망테.The upper ring 12 and the lower ring 13 having a diameter corresponding thereto according to the height in the conical mold 20 are deposited and placed on the wire mesh 11 cut to a predetermined size on the conical mold 20. A plurality of steel wires 14a and b longer than that are intersected at the center of the wire mesh, placed on the forming mold 20, and stones and gravel 30 are poured onto the wire mesh 11 to form the forming mold 20 at the weight thereof. Made of a resembling preliminary gabion (10 ') and then fold and seal the wire mesh (11) and the excess (14c) of the steel wires (14a, b) raised above the forming mold (20) to the center, and the excess of the steel wires (14a, b) (14c) A conical gabion, characterized in that a plurality of auxiliary steel wires (16a, b) radially sandwiched below and tied to the upper surface of the gabion (10).
KR2019960002292U 1996-02-14 1996-02-14 Rock packing KR0132715Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2019960002292U KR0132715Y1 (en) 1996-02-14 1996-02-14 Rock packing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2019960002292U KR0132715Y1 (en) 1996-02-14 1996-02-14 Rock packing

Publications (2)

Publication Number Publication Date
KR970051924U KR970051924U (en) 1997-09-08
KR0132715Y1 true KR0132715Y1 (en) 1998-12-15

Family

ID=19450514

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2019960002292U KR0132715Y1 (en) 1996-02-14 1996-02-14 Rock packing

Country Status (1)

Country Link
KR (1) KR0132715Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100760950B1 (en) * 2006-11-24 2007-09-21 한양대학교 산학협력단 Coastal structure built of net with tetrapod and fabrication method and constructing method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050010443A (en) * 2003-07-21 2005-01-27 삼원실업 주식회사 Method of construction using the puddle and the Fabrie Mesh bag

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100760950B1 (en) * 2006-11-24 2007-09-21 한양대학교 산학협력단 Coastal structure built of net with tetrapod and fabrication method and constructing method thereof

Also Published As

Publication number Publication date
KR970051924U (en) 1997-09-08

Similar Documents

Publication Publication Date Title
US4090363A (en) Dam of earth or rock fill having impervious core
AU2004272814B2 (en) A reinforcing device and a bifacial reinforcing unit for earthworks and a method for the production of a reinforced earthwork
JPH06193068A (en) Earth retaining method
JP3639864B2 (en) Beach stabilization structure
KR0132715Y1 (en) Rock packing
CN206902740U (en) A kind of retaining structure reinforced for weak soil cutting
JPH11323936A (en) Banking structure and stabilizing construction method therefor
KR100542823B1 (en) Method Manufaturing of Water Permeable Block
JPH0351424A (en) Banking forming method and forming material
KR102067784B1 (en) separation type foundation reinforcing bag
WO2007061156A1 (en) Construction method of embankment
CN107740381A (en) A kind of opened debris flow blocking dam set based on waste and old Container Reconstruction
CN210712875U (en) Slope surface reinforcing system and dam
JP2000204571A (en) Retaining wall construction method
CN110438942A (en) A kind of sandy soil fill protective slope structure and its construction method
RU2248427C1 (en) Method for gabion consolidation structure erection in water stream
JP3057048B2 (en) Futon basket
JPH0141795Y2 (en)
JPH0369721A (en) Steep gradient banking
JPH04108914A (en) Structure for reinforced banking body
KR100443378B1 (en) Porous block with stone net bag, and method for producing the same
JP2955267B2 (en) Box-shaped bag-like body and manufacturing method thereof
CN218374008U (en) Seaside building prevents throwing stone barricade of foundation soil loss
CN216194418U (en) Pile foundation bearing platform type berthing revetment structure with urban wall relief
KR100644358B1 (en) Method of producing natural stone panel

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20050923

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee