KR100443378B1 - Porous block with stone net bag, and method for producing the same - Google Patents

Porous block with stone net bag, and method for producing the same Download PDF

Info

Publication number
KR100443378B1
KR100443378B1 KR1020030058388A KR20030058388A KR100443378B1 KR 100443378 B1 KR100443378 B1 KR 100443378B1 KR 1020030058388 A KR1020030058388 A KR 1020030058388A KR 20030058388 A KR20030058388 A KR 20030058388A KR 100443378 B1 KR100443378 B1 KR 100443378B1
Authority
KR
South Korea
Prior art keywords
block
gabion
porous
natural stone
porous concrete
Prior art date
Application number
KR1020030058388A
Other languages
Korean (ko)
Inventor
배흥경
Original Assignee
배흥경
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배흥경 filed Critical 배흥경
Priority to KR1020030058388A priority Critical patent/KR100443378B1/en
Application granted granted Critical
Publication of KR100443378B1 publication Critical patent/KR100443378B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: A gabion-porous block and a manufacturing method thereof are provided to minimize a change in the ecosystem via environmental-friendly gabion porous blocks and to conserve the peripheral environments. CONSTITUTION: A gabion-porous block comprises plural native rocks(10) arranged in a space of a rectangular parallelepiped shape; a porous concrete(20) layer(B) formed to the lower layer of the native rocks to firmly combine the native rocks; reinforcements(40) inserted in the porous concrete layer to reinforce the inside strength; and a wire-mesh(30) enclosing the upper parts of the native rocks by having one end included in one side of the porous concrete layer and the other end included in the other side of the porous concrete layer.

Description

돌망태 포러스 블록 및 그 제조방법{Porous block with stone net bag, and method for producing the same}Porous block with stone net bag, and its manufacturing method {Porous block with stone net bag, and method for producing the same}

본 발명은 돌망태 포러스 블록 및 그 제조방법에 관한 것으로, 더욱 상세하게는, 블록을 형틀과, 돌망태, 그리고 포러스(porous) 콘크리트를 사용하여 대량으로 생산가능하도록 하고, 또한 친환경적인 구조로 형성되도록 하여 자연 생태계를 원래의 형태로 최대한 보존이 가능하도록 한 돌망태 포러스 블록 및 그 제조방법에관한 것이다.The present invention relates to a gabion porous block and a method of manufacturing the same, and more particularly, to enable the block to be produced in large quantities using a mold, a gabion, and porous concrete, and also to form an environmentally friendly structure It is about a gabion pore block and its manufacturing method that allows the natural ecosystem to be preserved in its original form.

종래 하천이나 해변의 제방, 도로법면 등의 보도가 쉽게 유실되는 것을 방지하기 위하여 콘크리트 블록으로 만들어진 호안블록을 설치하고 있다. 즉, 여러 가지 모양으로 된 상기 블록을 바둑판 모양으로 끼워 맞추는 방법으로 하여, 통상 상기 블록의 1/2 정도되는 깊이로 원지반을 파낸 후 조경블록을 시공하고 있고 있다.In order to prevent the loss of sidewalks, such as river banks, beach embankments, roads, and the like, easy installation is made of a revetment block made of concrete blocks. In other words, the land block is constructed by digging the base plate to a depth of about 1/2 of the block by fitting the blocks of various shapes into a checkerboard shape.

그러나, 이와 같은 경우 하천이나 해변 제방 모두가 콘크리트로 덮여지는 관계로 자연환경에 대한 적응력이 낮고, 초목이나 수초 등이 생육하지 못하여 자연 생태계에 큰 변화를 조장하게되는 등 장시간 사용에 따른 많은 문제점이 초래된다.However, in this case, since all rivers and seashore embankments are covered with concrete, they have low adaptability to the natural environment and do not grow vegetation or plants, causing large changes in the natural ecosystem. Caused.

또한, 상기와 같이 이루어지는 블록의 대부분은 무엇보다 콘크리트나 합성수지로 이루어져 있어 생물이 자생하기에는 적당하지 않게 되며, 그 결과 친환경적인 제방으로 개선하고자 상기 콘크리트를 전부 철거하여 처리할 경우 다량의 폐콘크리트나 폐합성수지로 인한 심각한 환경문제가 발생되게 된다.In addition, most of the blocks made as described above are made of concrete or synthetic resin above all, which is not suitable for living by itself, and as a result, a large amount of waste concrete or waste when the concrete is removed and treated to improve environmentally friendly dikes. Severe environmental problems are caused by synthetic resins.

따라서, 본 발명은 이와 같은 문제점을 해결하기 위하여 안출된 것으로, 친환경적인 돌망태 포러스 블록을 이용하여 생태계의 변화를 최소화 할 수 있게 하며, 나아가 주변 환경을 자연 환경 그대로 보존 유지가 가능하도록 하는 돌망태 포러스 블록 및 그 제조방법을 제공하고자 함에 목적이 있다.Accordingly, the present invention has been made to solve such a problem, it is possible to minimize the change of the ecosystem by using an eco-friendly gabion pore block, and furthermore, the gabion pore block to enable the preservation of the surrounding environment as it is And it is an object to provide a method of manufacturing the same.

또한, 본 발명은 일정한 형태로 블록을 대량으로 생산이 가능하도록 함으로써, 상기 블록을 현장으로 운반한 후에 단지 조립만하면 시공이 되도록 하여 간편한 시공과 함께 작업기간을 대폭적으로 줄일 수 있도록 하는 돌망태 포러스 블록및 그 제조방법을 제공하고자 함에도 그 목적이 있다.In addition, the present invention is to enable the production of a large amount of blocks in a certain form, the gabion porous block to significantly reduce the working period with a simple construction to be constructed by only assembling after carrying the block to the site and The purpose is to provide a manufacturing method.

도 1은 본 발명에 따른 돌망태 포러스 블록의 사시도를 나타낸 도면.1 is a perspective view of a gabion porous block according to the present invention.

도 2는 본 발명에 따른 돌망태 포러스 블록의 시공예를 나타낸 도면.2 is a view showing a construction example of the gabion porous block according to the present invention.

도 3 및 4는 본 발명에 따른 돌망태 포러스 블록의 제조방법을 나타낸 도면.3 and 4 is a view showing a method of manufacturing a gabion porous block according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10....자연석(사석) 20....포러스 콘크리트10 .... natural stone 20 .... porous concrete

30....돌망태 40....환형고리(철근)30 .... The gabion 40 .... The annular ring (rebar)

50....형틀50 .... template

A.....상부층 B.....하부층(포러스 콘크리트층)A ... top layer B ... bottom layer (porous concrete layer)

상기와 같은 목적을 달성하기 위해 본 발명에 따른 돌망태 포러스 블록은, 대체로 직육면체 형상으로 이루어진 블록으로써, 상기 직육면체 형상으로 이루어진 소정의 공간상에 배치되는 다수 개의 자연석과, 상기 자연석의 하부층에 형성되어 상기 자연석을 단단하게 결합하는 포러스 콘크리트층과, 상기 포러스 콘크리트층에 삽입되어 상기 콘크리트층의 강도를 보강하기 위한 철근과, 그리고 일단부가 상기 포러스 콘크리트층의 일측면에 포함되고, 그 타단부가 상기 포러스 콘크리트층의 타측면에 포함되도록 하여 상기 자연석의 상부를 둘러감싸고 있는 돌망태로 구성되는 것을 특징으로 한다.In order to achieve the above object, the gabion porous block according to the present invention is a block having a generally rectangular parallelepiped shape, and is formed in a plurality of natural stones arranged in a predetermined space having the rectangular parallelepiped shape and formed in a lower layer of the natural stone. A porous concrete layer for tightly coupling natural stones, reinforcing bars inserted into the porous concrete layer to reinforce the strength of the concrete layer, and one end of which is included in one side of the porous concrete layer, and the other end of the porous layer Being included in the other side of the concrete layer is characterized by consisting of a gabion surrounding the top of the natural stone.

또한 본 발명에 따른 돌망태 포러스 블록의 제조방법은 상기 블록을 제조하기 위한 형틀을 형성하는 단계와, 상기 형틀의 내벽에 걸쳐서 돌망태를 부착하는 단계와, 자연석을 서로 비슷한 크기가 되도록 분쇄한 후, 상기 돌망태가 부착된 형틀 내부에 배치하는 단계와, 상기 자연석 사이로 모래를 형틀 바닥에서 일정한 높이까지 채우는 단계와, 상기 자연석의 상부에다 철근을 일정한 간격으로 배치하는 단계와, 상기 형틀내부에 포러스 콘크리트를 타설하는 단계와, 그리고 상기 형틀을 뒤집어 블록을 분리한 후, 상기 블록의 자연석 사이에 채워진 모래를 깨끗이 세척하는 단계로 이루어지는 것을 특징으로 한다.In addition, the method of manufacturing a gabion porous block according to the present invention comprises the steps of forming a mold for manufacturing the block, attaching the gabion over the inner wall of the mold, and after grinding the natural stone to a similar size, the said Disposing the gabions inside the mold, filling sand between the natural stones to a certain height, placing reinforcing bars at regular intervals on top of the natural stones, and placing the porous concrete inside the mold. And, and after the mold is turned over to separate the block, characterized in that consisting of the step of washing the sand filled between the natural stone of the block.

그리고 본 발명의 실시예에 의하면, 상기 자연석은 40 내지 60 중량%, 상기 골재는 30 내지 50 중량%, 그리고 상기 시멘트가 잔부로 구성되는 것을 특징으로한다.And according to the embodiment of the present invention, the natural stone is 40 to 60% by weight, the aggregate is 30 to 50% by weight, and the cement is characterized in that the remainder is composed.

이를 위하여 본 발명에 따른 상기 포러스 콘크리트층은 골재와 시멘트를 혼합하여 구성되는 것이 바람직하다.To this end, the porous concrete layer according to the present invention is preferably configured by mixing aggregate and cement.

다음에는 본 발명의 바람직한 실시예에 따른 돌망태 포러스 블록 및 그 제조방법에 대하여 첨부된 도면을 기초하면서 자세히 설명하고자 한다.Next will be described in detail with reference to the accompanying drawings with respect to the gabion porous block and a method of manufacturing the same according to a preferred embodiment of the present invention.

도 1은 본 발명에 따른 돌망태 포러스 블록의 사시도를 나타낸 것으로, 도시된 바와 같이 상기 블록은 자연석(10)과, 상기 자연석(10)을 결합하는 포러스 콘크리트층(B), 그리고 상기 자연석(10)을 덮어 씌워지는 돌망태(30) 등으로 이루어지며, 본 발명에서 상기 돌망태(10)는 자연석(20)이 들어가 있는 망태라는 함축적인 의미를 가지고 있다 하겠다.1 is a perspective view of a gabion pore block according to the present invention, as shown in the block is a natural stone 10, a porous concrete layer (B) for coupling the natural stone 10, and the natural stone 10 It is made of a gabion 30 to be covered, etc. In the present invention, the gabion 10 has a connotation meaning that the natural stone 20 is in the gabion.

본 발명에 따른 상기 블록은 대체로 직육면체 형상으로 이루어진 블록으로써, 상기 직육면체 형상으로 이루어진 소정의 공간상에 비슷한 크기로 분쇄되어 다듬어진 자연석(10)을 가능한 붙여서 다수 개로 배치되며, 또한 상기 자연석(10)의 하부층에는 상기 자연석(10)을 단단하게 결합하는 포러스 콘크리트층(B)이 형성되어 이루어진다.The block according to the present invention is a block having a generally rectangular parallelepiped shape, and is disposed in as many pieces as possible by attaching a natural stone (10) crushed and trimmed to a similar size in a predetermined space formed of the rectangular parallelepiped shape, and the natural stone (10) The lower layer of the porous concrete layer (B) is formed to tightly couple the natural stone (10).

여기서, 상기 포러스 콘크리트층(B)은 골재와 시멘트를 혼합하여 구성되는데, 이때 상기 골재는 대체로 직경 15 내지 40㎜ 정도의 것이 사용되며, 상기 시멘트는 저 알카리성 고로스래그 시멘트로 상기 골재와 혼합하여 혼합물 형태로 만들어진 후 타설되게 된다.Here, the porous concrete layer (B) is composed by mixing the aggregate and cement, wherein the aggregate is generally used of about 15 to 40 mm in diameter, the cement is mixed with the aggregate with a low alkaline high-loss lag cement It is made into a mixture and then poured.

이와 같이 형성된 포러스 콘크리트층(B)은 대략 20 내지 30%의 공극율을 가지게 되어, 배수가 잘되기 때문에 상부에 식물이 자생할 수 있는 조건을 충분히 제공할 수가 있게 된다. 그리고 이와 같은 포러스 콘크리트층(B)은 전체 블록 높이의 반정도가 되도록 형성되는 것이 바람직하다.The porous concrete layer (B) formed as described above has a porosity of approximately 20 to 30%, and since the drainage is well, it is possible to provide sufficient conditions for plants to grow on top. And such a porous concrete layer (B) is preferably formed to be about half of the height of the entire block.

한편, 상기 콘크리트층(B)의 강도를 보강하기 위하여 포러스 콘크리트(20)가 타설될 때 다수 개의 철근(40)이 적당한 간격으로 미리 삽입되게 되며, 이때 상기 철근(40)은 상기 포러스 콘크리트(20)의 외부에 환형고리(40)의 형상으로 노출되어 형성되게 된다. 상기 환형고리(40)의 형상은 시공시 블록과 블록을 상호 연결하고자 할 경우, 연결고리로써의 역할을 하게 되는 것이다.On the other hand, when the porous concrete 20 is poured in order to reinforce the strength of the concrete layer (B), a plurality of reinforcing bar 40 is inserted in advance at appropriate intervals, wherein the reinforcing bar 40 is the porous concrete 20 It is formed to be exposed to the shape of the annular ring (40) on the outside. Shape of the annular ring 40 is to serve as a connecting ring, if you want to interconnect the block and the block during construction.

본 발명에서는 다량의 수분을 함유하고 있는 포러스 콘크리트에 의해 상기 철근이 부식되는 것을 방지하기 위하여 특수아연도금을 하여 사용하게 된다.In the present invention, to prevent corrosion of the reinforcement by the porous concrete containing a large amount of water is used by special zinc plating.

이상과 같이 하여 본 발명에 따른 블록은 자연석(10)과, 그 하부에 포러스 콘크리트층(B)이 각각 형성되게 되며, 최종 상기 자연석(10)의 상부로는 돌망태(30)가 둘러감싸고 있는 형태로 장착되게 되는데, 상기 돌망태(30)는 그 일단부가 상기 포러스 콘크리트층(B)의 일측면에 포함되고, 그 타단부가 상기 포러스 콘크리트층(B)의 타측면에 포함되도록 되어있다.As described above, the block according to the present invention has a natural stone 10 and a porous concrete layer B formed at a lower portion thereof, and the gabion 30 is surrounded by the upper portion of the natural stone 10. The gabion 30 has one end of which is included in one side of the porous concrete layer B, and the other end of which is included in the other side of the porous concrete layer B.

즉, 돌망태(30)의 양단부는 포러스 콘크리트(20)가 타설될 때 상기 포러스 콘크리트층(B)의 양쪽에 묻히도록 하여 고정되므로 자연석(10)의 하부층(B)에 형성된 콘크리트와 함께 자연석(10)의 상부층(A)까지 블록을 단단하게 고정할 수가 있게 된다.That is, both ends of the gabion 30 is fixed by being buried on both sides of the porous concrete layer (B) when the porous concrete 20 is poured, so that the natural stone (10) with the concrete formed in the lower layer (B) of the natural stone (10) The block can be firmly fixed up to the upper layer (A).

한편, 본 발명에서는 도 1에 도시된 바와 같이, 상기 돌망태(30)가자연석(10)을 한쪽 방향으로 둘러 감싸는 형태로 포러스 콘크리트층(B)의 양쪽에 묻혀있는 것에 대하여 설명하고 있으나, 이는 필요에 따라서 자연석(10)과 포러스 콘크리트층(B)으로 된 블록의 전체를 둘러 감싸도록 하여 형성될 수도 있으며, 이는 당업자라면 쉽게 변경할 수 있는 범위의 것이라 할 수 있다 하겠다.Meanwhile, in the present invention, as shown in FIG. 1, the gabion 30 is described as being buried on both sides of the porous concrete layer B in a form of surrounding the natural stone 10 in one direction, but this is necessary. Depending on the natural stone 10 and the porous concrete layer (B) may be formed to surround the entire block, which can be said to be a range that can be easily changed by those skilled in the art.

여기서, 상기 돌망태(30)는 아연도금된 철사를 대략 사각마름모 형상으로 엮어서 된 형태로, 자연석(10)을 감싸면서 덮여지므로 포러스 콘크리트층(B)에 의해 단단하게 고정되어 있어 자연석(10)과의 결속을 도와주게 되므로 블록 전체의 일체화를 도모하게 되는 것이다.Here, the gabion 30 is formed by weaving a galvanized wire in an approximately square rhombus shape, and is covered while covering the natural stone 10 so that the gabion 30 is firmly fixed by the porous concrete layer B and the natural stone 10. It helps to unite the, so that the entire block is integrated.

따라서, 블록 전체를 아주 단단하게 일체화할 수가 있어 시공후에도 그 자체가 매우 견고할 뿐 아니라, 블록을 상호 연결한 최종 상태에서도 역시 견고한 제방을 영구적으로 유지할 수가 있게 된다.Thus, the entire block can be very tightly integrated so that it is not only very strong after construction but also permanently maintains a strong embankment even in the final state of interconnecting the blocks.

한편, 본 발명에서는 이를 위하여 상기 자연석(10)은 40 내지 60 중량%, 상기 골재는 30 내지 50 중량%, 그리고 상기 시멘트가 잔부로 구성되도록 하여 친환경적인 블록이 되도록 하고 있다.On the other hand, in the present invention, for this purpose, the natural stone 10 is 40 to 60% by weight, the aggregate is 30 to 50% by weight, and the cement is to be composed of the remainder to be an environmentally friendly block.

여기서, 자연석(10)의 중량은 상기 범위를 벗어날 경우에는 블록의 무게가 너무 가볍거나 무거워 제조나 운반 등에 많은 어려움이 있게 되며, 또한 상기 골재의 중량은 20 내지 30%의 공극율을 가지도록 하기 위하여 선택된 것이다.Here, when the weight of the natural stone 10 is out of the above range, the weight of the block is too light or heavy, there is a lot of difficulty in manufacturing or transport, and also the weight of the aggregate to have a porosity of 20 to 30% It is selected.

그리고, 그 잔부를 시멘트로 함으로써 알카리성이기에 생물이 자생할 수 없는 문제점을 내포하고 있는 상기 시멘트의 비율을 최대한 억제가 되도록 하고 있다.And the remainder is made into cement so that the ratio of the said cement which contains the problem that an organism cannot grow | generate natively because it is alkaline is suppressed as much as possible.

따라서, 본원 발명에서는 적은 시멘트를 사용하고서도 충분한 결합력을 지니도록 하기 위하여 상기와 같은 범위로 구성된 블록을 돌망태(30)에 의해 견고하게 일체화가 되도록 하고 있으며, 그 결과 투수성이 뛰어나면서도 자연석(10)과 콘크리트층(B)이 견고하게 일체화가 될 수가 있어 무엇보다 친환경적인 블록이 제공될 수가 있다.Therefore, in the present invention, in order to have a sufficient bonding force even with a small amount of cement, the block composed of the above range is firmly integrated by the gabion 30, and as a result, the natural stone 10 has excellent water permeability. And concrete layer (B) can be firmly integrated can be provided above all the environmentally friendly block.

이상과 같이 구성된 본 발명에 따른 돌망태 포러스 블록은 최종 블록간에 결합이 되어 도 2에 도시된 바와 같이, 필요한 장소에 시공이 되게 되는데, 이때 이웃하게 위치하는 블록간의 결합은 포러스 콘크리트층의 외부에 노출된 환형고리(40, 도 1 참조)를 연결 수단, 가령 샤클이나 철사 등을 사용하여 달성되게 된다.The gabion pore block according to the present invention configured as described above is coupled between the final blocks to be constructed in the required place, as shown in FIG. 2, wherein the neighboring blocks are exposed to the outside of the porous concrete layer. The annular ring 40 (see FIG. 1) is achieved using a connecting means such as a shackle or wire.

그리고, 본 발명에서는 이에 더하여 블록에 덮여 있는 돌망태(30)를 이웃하는 블록의 돌망태(30)와 상호 결합되도록, 가령 돌망태(30)끼리 상호 꼬아서 하거나, 별도의 연결용 철사를 사용하여 연결할 수가 있게 된다.In addition, in the present invention, the gabions 30 covered by the blocks can be connected to each other by twisting the gabions 30 with each other, or by using a separate connection wire so as to be mutually coupled with the gabions 30 of the neighboring blocks. Will be.

그 결과 본 발명에 따른 블록은 하부에 위치한 환형고리(40, 도 1 참조)와 함께 상부에 위치한 돌망태(30)에 의해 블록의 상하부에서 동시에 이웃한 블록간의 상호결합이 가능하므로 이와 같은 블록으로 구성된 제방의 경우 시공자체가 매우 견고하게 이루어질 수가 있게 된다.As a result, the block according to the present invention is composed of such a block because it can be mutually coupled between the neighboring blocks at the same time in the upper and lower parts of the block by the gabion 30 located at the top with the annular ring (40, see Figure 1) located at the bottom In the case of the embankment, the construction itself can be made very robust.

한편, 상기와 구성된 돌망태 포러스 블록의 제조방법에 대하여 자세히 살펴보면 다음과 같다.On the other hand, look at in detail with respect to the manufacturing method of the gabion porous block configured as described above are as follows.

도 3은 본 발명에 따른 돌망태 포러스 블록의 제조방법에 대하여 구성요소를도시하여 나타낸 도면이며, 도 4는 이를 단계별로 설명하여 나타낸 도면이다.Figure 3 is a view showing the components showing the manufacturing method of the gabion pore block according to the present invention, Figure 4 is a view showing this step by step.

본 발명에서는 상기 돌망태 포러스 블록을 제조하기 위하여 다음과 같은 단계를 거치게 된다.In the present invention, in order to manufacture the gabion porous block is subjected to the following steps.

먼저, 상기 블록을 제조하기 위한 형틀(50)을 형성하게 되는데, 상기 형틀(50)은 만들고자 하는 블록의 외관을 대량으로 형성하기 위한 것이다. 상기 형틀(50)은 철제 등을 사용하여 제작되게 되며, 통상 철제 평판(60)위에 놓여서 블록을 제조하게 된다.First, to form a mold 50 for manufacturing the block, the mold 50 is to form a large amount of the appearance of the block to be made. The mold 50 is made of iron or the like, and is usually placed on the iron plate 60 to manufacture a block.

이때 상기 형틀(50)에서 만들어 지는 블록은 최종 뒤집어서 형틀(50)과 블록을 분리하게 되므로, 형틀(50)의 아래 부분이 블록의 상부가 되고, 반대로 형틀(50)의 윗 부분이 블록의 하부가 되게 된다. 그러므로 블록의 상부는 철제 평판(60)에 의해 최대한 평평하게 형성이 될 수가 있어, 최종 완성된 블록의 외관이 매우 균일하면서 보기도 좋게 되는 것이다.In this case, since the block made in the mold 50 is finally inverted to separate the mold 50 from the block, the lower part of the mold 50 becomes the upper part of the block, and the upper part of the mold 50 is the lower part of the block. Becomes. Therefore, the upper part of the block can be formed as flat as possible by the steel plate 60, the appearance of the final block is very uniform and look good.

그 다음으로 상기 형틀(50)의 내벽에 걸쳐서 돌망태(30)를 부착하게 되는데, 상기 돌망태(30)는 대략 형틀(50)의 내벽의 면적에 맞도록 제작되어 부착되어 진다. 그러나, 상기 돌망태(30)는 블록의 강도 등을 고려하여 보다 견고하게 형성될 필요가 있을 경우에는 상기 블록의 하부면과 측면부를 포함하여 전체면을 둘러 감쌀 정도로 여유있게 하여 형성되어 부착될 수도 있다.Next, the gabion 30 is attached to the inner wall of the mold 50, and the gabion 30 is manufactured and attached to approximately fit the area of the inner wall of the mold 50. However, when the gabion 30 needs to be formed more firmly in consideration of the strength of the block, the gabion 30 may be formed and attached to allow the gabion 30 to be wrapped around the entire surface including the lower surface and the side surface of the block. .

한편, 상기 돌망태(30)를 형틀(50)에 부착한 후에는, 상기 돌망태(30)가 부착된 형틀(50) 내부에 자연석(10)을 배치하게 되는데, 이때 상기 자연석(10)은 서로 비슷한 크기가 되도록 분쇄를 하고 다듬은 다음, 형틀(50) 내부에서 고른 분포가 되도록 적절하게 배치하게 된다.On the other hand, after attaching the gabion 30 to the mold 50, the natural stone 10 is disposed inside the mold 50 to which the gabion 30 is attached, wherein the natural stone 10 is similar to each other. Grinding and trimming to size, and then appropriately arranged to have an even distribution in the mold 50.

이와 같이 하여 다수 개의 자연석(10)을 형틀(50)에 배치한 다음, 상기 자연석(10) 사이로 모래(70)를 형틀(50) 바닥에서 일정한 높이까지 될 때까지 채우게 된다. 본 발명에서는 상기 높이를 형틀(50) 전체 높이의 반정도가 되도록 하는 것이 바람직하다.In this way, a plurality of natural stones 10 are arranged in the mold 50, and then the sand 70 is filled between the natural stones 10 until the sand 70 reaches a constant height from the bottom of the mold 50. In the present invention, the height is preferably about half of the entire height of the mold 50.

여기서, 상기 모래(70)는 다음에 설명하게 될 포러스 콘크리트(20)를 형틀(50) 내부에 타설할 때, 상기 모래(70)에 의하여 포러스 콘크리트(20)가 채워지지 못하도록 하기 위한 것이다.Here, the sand 70 is for preventing the porous concrete 20 from being filled by the sand 70 when pouring the porous concrete 20 to be described later into the mold 50.

그 다음, 상기 자연석(10)의 상부에다 다수 개의 철근(40)을 일정한 간격으로 배치한 후에 상기 형틀(50) 내부에 포러스 콘크리트(20)를 타설하게 되며, 상기 포러스 콘크리트(20)는 앞서 설명한 바와 같이 골재와 시멘트를 혼합하여 구성이 된다. 그리고 본 발명의 중요한 재료인 자연석(10)과, 골재, 그리고 시멘트의 중량 또한 앞서 설명한 바와 같은 비율로 구성되게 된다.Then, after placing a plurality of reinforcing bars 40 on the top of the natural stone 10 at regular intervals, the porous concrete 20 is poured into the mold 50, and the porous concrete 20 is described above. As such, aggregate and cement are mixed. In addition, the weight of natural stone 10, aggregate, and cement, which are important materials of the present invention, are also configured in the ratio as described above.

한편, 앞서 설명한 바와 같이 자연석(10)과 포러스 콘크리트(20)를 보다 견고하게 일체화 하는 돌망태(30)가 블록의 하부면과 측면부를 포함하여 전체면을 둘러 감쌀 정도로 형성된다면, 상기 단계, 즉 포러스 콘크리트(20)를 타설하기 전에 상기 돌망태(30)를 자연석(10)과 철근(40) 상부로 접은 다음 포러스 콘크리트(20)를 타설을 하면 된다.On the other hand, if the gabion 30 to more tightly integrate the natural stone 10 and the porous concrete 20 as described above is formed to wrap around the entire surface including the lower surface and the side surface of the block, that is, the porous Before placing the concrete 20, the gabion 30 is folded into the natural stone 10 and the reinforcing bar 40, and then the porous concrete 20 may be poured.

이와 같이 하여 상기 포러스 콘크리트(20)가 양생된 후에 상기 형틀(50)을 뒤집어 블록을 분리하게 되고, 이때 자연석(10) 사이에 채워진 모래(70)를 깨끗이세척하도록 하여 상부층(A, 도 1 참조)의 자연석(10)이 외부로 돌출되는 최종 돌망태 포러스 블록이 제조완료되게 되는 것이다.In this way, after the porous concrete 20 is cured, the mold 50 is turned upside down to separate the blocks. At this time, the sand 70 filled between the natural stones 10 is washed cleanly so that the upper layer A, see FIG. 1. The final gabion pore block of natural stone 10 protruding to the outside is to be manufactured.

따라서, 본 발명에 의하여 제조된 블록의 상부층은 상술한 바와 같은 최종 모래가 제거되어 빈 공간으로 남게 되기 때문에, 시공시나 일정시간 경과 후에 이 공간에 흙이 채워지게 되어 향후 초목 등이 쉽게 자생할 수가 있게 된다.Therefore, the upper layer of the block manufactured according to the present invention because the final sand as described above is removed to remain in the empty space, the soil is filled in this space during construction or after a certain period of time can easily grow vegetation, etc. in the future Will be.

또한, 빗물 등과 같은 지표수가 상기 공간 하부에 형성되어 있는 포러스 콘크리트층을 통하여 배수가 쉽게 이루어지므로 물이 고이는 현상이 발생되지 않게 된다.In addition, since surface water such as rainwater is easily drained through the porous concrete layer formed in the lower portion of the space, water does not occur.

그러므로, 상기 블록으로 조경된 경우, 마치 자연석이 흙에 파묻혀 있는 효과를 얻을 수가 있을 뿐 아니라, 자연석 사이사이의 빈공간에 메워진 흙에 자생하는 초목에 의해 조경사업을 실시하더라도 녹지공간이 대대적으로 줄게 되는 현상은 발생되지 않게 되는 것이다.Therefore, in the case of landscaping with the block, not only can the natural stone be buried in the soil, but also the landscaping space will be greatly reduced even if the landscaping business is carried out by the vegetation native to the soil filled in the empty space between the natural stones. The phenomenon is that it does not occur.

또한, 본 발명에 따른 블록을 하천이나 해변가에 시공할 경우, 블록의 상부층은 토사 등에 의해 자연 발생적으로 메워지게 되고, 여기에 수초 등이 자생하게 됨으로써 상기 수초 등에 의한 수질을 정화하는 효과도 얻을 수가 있게 된다.In addition, when the block according to the present invention is installed in a river or a beach, the upper layer of the block is naturally filled by earth and sand, and since the plants are grown naturally, the effect of purifying the water quality by the plants can be obtained. Will be.

그리고 무엇보다 본 발명에 의하면, 제방공사시에 현장에서 일일히 자연석을 분쇄하여 돌망태에 넣는 작업을 하지 않아도, 별도의 공장에서 상기 블록을 대량으로 생산하고, 이를 현장으로 운반한 다음 블록끼리 상호 조립만 하면 되므로 시공 자체가 매우 간편하게 이루어질 수가 있다.And above all, according to the present invention, even in the case of embankment construction, the natural stone is not crushed and put into the gabions daily, but the blocks are produced in a separate factory in large quantities, transported to the site, and then the blocks are assembled together. Since only the construction itself can be made very easily.

이상과 같이 본 발명에 의하면, 블록을 형틀과, 돌망태, 그리고 포러스 콘크리트를 사용하여 대량으로 생산가능하도록 하고, 또한 친환경적인 구조로 형성되도록 하여 조경사업시 공기의 단축이 가능할 뿐 아니라, 자연 생태계를 원래의 형태로 보존이 가능하도록 하는 것을 본 발명의 기술적 사상으로 하고 있음을 알 수 있다.As described above, according to the present invention, the block can be produced in large quantities using the mold, the gabion, and the porous concrete, and also formed into an environmentally friendly structure, which can shorten the air during the landscaping business, It can be seen that it is the technical idea of the present invention to enable storage in the original form.

이와 같은 본 발명의 기본적인 기술적 사상의 범주 내에서, 당업계의 통상의 지식을 가진 자에게 있어서는 다른 많은 변형이 가능함은 물론이다.Within the scope of the basic technical idea of the present invention, of course, many other modifications are possible to those skilled in the art.

상술한 바와 같이, 본 발명에 의하면, 친환경적인 돌망태 포러스 블록을 이용하여 생태계의 변화를 최소화 할 수 있게 하며, 나아가 주변 환경을 자연 환경 그대로 보존 유지가 가능할 수가 있다.As described above, according to the present invention, it is possible to minimize changes in the ecosystem by using an environmentally friendly gabion pore block, and furthermore, it may be possible to preserve and maintain the surrounding environment as it is.

그리고, 블록의 하부에 형성되는 포러스 콘크리트와 함께 상부에 형성된 돌망태에 의해 전체 블록의 구조가 매우 견고하게 형성되어 지며, 블록간의 결합 역시 상하부의 이중 체결방식으로 됨으로써 이를 사용하여 제방을 구축할 경우 영구적으로 원형 유지가 가능하게 된다.In addition, the structure of the entire block is formed very firmly by the gabions formed at the top together with the porous concrete formed at the bottom of the block. It is possible to maintain the circle.

또한, 일정한 형태를 가진 블록을 대량으로 생산이 가능하도록 함으로써, 생산된 블록을 현장으로 운반한 후에 단지 조립만하면 시공이 되도록 하여 간편한 시공과 함께 작업기간도 대폭적으로 줄일 수가 있다는 이점이 있게 된다.In addition, it is possible to produce a large number of blocks having a certain form, there is an advantage that can be greatly reduced the working period with a simple construction by simply assembling the construction after transporting the produced block to the site.

Claims (8)

대체로 직육면체 형상으로 이루어진 블록으로써,As a block that is generally rectangular in shape, 상기 직육면체 형상으로 이루어진 소정의 공간상에 배치되는 다수 개의 자연석(10)과,A plurality of natural stones 10 disposed on a predetermined space having a rectangular parallelepiped shape, 상기 자연석의 하부층에 형성되어 상기 자연석을 단단하게 결합하는 포러스 콘크리트층(B)과,A porous concrete layer (B) formed on the lower layer of the natural stone and firmly bonding the natural stone; 내부의 강도 보강을 위하여 상기 포러스 콘크리트층에 삽입되고, 외측 단부는 상기 포러스 콘크리트층(B)의 외부에 환형고리의 형상으로 노출되는 철근(40), 그리고Reinforcing bar 40 is inserted into the porous concrete layer for reinforcing strength inside, the outer end is exposed in the shape of an annular ring on the outside of the porous concrete layer (B), and 일단부가 상기 포러스 콘크리트층(B)의 일측면에 포함되고, 그 타단부가 상기 포러스 콘크리트층(B)의 타측면에 포함되도록 하여 상기 자연석(10)의 상부를 둘러감싸고 있는 돌망태(30)로 구성되는 것을 특징으로 하는 돌망태 포러스 블록.One end is included in one side of the porous concrete layer (B), and the other end is included in the other side of the porous concrete layer (B) to the gabion 30 surrounding the upper portion of the natural stone (10) Gabion porous block, characterized in that the configuration. 제 1 항에 있어서, 상기 포러스 콘크리트층(B)은 골재와 시멘트를 혼합하여 구성되는 것을 특징으로 하는 돌망태 포러스 블록.The gabion porous block according to claim 1, wherein the porous concrete layer (B) is formed by mixing aggregate and cement. 제 1 항 또는 제 2 항에 있어서, 상기 자연석(10)은 40 내지 60 중량%, 골재는 30 내지 50 중량%, 그리고 시멘트가 잔부로 구성되는 것을 특징으로 하는 돌망태 포러스 블록.The gabion porous block according to claim 1 or 2, wherein the natural stone (10) is 40 to 60% by weight, aggregate is 30 to 50% by weight, and cement is composed of the balance. 삭제delete 상기 제 1 항의 구성으로 된 돌망태 포러스 블록을 제조하기 위한 것으로, 상기 블록을 제조하기 위한 형틀(50)을 형성하는 단계와,Forming a mold 50 for manufacturing the block gabion pore block of the configuration of claim 1, and 상기 형틀의 내벽에 걸쳐서 돌망태(30)를 부착하는 단계와,Attaching the gabion 30 over the inner wall of the mold; 자연석(10)을 서로 비슷한 크기가 되도록 분쇄한 후, 상기 돌망태가 부착된 형틀(50) 내부에 배치하는 단계와,Pulverizing the natural stone 10 to have a similar size to each other, and then placing the natural stone 10 inside the mold 50 to which the gabions are attached; 상기 자연석 사이로 모래(70)를 형틀 바닥에서 일정한 높이까지 채우는 단계와,Filling the sand 70 between the natural stones to a certain height at the bottom of the mold; 상기 자연석(10)의 상부에다 철근(40)을 일정한 간격으로 배치하는 단계와,Arranging reinforcing bars 40 on the natural stone 10 at regular intervals; 상기 형틀 내부에 포러스 콘크리트(20)를 타설하는 단계와, 그리고Pouring the porous concrete 20 into the mold, and 상기 형틀을 뒤집어 블록을 분리한 후, 상기 블록의 자연석(10) 사이에 채워진 모래(70)를 깨끗이 세척하는 단계로 이루어지는 것을 특징으로 하는 돌망태 포러스 블록 제조방법.After the mold is inverted and the block is separated, the gabion pore block manufacturing method is characterized in that it comprises the step of washing the sand (70) filled between the natural stone (10) of the block. 제 5 항에 있어서, 상기 포러스 콘크리트층(B)은 골재와 시멘트를 혼합하여 구성되는 것을 특징으로 하는 돌망태 포러스 블록 제조방법.The method of claim 5, wherein the porous concrete layer (B) is a gabion porous block manufacturing method, characterized in that consisting of mixing aggregate and cement. 제 5 항 또는 제 6 항에 있어서, 상기 자연석(10)은 40 내지 60 중량%, 골재는 30 내지 50 중량%, 그리고 시멘트가 잔부로 구성되는 것을 특징으로 하는 돌망태 포러스 블록 제조방법.7. The method according to claim 5 or 6, wherein the natural stone (10) is 40 to 60% by weight, aggregate is 30 to 50% by weight, and cement is composed of the remainder. 삭제delete
KR1020030058388A 2003-08-22 2003-08-22 Porous block with stone net bag, and method for producing the same KR100443378B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030058388A KR100443378B1 (en) 2003-08-22 2003-08-22 Porous block with stone net bag, and method for producing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030058388A KR100443378B1 (en) 2003-08-22 2003-08-22 Porous block with stone net bag, and method for producing the same

Publications (1)

Publication Number Publication Date
KR100443378B1 true KR100443378B1 (en) 2004-08-09

Family

ID=37357657

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030058388A KR100443378B1 (en) 2003-08-22 2003-08-22 Porous block with stone net bag, and method for producing the same

Country Status (1)

Country Link
KR (1) KR100443378B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101413255B1 (en) 2013-10-01 2014-06-27 주식회사 청수환경 Key-stone net building in the river bottom and slope face and construction method of the same
KR101530601B1 (en) * 2013-08-02 2015-06-23 주식회사 티아이에스 Method for a patterned concrete pannel and method for manufacturing a retaining wall including the same, and patterned concrete pannel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101530601B1 (en) * 2013-08-02 2015-06-23 주식회사 티아이에스 Method for a patterned concrete pannel and method for manufacturing a retaining wall including the same, and patterned concrete pannel
KR101413255B1 (en) 2013-10-01 2014-06-27 주식회사 청수환경 Key-stone net building in the river bottom and slope face and construction method of the same

Similar Documents

Publication Publication Date Title
KR100917790B1 (en) Grid type hollow block for ecological restoration of bank and construction method of bank using thereof
KR100813236B1 (en) The structure for a slope reinforcement and eco slope reinforcement method
KR100923428B1 (en) Revetment block for vegetation
KR100542823B1 (en) Method Manufaturing of Water Permeable Block
KR100443378B1 (en) Porous block with stone net bag, and method for producing the same
KR200345937Y1 (en) Precast concrete block for retaining wall
KR200185613Y1 (en) Revetment block
KR100689662B1 (en) Block for green tract of land and method of producing the same
KR101501733B1 (en) The eco-friendly precast l type retaining wall fixed with an anchor
KR200403455Y1 (en) Block for plants
KR101047283B1 (en) The constructing method of planting stone embankment using block and reinforcement planting block
KR200300440Y1 (en) Revetment block
KR200249172Y1 (en) Revetment block
KR200338805Y1 (en) Shore protection block using stone
KR101222690B1 (en) Gabion block
JP2000054344A (en) Structure for face of slope and revetment retaining wall and construction method therefor
KR200408191Y1 (en) Revetment block
CN214613560U (en) Plant-growing concrete assembled bridge pier
KR20060125643A (en) Method to construct natural plantable block structure directing natural stone shape
KR100740293B1 (en) Block capable of growing plant for landscape rock net bag and method for manufacturing thereof
KR200324519Y1 (en) Revetment Block
KR100270156B1 (en) Block for landscape
JP3434507B1 (en) Seawall / fish reef block manufacturing method
KR200321439Y1 (en) a net revetment structure founded along the road for planting
JPH0369738A (en) Lightweight composite member and manufacture thereof

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20070727

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee