KR0128809B1 - Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same - Google Patents

Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same

Info

Publication number
KR0128809B1
KR0128809B1 KR1019940021776A KR19940021776A KR0128809B1 KR 0128809 B1 KR0128809 B1 KR 0128809B1 KR 1019940021776 A KR1019940021776 A KR 1019940021776A KR 19940021776 A KR19940021776 A KR 19940021776A KR 0128809 B1 KR0128809 B1 KR 0128809B1
Authority
KR
South Korea
Prior art keywords
strut
bolt
support
span
fixing
Prior art date
Application number
KR1019940021776A
Other languages
Korean (ko)
Other versions
KR960007966A (en
Inventor
남해진
Original Assignee
남해진
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 남해진 filed Critical 남해진
Priority to KR1019940021776A priority Critical patent/KR0128809B1/en
Publication of KR960007966A publication Critical patent/KR960007966A/en
Application granted granted Critical
Publication of KR0128809B1 publication Critical patent/KR0128809B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1842Balusters; Grille-type elements
    • E04F11/1846Balusters with means for fixing to the floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor

Abstract

The balustrade constructing method is comprised of (a) fixing a bottom plate of an inner pillar(21) comprised of a bottom plate(23) and a vertical extension part(25) in a flat surface of a respective up-down step board part of a staircase of a building; the step of (b) fixing one side of the scaffold pipe(24) in the vertical extension part(25) of the respective inner pillar(21) to install a temporary balustrade; the step of (c) separating the scaffold pipe(24) from the vertical extension part(25); the step of (d) fitting an outer pillar(31) comprised of a main body part(32) which can be fitted in the inner pillar, a wing part(33) and a bolt supporting part(34) in the circumference of the inner pillar; the step of (e) fixing terminal part of a span(41) in the outer pillar(31).

Description

기계단난간용 지주 구조물과 이를 이용한 난간 시공방법Strut structure for machine railing and handrail construction method

제1도는 종래의 방법으로 시공된 계단의 임시난간을 도시한 사시도.1 is a perspective view showing a temporary handrail of a staircase constructed by a conventional method.

제2도는 종래의 방법으로 시공된 영구난간의 사시도.2 is a perspective view of a permanent rail constructed by a conventional method.

제3도는 종래의 방법으로 시공된 칼라 강판으로 만든 영구난간의 사시도.3 is a perspective view of a permanent handrail made of a colored steel sheet constructed by a conventional method.

제4도는 본 발명의 난간 시공방법에 사용되는 내부 지주의 사시도.Figure 4 is a perspective view of the inner post used in the handrail construction method of the present invention.

제5도는 본 발명의 방법에 따라 시공된 임시난간의 사시도.5 is a perspective view of a temporary handrail constructed in accordance with the method of the present invention.

제6도는 본 발명에 따른 외부 지주의 사시도.6 is a perspective view of an outer post according to the invention.

제7도는 제6도에 도시된 외부 지주가 제4도에 도시된 내부 지주 주위에 끼워 맞춰진 상태를 도시한 단면도.FIG. 7 is a cross-sectional view showing a state in which the outer support shown in FIG. 6 is fitted around the inner support shown in FIG.

제8도는 본 발명에 따라 시공된 칼라 강판으로 만든 영구난간의 사시도.8 is a perspective view of a permanent handrail made of colored steel sheets constructed in accordance with the present invention.

* 도면의 주요 부분에 대한 부호의 설명* Explanation of symbols on main parts of drawing

2, 8 : 지주 4, 15, 27 : 고정구2, 8: Shoring 4, 15, 27: Fixture

6, 24, : 비게 파이프 11 : 기둥6, 24, blanking pipe 11: pillar

21 : 내부 지주 23 : 바닥판21: inside holding 23: bottom plate

25 : 수직 연장부 23a, 25a, 32a, 34a : 볼트구멍25: vertical extension parts 23a, 25a, 32a, 34a: bolt holes

33a : 볼트 삽입 구멍 31 : 외부 지주33a: bolt insertion hole 31: outer support

33 : 날개부 34 : 볼트 지지부33 wing 34 bolt support

35 : 덮개 36 : 플러그35: cover 36: plug

37 : 볼트 43 : 난간 구조물37 bolt 43 railing structure

본 발명은 건물 계단의 난간에 관한 것으로, 특히 작업시에 작업자의 안전을 위하여 시공 중인 계단에 설치하는 임시난간의 지주를 영구난간 구조물의 일부로서 이용하는 시공방법 및 지주 구조물에 관한 것이다.The present invention relates to a railing of a building staircase, and more particularly, to a construction method and a strut structure using a temporary guardrail to be installed on a stairway under construction for the safety of an operator during work as part of a permanent railing structure.

대부분의 공사 현장에서는 골조 공사 및 슬라브 공사가 완료되면 건물의 내부에서 여러 가지 내부 공사를 하게 되는데, 이 때 계단에 임시로 난간을 설치하여 작업자의 안전을 도모하고 있다.In most construction sites, when the framing and slab construction is completed, various internal constructions are performed inside the building. At this time, temporary staircases are installed on the stairs to promote worker safety.

건물 내부에서의 내부 마무리 공사가 끝나면 임시난간을 모두 해체하여 철거하고, 그 자리에 영구난간을 설치한다.After finishing the internal finishing work inside the building, all temporary railings are dismantled and removed, and permanent railings are installed in place.

즉, 아파트 및 사무용 건물 등의 계단에 안전을 위하여 설치한 철제, 스텐레스제 및 알루미늄제 등의 난간은 건물의 시공 완성 단계에서 영구적으로 설치한 영구난간들이다.That is, railings made of steel, stainless steel, and aluminum, which are installed for safety in stairs of apartments and office buildings, are permanent rails permanently installed in the construction completion stage of the building.

제1도 및 제2도를 참조하여 종래의 임시난간 및 영구난간의 시공방법에 대하여 설멸한다.With reference to FIG. 1 and FIG. 2, the conventional construction method of temporary handrails and permanent handrails is eliminated.

골조 공사 및 슬라브 공사가 완료된 건물의 계단에 임시난간을 설치하기 위하여 일단부에 클램프(1)이 부착된 난간 지주(2)를 계단의 상부와 하부 그리고 필요시에는 그 중간 부분에 적절한 수효로 설치한다. 볼트 또는 클램프 등의 고정구(4)를 사용하여 비게 파이프(6)을 이 지주들의 소정 높이에서 계단의 경사면에 평행하게 2개 또는 그 이상 고정시켜서 임시난간으로 사용한다. 건물의 내부 공사가 마무리되면, 이 임시난간을 해체하고 계단의 상부와 하부 그리고 필요시에는 그 중간부분에 적절한 수효로 계단의 단부측 표면 또는 측벽의 일정 위치에 드릴 등을 사용하여 구멍을 뚫는다. 그 다음에, 철근 등을 그 끝부분이 계단의 표면 또는 측벽위로 약간 돌출하게 하여 상기 구멍안에 삽입한다. 이 부분은 계단 바닥면 및 측면을 세멘트로 미장할 때 함께 미장하여 마감된다. 계단의 표면 또는 측벽위로 돌출된 철근에 난간 지주(8)의 하단을 용접하고 경간(9)를 지주와 간살의 상단에 용접한 후 도색하여 마무리한다.In order to install temporary handrails on the staircases of the completed frame and slab constructions, handrails (2) with clamps (1) attached to one end are installed in the upper and lower parts of the stairs and, if necessary, in the middle of the stairs. do. Using a fixture 4 such as a bolt or a clamp, the hollow pipe 6 is fixed at two or more parallel to the inclined surface of the stairs at a predetermined height and used as a temporary handrail. When the interior work of the building is finished, the temporary balustrade is dismantled and drilled using a drill, etc. at a certain position on the side surface or side wall of the stairway, with appropriate numbers in the upper and lower parts of the stairway and, if necessary, in the middle part. A rebar or the like is then inserted into the hole with its tip slightly protruding onto the surface or sidewall of the stairs. This part is finished by plastering the floor and side of the staircase with cement. The lower end of the handrail strut 8 is welded to the reinforcing bar projected onto the surface of the staircase or the side wall, and the span 9 is welded to the top of the strut and the liver and then painted and finished.

종래에는 영구난간을 철 제품, 스텐레스 제품 또는 알루미늄 제품을 사용하여 만들었다. 그러나, 이들 제품으로 계단 난간을 만들게 되면 다음과 같은 문제점이 있다.In the past, permanent railings were made using iron, stainless or aluminum products. However, when the stair railings are made of these products, there are the following problems.

즉, 철 제품의 난간을 시공하게 되면, 계단을 시공하는 공사 현장에서 난간의 지주와 경간 및 간살을 모두 용접해야 하므로 공사 현장이 복잡하여 안전사고 등의 위험이 있으며, 용접 작업이 완료된 후 수작업에 의하여 도색 작업을 해야하므로 도색 상태가 양호하지 못하고 또한 도색을 하더라도 용접 부위가 쉽게 부식되어 이 부분에 녹이 생기는 문제점이 있다.In other words, when constructing railing of iron products, it is necessary to weld all the pillars, span and liver of railing at the construction site where the stairs are constructed. Therefore, the construction site is complicated and there is a risk of safety accident. Due to the painting work, the painting state is not good, and there is a problem in that even if the painting, the welded portion is easily corroded and rust occurs in this portion.

스텐레스 제품의 난간을 시공하게 되면, 도색 작업을 하지 않기 때문에 난간의 색상이 획일적이어서 미관상 좋지 않으며, 수요자의 기호에 맞는 미려한 색상의 난간을 만들 수 없다.When the railing of stainless steel is constructed, the color of the railing is not uniform because it is not painted, and it is impossible to make a beautiful colored railing that meets the taste of the consumer.

알루미늄 제품으로 난간을 시공하게 되면, 지주와 경간 및 간살 등을 리벳 또는 나사 결합하게 되므로 결합 강도가 약하고 내구성이 짧다는 문제점이 있다.When the handrail is constructed of aluminum products, since the rivets or screws are coupled to the support post, the span, and the liver, there is a problem that the bonding strength is weak and the durability is short.

따라서, 현재에는 난간 구조물 제조 공장에서 제작한 칼라 강판으로 된 난간을 시공 현장에서 설치하는 방법을 사용하고 있다. 여기에서, 칼라 강판이라 함은 기판의 양 표면상에 아연층을 도금하여 그 위에 인산염을 피복하고 에폭시 수지를 피복한 다음에 외측면이 될 표면 상에는 폴리에틸렌을 피복하여 만든 것이다. 이러한 칼라 강판을 사용하여 난간 구조물을 제작하는 방법은, 칼라 강판을 난간 구조물을 이루는 경간 및 간살을 형성하기에 적합한 폭으로 절단한 다음에 이들을 각각 필요한 횟수로 절곡하여 경간 및 간살을 형성하고 경간의 하부면(하부 경간의 경우에는 상부면이 됨)에 경간의 길이를 따라 구멍을 형성하여 이 구멍에 간살들을 결합하는 것으로 이는 이 기술 분야에 공지되어 있다.Therefore, at present, a method of installing a railing made of color steel sheet manufactured at a railing structure manufacturing plant is used at a construction site. Here, the color steel sheet is made by plating a zinc layer on both surfaces of the substrate, coating phosphate thereon, coating an epoxy resin, and then coating polyethylene on the surface to be the outer surface. In the method of manufacturing a handrail structure using such a color steel sheet, the color steel sheet is cut to a width suitable for forming the span and liver meat forming the handrail structure, and then each of them is bent as many times as necessary to form a span and liver meat. It is known in the art to form holes along the length of the span in the lower face (which is the upper face in the case of the lower span) to join the livers in this hole.

이러한 칼라 강판으로 만든 난간은 약 250℃ 정도의 고온에서 도색하므로 도색 상태가 양호하고 색상이 미려하며 지주와 경간 및 간살 등의 결합 강도도 비교적 양호하므로 많이 사용되고 있다.Handrails made of such a color steel sheet are used at a high temperature of about 250 ° C., so they are well painted, beautiful in color, and relatively good in bonding strength such as props, spans, and liver meat.

그런데, 이러한 칼라 강판제의 계단난간을 시공함에 있어서는 여러 가지 문제점이 있다.However, there are various problems in constructing such a step railing made of color steel sheet.

칼라 강판으로 제작한 난간을 시공하는 순서를 한예로써 제3도를 참고로하여 설명하면 다음과 같다.Referring to Figure 3 as an example the procedure for constructing the handrail made of color steel plate as follows.

먼저, 슬라브 공사가 끝난 계단의 상하부의 적절한 위치에 클램프가 부착된 지주를 고정시키고 이 지주의 상부 및 중간부에 비게 파이프를 고정구에 의해 고정하여 임시난간으로 사용한다. 그 다음에, 상기 임시난간을 해체하여 제거하고 계단의 단부측 바닥면에 물받이 시공 작업을 한 후, 계단의 측면에 드릴을 사용하여 구멍을 뚫고 영구난간의 지주가 될 기둥(11)을 심는다. 마지막 단계로, 상기 기둥(11)에 난간 구조물(12)를 고정시키기 위해, 난간 구조물의 하부 경간(13)과 간살(14)를 상기 기둥에 스크류 등의 고정구(15)로 체결한다. 이렇게 하여 완성된 난간이 제3도에 도시되어 있다.First, fix the struts with clamps at the appropriate positions of the upper and lower parts of the stairs where the slab construction is completed, and use the temporary handrails by fixing the pipes by the fasteners in the upper and middle portions of the struts. Then, the temporary balustrade is dismantled and removed, and the dripping construction works on the bottom surface of the end side of the staircase, a hole is drilled on the side of the staircase, and a pillar 11 to be a pillar of the permanent balustrade is planted. In the last step, in order to fix the railing structure 12 to the pillar 11, the lower span 13 and the liver 14 of the railing structure is fastened to the pillar with a fixture 15 such as a screw. The balustrade thus completed is shown in FIG.

이 방법에서는, 난간이 시공된 후에 계단 물갈이 작업이나 계단 측벽 도색 작업을 하게 되므로 난간이 오염되거나 손상받게 된다. 이를 방지하기 위하여 임시난간을 해체하고 영구난간을 시공하기 전에 물갈이 작업 또는 계단 측벽 도색 작업을 하게 되면 계단난간이 없는 상태에서 작업해야 하므로 작업자의 안전을 해칠 우려가 있다.In this method, the railings are contaminated or damaged since the steps are to be changed or the sidewalls are painted after the railings are constructed. In order to prevent this, if the temporary railing is dismantled and the permanent railing is constructed, the water change work or the side wall painting work must be performed without the stair railing, which may harm the safety of the worker.

또한, 임시난간을 완전히 해체하여 제거한 후에 계단의 측벽에 구멍을 뚫고 새로이 지주 등을 삽입 및 고정시켜야 하므로 작업 기간 및 비용이 많이 소요된다.In addition, since the temporary guardrail is completely dismantled and removed, a hole is required to be drilled in the side wall of the stairs, and a new post and the like must be inserted and fixed.

본 발명은 계단난간을 시공함에 있어서의 상술한 문제점들을 해결하기 위한 것으로, 임시난간 설치시에 계단의 상부와 하부 반전부에 설치한 지주를 영구난간의 지주로 재사용하고, 공장에서 미리 제작한 난간 구조물을 시공 현장에서 간단히 조립하여 시공을 완료하므로써 작업 시간을 단축할 수 있고 비용을 절감할 수 있다.The present invention is to solve the above-mentioned problems in the construction of the stair railings, when the temporary railings are installed in the upper and lower inverted part of the staircases are reused as permanent railings, and handrails made in advance in the factory By simply assembling the structure at the construction site and completing the construction, the work time can be shortened and the cost can be saved.

따라서, 본 발명의 목적은 건물 계단의 경간을 고정하기 위한 지주 구조물을 마련하는 것으로, 상기 지주 구조물은, 건물 계단의 상하 반전부의 바닥면에 고정하기 위한 복수개의 볼트 구멍이 형성된 바닥판과 이 바닥판과 일체로 상부로 연장되고 임시 난간의 비게 파이프를 고정하기 위한 복수개의 볼트 구멍이 형성된 수직 연장부로 된 내부 지주와, 내부 지주의 수직 연장부 주위에 끼워맞춰지고 상기 수직 연장부와 같은 길이로 연장되고 난간 구조물의 경간과의 결합을 위한 복수개의 볼트 구멍이 형성된 중공형 본체부와 이 본체부의 2개의 측면으로부터 연장되어 경간의 단부를 에워싸도록 만곡되고 상기 볼트 구멍과 일치하는 복수개의 볼트 삽입 구멍이 형성된 날개부와 이 날개부 내부에 그 단면이 ㄱ자 형상으로 되고 복수개의 볼트 구멍이 형성된 볼트 지지부로 된 외부 지주를 포함한다.It is therefore an object of the present invention to provide a strut structure for fixing the span of a building staircase, the strut structure comprising a bottom plate and a bottom plate having a plurality of bolt holes for fixing to a bottom surface of an upside down portion of a building staircase. An inner strut consisting of a vertical extension extending upwardly integrally with the plate and having a plurality of bolt holes for fixing the hollow pipe of the temporary handrail, and fitted around the vertical extension of the inner strut and of the same length as the vertical extension; A hollow body portion having a plurality of bolt holes for extending and joining the span of the handrail structure, and a plurality of bolt insertions extending from two sides of the body portion to be curved to surround the ends of the span and coincident with the bolt holes. Wings with holes formed, and the cross section is in the shape of the inside of the wing, and a plurality of bolt holes are formed. It includes an outer strut with a built-in bolt support.

본 발명의 다른 목적은 건물 계단의 난간 시공방법을 마련하는 것으로, 상기 시공방법은, 건물 계단의 각각의 상하 반전부의 바닥면에 바닥판과 수직 연장부로 된 내부 지주의 바닥판을 고정하는 단계와, 상기 각각의 내부 지주의 수직 연장부에 비게 파이프의 일단을 고정하여 임시난간을 설치하는 단계와, 비게 파이프를 수직 연장부로부터 해체하는 단계와, 본체부와 날개부 및 볼트 지지부로 되고 상기 본체부가 내부 지주에 끼워질 수 있게 구성된 외부 지주를 내부 지주 주위에 끼워 맞추는 단계와, 경간의 단부를 외부 지주에 고정시키는 단계로 구성된다.Another object of the present invention is to provide a railing construction method of a building staircase, the construction method comprising the steps of fixing the bottom plate of the inner strut consisting of a bottom plate and a vertical extension on the bottom surface of each up and down inverted portion of the building stairs; And fixing temporary ends of the hollow pipes to the vertical extensions of the respective inner struts, and installing temporary railings; dismantling the hollow pipes from the vertical extensions; and a main body, a wing, and a bolt support. Fitting an outer strut around the inner strut so as to be fitted to the inner strut, and fixing the end of the span to the outer strut.

첨부 도면을 참조하여 본 발명의 양호한 실시예에 대하여 설명한다.EMBODIMENT OF THE INVENTION Preferred embodiment of this invention is described with reference to an accompanying drawing.

제4도는 본 발명의 임시난간 설치시에 사용되는 내부 지주(21)를 도시하고, 제5도는 상기 내부 지주(21)를 사용하여 설치한 임시난간(22)을 도시한다.4 shows the inner post 21 used in installing the temporary handrail of the present invention, and FIG. 5 shows the temporary handrail 22 installed using the inner post 21. As shown in FIG.

내부 지주(21)은 강철제의 기둥으로서, 높이가 약 1m 정도이다. 제4도에는 단면 형상을 장방형으로 도시하였으나 내부 지주(21)의 단면 형상 및 치수는 난간을 시공할 계단 반전부의 형태에 맞추어 적절히 정한다. 내부 지주(21)는 건물 계단의 상하 반전부의 바닥면에 고정하기 위한 복수개의 볼트 구멍(23a)가 형성된 바닥판(23)과, 이 바닥판(23)과 일체로 상부로 연장되고 난간의 비게 파이프(24, 제5도)를 고정하기 위한 복수개의 볼트 구멍(25a)가 형성된 수직 연장부(25)로 되어 있다. 수직 연장부(25)의 좌우측면에는 적절한 수효의 볼트 구멍(25a)가 형성되어 있는데, 이는 이후에 설명하게 될 본 발명의 외부 지주 및 경간과의 결합시에 사용된다.The inner post 21 is a steel pillar and has a height of about 1 m. Although the cross-sectional shape is illustrated in FIG. 4 in a rectangular shape, the cross-sectional shape and dimensions of the internal support 21 are appropriately determined in accordance with the shape of the step reversal portion to which the handrail is to be constructed. The inner strut 21 is a bottom plate 23 formed with a plurality of bolt holes 23a for fixing to the bottom surface of the top and bottom inverted portions of a building staircase, and is integrally extended upwardly with the bottom plate 23, and the handrail is empty. The vertical extension part 25 in which the some bolt hole 25a for fixing the pipe 24 (FIG. 5) is formed. On the left and right sides of the vertical extension 25, an appropriate number of bolt holes 25a are formed, which are used in engagement with the outer posts and spans of the present invention which will be described later.

바닥판(23)은 사각형 또는 다른 임의의 형태로도 될 수 있으며 수직 연장부(25)의 단면보다 크게 되어 있고, 그 주연부에는 복수개의 볼트 구멍(23a)가 형성되어 있다. 이들 볼트 구멍(23a)는 내부 지주(21)을 계단의 바닥면에 고정시킬 때 사용된다.The bottom plate 23 may be rectangular or any other shape and is larger than the cross section of the vertical extension 25, and a plurality of bolt holes 23a are formed at the periphery thereof. These bolt holes 23a are used when fixing the inner post 21 to the bottom surface of the stairs.

제5도에 도시된 것처럼, 본 발명에 따른 임시난간은 계단의 상하 반전부 바닥면에 고정된 내부 지주(21)과, 계단의 경사면에 평행하게 내부 지주(21)의 상부 및 중간부에 클램프 등으로 고정된 2개의 비게 파이프(24)로 이루어진다. 내부 지주(21)은 바닥판(23)의 주연에 형성된 볼트 구멍(23a)의 위치에 대응하게 계단의 상하 반전부 바닥면에 드릴 등으로 구멍을 뚫고, 이 구멍에 바닥판(23)의 볼트 구멍(23a)를 일치시켜 후크 볼트 등으로 고정하므로써 계단의 바닥면에 고정된다.As shown in FIG. 5, the temporary handrail according to the present invention has an inner support 21 fixed to the bottom surface of the upper and lower inverted portions of the stairs, and a clamp on the upper and middle portions of the inner support 21 parallel to the inclined surface of the stairs. It consists of two emptying pipes 24 fixed to the back. The inner support 21 drills a hole in the bottom surface of the upper and lower inverted portions of the stairs by a drill or the like corresponding to the position of the bolt hole 23a formed at the periphery of the bottom plate 23, and the bolt of the bottom plate 23 is inserted into this hole. It is fixed to the bottom surface of the stairs by matching the holes 23a and fixing them with a hook bolt or the like.

이렇게 고정된 상하 반전부의 내부 지주(21)의 수직 연장부(25)의 측면에 형성된 볼트 구멍(25a)를 이용하여 클램프 등의 고정구(27)로 비게 파이프(24)를 고정하므로써 임시난간이 완성된다.The temporary handrail is completed by fixing the pipe 24 with a fixture 27 such as a clamp by using a bolt hole 25a formed on the side of the vertical extension 25 of the inner support 21 of the upper and lower inverted portions. do.

건물 내부의 마무리 공사가 완료되면 콘크리트 공사만 시공하여 거칠게 되어 있는 계단의 바닥면과 측벽을 세멘트로 미장하게 되는데, 이 때 계단의 단부에 물받이도 시공하게 되며, 이 세멘트 마감 시공시에 내부 지주(21)의 바닥판(23)이 매립된다. 세멘트 미장 공사 후에 물갈이 작업 및/ 또는 계단 측벽 도색 작업을 수행한다.When the finishing work inside the building is completed, only the concrete work is done, and the floor and side walls of the rough stairs are plastered with cement. At this time, the drip tray is also installed at the end of the stairs. The bottom plate 23 of 21 is embedded. After cement plastering, change the water and / or paint the side walls of the stairs.

계단의 모든 마무리 작업이 끝나면, 임시난간을 해체하고 영구난간을 시공한다. 임시난간 해체시에는 내부 지주(21)은 그대로 두고 이 지주에 클램프로 고정되어 있는 비게 파이프(24)만 분리하여 제거하면 된다.After finishing all the steps on the stairs, the temporary balustrade is dismantled and the permanent balustrade is constructed. When dismantling the temporary railings, the internal struts 21 are left intact, and only the empty pipe 24 fixed to the struts is separated and removed.

제6도, 제7도 및 제8도를 참조하여 영구난간을 시공하는 방법에 대하여 설명한다.A method of constructing a permanent railing will be described with reference to FIGS. 6, 7, and 8.

제6도는 본 발명에 따른 외부 지주(31)을 도시한다. 제7도는 외부 지주(31)의 단면도를, 제8도는 완성된 영구 난간(40)을 도시하고 있다. 제6도 및 제7도에 도시된 외부 지주(31)은 알루미늄을 압출하여 만든 것으로 내부 지주(21)과 같이 기둥 형태로 되어 있으며, 내부 지주(21)의 수직 연장부(25) 주위에 끼워 맞춰지고 이 수직 연장부(25)와 같은 길이로 연장되고 난간 구조물의 경간(41, 제8도)과의 결합을 위한 복수개의 볼트 구멍(32a)가 형성된 중공형 본체부(32)와, 이 본체부의 2개의 측면으로부터 연장되어 경간(41, 제8도)의 단부를 에워싸도록 만곡되고 상기 볼트 구멍(32a)와 동축으로 형성되고 볼트가 전체적으로 삽입되는 복수개의 볼트 삽입 구멍(33a)가 형성된 날개부(33)과, 이 날개부 내부에 그 단면이 ㄱ자 형상으로 되고 볼트 헤드를 지지하도록 볼트 삽입 구멍(33a)와 동축으로 형성된 복수개의 볼트 구멍(34a)가 형성된 볼트 지지부(34)를 포함한다. 본체부(32)의 내부 치수는 내부 지주(21)의 외부 치수와 같거나 약간 크게 되어 있어서 내부 지주(21) 주위에 끼워 맞춰지게 되어 있다. 외부 지주(31)이 내부 지주(21) 주위에 끼워져서 고정된 상태가 제7도에 단면도로 되시되어 있다. 제6도에 도시된 것처럼, 외부 지주(31)의 본체부(32)의 좌우 측벽과 볼트 지지부(34)의 측벽에는 복수개의 볼트 구멍(32a,34a)가 형성되어 있다. 이들 볼트 구멍(32a, 34a)는 내부 지주(21)의 수직 연장부(25)에 형성된 볼트 구멍(25a)와 대응하는 위치에 형성되어 있으며, 이후에 설명하게 될 난간 구조물의 경간(41)을 이 지주 구조물에 고정할 때 사용된다. 외부 지주(31)의 날개부(33)의 개방 측면에는 난간 구조물의 경간(41)이 끼워지는 부분은 절개된 덮개(35)에 의해 밀폐된다. 외부 지주(31)의 날개부(33)에 형성된 볼트 삽입 구멍(33a)는 플러그(38)로 밀폐된다.6 shows an outer strut 31 according to the invention. FIG. 7 shows a cross section of the outer strut 31 and FIG. 8 shows a finished permanent rail 40. The outer struts 31 shown in FIGS. 6 and 7 are extruded aluminum and have a columnar shape like the inner struts 21 and are fitted around the vertical extension 25 of the inner struts 21. A hollow body portion 32 which is fitted and extends the same length as this vertical extension 25 and is formed with a plurality of bolt holes 32a for engagement with the span 41 (Fig. 8) of the handrail structure, A plurality of bolt insertion holes 33a are formed, which extend from two side surfaces of the main body portion and enclose the ends of the span 41 and 8, are coaxial with the bolt holes 32a, and the bolts are entirely inserted. Wing portion 33 and a bolt support portion 34 having a plurality of bolt holes 34a formed coaxially with the bolt insertion hole 33a so as to have a bolt-shaped cross section inside the wing portion and to support the bolt head; do. The inner dimension of the body portion 32 is equal to or slightly larger than the outer dimension of the inner strut 21 so that it fits around the inner strut 21. The state in which the outer strut 31 is fitted around the inner strut 21 and fixed is shown in cross section in FIG. As shown in FIG. 6, a plurality of bolt holes 32a and 34a are formed in the left and right sidewalls of the main body portion 32 of the outer support 31 and the sidewalls of the bolt support part 34. As shown in FIG. These bolt holes 32a and 34a are formed at positions corresponding to the bolt holes 25a formed in the vertical extension portion 25 of the inner support 21, and the span 41 of the railing structure to be described later will be described. It is used to fix it to the strut structure. In the open side of the wing portion 33 of the outer support 31, a portion into which the span 41 of the handrail structure is fitted is closed by a cut cover 35. The bolt insertion hole 33a formed in the wing portion 33 of the outer support 31 is sealed by the plug 38.

임시난간 설치시에 시공한 내부 지주(21)과 외부 지주(31)을 사용하여 영구 난간을 시공하는 방법에 대하여 설명한다.A method of constructing a permanent railing using the inner strut 21 and the outer strut 31 constructed at the time of temporary railing installation will be described.

계단의 마무리 공사 즉, 세멘트 미장 작업과 바닥 물갈이 작업 및 도색 작업이 끝난 상태에서 계단의 상하 반전부 바닥면에 바닥판(23)이 매립되어 고정된 상하 내부 지주(21) 각각의 주위에 외부 지주(31) 2개를 각각 날개부(33)의 개방 부분이 서로 마주보도록하여 끼운다. 그 다음에, 공장에서 미리 제작한 난간 구조물(43, 제8도)의 상하 경간(41)의 양단부를 외부 지주(31)의 개방부안의 본체부(32)와 볼트 지지부(34) 사이에 삽입하고 볼트(37)을 사용하여 고정시킨다. 즉, 내부 지주(21)의 수직 연장부(25)의 양측면에 형성한 볼트 구멍(25a)와, 외부 지주(31)의 본체부(32)의 양측벽에 형성한 볼트 구멍(32a)와, 볼트 지지부(34)에 형성한 볼트 구멍(34a), 그리고 경간(41)의 양단부에 형성한 볼트 구멍(도시 생략)의 위치를 일치시키고 이를 관통하여 볼트를 체결시킴으로써 내부 지주(21)과 외부 지주(31) 및 경간(41)을 일체로 견고하게 고정할 수 있다.Outer posts around each of the upper and lower inner posts 21 fixed with the bottom plate 23 embedded in the top and bottom inverted bottoms of the stairs in the state of finishing the finishing work, namely, cement plastering, floor changing and painting work. (31) The two are fitted so that the open portions of the wings 33 face each other. Then, both ends of the upper and lower spans 41 of the factory-prefabricated handrail structure 43 (Fig. 8) are inserted between the main body 32 and the bolt support part 34 in the opening of the outer support 31. And fix using bolts 37. That is, the bolt hole 25a formed in the both sides of the vertical extension part 25 of the inner support 21, the bolt hole 32a formed in the both side walls of the main-body part 32 of the outer support 31, Match the positions of the bolt hole 34a formed in the bolt support part 34 and the bolt hole (not shown) formed at both ends of the span 41, and penetrate the bolt through the inner strut 21 and the outer strut. The 31 and the span 41 can be integrally and firmly fixed.

경간(41)의 양단부를 외부 지주(31)에 고정한 후에, 외부 지주(31)의 날개부(33)의 개방부에 덮개(35)를 씌우고 외부 지주(31)의 날개부(33)의 구멍(33a)에 플러그(38)을 끼운 후, 지주 구조물의 상부에 덮개(44, 제8도)을 씌우면 난간이 완성된다.After fixing both ends of the span 41 to the outer support 31, the lid 35 is placed on the opening of the wing 33 of the outer support 31 and the hole of the wing 33 of the outer support 31 is provided. After inserting the plug 38 into 33a, the cover 44 (FIG. 8) is put on the top of the strut structure, and the railing is completed.

상기 실시예는 계단 반전부가 180°회전식인 경우에 대한 것으로 지주 구조물의 좌우측에 난간 구조물(43)이 설치되도록 한 내부 지주(21) 및 외부 지주(31)의 형상을 도시하고 설명하였으나, 내부 지주 및 외부 지주의 형상을 변경하면 계단 반전부가 180°가 아닌 경우에도 사용할 수 있다.The embodiment is for the case that the staircase reversal portion is 180 ° rotated to show the shape of the inner strut 21 and the outer strut 31 so that the handrail structure 43 is installed on the left and right sides of the strut structure, but the inner strut And changing the shape of the external struts can be used even when the step reversal portion is not 180 degrees.

예를 들어, 계단 반전부가 90°회전식인 경우에는 내부 지주(21)의 좌우 양측에 볼트 구멍(21a)를 형성하는 대신에 하나의 모서리에서 접하는 2개의 측면들에 형성하고, 마찬가지로 외부 지주(31)의 본체부(32)의 좌우 양측에 날개부(33)을 형성하는 대신에 하나의 모서리에서 접하는 2개의 측면들에 날개부를 형성하여 사용하면 된다.For example, when the step reversal portion is rotated by 90 °, instead of forming bolt holes 21a on the left and right sides of the inner support 21, it is formed on two side surfaces contacting at one corner, and likewise the outer support 31 Instead of forming the wing portions 33 on both the left and right sides of the main body portion 32) of the main body portion 32 may be used by forming the wing portion on the two side surfaces in contact with one corner.

상기 방법에 따라 난간을 시공하면 다음과 같은 효과를 갖게 된다.The construction of the handrail according to the above method has the following effects.

임시난간 설치시에 시공한 지주를 그대로 영구난간의 내부 지주로 사용하므로써 난간 시공에 소요되는 시간 및 비용을 절감할 수 있다.By using the pillars constructed at the time of installing temporary railings as internal pillars of the permanent railings, the time and cost required for railing construction can be reduced.

난간 시공 현장에서는 임시난간의 비게 파이프를 해체하고 곧바로 상기 내부 지주에 외부 지주와 난간 구조물을 볼트 또는 스크류 등으로 조립하면 되므로 임시난간 해체 후 영구난간 시공 완료까지의 시공 기간을 최소로 단축할 수 있고 난간없이 작업함에 따른 작업자의 안전사고 등을 줄일 수 있다.In the handrail construction site, after dismantling the empty handrail pipe and assembling the outer support and the railing structure to the inner support immediately with bolts or screws, the construction period from the dismantling of the temporary handrail to the completion of the permanent handrail can be minimized. It can reduce worker's safety accidents by working without handrails.

내부 지주를 계단 바닥면에 후크 볼트 등으로 고정한 후 계단의 세멘트 미장 작업시에 이 지주의 하단이 매립되기 때문에 내부 지주가 견고하게 고정될 수 있고 이에 의해서 전체 난간 구조물을 견고하게 고정할 수 있다.After fixing the inner strut to the bottom of the staircase with a hook bolt or the like, since the bottom of the strut is buried at the time of cement cementing of the staircase, the inner strut can be firmly fixed, thereby firmly fixing the entire railing structure.

이상, 본 발명을 양호한 실시예를 들어 설명하였으나, 이 기술 분야에 숙련된 자는 본 발명의 범위내에서 상기 실시예에 여러 가지 변경 또는 수정을 가할 수 있다. 예를 들면, 외부 지주를 알루미늄 압출 설형물로 하지 않고 중공형 본체부와 날개부를 별도로 성형한 후에 접합하거나, 날개부만을┎┒형으로 형성하여 내부 지주의 후면에 리벳 또는 나사 등으로 고정하여 사용할 수도 있다. 외부 지주는 알루미늄 압출 성형물이 아닌 다른 금속 성형물로 사용하는 것도 가능하다. 또한 외부 지주의 본체부 및 볼트 지지부의 각 볼트 구멍은 볼트의 지지력을 높이기 위하여 볼트 구멍 주위의 벽 두께를 증가시킨 보강부를 마련하는 것도 가능하다. 따라서, 본 발명은 상술한 실시예에 제한되지 않으며, 첨부한 청구 범위에 의해서만 제한된다.As mentioned above, although the present invention has been described with reference to preferred embodiments, those skilled in the art may add various changes or modifications to the above embodiments within the scope of the present invention. For example, the outer pillar is not formed of aluminum extrusion tongues, but the hollow body portion and the wing portion are separately molded and joined, or only the wing portion is formed in the shape of a rib to be fixed to the rear of the inner pillar by rivets or screws. It may be. The outer strut can also be used as a metal molding other than an aluminum extrusion. It is also possible for each bolt hole of the main body portion of the outer support and the bolt support to provide a reinforcement portion having increased wall thickness around the bolt hole in order to increase the bearing capacity of the bolt. Accordingly, the invention is not limited to the embodiments described above, but only by the appended claims.

Claims (6)

건물 계단의 경간을 고정하기 위한 지주 구조물에 있어서, 건물 계단의 상하 반전부의 바닥면에 고정하기 위한 복수개의 볼트 구멍(23a)가 형성된 바닥판(23)과, 이 바닥판(23)과 일체로 상부로 연장되고 비게 파이프(24) 및 경간(41)을 고정하기 위한 복수개의 볼트 구멍(25a)가 형성된 수직 연장부(25)로 된 내부 지주(21)과 ; 내부 지주(21)의 수직 연장부(25) 주위에 끼워 맞춰지고 상기 수직 연장부(25)와 같은 길이로 연장되고 난간 구조물의 경간(41)과의 결합을 위한 복수개의 볼트 구멍(32a)가 형성된 중공형 본체부(32)와, 이 본체부(32)의 2개의 측면으로부터 연장되어 경간(41)의 단부를 에워싸도록 만곡되고 상기 볼트 구멍(32a)와 동축으로 형성되고 복수개의 볼트 삽입 구멍(33a)가 형성된 날개부(33)과, 이 날개부 내부에 그 단면이 ㄱ자 형상으로 되고 볼트 삽입 구멍(33a)와 동축으로 형성된 복수개의 볼트 구멍(34a)가 형성된 볼트 지지부(34)로 된 외부 지주(31)을 포함하는 것을 특징으로 하는 지주 구조물.In the strut structure for fixing the span of a building staircase, the bottom plate 23 in which the several bolt hole 23a for fixing to the bottom surface of the up-down inversion part of a building staircase is integrated with this bottom plate 23 An internal strut 21 consisting of a vertical extension 25 extending upwardly and having a plurality of bolt holes 25a for fixing the hollow pipe 24 and the span 41; A plurality of bolt holes 32a are fitted around the vertical extension 25 of the inner strut 21 and extend the same length as the vertical extension 25 and for engagement with the span 41 of the handrail structure. The hollow body portion 32 formed, and extending from two side surfaces of the body portion 32 to bend to surround the end of the span 41 and formed coaxially with the bolt hole 32a and inserting a plurality of bolts. Wing portion 33 having a hole 33a formed therein, and a bolt support portion 34 having a plurality of bolt holes 34a formed coaxially with the bolt insertion hole 33a and having a cross-section thereof in an L-shape. A strut structure, characterized in that it comprises an outer strut 31. 제1항에 있어서, 외부 지주(31)의 날개부(33)의 개방 측면을 덮는 덮개(35)와, 볼트 삽입 구멍(33a)를 막는 플러그(38)과, 내부 지주(21)과 외부 지주(31)의 상면을 덮는 뚜껑(44)를 더 포함하는 것을 특징으로 하는 지주 구조물.The cover 35 which covers the open side of the wing part 33 of the outer support 31, the plug 38 which blocks the bolt insertion hole 33a, the inner support 21, and the external support. A strut structure, characterized in that it further comprises a lid (44) covering the upper surface of the (31). 제1항 또는 제2항에 있어서, 본체부(32)와 날개부(33)이 일체형 금속 성형물인 것을 특징으로 하는 지주 구조물.The strut structure according to claim 1 or 2, wherein the main body portion (32) and the wing portion (33) are integral metal moldings. 제3항에 있어서, 본체부(32)의 볼트 구멍(32a) 주위와 볼트 지지부(34)의 볼트 구멍(34a) 주위에 벽 두께를 증가시킨 보강부를 마련한 것을 특징으로 하는 지주 구조물.4. The strut structure according to claim 3, wherein a reinforcement portion having increased wall thickness is provided around the bolt hole (32a) of the body portion (32) and around the bolt hole (34a) of the bolt support portion (34). 건물 계단의 난간 시공방법에 있어서, 건물 계단의 각각의 상하 반전부의 바닥면에 바닥판(23)과 수직 연장부(25)로 된 내부 지주(21)의 바닥판을 고정하는 단계와, 상기 각각의 내부 지주(21)의 수직 연장부(25)에 비게 파이프(24)의 일단을 고정하여 임시난간을 설치하는 단계와, 비게 파이프(24)를 수직 연장부(25)로부터 해체하는 단계와, 본체부(32)와 날개부(33) 및 볼트 지지부(34)로 되고 상기 본체부(32)가 내부 지주(21)에 끼워질 수 있게 구성된 외부 지주(31)을 내부 지주(21) 주위에 끼워 맞추는 단계와, 경간(41)의 단부를 외부 지주(31)에 고정시키는 단계로 구성되는 것을 특징으로 하는 난간 시공방법.A method of constructing a handrail of a building staircase, the method comprising: fixing a bottom plate of an internal support 21 made of a bottom plate 23 and a vertical extension part 25 to a bottom surface of each upside down part of a building staircase, respectively; Fixing one end of the emptying pipe 24 to the vertical extension 25 of the inner support 21 of the installation to install a temporary handrail, dismantling the emptying pipe 24 from the vertical extension 25; An outer strut 31 is formed around the inner strut 21, which is composed of a body portion 32, a wing portion 33, and a bolt support portion 34, and configured such that the body portion 32 can be fitted to the inner strut 21. Handrail construction method comprising the step of fitting, and fixing the end of the span 41 to the outer support (31). 제5항에 있어서, 경간(41)을 외부 지주(31)에 고정시킨 후에 지주 구조물에 덮개(35)와 플러그(38) 및 뚜껑(44)를 씌워서 고정하는 단계를 더 포함하는 것을 특징으로 하는 난간 시공방법.6. The method of claim 5, further comprising the step of securing the span (41) to the outer support (31) by covering the cover (35), the plug (38) and the cover (44) to the support structure. Railing construction method.
KR1019940021776A 1994-08-31 1994-08-31 Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same KR0128809B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019940021776A KR0128809B1 (en) 1994-08-31 1994-08-31 Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019940021776A KR0128809B1 (en) 1994-08-31 1994-08-31 Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same

Publications (2)

Publication Number Publication Date
KR960007966A KR960007966A (en) 1996-03-22
KR0128809B1 true KR0128809B1 (en) 1998-04-10

Family

ID=19391660

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019940021776A KR0128809B1 (en) 1994-08-31 1994-08-31 Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same

Country Status (1)

Country Link
KR (1) KR0128809B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740213B1 (en) * 2005-07-20 2007-07-18 송인한 A Strut apparatus for stairs handrail and execution method thereof

Also Published As

Publication number Publication date
KR960007966A (en) 1996-03-22

Similar Documents

Publication Publication Date Title
US7062885B1 (en) Foundation wall, construction kit and method
SK19395A3 (en) Element based foam and concrete modular wall construction and method and apparatus thereof
US6389758B1 (en) Insulated form assembly for poured concrete wall
US6029408A (en) Pre-fabricated step and stairway system
KR100579440B1 (en) Mold-Reinforcing Rod One Body Type Precast Concrete Pannel and Fabrication Structure of The Same
KR0128809B1 (en) Support structure for the railing of stairs and a method for consturcting the railing by utilizing the same
KR200196692Y1 (en) A stairway mould
JPH07331830A (en) Handrail mounting method and mounting device in concrete building
KR20210039250A (en) gyeongjejeog-in yeong-gunangan gujomul
KR200491057Y1 (en) GAEJA balustrade assembly
KR100550458B1 (en) Precast concrete stairway structure of edifice and construction method thereof
KR200209599Y1 (en) A knockdown stairs mold
JP3215670B2 (en) Mounting structure of precast concrete rising wall
FI127264B (en) Staircase elements and procedure for building stairwells
JPS5847137Y2 (en) handrail
JP2786412B2 (en) Exterior panel covering structure of concrete building and covering construction method
KR200247957Y1 (en) Assembly panel construction system
JP2642597B2 (en) Concrete stairs
KR100464594B1 (en) The method of constructing the prefabricated step on reinforced concrete building
CN217924470U (en) Assembled parapet structure with lightning protection function
KR100930281B1 (en) Attachment bracket of steel stairway and attachment device and attachment method of steel stairway
RU4767U1 (en) Dismountable and creeping small-panel formwork
KR960008095Y1 (en) Assembling balustrades
JP3074235B2 (en) Method of constructing temporary scaffold for steel stairs and support fitting used for the method
JPS6217550Y2 (en)

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20030306

Effective date: 20040830

J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20061011

Effective date: 20070329

J302 Written judgement (patent court)

Free format text: JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_AFFIRMATIVE REQUESTED 20070501

Effective date: 20071005

FPAY Annual fee payment

Payment date: 20121031

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20130826

Year of fee payment: 17

EXPY Expiration of term