KR100930281B1 - Attachment bracket of steel stairway and attachment device and attachment method of steel stairway - Google Patents

Attachment bracket of steel stairway and attachment device and attachment method of steel stairway Download PDF

Info

Publication number
KR100930281B1
KR100930281B1 KR1020020004370A KR20020004370A KR100930281B1 KR 100930281 B1 KR100930281 B1 KR 100930281B1 KR 1020020004370 A KR1020020004370 A KR 1020020004370A KR 20020004370 A KR20020004370 A KR 20020004370A KR 100930281 B1 KR100930281 B1 KR 100930281B1
Authority
KR
South Korea
Prior art keywords
steel
floor
concrete
bracket
staircase
Prior art date
Application number
KR1020020004370A
Other languages
Korean (ko)
Other versions
KR20020062858A (en
Inventor
요코모리세이븐
Original Assignee
가부시키가이샤 요코모리 세이사쿠쇼
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 가부시키가이샤 요코모리 세이사쿠쇼 filed Critical 가부시키가이샤 요코모리 세이사쿠쇼
Publication of KR20020062858A publication Critical patent/KR20020062858A/en
Application granted granted Critical
Publication of KR100930281B1 publication Critical patent/KR100930281B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/104Treads
    • E04F11/116Treads of stone, concrete or like material or with an upper layer of stone or stone like material, e.g. ceramics, concrete; of glass or with an upper layer of glass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/062Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

(과제) 마루용 형틀의 일부로 되는 부착금구(5)를 사용하고, 철골계단을 마루용 형틀에 지지하므로, 서포트류를 불필요하게 하여 정확하고 용이하게 시공한다. 철골계단에서 층계참을 제거하고, 층계참을 현장 타설로 할 수 있다.(Problem) Since the mounting bracket 5 which is a part of the flooring mold is used and the steel stairway is supported on the flooring mold, support is unnecessary and construction is carried out accurately. The stairway can be removed from the steel stairway and the landing can be cast in place.

(해결수단) 기설 기준층(F0)의 마루(23)의 부착금구(5)에서 하방으로 향한 철골계단(20)이 고정되어 있다(a). 다음층(F1)용의 마루용의 형틀(24) 등을 구축함과 동시에, 부착금구(5)에 상방으로 향하는 철골계단(20A)의 하단을 고정하고, 철골계단(20A)에 중간 층계참(21), 철골계단(20B)을 연결한다. 철골계단(20B)의 상단에 고정된 다른 부착금구(5)를 F1층의 형틀(24)에 고정한다(b). 콘크리트를 타설하여, 부착금구(5)의 윗가장자리를 측정자로 하여 콘크리트의 상면을 평평하게 하면서, 다음층(F1)을 구축한다(c). 콘크리트가 고화발현후, 불요한 형틀 등을 떼어내면, 다음층(F1)의 콘크리트제 마루(23)를 비롯한 구성체의 구축이 완료되고, 철골게단(20A,20B)도 구축된다(d).(Measures) The steel frame staircase 20 facing downward from the attachment bracket 5 of the floor 23 of the existing reference layer F 0 is fixed (a). At the same time, the floor frame 24 for the next floor F 1 is constructed, and the lower end of the steel staircase 20A upward is fixed to the mounting bracket 5, and the intermediate stairway (20A) is attached to the steel staircase 20A. 21), connect the steel staircase (20B). Another attachment bracket 5 fixed to the upper end of the steel staircase 20B is fixed to the mold 24 of the F 1 layer (b). The concrete is poured, and the next layer F 1 is constructed while the upper surface of the concrete is flattened using the upper edge of the mounting bracket 5 as a measurer (c). After the concrete has solidified expression, the inner surface off the unnecessary a mold or the like, the construction of the structural body including the concrete floor 23 of the next layer (F 1) is completed, and is also built steel gedan (20A, 20B) (d) .

Description

철골계단의 부착금구 및 철골계단의 부착장치 그리고 부착방법{AFFIX STEEL MEMBER OF STEEL FRAMED STAIRS, AFFIX APPARATNS AND METHOD THEROF}Attachment bracket of steel stairway and attachment device of steel stairway and attachment method {AFFIX STEEL MEMBER OF STEEL FRAMED STAIRS, AFFIX APPARATNS AND METHOD THEROF}

도 1(a)는 본 발명의 부착금구의 실시예의 사시도이다.Figure 1 (a) is a perspective view of an embodiment of the mounting bracket of the present invention.

도 1(b)는 동 평면도이다.Fig. 1B is a plan view of the same.

도 1(c)는 동 실시예의 일부확대단면도이다.Fig. 1C is a partially enlarged cross-sectional view of the embodiment.

도 1(d)는 동 인서트의 다른 실시예의 일부확대단면도이다.Figure 1 (d) is a partially enlarged cross-sectional view of another embodiment of the insert.

도 2(a)는 본 발명의 부착금구의 다른 실시예의 사시도이다.Figure 2 (a) is a perspective view of another embodiment of the mounting bracket of the present invention.

도 2(b)는 동 평면도이다.2B is a plan view of the same.

도 3은 동 중간층계참을 철골계단으로 한 실시예이고, 일부를 생략한 평면도로서, 기준층(F0)을 표시한다.FIG. 3 is an embodiment in which the middle tier is made of steel stairway, and a part of the plan view is omitted, and the reference layer F 0 is displayed.

도 4는 동 일부를 생략한 평면도로서, 구축하는 층(F1)을 표시한다.4 is a plan view with a part omitted, and shows the layer F 1 to be constructed.

도 5는 도 3의 A-A선에 있어서 단면도이다.FIG. 5 is a cross-sectional view taken along the line A-A of FIG. 3.

도 6(a)는 도 3의 B-B선에 있어서 확대단면도이다.(A) is an expanded sectional view in the B-B line | wire of FIG.

도 6(b)는 도 3의 C부 확대도이다.FIG. 6B is an enlarged view of part C of FIG. 3.

도 7(a)는 동 도 4의 D-D선에 있어서 확대단면도이다.FIG. 7A is an enlarged cross-sectional view of the D-D line of FIG. 4.

도 7(b)는 동 도 4의 E-E선에 있어서 확대단면도이다. FIG. 7B is an enlarged cross-sectional view of the E-E line in FIG. 4.                 

도 8(a)는 동 도 3의 G-G선에 있어서 확대단면도이다.Fig. 8A is an enlarged cross sectional view of the G-G line of Fig. 3.

도 8(b)는 동 도 3의 H-H선에 있어서 확대단면도이다.FIG. 8B is an enlarged cross-sectional view of the H-H line in FIG. 3.

도 9는 본 발명의 다른 실시예로서, 중간층계참을 현장 다지기 콘크리트구조로 한 실시예의 일부를 생략한 평면도로서, 기준층(F0)을 표시한다.FIG. 9 is a plan view in which another part of the embodiment in which the intermediate layer is a site compacting concrete structure is omitted as another embodiment of the present invention, and shows the reference layer F 0 .

도 10은 동 일부를 생략한 평면도로서, 구축하는 층(F1)을 표시한다.Figure 10 shows the layer (F 1) for building, a plan view omitting the same portion.

도 11은 도 9의 Ⅰ-Ⅰ선에 있어서 단면도이다.FIG. 11 is a cross-sectional view taken along line II of FIG. 9.

도 12는 본 발명의 다른 부착금구를 사용한 실시예로서, 도 3의 G-G선에 있어서 단면도이고 (a)는 철골계단을 접합한 후, (b)는 철골계단을 접합하기전을 각각 표시한다.12 is a cross-sectional view taken along the line G-G of FIG. 3 according to an embodiment using the present invention, (a) after joining the steel stairs, and (b) shows before joining the steel stairs.

도 13(a)~(d)는 본 발명의 계단의 부착방법을 설명하는 도면이다.13 (a) to 13 (d) are views for explaining a method for attaching a staircase of the present invention.

도 14(a)~(f)는 본 발명의 계단의 다른 부착방법을 설명하는 도면이다.14 (a) to 14 (f) are diagrams illustrating another attaching method of the stairs of the present invention.

도 15는 본 발명의 실시예4의 부착금구로서, (a)는 평면도, (b)는 정면도, (c)는 배면도이다.15 is a mounting bracket according to the fourth embodiment of the present invention, where (a) is a plan view, (b) is a front view, and (c) is a rear view.

도 16(a)는 도 15(a)의 J부분 확대도, (b)는 도 15(a)의 K부분 확대도이다.Fig. 16A is an enlarged view of part J of Fig. 15A, and (b) is an enlarged view of part K of Fig. 15A.

도 17(a)는 도 16(a)의 M-M선에 있어서 단면도, (b)는 동 N-N선에 있어서 단면도, (c)는 도 16(b)의 P-P선에 있어서 단면도를 표시한다.(A) is sectional drawing in the M-M line | wire of (a), (b) is sectional drawing in the same N-N line | wire, (c) shows sectional drawing in the P-P line of FIG.

도 18은 실시예4,5에서, 부착금구에, 철골계단을 접합한 상태를 표시하는 평면도이다.FIG. 18 is a plan view showing the state in which the steel stairway is joined to the mounting bracket in Examples 4 and 5. FIG.

도 19는 도 18의 Q-Q선에 있어서 확대단면도이다. 19 is an enlarged cross-sectional view taken along the line Q-Q of FIG.                 

도 20은 도 18의 R-R선에 있어서 확대단면도이다.20 is an enlarged cross-sectional view of the R-R line in FIG. 18.

도 21은 도 18의 S-S선에 있어서 확대단면도이다.FIG. 21 is an enlarged sectional view taken along line S-S of FIG.

도 22는 본 발명의 실시예4,5에 의해 구축된 계단의 평면도이다.Fig. 22 is a plan view of a staircase constructed by Examples 4 and 5 of the present invention.

도 23은 동 종단면도이다.23 is a longitudinal cross-sectional view.

(부호의 주요부분에 대한 설명)Description of the main parts of the code

1; 직사각형 판 2; 지지판One; Rectangular plate 2; Support plate

3,4; 고정금구편 5; 부착금구3,4; Fixing bracket 5; Attachment Bracket

6; 인서트 7; 볼트(인서트고정용)6; Insert 7; Bolt (for insert fixing)

8; 못 구멍 9; 투시구멍(인서트고정용)8; Nail holes 9; Perspective hole (for insert fixing)

10; 투시구멍(철골계단고정용) 11; 볼트(철골계단고정용)10; See-through hole (for fixing steel stairways) 11; Bolt (for fixing steel stairs)

12; 너트(철골계단고정용) 13; 볼트형상 금구12; Nuts (for fixing stairways) 13; Bolt shape

14; 너트(볼트형상 금구고정용) 21a; U자형상 철근14; Nuts (for fixing bolt-shaped brackets) 21a; U-shaped rebar

16; 리브 17; 가느다란 도리16; Rib 17; Slender torii

18; 투시구멍(가느다란 도리) 19; 발판18; See-through hole (thin purlin) 19; Scaffolding

20,20A,20B,20C; 철골계단 21; 중간층계참20,20A, 20B, 20C; Steel staircase 21; Mezzanine

23; 콘크리트제 마루 24; 마루용 형틀23; Concrete flooring 24; Floorboard

25; 서포트 26; 계단실벽25; Support 26; Staircase

28; 중간층계참 콘크리트마루 29; 중간층계참 형틀28; Mezzanine concrete floor 29; Middle landing frame

31; 산형상 강 32; 투시구멍31; Mountain river 32; Perspective hole

33; 고정금구편 34; 투시구멍 33; Fasteners 34; Perspective hole                 

35; 철근(앵커) 38; 파이프서포트35; Rebar (anchor) 38; Pipe support

51,54; 개구 60,64; 포위틀51,54; Opening 60,64; Siege

70; 폐쇄판70; Closing plate

본 발명은, 층계와 콘크리트마루를 긴밀하고 또한 확실히 연결함과 동시에, 이 연결부의 강도적 신뢰도를 향상시키는 것을 목적으로 한 철골계단의 부착금구 및 부착장치 그리고 부착방법에 관한 것이다.The present invention relates to an attachment bracket, an attachment device, and an attachment method of a steel frame staircase for the purpose of closely and reliably connecting a staircase and a concrete floor, and to improve the strength and reliability of the joint.

종래 철골계단과 마루콘크리트는, 마루콘크리트내에 매설된 너트에, 계단측에서 삽통한 볼트를 나사맞춤하여 고정하는 등의 장치가 알려져 있다.Background Art Conventionally, steel frame staircases and floor concrete are known to have a nut embedded in floor concrete in which a bolt inserted through a step is fixed by screwing.

상기 종래의 방법에 의하면, 미리 마루콘크리트에 너트 등을 매설하여 두기 위해서, 계단측에 형틀이 있다. 그래서, 콘크리트경화후, 형틀을 제거한 후 계단을 부착하여야 했다. 그래서, 너트와, 계단부착부의 구멍의 어긋남이 있거나, 형틀의 설치와 제거에 시간이 걸리는 등의 문제점이 있었다.According to the said conventional method, in order to embed a nut etc. in floor concrete previously, there exists a mold in a staircase side. So, after hardening concrete, the mold had to be removed and the stairs attached. Thus, there are problems such as a gap between the nut and the hole of the stepped portion, or a time-consuming installation and removal of the mold.

또한, 미리 부착하여 철골계단을 설치하는 경우에는, 콘크리트를 타설하는 층에 위로 뻗는 철골계단을 조립하여야 하고, 위의 철골계단을 지지하는 가설의 서포트류가 필요하게 되어 가설부재가 많게 되는 문제점이 있었다.In addition, in the case of installing the steel staircase by attaching in advance, the steel staircase that extends upwards must be assembled on the layer where concrete is placed, and there is a problem in that there are many temporary members because the support types of the hypothesis supporting the steel staircase are needed. there was.

본 발명은, 콘크리트마루의 형틀겸용의 계단부착금구를 사용하므로써, 상기 종래의 문제점을 개선하는데 성공한 것이다.The present invention succeeds in improving the above-mentioned conventional problems by using a stair attachment bracket for the form floor of concrete floor.

즉, 본 발명은, 구축예정의 마루콘크리트의 두께와 거의 동일높이의 직사각형 판의 하단에 직각방향으로 지지판을 연설하여 가설된 마루용 형틀에 부착되도록 하고, 상기 직사각형 판과 지지판 중 적어도 하나에, 인서트 부착수단을 형성함과 동시에, 철골계단 부착수단을 형성한 것을 특징으로 하는 철골계단의 부착금구이다.That is, the present invention, the support plate in a direction perpendicular to the lower end of the rectangular plate of the same height as the floor concrete floor to be built so as to be attached to the hypothetical flooring frame, to at least one of the rectangular plate and the support plate, It is an attachment bracket of the steel staircase characterized in that the insert attachment means is formed, and the steel stair attachment means is formed.

또한, 상기에 있어서, 인서트 부착수단은 볼트구멍으로 하고, 철골계단 부착수단은, 철골계단의 가느다란 도리와 고정될 수 있는 고정금구편으로 한 것을 특징을 하는 철골계단의 부착금구이다. 또한, 상기에 있어서, 직사각형 판의 양측면중, 지지판을 연설한 한쪽 면을 마루콘크리트 부착측으로 하고, 타측 면을 계단 부착측으로 하고, 상기 직사각형 판의 일측 면 또는 지지판상에, 철골계단의 가느다란 도리와 고정하기 위한 고정금구편을 돌출설치하여 철골계단 부착수단을 구성하고, 상기 직사각형 판에, 상기 고정금구편에 대응한 위치에 개구를 형성하고, 상기 지지판에 상기 개구와 고정금구편을 포위하는 포위틀을 고정한 것을 특징으로 하는 철골계단의 부착금구이다.In the above, the insert attaching means is a bolt hole, the steel stair attaching means is a steel bracket attaching bracket, characterized in that the fixing bracket pieces that can be fixed with the narrow purlin of the steel stair. Further, in the above, on one side of the rectangular plate, the one surface on which the support plate is extended is the floor concrete attachment side, and the other side is the stairway attachment side, and on one side or the support plate of the rectangular plate, a thin purlin And protruding fixing bracket pieces for fixing to form a steel stair attachment means, forming openings in the rectangular plate at positions corresponding to the fixing bracket pieces, and surrounding the openings and fixing bracket pieces on the support plate. It is an attachment bracket of the steel staircase characterized in that the siege fixed.

또한, 다른 발명은, 철골계단의 단부에 철골계단 부착금구를 고정함과 동시에, 상기 철골계단 부착금구를 콘크리트마루의 단부에 설치하여, 상기 철골계단부착금구에 고정한 인서트를 상기 콘크리트마루 내에 매설한 것을 특징으로 하는 철골계단의 부착장치이다.In addition, another invention, while fixing the steel stair attachment bracket to the end of the steel staircase, at the same time to install the steel stair attachment bracket to the end of the concrete floor, the insert fixed to the steel stair attachment bracket embedded in the concrete floor Attachment device of the steel staircase characterized in that.

또한, 다른 발명은, 이하의 공정으로 이루어지는 것을 특징으로 하는 철골계단의 부착방법이다.
(1) 계단구축위치에, 인서트가 부착된 철골계단 부착금구가 상단부에 고정된 철골계단을 배치하는 단계와,
(2) 상기 철골계단의 하단부를 기설층의 마루에 고정함과 동시에, 상기 철골계단 부착금구를 구축예정층의 마루용 형틀에 고정하여, 이 마루용 형틀의 일부로 하는 단계와,
(3) 구축예정층에 콘크리트를 타설하고, 상기 철골계단 부착금구의 인서트를 매설하여, 구축예정층에 콘크리트마루를 조성하는 단계
Another invention is a method for attaching a steel staircase, comprising the following steps.
(1) arranging the steel staircase in which the steel stair attachment bracket with the insert is fixed to the upper end at the step construction position;
(2) fixing the lower end of the steel staircase to the floor of the existing floor, and fixing the steel stairway attachment bracket to the flooring frame of the floor to be constructed, as part of the flooring frame;
(3) placing concrete on the floor to be built, embedding the insert of the steel stairway attachment bracket, and forming concrete floor on the floor to be built;

삭제delete

삭제delete

삭제delete

또한, 다른 발명은, 이하의 공정을 가지는 것을 특징으로 하는 철골계단의 부착방법이다.
(1) 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제 1의 철골계단을 배치하는 단계와,
(2) 상기 제 1의 철골계단의 하단부를 기설층의 마루에 고정함과 동시에, 상기 철골계단 부착금구를 구축예정의 중간층계참을 위한 중간층계참 형틀에 고정하여, 이 중간층계참 형틀의 일부로 하는 단계와,
(3) 중간층계참의 콘크리트의 타설 후에, 상기 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제 2의 철골계단을 배치하거나,
충간층계참의 콘크리트의 타설 전에, 상기 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제2의 철골계단을 배치하고, 그 후, 중간층계참의 콘크리트를 타설하는 단계와,
(4) 상기 중간층계참 형틀 상의 철골계단 부착금구의 타측에, 상기 제 2의 철골계단의 하단부를 고정함과 동시에, 제 2의 철골계단의 상기 철골계단 부착금구를 구축예정층의 마루용 형틀에 고정하여, 이 마루용 형틀의 일부로 하는 단계와,
Another invention is a method of attaching a steel staircase, which has the following steps.
(1) arranging the first steel staircase of a half-layer, in which one side of the steel staircase mounting bracket with an insert is fixed to the upper end at the step construction position;
(2) fixing the lower end of the first steel staircase to the floor of the existing layer, and fixing the steel stair attachment bracket to the middle landing frame for the intermediate landing of the planned construction, and making it part of the middle landing frame; Wow,
(3) After placing the concrete in the middle tier, place the second steel staircase for the half-layer, in which one side of the steel stair attachment bracket with the insert is fixed to the upper end at the stair construction position;
Before placing the concrete in the interlocking ground, place the second steel stairs, which is half layered, in which one side of the steel stair attachment bracket with the insert is fixed to the upper end at the step construction position, and then the concrete in the middle landing To do that,
(4) While fixing the lower end of the second steel stair step to the other side of the steel stair attachment bracket on the intermediate landing frame, the steel stair attachment bracket of the second steel stair step to the floor mold of the floor to be constructed Fixing it to be part of this flooring mold,

(5) 구축예정층에 콘크리트를 타설하여, 상기 철골계단 부착금구의 인서트를 매설하고, 구축예정층에 콘크리트마루를 조성하는 단계(5) placing concrete on the floor to be built, embedding the insert of the steel stairway attachment bracket, and forming concrete floor on the floor to be built;

삭제delete

삭제delete

삭제delete

삭제delete

상기 발명에 있어서, 부착금구는 하측의 철골계단만을 고정한 상태로 현장에 반입장치하고, 계속해서 상기 부착금구에 위계단의 하단을 고정한다. 위 계단에 관해서는 아래층의 콘크리트를 타설 이전, 또는 타설 후에 설치하는 것으로, 그 전후는 오로지 건조물의 상태에 따라 정한다.In the above invention, the mounting bracket is carried in the site with only the lower steel staircase fixed, and then the lower end of the upper staircase is fixed to the mounting bracket. As for the upper staircase, the concrete of the lower floor is installed before or after pouring, and before and after it is decided only according to the condition of the building.

또한, 상기 발명에 있어서 부착금구와, 인서트와의 고정은, 볼트너트를 사용하고, 또한 용접 그외의 종래 알려지고 있는 고정수단은 어느것도 사용할 수 있다. 또한 인서트의 형상구조에 대하여 특히 제약은 없다.In the above invention, the fixing bracket and the insert are fixed to each other using a bolt nut, and any other conventionally known fastening means such as welding can be used. In addition, there is no restriction on the shape of the insert.

또한, 부착금구는, 형틀의 일부로서 사용한 후, 그대로 계단지지부재로서 잔류하므로, 계단의 부착부의 보강으로 되는 것은 물론, 형틀을 견고하게 유지하고, 또한 상기와같이 상하계단의 연결부재로도 된다.In addition, since the mounting bracket is used as a part of the mold and remains as a stair support member, it is not only reinforcement of the attaching part of the stairs, but also maintains the mold firmly, and may also be a connecting member of the upper and lower stairs as described above. .

또한, 부착금구의 상단면에 접근해서 마루콘크리트의 윗가장자리를 설정할 수 있다.In addition, the upper edge of the floor concrete can be set by approaching the upper surface of the mounting bracket.

(발명의 실시의 형태)(Embodiment of invention)

구축예정의 마루(콘크리트)의 두께와 동일높이의 종방향의 직사각형 판(1)의 하단에 횡방향의 지지판(2)을 연설한다. 직사각형 판(1)의 표면(1b)에, 철골계단(20) 고정용의 고정금구편(3,4)을 세로로 고착한다. 직사각형 판(1)의 투시구멍(9,9)에 삽통한 볼트(7,7)에 Y자형상의 인서트(6)를 나사맞춤 고정한다(도 1(c)). 직사각형 판(1)의 고정금구편(3,4)에 투시구멍(10,10)을 뚫어 설치하고, 지지판(2)에, 마루용의 형틀(24)에 고정하기 위한 못 구멍(8,8)을 뚫어 설치하여, 부착금구(5)로 한다(도 1(a)(b)).The supporting plate 2 in the transverse direction is delivered to the lower end of the longitudinal rectangular plate 1 having the same height as the thickness of the floor to be built. The fixing bracket pieces 3 and 4 for fixing the steel frame stairs 20 are vertically fixed to the surface 1b of the rectangular plate 1. The Y-shaped insert 6 is screwed into the bolts 7, 7, inserted into the see-through holes 9, 9 of the rectangular plate 1 (Fig. 1 (c)). Nail holes 8 and 8 for drilling through holes 10 and 10 in the fixing bracket pieces 3 and 4 of the rectangular plate 1 and fixing them to the support frame 2 to the mold 24 for flooring. ) Is installed to form the mounting bracket 5 (Fig. 1 (a) (b)).

또한, 장치의 발명은, 1층분의 철골계단의 상하단부에 부착금구(5)를 연결하고, 상기 부착금구(5)의 인서트(6)를 콘크리트제의 마루에 매설하여 철골계단을 고정한 것이다. 철골계단을 2개로 분할한 경우에는, 하측의 철골계단의 하단부에 부착금구(5)가 고정되고, 상측의 철골계단의 상단부에 부착금구(5)가 고정된다. 중간층계참을 철골계단으로 하지않고, 현장 다지기 콘크리트제로 하는 경우에는, 더욱 중간 층계참용의 부착금구(5)가, 하측의 철골계단의 상단부, 상측의 철골계단의 하단부에 각각 고정된다.In addition, the invention of the device connects the mounting brackets 5 to the upper and lower ends of the steel frame stairs for one layer, and inserts the inserts 6 of the mounting brackets 5 on concrete floors to fix the steel stairs. When the steel staircase is divided into two, the mounting bracket 5 is fixed to the lower end of the lower steel staircase, and the mounting bracket 5 is fixed to the upper end of the upper steel staircase. In the case where the intermediate stairway is not made of steel stairway and is made of site-ground concrete, the mounting bracket 5 for intermediate stairway is further fixed to the upper end of the lower steel stairway and the lower end of the upper steel stairway, respectively.

(실시예 1)(Example 1)

본 발명의 부착금구(5)의 실시예를 도 1, 도 2, 도 12에 근거하여 설명한다.An embodiment of the mounting bracket 5 of the present invention will be described with reference to FIG. 1, FIG. 2, FIG.

철판을 굴곡하여, 구축예정의 마루콘크리트의 두께와 동일높이의 직사각형 판(1)의 하단에 직각방향으로 지지판(2)이 연설된 구조를 형성한다. 상기 직사각형 판(1)의 표면에서, 지지판(2)측의 표면을 표면(1a)으로 하고, 지지판(2)의 반대측의 표면을 표면(1b)으로 한다. 직사각형 판(1)의 표면(1a)과 지지판(2)의 상면과의 사이에 직사각형 판(1)과 지지판(2)의 각도를 유지하기 위한 리브(16)가 가설고정되어 있다(도 1(b)). 상기 리브(16)는, 직사각형 판(1)과 지지판(2)의 모서리 부근은, 콘크리트가 흐르도록, 절결(16a)이 형성되어 있다(도 1(c)).The iron plate is bent to form a structure in which the support plate 2 is extended at right angles to the lower end of the rectangular plate 1 having the same height as the thickness of the floor concrete to be constructed. On the surface of the said rectangular plate 1, the surface on the side of the support plate 2 is made into the surface 1a, and the surface on the opposite side to the support plate 2 is made into the surface 1b. A rib 16 is temporarily installed between the surface 1a of the rectangular plate 1 and the upper surface of the support plate 2 to hold the angle between the rectangular plate 1 and the support plate 2 (FIG. 1 (FIG. 1 (FIG. 1)). b)). In the rib 16, the notches 16a are formed in the vicinity of the corners of the rectangular plate 1 and the support plate 2 so that concrete flows (Fig. 1 (c)).

상기 직사각형 판(1)의 표면(1b)의 양단부에 철골계단(20)과 고정하기위한 고정금구편(3,3)을 세로로 고착하고, 동일하게 중앙부로 고정금구편(4)을 세로로 고착한다. 또한, 상기 직사각형 판(1)에, 횡방향으로 적절한 간격을 설치하여, 투시구멍(9,9)을 뚫어 설치한다. 상기 직사각형 판(1)의 한측의 표면(1a)측에, Y자형상의 인서트(6)를 배치하고, 타측의 표면(1b)측에서 상기 투시구멍(9,9)에 삽입된 볼트(7,7)로, 인서트(6)를 고정한다(도 1(c)).Fasten fixing bracket pieces 3 and 3 for fixing the steel staircase 20 to the both ends of the surface 1b of the rectangular plate 1 vertically, and equally fasten the fixing bracket pieces 4 vertically to the center part. Stick. Moreover, the said rectangular plate 1 is provided with the appropriate space | interval in a horizontal direction, and is provided through the through-holes 9 and 9. On the surface 1a side of the rectangular plate 1, a Y-shaped insert 6 is disposed, and the bolt 7 inserted into the see-through holes 9 and 9 from the other surface 1b side, 7), the insert 6 is fixed (FIG. 1 (c)).

또한, 상기 직사각형 판(1)의 고정금구편(3,4)에, 철골계단의 가느다란 도리와 고정하기위해, 가느다란 도리의 투시구멍과 연통하는 투시구멍(10,10)을 뚫어 설치한다. 또한, 상기 지지판(2)에, 마루용의 형틀(24)과 지지판(2)을 고정하기 위한 못 구멍(8,8)을 적절한 간격으로 뚫어 설치한다. 이상과 같이 하여, 부착금구(5)를 구성한다(도 1(a)(b)).In addition, in order to fix it with the thin purlin of steel frame stairs, the fixing hole pieces 3 and 4 of the said rectangular plate 1 are provided with the through-holes 10 and 10 which communicate with the see-through hole of a thin purlin. . In addition, nail holes 8 and 8 for fixing the mold 24 for the floor and the support plate 2 are installed in the support plate 2 at appropriate intervals. As described above, the mounting bracket 5 is constituted (Fig. 1 (a) (b)).

상기 실시예에 있어서 인서트(6)는 선단을 Y자형상으로 형성하여 구성하였는데, 볼트형상 금구(13)에 적절한 길이의 U자형상의 철근(21a)을 걸고, 투시구멍(9)을 관통한 볼트형상 금구(13)의 나사부에 너트(14)를 나사맞춤할 수 도 있다(도 1(d)).In the above embodiment, the insert 6 is formed by forming the tip in a Y-shape. The bolt is fastened to the bolt-shaped bracket 13 by a U-shaped reinforcing bar 21a of an appropriate length and penetrated through the see-through hole 9. The nut 14 may be screwed onto the threaded portion of the shaped bracket 13 (Fig. 1 (d)).

또한, 상기 실시예에 있어서, 인서트(6), U자형상의 철근(21a)을 사용한 경우에는, 용접작업이 없으므로, 직사각형 판(1)에 변형이 생기지않아서 바람직하지만, 직사각형 판(1)의 용접에 의한 인서트용의 철근(35,35)을 용접하여 고착할 수 도 있다(도 12(b)).In the above embodiment, when the insert 6 and the U-shaped reinforcing bars 21a are used, there is no welding operation, and thus the rectangular plate 1 is preferably not deformed, but the welding of the rectangular plate 1 is preferable. It is also possible to weld and fix the reinforcing bars 35 and 35 for the insert (Fig. 12 (b)).

또한, 상기 실시예에 있어서, 직사각형 판(1)과 지지판(2)의 사이에, 리브(16)를 설치하여 보강, 보형하였는데, 리브(16)대신에, 직사각형 판(1)과 지지판(2)에, 비스듬히 배치한 철근(35a)의 양단부를 용접고착할 수 도 있다(도 12(a)(b)).In the above embodiment, the ribs 16 are provided between the rectangular plates 1 and the support plates 2 to reinforce and shape the ribs 16. Instead of the ribs 16, the rectangular plates 1 and the support plates 2 are provided. ), Both ends of the rebar 35a arranged at an angle may be welded (Fig. 12 (a) (b)).

또한, 상기 실시예에 있어서, 철골계단(20)의 가느다란 도리(17)의 투시구멍(18)과 연통하는 투시구멍(10,10)을 뚫어 설치한 고정금구편(3,4)을 고착하였는데, 다른 구성으로 할 수 도 있다(도 2, 도 12).Further, in the above embodiment, the fixing bracket pieces 3 and 4 provided by drilling through-hole holes 10 and 10 communicating with the see-through hole 18 of the slender purlin 17 of the steel staircase 20 are fixed. Although it can be set as another structure (FIG. 2, FIG. 12).

즉, 철골계단(20)의 가느다란 도리(17,17)사이에, 투시구멍(32,32)을 뚫어 설치한 산(山)형상 강(鋼)(31)을 가설고정하고(도 12(b)), 부착금구(5)의 직사각형 판(1)의 표면(1b)에, 이 투시구멍(32,32)에 대응한 투시구멍(34)을 뚫어 설치한 산형상 강편으로 이루어지는 고정금구편(33,33)을 고정하여 구성한다(도 2(a)(b), 도 12(b)). 이 경우, 철골계단(20)의 산형상 강(31)의 플랜지를, 부착금구(5)의 고정금구편(33,33)에 얹어놓고, 투시구멍(32,34)사이에 볼트(11)를 삽통하고, 너트(12)를 나사맞춤 죄이고, 철골계단(20)과 부착금구(5)를 고정한다(도 12(a)).That is, between the narrow purlins 17 and 17 of the steel staircase 20, a mountain-shaped steel 31 provided by drilling through holes 32 and 32 is temporarily installed (FIG. 12 ( b)) Fixing bracket piece which consists of the mountain-shaped steel piece which provided in the surface 1b of the rectangular plate 1 of the mounting bracket 5, and provided the through-hole 34 corresponding to this see-through hole 32,32. (33, 33) is fixed and configured (FIG. 2 (a) (b), FIG. 12 (b)). In this case, the flange of the mountain-shaped steel 31 of the steel step 20 is placed on the fixing bracket pieces 33 and 33 of the mounting bracket 5, and the bolt 11 is placed between the see-through holes 32 and 34. Insert the nut, screw the nut 12, and fix the steel staircase 20 and the mounting bracket 5 (Fig. 12 (a)).

(실시예 2)(Example 2)

다음에, 도 3 ~ 도 8, 도 13에 근거하여 본 발명의 구축방법에 대하여 설명한다.Next, the construction method of the present invention will be described with reference to Figs.

[철골계단의 구성][Configuration of Steel Stairs]

계단형상으로 배치한 발판(19,19)의 양단부를, 철판제의 가느다란 도리(17,17)로 끼워 고정하고, 철골계단(20)을 구성한다. 상기 가느다란 도리(17) 의 마루 구성체(부착금구)에 고정하는 부분에 투시구멍(18,18)을 뚫어 설치하고 있다. 또한, 가느다란 도리(17)의 타측에 고정될 수 있는, 철판제의 중간층계참(21)을 준비한다. 또한, 상기 발판(19)은, 모르타르계 재질의 발판을, 계단형상으로 굴곡한 얇은 강판으로 샌드위치하여 구성되어 있다.Both ends of the footrests 19 and 19 arranged in the step shape are pinched and fixed with the thin steel purlins 17 and 17, and the steel frame steps 20 are comprised. Perspective holes 18 and 18 are drilled and provided in a part of the slender purlin 17 fixed to the floor structure (attachment). In addition, the intermediate layer landing 21 made of iron plate, which can be fixed to the other side of the thin purlin 17 is prepared. The scaffold 19 is formed by sandwiching a mortar-based scaffold with a thin steel sheet bent in a step shape.

상기 철골계단(20)은, 반층분을 형성하고, 2개의 철골계단(20,20) 및 중간층계참(21)을 조합하여, 1층분의 계단을 구성한다.The steel stair step 20 forms a half-floor, and combines the two steel stair steps 20 and 20 and the middle stairway 21 to form a step for one floor.

또한, 구축현장으로 반입하기 전에 미리 공장에서, 또는 구축현장에 반입한 후에, 철골계단(20B)의 가느다란 도리(17)의 상단부에, 부착금구(5)를 고정한다. 즉, 부착금구(5)의 고정금구(3,4)을 가느다란 도리(17,17)에 첨부하고, 투시구멍(10,18)에 볼트(11)를 삽입하여, 너트(12)로 나사체결하여 행한다. 이 때, 부착금구(5)의 한측(5a)에 철골계단(20B)이 고정되고, 타측(5b)은, 철골계단은 설치되어 있지 않다(도 4 등).In addition, the attachment bracket 5 is fixed to the upper end of the slender purlin 17 of the steel frame staircase 20B before being brought into the construction site or after being brought into the construction site. That is, the fixing brackets 3 and 4 of the mounting bracket 5 are attached to the narrow purlins 17 and 17, the bolt 11 is inserted into the see-through holes 10 and 18, and the nut 12 is screwed. Tighten it. At this time, the steel frame stairs 20B are fixed to one side 5a of the mounting bracket 5, and the steel frame stairs are not provided on the other side 5b (Fig. 4, etc.).

상기 실시예에 있어서, 철골계단(20A,20B)과 중간층계참(21)으로 계단을 구성하였는데, 발판단부와 중간층계참편이 일체로 된 철골계단(20A,20B)을 사용할 수 도 이다(도시생략). 이 경우, 양 중간층계참편에서, 중간층계참을 구성한다.In the above embodiment, the staircase was composed of the steel staircase 20A, 20B and the middle stairway 21, and the steel staircase 20A, 20B, in which the foothold part and the middle stairway piece are integrated, may be used (not shown). . In this case, the intermediate landings constitute both middle landings.

[구축방법][How to build]

(1) 기준층(기설층)(F0)에서는, 부착금구(5)의 한측(5a)에 하방으로 향한 철골계단(20)이 고정된 상태로, 콘크리트제의 마루(23)가 구축되어 있다(도 13(a), 도 3, 도 8(a)(b)). (1) In the reference layer (base layer) F 0 , a concrete floor 23 is constructed in a state where the steel staircase 20 facing downward is fixed to one side 5a of the mounting bracket 5. ((A), FIG. 3, and (a) (b) of FIG. 13).

(2) 구축예정층(F1)(F0의 다음층)을 구축하기위한 마루용의 형틀(24)을 시작으로 한 형틀 및 철근을 종래의 방법에 의해 구축한다. 이 때, 예를들면 마루용의 형틀(24)은, 수평으로 배치된 버터파이프(36,37)를 통해서, 서포트(38,38)로 지지된다(도 5, 도 7, 도 8).(2) The frame and the reinforcing bar, including the frame 24 for the floor, for constructing the planned construction layer F 1 (the next layer of F 0 ), are constructed by a conventional method. At this time, for example, the flooring mold 24 is supported by the supports 38 and 38 through the butter pipes 36 and 37 arranged horizontally (FIGS. 5, 7 and 8).

또한, 상기 마루용의 형틀(24) 및 철근의 구축과 병행하여, 또는 구축후에, 구축예정층(F1)(F0의 다음층)으로 향하는 한쪽의 철골계단(20A), 중간층계참(21), 타측의 철골계단(20B)을 배치한다(도 13(a)). 상기 타측의 철골계단(20B)의 상단(다음층과의 연결부)에, 부착금구(5)의 한쪽(5a)이 고정되어 있다.Further, in parallel with or after the construction of the frame 24 and the reinforcing bar for the floor, one steel stair step 20A and the middle stairway step 21, which are directed to the construction scheduled floor F 1 (the next floor of the F 0 ). ), The other side of the steel stair step (20B) is placed (Fig. 13 (a)). One end 5a of the mounting bracket 5 is fixed to the upper end (connection portion with the next layer) of the steel frame step 20B on the other side.

(3) 한쪽의 철골계단(20A)하단부의 가느다란 도리(17)를, 기준층(F0)(기설)의 부착금구(5)의 타측(5b)에, 볼트(11), 너트(12)로 고정함과 동시에, 철골계단(20A) 타측 및 철골계단(20B)의 하단부에 중간층계참(21)을 볼트너트로 고정한다. 또한, 철골계단(20B)의 부착금구(5)를 구축예정층(F1)의 마루용의 형틀(24)에서 위에 싣고, 지지판(2)의 못 구멍(8,8)에서 못을 쳐박고, 부착금구(5)와 마루용 형틀(24)을 고정한다(도 13(b)). 이 때, 마루용 형틀(24)의 상면의 먹줄치기 위치에 맞추는 것만으로, 용이하게 부착금구(5)(철골계단(20B))를 정확한 위치에 배치할 수 있다. 또한, 중간층계참(21)의 하면을, 박스형 서포트(25)로 지지한다.(3) The bolt 11 and the nut 12 are attached to the other side 5b of the mounting bracket 5 of the reference layer F 0 (predetermined). At the same time, the middle layer landing 21 is fixed to the other side of the steel staircase 20A and the lower end of the steel staircase 20B with bolt nuts. In addition, the mounting bracket 5 of the steel staircase 20B is mounted on the floor mold 24 for the floor to be constructed F 1 , and nailed through the nail holes 8 and 8 of the support plate 2. , Fixing bracket 5 and flooring mold 24 (FIG. 13 (b)). At this time, the fitting bracket 5 (steel staircase 20B) can be easily positioned at the correct position only by fitting it to the streak position on the upper surface of the floor mold 24. In addition, the lower surface of the intermediate layer landing 21 is supported by the box type support 25.

이상의 작업에 의해, 철골계단(20A,20B)은 가설되고, 작업계단으로서 사용할 수 도 있다. 이 때, 부착금구(5)의 직사각형 판(1)이 거푸집널로서 마루용 형틀의 일부로서 기능하므로, 계단부분의 마루용 형틀의 구축이 경감된다. 또한, 중간층계참(21)을 지지하는 서포트만으로, 철골계단(20A,20B)을 지지하기 위한 서포트류를 불필요하게 할 수 있으므로, 구성체 및 철골계단을 구축하기 위한 가설작업을 대폭적으로 삭감할 수 있다.By the above operation, the steel frame stairs 20A and 20B are hypothesized, and can also be used as work stairs. At this time, since the rectangular plate 1 of the mounting bracket 5 functions as part of the floor mold as a formwork, construction of the floor mold in the stepped portion is reduced. In addition, since only the support for supporting the intermediate landing 21 can make unnecessary support for supporting the steel stairs 20A and 20B, the construction work for constructing the structure and the steel stairs can be greatly reduced. .

(4) 다음에, 마루용 형틀(24)을 시작으로 한 형틀상에, 콘크리트를 타설한다(도 13(c)). 이 때, 부착금구(5)의 직사각형 판(1)의 윗가장자리(1c)를 측정자로 하고, 아직 응고되지않은 콘크리트의 상면(23a)을 평평하게 할 수 있으므로, 콘크리트타설·평평작업을 경감할 수있다(도 7(a)(b)). 또한, 부착금구(5)의 타측(5b)에 상층으로 향하는 철골계단(20)이 접합되어 있지 않지만, 직사각형판으로 폐쇄하므로, 콘크리트의 타설에 지장이 없다(도 4). (4) Next, concrete is poured on the mold including the floor mold 24 (FIG. 13 (c)). At this time, since the upper edge 1c of the rectangular plate 1 of the mounting bracket 5 can be used as a measuring instrument, the upper surface 23a of the concrete, which has not yet solidified, can be flattened, thereby reducing concrete pouring and leveling work. (A) and (b). In addition, although the steel stairway 20 which goes to the upper layer is not joined to the other side 5b of the mounting bracket 5, since it is closed by a rectangular plate, there is no problem in placing concrete (FIG. 4).

또한, 상기에 있어서, 중간층계참(21)은, 단부에 관통한 앵커철근(22)이 콘크리트제의 계단실벽(26)내에 매설되고, 구성체에 고정된다(도 6(a)). 도 6(a)중에서, 27은 계단실벽용의 철근이다.In addition, in the above, in the intermediate landing 21, the anchor reinforcing bar 22 penetrating the end is embedded in the staircase chamber wall 26 made of concrete, and fixed to the structure (Fig. 6 (a)). In Fig.6 (a), 27 is a steel bar for stair room walls.

(5) 콘크리트가 고화발현(固化發現)후, 마루용 형틀(24)을 비롯, 불필요한 형틀, 서포트(38) 등을 제거하면, 다음층(F1)의 콘크리트제 마루(23)를 비롯한 구성체의 구축이 완료된다(도 13(d)).(5) After the concrete is solidified, if the mold 24, the unnecessary mold 38, the support 38, and the like are removed, the structure including the concrete floor 23 of the next layer F 1 is removed. Is completed (Fig. 13 (d)).

여기서, 부착금구(5)의 인서트(6,6)가 콘크리트내에 매설되므로, 부착금구(5)를 통해서, 철골계단(20A,20B)이 구성체에 고정된다. 또한, 부착금구(5)는 쳐넣기 형틀로서 남겨놓고, 콘크리트제 마루(23)의 하면단부가 부착금구(5)로 보강되므로, 이 부분을 보강할 수 있다. 또한, 상기 부착금구(5)로부터 하방으로 돌출한 못은, 종래의 방법에 의해 절단한다.Here, since the inserts 6 and 6 of the mounting bracket 5 are embedded in the concrete, the steel frame steps 20A and 20B are fixed to the structure through the mounting bracket 5. In addition, since the mounting bracket 5 is left as a casting mold and the lower end of the concrete floor 23 is reinforced with the mounting bracket 5, this part can be reinforced. In addition, the nail which protruded below from the said mounting bracket 5 is cut | disconnected by the conventional method.

(6) 이상에서, 철골계단의 구축이 완료된다(도 4, 도 5). 다음층의 철골계단(20C) 등도 동일하게 조립된다(도 4).(6) From the above, the construction of the steel frame stairs is completed (FIGS. 4 and 5). Steel frame stairs 20C of the next layer and the like are also assembled (FIG. 4).

(실시예 3)(Example 3)

도 9 ~ 도 11, 도 14에 근거해서 본 발명의 계단의 구축방법의 다른 실시예를 설명한다. 상기 실시예 2에서는, 이미 만들어진 철골제의 중간층계참(21)을 사용하였는데, 이 실시예에서는, 중간층계참도 철근콘크리트제로 하여, 현장에서 구축하는 실시예이다.9 to 11 and 14, another embodiment of the method of constructing the stairs of the present invention will be described. In the said Example 2, although the intermediate | middle layer landing 21 of the steel frame made already was used, in this Example, it is an Example which is constructed in the field by using the intermediate layer landing as reinforced concrete agent.

(1) 기준층(기설층)(F0)에서는, 부착금구(5)의 한쪽(5a)에서 하방으로 향한 철골계단(20)이 고정된 상태로, 콘크리트제의 마루(23)가 구축된다(도 14(a), 도 9, 도 8(a)(b)).(1) In the reference layer (base layer) F 0 , a concrete floor 23 is constructed in a state where the steel staircase 20 is fixed downward from one side 5a of the mounting bracket 5 ( 14 (a), 9, 8 (a) (b)).

(2) 구축예정의 중간층계참층(F0-1)(F0과 F1의 중간층)을 구축하기위한 층계참용의 형틀(29)을 비롯한 형틀 및 철근을 종래의 방법에 의해 구축한다. 이 때, 예를들면 마루용의 형틀(24)은, 수평으로 배치한 버터파이프(36,37)를 통해서, 서포트(38,38)로 지지된다(도 11).(2) The frame and the reinforcing bar, including the frame 29 for the landing, for constructing the intermediate landing layer F 0-1 (intermediate layer between F 0 and F 1 ), which are to be constructed, are constructed by a conventional method. At this time, for example, the floor mold 24 is supported by the supports 38 and 38 through the butter pipes 36 and 37 arranged horizontally (Fig. 11).

또한, 상기 형틀(29) 및 철근의 구축에 병행하여, 또는 구축후에, 구축예정의 (F0-1)층으로 향해서 한측의 철골계단(20A)을 배치한다(도 14(a)). 상기 타측의 철골계단(20B)의 상단(다음층과의 연결부)에, 부착금구(5)의 한측(5a)이 고정되어 있다. In addition, the steel frame stairs 20A on one side are arranged in parallel to or after the construction of the mold 29 and the reinforcing bar toward the (F 0-1 ) floor to be constructed (FIG. 14A). One side 5a of the mounting bracket 5 is fixed to the upper end (connection portion with the next layer) of the steel frame staircase 20B on the other side.

(3) 상기 실시예 2와 동일하게, 철골계단(20A)의 하단부의 가느다란 도리(17)를, 기준층(F0)(기설)의 부착금구(5)에 볼트(11), 너트(12)로 고정함과 동시에, 철골계단(20A)의 부착금구(5)를 구축예정의 층계참(F0-1)의 형틀(29)상에 싣고, 지지판(2)의 못 구멍(8,8)에서 못을 쳐박고, 부착금구(5)와 마루용 형틀(24)을 고정한다(도 14(b)). 이 때, 형틀(29)의 상면의 먹줄치기위치에 맞추는 것만으로, 용이하게 부착금구(5)(철골계단(20A))를 정확한 위치에 위치시킬 수 있다.(3) In the same manner as in Example 2, the slender purlin 17 at the lower end of the steel staircase 20A is attached to the bolt 11 and the nut 12 to the mounting bracket 5 of the reference layer F 0 (existing). At the same time, the mounting bracket 5 of the steel staircase 20A is mounted on the frame 29 of the stairway F 0-1 to be constructed, and the nail holes 8 and 8 of the support plate 2 are fixed. Nail the nail in, fixing the attachment bracket 5 and the flooring mold 24 (Fig. 14 (b)). At this time, the fitting bracket 5 (steel staircase 20A) can be easily positioned at the correct position only by matching the position of the upper surface of the mold 29 to the streak position.

(4) 다음에, 형틀(29)을 비롯한 형틀상에, 콘크리트를 타설하여 중간층계참(28)을 구축한다(도 14(c)). 또한, (F0-1)층의 부착금구(5)의 타측(5b)에 서 상층으로 향하는 철골계단(20B)이 접합되어 있지 않지만, 직사각형 판(1)으로 폐쇄하므로, 콘크리트의 타설에 지장이 없다.(4) Next, on the mold including the mold 29, concrete is poured to construct the intermediate floor landing 28 (FIG. 14 (c)). In addition, the steel staircase 20B heading from the other side 5b of the attachment bracket 5 of the (F 0-1 ) layer to the upper layer is not joined, but closed by the rectangular plate 1, which prevents the casting of concrete. There is no

또한, 상기 실시예 2에서는, 중간층계참을 지지하기 위한 박스형의 서포트를 가설하였지만, 본 실시예에서는, 중간층계참도 현장타설 콘크리트로 한다. 따라서, 구성체 구축용의 형틀만으로, 철골계단(20A,20B)을 지지하기위한 것만의 서포트류를 일체 불필요하게 할 수 있다.In addition, although the box-shaped support for supporting the intermediate landing was hypothesized in the second embodiment, in the present embodiment, the intermediate landing was also cast in place. Therefore, only the frame for constructing the structure can make unnecessary all kinds of supports only for supporting the steel frame steps 20A and 20B.

(5) 상기 중간층계참(F0-1)층의 콘크리트를 타설한 후, 상단(다음층과의 연결부)에, 부착금구(5)의 한쪽(5a)이 고정되어 있는 철골계단(20B)을 배치한다(도 14(c)). (5) After pouring the concrete of the intermediate layer (F 0-1 ) layer, the steel frame staircase 20B having one side 5a of the mounting bracket 5 fixed to the upper end (connection portion with the next layer). It arrange | positions (FIG. 14 (c)).

(6) 철골계단(20A)의 중간층계참(F0-1)층의 부착금구(5)의 타측(5b)에, 타측의 철골계단(20B)의 하단을 동일하게 하여, 볼트(11), 너트(12)로 고정함과 동시에, 철골계단(20B)의 부착금구(5)를 구축예정층(F1)의 마루용의 형틀(24)상에 싣고, 지지판(2)의 못 구멍(8,8)에서 못을 쳐박고, 부착금구(5)와 마루용 형틀(24)을 고정한다(도 14(d)). 이때, 예를들면 마루용 형틀(24)은, 수평으로 배치한 버터파이프(36,37)를 통해서, 서포트(38,38)로 지지된다(도 11).(6) The other end 5b of the mounting bracket 5 of the middle layer engaging (F 0-1 ) layer of the steel staircase 20A has the same lower end of the steel staircase 20B on the other side, and the bolt 11, At the same time as fixing with the nut 12, the mounting bracket 5 of the steel staircase 20B is mounted on the flooring frame 24 of the floor to be constructed F 1 , and the nail holes 8 of the supporting plate 2 are mounted. At 8, the nail is nailed and the attachment bracket 5 and the flooring mold 24 are fixed (Fig. 14 (d)). At this time, for example, the flooring mold 24 is supported by the supports 38 and 38 through the butter pipes 36 and 37 arranged horizontally (FIG. 11).

(7) 다음에, 마루용 형틀(24)을 비롯한 형틀상에, 콘크리트를 타설한다(도 14(e)). 이 때, 부착금구(5)의 직사각형 판(1)의 윗가장자리(1c)를 측정자로 하고, 아직 응고하지않은 콘크리트의 상면(23a)을 균일하게 할 수 있다. 또한, 부착금구(5)의 타측(5b)에서 상층으로 향하는 철골계단(20)이 접합되어 있지 않지만, 직사각형 판(1)로 폐쇄하므로, 콘크리트의 타설에 지장이 없다.(7) Next, concrete is poured on the mold including the floor mold 24 (FIG. 14 (e)). At this time, the upper edge 1c of the rectangular plate 1 of the attachment bracket 5 can be used as a measuring instrument, and the upper surface 23a of concrete which has not yet solidified can be made uniform. In addition, although the steel stairway 20 which goes to the upper layer from the other side 5b of the mounting bracket 5 is not joined, since it is closed by the rectangular plate 1, there is no problem in placing concrete.

(8) 콘크리트가 고화발현한 후, 마루용 형틀(24)을 비롯, 불필요한 형틀, 서포트(38) 등을 제거하면, 다음층(F1)의 콘크리트제 마루(23)를 비롯한 구성체의 구축이 완료된다(도 14(f), 도 11).(8) After the concrete has solidified, removing unnecessary molds, supports 38, etc., including the flooring mold 24, construction of the structure including the concrete floor 23 of the next floor F 1 It is completed (FIG. 14 (f), FIG. 11).

또한, 상기 실시예 2와 동일하게, 부착금구(5,5)의 인서트(6,6)가 콘크리트내에 매설되므로, 부착금구(5)를 통해서, 철골계단(20A,20B)이 구성체로 고정된다. 또한, 부착금구(5)는 박아넣기 형틀로서 남겨놓고, 콘크리트제 마루(23)의 하면 단부가 부착금구(5)로 보강되므로, 이 부분을 보강할 수 있다. 또한, 상기 부착금구(5)에서 하방으로 돌출한 못은, 종래의 방법에 의해 절단된다.In addition, as in the second embodiment, since the inserts 6 and 6 of the mounting brackets 5 and 5 are embedded in the concrete, the steel frame steps 20A and 20B are fixed to the structure through the mounting brackets 5. . In addition, the mounting bracket 5 is left as a mold and the bottom end of the concrete floor 23 is reinforced with the mounting bracket 5, so that this portion can be reinforced. In addition, the nail which protruded below from the said mounting bracket 5 is cut | disconnected by the conventional method.

(9) 이상에서, 철골계단의 구축이 완료된다(도 11, 도 9). 다음층의 철골계단(20C) 등도 동일하게 조립된다(도 10).(9) and above, the construction of the steel frame stairs is completed (FIGS. 11 and 9). Steel frame staircase 20C of the next layer is also similarly assembled (FIG. 10).

(10) 다른 실시예(10) another embodiment

상기 실시예에 있어서, 상기 중간층계참(F0-1)층의 콘크리트를 타설한 후에, 철골계단(20B)을 구축하였는데, 철골계단(20B)의 구축은, 상기 중간층계참(F0-1)층의 콘크리트를 타설하기 전후에 관계없다. 따라서, 중간층계참(F0-1)층, 다음층(F1)의 철골계단, 형틀 등을 구축한 후에, 중간층계참(F0-1)층, 다음층(F1)의 순으로 콘크리트를 타설하는 것도 가능하다.In the above embodiment, after pouring the concrete of the interlayer landing (F 0-1 ), the steel staircase 20B was constructed, the construction of the steel staircase (20B), the construction of the middle stairway (F 0-1 ). It does not matter before or after placing a layer of concrete. Therefore, after constructing the intermediate floor (F 0-1 ) layer, the next step (F 1 ), the steel stairs, the frame, etc., the concrete is placed in the order of the middle floor (F 0-1 ) layer and the next layer (F 1 ). It is also possible to pour.

(실시예 4)(Example 4)

이 발명의 부착금구(5)의 실시예를 도 15 ~ 도 17에 근거해서 설명한다.An embodiment of the mounting bracket 5 of this invention is demonstrated based on FIGS. 15-17.

(1) 구축예정의 마루콘크리트의 두께와 동일높이의 직사각형 판(1)의 하단을 직각방향으로 굴곡하여 지지판(2)을 연설한다. 직사각형 판(1)의 표면에서, 지지판(2)측의 표면을 표면(1a)으로 하고, 지지판(2)의 반대측의 표면을 표면(1b)으로 한다(도 17(b)).(1) The support plate 2 is extended by bending the lower end of the rectangular plate 1 having the same height as the thickness of the floor concrete to be constructed at right angles. On the surface of the rectangular plate 1, the surface on the side of the support plate 2 is made into the surface 1a, and the surface on the opposite side to the support plate 2 is made into the surface 1b (FIG. 17 (b)).

(2) 지지판(2)의 상면에서, 사용할 예정의 철골계단(20)의 가느다란 도리(17,17)의 투시구멍(18)의 위치에 대응시켜서, 고정금구편(3)(외주측), 고정금구편(4)(중앙측)을 돌출설치한다. 고정금구편(3,4)은, 상측의 철골계단(20), 하측의 철골계단(20)에 대응시켜서, 지지판(2)의 길이방향으로, 양측으로 각각 설치된다. 고정금구편(3,4)에는, 철골계단(20)의 가느다란 도리(17,17)의 투시구멍(18) 의 위치에 대응시켜서, 투시구멍(10,10)이 뚫어 설치되어 있다(도 17(a)(c), 도 18).(2) On the upper surface of the support plate 2, the fixing bracket piece 3 (outer circumferential side) corresponding to the position of the see-through hole 18 of the slender purlins 17 and 17 of the steel frame stairs 20 to be used. Fix the fixing bracket piece 4 (center side). The fixing bracket pieces 3 and 4 correspond to the upper steel frame stairs 20 and the lower steel frame stairs 20, respectively, and are provided on both sides in the longitudinal direction of the support plate 2. Perspective holes 10 and 10 are drilled in the fixing bracket pieces 3 and 4 in correspondence with the position of the see-through hole 18 of the narrow purlins 17 and 17 of the steel staircase 20 (Fig. 17 (a) (c), FIG. 18).

직사각형 판(1)에, 고정금구편(3,4)의 위치에 대응시켜서, 개구(51,54)를 형성한다. 개구(51,54)는, 가느다란 도리(17)의 접합단부(투시구멍(18)측)를 삽입시킬 수 있는 형상, 크기로 형성된다. 개구(51)는, 외주측의 고정금구편(3)에 대응하여 각각 1개씩 형성되고, 개구(54)는, 중앙측의 고정금구(4,4)의 양방에 대응하여 1개 형성된다(도 15(a)(b)).The openings 51 and 54 are formed in the rectangular plate 1 in correspondence with the positions of the fixing tool pieces 3 and 4. The openings 51 and 54 are formed in the shape and size which can insert the joining end part (sight hole 18 side) of the narrow purlin 17. As shown in FIG. One opening 51 is formed in correspondence with the fixing bracket piece 3 on the outer circumference side, and one opening 54 is formed in correspondence with both of the fixing brackets 4 and 4 on the center side ( 15 (a) (b)).

개구(51)에 면하는 직사각형 판(1)의 세로끝 가장자리(52)와, 고정금구편(3)의 가느다란 도리의 맞닿음면(53)을, 철골계단(20)과의 접합을 위해, 연직방향의 면에서 동일면으로 형성한다(도 15(a)(b), 도 16(a)). 동일하게, 개구(54)에 면하는 직사각형 판(1)의 세로끝 가장자리(55)와, 고정금구편(4)의 가느다란 도리의 맞닿음면(56)을, 연직방향의 면과 동일면으로 형성한다(도 15(a)(b), 도 16(b)).For joining the longitudinal edge 52 of the rectangular plate 1 facing the opening 51 and the abutting surface 53 of the narrow purlin of the fastener piece 3 with the steel staircase 20. Are formed in the same plane in the vertical direction (Figs. 15 (a) and 16 (a)). Similarly, the longitudinal edge 55 of the rectangular plate 1 facing the opening 54 and the abutting surface 56 of the slender purlin of the fastener piece 4 are flush with the surface in the vertical direction. 15 (a) (b) and 16 (b).

지지판(2)의 상면에, 고정금구편(3) 및 개구(51)를 둘러싸는 평면「ㄷ」자형상의 포위틀(60)을 고정하고, 포위틀(60)의 개방측의 끝 가장자리(60b)를, 직사각형 판(1)의 표면(1a)에 고정한다. 또한, 지지판(2)의 상면에, 고정금구편(4,4) 및 개구(54)를 둘러싸는 평면「ㄷ」자형상의 포위틀(64)을 고정하고, 포위틀(64)의 개방측의 끝 가장자리(64b)를, 직사각형 판(1)의 표면(1a)에 고정한다. 포위틀(60)은, 직사각형 판(1)에 직각으로 고정되는 측면판(61,61)과, 직사각형 판(1)과 병행하여 양측판(61,61)을 잇는 이면판(62)으로 구성된다(도 16(a)). 동일하게, 포위틀(64)은 각각, 직사각형 판(1)에 직각으로 고정되는 측면판(65,65)과 직사각형 판(1)과 병행하여 양측판(65,65)을 잇는 이면판(66)으로 구성된다(도 16(b)).On the upper surface of the support plate 2, the plane "C" shaped enclosure 60 surrounding the fixing tool piece 3 and the opening 51 is fixed, and the edge 60b of the opening side of the enclosure 60 is open. ) Is fixed to the surface 1a of the rectangular plate 1. In addition, the upper surface of the support plate 2 is fixed with a plane "c" shaped enclosure 64 surrounding the fixing tool pieces 4 and 4 and the opening 54, and the opening side of the enclosure 64 is fixed. The end edge 64b is fixed to the surface 1a of the rectangular plate 1. The envelope 60 is composed of side plates 61 and 61 fixed at right angles to the rectangular plate 1, and a back plate 62 connecting the both side plates 61 and 61 in parallel with the rectangular plate 1. (FIG. 16 (a)). Similarly, the enclosure 64 is a back plate 66 connecting the two side plates 65 and 65 in parallel with the side plates 65 and 65 and the rectangular plate 1 fixed to the rectangular plate 1 at right angles, respectively. ) (FIG. 16 (b)).

여기서, 포위틀(60,64)의 윗가장자리(60a,64a)와, 직사각형 판(1)의 윗가장자리(1c)는, 동일높이로 형성된다(도 17(a) ~ (c)). 또한, 포위틀(60,60)의 외측의 측면판(61)과, 지지판(2) 및 직사각형 판(1)의 외측의 끝가장자리는 동일면으로 형성된다(도 16(a)(b)).Here, the upper edges 60a and 64a of the enclosures 60 and 64 and the upper edge 1c of the rectangular plate 1 are formed at the same height (FIG. 17 (a)-(c)). In addition, the side plates 61 on the outside of the enclosures 60 and 60 and the end edges on the outside of the support plate 2 and the rectangular plate 1 are formed in the same plane (Fig. 16 (a) (b)).

또한, 포위틀(60,64)의 이면판(62,66)과, 지지판(2)의 자유단(58)은, 소정간격(길이(L1))(68)이 형성되고, 지지판(2)의 상면이 노출되어 있다(도 16(a)(b)).In addition, the back plates 62 and 66 of the enclosures 60 and 64 and the free ends 58 of the support plates 2 are provided with a predetermined interval (length L 1 ) 68, and the support plates 2 are provided. ) Is exposed (Fig. 16 (a) (b)).

(3) 직사각형 판(1)의 표면(1a)에서, 고정금구편(3,4)에 접근한 위치에, 볼트로 이루어지는 인서트(6)를 대략 수평으로 돌출설치한다. 또한, 직사각형 판(1)의 표면(1a)에서, 다른위치에 적절한 인서트(6,6)를 돌출설치한다.(3) On the surface 1a of the rectangular plate 1, the insert 6 which consists of bolts protrudes substantially horizontally in the position which approached the fastener piece 3,4. Moreover, the inserts 6 and 6 which are suitable in a different position protrude from the surface 1a of the rectangular plate 1.

또한, 직사각형 판(1)의 표면(1a)과 지지판(2)의 상면 사이에, 직사각형 판(1)과 지지판(2)의 각도를 유지하기위한 리브(16)가 가설고정되어 있다(도 15(c), 도 17(b)). 상기 리브(16)는, 콘크리트가 흐르도록, 절결(16a)이 형성되어 있다(도 17(b)).In addition, between the surface 1a of the rectangular plate 1 and the upper surface of the support plate 2, a rib 16 for temporarily holding the angle of the rectangular plate 1 and the support plate 2 is temporarily fixed (FIG. 15). (c), Figure 17 (b)). Notches 16a are formed in the ribs 16 so that concrete flows (Fig. 17 (b)).

또한, 지지판(1)의 상면에서, 포위틀(64)에 둘러싸인 부분에, 나사부(축을 위로 향한 볼트)(69,69)를 세워 설치 고정한다(도 16(b), 도 17(c), 도 15(a)(b)). 나사부(69,69)는, 개구(54)를 폐쇄하는 폐쇄판(70)을 부착하기 위해 사용된다.In addition, on the upper surface of the support plate 1, the screw portions (bolts facing the shafts) 69 and 69 are erected and fixed to a portion surrounded by the enclosure 64 (Figs. 16 (b) and 17 (c), 15 (a) (b)). The threads 69 and 69 are used to attach the closing plate 70 to close the opening 54.

또한, 지지판(2)에, 마루용 형틀(24)과 지지판(2)을 고정하기위한 못 구멍(8,8)을 적절한 간격으로 뚫어 설치한다(도 15(a)). 이상과 같이 하여, 부착금구(5)를 구성한다(도 15(a)(b)(c)).In addition, nail holes 8 and 8 for fixing the floor mold 24 and the support plate 2 are provided in the support plate 2 at appropriate intervals (Fig. 15 (a)). As described above, the mounting bracket 5 is constituted (FIG. 15 (a) (b) (c)).

(4) 또한, 상기 실시예에 있어서, 고정금구편(3,4)은, 한변을 지지판(2)의 상면에 고정하였는데, 더욱이, 다른변을 직사각형 판(1)의 표면(1a)에 고정할 수 도 있다. 또한, 고정금구편(3,4)은, 동일한 위치에 배치하여, 직사각형 판(1)의 표면(1a)만에 고정할 수 도 있다(어느것도 도시생략).(4) In addition, in the above embodiment, the fixing bracket pieces 3 and 4 fixed one side to the upper surface of the support plate 2, and the other side was fixed to the surface 1a of the rectangular plate 1. You may. In addition, the fixing tool pieces 3 and 4 can be arrange | positioned at the same position, and can be fixed only to the surface 1a of the rectangular plate 1 (not shown either).

(실시예 5)(Example 5)

도 18 ~ 도 23, 도 14에 근거해서 본 발명의 계단의 구축방법의 실시예를 설명한다. 상기 실시예 3의 구축방법에, 실시예 4의 부착금구(5)를 적용하고, 중간층계참도 철근콘크리트제로 하여, 현장에서 구축하는 실시예이다.An embodiment of the method of constructing the stairs of the present invention will be described with reference to FIGS. 18 to 23 and 14. The attachment bracket 5 of Example 4 is applied to the construction method of Example 3, and it is an Example built in the field using the intermediate | middle floor participant reinforced concrete.

[철골계단의 구성][Configuration of Steel Stairs]

계단형상으로 발판(19,19)의 양단부를, 철판제의 가느다란 도리(17,17)로 끼워 고정하여, 철골계단(20)을 구성한다. 가느다란 도리(17)의 마루구성체(부착금구(5)의 고정금구편(3,4))에 고정하는 부분에 투시구멍(18,18)을 뚫어 설치하고 있다. 또한, 투시구멍(18)의 근방의 위치에서, 가느다란 도리(17,17)사이에, 부착금구(5)의 직사각형 판(1)에 맞닿을 수 있는 전면판(75)을 가설고정하고 있다. 또한 발판(19)은, 모르타르계 재질을 성형하여 형성하고 있다.Both ends of the scaffolds 19 and 19 are stepped into a step shape and fixed with thin steel purlins 17 and 17 to form a steel staircase 20. Perspective holes 18 and 18 are drilled and provided in the part which is fixed to the floor structure (fixing bracket pieces 3 and 4 of the mounting bracket 5) of the thin purlin 17. As shown in FIG. Moreover, in the position near the sight hole 18, the front plate 75 which can abut on the rectangular plate 1 of the mounting bracket 5 is temporarily fixed between the narrow purlins 17 and 17. FIG. . Further, the scaffold 19 is formed by molding a mortar-based material.

상기 철골계단(20)은, 반층분을 형성하고, 2개의 철골계단(20,20)을 조합시켜, 1층분의 계단을 구성한다.The steel stair step 20 forms a half-layer and combines two steel stair steps 20 and 20 to form a step for one floor.

또한, 구축현장에 반입되기전에 미리 공장에서, 또는 구축현장에 반입후에, 철골계단(20A,20B)의 가느다란 도리(17)의 상단부에, 부착금구(5)의 일측(5a)을 고 정한다. 즉, 가느다란 도리(17,17)의 투시구멍(18)측을, 부착금구(5)의 개구(51,54)에 삽입하고, 고정금구편(3,4)의 투시구멍(10)과 가느다란 도리(17)의 투시구멍(18)에 볼트(11)를 삽입하여, 너트(12)로 나사맞춤 체결한다(도 18, 도 19). 이 때, 부착금구(5)의 한측(5a)에 철골계단(20B)이 고정되고, 타측(5b)은, 철골계단은 설치되어 있지 않다(도 4 등 참조).In addition, one side 5a of the mounting bracket 5 is fixed to the upper end of the slender purlins 17 of the steel staircases 20A and 20B prior to being brought into the construction site or after being brought into the construction site. . That is, the see-through hole 18 side of the narrow purlins 17 and 17 is inserted into the openings 51 and 54 of the mounting bracket 5, and the see-through hole 10 of the fixing bracket pieces 3 and 4 The bolt 11 is inserted into the see-through hole 18 of the thin purlin 17, and is screwed and fastened with the nut 12 (FIGS. 18 and 19). At this time, the steel frame stairs 20B are fixed to one side 5a of the mounting bracket 5, and the steel frame stairs are not provided on the other side 5b (see FIG. 4 and the like).

[구축방법][How to build]

(1) 기준층(기설층)(F0)에서는, 부착금구(5)의 한측(5a)에 하방으로 향한 철골계단(20)이 고정된 상태로, 콘크리트제의 마루(23)가 구축되어 있다(도 14(a), 도 18, 도 21).(1) In the reference layer (base layer) F 0 , a concrete floor 23 is constructed in a state where the steel staircase 20 facing downward is fixed to one side 5a of the mounting bracket 5. (FIG. 14 (a), FIG. 18, FIG. 21).

(2) 구축예정의 중간층계참층(F0-1)(F0 와 F1 의 중간층)을 구축하기위한 층계참용의 형틀(29)을 비롯한 형틀 및 철근을 종래의 방법에 의해 구축한다. 이 때, 예를들면 마루용의 형틀(24)은, 수평으로 배치된 목제 각재(角材)(73,74)를 통해서, 서포트(38,38)로 지지된다(도 23참조).(2) The frame and the reinforcing bar, including the frame 29 for the landing, for constructing the intermediate landing layer F 0-1 (intermediate layer between F 0 and F 1 ) to be constructed, are constructed by a conventional method. At this time, for example, the flooring mold 24 is supported by the supports 38 and 38 through the wooden beams 73 and 74 arranged horizontally (see Fig. 23).

또한, 상기 형틀(29) 및 철근의 구축에 평행하여, 또는 구축후에, 구축예정의 F0-1 층으로 향하는 일측의 철골계단(20A)을 배치한다(도 14(a), 도 19, 도 20). 상기 타측의 철골계단(20B)의 상단(다음층과의 연결부)에, 부착금구(5)의 한측(5a)이 고정되어 있다.In addition, parallel to the frame 29 and the reinforcement of the reinforcing bar, or after the construction, the steel frame stairs 20A on one side facing the F 0-1 floor to be constructed are arranged (Fig. 14 (a), Fig. 19, Fig. 20). One side 5a of the mounting bracket 5 is fixed to the upper end (connection portion with the next layer) of the steel frame staircase 20B on the other side.

(3) 상기 실시예 2와 동일하게, 철골계단(20A)의 가느다란 도리(17)의 하단부를, 기준층(F0)(기설)의 부착금구(5)의 고정금구편(3,4)에, 투시구멍(10,18)을 삽통한 볼트(11), 너트(12)로 고정함과 동시에, 철골계단(20A)의 부착금구(5)를 구축예정의 층계참층(F0-1)의 형틀(29)상에 싣고, 지지판(2)의 못 구멍(8,8)에서 못을 쳐박고, 부착금구(5)와 마루용 형틀(24)을 고정한다(도 14(b)). 이때, 형틀(29)의 상면의 먹줄치기위치에 맞추는 것만으로, 용이하게 부착금구(5)(철골계단(20A))를 정확한 위치에 배치할 수 있다.(3) In the same manner as in the second embodiment, the lower end portion of the slender purlin 17 of the steel staircase 20A is fixed to the fixing bracket pieces 3 and 4 of the mounting bracket 5 of the reference layer F 0 (existing). to, at the same time as bolt 11, nut 12 is inserted through the sight hole (10,18), the landing floor of the building a mounting bracket (5) of steel stairs (20A) going to (F 0-1) The nail is mounted on the mold 29 of the support plate 2, and nails are nailed through the nail holes 8 and 8 of the support plate 2 to fix the mounting bracket 5 and the floor mold 24 (FIG. 14 (b)). At this time, the fitting bracket 5 (steel staircase 20A) can be easily positioned at the correct position only by matching the position of the upper surface of the mold 29 to the streak position.

(4) 다음에, 형틀(29)을 비롯한 형틀상에, 콘크리트를 타설하여 중간층계참(28)을 구축한다(도 14(c)). 또한, 이 때, F0-1 층의 부착금구(5)의 타측(5b)에, 상층으로 향하는 철골계단(20B)이 접합되어 있지않지만, 직사각형 판(1) 및 포위틀(60,64)로 폐쇄하므로, 콘크리트를 타설하여도 콘크리트가 누출될 염려가 없다.(4) Next, on the mold including the mold 29, concrete is poured to construct the intermediate floor landing 28 (FIG. 14 (c)). Also, at this time, the steel frame stairs 20B directed to the upper layer are not joined to the other side 5b of the mounting bracket 5 of the F 0-1 layer, but the rectangular plates 1 and the enclosures 60 and 64 are not joined. Since it is closed by the concrete, there is no fear of concrete leaking even if the concrete is poured.

또한, 이 실시예에서는, 중간층계참(28)도 현장타설 콘크리트로 하므로, 구성체 구축용의 형틀만으로, 철골계단(20A,20B)을 지지하기 위한 것만의 서포트류를 일체 불필요하게 할 수 있다.In addition, in this embodiment, since the intermediate landing 28 is also made of cast-in-place concrete, only support for supporting the steel frame stairs 20A and 20B can be made unnecessary by the mold for constructing the structure.

(5) 상기 중간층계참(F0-1)층의 콘크리트를 타설한 후, 상단(다음층과의 연결부)에, 부착금구(5)의 한측(5a)이 고정되어 있는 철골계단(20B)을 배치한다(도 14(c), 도 22참조).(5) After pouring the concrete of the intermediate layer (F 0-1 ) layer, the steel staircase 20B having one side 5a of the mounting bracket 5 fixed to the upper end (connection portion with the next layer). It arrange | positions (refer FIG. 14 (c), FIG. 22).

(6) 철골계단(20A)의 중간층계참(F0-1)층의 부착금구(5)의 타측(5b)의 고정금구편(3,4)에, 타측의 철골계단(20B)의 하단을 동일하게 하여, 투시구멍(10,18)을 삽통한 볼트(11), 너트(12)로 고정함과 동시에, 철골계단(20B)의 부착금구(5)를 구축예정층(F1)의 마루용의 형틀(24)상에 싣고, 지지판(2)의 못 구멍(8,8)에서 못을 쳐박고, 부착금구(5)와 마루용 형틀(24)을 고정한다(도 14(d)). 이 때, 예를들면 마루용의 형틀(24)은, 수평으로 배치한 목재 각재(73,74)를 통해서, 서포트(38,38)로 지지된다(도 23참조). (6) The lower end of the steel stair step 20B of the other side to the fixing bracket pieces 3 and 4 of the other side 5b of the attachment bracket 5 of the middle stairway (F 0-1 ) layer of the steel stair step 20A. Similarly, while fixing the bolts 11 and nuts 12 through which the see-through holes 10 and 18 are inserted, the mounting bracket 5 of the steel staircase 20B is formed on the floor of the planned layer F 1 . It is mounted on the mold 24 of the dragon, nails are nailed through the nail holes 8 and 8 of the support plate 2, and the attachment bracket 5 and the floor mold 24 are fixed (Fig. 14 (d)). . At this time, for example, the flooring mold 24 is supported by the supports 38 and 38 through the wood beam members 73 and 74 arranged horizontally (see Fig. 23).

(7) 다음에, 마루용 형틀(24)을 비롯한 형틀상에, 콘크리트를 타설한다(도 14(e)). 이 때, 부착금구(5)의 직사각형 판(1)의 윗가장자리(1c) 및 포위틀(60,64)의 윗가장자리(60a,64a)를 측정자로 하여, 아직 경화되지않은 콘크리트의 상면(23a)을 평평하게 할 수 있다. 또한, 부착금구(5)의 타측(5b)에 상층으로 향하는 철골계단(20C)이 접합되어 있지 않지만, 직사각형 판(1) 및 포위틀(60,64)로 폐쇄하여, 콘크리트를 타설하여도 콘크리트가 무출될 염려가 없다(도 23참조).(7) Next, concrete is poured on the mold including the floor mold 24 (FIG. 14 (e)). At this time, using the upper edge 1c of the rectangular plate 1 of the mounting bracket 5 and the upper edges 60a and 64a of the enclosures 60 and 64 as measuring instruments, the upper surface 23a of concrete which has not yet been hardened ) Can be flattened. In addition, although the steel staircase 20C heading to the upper layer is not joined to the other side 5b of the mounting bracket 5, even if the concrete is poured by closing with the rectangular plate 1 and the sieves 60 and 64, There is no fear of smelting (see FIG. 23).

(8) 콘크리트가 고화발현후, 마루용 형틀(24)을 비롯, 불필요한 형틀, 서포트(38) 등을 제거하면, 다음층(F1)의 콘크리트제의 마루(23)를 비롯한 구성체의 구축이 완료된다(도 14(f), 도 22, 도 23).(8) If concrete removes unnecessary molds, supports 38, etc., including floor molds 24 after solidification, construction of constructs including concrete floors 23 of the next floor (F 1 ) It is completed (FIG. 14 (f), FIG. 22, FIG. 23).

또한, 상기 실시예 2 등과 동일하게, 부착금구(5,5)의 인서트(6,6)가 콘크리트내에 고정된다. 또한, 부착금구(5)는 다져넣기 형틀로서 남겨놓고, 콘크리트제 마루(23)의 하면 단부가 부착금구(5)로 보강되므로, 이 부분을 보강할 수 있다. 또한, 상기 부착금구(5)에서 하방으로 돌출한 못은, 종래의 방법으로 절단한다.In addition, the inserts 6 and 6 of the mounting brackets 5 and 5 are fixed in concrete in the same manner as in the second embodiment. In addition, since the mounting bracket 5 is left as a compaction mold, since the lower end of the concrete floor 23 is reinforced with the mounting bracket 5, this portion can be reinforced. In addition, the nail which protruded below from the said mounting bracket 5 is cut | disconnected by the conventional method.

(9) 또한, 적절한 계단에서 (고정금구편(3,4)에 철골계단의 가느다란 도리(17)가 고정된 이후이면 좋다), 개구(54)에 폐쇄판(70)을 배치하고, 금구(71)의 투시구멍(72,72)에 나사부(69,69)에 삽통되어, 이것에 너트를 나사맞춤 체결하고, 부착금구(5)에 폐쇄판(70)을 고정한다. 이어서, 포위틀(60,64)내에 콘크리트(모르타르)를 충전하고, 고정금구편(3,4) 및 가느다란 도리(17)의 접합부를 콘크리트내에 매설한다. 이 때, 포위틀(60)측에서는, 철골계단(20)의 전면판(가느다란 도리(17,17)사이에 가설고정되어 있다)(75)이 개구(51)를 폐쇄하고, 포위틀(64)측에서는, 폐쇄판(70)이 개구(54)를 폐쇄하므로, 충전된 콘크리트가 누출될 염려가 없다.(9) In addition, the closing plate 70 is arranged in the opening 54 in the appropriate step (it may be after the narrow purlin 17 of the steel staircase is fixed to the fixed metal fittings 3 and 4). The screw holes 69 and 69 are inserted into the see-through holes 72 and 72 of the 71, and the nut is screwed into this, and the closing plate 70 is fixed to the mounting bracket 5. Subsequently, concrete (mortar) is filled in the enclosures 60 and 64, and the junction part of the fastening tool piece 3 and 4 and the thin purlin 17 is embedded in concrete. At this time, on the side of the enclosure 60, the front plate (temporarily fixed between the slender purlins 17 and 17) 75 of the steel staircase 20 closes the opening 51 to form the enclosure 64. On the side), since the closing plate 70 closes the opening 54, there is no fear that the filled concrete will leak.

(10) 이상에서, 철골계단의 구축이 완료된다(도 22, 도 23). 다음층의 철골계단(20C) 등도 동일하게 조립된다. 또한 도면중 23b는, 마루 완성면이다.(10) and above, the construction of the steel frame stairs is completed (FIGS. 22 and 23). Steel frame staircase 20C of the next layer is similarly assembled. In addition, 23b in a figure is a floor completion surface.

(11) 상기에 있어서, 고정금구편(3,4)을 직사각형 판(1)의 표면(1a)에 (층계참측을 향해서)고정한 것으로, 표면(1b)에 고정된 실시예 1의 경우에 비하여, 고정금구편(3,4)에 철골계단(20)을 고정한 경우, 가설중(마루콘크리트를 타설하고 콘크리트가 고화발현하기까지)에, 부착금구(5)가 철골계단측으로 회전할 염려를 더 방지하여, 보다 안정되게 철골계단(20)을 유지할 수 있다. 또한, 고정금구편(3,4)이나 가느다란 도리(17)의 접합부분, 고정된 볼트·너트가 콘크리트내에 묻히므로, 완성후에, 접합부분이 노출되지않고, 특히, 계단의 이면측으로부터의 외관이 의장적으로 우수한 것이 된다. 더욱이, 고정금구편(3,4)과 가느다란 도리(17)의 접합작업이, 층계참측(마루 형틀(24)측)에서 될 수 있고, 더욱이 하방으로 향한 작업으로 되므로, 접합작업이 용이하게 된다. 또한, 철골계단(20)측에 접합작업용의 개구도 불필요하게 된다.(11) In the above, the fixing bracket pieces 3, 4 are fixed to the surface 1a of the rectangular plate 1 (toward the landing side), and compared with the case of Example 1 fixed to the surface 1b. If the steel staircase 20 is fixed to the fixed bracket pieces 3 and 4, the construction bracket 5 may be rotated toward the steel stairway during the construction (until pour concrete and solidify the concrete). By preventing, the steel staircase 20 can be maintained more stably. In addition, since the joints of the fixing bracket pieces 3 and 4 or the thin purlin 17 and the fixed bolts and nuts are buried in concrete, the joints are not exposed after completion, and in particular, the appearance from the back side of the stairs. This is an excellent design. Furthermore, the joining work of the fasteners 3 and 4 and the thin purlin 17 can be performed at the step landing side (floor mold 24 side), and furthermore, the work is directed downward, thus facilitating the joining work. do. In addition, an opening for joining work is also unnecessary on the steel frame step 20 side.

(12) 기타 실시예(12) Other Examples

상기 실시예에 있어서, 상기 실시예 3과 동일하게, 상기 중간층계참(F0-1)층의 콘크리트를 타설한 후에, 철골계단(20B)을 구축하였는데, 철골계단(20B)의 구축은, 상기 중간층계참(F0-1)층의 콘크리트를 타설하는 전후에 관계없다. 따라서, 중간층계참(F0-1)층, 다음층(F1)의 철골계단, 형틀 등을 구축한 후에, 중간층계참(F0-1 )층, 다음층(F1)의 순으로 콘크리트를 타설할 수 도 있다.In the above embodiment, in the same manner as in Example 3, after pouring the concrete of the intermediate layer (F 0-1 ) layer, the steel frame stairs 20B was constructed, the construction of the steel frame stairs 20B, It does not matter before or after placing concrete in the middle layer (F 0-1 ) layer. Therefore, after constructing the intermediate floor (F 0-1 ) layer, the next step (F 1 ), the steel stairs, the frame, etc., the concrete is placed in the order of the middle floor (F 0-1 ) layer and the next layer (F 1 ). It can also be poured.

또한, 상기 실시예에서는, 중간층계참을 현장타설의 콘크리트구조로 하였는데, 실시예 2(도 13)와 같이, 이미 만든 강제(鋼製)로 형성할 수 도 있다(도시생략).In addition, in the above embodiment, the intermediate landing was used as the concrete structure of the cast in place, and as in the second embodiment (FIG. 13), it may be formed by the already made steel (not shown).

본 발명은, 철골계단의 단부에 부착금구를 고정하고, 이 부착금구를 형틀의 일부에 사용할 수 있으므로, 일종의 일회용 형틀로 되고, 치수정밀도를 용이하게 유지함과 동시에, 형틀의 구성이 용이하게 되고, 또한 형틀해체의 노력을 절감할 수 있는 효과가 있다.In the present invention, since the mounting bracket can be fixed to the end of the steel frame step and the mounting bracket can be used for a part of the mold, it becomes a kind of disposable mold, and the configuration of the mold can be easily maintained while maintaining the dimensional accuracy easily. In addition, there is an effect that can reduce the effort of dismantling the mold.

또한, 본 발명의 부착금구에서는, 직사각형 판을 타설예정의 마루콘크리트의 두께와 거의 동일의 높이로 형성하였으므로, 직사각형 판의 윗가장자리를 측정자로 하여, 용이하게 콘크리트의 균일작업을 할 수 있는 효과가 있다.In addition, in the mounting bracket of the present invention, since the rectangular plate is formed at almost the same height as the thickness of the floor concrete to be placed, the upper edge of the rectangular plate is used as a measuring device, which makes it easy to perform uniform work of concrete easily. have.

또한, 본 발명은, 마루용의 형틀의 일부를 구성하는 부착금구를 사용하여, 철골계단을 부착할 수 있으므로, 철골계단을 발판부분만으로 구성하고, 계단접속부분의 마루(프로워 층계참, 중간층계참)를 현장타설 콘크리트구조로 하여, 용이하게 철골계단을 시공할 수 있다. 따라서, 기둥이나 보의 위치에 맞추어 오더·메이드로 설계생산하여야 했던 계단접속부분의 마루(프로워 층계참, 중간층계참)를 분리하여, 발판부분을 구성할 수 있다. 따라서, 발판부분만으로 되는 철골계단을, 계단높이와 계단폭과의 조건만으로 설계할 수 있으므로, 철골계단을 레디·메이드로하여 설계생산할 수 있으므로, 철골계단을 통상의 상품과 동일하게 인터넷을 통한 주문판매로 하여 취급할 수도 있는 효과가 있다.In addition, in the present invention, since the steel staircase can be attached using the mounting brackets constituting a part of the flooring frame, the steel staircase is composed of only the scaffolding portion, and the floor of the stair connection part (prow landing, middle landing) ) Can be easily constructed with steel frame staircase. Therefore, the footrest part can be constructed by separating the floor (prow landing and middle landing) of the step connection part which had to be designed and produced by order-made according to the position of a pillar and a beam. Therefore, the steel staircase consisting of only the scaffolding part can be designed only under the conditions of the step height and the width of the staircase, so that the steel staircase can be designed and produced by the ready-made, so that the steel staircase can be ordered through the Internet as in the ordinary products. The effect can be handled as a sale.

Claims (6)

구축예정의 마루콘크리트의 두께와 대략 동일높이의 직사각형 판의 하단에 직각방향으로 지지판을 연설하여 가설된 마루용 형틀에 부착되도록 하고, 상기 직사각형 판과 지지판 중 적어도 하나에, 인서트 부착수단을 형성함과 동시에, 철골계단 부착수단을 형성한 것을 특징으로 하는 철골계단의 부착금구.At least one of the rectangular plate and the support plate is formed by inserting a support plate in a direction perpendicular to the lower end of the rectangular plate having the same height as the thickness of the floor concrete to be constructed, and attaching the insert plate to at least one of the rectangular plate and the support plate. At the same time, the mounting bracket of the steel staircase characterized in that the steel stair attachment means formed. 제 1 항에 있어서, 상기 인서트 부착수단은 볼트구멍으로 하고, 상기 철골계단 부착수단은, 철골계단의 가느다란 도리와 고정될 수 있는 고정금구편으로 한 것을 특징을 하는 철골계단의 부착금구.      2. The steel bracket stair attachment tool according to claim 1, wherein the insert attaching means is a bolt hole, and the steel stair attaching means is a fixing bracket piece that can be fixed with a thin purlin of the steel stair step. 직사각형 판의 양측면중, 지지판을 연설한 일측 면을 마루콘크리트 부착측으로 하고, 타측 면을 계단 부착측으로 하고,On both sides of the rectangular plate, one side on which the support plate is raised is made the floor concrete attaching side, and the other side is the step attaching side, 상기 지지판상에, 철골계단의 가느다란 도리와 고정하기 위한 고정금구편을 돌출설치하여 철골계단 부착수단을 구성하고,On the support plate, a fixing bracket piece for protruding and fixing the thin purlin of the steel stairway is provided to constitute a steel stair attachment means, 상기 직사각형 판에, 상기 고정금구편에 대응한 위치에 개구를 형성하고, 상기 지지판에 상기 개구와 고정금구편을 둘러싸는 포위틀을 고정한 것을 특징으로 하는 철골계단의 부착금구.An opening bracket is formed in the rectangular plate at a position corresponding to the fixing bracket piece, and a support frame surrounding the opening and the fixing bracket piece is fixed to the support plate. 철골계단의 단부에 철골계단 부착금구를 고정함과 동시에, 상기 철골계단 부착금구를 콘크리트마루의 단부에 설치하여, 상기 철골계단 부착금구에 고정한 인서트를 상기 콘크리트마루 내에 매설한 것을 특징으로 하는 철골계단의 부착장치.The steel stair staircase is fixed to the end of the steel staircase, and at the same time, the steel staircase mounting bracket is installed at the end of the concrete floor, and the insert fixed to the steel stairway stairway bracket is embedded in the concrete floor. Attachment device. (1) 계단구축위치에, 인서트가 부착된 철골계단 부착금구가 상단부에 고정된 철골계단을 배치하는 단계와,(1) arranging the steel staircase in which the steel stair attachment bracket with the insert is fixed to the upper end at the step construction position; (2) 상기 철골계단의 하단부를 기설층의 마루에 고정함과 동시에, 상기 철골계단 부착금구를 구축예정층의 마루용 형틀에 고정하여, 이 마루용 형틀의 일부로 하는 단계와,(2) fixing the lower end of the steel staircase to the floor of the existing floor, and fixing the steel stairway attachment bracket to the flooring frame of the floor to be constructed, as part of the flooring frame; (3) 구축예정층에 콘크리트를 타설하고, 상기 철골계단 부착금구의 인서트를 매설하여, 구축예정층에 콘크리트마루를 조성하는 단계로 이루어지는 것을 특징으로 하는 철골계단의 부착방법.(3) The method of attaching steel stairway comprising the steps of placing concrete on the floor to be built, embedding the insert of the steel stairway attachment bracket, and forming a concrete floor on the floor to be built. (1) 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제 1의 철골계단을 배치하는 단계와,(1) arranging the first steel staircase of a half-layer, in which one side of the steel staircase mounting bracket with an insert is fixed to the upper end at the step construction position; (2) 상기 제 1의 철골계단의 하단부를 기설층의 마루에 고정함과 동시에, 상기 철골계단 부착금구를 구축예정의 중간층계참을 위한 중간층계참 형틀에 고정하여, 이 중간층계참 형틀의 일부로 하는 단계와,(2) fixing the lower end of the first steel staircase to the floor of the existing layer, and fixing the steel stair attachment bracket to the middle landing frame for the intermediate landing of the planned construction, and making it part of the middle landing frame; Wow, (3) 중간층계참의 콘크리트의 타설 후에, 상기 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제 2의 철골계단을 배치하거나,(3) After placing the concrete in the middle tier, place the second steel staircase for the half-layer, in which one side of the steel stair attachment bracket with the insert is fixed to the upper end at the stair construction position; 중간층계참의 콘크리트의 타설 전에, 상기 계단구축위치에, 인서트가 부착된 철골계단 부착금구의 한쪽이 상단부에 고정된 반층분의 제2의 철골계단을 배치하고, 그 후, 중간층계참의 콘크리트를 타설하는 단계와,Before placing the concrete in the middle tier, at the stair-building position, a second steel stair for half a layer, in which one side of the steel stair attachment bracket with the insert is fixed to the upper end, and then the concrete in the middle tier is poured. To do that, (4) 상기 중간층계참 형틀 상의 철골계단 부착금구의 타측에, 상기 제 2의 철골계단의 하단부를 고정함과 동시에, 제 2의 철골계단의 상기 철골계단 부착금구를 구축예정층의 마루용 형틀에 고정하여, 이 마루용 형틀의 일부로 하는 단계와,(4) While fixing the lower end of the second steel stair step to the other side of the steel stair attachment bracket on the intermediate landing frame, the steel stair attachment bracket of the second steel stair step to the floor mold of the floor to be constructed Fixing it to be part of this flooring mold, (5) 구축예정층에 콘크리트를 타설하여, 상기 철골계단 부착금구의 인서트를 매설하고, 구축예정층에 콘크리트마루를 조성하는 단계로 이루어지는 것을 특징으로 하는 철골계단의 부착방법.(5) The method of attaching steel stairway, comprising the step of placing concrete on the floor to be built, embedding the insert of the steel stairway mounting bracket, and forming a concrete floor on the floor to be built.
KR1020020004370A 2001-01-25 2002-01-25 Attachment bracket of steel stairway and attachment device and attachment method of steel stairway KR100930281B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2001017682 2001-01-25
JPJP-P-2001-00017682 2001-01-25

Publications (2)

Publication Number Publication Date
KR20020062858A KR20020062858A (en) 2002-07-31
KR100930281B1 true KR100930281B1 (en) 2009-12-09

Family

ID=37488517

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020020004370A KR100930281B1 (en) 2001-01-25 2002-01-25 Attachment bracket of steel stairway and attachment device and attachment method of steel stairway

Country Status (1)

Country Link
KR (1) KR100930281B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100500306B1 (en) * 2002-06-14 2005-07-11 두하요코모리주식회사 assembly type steel frame ladder of reinforcement concrete building and construction method thereof
KR100464594B1 (en) * 2002-06-17 2005-01-03 두하요코모리주식회사 The method of constructing the prefabricated step on reinforced concrete building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06180050A (en) * 1992-12-14 1994-06-28 Natl House Ind Co Ltd Stairway unit
JPH0776914A (en) * 1993-09-06 1995-03-20 Takenaka Komuten Co Ltd Hanging-down construction method of steel stairs
JPH07127210A (en) * 1993-10-28 1995-05-16 Yokomori Seisakusho:Kk Construction of stairs and unit stairs
JPH10238049A (en) * 1997-02-27 1998-09-08 Juken Sangyo Co Ltd Stairway and stairway passage structural member
JP2000038841A (en) * 1998-07-21 2000-02-08 Yokomori Mfg Co Ltd Constructing method of stair and stairhall, and supporter for stair

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06180050A (en) * 1992-12-14 1994-06-28 Natl House Ind Co Ltd Stairway unit
JPH0776914A (en) * 1993-09-06 1995-03-20 Takenaka Komuten Co Ltd Hanging-down construction method of steel stairs
JPH07127210A (en) * 1993-10-28 1995-05-16 Yokomori Seisakusho:Kk Construction of stairs and unit stairs
JPH10238049A (en) * 1997-02-27 1998-09-08 Juken Sangyo Co Ltd Stairway and stairway passage structural member
JP2000038841A (en) * 1998-07-21 2000-02-08 Yokomori Mfg Co Ltd Constructing method of stair and stairhall, and supporter for stair

Also Published As

Publication number Publication date
KR20020062858A (en) 2002-07-31

Similar Documents

Publication Publication Date Title
US6029408A (en) Pre-fabricated step and stairway system
JP3959517B2 (en) Steel frame mounting hardware and mounting method
KR100775359B1 (en) Concrete-mold assembly and construction method using the same
KR100930281B1 (en) Attachment bracket of steel stairway and attachment device and attachment method of steel stairway
JP3881135B2 (en) Connecting structure of floor slabs using concrete truss with concrete slab in bridge girder
TW201207207A (en) Stairs
JPH08312090A (en) Construction method of concrete stair with stepped form left, and stepped form
JPH08135087A (en) Precast concrete column member and joint method thereof
JP4650757B2 (en) Steel frame mounting hardware, steel frame mounting structure and mounting method
JPH0593448A (en) Standardized step module
JPH06212691A (en) Construction of building
JP2520354B2 (en) Construction method of precast concrete beams and columns, and earthquake-resistant walls using them
JPH0483051A (en) Construction of reinforced concrete staircase and staircase handrail precast concrete panel and staircase step form using for this
KR100550458B1 (en) Precast concrete stairway structure of edifice and construction method thereof
JP4061611B2 (en) PCa stairs mounting structure, PCa stairs mounting method, PCa stairs
JP3408629B2 (en) Precast concrete foundation structure
JPH0380946B2 (en)
JP7484056B2 (en) Precast concrete components and buildings
JP3841124B2 (en) Reverse beam method
JP3000448B2 (en) Construction method of protruding independent stairs
JPH0455504A (en) Constructing method for precast wall balustrade
JP2914205B2 (en) Installation method of handrail wall or lumbar wall
JP2683878B2 (en) Precast staircase structure
JP2004204508A (en) Construction method of staircase, and form for staircase
CN114250926A (en) Prefabricated assembled stair and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121203

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20131128

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20141126

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20191120