JPWO2017130326A1 - Energy management apparatus, power information display method and program - Google Patents

Energy management apparatus, power information display method and program Download PDF

Info

Publication number
JPWO2017130326A1
JPWO2017130326A1 JP2017563457A JP2017563457A JPWO2017130326A1 JP WO2017130326 A1 JPWO2017130326 A1 JP WO2017130326A1 JP 2017563457 A JP2017563457 A JP 2017563457A JP 2017563457 A JP2017563457 A JP 2017563457A JP WO2017130326 A1 JPWO2017130326 A1 JP WO2017130326A1
Authority
JP
Japan
Prior art keywords
power
time
measurement
measurement data
predetermined period
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017563457A
Other languages
Japanese (ja)
Other versions
JP6385599B2 (en
Inventor
遠藤 聡
聡 遠藤
矢部 正明
正明 矢部
聡司 峯澤
聡司 峯澤
一郎 丸山
一郎 丸山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2017130326A1 publication Critical patent/JPWO2017130326A1/en
Application granted granted Critical
Publication of JP6385599B2 publication Critical patent/JP6385599B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

エネルギー管理装置(2)は、電力計測装置(4)から、電力線(D2)の計測された電力を含む第1の計測データを取得し、EV−PCS(5)から、複数の電力線(D1,D3,D4)の計測された各電力を含む第2の計測データを取得する。エネルギー管理装置(2)は、予め定めた期間分の第1の計測データから電力線(D2)の電力である第1の電力が変化する第1の時刻を検出し、予め定めた期間分の第2の計測データから、複数の電力線(D1,D3,D4)の総電力である第2の電力が変化する第2の時刻を検出し、第1の時刻と第2の時刻との時間差を算出する。そして、エネルギー管理装置(2)は、予め定めた期間分の第1の計測データの各計測時刻と、予め定めた期間分の第2の計測データの各計測時刻の何れか一方を、算出した時間差に基づいて補正した電力情報を操作端末(3)に出力する。The energy management device (2) acquires the first measurement data including the measured power of the power line (D2) from the power measurement device (4), and from the EV-PCS (5), the plurality of power lines (D1, D1). 2nd measurement data including each measured electric power of D3, D4) is acquired. The energy management device (2) detects a first time when the first power that is the power of the power line (D2) changes from the first measurement data for a predetermined period, and the first time for a predetermined period. The second time at which the second power that is the total power of the plurality of power lines (D1, D3, D4) changes is detected from the measurement data of 2, and the time difference between the first time and the second time is calculated. To do. And energy management apparatus (2) computed either one of each measurement time of the 1st measurement data for a predetermined period, and each measurement time of the 2nd measurement data for a predetermined period The power information corrected based on the time difference is output to the operation terminal (3).

Description

本発明は、エネルギー管理装置、電力情報表示方法及びプログラムに関する。   The present invention relates to an energy management device, a power information display method, and a program.

特許文献1に開示されるように、1つの電力計測装置で複数の電力線の電力値を計測する技術が知られている。   As disclosed in Patent Document 1, a technique for measuring power values of a plurality of power lines with one power measuring device is known.

特開2013−210288号公報JP 2013-210288 A

ところで、近年、一般家庭において、いわゆるHEMS(Home Energy Management System)と称されるエネルギー管理システムの導入が進展している。また、HEMSと電気自動車(EV)用のパワーコンディショニングシステム(EV−PCS)等の他のシステムを連係させて、家庭内のエネルギー管理を行う技術も知られている。   Incidentally, in recent years, introduction of an energy management system referred to as a so-called HEMS (Home Energy Management System) has been progressing in general households. There is also known a technique for managing energy in the home by linking HEMS and other systems such as a power conditioning system (EV-PCS) for an electric vehicle (EV).

例えば、EV−PCSにおいては、EVに搭載されている蓄電池の充電及び放電の制御を行うため、買電又は売電の電力、発電電力、放電又は充電の電力を計測する必要がある。一方、HEMSにおいても電力計測装置により、宅内において消費される電力等を計測する。   For example, in the EV-PCS, in order to control charging and discharging of a storage battery mounted on the EV, it is necessary to measure power for purchasing or selling power, generated power, power for discharging or charging. On the other hand, in HEMS, the power consumed by the power measuring device is measured.

電力計測装置とEV−PCSにおいて、電力計測の間隔、換言すると、電力計測のサンプリング間隔は必ずしも同一とはいえず、仮に同一であったとしても、正確に同期させて計測させるようにするのは困難である。   In the power measurement apparatus and the EV-PCS, the power measurement interval, in other words, the power measurement sampling interval is not necessarily the same. Have difficulty.

つまり、電力計測装置とEV−PCSとの間に電力を計測するタイミングのずれ、即ち、電力を計測する時刻のずれが生じてしまい、このことがHEMSにおいて、これらの装置による電力の計測結果の活用を妨げる要因の1つになっている。   That is, there is a shift in the timing for measuring the power between the power measurement device and the EV-PCS, that is, a shift in the time for measuring the power. This is the result of the power measurement results by these devices in HEMS. This is one of the factors that hinder its use.

本発明は、上記課題を解決するためになされたものであり、複数の計測装置による電力の計測結果を有効に活用することが可能となるエネルギー管理装置等を提供することを目的とする。   The present invention has been made to solve the above-described problems, and an object thereof is to provide an energy management device or the like that can effectively use the measurement results of power by a plurality of measurement devices.

上記目的を達成するため、本発明に係るエネルギー管理装置は、
第1の計測装置から、第1の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第1の計測データを取得し、第2の計測装置から、第2の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第2の計測データを取得する計測データ取得手段と、
予め定めた期間分の前記第1の計測データから、前記第1の電力線グループの総電力である第1の電力が変化する第1の時刻を検出し、前記予め定めた期間分の前記第2の計測データから、前記第2の電力線グループの総電力である第2の電力が変化する第2の時刻を検出し、前記第1の時刻と前記第2の時刻との時間差を算出する時間差算出手段と、
前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れか一方を前記時間差に基づいて補正した電力情報を表示装置に出力する情報出力手段とを備える。
In order to achieve the above object, an energy management device according to the present invention provides:
First measurement data including each measured power of one or a plurality of power lines included in the first power line group is acquired from the first measurement apparatus, and then transferred from the second measurement apparatus to the second power line group. Measurement data acquisition means for acquiring second measurement data including each measured power of one or a plurality of power lines included;
A first time at which the first power that is the total power of the first power line group changes is detected from the first measurement data for a predetermined period, and the second time for the predetermined period. Time difference calculation for detecting a second time at which the second power, which is the total power of the second power line group, changes from the measured data, and calculating a time difference between the first time and the second time Means,
Displays power information obtained by correcting one of each measurement time of the first measurement data for the predetermined period and each measurement time of the second measurement data for the predetermined period based on the time difference. Information output means for outputting to the apparatus.

本発明によれば、複数の計測装置による電力の計測結果を有効に活用することが可能となる。   ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to utilize effectively the measurement result of the electric power by a several measuring device.

本発明の実施形態に係るエネルギー管理システムの全体構成を示す図である。It is a figure showing the whole energy management system composition concerning an embodiment of the present invention. 電力計測装置が生成する計測データについて説明するための図である。It is a figure for demonstrating the measurement data which an electric power measurement apparatus produces | generates. EV−PCSが生成する計測データについて説明するための図である。It is a figure for demonstrating the measurement data which EV-PCS produces | generates. エネルギー管理装置のハードウェア構成を示すブロック図である。It is a block diagram which shows the hardware constitutions of an energy management apparatus. エネルギー管理装置が備える二次記憶装置を説明するための図である。It is a figure for demonstrating the secondary storage device with which an energy management apparatus is provided. エネルギー管理装置の機能構成を示す図である。It is a figure which shows the function structure of an energy management apparatus. 時間差について説明するための図(その1)である。It is FIG. (1) for demonstrating a time difference. 時間差について説明するための図(その2)である。It is FIG. (2) for demonstrating a time difference. 時間差について説明するための図(その3)である。It is FIG. (3) for demonstrating a time difference. 時間差について説明するための図(その4)である。It is FIG. (4) for demonstrating a time difference. 時間差について説明するための図(その5)である。It is FIG. (5) for demonstrating a time difference. 時間差の算出手法について説明するための図である。It is a figure for demonstrating the calculation method of a time difference. 優先レベルテーブルの一例を示す図である。It is a figure which shows an example of a priority level table. 時間差を補正した電力情報の表示例を示す図である。It is a figure which shows the example of a display of the electric power information which correct | amended the time difference. 電力情報表示処理の手順を示すフローチャートである。It is a flowchart which shows the procedure of an electric power information display process. 他の実施形態に係るエネルギー管理システムの全体構成を示す図である。It is a figure which shows the whole structure of the energy management system which concerns on other embodiment. 他の実施形態に係るエネルギー管理システムの全体構成を示す図である。It is a figure which shows the whole structure of the energy management system which concerns on other embodiment.

以下、本発明の実施形態について図面を参照して詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

図1は、本発明の実施形態に係るエネルギー管理システム1の全体構成を示す図である。このエネルギー管理システム1は、一般家庭で使用される電力の管理を行う、いわゆる、HEMS(Home Energy Management System)と呼ばれるシステムである。エネルギー管理システム1は、エネルギー管理装置2と、操作端末3と、電力計測装置4と、EV−PCS5と、PV−PCS6とを備える。   FIG. 1 is a diagram showing an overall configuration of an energy management system 1 according to an embodiment of the present invention. The energy management system 1 is a so-called HEMS (Home Energy Management System) that manages electric power used in a general household. The energy management system 1 includes an energy management device 2, an operation terminal 3, a power measurement device 4, an EV-PCS 5, and a PV-PCS 6.

エネルギー管理装置2は、家屋H内の適切な場所に設置され、家屋H、即ち、需要地において消費される電力の監視を行い、電力の消費状況を操作端末3を介して表示する。また、エネルギー管理装置2は、複数の機器7(機器7−1,7−2,…)の動作制御や動作状態の監視などを行う。エネルギー管理装置2の詳細については後述する。   The energy management device 2 is installed at an appropriate location in the house H, monitors the power consumed in the house H, that is, the demand area, and displays the power consumption status via the operation terminal 3. Moreover, the energy management apparatus 2 performs operation control of a plurality of devices 7 (devices 7-1, 7-2,. Details of the energy management device 2 will be described later.

操作端末3(表示装置)は、押しボタン、タッチパネル、タッチパッド等の入力デバイスと、有機ELディスプレイ、液晶ディスプレイ等の出力デバイスと、通信インタフェースとを備えた、例えば、スマートフォンやタブレット端末等の携帯機器である。操作端末3は、エネルギー管理装置2と、Wi−Fi(登録商標)、Wi−SUN(登録商標)や有線LAN等の周知の通信規格に則った通信を行う。操作端末3は、ユーザからの操作を受け付け、受け付けた操作内容を示す情報をエネルギー管理装置2に送信する。また、操作端末3は、エネルギー管理装置2から送信された、ユーザに提示するための情報を受信し、受信した情報を表示する。このように、操作端末3は、ユーザとのインタフェース(ユーザインタフェース)としての役割を担う。   The operation terminal 3 (display device) includes an input device such as a push button, a touch panel, and a touch pad, an output device such as an organic EL display and a liquid crystal display, and a communication interface, for example, a mobile phone such as a smartphone or a tablet terminal. Equipment. The operation terminal 3 communicates with the energy management device 2 in accordance with a well-known communication standard such as Wi-Fi (registered trademark), Wi-SUN (registered trademark), or a wired LAN. The operation terminal 3 receives an operation from the user and transmits information indicating the received operation content to the energy management apparatus 2. In addition, the operation terminal 3 receives the information transmitted from the energy management device 2 and presented to the user, and displays the received information. Thus, the operation terminal 3 plays a role as an interface (user interface) with the user.

電力計測装置4は、一定時間毎に(本実施形態では、30秒毎に)、家屋Hの電力線D2(第1の電力線グループ)を送電される電力の値を計測する。電力線D2は、EV−PCS5と分電盤9との間に配設されている。電力計測装置4は、電力線D2に接続されたCT(Current Transformer)1と通信線を介して接続される。CT1は、交流電流を計測するセンサである。電力計測装置4は、CT1の計測結果に基づいて電力線D2の電力値を計測する。   The power measuring device 4 measures the value of power transmitted through the power line D2 (first power line group) of the house H at regular time intervals (every 30 seconds in the present embodiment). The power line D2 is disposed between the EV-PCS 5 and the distribution board 9. The power measuring device 4 is connected to a CT (Current Transformer) 1 connected to the power line D2 via a communication line. CT1 is a sensor that measures an alternating current. The power measuring device 4 measures the power value of the power line D2 based on the measurement result of CT1.

また、電力計測装置4は、無線通信インタフェースを備え、家屋H内に構築された無線ネットワーク(図示せず)を介して、エネルギー管理装置2と通信可能に接続する。この無線ネットワークは、例えば、エコーネットライト(ECHONET Lite)に準じたネットワークである。なお、電力計測装置4は、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続される仕様であってもよい。   The power measuring device 4 includes a wireless communication interface, and is connected to the energy management device 2 through a wireless network (not shown) constructed in the house H so as to be communicable. This wireless network is, for example, a network conforming to ECHONET Lite. The power measuring device 4 may be of a specification that is connected to this wireless network via an external communication adapter (not shown).

電力計測装置4は、エネルギー管理装置2からの要求に応答して、計測した電力線D2の電力値を格納した計測データを生成し、エネルギー管理装置2に送信する。具体的には、この計測データには、図2に示すように、電力計測装置4の機器IDと、電力データとが格納される。   In response to the request from the energy management device 2, the power measurement device 4 generates measurement data that stores the measured power value of the power line D <b> 2 and transmits the measurement data to the energy management device 2. Specifically, as shown in FIG. 2, the measurement data stores the device ID of the power measurement device 4 and the power data.

機器IDは、エネルギー管理装置2に接続する機器等(EV−PCS5、PV−PCS6、機器7−1,7−2,…)を識別するためのID(identification)である。本実施形態では、電力計測装置4の機器IDは、“10”である。   The device ID is an ID (identification) for identifying a device connected to the energy management apparatus 2 (EV-PCS5, PV-PCS6, devices 7-1, 7-2,...). In the present embodiment, the device ID of the power measuring device 4 is “10”.

電力データには、電力線D2の電力線IDと、計測された電力線D2の電力値とが格納される。電力線IDは、電力線を識別するためのIDであり、本実施形態では、電力線D2の電力線IDは、“02”である。   In the power data, the power line ID of the power line D2 and the measured power value of the power line D2 are stored. The power line ID is an ID for identifying the power line. In the present embodiment, the power line ID of the power line D2 is “02”.

図1に戻り、EV−PCS5は、EV(電気自動車)10用のパワーコンディショニングシステムである。EV−PCS5は、EV10に搭載されている蓄電池11の充電及び放電の制御を行う。EV−PCS5は、蓄電池11の充電時には、商用電源8やPV−PCS6からの電力を電力線D4を介して蓄電池11に供給する。また、EV−PCS5は、蓄電池11の放電時には、蓄電池11からの電力を電力線D4,D2を介して分電盤9に供給する。   Returning to FIG. 1, EV-PCS 5 is a power conditioning system for EV (electric vehicle) 10. The EV-PCS 5 controls charging and discharging of the storage battery 11 mounted on the EV 10. The EV-PCS 5 supplies power from the commercial power supply 8 and the PV-PCS 6 to the storage battery 11 via the power line D4 when the storage battery 11 is charged. Further, the EV-PCS 5 supplies the power from the storage battery 11 to the distribution board 9 via the power lines D4 and D2 when the storage battery 11 is discharged.

EV−PCS5は、充電及び放電の制御を行うため、一定時間毎に(本実施形態では、30秒毎に)、電力線D1,D3,D4(第2の電力線グループ)のそれぞれを送電される電力の値を計測する。電力線D1は商用電源8とEV−PCS5との間に配設され、電力線D3は、PV−PCS6とEV−PCS5との間に配設され、電力線D4は、EV−PCS5とEV10との間に配設されている。   The EV-PCS 5 performs control of charging and discharging, so that power is transmitted through each of the power lines D1, D3, and D4 (second power line group) at regular time intervals (in this embodiment, every 30 seconds). The value of is measured. The power line D1 is disposed between the commercial power supply 8 and the EV-PCS 5, the power line D3 is disposed between the PV-PCS 6 and the EV-PCS 5, and the power line D4 is disposed between the EV-PCS 5 and the EV 10. It is arranged.

EV−PCS5は、電力線D1,D3,D4にそれぞれ接続されたCT2〜4の各々と通信線を介して接続される。EV−PCS5は、CT2の計測結果に基づいて電力線D1の電力値を計測する。同様に、EV−PCS5は、CT3,4の計測結果に基づいて電力線D3,D4の電力値を計測する。   The EV-PCS 5 is connected to each of the CTs 2 to 4 connected to the power lines D1, D3, and D4 via communication lines. The EV-PCS 5 measures the power value of the power line D1 based on the measurement result of CT2. Similarly, the EV-PCS 5 measures the power values of the power lines D3 and D4 based on the measurement results of CT3 and 4.

また、EV−PCS5は、専用の通信線を介して、エネルギー管理装置2と通信可能に接続する。EV−PCS5は、エネルギー管理装置2からの要求に応答して、計測した電力線D1,D3,D4の電力値を格納した計測データを生成し、エネルギー管理装置2に送信する。なお、EV−PCS5は、家屋H内に構築された上述の無線ネットワークを介して、エネルギー管理装置2と通信してもよい。   Further, the EV-PCS 5 is communicably connected to the energy management device 2 via a dedicated communication line. In response to the request from the energy management device 2, the EV-PCS 5 generates measurement data that stores the measured power values of the power lines D 1, D 3, and D 4 and transmits the measurement data to the energy management device 2. Note that the EV-PCS 5 may communicate with the energy management apparatus 2 via the above-described wireless network built in the house H.

EV−PCS5が生成する計測データには、図3に示すように、EV−PCS5の機器IDと、電力データ1〜3とが格納される。本実施形態では、EV−PCS5の機器IDは、“11”である。電力データ1〜3には、電力線D1,D3,D4の電力線ID(本実施形態では、“01”,“03”,“04”)と計測された電力線D1,D3,D4の電力値とが格納される。   In the measurement data generated by the EV-PCS 5, the device ID of the EV-PCS 5 and the power data 1 to 3 are stored as shown in FIG. In the present embodiment, the device ID of the EV-PCS 5 is “11”. The power data 1 to 3 include the power line IDs of the power lines D1, D3, and D4 (in this embodiment, “01”, “03”, and “04”) and the measured power values of the power lines D1, D3, and D4. Stored.

図1に戻り、PV−PCS6は、PV(太陽光発電)用のパワーコンディショニングシステムである。PV−PCS6は、PVパネル12が発電した電気を直流電力から交流電力に変換し、電力線D3を介してEV−PCS5に供給する。PV−PCS6から供給された電力は、EV−PCS5によって、分電盤9に供給されたり、蓄電池11の充電に使用される。あるいは、PV−PCS6から供給された電力は、EV−PCS5によって商用電源8に供給されることもある(いわゆる売電)。   Returning to FIG. 1, the PV-PCS 6 is a power conditioning system for PV (solar power generation). The PV-PCS 6 converts the electricity generated by the PV panel 12 from DC power to AC power and supplies it to the EV-PCS 5 through the power line D3. The electric power supplied from the PV-PCS 6 is supplied to the distribution board 9 or used to charge the storage battery 11 by the EV-PCS 5. Alternatively, the power supplied from the PV-PCS 6 may be supplied to the commercial power supply 8 by the EV-PCS 5 (so-called power sale).

例えば、電力計測装置4は、本発明の第1の計測装置に相当し、EV−PCS5は、本発明の第2の計測装置に相当する。   For example, the power measuring device 4 corresponds to the first measuring device of the present invention, and the EV-PCS 5 corresponds to the second measuring device of the present invention.

機器7(機器7−1,7−2,…)は、例えば、エアコン、照明器、床暖房システム、冷蔵庫、IH(Induction Heating)調理器、テレビ、給湯機等の電気機器である。機器7−1,7−2,…は、家屋H(敷地も含む)内に設置され、電力線D2から分電盤9により分岐された電力線D5,D6,…にそれぞれ接続されている。各機器7は、上述の図示しない無線ネットワークを介して、エネルギー管理装置2と通信可能に接続する。なお、各機器7は、外付けの通信アダプタ(図示せず)を介して、この無線ネットワークに接続される仕様であってもよい。   The device 7 (devices 7-1, 7-2,...) Is an electric device such as an air conditioner, an illuminator, a floor heating system, a refrigerator, an IH (Induction Heating) cooker, a television, or a water heater. The devices 7-1, 7-2,... Are installed in the house H (including the site), and are connected to the power lines D5, D6,. Each device 7 is communicably connected to the energy management apparatus 2 via the wireless network (not shown). Each device 7 may have a specification that is connected to this wireless network via an external communication adapter (not shown).

エネルギー管理装置2は、図4に示すように、CPU(Central Processing Unit)20と、通信インタフェース21と、ROM(Read Only Memory)22と、RAM(Random Access Memory)23と、二次記憶装置24とを備える。これらの構成部は、バス25を介して相互に接続される。CPU20は、このエネルギー管理装置2を統括的に制御する。CPU20によって実現される機能の詳細については後述する。   As shown in FIG. 4, the energy management device 2 includes a CPU (Central Processing Unit) 20, a communication interface 21, a ROM (Read Only Memory) 22, a RAM (Random Access Memory) 23, and a secondary storage device 24. With. These components are connected to each other via a bus 25. The CPU 20 controls the energy management device 2 in an integrated manner. Details of functions realized by the CPU 20 will be described later.

通信インタフェース21は、電力計測装置4、機器7−1,7−2,…と無線通信又は有線通信するためのNIC(Network Interface Card controller)と、操作端末3、EV−PCS5と無線通信又は有線通信するためのNICを備える。   The communication interface 21 is a network interface card controller (NIC) for wireless communication or wired communication with the power measuring device 4 and the devices 7-1, 7-2,. A NIC for communication is provided.

ROM22は、複数のファームウェアやこれらのファームウェアの実行時に使用されるデータ等を記憶する。RAM23は、CPU20の作業領域として使用される。   The ROM 22 stores a plurality of firmware, data used when executing these firmware, and the like. The RAM 23 is used as a work area for the CPU 20.

二次記憶装置24は、EEPROM(Electrically Erasable Programmable Read-Only Memory)、フラッシュメモリ等の読み書き可能な不揮発性の半導体メモリやハードディスクドライブ等から構成される。二次記憶装置24は、図5に示すように、計測履歴DB240と優先レベルテーブル241を記憶する。なお、この他にも、二次記憶装置24は、この家庭で消費される電力を監視するためのプログラムや各機器7の動作を制御するためのプログラム、そして、これらのプログラムの実行時に使用されるデータ等を記憶する。   The secondary storage device 24 includes an EEPROM (Electrically Erasable Programmable Read-Only Memory), a readable / writable nonvolatile semiconductor memory such as a flash memory, a hard disk drive, and the like. As shown in FIG. 5, the secondary storage device 24 stores a measurement history DB 240 and a priority level table 241. In addition to this, the secondary storage device 24 is used when a program for monitoring the power consumed in the home, a program for controlling the operation of each device 7, and the execution of these programs. Store the data.

計測履歴DB(計測履歴データベース)240は、電力計測装置4(第1の計測装置)及びEV−PCS5(第2の計測装置)のそれぞれから送られてきた計測データ(即ち、第1の計測データ及び第2の計測データ)の履歴が格納されるデータベースである。優先レベルテーブル241については後述する。   The measurement history DB (measurement history database) 240 is measurement data (that is, first measurement data) sent from each of the power measurement device 4 (first measurement device) and the EV-PCS 5 (second measurement device). And the second measurement data) are stored in the database. The priority level table 241 will be described later.

続いて、エネルギー管理装置2の機能について説明する。エネルギー管理装置2は、機能的には、図6に示すように、ユーザインタフェース部200と、計測データ取得部201と、時間差算出部202と、電力情報生成部203と、表示指示部204とを備える。これらの各機能部は、CPU20が二次記憶装置24に記憶されている1又は複数のプログラムを実行することで実現される。   Next, functions of the energy management device 2 will be described. Functionally, the energy management apparatus 2 includes a user interface unit 200, a measurement data acquisition unit 201, a time difference calculation unit 202, a power information generation unit 203, and a display instruction unit 204, as shown in FIG. Prepare. Each of these functional units is realized by the CPU 20 executing one or a plurality of programs stored in the secondary storage device 24.

ユーザインタフェース部200は、操作端末3を介したユーザインタフェース処理を行う。即ち、ユーザインタフェース部200は、ユーザからの操作を操作端末3を介して受け付ける。また、ユーザインタフェース部200は、ユーザに提示するための情報を操作端末3に送信する。   The user interface unit 200 performs user interface processing via the operation terminal 3. That is, the user interface unit 200 receives an operation from the user via the operation terminal 3. In addition, the user interface unit 200 transmits information to be presented to the user to the operation terminal 3.

計測データ取得部201は、電力計測装置4及びEV−PCS5から、上述した計測データを取得する処理を行う。具体的には、計測データ取得部201は、一定時間毎に(本実施形態では、30秒毎に)、電力計測装置4及びEV−PCS5のそれぞれに対し、計測データの送信を要求する。計測データ取得部201は、かかる要求に応答して電力計測装置4から送られてきた計測データ(第1の計測データ)を取得し、取得した第1の計測データを、受信した時刻を計測時刻として付与した後、計測履歴DB240に格納する。同様に、計測データ取得部201は、上記の要求に応答してEV−PCS5から送られてきた第2の計測データを取得し、取得した第2の計測データを、受信した時刻を計測時刻として付与した後、計測履歴DB240に格納する。   The measurement data acquisition unit 201 performs processing for acquiring the measurement data described above from the power measurement device 4 and the EV-PCS 5. Specifically, the measurement data acquisition unit 201 requests the power measurement device 4 and the EV-PCS 5 to transmit measurement data at regular intervals (in this embodiment, every 30 seconds). The measurement data acquisition unit 201 acquires measurement data (first measurement data) sent from the power measurement device 4 in response to such a request, and measures the received time of the acquired first measurement data as a measurement time. And then stored in the measurement history DB 240. Similarly, the measurement data acquisition unit 201 acquires the second measurement data sent from the EV-PCS 5 in response to the above request, and uses the received second measurement data as the measurement time. After the assignment, it is stored in the measurement history DB 240.

時間差算出部202は、計測履歴DB240に格納されている、第1の計測データの履歴と第2の計測データの履歴に基づいて、第1の電力線グループの総電力(電力線D2の電力)が変化する時刻と、第2の電力線グループの総電力(電力線D1,D3,D4の合計電力)が変化する時刻との時間差(時刻のずれ)を算出する。以下、この時間差について説明する。   The time difference calculation unit 202 changes the total power of the first power line group (the power of the power line D2) based on the history of the first measurement data and the history of the second measurement data stored in the measurement history DB 240. And the time difference (time shift) between the time when the total power of the second power line group (the total power of the power lines D1, D3, and D4) changes is calculated. Hereinafter, this time difference will be described.

電力計測装置4とEV−PCS5において、電力計測の間隔、換言すると、電力計測のサンプリング間隔は、本実施形態においては同一(30秒)である。しかし、電力計測装置4とEV−PCS5とは、物理的に分離されており、双方が正確に常時同期して計測を行うようにするのは困難である。例えば、電力計測装置4とEV−PCS5とが、図7に示すようなタイミングで電力を計測すると、電力線D1〜D3の電力の推移は、図8に示すようになる。また、第2の電力線グループの総電力の推移は、図9に示すようになる。なお、図8及び図9に示す例では、蓄電池11の充電及び放電が行われていないものとする。また、図9における第2の電力線グループの総電力において、売電時での電力線D1の電力値は、負数として取り扱われているものとする。   In the power measurement device 4 and the EV-PCS 5, the power measurement interval, in other words, the power measurement sampling interval is the same (30 seconds) in the present embodiment. However, the power measuring device 4 and the EV-PCS 5 are physically separated, and it is difficult for both to accurately and constantly perform measurement. For example, when the power measuring device 4 and the EV-PCS 5 measure power at the timing as shown in FIG. 7, the transition of the power of the power lines D1 to D3 is as shown in FIG. Further, the transition of the total power of the second power line group is as shown in FIG. In the examples shown in FIGS. 8 and 9, it is assumed that the storage battery 11 is not charged and discharged. In addition, in the total power of the second power line group in FIG. 9, the power value of the power line D1 at the time of power sale is handled as a negative number.

上記のようなケースにおいて、エネルギー管理装置2が、電力計測装置4及びEV−PCS5のそれぞれから30秒毎に計測データを取得し、取得した時刻(計測データの受信時刻)に基づいて、電力線D1〜D3の電力の推移を同一時間軸で表示すると、図10に示すようになり、また、第2の電力線グループの総電力の推移は、図11に示すようになる。ここで、第1の電力線グループの総電力(電力線D2の電力)と、第2の電力線グループの総電力は、蓄電池11の充電及び放電の何れも行われていない場合、同時刻において理論上、同一の値となるはずである。   In the case as described above, the energy management device 2 acquires measurement data every 30 seconds from each of the power measurement device 4 and the EV-PCS 5, and based on the acquired time (measurement data reception time), the power line D1 When the transition of the power of .about.D3 is displayed on the same time axis, it is as shown in FIG. 10, and the transition of the total power of the second power line group is as shown in FIG. Here, the total power of the first power line group (power of the power line D2) and the total power of the second power line group are theoretically at the same time when neither the storage battery 11 is charged nor discharged, Should be the same value.

しかしながら、電力計測装置4とEV−PCS5とが非同期で電力の計測を行うため、何ら対策を講じない場合、エネルギー管理装置2で表示される、第1の電力線グループの総電力の推移と、第2の電力線グループの総電力の推移との間には、図11に示すように、電力変化の時刻のずれ(時間差)が生じてしまう。このように、時間差が生じたまま電力の情報を表示してしまうと、ユーザに違和感や不安感を抱かせる虞がある。   However, since the power measurement device 4 and the EV-PCS 5 measure power asynchronously, if no measures are taken, the transition of the total power of the first power line group displayed on the energy management device 2 and the first As shown in FIG. 11, there is a time lag (time difference) in power change between the two power line groups and the transition of the total power. As described above, if the power information is displayed with a time difference, the user may feel uncomfortable or uneasy.

時間差算出部202は、上記の時間差を以下のようにして算出する。先ず、時間差算出部202は、計測履歴DB240から、表示の対象となる予め定めた期間分の第1の計測データの履歴と第2の計測データの履歴を読み出す。   The time difference calculation unit 202 calculates the above time difference as follows. First, the time difference calculation unit 202 reads from the measurement history DB 240 the first measurement data history and the second measurement data history for a predetermined period to be displayed.

そして、時間差算出部202は、第1の電力線グループの総電力(第1の電力)が変化する時刻(第1の時刻)を検出する。より詳細には、先ず、時間差算出部202は、読み出した複数の第1の計測データに含まれる各電力値(即ち、電力線D2の電力値)と、各第1の計測データに付与された計測時刻に基づいて、第1の時刻を検出する。具体的には、時間差算出部202は、予め定めた時間(例えば、30秒)当たりの電力値の変化量(絶対値)が予め定めた閾値(例えば、300W)を超えるような変化を検出すると、当該変化に対応する第1の計測データの計測時刻を第1の時刻として取得する。なお、閾値は、宅内の負荷の大きさよって動的に変更されるようにしてもよい。   And the time difference calculation part 202 detects the time (1st time) when the total electric power (1st electric power) of a 1st power line group changes. More specifically, first, the time difference calculation unit 202 includes each power value (that is, the power value of the power line D2) included in the plurality of read first measurement data and the measurement given to each first measurement data. The first time is detected based on the time. Specifically, when the time difference calculation unit 202 detects a change such that the amount of change (absolute value) in the power value per predetermined time (for example, 30 seconds) exceeds a predetermined threshold (for example, 300 W). The measurement time of the first measurement data corresponding to the change is acquired as the first time. Note that the threshold value may be dynamically changed according to the size of the load in the house.

また、時間差算出部202は、第2の電力線グループの総電力(第2の電力)が変化する時刻(第2の時刻)を検出する。より詳細には、先ず、時間差算出部202は、読み出した複数の第2の計測データの各々について、総電力値(即ち、電力線D1,D3,D4の電力値の合計)を算出する。その際、時間差算出部202は、売電時においては、電力線D1の電力値を負数とし、また、蓄電池11の充電時においては、電力線D4の電力値を負数として取り扱う。   In addition, the time difference calculation unit 202 detects a time (second time) when the total power (second power) of the second power line group changes. More specifically, first, the time difference calculation unit 202 calculates the total power value (that is, the total power value of the power lines D1, D3, and D4) for each of the read second measurement data. At that time, the time difference calculation unit 202 treats the power value of the power line D1 as a negative number when selling power, and treats the power value of the power line D4 as a negative number when charging the storage battery 11.

そして、時間差算出部202は、算出した各総電力値と、各第2の計測データに付与された計測時刻に基づいて、上述した第1の時刻の検出と同様の手法により、第2の時刻を検出する。   Then, the time difference calculation unit 202 uses the same method as the detection of the first time described above based on each calculated total power value and the measurement time assigned to each second measurement data to generate the second time Is detected.

時間差算出部202は、それぞれ検出した第1の時刻及び第2の時刻との時間差を算出する。例えば、電力計測装置4とEV−PCS5から取得された計測データに基づいた第1の電力線グループの総電力の推移と、第2の電力線グループの総電力の推移が図11のように示される場合、時間差算出部202は、第1の時刻として、12時13分30秒を取得し、第2の時刻として、12時13分00秒を取得する(図12参照)。その結果、時間差算出部202は、第1の時刻と第2の時刻との差分時間である「+30秒」を時間差として算出する。   The time difference calculation unit 202 calculates the time difference between the detected first time and second time. For example, the transition of the total power of the first power line group and the transition of the total power of the second power line group based on the measurement data acquired from the power measuring device 4 and the EV-PCS 5 are shown as in FIG. The time difference calculation unit 202 acquires 12:13:30 as the first time, and acquires 12:13:00 as the second time (see FIG. 12). As a result, the time difference calculation unit 202 calculates “+30 seconds”, which is the difference time between the first time and the second time, as the time difference.

電力情報生成部203は、各電力線の電力や、複数の電力線の電力を適宜統合した電力(例えば、上述した第2の電力線グループの総電力)の推移を同一の時間軸で示した電力情報を生成する。その際、電力情報生成部203は、電力計測装置4とEV−PCS5の何れか一方に対応する各計測データの計測時刻を算出された時間差で補正する。なお、電力情報生成部203は、算出された時間差が予め定めた時間以内(例えば、60秒以内)である場合にかかる補正を行う。   The power information generation unit 203 displays power information indicating the transition of the power of each power line and the power of a plurality of power lines as appropriate (for example, the total power of the second power line group described above) on the same time axis. Generate. At that time, the power information generation unit 203 corrects the measurement time of each measurement data corresponding to one of the power measurement device 4 and the EV-PCS 5 with the calculated time difference. Note that the power information generation unit 203 performs correction when the calculated time difference is within a predetermined time (for example, within 60 seconds).

より詳細には、表示対象となる計測デ−タの内、電力計測装置4とEV−PCS5の何れか一方に対応する全ての計測データの計測時刻(受信時刻)を、時間差算出部202により算出された時間差に基づいて補正する。電力情報生成部203は、電力計測装置4とEV−PCS5の何れの計測データの計測時刻を上記の補正対象にするかを、二次記憶装置24に記憶されている優先レベルテーブル241を参照することで決定する。   More specifically, the time difference calculation unit 202 calculates the measurement time (reception time) of all measurement data corresponding to one of the power measurement device 4 and the EV-PCS 5 among the measurement data to be displayed. Correction is performed based on the time difference. The power information generation unit 203 refers to the priority level table 241 stored in the secondary storage device 24 to determine which measurement time of the measurement data of the power measurement device 4 or EV-PCS 5 is the correction target. To decide.

優先レベルテーブル241は、電力を計測する装置(本実施形態では、電力計測装置4とEV−PCS5)の優先レベルが定義されたデータテーブルである。本実施形態では、優先レベルテーブル241の各レコードは、図13に示すように、機器IDと優先レベルの2つの項目を含んでいる。本実施形態では、電力計測装置4の優先レベルが“1”、EV−PCS5の優先レベルが“2”となっており、EV−PCS5の方が、電力計測装置4より優先度が高いことが示されている。   The priority level table 241 is a data table in which priority levels of devices that measure power (in this embodiment, the power measurement device 4 and the EV-PCS 5) are defined. In the present embodiment, each record of the priority level table 241 includes two items of a device ID and a priority level as shown in FIG. In the present embodiment, the priority level of the power measurement device 4 is “1”, the priority level of the EV-PCS 5 is “2”, and the EV-PCS 5 has a higher priority than the power measurement device 4. It is shown.

優先レベルは、各装置の仕様上の計測精度や電力計測のサンプリング間隔に基づいて決定される。つまり、より計測精度の高い装置やサンプリング間隔がより短い装置に対して、より高い優先レベル(より大きい数値)が付与される。優先レベルの決定及び優先レベルテーブル241へのデータの設定は、例えば、エネルギー管理システム1の設置の際、工事担当者によって行われる。   The priority level is determined based on the measurement accuracy in the specifications of each device and the sampling interval of power measurement. That is, a higher priority level (a larger numerical value) is given to a device with higher measurement accuracy or a device with a shorter sampling interval. The determination of the priority level and the setting of data in the priority level table 241 are performed by a person in charge of construction when the energy management system 1 is installed, for example.

図13に示すように優先レベルが設定されている場合、電力情報生成部203は、第1の電力(電力線D2の電力)が変化する時刻(第1の時刻)が、第2の電力(電力線D1,D3,D4の総電力)が変化する時刻(第2の時刻)と一致するように、第1の計測データの計測時刻(受信時刻)を補正する。具体的には、電力情報生成部203は、表示対象となる全ての第1の計測データの計測時刻から、算出された時間差(30秒)を差し引く。このようにして、表示対象となる電力計測装置4に対応する全ての計測データの計測時刻を補正する。   When the priority level is set as illustrated in FIG. 13, the power information generation unit 203 determines that the time (first time) when the first power (power of the power line D2) changes is the second power (power line). The measurement time (reception time) of the first measurement data is corrected so as to coincide with the time (second time) when the total power of D1, D3, and D4 changes. Specifically, the power information generation unit 203 subtracts the calculated time difference (30 seconds) from the measurement times of all the first measurement data to be displayed. In this way, the measurement times of all measurement data corresponding to the power measurement device 4 to be displayed are corrected.

表示指示部204(情報出力手段)は、電力情報生成部203により生成された電力情報の表示を操作端末3に指示する。その結果、操作端末3に表示される電力情報の例を図14に示す。   The display instruction unit 204 (information output unit) instructs the operation terminal 3 to display the power information generated by the power information generation unit 203. As a result, an example of the power information displayed on the operation terminal 3 is shown in FIG.

図15は、エネルギー管理装置2によって実行される電力情報表示処理の手順を示すフローチャートである。この電力情報表示処理は、一定時間毎(本実施形態では、30秒毎)に繰り返し実行される。   FIG. 15 is a flowchart showing a procedure of power information display processing executed by the energy management device 2. This power information display process is repeatedly executed at regular time intervals (in this embodiment, every 30 seconds).

計測データ取得部201は、電力計測装置4から計測データを取得する(ステップS101)。また、計測データ取得部201は、EV−PCS5から計測データを取得する(ステップS102)。計測データ取得部201は、取得したそれぞれの計測データを、受信した時刻を計測時刻として付与した後、計測履歴DB240に格納する。   The measurement data acquisition unit 201 acquires measurement data from the power measurement device 4 (step S101). Moreover, the measurement data acquisition unit 201 acquires measurement data from the EV-PCS 5 (step S102). The measurement data acquisition unit 201 stores the acquired measurement data in the measurement history DB 240 after giving the received time as the measurement time.

時間差算出部202は、上述した時間差を算出する(ステップS103)。   The time difference calculation unit 202 calculates the time difference described above (step S103).

電力情報生成部203は、電力計測装置4に対応する計測データの計測時刻と、EV−PCS5に対応する計測データの計測時刻の何れか一方を算出された時間差に基づいて補正する(ステップS104)。   The power information generation unit 203 corrects one of the measurement time of measurement data corresponding to the power measurement device 4 and the measurement time of measurement data corresponding to the EV-PCS 5 based on the calculated time difference (step S104). .

そして、電力情報生成部203は、電力計測装置4に対応する電力の推移とEV−PCS5に対応する電力の推移を同一の時間軸で示した電力情報を生成する(ステップS105)。   Then, the power information generation unit 203 generates power information indicating the power transition corresponding to the power measuring device 4 and the power transition corresponding to the EV-PCS 5 on the same time axis (step S105).

表示指示部204は、生成された電力情報の表示を操作端末3に指示する(ステップS106)。   The display instruction unit 204 instructs the operation terminal 3 to display the generated power information (step S106).

以上説明したように、本発明の実施形態に係るエネルギー管理システム1では、エネルギー管理装置2は、電力計測装置4に対応する(電力計測装置4の計測に基づく)電力の推移と、EV−PCS5に対応する電力の推移を操作端末3に表示する際、双方の電力変化の時刻の時間差を算出する。そして、エネルギー管理装置2は、電力計測装置4に対応する計測データの計測時刻(受信時刻)と、EV−PCS5に対応する計測データの計測時刻(受信時刻)の何れか一方を算出した時間差に基づいて補正する。これにより、異なる装置で計測された電力の推移を同一の時間軸上に表示する際の不整合性を低減させることができる。したがって、ユーザに違和感や不安感を与えることなく、電力の使用状況に関する多種多様な情報をユーザに提示することができ、利便性の向上が図れる。   As described above, in the energy management system 1 according to the embodiment of the present invention, the energy management device 2 corresponds to the power measurement device 4 (based on the measurement of the power measurement device 4), and the EV-PCS 5 Is displayed on the operation terminal 3, the time difference between the times of the power changes is calculated. Then, the energy management device 2 calculates the time difference between the measurement time (reception time) of the measurement data corresponding to the power measurement device 4 and the measurement time (reception time) of the measurement data corresponding to the EV-PCS 5. Correct based on. Thereby, the inconsistency at the time of displaying the transition of the electric power measured with the different apparatus on the same time axis can be reduced. Therefore, it is possible to present a variety of information related to the power usage state to the user without giving the user a sense of incongruity or anxiety, thereby improving convenience.

なお、本発明は、上記実施形態に限定されず、本発明の要旨を逸脱しない範囲での種々の変更は勿論可能である。   In addition, this invention is not limited to the said embodiment, Of course, the various change in the range which does not deviate from the summary of this invention is possible.

例えば、上記実施形態では、電力計測装置4は、電力線D2の電力のみを計測していたが、さらに他の電力線の電力を計測してもよい。この場合、電力計測装置4は、計測した複数の電力線の電力値を格納した計測データを生成し、エネルギー管理装置2に送信する。   For example, in the above embodiment, the power measurement device 4 measures only the power of the power line D2, but may further measure the power of another power line. In this case, the power measurement device 4 generates measurement data that stores the measured power values of the plurality of power lines, and transmits the measurement data to the energy management device 2.

また、電力を計測する装置として、電力計測装置4とEV−PCS5以外の他の装置によって電力が計測され、計測された電力値を格納した計測データがエネルギー管理装置2に送信されるようにしてもよい。この場合の他の装置には、例えば、PV−PCS6や、何れも図示しない定置型蓄電池システム、スマートメータ等が含まれ、何れもが第1の計測装置又は第2の計測装置になり得る。また、電力を計測する装置が3つ以上の場合、優先レベルテーブル241に設定された優先度が最も高い装置の計測に対応する計測データの計測時刻(受信時刻)を基準として、他の各装置に対応する計測データの計測時刻(受信時刻)を補正すればよい。   Further, as a device for measuring power, power is measured by a device other than the power measuring device 4 and the EV-PCS 5, and measurement data storing the measured power value is transmitted to the energy management device 2. Also good. Other devices in this case include, for example, a PV-PCS 6, a stationary storage battery system, a smart meter, and the like (both not shown), and any of them can be the first measuring device or the second measuring device. When there are three or more devices that measure power, each other device is set with reference to the measurement time (reception time) of measurement data corresponding to the measurement of the device with the highest priority set in the priority level table 241. What is necessary is just to correct the measurement time (reception time) of the measurement data corresponding to.

また、電力計測装置4とEV−PCS5のサンプリング間隔は同一である必要はない。   Moreover, the sampling interval of the electric power measurement apparatus 4 and EV-PCS5 does not need to be the same.

上記実施形態では、エネルギー管理装置2は、計測データの受信時刻を当該計測データに対応する計測時刻として取り扱うことで上述の時間差を算出し、電力情報を生成した。しかし、電力を計測する装置からの計測データに時刻情報が含まれている場合には、かかる時刻情報を計測時刻として取り扱うことで時間差の算出及び電力情報の生成を行ってもよい。   In the above embodiment, the energy management device 2 calculates the time difference described above by handling the reception time of measurement data as the measurement time corresponding to the measurement data, and generates power information. However, when the time information is included in the measurement data from the device that measures power, the time difference may be calculated and the power information may be generated by handling the time information as the measurement time.

また、エネルギー管理装置2は、ユーザの操作に応じて、計測時刻を補正した電力情報の表示を行うか否かを切り替えるようにしてもよい。あるいは、エネルギー管理装置2は、メンテナンスモードの場合に、上記の切り替えを可能として、メンテナンスモード以外の場合では、上記の切り替えを禁止してもよい。   Further, the energy management device 2 may switch whether or not to display the power information with the measurement time corrected in accordance with a user operation. Alternatively, the energy management device 2 may allow the above switching in the maintenance mode, and prohibit the switching in a case other than the maintenance mode.

また、計測時刻を補正した電力情報の表示のみならず、計測時刻を補正した計測データを用いて、機器7等の動作を制御してもよい。   Further, not only the display of the power information with the corrected measurement time but also the operation of the device 7 or the like may be controlled using the measurement data with the corrected measurement time.

上記の実施形態では、操作端末3が、エネルギー管理装置2とユーザとの間のインタフェースの役割を担っていたが、エネルギー管理装置2が、ユーザからの操作を受け付けるための入力デバイスと、ユーザに情報を提示するための出力デバイスを含んで構成されるようにしてもよい。   In the above embodiment, the operation terminal 3 has played a role of an interface between the energy management device 2 and the user. However, the energy management device 2 has an input device for accepting an operation from the user and a user. An output device for presenting information may be included.

また、上記の実施形態においてエネルギー管理装置2が実行した一部の処理が、他の装置によって実行されるようにしてもよい。この場合のエネルギー管理システム1の全体構成を図16に示す。   Moreover, you may make it the one part process which the energy management apparatus 2 performed in said embodiment perform with another apparatus. FIG. 16 shows the overall configuration of the energy management system 1 in this case.

図16において、ルータ13は、ブロードバンドルータであり、エネルギー管理装置2とLANケーブルを介して通信可能に接続されている。エネルギー管理装置2の通信インタフェース21は、広域通信するためのNICをさらに備え、ルータ13を介して広域ネットワークNに接続し、サーバ14とデータ通信を行う。サーバ14は、エネルギー管理装置2の販売元等によって管理される、HEMS用のいわゆるクラウドサーバである。   In FIG. 16, a router 13 is a broadband router, and is connected to the energy management apparatus 2 via a LAN cable so as to be communicable. The communication interface 21 of the energy management apparatus 2 further includes a NIC for wide area communication, and is connected to the wide area network N via the router 13 to perform data communication with the server 14. The server 14 is a so-called cloud server for HEMS that is managed by a vendor or the like of the energy management device 2.

上記の場合において、エネルギー管理装置2は、電力計測装置4とEV−PCS5からそれぞれ取得した第1の計測データ及び第2の計測データを定期的にサーバ14に送信する。サーバ14は、時間差算出部202及び/又は電力情報生成部203と同等の機能を備える。サーバ14は、エネルギー管理装置2から送られてきた第1の計測データ及び第2の計測データに基づいて、上述した時間差を算出する処理や電力情報を生成する処理を行い、処理結果をエネルギー管理装置2に送信するようにしてもよい。   In the above case, the energy management device 2 periodically transmits the first measurement data and the second measurement data acquired from the power measurement device 4 and the EV-PCS 5 to the server 14. The server 14 has a function equivalent to that of the time difference calculation unit 202 and / or the power information generation unit 203. Based on the first measurement data and the second measurement data sent from the energy management device 2, the server 14 performs the above-described process for calculating the time difference and the process for generating the power information, and the process result is energy managed. You may make it transmit to the apparatus 2. FIG.

また、上記の実施形態では、エネルギー管理装置2が家屋Hに設置された場合について説明したが、エネルギー管理装置2と同等の機能を有する装置を家屋Hの外に設置するようにしてもよい。   Moreover, although said embodiment demonstrated the case where the energy management apparatus 2 was installed in the house H, you may make it install the apparatus which has a function equivalent to the energy management apparatus 2 outside the house H. FIG.

この場合のエネルギー管理システム1の全体構成を図17に示す。図17に示すエネルギー管理システム1では、図16に示す構成と異なり、家屋Hには、エネルギー管理装置2が設置されていない。この場合、ルータ13とサーバ14とが協調してエネルギー管理装置2の役割を果たす。   The overall configuration of the energy management system 1 in this case is shown in FIG. In the energy management system 1 illustrated in FIG. 17, unlike the configuration illustrated in FIG. 16, the energy management apparatus 2 is not installed in the house H. In this case, the router 13 and the server 14 cooperate to play the role of the energy management device 2.

上記の実施形態では、CPU20によって二次記憶装置24に記憶されている1又は複数のプログラムが実行されることで、エネルギー管理装置2の各機能部(図6参照)が実現された。しかし、エネルギー管理装置2の機能部の全部又は一部が、専用のハードウェアで実現されるようにしてもよい。専用のハードウェアとは、例えば、単一回路、複合回路、プログラム化されたプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field-Programmable Gate Array)、又は、これらの組み合わせ等である。   In the above-described embodiment, one or more programs stored in the secondary storage device 24 are executed by the CPU 20, thereby realizing each functional unit (see FIG. 6) of the energy management device 2. However, all or a part of the functional units of the energy management device 2 may be realized by dedicated hardware. The dedicated hardware is, for example, a single circuit, a composite circuit, a programmed processor, an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA), or a combination thereof.

また、本発明は、家屋のみに限らず、例えば、オフィスビルや工場等において設置されるエネルギー管理システムに採用することが可能である。   Further, the present invention is not limited to a house, and can be employed in an energy management system installed in, for example, an office building or a factory.

また、上記実施形態において、エネルギー管理装置2によって実行されるプログラムは、CD−ROM(Compact Disc Read Only Memory)、DVD(Digital Versatile Disc)、MO(Magneto-Optical Disk)、USB(Universal Serial Bus)メモリ、メモリカード等のコンピュータ読み取り可能な記録媒体に格納して配布することも可能である。そして、かかるプログラムを特定の又は汎用のコンピュータにインストールすることによって、当該コンピュータを上記実施形態におけるエネルギー管理装置2として機能させることも可能である。   In the above embodiment, the program executed by the energy management apparatus 2 is a CD-ROM (Compact Disc Read Only Memory), a DVD (Digital Versatile Disc), an MO (Magneto-Optical Disk), or a USB (Universal Serial Bus). It is also possible to store and distribute in a computer-readable recording medium such as a memory or a memory card. And it is also possible to make the said computer function as the energy management apparatus 2 in the said embodiment by installing this program in specific or a general purpose computer.

また、上記のプログラムをインターネット等の通信ネットワーク上のサーバ装置が有するディスク装置等に格納しておき、例えば、搬送波に重畳させて、コンピュータにダウンロードするようにしてもよい。あるいは、通信ネットワークを介してプログラムを転送しながら起動実行することによって、上述の処理を達成してもよい。さらに、プログラムの全部又は一部をサーバ装置上で実行させ、その処理に関する情報をコンピュータが通信ネットワークを介して送受信しながらプログラムを実行することによって、上述の処理を達成してもよい。   Further, the above program may be stored in a disk device or the like included in a server device on a communication network such as the Internet, and may be downloaded onto a computer, for example, superimposed on a carrier wave. Or you may achieve the above-mentioned process by starting and executing, transferring a program via a communication network. Furthermore, the above-described processing may be achieved by executing all or part of the program on the server device and executing the program while the computer transmits and receives information regarding the processing via a communication network.

なお、上述の機能を、OS(Operating System)が分担して実現する場合又はOSとアプリケーションとの協働により実現する場合等には、OS以外の部分のみを上記の記録媒体に格納して配布してもよく、あるいは、コンピュータにダウンロード等してもよい。   Note that when the above functions are realized by sharing an OS (Operating System) or when the functions are realized by cooperation between the OS and an application, only the parts other than the OS are stored in the recording medium and distributed. Alternatively, it may be downloaded to a computer.

本発明は、広義の精神と範囲を逸脱することなく、様々な実施形態及び変形が可能である。また、上述した実施形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。   Various embodiments and modifications can be made to the present invention without departing from the broad spirit and scope. Further, the above-described embodiment is for explaining the present invention, and does not limit the scope of the present invention. That is, the scope of the present invention is shown not by the embodiments but by the claims. Various modifications within the scope of the claims and within the scope of the equivalent invention are considered to be within the scope of the present invention.

本発明は、建物内で使用される電力の管理を行うシステム等に好適に採用され得る。   The present invention can be suitably employed in a system for managing power used in a building.

1 エネルギー管理システム、2 エネルギー管理装置、3 操作端末、4 電力計測装置、5 EV−PCS、6 PV−PCS、7(7−1,7−2,…) 機器、8 商用電源、9 分電盤、10 EV、11 蓄電池、12 PVパネル、13 ルータ、14 サーバ、20 CPU、21 通信インタフェース、22 ROM、23 RAM、24 二次記憶装置、25 バス、200 ユーザインタフェース部、201 計測データ取得部、202 時間差算出部、203 電力情報生成部、204 表示指示部、240 計測履歴DB、241 優先レベルテーブル、D1〜D6 電力線   DESCRIPTION OF SYMBOLS 1 Energy management system, 2 Energy management apparatus, 3 Operation terminal, 4 Electric power measurement apparatus, 5 EV-PCS, 6 PV-PCS, 7 (7-1, 7-2, ...) Equipment, 8 Commercial power supply, 9 Power distribution Panel, 10 EV, 11 Storage battery, 12 PV panel, 13 Router, 14 Server, 20 CPU, 21 Communication interface, 22 ROM, 23 RAM, 24 Secondary storage device, 25 Bus, 200 User interface unit, 201 Measurement data acquisition unit 202 Time difference calculation unit 203 Power information generation unit 204 Display instruction unit 240 Measurement history DB 241 Priority level table D1 to D6 Power line

Claims (8)

第1の計測装置から、第1の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第1の計測データを取得し、第2の計測装置から、第2の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第2の計測データを取得する計測データ取得手段と、
予め定めた期間分の前記第1の計測データから、前記第1の電力線グループの総電力である第1の電力が変化する第1の時刻を検出し、前記予め定めた期間分の前記第2の計測データから、前記第2の電力線グループの総電力である第2の電力が変化する第2の時刻を検出し、前記第1の時刻と前記第2の時刻との時間差を算出する時間差算出手段と、
前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れか一方を前記時間差に基づいて補正した電力情報を表示装置に出力する情報出力手段とを備える、エネルギー管理装置。
First measurement data including each measured power of one or a plurality of power lines included in the first power line group is acquired from the first measurement apparatus, and then transferred from the second measurement apparatus to the second power line group. Measurement data acquisition means for acquiring second measurement data including each measured power of one or a plurality of power lines included;
A first time at which the first power that is the total power of the first power line group changes is detected from the first measurement data for a predetermined period, and the second time for the predetermined period. Time difference calculation for detecting a second time at which the second power, which is the total power of the second power line group, changes from the measured data, and calculating a time difference between the first time and the second time Means,
Displays power information obtained by correcting one of each measurement time of the first measurement data for the predetermined period and each measurement time of the second measurement data for the predetermined period based on the time difference. An energy management device comprising information output means for outputting to the device.
前記計測データ取得手段は、前記第1の計測データ及び前記第2の計測データを取得した際、それぞれ取得した時刻を計測時刻として前記第1の計測データ及び前記第2の計測データに付与する、請求項1に記載のエネルギー管理装置。   The measurement data acquisition means, when acquiring the first measurement data and the second measurement data, gives the acquired time as a measurement time to the first measurement data and the second measurement data, The energy management apparatus according to claim 1. 前記電力情報を生成する電力情報生成手段をさらに備える、請求項1又は2に記載のエネルギー管理装置。   The energy management apparatus according to claim 1, further comprising power information generation means for generating the power information. 前記電力情報生成手段は、前記時間差が予め定めた時間以内である場合に、前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れか一方を前記時間差に基づいて補正する、請求項3に記載のエネルギー管理装置。   When the time difference is within a predetermined time, the power information generating unit is configured to measure each measurement time of the first measurement data for the predetermined period and the second measurement data for the predetermined period. The energy management apparatus according to claim 3, wherein any one of the measurement times is corrected based on the time difference. 前記電力情報生成手段は、前記第1の計測装置及び前記第2の計測装置に付与されている優先レベルに基づいて、前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れを補正するを決定する、請求項3又は4に記載のエネルギー管理装置。   The power information generation unit is configured to measure each measurement time of the first measurement data for the predetermined period based on a priority level assigned to the first measurement device and the second measurement device; The energy management device according to claim 3 or 4, wherein which of the measurement times of the second measurement data for a predetermined period is determined to be corrected. 前記時間差算出手段は、前記第1の電力が予め定めた閾値を超えて変化した場合に前記第1の時刻を検出し、前記第2の電力が前記閾値を超えて変化した場合に前記第2の時刻を検出する、請求項1から5の何れか1項に記載のエネルギー管理装置。   The time difference calculating means detects the first time when the first power changes exceeding a predetermined threshold value, and detects the second time when the second power changes beyond the threshold value. The energy management device according to claim 1, wherein the time is detected. 第1の計測装置から、第1の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第1の計測データを取得し、
第2の計測装置から、第2の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第2の計測データを取得し、
予め定めた期間分の前記第1の計測データから、前記第1の電力線グループの総電力である第1の電力が変化する第1の時刻を検出し、
前記予め定めた期間分の前記第2の計測データから、前記第2の電力線グループの総電力である第2の電力が変化する第2の時刻を検出し、
前記第1の時刻と前記第2の時刻との時間差を算出し、
前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れか一方を前記時間差に基づいて補正した電力情報を表示装置に出力する、電力情報表示方法。
From the first measurement device, obtain first measurement data including each measured power of one or more power lines included in the first power line group,
From the second measurement device, obtain second measurement data including each measured power of one or more power lines included in the second power line group,
From the first measurement data for a predetermined period, a first time at which the first power that is the total power of the first power line group changes is detected,
From the second measurement data for the predetermined period, a second time when the second power that is the total power of the second power line group changes is detected,
Calculating a time difference between the first time and the second time;
Displays power information obtained by correcting one of each measurement time of the first measurement data for the predetermined period and each measurement time of the second measurement data for the predetermined period based on the time difference. A power information display method for outputting to a device.
コンピュータを、
第1の計測装置から、第1の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第1の計測データを取得し、第2の計測装置から、第2の電力線グループに含まれる1又は複数の電力線の計測された各電力を含む第2の計測データを取得する計測データ取得手段、
予め定めた期間分の前記第1の計測データから、前記第1の電力線グループの総電力である第1の電力が変化する第1の時刻を検出し、前記予め定めた期間分の前記第2の計測データから、前記第2の電力線グループの総電力である第2の電力が変化する第2の時刻を検出し、前記第1の時刻と前記第2の時刻との時間差を算出する時間差算出手段、
前記予め定めた期間分の第1の計測データの各計測時刻と、前記予め定めた期間分の第2の計測データの各計測時刻の何れか一方を前記時間差に基づいて補正した電力情報を表示装置に出力する情報出力手段として機能させる、プログラム。
Computer
First measurement data including each measured power of one or a plurality of power lines included in the first power line group is acquired from the first measurement apparatus, and then transferred from the second measurement apparatus to the second power line group. Measurement data acquisition means for acquiring second measurement data including each measured power of one or more power lines included;
A first time at which the first power that is the total power of the first power line group changes is detected from the first measurement data for a predetermined period, and the second time for the predetermined period. Time difference calculation for detecting a second time at which the second power, which is the total power of the second power line group, changes from the measured data, and calculating a time difference between the first time and the second time means,
Displays power information obtained by correcting one of each measurement time of the first measurement data for the predetermined period and each measurement time of the second measurement data for the predetermined period based on the time difference. A program that functions as information output means for output to a device.
JP2017563457A 2016-01-27 2016-01-27 Energy management apparatus, power information display method and program Active JP6385599B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2016/052337 WO2017130326A1 (en) 2016-01-27 2016-01-27 Energy management device, electric power information display method, and program

Publications (2)

Publication Number Publication Date
JPWO2017130326A1 true JPWO2017130326A1 (en) 2018-04-26
JP6385599B2 JP6385599B2 (en) 2018-09-05

Family

ID=59397645

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017563457A Active JP6385599B2 (en) 2016-01-27 2016-01-27 Energy management apparatus, power information display method and program

Country Status (2)

Country Link
JP (1) JP6385599B2 (en)
WO (1) WO2017130326A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116205355B (en) * 2023-02-22 2023-12-01 正泰电气股份有限公司 Power load prediction method, device and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012019653A (en) * 2010-07-09 2012-01-26 Sony Corp Apparatus and method for controlling electric power
JP2013106066A (en) * 2011-11-10 2013-05-30 Sumitomo Electric Ind Ltd Optical communication system, control method therefor and customer premise-side device
JP2014014223A (en) * 2012-07-04 2014-01-23 Sumitomo Electric Ind Ltd Power control system, server device, control apparatus for power demand facility, and power control method
WO2016016931A1 (en) * 2014-07-28 2016-02-04 三菱電機株式会社 Energy management controller, energy management method, and program

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012019653A (en) * 2010-07-09 2012-01-26 Sony Corp Apparatus and method for controlling electric power
JP2013106066A (en) * 2011-11-10 2013-05-30 Sumitomo Electric Ind Ltd Optical communication system, control method therefor and customer premise-side device
JP2014014223A (en) * 2012-07-04 2014-01-23 Sumitomo Electric Ind Ltd Power control system, server device, control apparatus for power demand facility, and power control method
WO2016016931A1 (en) * 2014-07-28 2016-02-04 三菱電機株式会社 Energy management controller, energy management method, and program

Also Published As

Publication number Publication date
JP6385599B2 (en) 2018-09-05
WO2017130326A1 (en) 2017-08-03

Similar Documents

Publication Publication Date Title
JP6161822B2 (en) Energy management controller, energy management method and program
JP6552769B1 (en) Energy display system, display device and energy display method
JP6013076B2 (en) Energy management device, energy management system, and energy management method
US10886755B2 (en) Power control system, method, and power control apparatus
JP2017017779A (en) Power supply system and power supply method
JP6192907B2 (en) Energy management device, energy management system, and energy management method
JP6198970B2 (en) Control device, device control system, device control method and program
WO2016002346A1 (en) Power control system, and power control device
JP6744071B2 (en) Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program
WO2017033282A1 (en) Control device, event information display method and program
JP6385599B2 (en) Energy management apparatus, power information display method and program
JP5592730B2 (en) Electricity price visualization device
JPWO2015079493A1 (en) Energy management system, power measuring device, load device, communication adapter, system controller, energy management method and program
JP6076666B2 (en) Management system, management method, and control apparatus
JP6373513B2 (en) Control device, charging information display method and program
JP6440873B2 (en) Energy management apparatus, power information display method and program
JP5843716B2 (en) Power management system, power management method, integrated management apparatus, and program
JP2012098187A (en) Electric power display system and electric power display method
JP6261755B2 (en) Control device, device control method, and program
JP2014119288A (en) Energy management device, energy management system, and energy management method
JPWO2017109935A1 (en) Management device and management system
JP2016185036A (en) Power management device, power management system and power management method
JP2016103103A (en) Power display terminal, power management device, power display method, and program
JP2016181270A (en) Energy management device, energy management system, and energy management method
JP2016045876A (en) Electronic device, control system, and control method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171026

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180710

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180807

R150 Certificate of patent or registration of utility model

Ref document number: 6385599

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250