JPWO2017090110A1 - Water heater control system, control method and program - Google Patents

Water heater control system, control method and program Download PDF

Info

Publication number
JPWO2017090110A1
JPWO2017090110A1 JP2017552577A JP2017552577A JPWO2017090110A1 JP WO2017090110 A1 JPWO2017090110 A1 JP WO2017090110A1 JP 2017552577 A JP2017552577 A JP 2017552577A JP 2017552577 A JP2017552577 A JP 2017552577A JP WO2017090110 A1 JPWO2017090110 A1 JP WO2017090110A1
Authority
JP
Japan
Prior art keywords
power
hot water
water heater
time
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017552577A
Other languages
Japanese (ja)
Other versions
JP6479212B2 (en
Inventor
雄喜 小川
雄喜 小川
矢部 正明
正明 矢部
正之 小松
正之 小松
聡司 峯澤
聡司 峯澤
明宏 戸田
明宏 戸田
隆司 新井
隆司 新井
智 赤木
智 赤木
淳子 貴島
淳子 貴島
晶代 大野
晶代 大野
正樹 豊島
正樹 豊島
啓輔 ▲高▼山
啓輔 ▲高▼山
赳弘 古谷野
赳弘 古谷野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of JPWO2017090110A1 publication Critical patent/JPWO2017090110A1/en
Application granted granted Critical
Publication of JP6479212B2 publication Critical patent/JP6479212B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/18Water-storage heaters
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/62The condition being non-electrical, e.g. temperature
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Abstract

給湯器制御システム(100)は、商用電力系統と商用電力系統に電力を供給する分散型電源(30)との少なくとも一方から供給される電力で貯湯タンク(24)に湯を供給する給湯器(20)を制御する。給湯器制御システム(100)は、第1の時間における分散型電源(30)から商用電力系統への電力の供給を抑制する指示を取得する指示取得部(11)と、指示取得部(11)によって指示が取得されない場合に、第1の時間より前の第2の時間に給湯器(20)に予め定められた量の湯を供給させ、指示取得部(11)によって指示が取得された場合に、給湯器(20)に、第2の時間に予め定められた量より少ない量の湯を供給させて第1の時間に湯を供給させることにより、予め定められた量以上の量の湯を供給させる制御部(21)と、を備える。The hot water heater control system (100) includes a hot water heater (24) that supplies hot water to a hot water storage tank (24) with electric power supplied from at least one of a commercial power system and a distributed power source (30) that supplies power to the commercial power system. 20) is controlled. The water heater control system (100) includes an instruction acquisition unit (11) that acquires an instruction to suppress power supply from the distributed power source (30) to the commercial power system in the first time, and an instruction acquisition unit (11). When the instruction is not acquired by the instruction acquisition unit (11), when a predetermined amount of hot water is supplied to the water heater (20) at the second time before the first time and the instruction acquisition unit (11) acquires the instruction. In addition, by causing the water heater (20) to supply an amount of hot water that is less than a predetermined amount at the second time and to supply hot water at the first time, an amount of hot water equal to or greater than the predetermined amount is supplied. And a control unit (21) for supplying.

Description

本発明は、給湯器制御システム、制御方法及びプログラムに関する。   The present invention relates to a water heater control system, a control method, and a program.

近年、自然エネルギーを活用する技術が注目されており、太陽光及び風力に代表される自然エネルギーにより発電する分散型電源が需要家に設置されるケースが多くなっている。このような需要家は、分散型電源による発電電力を自ら消費したり商用電力系統へ供給して電気事業者に売ったりする。これにより、需要家は、商用電力系統から購入する電力を減少させて、経済的利益を得ることができる。   2. Description of the Related Art In recent years, technology that utilizes natural energy has attracted attention, and there are many cases where distributed power sources that generate power using natural energy represented by sunlight and wind power are installed in consumers. Such a consumer consumes the electric power generated by the distributed power source or supplies it to a commercial power system and sells it to an electric utility. Thereby, a consumer can reduce the electric power purchased from a commercial power grid, and can obtain an economic profit.

需要家から商用電力系統へ電力が供給される逆潮流により、商用電力系統の需給バランスが崩れることがある。例えば、快晴の休日には、需要が大幅に減少するとともに、太陽光による発電量が増加して供給量が増加する。   Due to the reverse flow in which power is supplied from the consumer to the commercial power system, the supply and demand balance of the commercial power system may be disrupted. For example, on a sunny holiday, the demand is greatly reduced, and the amount of power generated by sunlight is increased to increase the supply amount.

そこで、商用電力系統の需給バランスを保つために、電気事業者が需要家に対して時間を指定して逆潮流の抑制を予め指示するための制度の整備が進められている。例えば、2014年には日本の資源エネルギー庁から、太陽光発電に対する出力制御ルールが公示されている。この出力制御ルールは、分散型電源の発電量を調整して、商用電力系統への売電を抑えるものである。   Therefore, in order to maintain the supply and demand balance of the commercial power system, the establishment of a system for an electric power company to specify the time in advance for the consumer and to instruct the suppression of the reverse power flow is in progress. For example, in 2014, Japan's Agency for Natural Resources and Energy announced an output control rule for photovoltaic power generation. This output control rule adjusts the power generation amount of the distributed power source to suppress the power sale to the commercial power system.

また、発電電力を需要家で極力消費して、逆潮流を減少させるための技術が提案されている(例えば、特許文献1を参照)。特許文献1には、逆潮電力量が最も多くなる時間帯を含む運転時間帯に、貯湯タンクを備える給湯暖房装置を動作させる技術が記載されている。貯湯タンクを備える給湯装置の消費電力は一般的に大きいため、特許文献1に記載の技術は、逆潮電力量を効果的に減少させることができる。   In addition, a technique for consuming as much power as possible at a consumer to reduce reverse power flow has been proposed (see, for example, Patent Document 1). Patent Document 1 describes a technique for operating a hot water supply / heating device including a hot water storage tank in an operation time period including a time period in which the amount of reverse power flow is maximized. Since the power consumption of a hot water supply apparatus including a hot water storage tank is generally large, the technique described in Patent Document 1 can effectively reduce the amount of reverse power flow.

国際公開第2012/090365号International Publication No. 2012/090365

しかしながら、特許文献1に記載の技術は、上述のような逆潮流を抑制するための指示に応じて逆潮流を減少させるものではないため、商用電力系統の需給バランスを改善するとは限らない。また、特許文献1に記載の技術は、逆潮電力量が多くなる時間帯に、その後に必要とされる熱量を生成するため、当該時間帯までに貯湯タンクの最大容量付近まで蓄熱されている場合には、給湯暖房装置を動作させることができず、逆潮流を減少させることができない。この場合において逆潮流を抑制することが指示されると、発電電力を制限する必要があり、分散型電源の発電能力を十分に活用することができないおそれがあった。ひいては、特許文献1に記載の技術には、電力の利用効率を向上させる余地があった。   However, since the technique described in Patent Document 1 does not reduce the reverse power flow according to the instruction for suppressing the reverse power flow as described above, it does not necessarily improve the supply and demand balance of the commercial power system. In addition, the technique described in Patent Document 1 stores heat up to the vicinity of the maximum capacity of the hot water storage tank by the time zone in order to generate the amount of heat required thereafter during the time zone when the amount of reverse power flow increases. In such a case, the hot water heater cannot be operated and the reverse power flow cannot be reduced. In this case, if it is instructed to suppress the reverse power flow, it is necessary to limit the generated power, and there is a possibility that the power generation capability of the distributed power source cannot be fully utilized. As a result, the technique described in Patent Document 1 has room for improving the power use efficiency.

本発明は、上記の事情に鑑みてなされたもので、電力の利用効率を向上させることを目的とする。   The present invention has been made in view of the above circumstances, and an object thereof is to improve the utilization efficiency of electric power.

上記目的を達成するため、本発明の給湯器制御システムは、商用電力系統と商用電力系統に電力を供給する分散型電源との少なくとも一方から供給される電力で貯湯タンクに湯を供給する給湯器を制御する給湯器制御システムであって、第1の時間における分散型電源から商用電力系統への電力の供給を抑制する指示を取得する指示取得手段と、指示取得手段によって指示が取得されない場合に、第1の時間より前の第2の時間に給湯器に予め定められた量の湯を供給させ、指示取得手段によって指示が取得された場合に、給湯器に、第2の時間に予め定められた量より少ない量の湯を供給させて第1の時間に湯を供給させることにより、予め定められた量以上の量の湯を供給させる制御手段と、を備える。   In order to achieve the above object, a water heater control system of the present invention is a water heater that supplies hot water to a hot water storage tank with electric power supplied from at least one of a commercial power system and a distributed power source that supplies power to the commercial power system. A hot water supply control system for controlling the power supply, the instruction acquisition means for acquiring an instruction to suppress the supply of power from the distributed power source to the commercial power system in the first time, and when the instruction is not acquired by the instruction acquisition means When a predetermined amount of hot water is supplied to the water heater at a second time before the first time and the instruction is acquired by the instruction acquisition means, the water heater is predetermined at the second time. Control means for supplying an amount of hot water equal to or greater than a predetermined amount by supplying an amount of hot water less than a predetermined amount and supplying hot water at a first time.

本発明によれば、指示取得手段によって指示が取得されない場合には第2の時間に予め定められた量の湯が供給される一方、指示が取得された場合には第2の時間に予め定められた量より少ない量の湯が供給される。そして、指示が取得された場合には、指示により指定された第1の時間に湯が供給される。これにより、第1の時間にある程度の量の湯を供給することが可能になり、分散型電源の発電能力を活用することができる。ひいては、電力の利用効率を向上させることができる。   According to the present invention, when an instruction is not acquired by the instruction acquisition means, a predetermined amount of hot water is supplied at the second time, whereas when an instruction is acquired, the predetermined time is determined at the second time. An amount of hot water less than the amount supplied is supplied. Then, when the instruction is acquired, hot water is supplied at the first time specified by the instruction. As a result, a certain amount of hot water can be supplied in the first time, and the power generation capability of the distributed power source can be utilized. As a result, the utilization efficiency of electric power can be improved.

実施の形態1に係る給湯器制御システムの構成を示す図である。It is a figure which shows the structure of the water heater control system which concerns on Embodiment 1. FIG. 逆潮電力を抑制する抑制指示を説明するための図である。It is a figure for demonstrating the control instruction | indication which suppresses reverse power. パワーコンディショナによって制限される発電電力の一例を示す図である。It is a figure which shows an example of the generated electric power restrict | limited by a power conditioner. 制御装置、給湯器の制御部、計測装置及びデータサーバのハードウェア構成を示す図である。It is a figure which shows the hardware constitutions of a control apparatus, the control part of a water heater, a measuring device, and a data server. 給湯器制御システムの機能的な構成を示すブロック図である。It is a block diagram which shows the functional structure of a water heater control system. 沸上げ運転を夜間から昼間にシフトすることを示す模式図である。It is a schematic diagram which shows shifting boiling operation from night to daytime. 沸上げ運転による湯量の推移の例を示す図である。It is a figure which shows the example of transition of the amount of hot water by boiling operation. 発電抑制処理を示すフロー図である。It is a flowchart which shows a power generation suppression process. 制御装置と給湯器との間で行われる通信の概要を示すシーケンス図である。It is a sequence diagram which shows the outline | summary of the communication performed between a control apparatus and a water heater. 夜間までに実行される処理の概要を示すシーケンス図である。It is a sequence diagram which shows the outline | summary of the process performed by night. 余剰電力予測処理を示すフロー図である。It is a flowchart which shows a surplus electric power prediction process. 余剰電力の予測値の一例を示す図である。It is a figure which shows an example of the predicted value of surplus electric power. 昼間沸上げ判定処理を示す第1のフロー図である。It is a 1st flowchart which shows a daytime boiling determination process. 沸上げ許可フラグに設定される値を説明するための図である。It is a figure for demonstrating the value set to a boiling permission flag. 発電電力と経済効果との関係を説明するための第1の図である。It is a 1st figure for demonstrating the relationship between generated electric power and an economic effect. 発電電力と経済効果との関係を説明するための第2の図である。It is a 2nd figure for demonstrating the relationship between generated electric power and an economic effect. 発電電力と経済効果との関係を説明するための第3の図である。It is a 3rd figure for demonstrating the relationship between generated electric power and an economic effect. 沸上げ許可フラグの系列について説明するための図である。It is a figure for demonstrating the series of a boiling permission flag. 昼間沸上げ判定処理を示す第2のフロー図である。It is a 2nd flowchart which shows a daytime boiling determination process. 計画処理を示すフロー図である。It is a flowchart which shows a plan process. 湯量の計画について説明するための図である。It is a figure for demonstrating the plan of the amount of hot water. 予測修正処理を示すフロー図である。It is a flowchart which shows a prediction correction process. 昼間に実行される処理の概要を示すシーケンス図である。It is a sequence diagram which shows the outline | summary of the process performed in the daytime. 買電価格判定処理を示すフロー図である。It is a flowchart which shows a power purchase price determination process. 売電価格判定処理を示すフロー図である。It is a flowchart which shows a power sale price determination process. 実施の形態2に係る給湯器制御システムの構成を示す図である。It is a figure which shows the structure of the water heater control system which concerns on Embodiment 2. FIG. 実施の形態2に係る給湯器制御システムの機能的な構成を示すブロック図である。It is a block diagram which shows the functional structure of the water heater control system which concerns on Embodiment 2. FIG. 実施の形態3に係る給湯器制御システムの構成を示す図である。It is a figure which shows the structure of the water heater control system which concerns on Embodiment 3. FIG. 実施の形態4に係る給湯器制御システムの構成を示す図である。It is a figure which shows the structure of the water heater control system which concerns on Embodiment 4. FIG. 実施の形態5に係る給湯器制御システムの構成を示す図である。It is a figure which shows the structure of the water heater control system which concerns on Embodiment 5. FIG. 対象機器選択処理を示すフロー図である。It is a flowchart which shows an object apparatus selection process.

以下、本発明の実施の形態を、図面を参照しつつ詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

実施の形態1.
図1には、実施の形態1に係る給湯器制御システム100の構成が示されている。給湯器制御システム100は、住宅HMに設置された給湯器20を制御して電力を効率的に利用するためのHEMS(Home Energy Management System)である。給湯器制御システム100は、図1に示されるように、給湯器20を制御する制御装置10、水を加熱して生成した湯をタンクに供給して貯える給湯器20、太陽光により発電する分散型電源30、分散型電源30によって発電される発電電力及び住宅HMで消費される電力を計測する計測装置40、電力を消費する電気機器50、並びに、広域ネットワークNW1を介して制御装置10に接続される電力サーバ60及びデータサーバ70を有している。なお、制御装置10、給湯器20、分散型電源30、計測装置40及び電気機器50はいずれも、住宅HMに設置される。また、図1中の商用電力系統PSにつながる太い実線は電力線を表し、細い破線は通信線(信号線)を表している。
Embodiment 1 FIG.
FIG. 1 shows the configuration of water heater control system 100 according to the first embodiment. The water heater control system 100 is a HEMS (Home Energy Management System) for efficiently using electric power by controlling the water heater 20 installed in the house HM. As shown in FIG. 1, the water heater control system 100 includes a control device 10 that controls the water heater 20, a water heater 20 that supplies and stores hot water generated by heating water in a tank, and a dispersion that generates power by sunlight. Connected to the control device 10 via the power source 30, the measuring device 40 that measures the power generated by the distributed power source 30 and the power consumed by the house HM, the electric device 50 that consumes the power, and the wide area network NW 1 The power server 60 and the data server 70 are provided. Note that the control device 10, the water heater 20, the distributed power source 30, the measuring device 40, and the electric device 50 are all installed in the house HM. Further, a thick solid line connected to the commercial power system PS in FIG. 1 represents a power line, and a thin broken line represents a communication line (signal line).

制御装置10は、住宅HM内の機器を統合的に制御することが可能なHEMS(Home Energy Management System)コントローラである。制御装置10は、給湯器20及び電気機器50から、その運転状態を定期的に取得することにより、給湯器20及び電気機器50の運転状態を監視する。そして、制御装置10は、制御コマンドを送信することにより給湯器20及び電気機器50の運転状態を変化させて、給湯器20及び電気機器50を制御する。   The control device 10 is a HEMS (Home Energy Management System) controller that can integrally control devices in the house HM. The control apparatus 10 monitors the operation state of the water heater 20 and the electric device 50 by periodically acquiring the operation state from the water heater 20 and the electric device 50. And the control apparatus 10 changes the driving | running state of the water heater 20 and the electric equipment 50 by transmitting a control command, and controls the water heater 20 and the electric equipment 50.

また、制御装置10は、計測装置40から電力の計測結果を定期的に取得して、取得した計測結果を分散型電源30及びデータサーバ70に提供する。さらに、制御装置10は、電力サーバ60からの指示を取得する指示取得部11を有している。指示取得部11は、特定の時間における分散型電源30から商用電力系統PSへの電力の供給を抑制する指示を電力サーバ60から取得して、分散型電源30へ転送する。電力サーバ60からの指示を、以下では抑制指示という。抑制指示によって指定される特定の時間は、通常、商用電力系統PSの需給状況に対して分散型電源30による発電電力が過剰となる時間である。   In addition, the control device 10 periodically acquires a power measurement result from the measurement device 40 and provides the acquired measurement result to the distributed power source 30 and the data server 70. Furthermore, the control device 10 includes an instruction acquisition unit 11 that acquires an instruction from the power server 60. The instruction acquisition unit 11 acquires an instruction for suppressing the supply of power from the distributed power supply 30 to the commercial power system PS at a specific time from the power server 60 and transfers the instruction to the distributed power supply 30. Hereinafter, the instruction from the power server 60 is referred to as a suppression instruction. The specific time specified by the suppression instruction is usually a time when the power generated by the distributed power source 30 becomes excessive with respect to the supply and demand situation of the commercial power system PS.

抑制指示は、特定の時間に分散型電源30から商用電力系統PSへ電力が供給されるときの発電電力の制限値を指定する。図2には、抑制指示の具体例が示されている。図2に示される例では、0時から9時までの発電量を、分散型電源30の定格電力の100%とすることが指定されている。また、9時から11時までの発電量を、分散型電源30の定格電力の40%とすることが指定されている。図2に例示された抑制指示は、分散型電源30の定格電力に対する割合で制限値を指定したが、発電電力の制限値をkW単位で指定してもよい。   The suppression instruction specifies a limit value of generated power when power is supplied from the distributed power supply 30 to the commercial power system PS at a specific time. FIG. 2 shows a specific example of the suppression instruction. In the example shown in FIG. 2, it is specified that the power generation amount from 0:00 to 9:00 is 100% of the rated power of the distributed power source 30. In addition, it is specified that the power generation amount from 9:00 to 11:00 is 40% of the rated power of the distributed power source 30. In the suppression instruction illustrated in FIG. 2, the limit value is specified by the ratio with respect to the rated power of the distributed power source 30, but the limit value of the generated power may be specified in units of kW.

なお、図2中の実線で示される線Laは、分散型電源30によって出力可能な発電電力の推移を表し、破線で示される線Lpは、抑制指示によって指定される制限値の推移を表す。本実施の形態では、抑制指示によって発電電力が制限される時間を、単に昼間という。ただし、100%の制限値では、実質的に発電電力が制限されないため、図2の例における昼間は、9時から15時を意味する。   Note that a line La indicated by a solid line in FIG. 2 represents a transition of generated power that can be output by the distributed power source 30, and a line Lp represented by a broken line represents a transition of a limit value designated by the suppression instruction. In the present embodiment, the time during which generated power is limited by the suppression instruction is simply referred to as daytime. However, since the generated power is not substantially limited at the limit value of 100%, the daytime in the example of FIG. 2 means from 9:00 to 15:00.

図1に戻り、給湯器20は、ヒートポンプ式の電気給湯器である。給湯器20は、上水道から供給された水を加熱して生成した湯を貯湯タンク24(図5参照)に供給し、住宅HMの住人が使用する湯を貯湯タンク24から出水する。通常、給湯器20は、電気料金が安価になる夜間に、1日間に必要な量の湯を沸上げて、夜間以外の時間には、湯量が不足した場合に限り湯を沸上げる。なお、湯の沸上げは、湯を生成して貯湯タンク24に供給することを意味する。給湯器20によって生成される湯の温度は、約60℃である。   Returning to FIG. 1, the water heater 20 is a heat pump type electric water heater. The water heater 20 supplies the hot water generated by heating the water supplied from the water supply to the hot water storage tank 24 (see FIG. 5), and discharges the hot water used by the residents of the house HM from the hot water storage tank 24. Usually, the water heater 20 boils the amount of hot water necessary for one day at night when the electricity rate is low, and boils hot water only at times other than the night when the amount of hot water is insufficient. The boiling of hot water means that hot water is generated and supplied to the hot water storage tank 24. The temperature of the hot water produced by the water heater 20 is about 60 ° C.

給湯器20は、給湯器20が備えるヒートポンプユニット23(図5参照)を制御する制御部21を有している。制御部21の機能については、後述する。   The water heater 20 includes a control unit 21 that controls a heat pump unit 23 (see FIG. 5) included in the water heater 20. The function of the control unit 21 will be described later.

分散型電源30は、住宅HMの屋根の上に設置される発電装置である。分散型電源30は、例えば多結晶シリコン型のソーラーパネル(不図示)、及びソーラーパネルにより発電された電力を変換して出力するパワーコンディショナ31を有している。   The distributed power supply 30 is a power generator installed on the roof of the house HM. The distributed power source 30 includes, for example, a polycrystalline silicon solar panel (not shown), and a power conditioner 31 that converts and outputs electric power generated by the solar panel.

パワーコンディショナ31は、計測装置40による計測結果を、制御装置10を介して取得することにより、発電電力Pgと、給湯器20、分散型電源30及び電気機器50を有する住宅HMで消費される消費電力Pcとを監視する。発電電力Pgが消費電力Pcを超えると、住宅HMでは余剰電力が生じる。この余剰電力は逆潮電力Prとして商用電力系統PSへ供給される。このため、Pg=Pc+Prの関係式が成立する。なお、商用電力系統PSから電力が住宅HMに供給される場合には、逆潮電力Prが負の値になる。以下では、住宅HMで消費される消費電力を、単に消費電力という。   The power conditioner 31 is consumed in the house HM having the generated power Pg, the hot water heater 20, the distributed power source 30, and the electric device 50 by acquiring the measurement result by the measuring device 40 via the control device 10. The power consumption Pc is monitored. When the generated power Pg exceeds the power consumption Pc, surplus power is generated in the house HM. This surplus power is supplied to the commercial power system PS as reverse power Pr. For this reason, the relational expression of Pg = Pc + Pr is established. Note that, when power is supplied from the commercial power system PS to the house HM, the reverse power Pr is a negative value. Hereinafter, the power consumption consumed in the house HM is simply referred to as power consumption.

パワーコンディショナ31は、電力サーバ60から指示取得部11を介して抑制指示を取得すると、抑制指示により指定された時間に、制限値を超えないように発電電力Pgを制限する。ただし、この制限値は、逆潮流が生じる際に指定された制限値であるため、逆潮電力Prが負の場合には、パワーコンディショナ31は、逆潮電力Prが正にならない範囲で発電電力Pgを制限する。この場合の発電電力Pgは、制限値を超えることがある。すなわち、パワーコンディショナ31は、消費電力Pcが制限値を超えると、消費電力Pcを超えない大きさの発電電力Pgを住宅HMに供給して、逆潮電力Prをゼロとする。分散型電源30が出力可能な電力が消費電力Pcより大きい場合には、パワーコンディショナ31は、消費電力Pcに等しい大きさの発電電力Pgを住宅HMに供給することになる。   When the power conditioner 31 acquires the suppression instruction from the power server 60 via the instruction acquisition unit 11, the power conditioner 31 limits the generated power Pg so as not to exceed the limit value during the time specified by the suppression instruction. However, since this limit value is a limit value specified when reverse power flow occurs, when the reverse power power Pr is negative, the power conditioner 31 generates power within a range in which the reverse power power Pr does not become positive. The power Pg is limited. The generated power Pg in this case may exceed the limit value. That is, when the power consumption Pc exceeds the limit value, the power conditioner 31 supplies the generated power Pg having a magnitude that does not exceed the power consumption Pc to the house HM, and sets the reverse power Pr to zero. When the power that can be output from the distributed power source 30 is larger than the power consumption Pc, the power conditioner 31 supplies the generated power Pg having the same magnitude as the power consumption Pc to the house HM.

図3には、パワーコンディショナ31によって制限される発電電力Pgの具体例が示されている。図3中の一点鎖線で示される線Lcは、消費電力Pcの推移を表し、太い実線で示される線Lgは、実際に発電される発電電力Pgの推移を表す。図3に示される例において、発電電力Pgが制限されない時間P1,P4では、発電電力Pgが、分散型電源30により出力可能な電力に等しくなる。また、制限値が消費電力Pcより大きい時間P2では、発電電力Pgが、制限値に等しくなる。また、制限値が消費電力より小さい時間P3では、発電電力Pgが、消費電力Pcに等しくなる。ただし、分散型電源30により出力可能な電力が消費電力Pcより小さければ、発電電力Pgは、図3中の15時直前に示されるように、出力可能な電力に等しくなる。   FIG. 3 shows a specific example of the generated power Pg limited by the power conditioner 31. A line Lc indicated by a one-dot chain line in FIG. 3 represents a transition of the power consumption Pc, and a line Lg represented by a thick solid line represents a transition of the generated power Pg actually generated. In the example shown in FIG. 3, the generated power Pg becomes equal to the power that can be output by the distributed power source 30 at the times P1 and P4 when the generated power Pg is not limited. In addition, at time P2 when the limit value is greater than the power consumption Pc, the generated power Pg becomes equal to the limit value. Further, at the time P3 when the limit value is smaller than the power consumption, the generated power Pg becomes equal to the power consumption Pc. However, if the power that can be output by the distributed power source 30 is smaller than the power consumption Pc, the generated power Pg becomes equal to the power that can be output, as shown immediately before 15:00 in FIG.

図3下部に示されるように、時間P2に含まれる時刻T1において、発電電力Pgが制限値に等しいため、出力可能な電力から実際の発電電力Pgを減じて得る損失電力は、比較的大きい。一方、時間P3に含まれる時刻T2では、出力可能な電力及び制限値が時刻T1とほぼ等しい。この時刻T2では、消費電力Pcが時刻T1からある程度増加して制限値を超えるため、発電電力Pgが消費電力Pcに等しく、損失電力は、比較的小さくなる。このため、抑制指示により逆潮電力Prが制限される昼間に、制限値を超えるように消費電力Pcを増加させれば、損失電力を低減させることができる。   As shown in the lower part of FIG. 3, since the generated power Pg is equal to the limit value at the time T1 included in the time P2, the loss power obtained by subtracting the actual generated power Pg from the power that can be output is relatively large. On the other hand, at the time T2 included in the time P3, the power that can be output and the limit value are substantially equal to the time T1. At time T2, the power consumption Pc increases to some extent from time T1 and exceeds the limit value. Therefore, the generated power Pg is equal to the power consumption Pc, and the loss power is relatively small. For this reason, if the power consumption Pc is increased so as to exceed the limit value during the daytime when the backflow power Pr is limited by the suppression instruction, the power loss can be reduced.

図1に戻り、計測装置40は、住宅HMの分電盤内で電力線に取り付けられた変流器(不図示)を用いて、発電電力及び消費電力を計測する。計測装置40は、発電電力の計測値を取得する第1計測値取得部41と、消費電力の計測値を取得する第2計測値取得部42とを有している。計測装置40は、取得した計測値を、制御装置10に通知する。   Returning to FIG. 1, the measuring device 40 measures generated power and consumed power using a current transformer (not shown) attached to the power line in the distribution board of the house HM. The measurement device 40 includes a first measurement value acquisition unit 41 that acquires a measurement value of generated power and a second measurement value acquisition unit 42 that acquires a measurement value of power consumption. The measurement device 40 notifies the control device 10 of the acquired measurement value.

電気機器50は、例えば、空調機器、照明機器又は調理機器に代表される家電機器である。電気機器50は、制御装置10を介して給湯器20を操作するための端末であってもよい。   The electric device 50 is, for example, a home appliance represented by an air conditioner, a lighting device, or a cooking device. The electric device 50 may be a terminal for operating the water heater 20 via the control device 10.

電力サーバ60は、商用電力系統PSを商用電源として提供する電気事業者によって運営される配信サーバである。電力サーバ60は、抑制指示によって時間が指定される日の前日以前に、例えば気象予報に基づいて作成した抑制指示を需要家へ配信する。なお、需要家による逆潮流を抑制する必要がない日には、抑制指示が配信されない。   The power server 60 is a distribution server operated by an electric power company that provides the commercial power system PS as a commercial power source. The power server 60 distributes, for example, a suppression instruction created based on a weather forecast to the consumer before the day before the time specified by the suppression instruction. In addition, the suppression instruction is not distributed on the day when it is not necessary to suppress the reverse power flow by the consumer.

データサーバ70は、制御装置10と連携してHEMSを機能させるためのサーバ装置である。データサーバ70は、制御装置10の動作に必要なデータを記憶する。例えば、データサーバ70は、計測装置40による計測結果を、制御装置10を介して取得して蓄積する。また、データサーバ70は、制御装置10によって収集された給湯器20及び電気機器50の運転状態を取得して蓄積する。また、データサーバ70は、給湯器20及び電気機器50それぞれの運転状態と、その運転状態で消費される電力とを対応付けて記憶している。さらに、データサーバ70は、商用電力系統PSから住宅HMへ供給される電力の買電単価と、商用電力系統PSへ供給される逆潮電力Prの売電単価を時間帯別に記憶している。そして、データサーバ70は、制御装置10からの要求に応じて、データを制御装置10に提供する。   The data server 70 is a server device for causing the HEMS to function in cooperation with the control device 10. The data server 70 stores data necessary for the operation of the control device 10. For example, the data server 70 acquires and accumulates measurement results obtained by the measurement device 40 via the control device 10. Further, the data server 70 acquires and accumulates the operating states of the water heater 20 and the electric device 50 collected by the control device 10. In addition, the data server 70 stores the operation state of each of the water heater 20 and the electric device 50 and the power consumed in the operation state in association with each other. Furthermore, the data server 70 stores the unit price of power to be supplied from the commercial power system PS to the house HM and the unit price of power sold for the reverse power Pr supplied to the commercial power system PS for each time zone. Then, the data server 70 provides data to the control device 10 in response to a request from the control device 10.

図4には、制御装置10、給湯器20の制御部21、計測装置40及びデータサーバ70のハードウェア構成が示されている。図4に示されるように、制御装置10、制御部21、計測装置40及びデータサーバ70は、プロセッサH1、主記憶部H2、補助記憶部H3、入力部H4、出力部H5、及び通信部H6を有するコンピュータとして構成される。主記憶部H2、補助記憶部H3、入力部H4、出力部H5、及び通信部H6はいずれも、内部バスH7を介してプロセッサH1に接続されている。   FIG. 4 shows hardware configurations of the control device 10, the control unit 21 of the water heater 20, the measurement device 40, and the data server 70. As shown in FIG. 4, the control device 10, the control unit 21, the measurement device 40, and the data server 70 include a processor H1, a main storage unit H2, an auxiliary storage unit H3, an input unit H4, an output unit H5, and a communication unit H6. It is comprised as a computer which has. The main storage unit H2, the auxiliary storage unit H3, the input unit H4, the output unit H5, and the communication unit H6 are all connected to the processor H1 via the internal bus H7.

プロセッサH1は、CPU(Central Processing Unit)を含んで構成される。プロセッサH1は、補助記憶部H3に記憶されるプログラムPaを実行することにより、後述の機能を発揮する。   The processor H1 includes a CPU (Central Processing Unit). The processor H1 exhibits the functions described later by executing the program Pa stored in the auxiliary storage unit H3.

主記憶部H2は、RAM(Random Access Memory)を含んで構成される。主記憶部H2は、補助記憶部H3からプログラムPaをロードする。そして、主記憶部H2は、プロセッサH1の作業領域として用いられる。   The main storage unit H2 includes a RAM (Random Access Memory). The main storage unit H2 loads the program Pa from the auxiliary storage unit H3. The main storage unit H2 is used as a work area for the processor H1.

補助記憶部H3は、HDD(Hard Disk Drive)又はフラッシュメモリ等の不揮発性メモリを含んで構成される。補助記憶部H3は、プログラムPaの他に、プロセッサH1の処理に用いられる種々のデータを記憶している。   The auxiliary storage unit H3 includes a nonvolatile memory such as an HDD (Hard Disk Drive) or a flash memory. In addition to the program Pa, the auxiliary storage unit H3 stores various data used for the processing of the processor H1.

入力部H4は、例えば入力キー及び静電容量方式のポインティングデバイスを含んで構成される。入力部H4は、ユーザによって入力された情報を取得して、プロセッサH1に通知する。   The input unit H4 includes, for example, an input key and a capacitance type pointing device. The input unit H4 acquires information input by the user and notifies the processor H1.

出力部H5は、例えばLCD(Liquid Crystal Display)に代表される表示デバイスを含んで構成される。出力部H5は、例えば、入力部H4を構成するポインティングデバイスと一体的に形成されることで、タッチスクリーンを構成する。   The output unit H5 includes a display device typified by an LCD (Liquid Crystal Display), for example. For example, the output unit H5 is formed integrally with a pointing device that configures the input unit H4, thereby configuring a touch screen.

通信部H6は、外部の機器と通信するための通信インタフェース回路を含んで構成される。通信部H6は、外部から受信した信号に含まれる情報をプロセッサH1に通知して、プロセッサH1から出力された情報を伝送するための信号を外部の機器に送信する。   The communication unit H6 includes a communication interface circuit for communicating with an external device. The communication unit H6 notifies the processor H1 of information included in the signal received from the outside, and transmits a signal for transmitting the information output from the processor H1 to an external device.

図5には、給湯器制御システム100の機能的な構成が示されている。図5に示される制御装置10、給湯器20の制御部21、計測装置40及びデータサーバ70の機能は、上述のハードウェアが連携して動作することで実現される。   FIG. 5 shows a functional configuration of the water heater control system 100. The functions of the control device 10, the control unit 21 of the water heater 20, the measurement device 40, and the data server 70 shown in FIG. 5 are realized by the above hardware operating in cooperation.

制御装置10の指示取得部11及び転送部12は、主として制御装置10のプロセッサH1と通信部H6とによって実現される。指示取得部11は、電力サーバ60から送信された抑制指示を分散型電源30のパワーコンディショナ31及び判定部14へ転送する。また、転送部12は、計測装置40による計測結果をデータサーバ70の発電消費予測部71へ転送する。   The instruction acquisition unit 11 and the transfer unit 12 of the control device 10 are mainly realized by the processor H1 and the communication unit H6 of the control device 10. The instruction acquisition unit 11 transfers the suppression instruction transmitted from the power server 60 to the power conditioner 31 and the determination unit 14 of the distributed power supply 30. In addition, the transfer unit 12 transfers the measurement result obtained by the measurement device 40 to the power generation consumption prediction unit 71 of the data server 70.

余剰電力予測部13は、主として制御装置10のプロセッサH1によって実現される。余剰電力予測部13は、データサーバ70の発電消費予測部71によって予測された発電電力及び消費電力の予測値に基づいて、住宅HMにおける余剰電力の推移を予測する。そして、余剰電力予測部13は、予測結果を判定部14に通知する。   The surplus power prediction unit 13 is realized mainly by the processor H1 of the control device 10. The surplus power prediction unit 13 predicts the transition of surplus power in the house HM based on the generated power predicted by the power generation and consumption prediction unit 71 of the data server 70 and the predicted value of power consumption. Then, the surplus power prediction unit 13 notifies the determination unit 14 of the prediction result.

判定部14は、主として制御装置10のプロセッサH1と通信部H6とによって実現される。判定部14は、図6に示されるように、通常は夜間に実行される給湯器20の沸上げ運転を昼間に実行するための条件が成立するか否かを、夜間の沸上げ運転が実行される前に抑制指示に応じて判定する。沸上げ運転が昼間に実行されれば、昼間の消費電力が増加して、損失電力を低減することが可能になる。判定部14は、判定の結果を給湯器20の制御部21に通知する。   The determination unit 14 is realized mainly by the processor H1 and the communication unit H6 of the control device 10. As shown in FIG. 6, the determination unit 14 performs the night boiling operation as to whether or not a condition for performing the boiling operation of the water heater 20 that is normally performed at night is satisfied during the day. It is determined according to the suppression instruction before being performed. If the boiling operation is performed in the daytime, the power consumption in the daytime increases and the power loss can be reduced. The determination unit 14 notifies the determination result to the control unit 21 of the water heater 20.

給湯器20の制御部21は、判定部14の判定結果に基づいて、ヒートポンプユニット23を制御することにより、給湯器20に湯を生成させる。換言すると、制御部21は、制御装置10の指示取得部11によって抑制指示が取得されない場合には夜間に給湯器20に目標貯湯量の湯を貯湯タンク24へ供給させる。目標貯湯量は、1日間に使用が見込まれる湯量であって、過去のユーザによる湯の使用実績から予め定められる。また、制御部21は、指示取得部11によって抑制指示が取得された場合において条件が成立したときには、給湯器20に、夜間に目標貯湯量より少ない量の湯を供給させて昼間に湯を供給させることにより、目標貯湯量以上の量の湯を貯湯タンク24へ供給させる。   The control unit 21 of the water heater 20 controls the heat pump unit 23 based on the determination result of the determination unit 14 to cause the water heater 20 to generate hot water. In other words, the control unit 21 causes the hot water heater 20 to supply the hot water storage tank 24 with hot water of the target hot water storage amount when the instruction acquisition unit 11 of the control device 10 does not acquire the suppression instruction. The target hot water storage amount is the amount of hot water that is expected to be used in one day, and is determined in advance from the actual use of hot water by past users. In addition, the control unit 21 supplies hot water in the daytime by causing the water heater 20 to supply a smaller amount of hot water than the target hot water storage amount at night when the condition is established when the instruction acquisition unit 11 acquires the suppression instruction. By doing so, hot water in an amount greater than the target hot water storage amount is supplied to the hot water storage tank 24.

図7には、給湯器20が昼間に沸上げ運転を実行する場合と実行しない場合それぞれの湯量の推移が示されている。図7中の実線で示されるL11は、昼間に沸上げ運転を実行することなく、夜間に目標貯湯量の湯を沸上げる通常の場合に対応する。一方、破線で示されるL12は、夜間に沸上げる湯量を目標貯湯量から減らして、抑制指示に応じて昼間に湯を沸上げる場合に対応する。図7に示されるように、昼間沸上げ運転を実行すると、通常は夜間に沸上げられる湯量V1が昼間にシフトして、電力消費も昼間にシフトすることとなる。   FIG. 7 shows changes in the amount of hot water when the water heater 20 performs the boiling operation during the day and when it does not. L11 indicated by a solid line in FIG. 7 corresponds to a normal case of boiling the target hot water storage amount at night without performing the boiling operation during the daytime. On the other hand, L12 indicated by a broken line corresponds to a case where the amount of hot water to be boiled at night is reduced from the target hot water storage amount and the hot water is boiled in the daytime according to a suppression instruction. As shown in FIG. 7, when the daytime boiling operation is executed, the amount of hot water V1 that is normally boiled at night shifts in the daytime, and the power consumption also shifts in the daytime.

図5に戻り、制御部21は、給湯器20の運転計画を立案する計画モジュール22、並びに、計画モジュール22によって立案された運転計画に従ってヒートポンプユニット23を制御する第1制御モジュール22a及び第2制御モジュール22bを有している。計画モジュール22、第1制御モジュール22a及び第2制御モジュール22bは、主として制御部21のプロセッサH1及び通信部H6により実現される。第1制御モジュール22aは、逆潮電力を抑制することが指示されない通常の場合に立案された運転計画に従ってヒートポンプユニット23を制御して夜間に目標貯湯量の湯を貯湯タンク24に供給させる。また、第2制御モジュール22bは、逆潮電力を抑制する旨の指示がなされた場合において条件が成立したときに立案された運転計画に従ってヒートポンプユニット23を制御して、夜間に目標貯湯量より少ない量の湯を供給させて昼間に湯を供給させることにより、目標貯湯量以上の量の湯を貯湯タンク24へ供給させる。   Returning to FIG. 5, the control unit 21 plans the operation plan of the water heater 20, and the first control module 22 a and the second control that control the heat pump unit 23 according to the operation plan prepared by the planning module 22. It has a module 22b. The planning module 22, the first control module 22a, and the second control module 22b are mainly realized by the processor H1 and the communication unit H6 of the control unit 21. The first control module 22a controls the heat pump unit 23 in accordance with an operation plan designed in a normal case where it is not instructed to suppress the reverse power, and supplies hot water of a target hot water storage amount to the hot water storage tank 24 at night. Further, the second control module 22b controls the heat pump unit 23 according to the operation plan designed when the condition is satisfied when an instruction to suppress the reverse power is made, and is smaller than the target hot water storage amount at night. By supplying an amount of hot water and supplying hot water in the daytime, an amount of hot water equal to or greater than the target hot water storage amount is supplied to the hot water storage tank 24.

ヒートポンプユニット23は、貯湯タンク24と管路を介して接続され、貯湯タンク24に貯えられる湯水を加熱してから貯湯タンク24に供給する。貯湯タンク24の容量は、例えば800リットルである。なお、給湯器20の沸上げ運転によって生成される湯の量は、ヒートポンプユニット23により配水管を介して貯湯タンク24に供給される湯の量を意味する。また、貯湯タンク24に貯えられた湯の量は、ユーザによる使用が想定される43℃の湯に換算したときの量を意味するものとしてもよい。   The heat pump unit 23 is connected to the hot water storage tank 24 via a pipe line, heats the hot water stored in the hot water storage tank 24, and then supplies the hot water to the hot water storage tank 24. The capacity of the hot water storage tank 24 is, for example, 800 liters. The amount of hot water generated by the boiling operation of the water heater 20 means the amount of hot water supplied to the hot water storage tank 24 by the heat pump unit 23 through the water pipe. Further, the amount of hot water stored in the hot water storage tank 24 may mean the amount when converted into hot water at 43 ° C. that is assumed to be used by the user.

続いて、給湯器制御システム100において実行される処理について、図8〜25を用いて説明する。   Then, the process performed in the water heater control system 100 is demonstrated using FIGS.

図8には、分散型電源30のパワーコンディショナ31によって実行される発電抑制処理が示されている。この発電抑制処理は、パワーコンディショナ31に電力が供給されると、一定の周期でくり返し実行される。一定の周期は、1分間である。   FIG. 8 shows power generation suppression processing executed by the power conditioner 31 of the distributed power source 30. When power is supplied to the power conditioner 31, this power generation suppression process is repeatedly executed at a constant cycle. The fixed period is 1 minute.

発電抑制処理において、パワーコンディショナ31は、まず、現在時刻が抑制指示により指定された時間に含まれるか否かを判定する(ステップS311)。なお、抑制指示がない場合には、ステップS311の判定は否定される。   In the power generation suppression process, the power conditioner 31 first determines whether or not the current time is included in the time specified by the suppression instruction (step S311). When there is no suppression instruction, the determination in step S311 is negative.

現在時刻が抑制指示により指定された時間に含まれないと判定した場合(ステップS311;No)、パワーコンディショナ31は、通常モードで動作する(ステップS312)。通常モードは、発電電力を制限することなく、出力可能な電力をすべて住宅HM及び商用電力系統PSへ供給するモードである。その後、パワーコンディショナ31は、発電抑制処理を終了する。   When it is determined that the current time is not included in the time designated by the suppression instruction (step S311; No), the power conditioner 31 operates in the normal mode (step S312). The normal mode is a mode in which all outputable power is supplied to the house HM and the commercial power system PS without limiting the generated power. Thereafter, the power conditioner 31 ends the power generation suppression process.

一方、現在時刻が抑制指示により指定された時間に含まれると判定した場合(ステップS311;Yes)、パワーコンディショナ31は、現在の発電能力が制限値より大きいか否かを判定する(ステップS313)。現在の発電能力は、現在時刻において出力可能な発電電力を意味する。   On the other hand, when it is determined that the current time is included in the time specified by the suppression instruction (step S311; Yes), the power conditioner 31 determines whether or not the current power generation capacity is greater than the limit value (step S313). ). The current power generation capacity means generated power that can be output at the current time.

現在の発電能力が制限値より大きくないと判定した場合(ステップS313;No)、パワーコンディショナ31は、発電電力を制限する必要がないため、ステップS312へ移行する。   When it is determined that the current power generation capacity is not greater than the limit value (step S313; No), the power conditioner 31 does not need to limit the generated power, and thus the process proceeds to step S312.

一方、現在の発電能力が制限値より大きいと判定した場合(ステップS313;Yes)、パワーコンディショナ31は、商用電力系統PSから電力が供給されているか否かを判定する(ステップS314)。すなわち、パワーコンディショナ31は、逆潮電力Prが負であるか否かを判定する。   On the other hand, when it determines with the present electric power generation capacity being larger than a limit value (step S313; Yes), the power conditioner 31 determines whether electric power is supplied from the commercial power grid PS (step S314). That is, the power conditioner 31 determines whether or not the reverse flow power Pr is negative.

商用電力系統PSから電力が供給されていないと判定した場合(ステップS314;No)、パワーコンディショナ31は、出力抑制モードで動作する(ステップS315)。出力抑制モードは、抑制指示により指定された制限値まで発電電力を制限するモードである。その後、パワーコンディショナ31は、発電抑制処理を終了する。   When it is determined that power is not supplied from the commercial power system PS (step S314; No), the power conditioner 31 operates in the output suppression mode (step S315). The output suppression mode is a mode in which the generated power is limited to the limit value specified by the suppression instruction. Thereafter, the power conditioner 31 ends the power generation suppression process.

商用電力系統PSから電力が供給されていると判定した場合(ステップS314;Yes)パワーコンディショナ31は、逆潮流ゼロモードで動作する(ステップS316)。逆潮流ゼロモードは、逆潮電力Prが極力ゼロに近づくように発電電力を制限するモードである。その後、パワーコンディショナ31は、発電抑制処理を終了する。   When it is determined that power is supplied from the commercial power system PS (step S314; Yes), the power conditioner 31 operates in the reverse power flow zero mode (step S316). The reverse power flow zero mode is a mode in which the generated power is limited so that the reverse power power Pr approaches zero as much as possible. Thereafter, the power conditioner 31 ends the power generation suppression process.

続いて、制御装置10と給湯器20との間で行われる通信の概要について、図9を用いて説明する。図9に示されるように、電力サーバ60から抑制指示が制御装置10へ送信されると(ステップS1)、制御装置10は、給湯器20に昼間に湯を生成させるための条件が成立するか否かを判定する(ステップS2)。   Then, the outline | summary of the communication performed between the control apparatus 10 and the water heater 20 is demonstrated using FIG. As shown in FIG. 9, when a suppression instruction is transmitted from the power server 60 to the control device 10 (step S <b> 1), does the control device 10 establish a condition for causing the water heater 20 to generate hot water during the daytime? It is determined whether or not (step S2).

条件が成立すると判定した場合(ステップS2;Yes)、制御装置10は、給湯器20に対して昼間の沸上げを要求する(ステップS3)。一方、条件が成立しないと判定した場合(ステップS2;No)、制御装置10は、昼間の沸上げを要求しない。   When it determines with conditions being satisfied (step S2; Yes), the control apparatus 10 requests | requires boiling in the daytime with respect to the water heater 20 (step S3). On the other hand, when it determines with conditions not being satisfied (step S2; No), the control apparatus 10 does not request | require boiling in the daytime.

昼間の沸上げを要求された給湯器20は、昼間の沸上げ運転を計画する計画処理を実行する(ステップS22)。その後、給湯器20は、計画処理にて立案された運転計画に従って、給湯器20のヒートポンプユニット23を制御する制御処理を実行する(ステップS21)。この場合の制御処理は、第2制御モジュール22b(図5参照)によって実行される処理に相当する。これにより、給湯器20は、夜間の沸上げ運転と昼間の沸上げ運転とを実行することとなる。なお、昼間の沸上げが要求されない場合には、夜間の沸上げ運転を計画する計画処理が実行され、この計画にしたがってヒートポンプユニット23を制御する制御処理が夜間に実行される。この場合の制御処理は、第1制御モジュール22a(図5参照)によって実行される処理に相当する。   The water heater 20 that is requested to boil in the daytime executes a planning process for planning a daytime boiling operation (step S22). Thereafter, the water heater 20 executes a control process for controlling the heat pump unit 23 of the water heater 20 in accordance with the operation plan established in the planning process (step S21). The control process in this case corresponds to a process executed by the second control module 22b (see FIG. 5). Thereby, the water heater 20 will perform the night boiling operation and the daytime boiling operation. When daytime boiling is not required, a planning process for planning a night boiling operation is executed, and a control process for controlling the heat pump unit 23 is executed at night according to this plan. The control process in this case corresponds to a process executed by the first control module 22a (see FIG. 5).

昼間の沸上げ運転をするための制御処理が実行されると、制御装置10は、運転モード変更フラグがONか否かを判定する(ステップS4)。運転モードの変更は、予め計画された昼間の沸上げ運転を、実際の発電電力及び消費電力の状況に応じて停止することを意味する。   When the control process for performing the daytime boiling operation is executed, the control device 10 determines whether or not the operation mode change flag is ON (step S4). The change of the operation mode means that the daytime boiling operation planned in advance is stopped according to the actual generated power and power consumption.

沸上げモード変更フラグがONであると判定した場合(ステップS4;Yes)、制御装置10は、給湯器20に対して運転モードの変更を要求する(ステップS5)。一方、運転モード変更フラグがONではないと判定した場合(ステップS4;No)、制御装置10は、給湯器20に対して運転モードの変更を要求しない。   When it determines with the boiling mode change flag being ON (step S4; Yes), the control apparatus 10 requests | requires the change of an operation mode with respect to the water heater 20 (step S5). On the other hand, when it is determined that the operation mode change flag is not ON (step S4; No), the control device 10 does not request the hot water heater 20 to change the operation mode.

給湯器20は、運転モードの変更を要求されると、運転モードを変更する(ステップS6)。   When requested to change the operation mode, the water heater 20 changes the operation mode (step S6).

続いて、図9に示された一連の処理のうち、夜間までに実行される部分の詳細を、図10を用いて説明する。   Next, details of a portion of the series of processes shown in FIG. 9 that are executed by night will be described with reference to FIG.

図10に示されるように、電力サーバ60から制御装置10に抑制指示が送信される(ステップS1)。また、計測装置40は、発電電力及び消費電力の計測値を、制御装置10を介してデータサーバ70へ順次送信する。   As shown in FIG. 10, a suppression instruction is transmitted from the power server 60 to the control device 10 (step S1). In addition, the measurement device 40 sequentially transmits measurement values of generated power and power consumption to the data server 70 via the control device 10.

データサーバ70は、受信した計測値から、発電電力及び消費電力の予測値を算出する発電消費予測処理を実行する(ステップS70)。発電消費予測処理による予測は、例えば、過去の一定期間における1日間の推移の平均を算出するものであってもよいし、気象状況、曜日、及びユーザのスケジュールを含むパラメータを用いて統計的に予測値を算出するものであってもよい。なお、発電電力の予測は、抑制指示によって過去に抑制された発電電力の実績を排除して実行される。すなわち、発電電力の予測値は、分散型電源30によって出力可能な発電電力の予測値を意味する。また、消費電力の予測値は、昼間の沸き上げ運転が実行されるケースを排除して予測されたものであることが望ましいが、このケースを含んで予測されたものであってもよい。   The data server 70 executes a power generation consumption prediction process for calculating a predicted value of generated power and power consumption from the received measurement values (step S70). The prediction by the power generation consumption prediction process may be, for example, calculating an average of the transition of one day in the past fixed period, or statistically using parameters including weather conditions, day of the week, and user schedule. A prediction value may be calculated. Note that the prediction of the generated power is executed by excluding the actual result of the generated power suppressed in the past by the suppression instruction. That is, the predicted value of the generated power means a predicted value of the generated power that can be output by the distributed power source 30. Moreover, although it is desirable that the predicted value of power consumption be predicted by excluding the case where daytime boiling operation is executed, it may be predicted including this case.

制御装置10は、データサーバ70に対して予測結果を要求し、その応答により予測結果を得る。そして、制御装置10は、発電電力及び消費電力の予測値に基づいて住宅HM内の余剰電力の予測値を算出する余剰電力予測処理を実行する(ステップS13)。この余剰電力予測処理について、図11,12を用いて説明する。   The control device 10 requests the prediction result from the data server 70, and obtains the prediction result from the response. And the control apparatus 10 performs the surplus power prediction process which calculates the predicted value of the surplus power in the house HM based on the predicted value of generated electric power and power consumption (step S13). This surplus power prediction process will be described with reference to FIGS.

余剰電力予測処理は、翌日の0時から24時における余剰電力の推移を、30分間の時間区分毎に予測する処理である。図11に示されるように、余剰電力予測処理において、制御装置10の余剰電力予測部13は、まず、変数aに1を代入する(ステップS131)。変数aは、時間区分に付される番号である。   The surplus power prediction process is a process for predicting the transition of surplus power from 0:00 to 24:00 on the next day for each 30-minute time segment. As shown in FIG. 11, in the surplus power prediction process, the surplus power prediction unit 13 of the control device 10 first substitutes 1 for a variable a (step S131). The variable a is a number assigned to the time segment.

次に、余剰電力予測部13は、a番目の時間区分における余剰電力を予測する(ステップS132)。この予測は、例えば、a番目の時間区分における発電電力の予測値から消費電力の予測値を減算することで余剰電力の予測値を得るものである。なお、発電電力及び消費電力の予測値が30分間の時間区分に区切られていないときには、余剰電力予測部13は、この時間区分における平均値を用いて、余剰電力の予測値を算出する。   Next, the surplus power prediction unit 13 predicts surplus power in the a-th time segment (step S132). In this prediction, for example, a predicted value of surplus power is obtained by subtracting a predicted value of power consumption from a predicted value of generated power in the a-th time segment. Note that when the predicted values of generated power and consumed power are not divided into 30-minute time segments, the surplus power predicting unit 13 calculates the predicted value of surplus power using the average value in this time segment.

次に、余剰電力予測部13は、変数aが最後の値であるか否かを判定する(ステップS133)。最後の値は、23時30分から24時ちょうどまでの時間区分に付される番号「48」である。   Next, the surplus power predicting unit 13 determines whether or not the variable a is the last value (step S133). The last value is the number “48” assigned to the time segment from 23:30 to 24:00.

変数aが最後の値ではないと判定した場合(ステップS133;No)、余剰電力予測部13は、変数aの値を1だけ増加させる(ステップS134)。その後、余剰電力予測部13は、ステップS132以降の処理をくり返す。   When it is determined that the variable a is not the last value (step S133; No), the surplus power prediction unit 13 increases the value of the variable a by 1 (step S134). Thereafter, the surplus power predicting unit 13 repeats the processes after step S132.

一方、変数aが最後の値であると判定した場合(ステップS133;Yes)、余剰電力予測部13は、余剰電力予測処理を終了する。   On the other hand, when it determines with the variable a being the last value (step S133; Yes), the surplus power prediction part 13 complete | finishes a surplus power prediction process.

図12には、余剰電力予測処理による予測結果が示されている。図12では、余剰電力に相当する領域にハッチングが付されている。余剰電力予測処理では、ハッチングが付された領域を30分間の時間区分に区切って電力の値が予測される。なお、図12中の線Lgは、発電電力の予測値の推移を示し、線Lcは、消費電力の予測値の推移を示している。   FIG. 12 shows a prediction result by the surplus power prediction process. In FIG. 12, a region corresponding to surplus power is hatched. In the surplus power prediction process, the value of power is predicted by dividing the hatched region into 30-minute time segments. In addition, the line Lg in FIG. 12 shows transition of the predicted value of generated power, and the line Lc shows transition of the predicted value of power consumption.

図10に戻り、制御装置10は、余剰電力予測処理(ステップS13)に続いて昼間沸上げ判定処理を実行する(ステップS14)。昼間沸上げ判定処理は、昼間に沸上げ運転を実行する条件が成立するか否かを判定する処理であって、図9中のステップS2に対応する。昼間沸上げ判定処理は、例えば、電気料金が安価になる23時までに後述のステップS3が完了するように、22時30分までに実行される。以下、昼間沸上げ判定処理について、図13〜19を用いて説明する。   Returning to FIG. 10, the control apparatus 10 performs a daytime boiling determination process (step S14) following the surplus power prediction process (step S13). The daytime boiling determination process is a process for determining whether or not a condition for performing a boiling operation during the day is satisfied, and corresponds to step S2 in FIG. The daytime boiling determination process is executed by 22:30 so that, for example, step S3 described later is completed by 23:00 when the electricity bill becomes cheap. Hereinafter, the daytime boiling determination process will be described with reference to FIGS.

昼間沸上げ判定処理では、判定部14は、まず、変数aに1を代入して、すべての昼間沸上げ許可フラグをOFFに設定する(ステップS141)。   In the daytime boiling determination process, the determination unit 14 first assigns 1 to the variable a and sets all daytime boiling permission flags to OFF (step S141).

次に、判定部14は、a番目の時間区分に対する抑制指示があるか否かを判定する(ステップS142)。具体的には、判定部14は、翌日のa番目の時間区分が抑制指示により指定された時間に含まれていて、かつ、分散型電源30の定格電力より小さい制限値が指定されているか否かを判定する。   Next, the determination unit 14 determines whether or not there is a suppression instruction for the a-th time segment (step S142). Specifically, the determination unit 14 determines whether or not the a-th time segment of the next day is included in the time specified by the suppression instruction and a limit value smaller than the rated power of the distributed power source 30 is specified. Determine whether.

a番目の時間区分に対する抑制指示がないと判定した場合(ステップS142;No)、判定部14は、ステップS149へ処理を移行する。一方、a番目の時間区分に対する抑制指示があると判定した場合(ステップS142;Yes)、判定部14は、a番目の時間区分における発電電力の制限値を算出する(ステップS143)。具体的には、抑制指示により指定される制限値が、分散型電源30の定格電力に対する割合を示すものであるときに、判定部14は、この割合を定格電力に乗じることでW又はkW単位の制限値を算出する。   When it determines with there being no suppression instruction | indication with respect to an a-th time division (step S142; No), the determination part 14 transfers a process to step S149. On the other hand, if it is determined that there is a suppression instruction for the a-th time segment (step S142; Yes), the determination unit 14 calculates a limit value of the generated power in the a-th time segment (step S143). Specifically, when the limit value specified by the suppression instruction indicates a ratio with respect to the rated power of the distributed power supply 30, the determination unit 14 multiplies the rated power by this ratio to make a unit of W or kW. The limit value is calculated.

次に、判定部14は、a番目の時間区分において給湯器20が湯を生成しても消費電力が発電電力より小さいか否かを判定する(ステップS144)。具体的には、判定部14は、a番目の時間区分において給湯器20が沸上げ運転を実行して住宅HMで消費される消費電力の予測値が増加しても、増加した消費電力の予測値が発電電力の予測値より小さいか否かを判定する。   Next, the determination unit 14 determines whether or not the power consumption is smaller than the generated power even if the water heater 20 generates hot water in the a-th time segment (step S144). Specifically, the determination unit 14 predicts the increased power consumption even if the predicted value of the power consumption consumed in the house HM increases when the water heater 20 performs the boiling operation in the a-th time segment. It is determined whether the value is smaller than the predicted value of the generated power.

ただし、発電消費予測部71から出力された消費電力の予測値は、給湯器20が昼間に沸上げ運転を実行することなく夜間に沸上げ運転を実行したときの消費電力を示している。このため、判定部14は、データサーバ70に記憶される給湯器20の運転状態の履歴と、その運転状態で消費される電力とを参照することにより、消費電力の予測値のうち、給湯器20以外の機器の総消費電力の予測値を得ることができる。判定部14は、この総消費電力の予測値と、沸上げ運転を実行する給湯器20の消費電力との和が、発電電力の予測値より小さいか否かを判定する。   However, the predicted value of the power consumption output from the power generation consumption prediction unit 71 indicates the power consumption when the water heater 20 performs the boiling operation at night without performing the boiling operation during the daytime. For this reason, the determination unit 14 refers to the history of the operation state of the water heater 20 stored in the data server 70 and the power consumed in the operation state, so that the water heater among the predicted power consumption values. A predicted value of the total power consumption of devices other than 20 can be obtained. The determination unit 14 determines whether the sum of the predicted value of the total power consumption and the power consumption of the water heater 20 that performs the boiling operation is smaller than the predicted value of the generated power.

給湯器20が湯を生成しても消費電力が発電電力より小さいわけではないと判定した場合(ステップS144;No)、判定部14は、ステップS149へ処理を移行する。   If it is determined that even if the water heater 20 generates hot water, the power consumption is not smaller than the generated power (step S144; No), the determination unit 14 proceeds to step S149.

一方、給湯器20が湯を生成しても消費電力が発電電力より小さいと判定した場合(ステップS144;Yes)、判定部14は、a番目の時間区分における発電電力が制限値より大きいか否かを判定する(ステップS145)。具体的には、判定部14は、発電電力の予測値がステップS143で算出した制限値より大きいか否かを判定する。   On the other hand, if it is determined that the power consumption is smaller than the generated power even if the water heater 20 generates hot water (step S144; Yes), the determination unit 14 determines whether the generated power in the a-th time segment is larger than the limit value. Is determined (step S145). Specifically, the determination unit 14 determines whether or not the predicted value of the generated power is larger than the limit value calculated in step S143.

発電電力が制限値より大きいと判定した場合(ステップS145;Yes)、判定部14は、a番目の時間区分における消費電力が制限値より大きいか否かを判定する(ステップS146)。具体的には、判定部14は、消費電力の予測値がステップS143で算出した制限値より大きいか否かを判定する。   If it is determined that the generated power is greater than the limit value (step S145; Yes), the determination unit 14 determines whether the power consumption in the a-th time segment is greater than the limit value (step S146). Specifically, the determination unit 14 determines whether or not the predicted power consumption value is greater than the limit value calculated in step S143.

消費電力が制限値より大きいと判定した場合(ステップS146;Yes)、判定部14は、昼間に沸上げ運転を実行するための条件が成立したと判断して、a番目の時間区分に対応する沸上げ許可フラグをONに設定する(ステップS147)。   When it determines with power consumption being larger than a limit value (step S146; Yes), the determination part 14 judges that the conditions for performing a boiling operation in the daytime were materialized, and respond | corresponds to the ath time division. A boiling permission flag is set to ON (step S147).

ステップS145において発電電力が制限値より大きくはないと判定した場合(ステップS145;No)、判定部14は、夜間に給湯器20が消費する電力の買電価格が昼間の逆潮電力の売電価格より大きいか否かを判定する(ステップS148)。具体的には、判定部14は、夜間に給湯器20が30分間で消費する電力にかかる料金が、a番目の時間区分における逆潮電力の予測値の売電価格より大きいか否かを判定する。   If it is determined in step S145 that the generated power is not larger than the limit value (step S145; No), the determination unit 14 sells the reverse power during the day when the power purchase price of the power consumed by the water heater 20 is nighttime. It is determined whether or not the price is larger (step S148). Specifically, the determination unit 14 determines whether the charge for the power consumed by the water heater 20 at 30 minutes at night is larger than the power sale price of the predicted value of the reverse power in the a-th time segment. To do.

ステップS148の判定が肯定されれば(ステップS148;Yes)、a番目の時間区分に逆潮電力を商用電力系統PSへ供給して売電することにより得る経済的利益よりも、a番目の時間区分に給湯器20に沸上げ運転を実行させて夜間の電力消費にかかる料金を減少させることで得る経済的利益の方が大きい。すなわち、昼間に沸上げ運転を実行する方が、経済的利益が大きい。このため、ステップS148の判定が肯定された場合、判定部14は、ステップS147へ移行して、沸上げ許可フラグをONに設定する。   If the determination in step S148 is affirmative (step S148; Yes), the a-th time is more than the economic benefit obtained by supplying the reverse power to the commercial power system PS for sale in the a-th time segment. The economic benefits obtained by causing the water heater 20 to perform a boiling operation in the section and reducing the charge for nighttime power consumption are greater. That is, it is more economical to perform boiling operation during the daytime. For this reason, when determination of step S148 is affirmed, the determination part 14 transfers to step S147, and sets a boiling permission flag to ON.

一方、ステップS148の判定が否定されれば、昼間に沸上げ運転を実行しない方が、経済的利益が大きい。このため、判定部14は、沸上げ許可フラグをONにすることなく、ステップS149へ処理を移行する。   On the other hand, if the determination in step S148 is negative, economic benefits are greater when no boiling operation is performed in the daytime. For this reason, the determination part 14 transfers a process to step S149, without turning ON a boiling permission flag.

ただし、ステップS145の判定が否定された後に実行されるステップS148の判定では、逆潮電力は、発電電力から消費電力を除いたものに等しい。   However, in the determination in step S148 executed after the determination in step S145 is denied, the reverse power flow is equal to the generated power minus power consumption.

ステップS146において消費電力が制限値より大きくはないと判定した場合(ステップS146;No)、判定部14は、ステップS148へ処理を移行する。ただし、この場合におけるステップS148の判定では、逆潮電力は、制限値から消費電力を除いたものに等しい。   When it determines with power consumption not being larger than a limit value in step S146 (step S146; No), the determination part 14 transfers a process to step S148. However, in the determination in step S148 in this case, the reverse power flow is equal to the limit value minus the power consumption.

ステップS144〜S147の処理により、特定の場合に沸上げ許可フラグがONに設定される。図14には、発電電力Pg、制限値Pp、給湯器20以外の機器の総消費電力Pd、及び給湯器20の消費電力Phの大小関係と、経済効果と、沸上げ許可フラグと、パワーコンディショナ31の運転モードとを関連づけたテーブルが示されている。   By the processing in steps S144 to S147, the boiling permission flag is set to ON in a specific case. FIG. 14 shows the magnitude relationship among the generated power Pg, the limit value Pp, the total power consumption Pd of devices other than the water heater 20, and the power consumption Ph of the water heater 20, the economic effect, the boiling permission flag, and the power condition. The table which linked | related with the operation mode of NA 31 is shown.

また、図15には、制限値Ppが、給湯器20以外の機器の総消費電力Pdと給湯器20の消費電力Phとの和より大きい場合における発電電力Pgと経済効果との関係が示されている。図15中の線L21は、昼間に沸上げ運転を実行しない場合に対応し、線L22は、昼間に沸上げ運転を実行する場合に対応する。また、Gmaxは、分散型電源30の定格電力を意味する。図15に示される電力の大小関係は、図14に示されるケース1,2,7,8,9,10を含んでいる。   FIG. 15 shows the relationship between the generated power Pg and the economic effect when the limit value Pp is larger than the sum of the total power consumption Pd of devices other than the water heater 20 and the power consumption Ph of the water heater 20. ing. The line L21 in FIG. 15 corresponds to the case where the boiling operation is not performed in the daytime, and the line L22 corresponds to the case where the boiling operation is performed in the daytime. Gmax means the rated power of the distributed power supply 30. The power magnitude relationship shown in FIG. 15 includes cases 1, 2, 7, 8, 9, and 10 shown in FIG.

線L21で示されるように、昼間に沸上げ運転を実行しない場合において、発電電力Pgが総消費電力Pdを超えると逆潮電力が生じるため、売電による経済効果が得られる。ただし、発電電力Pgが制限値Ppを超えても、実際に発電される電力は制限値Ppに制限されるため、経済効果が増加することはない。また、発電電力Pgが総消費電力Pdを下回ってゼロになると、総消費電力Pdを商用電力系統PSからの電力で賄うことになるため、経済効果は減少する。   As indicated by the line L21, in the case where the boiling operation is not performed in the daytime, since the reverse power is generated when the generated power Pg exceeds the total power consumption Pd, the economic effect of power sale is obtained. However, even if the generated power Pg exceeds the limit value Pp, the power that is actually generated is limited to the limit value Pp, so the economic effect does not increase. Further, when the generated power Pg falls below the total power consumption Pd and becomes zero, the total power consumption Pd is covered by power from the commercial power system PS, so the economic effect is reduced.

また、線L22に示されるように、昼間に沸上げ運転を実行する場合において、発電電力Pgが総消費電力Pdと給湯器20の消費電力Phとの和Pd+Phを超えると、夜間の沸上げ運転に必要な電力消費が減少するため、経済効果が得られる。また、発電電力PgがPd+Phを下回ってゼロになると、総消費電力Pdと給湯器20の消費電力Phとを商用電力系統PSからの電力で賄うことになるため、経済効果は減少する。   Further, as shown by the line L22, when the boiling operation is performed in the daytime, if the generated power Pg exceeds the sum Pd + Ph of the total power consumption Pd and the power consumption Ph of the water heater 20, the night boiling operation is performed. Economical effects can be obtained because the power consumption required for this is reduced. Further, when the generated power Pg becomes less than Pd + Ph and becomes zero, the total power consumption Pd and the power consumption Ph of the water heater 20 are covered by the power from the commercial power system PS, so the economic effect is reduced.

図16には、制限値Ppが、総消費電力Pdより大きく、総消費電力Pdと給湯器20の消費電力Phとの和より小さい場合における、発電電力Pgと経済効果との関係が示されている。図16に示される電力の大小関係は、図14に示されるケース3を含んでいる。   FIG. 16 shows the relationship between the generated power Pg and the economic effect when the limit value Pp is larger than the total power consumption Pd and smaller than the sum of the total power consumption Pd and the power consumption Ph of the water heater 20. Yes. The magnitude relationship of the electric power shown in FIG. 16 includes case 3 shown in FIG.

図17には、制限値Ppが総消費電力Pdより小さい場合における発電電力Pgと経済効果との関係が示されている。図17に示される電力の大小関係は、図14に示されるケース4,5,6,11を含んでいる。   FIG. 17 shows the relationship between the generated power Pg and the economic effect when the limit value Pp is smaller than the total power consumption Pd. The power magnitude relationship shown in FIG. 17 includes cases 4, 5, 6, and 11 shown in FIG.

図13に戻り、ステップS147に続いて、判定部14は、変数aが最後の値であるか否かを判定する(ステップS149)。変数aが最後の値ではないと判定した場合(ステップS149;No)、判定部14は、変数aの値を1だけ増加させる(ステップS150)。その後、判定部14は、ステップS142以降の処理をくり返す。   Returning to FIG. 13, following step S147, the determination unit 14 determines whether or not the variable a is the last value (step S149). If it is determined that the variable a is not the last value (step S149; No), the determination unit 14 increases the value of the variable a by 1 (step S150). Then, the determination part 14 repeats the process after step S142.

ステップS141〜S149の処理により、翌日の時間区分それぞれについて沸上げ許可フラグがON又はOFFに設定される。図18には、沸上げ許可フラグの系列と、発電電力、消費電力及び制限値の推移との関係の一例が示されている。図18に示される例では、沸上げ許可フラグがONに設定される時間の余剰電力に対応する領域にハッチングが付されている。抑制指示により制限値が指定される時間のうち時間P13では、余剰電力が不足しており、給湯器20が沸上げ運転を実行すると消費電力が発電電力を超えるため、沸上げ許可フラグがOFFに設定される。また、時間P11では、制限値が消費電力を超えており、給湯器20に沸上げ運転を実行させるよりも逆潮電力を売電する方が、経済効果が大きいという判断に基づいて、沸上げ許可フラグがOFFに設定される。また、時間P12では、十分な余剰電力があり、制限値が消費電力より小さいため、沸上げ許可フラグがONに設定される。   By the processing in steps S141 to S149, the boiling permission flag is set to ON or OFF for each time segment on the next day. FIG. 18 shows an example of the relationship between the boiling permission flag series and the transition of the generated power, the power consumption, and the limit value. In the example shown in FIG. 18, the area corresponding to the surplus power during the time when the boiling permission flag is set to ON is hatched. Of the time when the limit value is specified by the suppression instruction, at time P13, the surplus power is insufficient, and when the water heater 20 performs the boiling operation, the power consumption exceeds the generated power, so the boiling permission flag is turned off. Is set. Further, at time P11, the limit value exceeds the power consumption, and the boiling power is raised based on the judgment that it is more economical to sell the reverse power than to make the water heater 20 perform the boiling operation. The permission flag is set to OFF. In addition, at time P12, since there is sufficient surplus power and the limit value is smaller than the power consumption, the boiling permission flag is set to ON.

図13に示されるステップS149において変数aが最後の値であると判定した場合(ステップS149;Yes)、判定部14は、図19に示されるように、条件成立時間として、沸上げ許可フラグが連続してONになる最長時間を探索する(ステップS151)。   When it is determined in step S149 shown in FIG. 13 that the variable a is the last value (step S149; Yes), the determination unit 14 sets the boiling permission flag as the condition establishment time as shown in FIG. The longest time that is continuously turned on is searched (step S151).

次に、判定部14は、条件成立時間以外の沸上げ許可フラグをOFFに設定する(ステップS152)。これにより、給湯器20の沸上げ運転の実行と停止とが交互にくり返されることを防ぐことができる。   Next, the determination unit 14 sets the boiling permission flag other than the condition establishment time to OFF (step S152). Thereby, execution and stop of the boiling operation of the water heater 20 can be prevented from being repeated alternately.

次に、判定部14は、条件成立時間の開始時刻と終了時刻を取得する(ステップS153)。判定部14は、取得した開始時刻及び終了時刻を給湯器20に通知する(ステップS154)。そして、判定部14は、昼間沸上げ判定処理を終了する。   Next, the determination unit 14 acquires the start time and end time of the condition establishment time (step S153). The determination unit 14 notifies the acquired start time and end time to the water heater 20 (step S154). And the determination part 14 complete | finishes a daytime boiling determination process.

図10に戻り、昼間沸上げ判定処理(ステップS14)が完了すると、制御装置10は、条件成立時間の開始時刻及び終了時刻を通知することにより、給湯器20に対して昼間の沸上げ運転の実行を要求する(ステップS3)。給湯器20は、この要求に対する応答をして、計画処理を実行する(ステップS22)。計画処理は、制御装置10から通知された条件成立時間に基づいて、沸上げ運転の開始時刻及び終了時刻と、沸上げ湯量を計画する処理である。この計画処理について、図20を用いて説明する。   Returning to FIG. 10, when the daytime boiling determination process (step S <b> 14) is completed, the control device 10 notifies the water heater 20 of the daytime boiling operation by notifying the start time and the end time of the condition establishment time. Execution is requested (step S3). The water heater 20 responds to this request and executes the planning process (step S22). The planning process is a process of planning the start time and end time of the boiling operation and the amount of boiling water based on the condition establishment time notified from the control device 10. This planning process will be described with reference to FIG.

計画処理では、給湯器20の計画モジュール22は、まず、条件成立時間の開始時刻及び終了時刻から条件成立時間の長さを取得する(ステップS221)。次に、計画モジュール22は、条件成立時間の長さが沸上げ運転時間の下限値より長いか否かを判定する(ステップS222)。沸上げ運転時間の下限値は、例えば20分間であって、給湯器20の機種に応じて予め設定されるが、ユーザにより設定されてもよい。   In the planning process, the planning module 22 of the water heater 20 first acquires the length of the condition satisfaction time from the start time and end time of the condition satisfaction time (step S221). Next, the planning module 22 determines whether or not the length of the condition establishment time is longer than the lower limit value of the boiling operation time (step S222). The lower limit value of the boiling operation time is, for example, 20 minutes, and is set in advance according to the model of the water heater 20, but may be set by the user.

条件成立時間の長さが沸上げ運転時間の下限値より長くないと判定した場合(ステップS222;No)、計画モジュール22は、計画処理を終了する。一方、条件成立時間の長さが沸上げ運転時間の下限値より長いと判定した場合(ステップS222;Yes)、計画モジュール22は、条件成立時間の長さが閾値より長いか否かを判定する(ステップS223)。この閾値は、沸上げ運転を実行可能な昼間の最長の時間であって、昼間に沸上げ可能な湯量に応じて定められる。昼間に沸上げ可能な湯量は、例えば、目標貯湯量から、昼間までの湯切れを防止するための最小貯湯量を減じた量である。   When it is determined that the condition establishment time is not longer than the lower limit value of the boiling operation time (step S222; No), the planning module 22 ends the planning process. On the other hand, when it is determined that the condition establishment time is longer than the lower limit value of the boiling operation time (step S222; Yes), the planning module 22 determines whether the condition establishment time is longer than the threshold. (Step S223). This threshold is the longest daytime in which the boiling operation can be performed, and is determined according to the amount of hot water that can be boiled in the daytime. The amount of hot water that can be boiled in the daytime is, for example, an amount obtained by subtracting the minimum hot water storage amount for preventing hot water shortage until the daytime from the target hot water storage amount.

条件成立時間の長さが閾値より長いと判定した場合には(ステップS223;Yes)、計画モジュール22は、条件成立時間のすべてを沸上げ運転に割り当てることができない。この場合に、計画モジュール22は、夜間に生成する湯量を、最小貯湯量に設定する(ステップS224)。   If it is determined that the condition establishment time is longer than the threshold (step S223; Yes), the planning module 22 cannot allocate all the condition establishment times to the boiling operation. In this case, the planning module 22 sets the amount of hot water generated at night to the minimum amount of stored hot water (step S224).

次に、計画モジュール22は、昼間に生成する湯量を、給湯器20の最大貯湯量から最小貯湯量を減じた量に設定する(ステップS225)。最大貯湯量は、貯湯タンク24の容量である。   Next, the planning module 22 sets the amount of hot water generated during the day to an amount obtained by subtracting the minimum hot water storage amount from the maximum hot water storage amount of the water heater 20 (step S225). The maximum hot water storage amount is the capacity of the hot water storage tank 24.

次に、計画モジュール22は、昼間の湯の生成終了時刻を、条件成立時間の終了時刻に設定する(ステップS226)。これにより、放熱を極力抑えることができる。なお、湯の生成終了時刻は、沸上げ運転の終了時刻を意味する。   Next, the planning module 22 sets the daytime hot water generation end time as the end time of the condition establishment time (step S226). Thereby, heat dissipation can be suppressed as much as possible. The hot water generation end time means the end time of the boiling operation.

次に、計画モジュール22は、昼間の湯の生成開始時刻を設定する(ステップS227)。具体的には、計画モジュール22は、最大貯湯量の湯を貯えるために必要な時間を算出して、算出した時間をステップS226で設定した生成終了時刻から減算することで得た時刻を、生成開始時刻として設定する。なお、湯の生成開始時刻は、沸上げ運転の開始時刻を意味する。その後、計画モジュール22は、ステップS231へ処理を移行する。   Next, the planning module 22 sets the daytime hot water generation start time (step S227). Specifically, the planning module 22 calculates the time required to store the maximum amount of hot water, and generates the time obtained by subtracting the calculated time from the generation end time set in step S226. Set as start time. The hot water generation start time means the start time of the boiling operation. Thereafter, the planning module 22 shifts the processing to step S231.

ステップS223において条件成立時間の長さが閾値より長くないと判定した場合には(ステップS223;No)、計画モジュール22は、条件成立時間のすべてを沸上げ運転に割り当てることができる。この場合に、計画モジュール22は、昼間の湯の生成開始時刻及び生成終了時刻を、条件成立時間の開始時刻及び終了時刻に設定する(ステップS228)。   If it is determined in step S223 that the condition establishment time is not longer than the threshold (step S223; No), the planning module 22 can assign all of the condition establishment times to the boiling operation. In this case, the planning module 22 sets the generation start time and generation end time of daytime hot water to the start time and end time of the condition establishment time (step S228).

次に、計画モジュール22は、条件成立時間で生成可能な湯量を、昼間に生成する湯量として算出する(ステップS229)。計画モジュール22は、夜間に生成する湯量を、目標貯湯量から昼間に生成する湯量を減じた量に設定する(ステップS230)。   Next, the planning module 22 calculates the amount of hot water that can be generated during the condition establishment time as the amount of hot water generated during the daytime (step S229). The planning module 22 sets the amount of hot water generated at night to an amount obtained by subtracting the amount of hot water generated during the day from the target hot water storage amount (step S230).

次に、計画モジュール22は、夜間の湯の生成開始時刻及び生成終了時刻を算出する(ステップS231)。具体的には、計画モジュール22は、ステップS224又はステップS230にて設定された湯量を生成する時間を設定する。この時間は、放熱を極力抑える観点から、電気料金が低廉な時間の終了時付近に設定されることが好ましい。その後、計画モジュール22は、計画処理を終了する。   Next, the planning module 22 calculates the generation start time and generation end time of nighttime hot water (step S231). Specifically, the planning module 22 sets the time for generating the amount of hot water set in step S224 or step S230. This time is preferably set in the vicinity of the end of the time when the electricity rate is low, from the viewpoint of suppressing heat dissipation as much as possible. Thereafter, the planning module 22 ends the planning process.

図21には、計画処理において設定される湯量の一例が示されている。図21において矢印で示されるように、条件成立時間が閾値より長い場合には、夜間の生成湯量が設定された後に、昼間の生成湯量が設定される。なお、図21に示される例では、最小貯湯量は、湯切れを防止するための最低限の起動貯湯量にマージンを加えた量に設定される。一方、条件成立時間が閾値より短い場合には、矢印で示されるように、昼間の生成湯量が設定された後に、夜間の生成湯量が設定される。   FIG. 21 shows an example of the amount of hot water set in the planning process. As indicated by an arrow in FIG. 21, when the condition establishment time is longer than the threshold value, the amount of hot water generated during the day is set after the amount of hot water generated at night is set. In the example shown in FIG. 21, the minimum hot water storage amount is set to an amount obtained by adding a margin to the minimum starting hot water storage amount for preventing hot water shortage. On the other hand, when the condition establishment time is shorter than the threshold, the amount of hot water generated at night is set after the amount of hot water generated during the day is set, as indicated by an arrow.

図10に戻り、計画処理(ステップS22)が終了すると、制御装置10は、計画処理で計画された湯の生成時刻を給湯器20に対して要求し、この要求に対する応答を受信することで湯の生成時刻を取得する。そして、制御装置10は、予測値を修正する予測修正処理を実行する(ステップS15)。この予測修正処理について、図22を用いて説明する。   Returning to FIG. 10, when the planning process (step S <b> 22) ends, the control device 10 requests the hot water heater 20 for the hot water generation time planned in the planning process, and receives a response to this request to receive the hot water. Get generation time of. And the control apparatus 10 performs the prediction correction process which corrects a predicted value (step S15). This prediction correction process will be described with reference to FIG.

予測修正処理において、制御装置10のプロセッサH1は、まず、変数aに1を代入する(ステップS151)。次に、プロセッサH1は、a番目の時間区分における沸上げ運転の有無が、制御装置10によって記憶されている給湯器20のスケジュールと異なるか否かを判定する(ステップS152)。このスケジュールは、通常、昼間に沸上げ運転を実行することなく、夜間に沸上げ運転を実行するスケジュールである。   In the prediction correction process, the processor H1 of the control device 10 first substitutes 1 for the variable a (step S151). Next, the processor H1 determines whether or not the boiling operation in the a-th time segment is different from the schedule of the water heater 20 stored by the control device 10 (step S152). This schedule is usually a schedule for performing a boiling operation at night without performing a boiling operation in the daytime.

沸上げ運転の有無がスケジュールと異ならないと判定した場合(ステップS152;No)、プロセッサH1は、ステップS154へ処理を移行する。一方、沸上げ運転の有無がスケジュールと異なると判定した場合(ステップS152;Yes)、プロセッサH1は、a番目の時間区分における消費電力の予測値を修正する(ステップS153)。   When it determines with the presence or absence of boiling operation not differing from a schedule (step S152; No), the processor H1 transfers a process to step S154. On the other hand, when it determines with the presence or absence of boiling operation differing from a schedule (step S152; Yes), the processor H1 corrects the predicted value of the power consumption in the a-th time division (step S153).

次に、プロセッサH1は、変数aが最後の値であるか否かを判定し(ステップS154)、最後の値ではないと判定した場合(ステップS154;No)、変数aの値に1だけ増加させて(ステップS155)、ステップS152以降の処理をくり返す。一方、変数aが最後の値であると判定した場合(ステップS154;Yes)、プロセッサH1は、予測修正処理を終了する。   Next, the processor H1 determines whether or not the variable a is the last value (step S154). If it is determined that the variable a is not the last value (step S154; No), the value of the variable a is increased by 1. (Step S155), and the processing after Step S152 is repeated. On the other hand, when it is determined that the variable a is the last value (step S154; Yes), the processor H1 ends the prediction correction process.

続いて、図9に示された一連の処理のうち、昼間に実行される部分の詳細を、図23〜25を用いて説明する。   Next, details of a portion executed in the daytime in the series of processes shown in FIG. 9 will be described with reference to FIGS.

図23に示されるように、昼間の湯の生成開始時刻になると、給湯器20は、湯の生成を開始する(ステップS25)。また、計測装置40は、発電電力及び消費電力の計測値をくり返し制御装置10へ送信する。   As shown in FIG. 23, when the daytime hot water generation start time is reached, the water heater 20 starts hot water generation (step S25). In addition, the measurement device 40 repeatedly transmits the measurement values of the generated power and the power consumption to the control device 10.

制御装置10は、計測値に基づいて、買電価格判定処理(ステップS16)と売電価格判定処理(ステップS17)とを順に実行する。これらの処理は、実際の余剰電力の大きさが予測された余剰電力と異なるときに、給湯器20の運転モードを変更すべきか否かを判定する処理である。以下では、これらの処理について図24,25を用いて説明する。   The control device 10 sequentially executes a power purchase price determination process (step S16) and a power sale price determination process (step S17) based on the measured value. These processes are processes for determining whether or not to change the operation mode of the water heater 20 when the actual surplus power is different from the predicted surplus power. Hereinafter, these processes will be described with reference to FIGS.

図24には、買電価格判定処理が示されている。買電価格判定処理は、余剰電力が不足することにより生じた買電を、給湯器20の沸上げ運転を停止させることで抑えるべきか否かを判定する処理である。図24に示されるように、買電価格判定処理において、判定部14は、まず、昼間における買電価格の積算値を算出する(ステップS161)。余剰電力が予測通りに推移して昼間に沸上げ運転が実行された場合には、消費電力が発電電力を上回ることがないので、ステップS161で算出される買電価格はゼロになる。   FIG. 24 shows a power purchase price determination process. The power purchase price determination process is a process for determining whether or not the power purchase caused by the shortage of surplus power should be suppressed by stopping the boiling operation of the water heater 20. As illustrated in FIG. 24, in the power purchase price determination process, the determination unit 14 first calculates an integrated value of the power purchase price in the daytime (step S161). When the surplus power changes as predicted and the boiling operation is executed in the daytime, the power consumption does not exceed the generated power, so the power purchase price calculated in step S161 becomes zero.

次に、判定部14は、算出した買電価格が、1日間における給湯器20の消費電力の買電価格の平均値より大きいか否かを判定する(ステップS162)。この平均値は、例えば、過去の一定期間における給湯器20の運転履歴から算出される。   Next, the determination unit 14 determines whether or not the calculated power purchase price is larger than the average value of the power purchase price of the power consumption of the water heater 20 in one day (step S162). This average value is calculated from, for example, the operation history of the water heater 20 in a past fixed period.

算出した買電価格が平均値より大きくはないと判定した場合(ステップS162;No)、判定部14は、買電価格判定処理を終了する。一方、算出した買電価格が平均値より大きいと判定した場合(ステップS162;Yes)、判定部14は、運転モード変更フラグをONに設定して、昼間に生成すべき湯量を目標貯湯量に変更する(ステップS163)。その後、判定部14は、買電価格判定処理を終了する。   When it determines with the calculated electric power purchase price not being larger than an average value (step S162; No), the determination part 14 complete | finishes an electric power purchase price determination process. On the other hand, when it determines with the calculated electricity purchase price being larger than an average value (step S162; Yes), the determination part 14 sets an operation mode change flag to ON, and sets the hot water amount which should be produced | generated in the daytime as the target hot water storage amount. Change (step S163). Thereafter, the determination unit 14 ends the purchase price determination process.

図25には、売電価格判定処理が示されている。売電価格判定処理は、余剰電力が過剰であって、給湯器20に代えて電力系統PSへ電力を供給すべきか否かを、経済効果の観点から判定する処理である。図25に示されるように、売電価格判定処理において、判定部14は、まず、現在の貯湯量が目標貯湯量より大きいか否かを判定する(ステップS171)。   FIG. 25 shows a power selling price determination process. The power selling price determination process is a process for determining whether or not surplus power is excessive and whether or not power should be supplied to the power system PS instead of the water heater 20 from the viewpoint of economic effect. As shown in FIG. 25, in the power selling price determination process, the determination unit 14 first determines whether or not the current hot water storage amount is larger than the target hot water storage amount (step S171).

次に、判定部14は、給湯器20が湯を生成しないときの逆潮電力の売電価格が、夜間に給湯器が消費する電力の買電価格を超えるか否かを判定する(ステップS172)。具体的には、判定部14は、現在の消費電力の計測値から給湯器20の消費電力を減じた電力を、給湯器20が湯を生成しないときの消費電力として算出し、算出した電力を現在の発電電力から減じて得た逆潮電力の売電価格を算出する。また、判定部14は、給湯器20が昼間に沸上げ運転を実行することなく夜間に沸上げ運転を実行した場合に消費される電力の買電価格を算出する。そして、判定部14は、算出した売電価格が買電価格より高いか否かを判定する。   Next, the determination unit 14 determines whether or not the power sale price of the reverse power when the water heater 20 does not generate hot water exceeds the power purchase price of the power consumed by the water heater at night (step S172). ). Specifically, the determination unit 14 calculates the power obtained by subtracting the power consumption of the water heater 20 from the current measured power consumption value as the power consumption when the water heater 20 does not generate hot water, and calculates the calculated power. Calculate the selling price of the reverse power obtained by subtracting the current generated power. Moreover, the determination part 14 calculates the electric power purchase price of the electric power consumed when the water heater 20 performs a boiling operation at night, without performing a boiling operation in the daytime. Then, the determination unit 14 determines whether or not the calculated power sale price is higher than the power purchase price.

売電価格が買電価格を超えないと判定した場合(ステップS172;No)、判定部14は、売電価格判定処理を終了する。一方、売電価格が買電価格を超えると判定した場合(ステップS172;Yes)、判定部14は、運転モード変更フラグをONに設定して、給湯器20に沸上げ運転を停止させる(ステップS173)。その後、判定部14は、売電価格判定処理を終了する。   When it determines with a power selling price not exceeding a power purchasing price (step S172; No), the determination part 14 complete | finishes a power selling price determination process. On the other hand, when it determines with a power sale price exceeding a power purchase price (step S172; Yes), the determination part 14 sets an operation mode change flag to ON, and makes the water heater 20 stop boiling operation (step). S173). Thereafter, the determination unit 14 ends the power sale price determination process.

図23に戻り、売電価格判定処理(ステップS17)に続いて、制御装置10は、運転モード変更フラグがONに設定されているか否かを判定する(ステップS4)。   Returning to FIG. 23, following the power sale price determination process (step S17), the control device 10 determines whether or not the operation mode change flag is set to ON (step S4).

運転モード変更フラグがONに設定されていないと判定した場合(ステップS4;No)、制御装置10は、給湯器20の運転モードを変更しない。一方、運転モード変更フラグがONに設定されていると判定した場合(ステップS4;Yes)、制御装置10は、給湯器20に対して運転モードの変更を要求する(ステップS5)。   When it determines with the operation mode change flag not being set to ON (step S4; No), the control apparatus 10 does not change the operation mode of the water heater 20. FIG. On the other hand, when it determines with the operation mode change flag being set to ON (step S4; Yes), the control apparatus 10 requests | requires the change of an operation mode with respect to the water heater 20 (step S5).

その後、給湯器20は、制御装置10からの要求に従って、運転モードを変更する(ステップS6)。そして、昼間の湯の生成終了時刻になり、沸上げ運転が継続されている場合には、給湯器20は、湯の生成を停止する(ステップS27)。   Thereafter, the water heater 20 changes the operation mode in accordance with a request from the control device 10 (step S6). Then, when the hot water generation end time is reached and the boiling operation is continued, the water heater 20 stops the hot water generation (step S27).

以上、説明したように、本実施の形態に係る給湯器制御システム100では、抑制指示が制御装置10の指示取得部11によって取得されていない場合に、給湯器20の制御部21が、夜間に給湯器20に目標貯湯量の湯を生成させ、抑制指示が指示取得部11によって取得された場合に、給湯器20に、夜間に目標貯湯量より少ない量の湯を生成させて、抑制指示によって指定された昼間の時間にも湯を生成させることにより、目標貯湯量以上の量の湯を生成させる。これにより、発電可能であるにも関わらず抑制指示によって発電電力が制限されることで損失する電力を減少させることができる。ひいては、電力の利用効率を向上させることができる。   As described above, in the water heater control system 100 according to the present embodiment, when the suppression instruction is not acquired by the instruction acquisition unit 11 of the control device 10, the control unit 21 of the water heater 20 is operated at night. When the hot water heater 20 generates hot water of the target hot water storage amount and the suppression instruction is acquired by the instruction acquisition unit 11, the hot water heater 20 generates hot water of an amount smaller than the target hot water storage amount at night, and the suppression instruction By generating hot water during the designated daytime, an amount of hot water that exceeds the target hot water storage amount is generated. As a result, although the power generation is possible, the power lost due to the generated power being limited by the suppression instruction can be reduced. As a result, the utilization efficiency of electric power can be improved.

また、給湯器制御システム100では、図13のステップS144に示されるように、昼間に給湯器20が湯を生成しても消費電力が発電電力より小さいことが、第1計測値取得部41及び第2計測値取得部42によって取得された計測値から予測により示されるときに、制御部21が昼間の沸上げ運転を実行した。これにより、新たな買電を生じさせることなく、昼間の沸上げ運転を実行することができる。   Further, in the water heater control system 100, as shown in step S144 of FIG. 13, even if the water heater 20 generates hot water in the daytime, it is determined that the power consumption is smaller than the generated power. When indicated by the prediction from the measurement value acquired by the second measurement value acquisition unit 42, the control unit 21 performed the daytime boiling operation. This makes it possible to perform daytime boiling operation without causing new power purchase.

また、給湯器制御システム100では、図13のステップS146に示されるように、抑制指示により指定された制限値が、第2計測値取得部42によって取得された計測値から予測により示される昼間の消費電力より小さいときに、制御部21が昼間の沸上げ運転を実行した。これにより、パワーコンディショナ31の逆潮流ゼロモードを利用して、分散型電源30の発電能力を活用することができる。   Moreover, in the water heater control system 100, as shown in step S146 of FIG. 13, the limit value specified by the suppression instruction is daytime indicated by prediction from the measurement value acquired by the second measurement value acquisition unit 42. When the power consumption is lower than the power consumption, the control unit 21 performs a daytime boiling operation. Thereby, the power generation capability of the distributed power source 30 can be utilized using the reverse power flow zero mode of the power conditioner 31.

また、給湯器制御システム100では、図13のステップS148に示されるように、給湯器20が夜間に湯を生成するために消費する電力の買電価格が、計測値から予測により示される昼間の逆潮電力の売電価格より高いときに、制御部21が昼間の沸上げ運転を実行した。これにより、経済効果を加味して、昼間の沸上げ運転の有無を決定することができる。   Moreover, in the water heater control system 100, as shown in step S148 of FIG. 13, the power purchase price of the power consumed by the water heater 20 to generate hot water at night is calculated in the daytime indicated by the prediction from the measured value. When the reverse selling power was higher than the power selling price, the control unit 21 performed daytime boiling operation. Thereby, the presence or absence of the daytime boiling operation can be determined in consideration of economic effects.

また、給湯器制御システム100では、図24のステップS163に示されるように、昼間の沸上げ運転が実行された際に、昼間の消費電力の買電価格が、給湯器20が1日に消費した電力の買電価格の平均値を超えると、生成湯量が目標貯湯量に変更された。これにより、制御部21は、少なくとも目標貯湯量の湯を生成すると、給湯器20の運転を停止させることとなる。このため、余分な買電を防ぐことができる。   Further, in the water heater control system 100, as shown in step S163 of FIG. 24, when the daytime boiling operation is executed, the power purchase price of the daytime power consumption is the same as that consumed by the water heater 20 in one day. The generated hot water volume was changed to the target hot water storage volume when it exceeded the average power purchase price. Thereby, the control part 21 will stop operation | movement of the water heater 20, if the hot water of the target hot water storage amount is produced | generated at least. For this reason, excessive power purchase can be prevented.

また、給湯器制御システム100では、図25のステップS173に示されるように、昼間の沸上げ運転が実行されて目標貯湯量の湯が貯えられている際に、給湯器20が湯を生成しないときの逆潮電力の売電価格が、夜間に給湯器20が湯を生成するために消費する電力の買電価格を超えると、制御部21が給湯器20の運転を停止した。これにより、目標貯湯量の湯を確保しつつ、経済的利益を高めることができる。   Further, in the water heater control system 100, as shown in step S173 of FIG. 25, the hot water heater 20 does not generate hot water when the daytime boiling operation is executed and the target amount of hot water is stored. When the power selling price of the reverse power at that time exceeds the power purchase price of the power consumed by the water heater 20 to generate hot water at night, the control unit 21 stops the operation of the water heater 20. Thereby, economic profit can be raised, ensuring hot water of the target hot water storage amount.

また、給湯器制御システム100では、図20のステップS224,S225に示されるように、条件成立時間の長さが閾値より長いときに、制御部21が給湯器20に最小貯湯量の湯を夜間に生成させて、昼間にも湯を生成させることにより、最大貯湯量の湯が生成された。また、図20のステップS229,S230に示されるように、条件成立時間の長さが閾値より短いときに、制御部21が条件成立時間に給湯器20に湯を生成させて、夜間にも湯を生成させることにより、目標貯湯量の湯が生成された。これにより、昼間に発電電力を利用して極力多くの湯を生成することができる。   Further, in the water heater control system 100, as shown in steps S224 and S225 of FIG. 20, when the condition establishment time is longer than the threshold, the control unit 21 supplies the water heater 20 with the minimum amount of hot water at night. The hot water of the maximum amount of hot water was generated by generating the hot water in the daytime. Further, as shown in steps S229 and S230 of FIG. 20, when the condition establishment time is shorter than the threshold, the control unit 21 causes the water heater 20 to generate hot water at the condition establishment time, so As a result, the target amount of hot water was generated. Thereby, as much hot water as possible can be generated using the generated power in the daytime.

実施の形態2.
続いて、実施の形態2について、上述の実施の形態1との相違点を中心に説明する。なお、上記実施の形態1と同一又は同等の構成については、同等の符号を用いるとともに、その説明を省略又は簡略する。
Embodiment 2. FIG.
Next, the second embodiment will be described focusing on the differences from the first embodiment. In addition, about the structure which is the same as that of the said Embodiment 1, or equivalent, while using an equivalent code | symbol, the description is abbreviate | omitted or simplified.

本実施の形態に係る給湯器制御システム101は、制御装置10を省略して構成される点で、実施の形態1に係る給湯器制御システム100と異なっている。   The water heater control system 101 according to the present embodiment is different from the water heater control system 100 according to the first embodiment in that the controller 10 is omitted.

図26に示されるように、給湯器制御システム101では、分散型電源30、計測装置40、電気機器50が、宅内ネットワークNW2と広域ネットワークNW1とを介してデータサーバ70と通信可能となるように接続されている。また、給湯器20は、分散型電源30と通信可能となるように接続され、分散型電源30を介してデータサーバ70に接続される。   As shown in FIG. 26, in the water heater control system 101, the distributed power source 30, the measuring device 40, and the electric device 50 can communicate with the data server 70 via the home network NW2 and the wide area network NW1. It is connected. The water heater 20 is connected so as to be communicable with the distributed power source 30 and is connected to the data server 70 via the distributed power source 30.

データサーバ70は、指示取得部11を有している。データサーバ70は、実施の形態1に係る制御装置10と同等に機能する。   The data server 70 has an instruction acquisition unit 11. The data server 70 functions in the same manner as the control device 10 according to the first embodiment.

図27には、本実施の形態に係る給湯器制御システム101の機能的な構成が示されている。図27に示されるように、データサーバ70は、指示取得部11、余剰電力予測部13及び判定部14を有している。また、分散型電源30は、データサーバ70の判定部14と給湯器20の制御部21との通信を中継する中継部32を有している。   FIG. 27 shows a functional configuration of water heater control system 101 according to the present embodiment. As illustrated in FIG. 27, the data server 70 includes an instruction acquisition unit 11, a surplus power prediction unit 13, and a determination unit 14. In addition, the distributed power source 30 includes a relay unit 32 that relays communication between the determination unit 14 of the data server 70 and the control unit 21 of the water heater 20.

以上、説明したように、本実施の形態では、制御装置10を省略して給湯器制御システム101が構成された。これにより、住宅HMに設置する機器の数を減らして、給湯器制御システム101を簡便に構成することができる。   As described above, in the present embodiment, the water heater control system 101 is configured by omitting the control device 10. Thereby, the number of the apparatuses installed in the house HM can be reduced, and the water heater control system 101 can be simply configured.

実施の形態3.
続いて、実施の形態3について、上述の実施の形態2との相違点を中心に説明する。なお、上記実施の形態2と同一又は同等の構成については、同等の符号を用いるとともに、その説明を省略又は簡略する。
Embodiment 3 FIG.
Subsequently, the third embodiment will be described focusing on differences from the above-described second embodiment. In addition, about the structure same or equivalent to the said Embodiment 2, while using an equivalent code | symbol, the description is abbreviate | omitted or simplified.

本実施の形態に係る給湯器制御システム102は、図28に示されるように、給湯器20が宅内ネットワークNW2を介してデータサーバ70と通信する点で、実施の形態2に係る給湯器制御システム101と異なっている。   As shown in FIG. 28, the water heater control system 102 according to the present embodiment is a water heater control system according to the second embodiment in that the water heater 20 communicates with the data server 70 via the home network NW2. 101.

以上、説明したように、本実施の形態では、分散型電源30がデータサーバ70と給湯器20との通信を中継する必要がないため、汎用の分散型電源30を用いて給湯器制御システム102を構成することができる。   As described above, in the present embodiment, since the distributed power source 30 does not need to relay communication between the data server 70 and the water heater 20, the water heater control system 102 using the general-purpose distributed power source 30 is used. Can be configured.

実施の形態4.
続いて、実施の形態4について、上述の実施の形態1との相違点を中心に説明する。なお、上記実施の形態1と同一又は同等の構成については、同等の符号を用いるとともに、その説明を省略又は簡略する。
Embodiment 4 FIG.
Next, the fourth embodiment will be described focusing on the differences from the first embodiment. In addition, about the structure which is the same as that of the said Embodiment 1, or equivalent, while using an equivalent code | symbol, the description is abbreviate | omitted or simplified.

本実施の形態に係る給湯器制御システム103は、制御装置10及びデータサーバ70を省略して構成される点で、実施の形態1に係る給湯器制御システム100と異なっている。さらに、給湯器制御システム103は、発電消費予測部71及び余剰電力予測部13を省略して構成される点で、給湯器制御システム100と異なっている。   The water heater control system 103 according to the present embodiment is different from the water heater control system 100 according to the first embodiment in that the controller 10 and the data server 70 are omitted. Further, the water heater control system 103 is different from the water heater control system 100 in that the power generation consumption prediction unit 71 and the surplus power prediction unit 13 are omitted.

図29には、給湯器制御システム103の機能的な構成が示されている。図29に示されるように、給湯器20は、指示取得部11と、判定部14と、計測値を蓄積する記憶部19とを有している。判定部14は、実施の形態1に係る予測値に代えて、記憶部19に蓄積された発電電力及び消費電力の計測値の平均値を、昼間沸上げ判定処理に用いる。   FIG. 29 shows a functional configuration of the water heater control system 103. As shown in FIG. 29, the water heater 20 includes an instruction acquisition unit 11, a determination unit 14, and a storage unit 19 that accumulates measurement values. The determination unit 14 uses the average value of the measured values of the generated power and the power consumption accumulated in the storage unit 19 in the daytime boiling determination process instead of the predicted value according to the first embodiment.

以上、説明したように、本実施の形態では、制御装置10及びデータサーバ70を省略して給湯器制御システム103が構成された。これにより、給湯器制御システム103を簡便に構成することができる。   As described above, in the present embodiment, the water heater control system 103 is configured by omitting the control device 10 and the data server 70. Thereby, the water heater control system 103 can be simply configured.

実施の形態5.
続いて、実施の形態5について、上述の実施の形態1との相違点を中心に説明する。なお、上記実施の形態1と同一又は同等の構成については、同等の符号を用いるとともに、その説明を省略又は簡略する。
Embodiment 5. FIG.
Next, the fifth embodiment will be described focusing on the differences from the first embodiment described above. In addition, about the structure which is the same as that of the said Embodiment 1, or equivalent, while using an equivalent code | symbol, the description is abbreviate | omitted or simplified.

本実施の形態に係る給湯器制御システム104は、図30に示されるように、蓄電装置81及び電気自動車82を有する点で、実施の形態1に係る給湯器制御システム100と異なっている。また、給湯器制御システム104は、抑制指示に応じて昼間に稼動させる機器を、給湯器20、電気機器50、蓄電装置81及び電気自動車82から選択する点で、給湯器制御システム100と異なっている。   The water heater control system 104 according to the present embodiment is different from the water heater control system 100 according to the first embodiment in that it includes a power storage device 81 and an electric vehicle 82, as shown in FIG. Also, the water heater control system 104 is different from the water heater control system 100 in that a device to be operated during the day according to the suppression instruction is selected from the water heater 20, the electric device 50, the power storage device 81, and the electric vehicle 82. Yes.

制御装置10は、抑制指示を取得すると、図31に示される対象機器選択処理を実行する。この対象機器選択処理は、昼間に電力を消費して稼動させる対象となる機器を選択する処理である。   When acquiring the suppression instruction, the control device 10 executes a target device selection process shown in FIG. This target device selection process is a process of selecting a device to be operated by consuming electric power during the daytime.

対象機器選択処理において、制御装置10のプロセッサH1は、まず、蓄電装置81又は電気自動車82が制御装置10と通信可能となるように接続されているか否かを判定する(ステップS181)。蓄電装置81又は電気自動車82が接続されていると判定した場合(ステップS181;Yes)、プロセッサH1は、接続されている蓄電装置81又は電気自動車82について、対象機器の適合条件が成立するか否かを判定する(ステップS182)。この適合条件には、例えば、ユーザの使用予定がないこと、あるいは、充電率が一定値以下であることが含まれる。   In the target device selection process, the processor H1 of the control device 10 first determines whether or not the power storage device 81 or the electric vehicle 82 is connected so as to be communicable with the control device 10 (step S181). When it is determined that the power storage device 81 or the electric vehicle 82 is connected (step S181; Yes), the processor H1 determines whether or not the target device conformity condition is satisfied for the connected power storage device 81 or the electric vehicle 82. Is determined (step S182). This conforming condition includes, for example, that the user does not plan to use or that the charging rate is a certain value or less.

適合条件が成立すると判定した場合(ステップS182;Yes)、プロセッサH1は、蓄電装置81又は電気自動車82を選択する(ステップS183)。これらの機器が選択された場合に、制御装置10は、抑制指示によって指定された時間に、これらの機器に充電処理を実行させる。その後、プロセッサH1は、対象機器選択処理を終了する。   When it determines with a suitable condition being satisfied (step S182; Yes), the processor H1 selects the electrical storage apparatus 81 or the electric vehicle 82 (step S183). When these devices are selected, the control device 10 causes these devices to execute a charging process at the time designated by the suppression instruction. Thereafter, the processor H1 ends the target device selection process.

ステップS181にて蓄電装置81又は電気自動車82が接続されていないと判定した場合(ステップS181;No)、又はステップS182にて適合条件が成立しないと判定した場合(ステップS182;No)、プロセッサH1は、給湯器20が制御装置10と通信可能に接続されているか否かを判定する(ステップS184)。   When it is determined in step S181 that the power storage device 81 or the electric vehicle 82 is not connected (step S181; No), or when it is determined in step S182 that the matching condition is not satisfied (step S182; No), the processor H1 Determines whether the water heater 20 is communicably connected to the control device 10 (step S184).

給湯器20が接続されていると判定した場合(ステップS184;Yes),プロセッサH1は、接続されている給湯器20について、適合条件が成立するか否かを判定する(ステップS185)。この適合条件には、例えば、ユーザの使用予定がないこと、あるいは、貯湯量が一定値以下であることが含まれる。   When it is determined that the water heater 20 is connected (step S184; Yes), the processor H1 determines whether or not the matching condition is satisfied for the connected water heater 20 (step S185). This conforming condition includes, for example, that the user does not plan to use, or that the amount of stored hot water is a predetermined value or less.

適合条件が成立すると判定した場合(ステップS185;Yes)、プロセッサH1は、給湯器20を選択する(ステップS186)。その後、プロセッサH1は、対象機器選択処理を終了する。   If it is determined that the matching condition is satisfied (step S185; Yes), the processor H1 selects the water heater 20 (step S186). Thereafter, the processor H1 ends the target device selection process.

ステップS184にて給湯器20が接続されていないと判定した場合(ステップS184;No)、又はステップS185にて適合条件が成立しないと判定した場合(ステップS185;No)、プロセッサH1は、節電機器が制御装置10と通信可能に接続されているか否かを判定する(ステップS187)。節電機器は、節電の対象となっている電気機器50を意味し、例えば、冷蔵庫又は空調機器である。   When it is determined in step S184 that the water heater 20 is not connected (step S184; No), or when it is determined in step S185 that the matching condition is not satisfied (step S185; No), the processor H1 Is determined to be communicable with the control device 10 (step S187). The power saving device means the electric device 50 that is a target of power saving, and is, for example, a refrigerator or an air conditioning device.

節電機器が接続されていると判定した場合(ステップS187;Yes)、プロセッサH1は、接続されている節電機器について、適合条件が成立するか否かを判定する(ステップS188)。   When it is determined that the power saving device is connected (step S187; Yes), the processor H1 determines whether or not a conforming condition is satisfied for the connected power saving device (step S188).

適合条件が成立すると判定した場合(ステップS188;Yes)、プロセッサH1は、節電機器を選択する(ステップS189)。節電機器が選択された場合に、制御装置10は、抑制指示によって指定された時間に、節電機器に課されている節電の設定を解除する。その後、プロセッサH1は、対象機器選択処理を終了する。   When it determines with a suitable condition being satisfied (step S188; Yes), the processor H1 selects a power saving apparatus (step S189). When the power saving device is selected, the control device 10 cancels the power saving setting imposed on the power saving device at the time specified by the suppression instruction. Thereafter, the processor H1 ends the target device selection process.

ステップS187にて節電機器が接続されていないと判定した場合(ステップS187;No)、又はステップS188にて適合条件が成立しないと判定した場合(ステップS188;No)、プロセッサH1は、対象機器を選択することなく、対象機器選択処理を終了する。   If it is determined in step S187 that the power-saving device is not connected (step S187; No), or if it is determined in step S188 that the matching condition is not satisfied (step S188; No), the processor H1 selects the target device. The target device selection process is terminated without making a selection.

以上、説明したように、本実施の形態に係る制御装置10は、蓄電装置81又は電気自動車82、給湯器20、節電機器の順で対象機器を選択した。蓄電装置81及び電気自動車82は、蓄積するエネルギーの容量が大きく、かつ、蓄積したエネルギーを電力として再利用することができるため利便性が高い。また、給湯器20は、蓄積した熱量を電力として再利用することはできないが、蓄積するエネルギーの容量は比較的大きい。このため、利便性の高い順で適切な機器を選択することができる。   As described above, the control device 10 according to the present embodiment selects the target devices in the order of the power storage device 81 or the electric vehicle 82, the water heater 20, and the power saving device. The power storage device 81 and the electric vehicle 82 are highly convenient because they have a large energy storage capacity and can reuse the stored energy as electric power. In addition, the hot water heater 20 cannot reuse the accumulated amount of heat as electric power, but the capacity of the accumulated energy is relatively large. For this reason, a suitable apparatus can be selected in order with high convenience.

以上、本発明の実施の形態について説明したが、本発明は上記実施の形態によって限定されるものではない。   As mentioned above, although embodiment of this invention was described, this invention is not limited by the said embodiment.

例えば、分散型電源30は、太陽光により発電する装置に限られず、風力又は水力により発電する装置であってもよいし、燃料電池を備える装置であってもよい。   For example, the distributed power source 30 is not limited to a device that generates power using sunlight, and may be a device that generates power using wind power or hydraulic power, or may be a device including a fuel cell.

また、補助記憶部H3に記憶されているプログラムPaを、フレキシブルディスク、CD−ROM(Compact Disk Read-Only Memory)、DVD(Digital Versatile Disk)、MO(Magneto-Optical disk)等のコンピュータ読み取り可能な記録媒体に格納して配布し、そのプログラムPaをコンピュータにインストールすることにより、上述の処理を実行する装置を構成することができる。   The program Pa stored in the auxiliary storage unit H3 can be read by a computer such as a flexible disk, a CD-ROM (Compact Disk Read-Only Memory), a DVD (Digital Versatile Disk), and an MO (Magneto-Optical disk). By storing and distributing in a recording medium and installing the program Pa in a computer, an apparatus for executing the above-described processing can be configured.

また、プログラムPaをインターネットに代表される通信ネットワーク上のサーバ装置が有するディスク装置に格納しておき、例えば、搬送波に重畳させて、コンピュータにダウンロードするようにしてもよい。   Further, the program Pa may be stored in a disk device included in a server device on a communication network represented by the Internet, and may be downloaded onto a computer, for example, superimposed on a carrier wave.

また、インターネットに代表されるネットワークを介してプログラムPaを転送しながら起動実行することによっても、上述の処理を達成することができる。   The above-described processing can also be achieved by starting and executing the program Pa while transferring it via a network represented by the Internet.

さらに、プログラムPaの全部又は一部をサーバ装置上で実行させ、その処理に関する情報をコンピュータが通信ネットワークを介して送受信しながらプログラムPaを実行することによっても、上述の処理を達成することができる。   Furthermore, the above-described processing can also be achieved by executing all or part of the program Pa on the server device and executing the program Pa while the computer transmits / receives information related to the processing via the communication network. .

なお、上述の機能を、OS(Operating System)が分担して実現する場合又はOSとアプリケーションとの協働により実現する場合には、OS以外の部分のみを媒体に格納して配布してもよく、また、コンピュータにダウンロードしてもよい。   In the case where the above functions are realized by sharing an OS (Operating System) or when the functions are realized by cooperation between the OS and an application, only the part other than the OS may be stored in a medium and distributed. It may also be downloaded to a computer.

また、制御装置10及び給湯器20の機能を実現する手段は、ソフトウェアに限られず、その一部又は全部を専用のハードウェアによって実現してもよい。例えば、指示取得部11、余剰電力予測部13、判定部14、計画モジュール22、第1制御モジュール22a及び第2制御モジュール22bを、FPGA(Field Programmable Gate Array)又はASIC(Application Specific Integrated Circuit)に代表される回路を用いて構成すれば、制御装置10及び給湯器20の省電力化を図ることができる。   In addition, the means for realizing the functions of the control device 10 and the water heater 20 is not limited to software, and part or all of the means may be realized by dedicated hardware. For example, the instruction acquisition unit 11, surplus power prediction unit 13, determination unit 14, planning module 22, first control module 22 a and second control module 22 b are integrated into an FPGA (Field Programmable Gate Array) or ASIC (Application Specific Integrated Circuit). If the circuit is typified, the power consumption of the control device 10 and the water heater 20 can be reduced.

本発明は、本発明の広義の精神と範囲を逸脱することなく、様々な実施の形態及び変形が可能とされるものである。また、上述した実施の形態は、本発明を説明するためのものであり、本発明の範囲を限定するものではない。つまり、本発明の範囲は、実施の形態ではなく、請求の範囲によって示される。そして、請求の範囲内及びそれと同等の発明の意義の範囲内で施される様々な変形が、本発明の範囲内とみなされる。   Various embodiments and modifications can be made to the present invention without departing from the broad spirit and scope of the present invention. The above-described embodiments are for explaining the present invention and do not limit the scope of the present invention. In other words, the scope of the present invention is shown not by the embodiments but by the claims. Various modifications within the scope of the claims and within the scope of the equivalent invention are considered to be within the scope of the present invention.

本発明の給湯器制御システム、制御方法及びプログラムは、電力の効率的な利用に適している。   The water heater control system, control method, and program of the present invention are suitable for efficient use of electric power.

10 制御装置、 11 指示取得部、 12 転送部、 13 余剰電力予測部、 14 判定部、 19 記憶部、 20 給湯器、 21 制御部、 22 計画モジュール、 22a 第1制御モジュール、 22b 第2制御モジュール、 23 ヒートポンプユニット、 24 貯湯タンク、 30 分散型電源、 31 パワーコンディショナ、 32 中継部、 40 計測装置、 41 第1計測値取得部、 42 第2計測値取得部、 50 電気機器、 60 電力サーバ、 70 データサーバ、 71 発電消費予測部、 81 蓄電装置、 82 電気自動車、 100〜104 給湯器制御システム、 HM 住宅、 H1 プロセッサ、 H2 主記憶部、 H3 補助記憶部、 H4 入力部、 H5 出力部、 H6 通信部、 H7 内部バス、 L21,L22,La,Lc,Lg,Lp, 線、 NW1 広域ネットワーク、 NW2 宅内ネットワーク、 Pa プログラム、 PS 商用電力系統。   DESCRIPTION OF SYMBOLS 10 Control apparatus, 11 Instruction acquisition part, 12 Transfer part, 13 Surplus power prediction part, 14 Judgment part, 19 Memory | storage part, 20 Water heater, 21 Control part, 22 Planning module, 22a 1st control module, 22b 2nd control module , 23 heat pump unit, 24 hot water storage tank, 30 distributed power source, 31 power conditioner, 32 relay unit, 40 measuring device, 41 first measurement value acquisition unit, 42 second measurement value acquisition unit, 50 electrical equipment, 60 power server , 70 data server, 71 power generation consumption prediction unit, 81 power storage device, 82 electric vehicle, 100-104 water heater control system, HM housing, H1 processor, H2 main storage unit, H3 auxiliary storage unit, H4 input unit, H5 output unit , H6 communication unit, H7 internal bus, L 21, L22, La, Lc, Lg, Lp, line, NW1 wide area network, NW2 residential network, Pa program, PS commercial power system.

上記目的を達成するため、本発明の給湯器制御システムは、商用電力系統と商用電力系統に電力を供給する分散型電源との少なくとも一方から供給される電力で貯湯タンクに湯を供給する給湯器を制御する給湯器制御システムであって、第1の時間における分散型電源から商用電力系統への電力の供給を抑制する指示を取得する指示取得手段と、指示取得手段によって指示が取得されない場合に、第1の時間より前の第2の時間に給湯器に予め定められた量の湯を供給させ、指示取得手段によって指示が取得された場合に、給湯器に、第2の時間に予め定められた量より少ない量の湯を供給させて第1の時間に湯を供給させることにより、予め定められた量以上の量の湯を供給させる制御手段と、を備え、制御手段は、指示取得手段によって指示が取得された場合において、第1の時間のうち給湯器に湯を供給させる条件が成立する条件成立時間の長さが閾値より長いときには、給湯器に、湯切れを防止するための最小貯湯量の湯を第2の時間に供給させて第1の時間に湯を供給させることにより、予め定められた量以上の量の湯を供給させ、条件成立時間の長さが閾値より短いときには、給湯器に、第2の時間に予め定められた量より少ない量の湯を供給させて条件成立時間に湯を供給させることにより、予め定められた量の湯を供給させるIn order to achieve the above object, a water heater control system of the present invention is a water heater that supplies hot water to a hot water storage tank with electric power supplied from at least one of a commercial power system and a distributed power source that supplies power to the commercial power system. A hot water supply control system for controlling the power supply, the instruction acquisition means for acquiring an instruction to suppress the supply of power from the distributed power source to the commercial power system in the first time, and when the instruction is not acquired by the instruction acquisition means When a predetermined amount of hot water is supplied to the water heater at a second time before the first time and the instruction is acquired by the instruction acquisition means, the water heater is predetermined at the second time. first by supplying hot water to the time by supplying less than the amount of the hot water amount which is, and a control means for supplying the hot water predetermined amount or more amount, the control means, the instruction acquisition By means In the case where the indication is acquired, the minimum hot water storage for preventing the hot water heater from running out when the condition establishment time for satisfying the condition for supplying hot water to the water heater during the first time is longer than the threshold value. When the amount of hot water is supplied in the second time and the hot water is supplied in the first time, an amount of hot water of a predetermined amount or more is supplied, and when the condition establishment time is shorter than the threshold value, By causing the water heater to supply an amount of hot water that is less than a predetermined amount at the second time and to supply hot water at the condition establishment time, a predetermined amount of hot water is supplied .

Claims (9)

商用電力系統と前記商用電力系統に電力を供給する分散型電源との少なくとも一方から供給される電力で貯湯タンクに湯を供給する給湯器を制御する給湯器制御システムであって、
第1の時間における前記分散型電源から前記商用電力系統への電力の供給を抑制する指示を取得する指示取得手段と、
前記指示取得手段によって前記指示が取得されない場合に、前記第1の時間より前の第2の時間に前記給湯器に予め定められた量の湯を供給させ、前記指示取得手段によって前記指示が取得された場合に、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる制御手段と、
を備える給湯器制御システム。
A water heater control system that controls a water heater that supplies hot water to a hot water storage tank with power supplied from at least one of a commercial power system and a distributed power source that supplies power to the commercial power system,
Instruction acquisition means for acquiring an instruction to suppress power supply from the distributed power source to the commercial power system in a first time;
If the instruction is not acquired by the instruction acquisition unit, a predetermined amount of hot water is supplied to the water heater at a second time before the first time, and the instruction is acquired by the instruction acquisition unit. If so, the predetermined amount is obtained by causing the water heater to supply less hot water than the predetermined amount at the second time and supply hot water at the first time. Control means for supplying the above amount of hot water;
A water heater control system.
前記分散型電源による発電電力の計測値を取得する第1計測値取得手段と、
前記給湯器を有し、前記分散型電源と前記商用電力系統との少なくとも一方からの電力が供給される住宅で消費される消費電力の計測値を取得する第2計測値取得手段と、をさらに備え、
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記第1の時間に前記給湯器が湯を供給しても前記消費電力が前記発電電力より小さいことが、前記第1計測値取得手段によって取得された計測値と前記第2計測値取得手段によって取得された計測値とから示されるときに、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる、
請求項1に記載の給湯器制御システム。
First measurement value acquisition means for acquiring a measurement value of power generated by the distributed power source;
A second measurement value acquisition unit that includes the water heater, and acquires a measurement value of power consumption consumed in a house to which power from at least one of the distributed power source and the commercial power system is supplied; Prepared,
When the instruction is acquired by the instruction acquisition means, the control means is configured such that the power consumption is smaller than the generated power even if the hot water supply supplies hot water at the first time. When indicated by the measurement value acquired by the measurement value acquisition means and the measurement value acquired by the second measurement value acquisition means, the water heater is less than the predetermined amount at the second time. Supplying an amount of hot water and supplying hot water in the first time period to supply an amount of hot water equal to or greater than the predetermined amount;
The water heater control system according to claim 1.
前記指示は、前記第1の時間に前記分散型電源から前記商用電力系統へ電力が供給されるときの前記発電電力の制限値を指定し、
前記分散型電源は、前記消費電力が前記制限値を超えると、前記消費電力に等しい大きさの前記発電電力を前記住宅へ供給し、
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記制限値が、前記第2計測値取得手段によって取得された計測値から示される前記第1の時間における前記消費電力より小さいときに、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる、
請求項2に記載の給湯器制御システム。
The instruction specifies a limit value of the generated power when power is supplied from the distributed power source to the commercial power system at the first time,
When the power consumption exceeds the limit value, the distributed power source supplies the generated power having a magnitude equal to the power consumption to the house,
When the instruction is acquired by the instruction acquisition unit, the control unit is configured to obtain the limit value from the power consumption at the first time indicated by the measurement value acquired by the second measurement value acquisition unit. More than the predetermined amount by causing the water heater to supply an amount of hot water less than the predetermined amount at the second time and supply hot water at the first time when it is small. To supply the amount of hot water,
The water heater control system according to claim 2.
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記給湯器が前記第2の時間に湯を供給するために消費する電力の買電価格が、前記第1計測値取得手段によって取得された計測値と前記第2計測値取得手段によって取得された計測値とから示される、前記第1の時間に前記分散型電源から前記商用電力系統へ供給される電力の売電価格より高いときに、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる、
請求項2に記載の給湯器制御システム。
In the case where the instruction is acquired by the instruction acquisition unit, the control unit is configured to acquire a power purchase price of power consumed by the water heater to supply hot water in the second time. The selling price of the power supplied from the distributed power source to the commercial power system at the first time indicated by the measured value acquired by the means and the measured value acquired by the second measured value acquiring means The predetermined amount is caused by causing the water heater to supply less hot water than the predetermined amount at the second time to supply hot water at the first time when higher. To supply more hot water,
The water heater control system according to claim 2.
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記給湯器に前記予め定められた量より多い量の湯を供給させ、前記給湯器を有し、前記分散型電源と前記商用電力系統との少なくとも一方からの電力が供給される住宅へ前記商用電力系統から前記第1の時間に供給された電力の買電価格が、前記給湯器が1日に消費した電力の買電価格の平均値を超えると、前記給湯器に湯の供給を停止させる、
請求項1から4のいずれか一項に記載の給湯器制御システム。
When the instruction is acquired by the instruction acquisition unit, the control unit causes the water heater to supply a larger amount of hot water than the predetermined amount, includes the water heater, and includes the distributed power source. The purchase price of the electric power consumed by the water heater in a day is determined by the purchase price of the electric power supplied from the commercial electric power system to the house supplied with electric power from at least one of the commercial electric power system at the first time. When the average price of electricity is exceeded, the hot water supply is stopped from supplying hot water.
The water heater control system according to any one of claims 1 to 4.
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記給湯器に前記予め定められた量より多い量の湯を供給させ、前記給湯器が湯を供給しないときの前記分散型電源から前記商用電力系統へ供給される電力の売電価格が、前記給湯器が前記第2の時間に湯を供給するために消費する電力の買電価格を超えると、前記給湯器に湯の供給を停止させる、
請求項1から5のいずれか一項に記載の給湯器制御システム。
The control means causes the water heater to supply a larger amount of hot water than the predetermined amount when the instruction is acquired by the instruction acquiring means, and the dispersion when the water heater does not supply hot water. When the selling price of the power supplied from the mold power source to the commercial power system exceeds the power purchase price of the power consumed by the water heater to supply hot water in the second time, hot water is supplied to the water heater. Stop supplying,
The water heater control system according to any one of claims 1 to 5.
前記制御手段は、前記指示取得手段によって前記指示が取得された場合において、前記第1の時間のうち前記給湯器に湯を供給させる条件が成立する条件成立時間の長さが閾値より長いときには、前記給湯器に、湯切れを防止するための最小貯湯量の湯を前記第2の時間に供給させて前記第1の時間に湯を供給させることにより、前記貯湯タンクの最大貯湯量の湯を供給させ、前記条件成立時間の長さが前記閾値より短いときには、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記条件成立時間に湯を供給させることにより、前記予め定められた量の湯を供給させる、
請求項1から6のいずれか一項に記載の給湯器制御システム。
In the case where the instruction is acquired by the instruction acquisition unit, the control unit is configured such that when a condition establishment time in which a condition for supplying hot water to the water heater in the first time is satisfied is longer than a threshold, By causing the water heater to supply a minimum amount of hot water for preventing hot water shortage during the second time and supplying hot water during the first time, the hot water having the maximum amount of hot water stored in the hot water storage tank is obtained. When the condition establishment time is shorter than the threshold, the water heater is supplied with a smaller amount of hot water than the predetermined amount during the second time, and hot water is supplied during the condition establishment time. By supplying the predetermined amount of hot water,
The water heater control system according to any one of claims 1 to 6.
商用電力系統と前記商用電力系統に電力を供給する分散型電源との少なくとも一方から供給される電力で貯湯タンクに湯を供給する給湯器を制御する制御方法であって、
第1の時間における前記分散型電源から前記商用電力系統への電力の供給を抑制することが指示されない場合に、前記第1の時間より前の第2の時間に前記給湯器に予め定められた量の湯を供給させる第1制御ステップと、
前記指示がなされた場合に、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる第2制御ステップと、
を含む制御方法。
A control method for controlling a water heater that supplies hot water to a hot water storage tank with power supplied from at least one of a commercial power system and a distributed power source that supplies power to the commercial power system,
In the case where there is no instruction to suppress the supply of power from the distributed power source to the commercial power system in the first time, the water heater is predetermined in the second time before the first time. A first control step of supplying a quantity of hot water;
When the instruction is given, the predetermined amount of water is supplied to the water heater by supplying less hot water than the predetermined amount at the second time and supplying hot water at the first time. A second control step for supplying an amount of hot water equal to or greater than a predetermined amount;
Control method.
商用電力系統と前記商用電力系統に電力を供給する分散型電源との少なくとも一方から供給される電力で貯湯タンクに湯を供給する給湯器を制御するコンピュータを、
第1の時間における前記分散型電源から前記商用電力系統への電力の供給を抑制することが指示されない場合に、前記第1の時間より前の第2の時間に前記給湯器に予め定められた量の湯を供給させる第1制御手段、
前記指示がなされた場合に、前記給湯器に、前記第2の時間に前記予め定められた量より少ない量の湯を供給させて前記第1の時間に湯を供給させることにより、前記予め定められた量以上の量の湯を供給させる第2制御手段、
として機能させるためのプログラム。
A computer that controls a water heater that supplies hot water to a hot water storage tank with power supplied from at least one of a commercial power system and a distributed power source that supplies power to the commercial power system;
In the case where there is no instruction to suppress the supply of power from the distributed power source to the commercial power system in the first time, the water heater is predetermined in the second time before the first time. First control means for supplying a quantity of hot water;
When the instruction is given, the predetermined amount of water is supplied to the water heater by supplying less hot water than the predetermined amount at the second time and supplying hot water at the first time. Second control means for supplying an amount of hot water equal to or greater than a predetermined amount;
Program to function as.
JP2017552577A 2015-11-25 2015-11-25 Water heater control system, control method and program Active JP6479212B2 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/083033 WO2017090110A1 (en) 2015-11-25 2015-11-25 Water heater control system, control method, and program

Publications (2)

Publication Number Publication Date
JPWO2017090110A1 true JPWO2017090110A1 (en) 2018-04-26
JP6479212B2 JP6479212B2 (en) 2019-03-06

Family

ID=58763774

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017552577A Active JP6479212B2 (en) 2015-11-25 2015-11-25 Water heater control system, control method and program

Country Status (2)

Country Link
JP (1) JP6479212B2 (en)
WO (1) WO2017090110A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6598070B2 (en) * 2016-03-11 2019-10-30 パナソニックIpマネジメント株式会社 Energy prediction system
JP7230476B2 (en) * 2018-12-12 2023-03-01 富士通株式会社 Power management method, power management system and power management program

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006158027A (en) * 2004-11-26 2006-06-15 Hanshin Electric Co Ltd Domestic power system
WO2012063409A1 (en) * 2010-11-10 2012-05-18 パナソニック株式会社 Operation planning method, operation planning device, method for operating heat pump hot-water supply system, and method for operating heat pump hot-water supply and heating system
WO2012169116A1 (en) * 2011-06-06 2012-12-13 パナソニック株式会社 Operating method for heat pump, and heat pump system
JP2013110917A (en) * 2011-11-24 2013-06-06 Panasonic Corp Power selling schedule presentation system
JP2013148287A (en) * 2012-01-20 2013-08-01 Mitsubishi Electric Corp Storage type hot water supply system
JP2013222293A (en) * 2012-04-16 2013-10-28 Toshiba Corp Energy management system, energy management method, program, server device and client device
JP2014066496A (en) * 2012-09-27 2014-04-17 Noritz Corp Hot water supply device
JP2014122764A (en) * 2012-12-21 2014-07-03 Mitsubishi Electric Corp Hot water storage-type water heater and solar system
JP2014126300A (en) * 2012-12-26 2014-07-07 Rinnai Corp Hot water storage type hot water supply device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006158027A (en) * 2004-11-26 2006-06-15 Hanshin Electric Co Ltd Domestic power system
WO2012063409A1 (en) * 2010-11-10 2012-05-18 パナソニック株式会社 Operation planning method, operation planning device, method for operating heat pump hot-water supply system, and method for operating heat pump hot-water supply and heating system
WO2012169116A1 (en) * 2011-06-06 2012-12-13 パナソニック株式会社 Operating method for heat pump, and heat pump system
JP2013110917A (en) * 2011-11-24 2013-06-06 Panasonic Corp Power selling schedule presentation system
JP2013148287A (en) * 2012-01-20 2013-08-01 Mitsubishi Electric Corp Storage type hot water supply system
JP2013222293A (en) * 2012-04-16 2013-10-28 Toshiba Corp Energy management system, energy management method, program, server device and client device
JP2014066496A (en) * 2012-09-27 2014-04-17 Noritz Corp Hot water supply device
JP2014122764A (en) * 2012-12-21 2014-07-03 Mitsubishi Electric Corp Hot water storage-type water heater and solar system
JP2014126300A (en) * 2012-12-26 2014-07-07 Rinnai Corp Hot water storage type hot water supply device

Also Published As

Publication number Publication date
WO2017090110A1 (en) 2017-06-01
JP6479212B2 (en) 2019-03-06

Similar Documents

Publication Publication Date Title
Sedhom et al. IoT-based optimal demand side management and control scheme for smart microgrid
JP6580159B2 (en) Water heater control system, control method and program
Arun et al. Intelligent residential energy management system for dynamic demand response in smart buildings
Ramchurn et al. Agent-based control for decentralised demand side management in the smart grid
Adika et al. Autonomous appliance scheduling for household energy management
Dai et al. Optimal power generation and load management for off-grid hybrid power systems with renewable sources via mixed-integer programming
US20150378381A1 (en) Systems and methods for energy cost optimization
US20160124411A1 (en) Distributed energy demand management
AU2015415604A1 (en) Water heater control system and storage-type electric water heater
Bartolucci et al. Renewable source penetration and microgrids: Effects of MILP–Based control strategies
JPWO2016088761A1 (en) Power control system, power control method and program
JP2018007536A (en) Adaptive energy management scheduling system and method for hybrid energy storage system linked with new renewable energy
JP2007104775A (en) Energy demanding/supplying method in combined power supply, and energy demanding/supplying apparatus
JP6385857B2 (en) Power management apparatus and control method thereof
Janocha et al. Cost minimization by optimization of electricity generation and demand side management
Gomathy et al. Energy management system and peak shaving algorithm for smart home integrated with renewable energy
Ali et al. Optimal appliance management system with renewable energy integration for smart homes
JP6479212B2 (en) Water heater control system, control method and program
Lee et al. A genetic algorithm based power consumption scheduling in smart grid buildings
JP6903531B2 (en) Distributed power control device, distributed power control system and distributed power control method
JP2017163630A (en) Controller, power generator, control method and program
JP2017169292A (en) Controller, control method, and program
Khodaei et al. Optimal hourly scheduling of community-aggregated electricity consumption
JP6678347B2 (en) Power management system
JP6678348B2 (en) Distributed power generation system and method for providing at least part of the operation plan of the system outside the system

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171208

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190205

R150 Certificate of patent or registration of utility model

Ref document number: 6479212

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250