JPWO2013175846A1 - Protection relay operation test system - Google Patents

Protection relay operation test system Download PDF

Info

Publication number
JPWO2013175846A1
JPWO2013175846A1 JP2014516697A JP2014516697A JPWO2013175846A1 JP WO2013175846 A1 JPWO2013175846 A1 JP WO2013175846A1 JP 2014516697 A JP2014516697 A JP 2014516697A JP 2014516697 A JP2014516697 A JP 2014516697A JP WO2013175846 A1 JPWO2013175846 A1 JP WO2013175846A1
Authority
JP
Japan
Prior art keywords
signal
relay device
test
protective relay
test signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014516697A
Other languages
Japanese (ja)
Other versions
JP5791796B2 (en
Inventor
笹川 悟
悟 笹川
片山 和頼
和頼 片山
俊彦 宮内
俊彦 宮内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2014516697A priority Critical patent/JP5791796B2/en
Application granted granted Critical
Publication of JP5791796B2 publication Critical patent/JP5791796B2/en
Publication of JPWO2013175846A1 publication Critical patent/JPWO2013175846A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • G01R31/3278Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/04Details with warning or supervision in addition to disconnection, e.g. for indicating that protective apparatus has functioned
    • H02H3/044Checking correct functioning of protective arrangements, e.g. by simulating a fault
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/05Details with means for increasing reliability, e.g. redundancy arrangements

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

系統からの入力信号を受けてアナログ計測値を出力する回路(3)と、前記アナログ計測値をデジタル信号に変換するコンバータ(4)と、保護継電装置(100)に対するテスト信号を生成する回路(6)と、回路(3)の前段に設けられ、前記テスト信号と前記系統からの入力信号とを切換えるスイッチ(2)と、前記デジタル信号を入力として取り込み、保護継電装置(100)の保護演算と演算結果に基づいた保護もしくは制御の指示発令を行なうと共に、スイッチ(2)の切換えタイミングを制御するCPU(5)と、回路(3)及びコンバータ(4)を経由して入力される前記テスト信号と回路(6)から直接入力される前記テスト信号とを比較して異常有無を判定する保護/監視処理部(5a)と、を備え、コンバータ(4)からの前記テスト信号と前記系統からの前記入力信号を交互にサンプリングを実施して異常の有無を監視する。A circuit (3) that receives an input signal from the system and outputs an analog measurement value, a converter (4) that converts the analog measurement value into a digital signal, and a circuit that generates a test signal for the protective relay device (100) (6), a switch (2) provided before the circuit (3), for switching between the test signal and the input signal from the system, and taking the digital signal as an input, for the protection relay device (100) A protection or control instruction is issued based on the protection calculation and the calculation result, and input via the CPU (5) for controlling the switching timing of the switch (2), the circuit (3) and the converter (4). A protection / monitoring processing unit (5a) for comparing the test signal and the test signal input directly from the circuit (6) to determine the presence or absence of an abnormality, and comprising a converter (4) The test signal al and the input signal from the system to implement the sampling alternately monitor the presence of abnormality.

Description

この発明は、電気設備を系統異常から保護する保護継電装置の動作試験を行う保護継電装置の動作試験システムに関するものである。   The present invention relates to an operation test system for a protective relay device that performs an operation test of a protective relay device that protects electrical equipment from system abnormality.

配電盤で使用する保護継電装置においては、内部電源電圧の監視を始めとする自己監視機能を有するものがある。しかし保護継電装置については、これまでは1年〜数年ごとの定期点検時のリレー試験により保護継電装置の動作確認を行うのが一般的であり、電気設備の運転中は常時信号が入力されているため、電気設備の異常か保護継電装置の異常かの判断が困難であった。   Some protective relay devices used in the switchboard have a self-monitoring function including monitoring of the internal power supply voltage. However, with regard to protective relay devices, until now, it has been common to check the operation of protective relay devices through relay tests during regular inspections every year to several years. Because of the input, it was difficult to determine whether the electrical equipment was abnormal or the protective relay was abnormal.

従来、電気設備を系統異常から保護する保護継電装置の特性試験を行う保護継電装置の特性試験システムとして、例えば特開2010−284057号公報(特許文献1)に開示されたものがある。この特許文献1では、保護継電装置のアナログ入力回路の前段に系統からの入力遮断スイッチを備え、これにより系統からのアナログ入力回路への電気量の入力を遮断する。この状態でアナログ入力回路へ試験波形を入力して保護継電装置を動作させることにより、停電を伴うことなく保護継電装置の特性試験を実施するものである。   Conventionally, as a characteristic test system for a protective relay device that performs a characteristic test of a protective relay device that protects electrical equipment from system abnormality, for example, there is one disclosed in Japanese Patent Application Laid-Open No. 2010-284057 (Patent Document 1). In this patent document 1, an input cut-off switch from the system is provided in the preceding stage of the analog input circuit of the protective relay device, thereby shutting off the input of electric quantity from the system to the analog input circuit. In this state, by inputting a test waveform to the analog input circuit and operating the protective relay device, the characteristic test of the protective relay device is performed without any power failure.

特開2010−284057号公報JP 2010-284057 A

前記特許文献1に開示された保護継電装置の特性試験システムによれば、系統に接続されている既設の保護継電装置の特性試験を、停電を伴うことなく、或いは停電させることなく行うことができる。しかし、保護継電装置の特性試験期間中は系統からの入力を遮断するために、電気設備の保護ができない状態であった。   According to the characteristic test system of the protective relay device disclosed in Patent Document 1, the characteristic test of the existing protective relay device connected to the system is performed without power failure or without power failure. Can do. However, during the characteristic test period of the protective relay device, the input from the system was cut off, so that the electrical equipment could not be protected.

この発明は、前記課題を解決するためになされたもので、外部からの入力を監視しつつ、テスト信号生成回路で生成したテスト信号により保護機能の健全性が確認できる保護継電装置の動作試験システムを提供することを目的とするものである。   The present invention has been made to solve the above-described problems, and is an operation test of a protective relay device in which the soundness of a protective function can be confirmed by a test signal generated by a test signal generation circuit while monitoring an external input. The purpose is to provide a system.

この発明による保護継電装置の動作試験システムは、系統異常を検出し系統の電気設備を系統異常から保護する保護継電装置の動作試験システムにおいて、前記系統からの入力信号を受けてアナログ計測値を出力するアナログ計測回路と、前記アナログ計測回路から出力される前記アナログ計測値をデジタル信号に変換するA/Dコンバータと、前記保護継電装置に対するテスト信号を生成するテスト信号生成回路と、前記保護継電装置の前記アナログ計測回路の前段に設けられ、前記テスト信号と前記系統からの入力信号とを切換える切換スイッチと、前記A/Dコンバータからの前記デジタル信号を入力として取り込み、前記保護継電装置の保護演算と演算結果に基づいた保護もしくは制御の指示発令を行なうと共に、前記切換スイッチの切換えタイミングを制御するCPUと、前記アナログ計測回路及び前記A/Dコンバータを経由して入力される前記テスト信号と前記テスト信号生成回路から直接入力される前記テスト信号とを比較して異常有無を判定する保護/監視処理部と、を備え、前記A/Dコンバータからの前記テスト信号と前記系統からの前記入力信号を交互にサンプリングを実施して異常の有無を監視するものである。   An operation test system for a protection relay device according to the present invention is an operation test system for a protection relay device that detects a system abnormality and protects the electrical equipment of the system from the system abnormality, and receives an analog measurement value in response to an input signal from the system. An analog measurement circuit that outputs the analog measurement value output from the analog measurement circuit to a digital signal, a test signal generation circuit that generates a test signal for the protective relay device, and Provided before the analog measuring circuit of the protective relay device, the selector switch for switching between the test signal and the input signal from the system, and the digital signal from the A / D converter as an input, and the protective relay The protection switch of the electric device and a protection or control instruction is issued based on the calculation result, and the changeover switch The CPU for controlling the switching timing, the test signal input via the analog measurement circuit and the A / D converter, and the test signal input directly from the test signal generation circuit are compared to determine whether there is an abnormality. And a protection / monitoring processing unit for determining, and monitoring the presence / absence of abnormality by alternately sampling the test signal from the A / D converter and the input signal from the system.

この発明による保護継電装置の動作試験システムによれば、系統に接続されている既設の保護継電装置の動作試験を、停電を伴うことなく、或いは停電させることなく行うことができると共に、動作試験期間中においても電気設備の保護ができる。   According to the operation test system for the protective relay device according to the present invention, the operation test of the existing protective relay device connected to the system can be performed without power failure or without power failure. Electrical equipment can be protected even during the test period.

この発明の実施の形態1による保護継電装置の動作試験システムを説明するブロック構成図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a block block diagram explaining the operation | movement test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの動作を説明する図である。It is a figure explaining operation | movement of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態1による保護継電装置の動作試験システムの具体的実施例を説明する図である。It is a figure explaining the specific Example of the operation test system of the protection relay apparatus by Embodiment 1 of this invention. この発明の実施の形態2による保護継電装置の動作試験システムを説明するブロック構成図である。It is a block block diagram explaining the operation test system of the protection relay apparatus by Embodiment 2 of this invention. この発明の実施の形態2による保護継電装置の動作試験システムの動作を説明する図である。It is a figure explaining operation | movement of the operation test system of the protection relay apparatus by Embodiment 2 of this invention. この発明の実施の形態3による保護継電装置の動作試験システムを説明するブロック構成図である。It is a block block diagram explaining the operation test system of the protection relay apparatus by Embodiment 3 of this invention. この発明の実施の形態3による保護継電装置の動作試験システムの動作を説明する図である。It is a figure explaining operation | movement of the operation | movement test system of the protection relay apparatus by Embodiment 3 of this invention. 実施の形態4による保護継電装置の動作試験システムを説明するブロック構成図である。FIG. 10 is a block configuration diagram illustrating an operation test system for a protective relay device according to a fourth embodiment.

以下、この発明による保護継電装置の動作試験システムの好適な実施の形態について図面を参照して説明する。なお、各図中、同一符号は同一または相当部分を示している。   DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of an operation test system for a protective relay device according to the invention will be described with reference to the drawings. In each figure, the same numerals indicate the same or corresponding parts.

実施の形態1.
図1は、この発明の実施の形態1による保護継電装置の動作試験システムを説明するブロック構成図である。
図1において、符号100は保護継電装置を示している。保護継電装置100は、図示しない系統からの入力信号を変換する変圧器または変流器などの変成器(ここでは変圧器として説明する。)1、変圧器1から切換スイッチ2を介して入力される信号を増幅し、フィルタ回路により雑音を除去するアナログ計測回路3、アナログ計測回路3からのアナログ信号をデジタル信号へ変換するA/Dコンバータ4、演算や保護、あるいは切換スイッチ2の切換え処理を行うCPU5、およびCPU5からの指令に応じてテスト波形を生成するテスト信号生成回路6を備えている。なお、切換スイッチ2は、CPU5からの指示により、アナログ計測回路3へ入力される信号を、変圧器1から入力される信号とテスト信号生成回路6から入力される信号とを切換えるように構成されている。また、テスト信号生成回路6は、D/Aコンバータもしくは任意の大きさの信号を生成する回路で構成されている。
Embodiment 1 FIG.
1 is a block diagram illustrating an operation test system for a protective relay device according to Embodiment 1 of the present invention.
In FIG. 1, reference numeral 100 indicates a protective relay device. The protective relay device 100 is input from a transformer (which will be described here as a transformer) 1 such as a transformer or a current transformer for converting an input signal from a system (not shown), and from the transformer 1 via a changeover switch 2. Analog measurement circuit 3 that amplifies the received signal and removes noise by the filter circuit, A / D converter 4 that converts the analog signal from the analog measurement circuit 3 into a digital signal, computation and protection, or switching processing of the changeover switch 2 And a test signal generation circuit 6 that generates a test waveform in response to a command from the CPU 5. The changeover switch 2 is configured to switch a signal input to the analog measurement circuit 3 between a signal input from the transformer 1 and a signal input from the test signal generation circuit 6 in accordance with an instruction from the CPU 5. ing. The test signal generation circuit 6 is composed of a D / A converter or a circuit that generates a signal of an arbitrary magnitude.

更に、保護継電装置100は、機械式リレー7を動作させるための信号を生成する出力回路8、保護継電装置100からの情報を収集する中央監視装置9との通信を行う通信回路10、および系統やテスト信号生成回路6のテスト信号の状態を表示するランプあるいは表示画面などの表示手段11を備えている。   Furthermore, the protective relay device 100 includes an output circuit 8 that generates a signal for operating the mechanical relay 7, a communication circuit 10 that performs communication with the central monitoring device 9 that collects information from the protective relay device 100, And display means 11 such as a lamp or a display screen for displaying the status of the system and the test signal of the test signal generation circuit 6.

実施の形態1による保護継電装置の動作試験システムは前記のように構成されており、次に、その動作について説明する。
系統からの入力のサンプリング時においては、CPU5は切換スイッチ2をサンプリングの度に変圧器1あるいはテスト信号生成回路6に接続を切換えるようにし、図2(a)(b)に示すように、変圧器1からの信号とテスト信号生成回路6からの信号に対して交互にサンプリングを実行する。サンプリングの回数は電流または電圧波形1サイクルにつき1回以上の任意の値とする。サンプリング後のデータは、両信号が合成されたデータとなるが、CPU5の内部のソフトウエア処理において、サンプリングデータのタイミングにより、テスト信号生成回路6のデータと変圧器1のデータとに分割する。そしてCPU5は、分割したそれぞれのデータに対して保護/監視処理部5aにより、保護/監視処理を行う。なお、本実施の形態では、保護/監視処理部5aをCPU5の内部の機能部として図示しているが、CPU5の外部の機能部として具備するように構成してもよい。
The operation test system for the protective relay device according to the first embodiment is configured as described above, and the operation thereof will be described next.
At the time of sampling of the input from the system, the CPU 5 switches the connection of the changeover switch 2 to the transformer 1 or the test signal generating circuit 6 every sampling, and as shown in FIGS. Sampling is alternately performed on the signal from the tester 1 and the signal from the test signal generation circuit 6. The number of times of sampling is an arbitrary value of 1 or more per cycle of the current or voltage waveform. The sampled data is data obtained by synthesizing both signals, but is divided into the data of the test signal generation circuit 6 and the data of the transformer 1 according to the timing of the sampling data in the software processing inside the CPU 5. Then, the CPU 5 performs protection / monitoring processing on each divided data by the protection / monitoring processing unit 5a. In the present embodiment, the protection / monitoring processing unit 5a is illustrated as a functional unit inside the CPU 5, but may be configured as a functional unit outside the CPU 5.

CPU5が変圧器1からの信号により系統の異常を検出した場合、出力回路8を介して機械式リレー7を動作させることで遮断器(図示せず)を開放させる。これに対してテスト信号生成回路6からの信号による保護動作の場合は、機械式リレー7を動作させずに、通信回路10により中央監視装置9へ保護動作結果を送信する。これにより、その保護機能の健全性が確認できる。   When the CPU 5 detects a system abnormality by a signal from the transformer 1, the circuit breaker (not shown) is opened by operating the mechanical relay 7 via the output circuit 8. On the other hand, in the case of the protection operation by the signal from the test signal generation circuit 6, the protection operation result is transmitted to the central monitoring device 9 by the communication circuit 10 without operating the mechanical relay 7. Thereby, the soundness of the protection function can be confirmed.

以上により、変圧器1からの信号、即ち、系統からの入力を監視しつつ、テスト信号生成回路6で生成したテスト信号により保護機能の健全性確認が可能となる。なお、前記においては変圧器1を用いた場合について説明したが、変流器を用いた場合についても同様である。   As described above, the soundness of the protection function can be confirmed by the test signal generated by the test signal generation circuit 6 while monitoring the signal from the transformer 1, that is, the input from the system. Although the case where the transformer 1 is used has been described above, the same applies to the case where a current transformer is used.

次に、CPU5による保護/監視処理について具体的実施例を説明する。
(実施例1)
CPU5からの指令により、テスト信号生成回路6において直流信号を生成する。CPU5は、テスト信号としてこの直流信号が入力されていることの監視を行う。なお、ここで言う直流信号とは、信号の幅(時間)、および大きさを規定するものではなく、例えば1サイクルにつき1回のパルス状の波形でも可とする。
Next, specific examples of protection / monitoring processing by the CPU 5 will be described.
Example 1
In response to a command from the CPU 5, the test signal generation circuit 6 generates a DC signal. The CPU 5 monitors that this DC signal is input as a test signal. Note that the DC signal mentioned here does not define the width (time) and magnitude of the signal, and, for example, a pulse waveform once per cycle is acceptable.

例えば、テスト信号生成回路6で生成される直流信号を図3(a)の上段に示すようなパルス状の信号とし、信号の発生間隔t1、信号の幅t2、信号の大きさdを規定する。そして、図3(b)に示すA/Dコンバータ4の出力信号を、CPU5の内部のソフトウエア処理において、サンプリングデータのタイミングにより、図3(c)に示すようにテスト信号生成回路6のデータと変圧器1のデータとに分割する。なお、図3(a)の下段は系統からの入力信号を示している。また、図3(c)において上段はテスト信号生成回路6のデータを示し、下段は変圧器1からの信号を示している。   For example, the DC signal generated by the test signal generation circuit 6 is a pulse signal as shown in the upper part of FIG. 3A, and the signal generation interval t1, the signal width t2, and the signal magnitude d are defined. . Then, the output signal of the A / D converter 4 shown in FIG. 3B is converted into the data of the test signal generation circuit 6 as shown in FIG. And transformer 1 data. In addition, the lower stage of Fig.3 (a) has shown the input signal from a system | strain. In FIG. 3C, the upper part shows data of the test signal generation circuit 6, and the lower part shows a signal from the transformer 1.

以上のように、テスト信号生成回路6のテスト信号の監視処理において、これらの値を監視することで、例えば切換スイッチ2やA/Dコンバータ4の入力端子がオンの状態で故障した場合など、回路部品の故障を発見することができる。   As described above, by monitoring these values in the test signal monitoring process of the test signal generation circuit 6, for example, when the input terminal of the changeover switch 2 or the A / D converter 4 is in a failure state, Circuit component failures can be found.

(実施例2)
また、図4に示すように、テスト信号生成回路6のテスト信号を0から計測可能範囲まで段階的に大きくすることにより、計測可能範囲の精度確認が可能である。更にまた、図5(a)(b)に示すように、テスト信号生成回路6のテスト信号を1サンプリングごとに大きくすることにより、1サイクルの途中で回路の異常が発生した場合でも即時に検出が可能となる。なお、図4、図5において、上段がテスト信号生成回路6のテスト信号を示し、下段が変圧器1からの信号を示している。
(Example 2)
As shown in FIG. 4, the accuracy of the measurable range can be confirmed by increasing the test signal of the test signal generation circuit 6 stepwise from 0 to the measurable range. Furthermore, as shown in FIGS. 5A and 5B, by increasing the test signal of the test signal generation circuit 6 every sampling, even if a circuit abnormality occurs during one cycle, it is detected immediately. Is possible. 4 and 5, the upper stage shows the test signal of the test signal generation circuit 6, and the lower stage shows the signal from the transformer 1.

(実施例3)
前記においては、テスト信号生成回路6において、直流信号を生成する場合について説明したが、テスト信号生成回路6で正弦波信号を生成してもよい。次に、正弦波による保護機能の確認について説明する。
(Example 3)
In the above description, the case where the test signal generation circuit 6 generates a DC signal has been described. However, the test signal generation circuit 6 may generate a sine wave signal. Next, confirmation of the protection function using a sine wave will be described.

テスト信号生成回路6のテスト信号を図6(a)の上段に示すような正弦波信号とし、この信号の大きさおよび周波数を保護継電装置100の製品の仕様で規定された範囲の値、即ち、規定値として保護機能を動作させる。そして、図6(b)に示すA/Dコンバータ4の出力信号を、CPU5の内部のソフトウエア処理において、サンプリングデータのタイミングにより、図6(c)に示すようにテスト信号生成回路6のデータと変圧器1のデータとに分割する。なお、図6(a)の下段は系統からの入力信号を示している。また、図6(c)の上段はテスト信号生成回路6のデータを示し、下段は変圧器1からの信号を示している。   The test signal of the test signal generation circuit 6 is a sine wave signal as shown in the upper part of FIG. 6A, and the magnitude and frequency of this signal are values in a range defined by the product specifications of the protective relay device 100. That is, the protection function is operated as a specified value. Then, the output signal of the A / D converter 4 shown in FIG. 6B is converted into the data of the test signal generation circuit 6 as shown in FIG. And transformer 1 data. The lower part of FIG. 6A shows an input signal from the system. Further, the upper part of FIG. 6C shows data of the test signal generation circuit 6, and the lower part shows a signal from the transformer 1.

これにより、保護継電装置100の定期点検時に実施しているリレー試験の代用とすることができる。この動作結果のデータを、保護継電装置100に搭載した通信回路10を用いて中央監視装置9で定期的に収集することにより、保護機能の動作変化を中央監視装置9で確認することができる。   Thereby, it can substitute for the relay test currently implemented at the time of the periodic inspection of the protective relay apparatus 100. FIG. By periodically collecting the data of the operation results by the central monitoring device 9 using the communication circuit 10 mounted on the protective relay device 100, the central monitoring device 9 can confirm the operation change of the protection function. .

(実施例4)
実施例3ではテスト信号を正弦波とし、テスト波形に対して保護継電装置100の保護機能を動作させたが、実施例4では保護継電装置100のアナログ計測回路3の監視用として使用する場合を説明する。
Example 4
In the third embodiment, the test signal is a sine wave, and the protection function of the protective relay device 100 is operated on the test waveform. However, in the fourth embodiment, the test signal is used for monitoring the analog measuring circuit 3 of the protective relay device 100. Explain the case.

テスト信号生成回路6は、予め規定された値(例えば、計測可能範囲の最大値)のテスト信号を正弦波で出力する。CPU5では取り込んだテスト信号に対して監視用データと共通の保護、監視処理を行い、予め規定された値との比較を行う。図7はその具体的実施例を図示したものである。   The test signal generation circuit 6 outputs a test signal having a predetermined value (for example, the maximum value in the measurable range) as a sine wave. The CPU 5 performs common protection and monitoring processing on the captured test signal with the monitoring data, and compares it with a predetermined value. FIG. 7 illustrates a specific embodiment thereof.

この方法において、テスト信号生成回路6のテスト信号は系統、即ち、変圧器1より入力される電流および電圧と同等であるため、アナログ計測回路3およびA/Dコンバータ4の健全性に加えて、CPU5の内部の保護、監視処理をリアルタイムで診断することができ、高信頼の保護継電装置100が実現できる。   In this method, since the test signal of the test signal generation circuit 6 is equivalent to the system, that is, the current and voltage input from the transformer 1, in addition to the soundness of the analog measurement circuit 3 and the A / D converter 4, The internal protection and monitoring processing of the CPU 5 can be diagnosed in real time, and a highly reliable protective relay device 100 can be realized.

(実施例5)
更に、図8に示すようにCPU5が計測表示処理部12を有する場合、表示手段11の表示画面においてテスト信号による変換結果を表示するので、保護継電装置100の使用者が系統、即ち、変圧器1からの入力による計測値とテスト信号による計測値を画面で比較確認することが可能となる。
(Example 5)
Further, when the CPU 5 has the measurement display processing unit 12 as shown in FIG. 8, the conversion result by the test signal is displayed on the display screen of the display means 11, so that the user of the protective relay device 100 can change the system, It becomes possible to compare and confirm the measured value by the input from the device 1 and the measured value by the test signal on the screen.

保護継電装置100の操作機能により、テスト信号の大きさを指定可能とすることで、使用者がアナログ計測回路3の計測可能範囲における任意の値を指定し、その値に対しての健全性を目視にて確認することができ、通信回路10により中央監視装置9においても健全性確認を行うことができる。   By making it possible to specify the magnitude of the test signal by the operation function of the protective relay device 100, the user specifies an arbitrary value in the measurable range of the analog measurement circuit 3, and the soundness with respect to that value is specified. Can be visually confirmed, and the communication circuit 10 can also check the soundness of the central monitoring device 9.

実施の形態2.
次に、この発明の実施の形態2による保護継電装置の動作試験システムについて説明する。近年の保護継電装置は複数の保護要素を搭載したものが一般的となっている。実施の形態1では単一の回路例を説明したが、複数の回路を有する保護継電装置においても、本発明の適用は可能である。
Embodiment 2. FIG.
Next, an operation test system for a protective relay device according to Embodiment 2 of the present invention will be described. In recent years, a protection relay device is generally equipped with a plurality of protection elements. Although a single circuit example has been described in Embodiment 1, the present invention can also be applied to a protective relay device having a plurality of circuits.

図9は、実施の形態2による保護継電装置の動作試験システムを説明するブロック構成図である。図9において、符号200は保護継電装置を示している。保護継電装置200は、図示しない系統からの入力信号を変換する変圧器1a、1b、変流器1c、1nを備えると共に、変圧器1a、1b、変流器1c、1nのそれぞれから切換スイッチ2a、2b、2c、2nを介して入力される信号を増幅し、フィルタ回路により雑音を除去するアナログ計測回路3a、3b、3c、3nがn種類設けられている。そして、A/Dコンバータ4には、それぞれに対する入力端子1〜nが設けられている。なお、その他の構成については実施の形態1と同様であり、同一符号を付すことにより説明を省略する。   FIG. 9 is a block diagram illustrating the operation test system for the protective relay device according to the second embodiment. In FIG. 9, reference numeral 200 denotes a protective relay device. The protective relay device 200 includes transformers 1a and 1b and current transformers 1c and 1n for converting input signals from a system (not shown), and switches from the transformers 1a and 1b and the current transformers 1c and 1n. There are n types of analog measurement circuits 3a, 3b, 3c, and 3n that amplify signals input through 2a, 2b, 2c, and 2n and remove noise by a filter circuit. The A / D converter 4 is provided with input terminals 1 to n for each. In addition, about another structure, it is the same as that of Embodiment 1, and description is abbreviate | omitted by attaching | subjecting the same code | symbol.

実施の形態2による保護継電装置の動作試験システムは前記のように構成されており、CPU5は、テスト信号生成回路6に対して、テスト信号を出力する対象の回路および信号の大きさなどを指定する。テスト信号生成回路6はそれに応じた信号を、対象とする回路へ入力する。ここで、複数の回路も選択可能である。   The operation test system of the protective relay device according to the second embodiment is configured as described above, and the CPU 5 determines the circuit to which the test signal is output and the magnitude of the signal to the test signal generation circuit 6. specify. The test signal generation circuit 6 inputs a signal corresponding thereto to the target circuit. Here, a plurality of circuits can also be selected.

CPU5は、テスト信号生成回路6への指示の後、サンプリングのタイミングに合わせて、対象とするアナログ計測回路3a、3b、3c、3nに対応する切換スイッチ2a、2b、2c、2nの切換えを実施する。同時に複数のチャンネルがサンプリング可能なA/Dコンバータ4の場合は、切換え前後で待ち時間を設け、切換スイッチ2a、2b、2c、2nの切換え時に発生するノイズの影響を防止する。図10は、実施の形態2による保護継電装置の動作試験システムの動作を説明する図で、保護継電装置200に設けられたCPU5のサンプリングタイミング例を示すものである。   After instructing the test signal generation circuit 6, the CPU 5 switches the selector switches 2a, 2b, 2c, and 2n corresponding to the target analog measurement circuits 3a, 3b, 3c, and 3n in accordance with the sampling timing. To do. In the case of the A / D converter 4 capable of sampling a plurality of channels at the same time, a waiting time is provided before and after switching to prevent the influence of noise generated when switching the change-over switches 2a, 2b, 2c and 2n. FIG. 10 is a diagram for explaining the operation of the protection relay device operation test system according to the second embodiment, and shows an example of the sampling timing of the CPU 5 provided in the protection relay device 200.

以上のように、複数の回路を有する保護継電装置200においても、実施の形態1と同様に、変圧器1a、1b、変流器1c、1nからの信号、即ち、系統からの入力を監視しつつ、テスト信号生成回路6で生成したテスト信号により保護機能の健全性確認が可能となる。   As described above, in the protective relay device 200 having a plurality of circuits, as in the first embodiment, the signals from the transformers 1a and 1b and the current transformers 1c and 1n, that is, the input from the system are monitored. However, the soundness of the protection function can be confirmed by the test signal generated by the test signal generation circuit 6.

実施の形態3.
次に、この発明の実施の形態3による保護継電装置の動作試験システムについて説明する。図11は、実施の形態3による保護継電装置の動作試験システムを説明するブロック構成図である。実施の形態3は実施の形態2の変形例であって、図11に示すように、保護継電装置300のA/Dコンバータ4の入力端子が1点の場合の構成である。複数の要素を入力する場合、A/Dコンバータ4の前段に1:nのアナログスイッチ13を設け、これで順次切換えを行いながらそれぞれの外部からの入力のサンプリングを実施する。
Embodiment 3 FIG.
Next, an operation test system for a protective relay device according to Embodiment 3 of the present invention will be described. FIG. 11 is a block diagram illustrating an operation test system for a protective relay device according to the third embodiment. The third embodiment is a modification of the second embodiment, and has a configuration in which the input terminal of the A / D converter 4 of the protective relay device 300 is one point as shown in FIG. In the case of inputting a plurality of elements, a 1: n analog switch 13 is provided in the preceding stage of the A / D converter 4, and sampling of inputs from the outside is performed while sequentially switching.

各要素のサンプリングが終了した時点で、切換スイッチ2a、2b、2c、2nをテスト信号生成回路6に接続するように切換えておく。これにより変圧器1a、1b、変流器1c、1nからの入力とテスト信号回路6からの入力との切換えまでの時間が発生するため、切換スイッチ2a、2b、2c、2nを切換えた時のノイズの影響を低減することが可能である。図12は、実施の形態3による保護継電装置の動作試験システムの動作を説明する図で、保護継電装置300に設けられたCPU5のサンプリングタイミング例を示すものである。   When sampling of each element is completed, the change-over switches 2a, 2b, 2c, and 2n are switched so as to be connected to the test signal generation circuit 6. As a result, a time until switching between the input from the transformers 1a, 1b, the current transformers 1c, 1n and the input from the test signal circuit 6 is generated. Therefore, when the changeover switches 2a, 2b, 2c, 2n are switched. It is possible to reduce the influence of noise. FIG. 12 is a diagram for explaining the operation of the protection relay device operation test system according to the third embodiment, and shows an example of the sampling timing of the CPU 5 provided in the protection relay device 300.

実施の形態4.
次に、この発明の実施の形態4による保護継電装置の動作試験システムについて説明する。これまではテスト信号生成回路6のテスト信号をアナログ計測回路3へ入力する場合について説明したが、変圧器または変流器(ここでは変圧器として説明する。)1の一次側への入力も可能である。これにより保護継電装置内部の変圧器1の健全性確認が可能である。
Embodiment 4 FIG.
Next, an operation test system for a protective relay device according to Embodiment 4 of the present invention will be described. The case where the test signal of the test signal generation circuit 6 is input to the analog measurement circuit 3 has been described so far. However, the input to the primary side of the transformer or current transformer (herein described as a transformer) 1 is also possible. It is. This makes it possible to check the soundness of the transformer 1 inside the protective relay device.

図13は、実施の形態4による保護継電装置の動作試験システムを説明するブロック構成図である。図13において、符号400は保護継電装置を示している。保護継電装置400は、変圧器1の一次側と保護継電装置400の内部回路との絶縁部14と、変圧器1の試験用端子1tへの入力回路15を備えている。なお、その他の構成については、実施の形態1と同様であり、同一符号を付すことにより説明を省略する。   FIG. 13 is a block diagram illustrating an operation test system for a protective relay device according to the fourth embodiment. In FIG. 13, reference numeral 400 indicates a protective relay device. The protective relay device 400 includes an insulating portion 14 between the primary side of the transformer 1 and the internal circuit of the protective relay device 400, and an input circuit 15 to the test terminal 1 t of the transformer 1. In addition, about another structure, it is the same as that of Embodiment 1, and description is abbreviate | omitted by attaching | subjecting the same code | symbol.

実施の形態4による保護継電装置の動作試験システムは前記のように構成されており、変圧器1の一次側へテスト信号生成回路6のテスト信号を入力するので、大電圧の信号が必要となる。このため、変圧器1に試験用端子1tを設け、この試験用端子1tにテスト信号生成回路6のテスト信号を入力するようにしている。これにより大電圧の生成は不要である。なお、前記においては変圧器を用いた場合について説明したが、変流器を用いた場合についても同様である。   The operation test system for the protective relay device according to the fourth embodiment is configured as described above. Since the test signal of the test signal generation circuit 6 is input to the primary side of the transformer 1, a large voltage signal is required. Become. For this reason, the transformer 1 is provided with a test terminal 1t, and the test signal of the test signal generation circuit 6 is input to the test terminal 1t. This eliminates the need for generating a large voltage. In addition, although the case where the transformer was used was demonstrated in the above, it is the same also when the current transformer is used.

以上のように、実施の形態4による保護継電装置の動作試験システムにおいても、保護継電装置400の健全性確認が可能であり、この実施の形態によれば、保護継電装置内部の変圧器1の健全性も確認できる。   As described above, also in the operation test system for the protective relay device according to the fourth embodiment, the soundness of the protective relay device 400 can be confirmed. According to this embodiment, the transformation inside the protective relay device can be confirmed. The soundness of the vessel 1 can also be confirmed.

以上において、実施の形態1から実施の形態4について説明したが、保護継電装置で使用される電子部品については経年による劣化はほとんど無く、また、保護機能の動作についてはソフトウエア処理で実行するため、保護機能の動作変化もほとんど発生しない。このため、実施の形態1で説明した実施例3については必要に応じて1年に1回や1ヶ月に1回など定期的に実施すればよく、実施の形態1で説明した実施例1、2、4、5については、アナログ計測回路3の異常検出が目的であるため、常時実行することで保護継電装置の異常検出を即時に発見することができる。なお、この発明はこれらに限定されるものでなく、その発明の範囲内において、各実施の形態を自由に組み合わせたり、各実施の形態を適宜、変形、省略することが可能である。   In the above, the first to fourth embodiments have been described. However, the electronic components used in the protective relay device are hardly deteriorated over time, and the operation of the protective function is executed by software processing. Therefore, there is almost no change in the operation of the protection function. For this reason, the third embodiment described in the first embodiment may be performed periodically such as once a year or once a month as necessary. The first embodiment described in the first embodiment, For 2, 4, and 5, the purpose is to detect an abnormality in the analog measurement circuit 3, so that the abnormality detection of the protective relay device can be immediately found by always executing it. In addition, this invention is not limited to these, Within the range of the invention, each embodiment can be combined freely and each embodiment can be suitably changed and abbreviate | omitted.

この発明による保護継電装置の動作試験システムは、系統異常を検出し系統の電気設備を系統異常から保護する保護継電装置の動作試験システムにおいて、前記系統からの入力信号を受けてアナログ計測値を出力するアナログ計測回路と、前記アナログ計測回路から出力される前記アナログ計測値をデジタル信号に変換するA/Dコンバータと、前記保護継電装置に対するテスト信号を生成するテスト信号生成回路と、前記アナログ計測回路の前段に設けられ、前記テスト信号と前記系統からの入力信号とを切換える切換スイッチと、前記A/Dコンバータから出力される前記デジタル信号を入力として取り込み、前記保護継電装置の保護演算と演算結果に基づいた保護もしくは制御の指示発令を行なうと共に、前記切換スイッチの切換えタイミングを制御するCPUと、前記テスト信号と前記系統からの前記入力信号とを比較して異常有無を判定する保護/監視処理部と、を備え、前記テスト信号と前記系統からの前記入力信号前記切換スイッチにより切り換えることで交互にサンプリングし、異常の有無を監視するものである。 An operation test system for a protection relay device according to the present invention is an operation test system for a protection relay device that detects a system abnormality and protects the electrical equipment of the system from the system abnormality, and receives an analog measurement value in response to an input signal from the system. an analog measuring circuit for outputting, an a / D converter which converts the analog measurement to a digital signal output from the analog measuring circuit, the test signal generating circuit for generating a test signal for the protective relay device, wherein Provided in the preceding stage of the analog measurement circuit, the changeover switch for switching between the test signal and the input signal from the system, and the digital signal output from the A / D converter as an input, to protect the protective relay device A protection or control instruction is issued based on the calculation and the calculation result, and the changeover switch is switched. A CPU for controlling the timing, and a protection / monitoring unit judges abnormal presence by comparing the input signal from the test signal and the system, the input signal from the test signal and the system and Are alternately sampled by switching with the changeover switch , and the presence or absence of abnormality is monitored.

Claims (10)

系統異常を検出し系統の電気設備を系統異常から保護する保護継電装置の動作試験システムにおいて、
前記系統からの入力信号を受けてアナログ計測値を出力するアナログ計測回路と、
前記アナログ計測回路から出力される前記アナログ計測値をデジタル信号に変換するA/Dコンバータと、
前記保護継電装置に対するテスト信号を生成するテスト信号生成回路と、
前記保護継電装置の前記アナログ計測回路の前段に設けられ、前記テスト信号と前記系統からの入力信号とを切換える切換スイッチと、
前記A/Dコンバータからの前記デジタル信号を入力として取り込み、前記保護継電装置の保護演算と演算結果に基づいた保護もしくは制御の指示発令を行なうと共に、前記切換スイッチの切換えタイミングを制御するCPUと、
前記アナログ計測回路及び前記A/Dコンバータを経由して入力される前記テスト信号と前記テスト信号生成回路から直接入力される前記テスト信号とを比較して異常有無を判定する保護/監視処理部と、
を備え、
前記A/Dコンバータからの前記テスト信号と前記系統からの前記入力信号を交互にサンプリングを実施して異常の有無を監視することを特徴とする保護継電装置の動作試験システム。
In the operation test system of the protective relay device that detects the system abnormality and protects the electrical equipment of the system from the system abnormality,
An analog measurement circuit that receives an input signal from the system and outputs an analog measurement value; and
An A / D converter that converts the analog measurement value output from the analog measurement circuit into a digital signal;
A test signal generation circuit for generating a test signal for the protective relay device;
A changeover switch that is provided before the analog measurement circuit of the protective relay device and switches between the test signal and an input signal from the system,
A CPU that takes in the digital signal from the A / D converter as an input, issues a protection calculation of the protection relay device and a protection or control instruction based on the calculation result, and controls a switching timing of the changeover switch; ,
A protection / monitoring processing unit for comparing the test signal input via the analog measurement circuit and the A / D converter and the test signal directly input from the test signal generation circuit to determine the presence or absence of an abnormality; ,
With
An operation test system for a protective relay device, wherein the test signal from the A / D converter and the input signal from the system are alternately sampled to monitor the presence or absence of an abnormality.
系統異常を検出し系統の電気設備を系統異常から保護する保護継電装置の動作試験システムにおいて、
前記系統からの入力信号を受けてアナログの計測値を出力するアナログ計測回路と、
前記アナログ計測回路から出力される前記アナログ計測値をデジタル信号に変換するA/Dコンバータと、
前記保護継電装置に対するテスト信号を生成するテスト信号生成回路と、
前記保護継電装置の前記アナログ計測回路の前段に設けられ、前記テスト信号と前記系統からの入力信号とを切換える切換スイッチと、
前記A/Dコンバータからの前記デジタル信号を入力として取り込み、前記保護継電装置の保護演算と演算結果に基づいた保護もしくは制御の指示発令を行なうと共に、前記切換スイッチの切換えタイミングを制御するCPUと、
前記アナログ計測回路及び前記A/Dコンバータを経由して入力される前記テスト信号と前記テスト信号生成回路から直接入力される前記テスト信号とを比較して異常有無を判定する保護/監視処理部と、を備え、
前記A/Dコンバータからの前記テスト信号と前記系統からの前記入力信号を、前記系統の監視対象の電流又は電圧の1サイクル以下の間隔で交互にサンプリングを実施することを特徴とする保護継電装置の動作試験システム。
In the operation test system of the protective relay device that detects the system abnormality and protects the electrical equipment of the system from the system abnormality,
An analog measurement circuit that receives an input signal from the system and outputs an analog measurement value;
An A / D converter that converts the analog measurement value output from the analog measurement circuit into a digital signal;
A test signal generation circuit for generating a test signal for the protective relay device;
A changeover switch that is provided before the analog measurement circuit of the protective relay device and switches between the test signal and an input signal from the system,
A CPU that takes in the digital signal from the A / D converter as an input, issues a protection calculation of the protection relay device and a protection or control instruction based on the calculation result, and controls a switching timing of the changeover switch; ,
A protection / monitoring processing unit for comparing the test signal input via the analog measurement circuit and the A / D converter and the test signal directly input from the test signal generation circuit to determine the presence or absence of an abnormality; With
A protective relay characterized in that the test signal from the A / D converter and the input signal from the system are alternately sampled at intervals of one cycle or less of the current or voltage to be monitored in the system. Equipment operation test system.
系統異常を検出し系統の電気設備を系統異常から保護する保護継電装置の動作試験システムにおいて、
前記系統からの入力信号を変換する複数の変成器と、
前記保護継電装置に対するテスト信号を生成するテスト信号生成回路と、
前記保護継電装置に設けられた複数のアナログ計測回路のそれぞれの前段に設けられ、前記テスト信号と前記複数の変成器のそれぞれからの入力信号とを切換える切換スイッチと、
前記切換スイッチの切換えタイミングを制御するCPUと、を備え、
前記テスト信号生成回路のテスト信号と前記複数の変成器のそれぞれからの入力信号で交互にサンプリングを実施することを特徴とする保護継電装置の動作試験システム。
In the operation test system of the protective relay device that detects the system abnormality and protects the electrical equipment of the system from the system abnormality,
A plurality of transformers for converting an input signal from the system;
A test signal generation circuit for generating a test signal for the protective relay device;
A selector switch provided in a preceding stage of each of the plurality of analog measurement circuits provided in the protective relay device, for switching between the test signal and an input signal from each of the plurality of transformers;
CPU for controlling the switching timing of the selector switch,
An operation test system for a protective relay device, wherein sampling is performed alternately with a test signal of the test signal generation circuit and an input signal from each of the plurality of transformers.
前記CPUからの指令により前記テスト信号生成回路にて直流信号を生成し、前記CPUの指令と前記テスト信号生成回路で生成される直流信号から前記保護継電装置の動作を確認することを特徴とする請求項1から3の何れか一項に記載の保護継電装置の動作試験システム。   The test signal generation circuit generates a DC signal in response to a command from the CPU, and the operation of the protective relay device is confirmed from the CPU command and the DC signal generated by the test signal generation circuit. The operation test system for the protective relay device according to any one of claims 1 to 3. 前記直流信号をパルス状の信号とし、前記信号の発生間隔、前記信号の幅、前記信号の大きさを規定し、前記保護継電装置の動作を確認することを特徴とする請求項4に記載の保護継電装置の動作試験システム。   The DC signal is a pulse signal, the signal generation interval, the signal width, and the signal size are defined, and the operation of the protective relay device is confirmed. Protection relay operation test system. 前記信号は、0から計測可能範囲まで段階的に大きくなる信号であることを特徴とする請求項5に記載の保護継電装置の動作試験システム。   The operation test system for a protective relay device according to claim 5, wherein the signal is a signal that gradually increases from 0 to a measurable range. 前記信号は、1サンプリングごとに大きくされた信号であることを特徴とする請求項5に記載の保護継電装置の動作試験システム。   The operation test system for a protective relay device according to claim 5, wherein the signal is a signal increased for each sampling. 前記CPUからの指令により前記テスト信号生成回路にて正弦波信号を生成し、前記正弦波信号の大きさおよび周波数を前記保護継電装置の規定値として動作させることを特徴とする請求項1から3の何れか一項に記載の保護継電装置の動作試験システム。   The sine wave signal is generated by the test signal generation circuit in response to a command from the CPU, and the magnitude and frequency of the sine wave signal are operated as specified values of the protective relay device. The operation test system for the protective relay device according to any one of claims 3 to 4. 前記規定値は、前記系統からの入力信号と同等であることを特徴とする請求項8に記載の保護継電装置の動作試験システム。   9. The protection relay device operation test system according to claim 8, wherein the specified value is equivalent to an input signal from the system. 前記系統から入力信号を得る変成器を備え、前記テスト信号生成回路のテスト信号を前記変成器の一次側に入力することを特徴とする請求項1から9の何れか一項に記載の保護継電装置の動作試験システム。   10. The protection circuit according to claim 1, further comprising a transformer that obtains an input signal from the system, wherein the test signal of the test signal generation circuit is input to a primary side of the transformer. Electrical equipment operation test system.
JP2014516697A 2012-05-21 2013-03-22 Protection relay operation test system Active JP5791796B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014516697A JP5791796B2 (en) 2012-05-21 2013-03-22 Protection relay operation test system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2012115230 2012-05-21
JP2012115230 2012-05-21
PCT/JP2013/058272 WO2013175846A1 (en) 2012-05-21 2013-03-22 Performance test system for protective relay apparatus
JP2014516697A JP5791796B2 (en) 2012-05-21 2013-03-22 Protection relay operation test system

Publications (2)

Publication Number Publication Date
JP5791796B2 JP5791796B2 (en) 2015-10-07
JPWO2013175846A1 true JPWO2013175846A1 (en) 2016-01-12

Family

ID=49623550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014516697A Active JP5791796B2 (en) 2012-05-21 2013-03-22 Protection relay operation test system

Country Status (6)

Country Link
JP (1) JP5791796B2 (en)
KR (1) KR101617117B1 (en)
CN (1) CN104380553B (en)
PH (1) PH12014502021B1 (en)
TW (1) TWI459013B (en)
WO (1) WO2013175846A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015075815A1 (en) * 2013-11-22 2015-05-28 三菱電機株式会社 Electronic circuit breaker
EP3218730A1 (en) * 2014-11-10 2017-09-20 Eaton Corporation Circuit interrupter and system for testing the same
CN105182227A (en) * 2015-08-31 2015-12-23 中国电子科技集团公司第四十研究所 Relay aging instrument
CN107168225B (en) * 2017-05-22 2019-06-21 南京南瑞继保电气有限公司 A kind of AC sampling switching method of different model protection measuring and controlling equipment
CN107741563B (en) * 2017-11-09 2023-12-05 许昌许继软件技术有限公司 Test platform suitable for relay protection device
CN112154340B (en) * 2018-05-30 2024-03-19 三菱电机株式会社 Characteristic test system of protective relay device
CN110913527B (en) * 2019-11-12 2022-06-21 上海铁大电信科技股份有限公司 Supervision driving circuit

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5497755A (en) * 1978-01-18 1979-08-02 Tokyo Electric Power Co Inc:The Inspection of digital protective relay
JPS61147724A (en) * 1984-12-21 1986-07-05 株式会社東芝 Automatic monitor system
JPH02136020A (en) * 1988-11-17 1990-05-24 Toshiba Corp Protective relay
JPH06217447A (en) * 1993-01-12 1994-08-05 Toshiba Corp Automatic monitoring system for digital relay
JP3729224B2 (en) * 1997-08-07 2005-12-21 株式会社日立製作所 Digital protection and control equipment for power systems
JP2000209767A (en) * 1999-01-12 2000-07-28 Takaoka Electric Mfg Co Ltd Analog input section monitoring device for digital protective controller
JP3684393B2 (en) * 1999-07-27 2005-08-17 ティーオーエー株式会社 Inspection device for connection line for remote controller in broadcasting equipment
TW533642B (en) * 2001-03-01 2003-05-21 Hitachi Ltd Protective relay apparatus
US7330342B2 (en) * 2005-04-12 2008-02-12 Associated Research, Inc. Safety tester having a high-voltage switching relay protected by an in-line electronic circuit breaker
JP2008079367A (en) * 2006-09-19 2008-04-03 Toshiba Corp Protection relay device
CN101458306A (en) * 2008-11-06 2009-06-17 上海电器科学研究所(集团)有限公司 Breaker operating characteristic test apparatus
JP5322784B2 (en) 2009-06-08 2013-10-23 三菱電機株式会社 Protection relay device characteristic test system
CN101769968B (en) * 2009-12-24 2013-05-01 宁波电业局 Mutual inductor no-load voltage ratio tester
CN102487245A (en) * 2010-12-06 2012-06-06 上海宝钢工业检测公司 Simulation system of microcomputer relay protection logical test signal system

Also Published As

Publication number Publication date
PH12014502021A1 (en) 2014-11-24
PH12014502021B1 (en) 2014-11-24
TW201400837A (en) 2014-01-01
CN104380553A (en) 2015-02-25
JP5791796B2 (en) 2015-10-07
CN104380553B (en) 2016-10-12
TWI459013B (en) 2014-11-01
KR20150001771A (en) 2015-01-06
WO2013175846A1 (en) 2013-11-28
KR101617117B1 (en) 2016-04-29

Similar Documents

Publication Publication Date Title
JP5791796B2 (en) Protection relay operation test system
JP2014039408A (en) Digital protection relay, digital protection relay testing device and digital protection relay testing method
JP6105236B2 (en) Merging unit
WO2016207954A1 (en) Power conversion device, and diagnosis system and diagnosis method for power conversion device
CN111133324B (en) Method and device for detecting partial discharges in an electric operating element
KR101343341B1 (en) Apparatus for diagnosing a partial discharging equipped with a function of self-diagnosis
CN203799008U (en) Pillar type electronic current transformer primary vibration test data acquisition device
JP6456573B1 (en) Protection relay device characteristic test system
JP5153693B2 (en) Data collection system
KR101575200B1 (en) Apparatus for diagnosing a partial discharge equipped with functions of self diagnosis and Algorism diagnosis
KR100530467B1 (en) On-line check system for induction motors
KR100368425B1 (en) method for diagnosing operation status of gas insulation open and close apparatus
WO2015008412A1 (en) Protection control system and interface device
JP6548449B2 (en) Operation test system of protective relay device
JP7310156B2 (en) Circuit breaker status diagnostic device, circuit breaker status diagnostic system, circuit breaker status diagnostic method, and program
JP4033801B2 (en) Insulation deterioration detector
JP7423897B2 (en) Protection/control device and protection/control method
JP2004112977A (en) Protective relay device
JP2012151978A (en) Digital protection relay and testing method thereof
JP2019213352A (en) Protection control device
JP2024020717A (en) Merging unit and intelligent electronic device
JP5948636B2 (en) Digital protection control device and substrate identification method
CN112904265A (en) Second winding open circuit detection circuit of zero sequence current transformer
JP2004266918A (en) Digital protective relaying apparatus
KR20000020306A (en) Digital power control/measurement device

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150707

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150804

R151 Written notification of patent or utility model registration

Ref document number: 5791796

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250