JPS6429504A - Holing rope support method for erecting suspension bridge cable - Google Patents

Holing rope support method for erecting suspension bridge cable

Info

Publication number
JPS6429504A
JPS6429504A JP18488187A JP18488187A JPS6429504A JP S6429504 A JPS6429504 A JP S6429504A JP 18488187 A JP18488187 A JP 18488187A JP 18488187 A JP18488187 A JP 18488187A JP S6429504 A JPS6429504 A JP S6429504A
Authority
JP
Japan
Prior art keywords
hauling rope
strand
suspended
tower
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18488187A
Other languages
Japanese (ja)
Inventor
Izumi Imoto
Yoshiaki Imoto
Masato Imazaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Mitsubishi Heavy Industries Ltd
JFE Engineering Corp
Original Assignee
IHI Corp
Mitsubishi Heavy Industries Ltd
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp, Mitsubishi Heavy Industries Ltd, NKK Corp, Nippon Kokan Ltd filed Critical IHI Corp
Priority to JP18488187A priority Critical patent/JPS6429504A/en
Publication of JPS6429504A publication Critical patent/JPS6429504A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: To remarkably reduce conventional strand suspension equipment by a method hauling rope is arranged in a state to be directly suspended between a tower and an anchorage and a strand is suspended through reciprocation of a hauling rope. CONSTITUTION: A hauling rope 9 is directly fed from a hauling rope drive device to a guide roller unit 24 at the upper part of a tower 7 through a hauling guide roller 19 on the upper surface of the rear part of an anchorage 8. A dead wire is then wound around a strand shoe 18 and wound around a spinning wheel 11 and the hauling rope 9 is reciprocated the given number of times, and a single strand 20 is suspended between a tower 7 and the strand shoe 18. A plurality of the strands 20 are suspended by the same procedures described above to form a single suspension bridge cable. This constitution eliminates a need to vary the direction of the hauling rope.
JP18488187A 1987-07-24 1987-07-24 Holing rope support method for erecting suspension bridge cable Pending JPS6429504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18488187A JPS6429504A (en) 1987-07-24 1987-07-24 Holing rope support method for erecting suspension bridge cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18488187A JPS6429504A (en) 1987-07-24 1987-07-24 Holing rope support method for erecting suspension bridge cable

Publications (1)

Publication Number Publication Date
JPS6429504A true JPS6429504A (en) 1989-01-31

Family

ID=16160948

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18488187A Pending JPS6429504A (en) 1987-07-24 1987-07-24 Holing rope support method for erecting suspension bridge cable

Country Status (1)

Country Link
JP (1) JPS6429504A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869027A (en) * 2017-03-05 2017-06-20 郑州大学 A kind of method for realizing the disrumpent feelings early warning of parallel steel wire suspension cable
CN111778855A (en) * 2020-06-08 2020-10-16 中交第二公路工程局有限公司 AS-method linkage control pay-off system
CN114086479A (en) * 2021-11-30 2022-02-25 广西路桥工程集团有限公司 Tower foot anchoring structure for assembling tower and tower building method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869027A (en) * 2017-03-05 2017-06-20 郑州大学 A kind of method for realizing the disrumpent feelings early warning of parallel steel wire suspension cable
CN111778855A (en) * 2020-06-08 2020-10-16 中交第二公路工程局有限公司 AS-method linkage control pay-off system
CN111778855B (en) * 2020-06-08 2021-09-17 中交第二公路工程局有限公司 AS-method linkage control pay-off system
CN114086479A (en) * 2021-11-30 2022-02-25 广西路桥工程集团有限公司 Tower foot anchoring structure for assembling tower and tower building method

Similar Documents

Publication Publication Date Title
EP0670282A3 (en) Method of raising an elevator assembly
CS275471B2 (en) Equipment for gas concrete cutting
DE2139070A1 (en) Device for preventing swinging movements of a hanging load
HK1000352A1 (en) Process and apparatus for placing parallel wire strands in cable-stayed bridges
CN101459321B (en) Long distance bundling paying-out method and apparatus for slope tower over hanging power transmission line
JPS6429504A (en) Holing rope support method for erecting suspension bridge cable
CA1237593A (en) Ground control
CN211142840U (en) Suspension bridge main push-towing rope erects system
EP0810304A3 (en) Method of and apparatus for manufacturing metallic fiber and the twine of metallic fibers, and method of coloring metallic fiber and the twine of metallic fibers
JPS6429505A (en) Method of adjusting catwalk at time of erection of suspension bridge cable through method of air spinning construction
GB911976A (en) Method of apparatus for spinning a parallel wire suspension cable
JPH09240957A (en) Main rope guide device of elevator
Ksyunin et al. Manufacture of Wire Rope With Uniform Tension of the Strands
DE69720562D1 (en) Compacted essentially triangular strands and methods of making them
JPS6429506A (en) Method of adjusting catwalk at time of erection of suspension bridge cable through method of air spinning construction
JPH0891734A (en) Tail cord and elevator using it
FR2413315A1 (en) Tower crane travelling hoist - is controlled by cable wound onto drum at tower, passing around eight pulleys at hoist
CN117334408A (en) Shock absorption guiding system of net twine pair strander
JPH0629486B2 (en) Suspension bridge cable construction method
JPS6429507A (en) Method of supporting catwalk for suspension bridge cable erection in method of air spinning construction
JP2603731B2 (en) Elevator main rope changing device
CN117262961A (en) Elevator shunt traction method
JPS6417787A (en) Method of exchange construction of main cable for elevator
JPS60175769U (en) cableway equipment
JPS54120358A (en) Cable band of suspension bridge cable and its mounting method