JPS642726B2 - - Google Patents

Info

Publication number
JPS642726B2
JPS642726B2 JP4760583A JP4760583A JPS642726B2 JP S642726 B2 JPS642726 B2 JP S642726B2 JP 4760583 A JP4760583 A JP 4760583A JP 4760583 A JP4760583 A JP 4760583A JP S642726 B2 JPS642726 B2 JP S642726B2
Authority
JP
Japan
Prior art keywords
sand
ground
soil
piles
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4760583A
Other languages
Japanese (ja)
Other versions
JPS59173416A (en
Inventor
Kazuma Misaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Construction Co Ltd filed Critical Fudo Construction Co Ltd
Priority to JP4760583A priority Critical patent/JPS59173416A/en
Publication of JPS59173416A publication Critical patent/JPS59173416A/en
Publication of JPS642726B2 publication Critical patent/JPS642726B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • E02D3/106Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains by forming sand drains containing only loose aggregates

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 本発明は軟弱地盤中に多数の砂杭を造成して地
盤改良する工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction method for improving the ground by constructing a large number of sand piles in soft ground.

軟弱地盤中に多数の砂杭を造成して地盤改良す
るに当り、均一な改良地盤をうるために、原地盤
土性の変化に対応して砂杭径と砂杭強度の何れか
一方若しくは双方を変化させながら各砂杭を造成
することは、先に本出願人により提案されている
(特願昭56−149708号特開昭58−50216号参照)。
When constructing a large number of sand piles in soft ground to improve the ground, in order to obtain a uniformly improved ground, either the sand pile diameter or the sand pile strength, or both, should be adjusted in response to changes in the soil properties of the original ground. It has been previously proposed by the present applicant to construct each sand pile while changing the sand piles (see Japanese Patent Application No. 56-149708 and Japanese Unexamined Patent Publication No. 58-50216).

この先願発明を実施する場合は、砂杭造成地点
の原地盤土性を砂杭造成に先立つて検出すること
が必要であるが、本発明は、この原地盤土性の検
出を砂杭造成用中空管の貫入工程で行うことによ
り、所期の砂杭造成が能率良く、かつ、正確にな
されるようにしたものである。
When carrying out this prior invention, it is necessary to detect the soil properties of the original soil at the sand pile construction point prior to sand pile construction. By performing the process of penetrating the hollow tube, the sand pile construction can be carried out efficiently and accurately.

以下、図面を参照しつつ本発明を具体的に説明
する。
Hereinafter, the present invention will be specifically described with reference to the drawings.

本発明工法における各砂杭の造成には第1図に
例示されているような砂杭造成用中空管1が用い
られる。
For constructing each sand pile in the construction method of the present invention, a hollow pipe 1 for constructing sand piles as illustrated in FIG. 1 is used.

図示の砂杭造成用中空管1の下端部には液圧ピ
ストン・シリンダ装置2により強制的に上下動さ
せられる砂排出兼締固め部材3が設けられてお
り、このタイプの砂杭造成用中空管は以下の説明
で明らかなように本発明にとつて好ましいもので
あるが、本発明で用いる砂杭造成用中空管はこの
タイプのものでなくても構わない。
A sand discharge/compaction member 3 that is forcibly moved up and down by a hydraulic piston/cylinder device 2 is provided at the lower end of the illustrated hollow pipe 1 for sand pile construction. Although hollow tubes are preferred for the present invention as will be clear from the following description, the hollow tubes for constructing sand piles used in the present invention do not have to be of this type.

図示の砂杭造成用中空管1を用いた場合、砂杭
の造成は、第2図イに示すように、砂杭造成用中
空管1を造成地点の地表Aから地盤中所定深度の
Bまで貫入し(貫入工程)、次いで、砂杭造成
用中空管1を引抜きつつ、砂排出兼締固め部材3
の作動により砂杭造成用中空管1内の砂の強制排
出と締固めを行つて、順次地表まで砂杭を造成し
ていく(造成工程)のであるが、本発明工法で
は前記貫入工程において第2図ロに示すように
各深度(GL1〜GLo)毎に原地盤土性(原地盤強
度)を検出する。
When using the illustrated hollow pipe 1 for sand pile construction, the sand pile construction is carried out by moving the sand pile construction hollow pipe 1 from the ground surface A at the construction point to a predetermined depth in the ground, as shown in Figure 2A. Penetrate up to B (penetration process), and then pull out the sand pile construction hollow pipe 1 while removing the sand discharge and compaction member 3.
The sand in the hollow pipe 1 for sand pile construction is forcibly discharged and compacted by the operation of the sand pile, and the sand pile is successively constructed up to the ground surface (construction process), but in the method of the present invention, in the penetration process, As shown in FIG. 2B, the original ground soil properties (original ground strength) are detected for each depth (GL 1 to GL o ).

原地盤土性の検出方法は任意であり、例えば、
砂杭造成用中空管の適所に応力測定用ゲージ、ロ
ードセル等を設けて検出する方法、砂杭造成用中
空管の貫入速度の変化から検出する方法等が考え
られるが、砂杭造成用中空管1の砂排出兼締固め
部材3を利用して次のようにして検出してもよ
い。
The method of detecting the soil texture of the original ground is arbitrary; for example,
Possible methods include a method of detecting stress by installing stress measurement gauges, load cells, etc. at appropriate locations in hollow pipes for sand pile construction, and methods of detecting from changes in the penetration speed of hollow pipes for sand pile construction. The sand discharge and compaction member 3 of the hollow tube 1 may be used for detection as follows.

第1図において、切換弁4を中立位置にする
と、液圧ピストン・シリンダ装置2のシリンダの
上部室に通ずる管路5の矢印方向への液の流れは
切換弁4とパイロツト操作の逆止め弁6により完
全に阻止されるから、この状態で砂杭造成用中空
管1を地盤中に貫入すれば、砂排出兼締固め部材
3に作用する貫入抵抗に対応する液圧が管路5の
液に生ずる。そこで、この液圧を圧力センサ7で
検出することにより、地盤土性を知ることができ
る。
In FIG. 1, when the switching valve 4 is placed in the neutral position, the liquid flows in the direction of the arrow in the pipe line 5 leading to the upper chamber of the cylinder of the hydraulic piston-cylinder device 2 through the switching valve 4 and the pilot-operated check valve. If the hollow pipe 1 for sand pile construction penetrates into the ground in this state, the hydraulic pressure corresponding to the penetration resistance acting on the sand discharge/compaction member 3 will be completely blocked by the pipe 5. Occurs in liquid. Therefore, by detecting this hydraulic pressure with the pressure sensor 7, the soil properties of the ground can be known.

また、砂杭造成用中空管1の貫入中に砂排出兼
締固め部材3を作動させ、その最伸長時直前にお
ける管路5の液圧から原地盤土性を検出すること
もできるが、この場合に逆止め弁6が不用である
のは言うまでもない。
It is also possible to operate the sand discharge/compaction member 3 during penetration of the hollow pipe 1 for sand pile construction, and detect the soil properties of the original ground from the hydraulic pressure of the pipe 5 immediately before its maximum extension. Needless to say, the check valve 6 is unnecessary in this case.

砂杭造成用中空管の貫入深度は従来公知の深度
計で検出し、検出した深度と原地盤土性の関係は
記録計の記録紙上に記録しておく。
The penetration depth of the hollow pipe for sand pile construction is detected with a conventionally known depth meter, and the relationship between the detected depth and the soil properties of the original ground is recorded on the recording paper of the recorder.

本発明工法では、貫入工程に続く造成工程
で、各深度毎に、前述のようにして検出した原地
盤土性に対応するように造成砂杭の径と強度の何
れか一方若しくは双方を変化させて、順次上方に
向つて砂杭を造成していくのであるが、砂杭の径
で言えば、検出して原地盤土性に対応するように
変化させるとは、検出原地盤土性値(実際の原地
盤強度a)が設計用原地盤土性値(平均的な強度
b)より小さい所ではその度合に応じて造成砂杭
の径を設計上決められた基準杭径Dより大きく
し、逆に大きい所では同様に小さくすることであ
り(第3図参照)、その具体的な数値は、経験に
基いて予め作成した相関式等から演算して求め
る。
In the construction method of the present invention, in the construction process following the penetration process, either or both of the diameter and strength of the construction sand pile is changed at each depth to correspond to the soil properties of the original soil detected as described above. Sand piles are constructed one after another in the upward direction, but in terms of the diameter of the sand piles, detecting and changing the diameter to correspond to the soil properties of the original soil means detecting the soil properties of the original soil ( In places where the actual original soil strength a) is lower than the design original soil property value (average strength b), the diameter of the construction sand pile is made larger than the standard pile diameter D determined in the design, depending on the degree. On the other hand, if it is large, it should be made smaller as well (see Fig. 3), and the specific value is calculated from a correlation formula prepared in advance based on experience.

この演算は造成工程が始まるまでに済ませ、
その結果を記録又は表示するか若しくは記憶装置
に記憶させておく。
This calculation is completed before the construction process begins,
The results are recorded or displayed or stored in a storage device.

決められた径等になるようにする操作は、前述
の記録又は表示を見ながらオペレーターが行つて
もよいし、記憶装置からの信号に基いて自動的に
なすようにしてもよい。
The operation to obtain a predetermined diameter, etc. may be performed by an operator while looking at the above-mentioned record or display, or may be performed automatically based on a signal from a storage device.

砂杭径に関する制御は、代表的なのは砂杭造成
用中空管1の引上げ速度の調節であるが、この
外、砂排出兼締固め部材3のストローク長、昇降
速度、サイクルタイムの調節も考えられる。
The sand pile diameter is typically controlled by adjusting the pulling speed of the sand pile construction hollow pipe 1, but in addition to this, it is also possible to consider adjusting the stroke length, lifting speed, and cycle time of the sand discharge/compaction member 3. It will be done.

また、砂杭強度(砂の密度)の制御には、砂排
出兼締固め部材3に微振動を付加したり、これを
止めたりすること、付加している微振動の振動数
と振幅の何れか一方若しくは双方を変化させるこ
と等が考えられる。
In addition, to control the sand pile strength (sand density), it is necessary to add or stop micro-vibrations to the sand discharge/compaction member 3, and to adjust the frequency and amplitude of the micro-vibrations being applied. It is conceivable to change one or both of them.

なお、杭径を大にしたり、杭強度を高める場合
に、補助的に石灰、セメント等の固結材を添加し
てもよい。
In addition, when increasing the pile diameter or increasing the pile strength, a consolidation agent such as lime or cement may be added as an supplement.

本発明工法は、以上のようにして砂杭により均
一な改良地盤を形成するものであるが、特に砂杭
造成用中空管の貫入時に各深度の原地盤土性を検
出しているので、砂杭の造成工程に移る前に各深
度における砂杭の造成をどのように行えばよいか
を決めることができ、この点で均一な改良地盤形
成を能率良く、しかも正確に行うことができる。
The method of the present invention forms a uniform improved ground using sand piles as described above, but in particular, the soil properties of the original soil at each depth are detected when the hollow pipe for sand pile construction is penetrated. Before moving on to the sand pile construction process, it is possible to decide how to construct sand piles at each depth, and in this respect, uniform improved ground formation can be performed efficiently and accurately.

なお、以上の記載は砂杭についてなされている
が、砂利、砕石等の砂類似材料を用いた杭の場合
にも本発明は適用される。
Although the above description has been made regarding sand piles, the present invention is also applicable to piles using sand-like materials such as gravel and crushed stone.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明工法実施用装置の1例の説明
図、第2図イ,ロと第3図イ,ロは本発明工法の
説明図である。 図中、1…砂杭造成用中空管、2…液圧ピスト
ン・シリンダ装置、3…砂排出兼締固め部材、4
…切換弁、6…逆止め弁、7…圧力センサ。
FIG. 1 is an explanatory diagram of an example of a device for carrying out the construction method of the present invention, and FIGS. 2A and 2B and 3A and 3B are explanatory diagrams of the present invention construction method. In the figure, 1...Hollow pipe for sand pile construction, 2...Hydraulic piston/cylinder device, 3...Sand discharge and compaction member, 4
...Switching valve, 6...Check valve, 7...Pressure sensor.

Claims (1)

【特許請求の範囲】 1 軟弱地盤中に多数の砂杭を造成して地盤改良
する工法において、各砂杭の造成に当り、砂杭造
成用中空管を軟弱地盤の所定深度まで貫入する工
程で、各深度における原地盤土性を検出し、砂杭
造成用中空管を引抜きつつ砂杭を造成する工程
で、前記貫入工程で検出した原地盤土性に対応す
るように各深度毎に砂杭の径と強度の何れか一方
若しくは双方を変化させて、均一な改良地盤を形
成することを特徴とする砂杭による軟弱地盤改良
工法。 2 下端部に液圧作動の砂排出兼締固め部材を設
けた砂杭造成用中空管を用い、原地盤土性の検出
と砂杭の造成とを前記砂排出兼締固め部材を利用
して行う特許請求の範囲1記載の砂杭による軟弱
地盤改良工法。
[Scope of Claims] 1. In a construction method for improving the ground by constructing a large number of sand piles in soft ground, a step of penetrating a hollow pipe for sand pile construction to a predetermined depth into the soft ground when constructing each sand pile. In the process of detecting the soil properties of the original soil at each depth and creating sand piles while pulling out the hollow pipe for sand pile construction, the soil properties of the original soil are detected at each depth in order to correspond to the soil properties of the original soil detected in the penetration process. A method for improving soft ground using sand piles, which is characterized by forming uniform improved ground by changing either or both of the diameter and strength of the sand piles. 2. A hollow pipe for sand pile construction is equipped with a hydraulically operated sand discharge and compaction member at the lower end, and the sand pile construction is performed using the sand discharge and compaction member to detect the soil texture of the original ground and to create sand piles. A soft ground improvement method using sand piles according to claim 1.
JP4760583A 1983-03-22 1983-03-22 Soft ground improvement work by sand pile Granted JPS59173416A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4760583A JPS59173416A (en) 1983-03-22 1983-03-22 Soft ground improvement work by sand pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4760583A JPS59173416A (en) 1983-03-22 1983-03-22 Soft ground improvement work by sand pile

Publications (2)

Publication Number Publication Date
JPS59173416A JPS59173416A (en) 1984-10-01
JPS642726B2 true JPS642726B2 (en) 1989-01-18

Family

ID=12779865

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4760583A Granted JPS59173416A (en) 1983-03-22 1983-03-22 Soft ground improvement work by sand pile

Country Status (1)

Country Link
JP (1) JPS59173416A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62211417A (en) * 1986-03-12 1987-09-17 Fudo Constr Co Ltd Construction work of sand pile according to soil layer

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55105149U (en) * 1979-01-17 1980-07-22
JPS5820332B2 (en) * 1979-01-19 1983-04-22 マップエンジニアリング株式会社 Sand pile creation device

Also Published As

Publication number Publication date
JPS59173416A (en) 1984-10-01

Similar Documents

Publication Publication Date Title
Fellenius et al. O-cell testing and FE analysis of 28-m-deep barrette in Manila, Philippines
CN110080194B (en) Exploration pressure injection instrument and application thereof
Haque et al. Case study on instrumenting and testing full-scale test piles for evaluating setup phenomenon
Brenner et al. Shear strength behaviour and the measurement of shear strength in residual soils
NeSmith Static capacity analysis of augered, pressure-injected displacement piles
CN107780407B (en) Secondary precipitation union dynamic consolidation soft base processing method
JPS642726B2 (en)
AU2003280334A1 (en) Drop mass compaction of soil
JPS5857573B2 (en) Soil compaction methods and equipment
JP2005009170A (en) Compaction pile formation method
Brettmann et al. Advances in auger pressure grouted piles: design, construction and testing
CN206873512U (en) A kind of provided pipe bottom exciting side hole receives velocity of wave test pile bottom slip casting test apparatus
Liang et al. Wave equation parameters from driven-rod test
JP2005009169A (en) Compaction pile formation method
JPS6125859B2 (en)
JP3893572B2 (en) Sand pile construction method
CN213173663U (en) Dynamic consolidation construction system for large-area complex site foundation of water transport engineering
DE3434565A1 (en) Method for measuring the deformation of sunken pile-driving bodies and drill bodies
JPS642725B2 (en)
CN113153272A (en) CFG pile drilling construction depth detection and construction control system and method
Likins et al. Construction Control for Augercast Piling
JPH02292409A (en) Quality control method in construction of foundation improvement pile
Handy Evolution of geotechnical soil testing I. Field tests
Bondarik Dynamic and Static Sounding of Soils in Engineering Geology:(Dinamicheskoe i Staticheskoe Zondirovanie Gruntov V Inzhenernoi Geologii).
Albuquerque et al. Bored, continuous flight auger and omega instrumented piles: Behavior under compression