JPS6417968A - Method of assembling beam reinforcement - Google Patents
Method of assembling beam reinforcementInfo
- Publication number
- JPS6417968A JPS6417968A JP17382287A JP17382287A JPS6417968A JP S6417968 A JPS6417968 A JP S6417968A JP 17382287 A JP17382287 A JP 17382287A JP 17382287 A JP17382287 A JP 17382287A JP S6417968 A JPS6417968 A JP S6417968A
- Authority
- JP
- Japan
- Prior art keywords
- main reinforcements
- end main
- horizontal support
- assembling
- beam reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
PURPOSE: To improve the efficiency of the execution of works by a method wherein an upper horizontal support member is placed between the top sections of vertical supports while a lower horizontal support member is moved by utilizing a fixture for beforehand assembling a beam reinforcing bar and the beam reinforcing bar is carried into a specified place by beforehand assembling the beam reinforcing bar on a ground section. CONSTITUTION: The upper-end main reinforcements 7 of beams are placed at specified positions on the upper horizontal support material 2 of fixtures 1 for beforehand assembling beam reinforcing bars installed at every regular interval while a lower horizontal support material 3 is supported temporarily on bolts 4 penetrated into the boltholes of vertical supports upper than normal places in the lower-end main reinforcements 8 of the beams. Sirrups 9 fitted extending over upper-lower both main reinforcements 7, 8 and suspended from the upper-end main reinforcements 7 are moved and fixed at specified places along the upper-end main reinforcements 7, the temporary fixing of the lower horizontal support material 3 supporting the lower-end main reinforcements 8 and the bolts 4 is released, and the lower-end main reinforcements 8 are placed and fastened onto the bottom-section pieces of the stirrups 9, and the beam reinforcement bars are assembled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17382287A JPS6417968A (en) | 1987-07-14 | 1987-07-14 | Method of assembling beam reinforcement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP17382287A JPS6417968A (en) | 1987-07-14 | 1987-07-14 | Method of assembling beam reinforcement |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6417968A true JPS6417968A (en) | 1989-01-20 |
Family
ID=15967792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP17382287A Pending JPS6417968A (en) | 1987-07-14 | 1987-07-14 | Method of assembling beam reinforcement |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6417968A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101258330B1 (en) * | 2010-11-02 | 2013-04-25 | 케이고 나가세 | Temporary supporting system of steel beam and construstion method thereof |
JP2018094597A (en) * | 2016-12-13 | 2018-06-21 | ジョン ウー ビーエヌシー カンパニーリミテッドJeong Woo Bnc Co.,Ltd. | Reinforcement net assembly method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5234532A (en) * | 1975-09-11 | 1977-03-16 | Takenaka Komuten Co | Method of and apparatus for assembling caged reinforcing steel |
-
1987
- 1987-07-14 JP JP17382287A patent/JPS6417968A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5234532A (en) * | 1975-09-11 | 1977-03-16 | Takenaka Komuten Co | Method of and apparatus for assembling caged reinforcing steel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101258330B1 (en) * | 2010-11-02 | 2013-04-25 | 케이고 나가세 | Temporary supporting system of steel beam and construstion method thereof |
JP2018094597A (en) * | 2016-12-13 | 2018-06-21 | ジョン ウー ビーエヌシー カンパニーリミテッドJeong Woo Bnc Co.,Ltd. | Reinforcement net assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN215716012U (en) | Flying saucer type steel structure in entrance hall | |
JPS6417968A (en) | Method of assembling beam reinforcement | |
MY8500886A (en) | Spacer for reinforcements | |
JPS5941530A (en) | Installation of foundation bolt for apparatus setting | |
JPH0742238A (en) | Roof structure and construction method | |
KR960004047B1 (en) | Hanging garage for building materials | |
KR970006148B1 (en) | Sludge digetion tank | |
JPS6466369A (en) | Method of assembly construction of beam reinforcement in steel-frame reinforced concrete construction | |
CN114348904A (en) | Transferring and temporary positioning device and method for ring frame beam angle steel support | |
JPS6028985B2 (en) | How to assemble reinforcing bar beams | |
JP2002038717A (en) | Method of installing structural member | |
CN116084613A (en) | Mounting structure and mounting method of steel structure roof based on BIM technology | |
SU1698394A1 (en) | Method of manufacturing a beam | |
CN116427252A (en) | Connecting device for bridge auxiliary facilities | |
KR930003855Y1 (en) | Deck plate for steel frame construction building | |
SU920159A1 (en) | Ferroconcrete under-rafter truss | |
SU1744226A1 (en) | Cooling tower and its erection method | |
SU754015A1 (en) | Arrangement for reinforcing monolithic concrete structures | |
FR2449753A1 (en) | Prefabricated reinforced concrete construction for transformer station - has hollow foundation allowing access to base of plant and supporting floor slab on sand | |
JP2001241047A (en) | Method of installing anchor bolt for fixing large-sized equipment | |
FR2355433A7 (en) | Lightweight building construction system - uses angle iron frame with agglomerate supported panels | |
JPH0711771A (en) | Reinforced crate assembly and built-up device | |
ES2117526A1 (en) | Process for mounting a tower and platform used therein | |
JPS5641933A (en) | Execution method of reinforced concrete structure | |
NO900578L (en) | PROCEDURE AND APPARATUS FOR FITTING HORIZONTAL BEAMS ON STEEL PILLARS. |