JPS63310307A - Execution of plural-extension-wire work - Google Patents

Execution of plural-extension-wire work

Info

Publication number
JPS63310307A
JPS63310307A JP62005746A JP574687A JPS63310307A JP S63310307 A JPS63310307 A JP S63310307A JP 62005746 A JP62005746 A JP 62005746A JP 574687 A JP574687 A JP 574687A JP S63310307 A JPS63310307 A JP S63310307A
Authority
JP
Japan
Prior art keywords
wire
wires
ropes
extension
hanging wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP62005746A
Other languages
Japanese (ja)
Inventor
Toshiro Takahashi
敏郎 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SWCC Corp
Original Assignee
Showa Electric Wire and Cable Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Showa Electric Wire and Cable Co filed Critical Showa Electric Wire and Cable Co
Priority to JP62005746A priority Critical patent/JPS63310307A/en
Publication of JPS63310307A publication Critical patent/JPS63310307A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

PURPOSE:To extend a plurality of wires at a time and enable the extension of the wires of a plurality of frequencies to be performed with the preparation work of one frequency, by using main cables expanded previously between steel towers, as extension ropes, and by extending the wires. CONSTITUTION:When wires 44 are extended between steel towers 20, then main cables 40 are temporarily arranged at specified intervals first, and metal wheel bearing rollers 19 are engaged with the main cables 40 to support suspension metal wheels K. After that, ropes 41 are expanded as leading ropes by suspending the suspension metal wheels K from the main cables 40, and by using extension ropes 43, the wires 44 are extended. Then, the respective wires 44 are temporarily clamped and after they are extended, they are supported by suspension metal wheel bearing rollers 18. After that, when the tensile force of the main cables 40 engaged with the bearing rollers 19 and provided with the supported suspension metal wheels K first is loosened, then the main cables 40 are separated from the bearing rollers 19, and are dropped on the upper surfaces of extension wire rollers 16. Then, the dropped main cables 40 are used as extension wire ropes, and on the upper surfaces of the extension wire rollers 16, two wires in total, namely, one by one, are extended, and they are temporarily clamped. when the leading-out and temporary arrangement of four upper-layer wires are completed, then external frames 12 are removed from and expansion is performed on the middle-layer main cables 40.

Description

【発明の詳細な説明】 [発明の技術分野] 本発明は多条の電線を1回の準備作業で延線することが
できる多条延線工法に係る。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a multi-strip wire extension method that allows multi-strip electric wires to be extended in one preparatory operation.

[発明の技術的背景とその問題点] 従来、低張力延線工法、地線の無停電張替工法に使用さ
れている金車には、爾3図A、B、に示す非反転式吊金
車がある。
[Technical background of the invention and its problems] Conventionally, the metal wheels used in the low-tension wire extension method and the ground wire uninterruptible replacement method have a non-reversible suspension type as shown in Figures A and B. There is a gold car.

以下、第3図A、B、第4図A〜第4図工につき前記非
反転式金車およびそれを使用した延線工法を説明する。
Hereinafter, the non-reversible metal wheel and the wire extending method using the same will be explained with reference to FIGS. 3A and 3B and FIGS. 4A to 4.

第3図Aは非反転式吊金車により電線引抜を行っている
状態を、また第3図Bはそれが電線仮上を行っている状
態を示している。
FIG. 3A shows a state in which the wire is being pulled out by a non-reversible hanging wheel, and FIG. 3B shows a state in which the wire is temporarily lifted.

これ等の図において、非反転式吊金車は枠構1によりほ
ぼ四辺形の頂点に支持された鼓型の4箇のローラ2を有
する。
In these figures, the non-reversible hanging wheel has four drum-shaped rollers 2 supported by a framework 1 at the vertices of a substantially quadrilateral shape.

而して、まず第4図Aに示すように延線の開始に先立ち
、径間両端の鉄塔20に上相の16φワイヤ21を規定
の弛度で仮上する0次に、前記径間に16φワイヤ21
に沿って予め配置してあった12φナイロンロープ22
を、第4図Bに示すように引きロープとして使用し、径
間に16φナイロンロープ23で相互に連結され、第3
図A、已につき説明した構造の吊金車24を展開させる
First, as shown in FIG. 4A, before starting the wire extension, the upper phase 16φ wire 21 is temporarily raised to the steel towers 20 at both ends of the span with a specified slack. 16φ wire 21
The 12φ nylon rope 22 was placed in advance along the
are used as pull ropes as shown in FIG.
The hanging wheel 24 having the structure described in Figure A is deployed.

このようにして吊金車の展開を終了した後、第4図Cに
示すように前記16φナイロンロープ23を16φワイ
ヤ25に引き抜く、なお、この図中の26はナイロンロ
ープ22とワイヤ23とを連結するスイベルを示す。
After completing the deployment of the hanging wheel in this way, the 16φ nylon rope 23 is pulled out to the 16φ wire 25 as shown in FIG. The connecting swivels are shown.

次に、第4図りに示すように引き抜いたワイヤ23によ
り1条目の電線27を延線する。なお、この図中28は
ワイヤ23と電線27とを連結する引留クランプを示す
Next, as shown in the fourth diagram, the first wire 27 is extended using the drawn wire 23. Note that 28 in this figure indicates a retaining clamp that connects the wire 23 and the electric wire 27.

さらに、第4図Eに示すように、電線27を仮上する。Furthermore, as shown in FIG. 4E, the electric wire 27 is temporarily raised.

次に、第4図Fに示すように16φワイヤ21を弛め、
吊り金車24を前記仮上した電線27に支持させ、第4
図Gに示すように16φワイヤ21を引きワイヤとして
2条目の電線29を延線する。
Next, as shown in FIG. 4F, loosen the 16φ wire 21,
The hanging wheel 24 is supported by the temporarily raised electric wire 27, and the fourth
As shown in Figure G, a second electric wire 29 is drawn using the 16φ wire 21 as a pull wire.

ここで、吊金車24を回収するため第4図Hに示すよう
に、2条目の電線29の弛度を1条目のそれと揃える。
Here, in order to recover the hanging wheel 24, as shown in FIG. 4H, the slackness of the second wire 29 is made equal to that of the first wire.

さらに、中相の16φワイヤ30を規定の弛度に仮上後
、上相の吊金車24を回収しながらこれ等を前記中相の
16φワイヤ30に展開する。
Furthermore, after temporarily raising the middle phase 16φ wire 30 to a specified slack, while recovering the upper phase hanging wheel 24, these are developed into the middle phase 16φ wire 30.

以下、前記と同様の手順で中相、下相の2条の電線の延
線を行う。
Thereafter, the two wires for the middle phase and lower phase are wired in the same manner as above.

上記従来の延線工法においては、電線1条ずつしか延線
できず、しかも1回の延線準備作業につき最大限2条の
電線しか延線できない。
In the above-mentioned conventional wire extending method, only one electric wire can be extended, and moreover, only two electric wires at maximum can be extended in one wire extension preparation operation.

これでは、4導体線路、6導体線路、8導体線路のよう
に多条導体線路の延線をするには、多数回の準備作業を
行う必要があり、延線作業に要する手数と時間とは著し
く大であった。
In this case, in order to extend multi-conductor lines such as 4-conductor lines, 6-conductor lines, and 8-conductor lines, it is necessary to perform preparation work many times, and the number of steps and time required for the line extension work is limited. It was noticeably large.

[発明の目的] 本発明は上記の事情に基づきなされたもので、一度に複
数条の電線の延線をなし得、しかも1回の準備作業につ
き複数回の延線をすることができる延線工法を得ること
を目的としている。
[Object of the Invention] The present invention has been made based on the above circumstances, and provides a wire extension that is capable of extending multiple wires at once, and moreover, that allows the wire to be extended multiple times in one preparatory work. The purpose is to obtain construction methods.

[発明の概要] 本発明の延線工法は、フレームの上端に位置し相当りの
導体条数に等しい数の延線機吊金車支持ローラと、それ
等ローラの外側にある2箇の吊金車支持ローラと、前記
延線機吊金車支持ローラ直下に位置しそれ等と同数の延
線ローラを備え、吊金車支持ローラと前記延線ローラ間
を隔てる中間フレーム下端には開閉板を設けてなる吊金
車を使用し、鉄塔間に予め展張した相当り2条の主索に
前記吊金車支持ローラを係合させて吊金車を前記主索に
展開支持させ、予め前記各主索に沿わせて配置した延線
ロープにより相を形成する複数条のWi線を同時に前記
延線ローラ上に延線し、これ等の電線を仮上した後前記
主索を弛緩させて主索を前記開閉板を押し開いて前記延
線ローラ上に落下させ、これ等の主索を延線ロープとし
て使用して次の電線の延線を行うようにしたことを特徴
とする。
[Summary of the Invention] The wire drawing method of the present invention comprises a wire drawing machine hanging wheel support roller of a number equal to the number of corresponding conductor strips located at the upper end of the frame, and two hanging wheels located on the outside of these rollers. It is equipped with a wire wheel support roller and the same number of wire drawing rollers located directly below the wire drawing machine hanging wheel support roller, and an opening/closing plate is provided at the lower end of the intermediate frame separating the hanging wheel support roller and the wire drawing roller. Using a hanging wheel provided with A plurality of Wi wires forming a phase are simultaneously extended onto the wire extension rollers by wire extension ropes arranged along each main rope, and after temporarily hoisting these wires, the main rope is relaxed. The present invention is characterized in that the main ropes are pushed open by the opening/closing plate and dropped onto the wire extension rollers, and these main ropes are used as wire extension ropes to carry out the next extension of the electric wire.

[発明の実施例] 第1図Aは本発明工法において使用する吊金車の正面図
、第1図Bはその側面図である。この吊金車は4導体延
線用に構成されたもので、フレーム10は上端を第1の
軸11に挿通され平行な上端部と、下端部と、それ等を
連ねる斜辺とからなり、第1の軸11の両端に配置され
た2箇の外部フレーム12と、外部フレーム12の上端
部、下端部に平行で上端を第1の軸11の中央近傍に挿
通された2箇の内部フレーム13と、内外面フレーム間
に位置し上端部を第1の軸11に挿通され、下端にヒン
ジ14で取り付けられた開閉板15aを有する中間フレ
ーム15とからなる。内外部面フレーム12.13の下
端間には大径の電線延線ローラ16.16が第2の軸1
7により可回動に支持され、それ等フレームの上端間に
は第1の軸11により延線機吊金車支持ローラ18が第
1の軸11により可回動に支持されている。また、外部
フレーム12と中間フレーム15の上端間には、吊金車
支持ローラ19が第1の軸11により可回動に支持され
ている。なお、第1の軸11には金車間を連結するロー
プを結び付ける金具11aが設けである。
[Embodiments of the Invention] FIG. 1A is a front view of a hanging wheel used in the construction method of the present invention, and FIG. 1B is a side view thereof. This hanging wheel is configured for four-conductor wire extension, and the frame 10 has an upper end inserted into the first shaft 11 and consists of a parallel upper end, a lower end, and an oblique side connecting them. two external frames 12 arranged at both ends of the first shaft 11; and two internal frames 13 parallel to the upper and lower ends of the external frames 12 and whose upper ends are inserted near the center of the first shaft 11. and an intermediate frame 15 having an opening/closing plate 15a located between the inner and outer frames, whose upper end is inserted through the first shaft 11, and whose lower end is attached by a hinge 14. Between the lower ends of the inner and outer surface frames 12.13, a large diameter wire drawing roller 16.16 is connected to the second shaft 1.
A wire drawing machine hanger support roller 18 is rotatably supported by a first shaft 11 between the upper ends of these frames. Further, between the upper ends of the external frame 12 and the intermediate frame 15, a hanging wheel support roller 19 is rotatably supported by the first shaft 11. Note that the first shaft 11 is provided with a metal fitting 11a for connecting a rope connecting the metal wheels.

上記構成の4導体延線用金車により本発明の延線工法は
次のようにして実施される。
The wire rolling method of the present invention is carried out as follows using the four-conductor wire rolling wheel having the above configuration.

第2図A工、A2、A、〜H1、H2、Hlは延線工法
の各工程を示す模式図で、これ等の図中添字1を付した
ものは鉄塔間の電線、ワイヤ、ロープ、金車等の状態を
示し、添字2を付したものは鉄塔のアームにおけるワイ
ヤ等の状態を示し、添字3を付したものは第1図ABに
示した吊金車における前記ワイヤ等の状態を示す。なお
、図中Oは電線、・は主索、口は延線ロープ、Δはロー
プ、×は地線を示している。
Figure 2 A, A2, A, ~H1, H2, Hl are schematic diagrams showing each process of the wire extension method, and those with the subscript 1 in these figures are electric wires, wires, ropes, etc. between towers, Those with the suffix 2 indicate the condition of the wires, etc. in the arm of the tower, and the ones with the suffix 3 indicate the condition of the wires, etc. on the hanging wheel shown in Figure 1AB. show. In addition, in the figure, O indicates an electric wire, * indicates a main rope, an opening indicates an extended rope, Δ indicates a rope, and × indicates a ground wire.

最初に第2図へ〇に示すように、鉄塔20間に所定の弛
度で上、中、下各相2条の主索40を所定の間隔で仮止
しておく。この主索40に金車支持ローラ19を係合さ
せて吊金車Kを支持させ、径間に展開させる。主索40
には予めロープ41が沿わせである1図中42は地線を
示している。
First, as shown in the circle in FIG. 2, two main ropes 40 for each of the upper, middle, and lower phases are temporarily fixed between the steel towers 20 with a predetermined slack at a predetermined interval. The metal wheel support roller 19 is engaged with the main rope 40 to support the hanging wheel K, and the hanging wheel K is deployed in the span. Main rope 40
42 in FIG. 1 indicates a ground line along which a rope 41 is placed in advance.

第2図A2は鉄塔アームにおけるそれ等の配置を示す。Figure 2 A2 shows their arrangement on the tower arm.

次に第2図Biに示すように、2条の主索40に吊金車
に支持ローラ19の下面を係合させ、金車間を金具11
aを使用して前記ロープ41を引きロープとして、複数
の吊金車Kを主索40に吊り下げ展開する。この展開と
同時にロープ41により、展開された各金車の延線ロー
ラ16の上面に主索40と同一構成の延線用ロープ43
を引き通す。
Next, as shown in FIG. 2 Bi, the lower surface of the support roller 19 is engaged with the two main ropes 40 and the hanging wheel, and the metal fitting 11 is connected between the hanging wheels.
Using the rope 41 as a pull rope, a plurality of hanging wheels K are suspended from the main rope 40 and deployed. At the same time as this unfolding, a wire extending rope 43 having the same structure as the main rope 40 is placed on the upper surface of the wire extending roller 16 of each unfolded metal wheel by the rope 41.
pull it through.

次に第2図01に示すように、これ等の延線ロープ43
を使用して、前記ローラ16上面にそれぞれ1集計2条
のf1M44を延線する(f!!線の引抜)0図中45
は吊金車に間を連結する連結ロープを示す。
Next, as shown in FIG. 201, these extended ropes 43
Using , extend one total of two f1M44 wires on the upper surface of the roller 16 (f!! line drawing) 0 45 in Figure
indicates a connecting rope that connects the hanging wheel.

ここで、第2図D工に示すように各電線44を仮緊線し
て延線機吊金車支持ローラ18に係合させ、吊金車Kを
延線機吊金車支持ローラ18に支持させる(電線の仮上
)。
Here, as shown in Fig. 2 D, each electric wire 44 is temporarily tied and engaged with the wire-drawing machine hanging wheel support roller 18, and the hanging wheel K is connected to the wire-drawing machine hanging wheel support roller 18. Support it (temporarily raise the wire).

次に、第2図E1に示すように、吊金車支持ローラ19
に係合し最初に吊金車Kを支持してぃた主索40の張力
を弛めると、これ等の主索40は吊金車支持ローラ19
を離れ、中間フレーム15下端の開閉板15aを押し開
いて延線ローラ16の上面に落下する。
Next, as shown in FIG. 2 E1, the hanging wheel support roller 19
When the tension of the main ropes 40 that initially supported the sling wheel K is loosened, these main ropes 40 are attached to the sling wheel support rollers 19.
, pushes open the open/close plate 15a at the lower end of the intermediate frame 15, and falls onto the upper surface of the wire drawing roller 16.

ここで、第2図F、に示すように、前記落下した主索4
0を延線ロープとして使用し、延線ローラ16上面にそ
れぞれ1集計2条の電線を延線し第2図G工に示すよう
にそれ等を仮緊線する(電線の仮上)。
Here, as shown in FIG. 2F, the fallen main rope 4
0 as a wire extension rope, extend two wires, one total, each on the upper surface of the wire extension roller 16, and temporarily tie them as shown in Fig. 2 (G) (Temporary tensioning of the wires).

上記のようにして、上相の4条の電線の引抜、仮上を終
了したら、金車間を連結するロープを引張って吊金車K
を径間の何れか一端に回収しながら、外部フレーム12
を外して前記仮上した各電線から離脱させ、中相の主索
40上に展開させる。
After completing the pulling out and temporary hoisting of the four wires on the upper phase as described above, pull the rope connecting the metal wheels to the hanging wheel.
while collecting the external frame 12 at either end of the span.
is detached from each of the temporarily raised electric wires, and deployed onto the main rope 40 of the middle phase.

以下、前記と同様にして中相、下相の電線の引抜、仮上
を4条ずつ行うことができる。
Thereafter, in the same manner as described above, the wires of the middle phase and the lower phase can be pulled out and temporarily put on four wires at a time.

上記のようにして、ただ1回の準備作業をするだけで1
相当り4条の電線の引抜、仮上を行うことができる。さ
らに、電線2条を同時に低張力でしかも金車を反転させ
ることなく延線することができるので、安定した延線を
することができる。
As described above, just one preparatory work is required to complete 1
Capable of pulling out and temporarily hoisting four wires. Furthermore, since two wires can be simultaneously stretched under low tension and without reversing the metal wheel, stable wire stretching can be achieved.

なお、本発明は上記実施例のみに限定されない。Note that the present invention is not limited to the above embodiments.

すなわち、実施例は4導体線路の延線につき本発明を適
用したものであり、準備作業の回数倍数の導体8.1導
導体等の導体の引抜、仮上が可能であるが、各種ローラ
やフレームとを適宜組み合わせることにより、単導体、
多導体の延線が出来ることは勿論である。
That is, in the embodiment, the present invention is applied to the extension of a four-conductor line, and it is possible to pull out and temporarily lift conductors such as 8.1 conductors for the number of times the preparation work is performed. By appropriately combining with the frame, single conductor,
Of course, it is possible to extend multiple conductors.

[発明の効果]。[Effect of the invention].

上記から明らかなように本発明の多条延線工法によれば
、径間に対する吊金車の展開と云う準備作業を1回行っ
ただけで、多条の電線の延線をなし得るので、多条布設
の線路の電線の延線の手数を省くことができ、延線作業
の作業性、安全性の向上を図ることができる。また、同
時に2条以上の電線を低張力で延線することができるの
で、延線作業の安全性1作業性を向上させることができ
るだけでなく、布設された電線の性能の向上をも図るこ
とができる。
As is clear from the above, according to the multi-strip wire extension method of the present invention, multi-strip wires can be extended by performing the preparatory work of deploying the hanging wheel over the span only once. It is possible to save the trouble of extending electric wires on multi-stranded lines, and it is possible to improve the workability and safety of the wire extension work. In addition, since two or more wires can be stretched at the same time with low tension, it is possible to not only improve the safety and workability of wire-stretching work, but also to improve the performance of the wires that have been laid. Can be done.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図Aは本発明の延線工法において使用される吊金車
の正面図、第1図Bはその側面図、第2図Ai、 A、
、A、〜第2図H工、H2、H,は本発明工法の工程を
示す模式図、第3図Aは従来の非反転式金車の電線引抜
時の模式図、第3図Bはその電線仮上時の模式図、第4
図A〜工は従来の吊金車による延線工法の工程を示す模
式図である。
Figure 1A is a front view of the hanging wheel used in the wire extension method of the present invention, Figure 1B is its side view, Figure 2Ai, A,
, A, - Figure 2 H, H2, H, are schematic diagrams showing the process of the method of the present invention, Figure 3 A is a schematic diagram of the conventional non-reversible metal wheel when wires are being pulled out, and Figure 3 B is a schematic diagram showing the process of the method of the present invention. Schematic diagram of the temporary lifting of the wire, No. 4
Figures A to A are schematic diagrams showing the steps of a conventional wire stretching method using a hanging wheel.

Claims (1)

【特許請求の範囲】[Claims] フレームの上端に位置し相当りの導体条数に等しい数の
延線後吊金車支持ローラと、それ等ローラの外側にある
2箇の吊金車支持ローラと、前記延線後吊金車支持ロー
ラ直下に位置しそれ等と同数の延線ローラを備え、吊金
車支持ローラと前記延線ローラ間を隔てる中間フレーム
下端には開閉板を設けてなる吊金車を使用し、鉄塔間に
予め展張した相当り2条の主索に前記吊金車支持ローラ
を係合させて吊金車を前記主索に展開支持させ、予め前
記各主索に沿わせて配置した延線ロープにより相を形成
する複数条の電線を同時に前記延線ローラ上に延線し、
これ等の電線を仮上した後前記主索を弛緩させて主索を
前記開閉板を押し開いて前記延線ローラ上に落下させ、
これ等の主索を延線ロープとして使用して次の電線の延
線を行うようにしたことを特徴とする多条延線工法。
A post-wire hanging wheel support roller located at the upper end of the frame and having a number equal to the corresponding number of conductor strips, two hanging wheel support rollers located outside these rollers, and the post-wire hanging wheel supporting rollers. A hanging wheel is used, which is equipped with the same number of wire stretching rollers located directly below the support rollers, and has an opening/closing plate at the lower end of the intermediate frame that separates the hanging wheel support rollers from the wire stretching rollers. The hanging wheel support roller is engaged with two main ropes that have been stretched out in advance, so that the hanging wheel is expanded and supported by the main ropes, and the extended ropes that have been placed along each of the main ropes in advance are used. simultaneously stretching a plurality of wires forming a phase onto the wire stretching roller;
After temporarily hoisting these electric wires, the main rope is relaxed, the main rope is pushed open the opening/closing plate, and is dropped onto the wire extension roller,
A multi-strand wire extension method characterized in that these main ropes are used as wire extension ropes to extend the next wire.
JP62005746A 1987-01-13 1987-01-13 Execution of plural-extension-wire work Pending JPS63310307A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62005746A JPS63310307A (en) 1987-01-13 1987-01-13 Execution of plural-extension-wire work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62005746A JPS63310307A (en) 1987-01-13 1987-01-13 Execution of plural-extension-wire work

Publications (1)

Publication Number Publication Date
JPS63310307A true JPS63310307A (en) 1988-12-19

Family

ID=11619669

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62005746A Pending JPS63310307A (en) 1987-01-13 1987-01-13 Execution of plural-extension-wire work

Country Status (1)

Country Link
JP (1) JPS63310307A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104600623A (en) * 2015-01-16 2015-05-06 国家电网公司 High-altitude crossover releasing device for lifting type heavy power cable
CN105401781A (en) * 2015-12-01 2016-03-16 浙江省送变电工程公司 Double-friction barrel rope releaser

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104600623A (en) * 2015-01-16 2015-05-06 国家电网公司 High-altitude crossover releasing device for lifting type heavy power cable
CN105401781A (en) * 2015-12-01 2016-03-16 浙江省送变电工程公司 Double-friction barrel rope releaser

Similar Documents

Publication Publication Date Title
JPS63310307A (en) Execution of plural-extension-wire work
JP3401751B2 (en) How to transfer electric wires from wire-drawing wheel to suspension clamp at the time of work on tight line
JP3692409B2 (en) Overhead wire transfer method and transfer device
JPS5952608B2 (en) Long-distance electric wire extension method
RU2153748C1 (en) Process of installation of wire by means of flying vehicles
JPH0419763B2 (en)
JP2866853B2 (en) How to build a roof structure
JP2850207B2 (en) Hall prefabricated wiring method
JPH06323040A (en) Broken electric pole temporarily supporting construction method and temporary post
JPH09144197A (en) Method for constructing roof of stadium
JP3382720B2 (en) Wire drawing method and wire drawing wheel device for wire drawing
JPH03289308A (en) Vehicle for laying cable
JPS6358010B2 (en)
JPH079543Y2 (en) Gold wire for cable extension
JPS6366124B2 (en)
JPH0226442B2 (en)
CN212751629U (en) 1000kV line strain insulator string insulator replacement tool
CN214031223U (en) Flexible graphite grounding body packing wire coiling device
JPH03212104A (en) Steel tower wiring method and carrier
JPS598122B2 (en) Overhead line method for multi-conductor power transmission lines using hanging wheels
JPS604083B2 (en) How to install a belt conveyor
JPS59220004A (en) Method of developing and recovering warehouse for transmission trolley wire
JP2556915Y2 (en) Wire drawing equipment
JP2924677B2 (en) Loop type low tension wire moving method
JPS6217926B2 (en)