JPS6329017B2 - - Google Patents

Info

Publication number
JPS6329017B2
JPS6329017B2 JP18547583A JP18547583A JPS6329017B2 JP S6329017 B2 JPS6329017 B2 JP S6329017B2 JP 18547583 A JP18547583 A JP 18547583A JP 18547583 A JP18547583 A JP 18547583A JP S6329017 B2 JPS6329017 B2 JP S6329017B2
Authority
JP
Japan
Prior art keywords
bobbin
full
bobbins
transport
conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP18547583A
Other languages
Japanese (ja)
Other versions
JPS6075625A (en
Inventor
Eijiro Araki
Michio Shibano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyoda Jidoshokki Seisakusho KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Jidoshokki Seisakusho KK filed Critical Toyoda Jidoshokki Seisakusho KK
Priority to JP18547583A priority Critical patent/JPS6075625A/en
Publication of JPS6075625A publication Critical patent/JPS6075625A/en
Publication of JPS6329017B2 publication Critical patent/JPS6329017B2/ja
Granted legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/18Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for supplying bobbins, cores, receptacles, or completed packages to, or transporting from, paying-out or take-up stations ; Arrangements to prevent unwinding of roving from roving bobbins

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Description

【発明の詳細な説明】 技術分野 この発明は粗紡機で玉揚げされた満ボビンの精
紡工程への搬送及び精紡工程で使用された後の残
糸ボビンの残粗糸を処理して空ボビンとして粗紡
機へ搬送する粗紡・精紡工程間のボビン搬送方法
に関するものである。
Detailed Description of the Invention Technical Field This invention relates to transporting a full bobbin doffed by a roving machine to a spinning process, and processing the remaining rovings of the remaining yarn bobbin after being used in the spinning process to empty the bobbin. This invention relates to a bobbin transport method between the roving and spinning processes in which the bobbin is transported to the roving machine.

従来技術 近年紡績工場においては省力化が進み、各工程
内の自動化から一歩進展して各工程間の連結、搬
送の自動化を取り入れる場合が多くなつている。
そして、粗紡・精紡工程間の連結及びボビンの自
動搬送についてもいくつかの提案がなされてい
る。例えば、昭和49年5月11日公開の特開昭49−
48931号公報には、精紡機の上方に多数列のレー
ルを配置し該レールに接続するレールを粗紡工程
に至るレールと連結し、粗紡工程で玉揚げされた
満ボビンをトロリーに吊下して精紡機上方まで搬
送して直接精紡機のクリールを構成し、使用後の
残糸ボビンを前記レールに沿つて粗紡工程へ搬送
する方法が記載されている。又、昭和50年6月23
日公開の特開昭50−76340号公報には精紡機のク
リールの側方に沿つて搬送路を形成し同搬送路を
粗紡機に沿つて配設された搬送路と連結し、粗紡
機で玉揚げされた満ボビンを前記搬送路に沿つて
走行するパレツトに吊下して精紡機まで搬送しク
リールに吊下された使用後の残糸ボビンと満ボビ
ンとを交換し残糸ボビンを再び前記パレツトに吊
下して粗紡機側へと搬送する方法が記載されてい
る。
BACKGROUND OF THE INVENTION In recent years, labor saving has progressed in textile mills, and in many cases, the automation of each process has gone one step further to include automation of connections and conveyance between each process.
Several proposals have also been made regarding the connection between the roving and spinning processes and the automatic conveyance of bobbins. For example, Japanese Patent Publication No. 1973-1973 released on May 11, 1970.
Publication No. 48931 discloses that multiple rows of rails are arranged above the spinning machine, the rails connected to these rails are connected to the rails leading to the roving process, and full bobbins doffed in the roving process are suspended on a trolley. A method is described in which the remaining yarn bobbin is conveyed to the upper part of the spinning frame to directly constitute the creel of the spinning frame, and the remaining yarn bobbin after use is conveyed along the rail to the roving process. Also, June 23, 1975
Japanese Patent Laid-Open No. 50-76340, published in Japan, discloses that a conveyance path is formed along the side of the creel of a spinning frame, and this conveyance path is connected to a conveyance path arranged along a roving frame. The doffed full bobbin is suspended on a pallet running along the conveyance path and transported to the spinning machine, the used remaining yarn bobbin suspended from the creel is replaced with the full bobbin, and the remaining yarn bobbin is replaced again. A method is described in which the material is suspended from the pallet and transported to the roving frame.

ところが、紡績工場においては精紡機の効率的
稼動が生産性の向上に大きな比重を占めているの
で、精紡機は24時間操業あるいはそれに近い操業
が行われている。そのため粗紡機あがりの満ボビ
ンを常にストツクしておく必要があり前述した従
来方法のような工場の天井梁下に配設された搬送
レールを利用して粗紡工程から精紡工程へとボビ
ンの搬送を行う方法においては粗紡工程から精紡
工程までの搬送経路の他に満ボビンのストツク場
所としての搬送レールを多数配設しなければなら
ず設備費用がかさむばかりでなく、美観上も好ま
しくないという問題がある。
However, in spinning factories, the efficient operation of spinning machines plays a large role in improving productivity, so spinning machines are operated 24 hours a day or close to that. Therefore, it is necessary to always keep a stock of full bobbins from the roving machine, and the conventional method described above uses transport rails installed under the ceiling beams of the factory to transport bobbins from the roving process to the spinning process. In this method, in addition to the transport path from the roving process to the spinning process, many transport rails must be installed to store full bobbins, which not only increases equipment costs but also is aesthetically undesirable. There's a problem.

目 的 この発明は前記従来の問題点を解消するために
なされたものであつて、その目的は粗紡工程から
精紡工程への満ボビンの搬送及び精紡工程で使用
された後の空ボビンの粗紡工程への搬送を自動的
に行うことができ、しかも精紡工程における24時
間操業に対応して粗紡機あがりの満ボビンを常に
ストツクしておくストツク場所にあまり制限がな
く設備費用も僅かですむボビン搬送方法を提供す
ることにある。
Purpose This invention was made to solve the above-mentioned conventional problems, and its purpose is to transport full bobbins from the roving process to the spinning process and to transport empty bobbins after being used in the spinning process. Transport to the roving process can be carried out automatically, and in addition, in response to 24-hour operation in the spinning process, there are no restrictions on the storage location where full bobbins from the roving machine are always stocked, and the equipment cost is low. An object of the present invention is to provide a bobbin conveying method.

発明の構成 前記の目的を達成するためこの発明において
は、満ボビン又は残糸ボビンを吊下して搬送する
搬送マガジンの搬送路を精紡機群の各精紡機の上
方にその長手方向に沿つて配設するとともに該精
紡機群の両側において前記搬送路に接続する主搬
送路を設け、粗紡機の一端にはボビンが垂直状態
で挿入されるペツグを所定間隔に多数立設した搬
送体上に垂直に積載された空ボビンを取り出すと
ともに、玉揚げされた満ボビンを前記空ボビンが
取り出されたペツグ上に受け渡す作用をなす管替
え装置を配設し、前記主搬送路には満ボビンを垂
直に積載した搬送体から満ボビンを取り出して前
記搬送マガジンのボビンハンガーに該満ボビンを
挿入する作用をなす満ボビンローデイング装置
と、前記搬送マガジンに吊下された残糸ボビンを
取り外し残粗糸を除去した空ボビンを垂直状態で
前記搬送体上に受す渡す作用をなす残糸ボビン自
動処理装置とを配設し、前記管替え装置と、満ボ
ビンローデイング装置と、残糸ボビン自動処理装
置とを前記搬送体で連絡して粗紡機、精紡機間で
ボビンを搬送するようにした。
Structure of the Invention In order to achieve the above-mentioned object, in this invention, a conveyance path of a conveyance magazine for suspending and conveying a full bobbin or a remaining thread bobbin is provided above each spinning machine in a group of spinning machines along its longitudinal direction. At the same time, a main transport path is provided on both sides of the spinning frame group and connected to the transport path, and at one end of the spinning frame, a number of pegs into which bobbins are vertically inserted are erected at predetermined intervals on a transport body. A pipe changing device is provided that takes out the vertically loaded empty bobbins and transfers the doffed full bobbins onto the peg from which the empty bobbins are taken out, and the main conveyance path is provided with a pipe changing device for transferring the full bobbins to the peg from which the empty bobbins are taken out. A full bobbin loading device that takes out a full bobbin from a vertically loaded conveyance body and inserts the full bobbin into a bobbin hanger of the conveyance magazine; and a full bobbin loading device that takes out a full bobbin from a vertically loaded conveyance body and inserts the full bobbin into a bobbin hanger of the conveyance magazine; An automatic residual yarn bobbin processing device is provided which functions to receive and pass empty bobbins from which yarn has been removed onto the conveyor in a vertical state, and the tube change device, a full bobbin loading device, and a residual yarn bobbin automatic processing device are provided. The bobbin was conveyed between the roving frame and the spinning frame by communicating with the processing device through the conveying body.

又、第二の発明においては、前記第一の発明に
おける満ボビンローテイング装置と、残糸ボビン
自動処理装置とを前記主搬送路の前記精紡機の長
手方向と平行に配設された部分に近接して配設
し、前記管替え装置と、満ボビンローデイング装
置と、残糸ボビン自動処理装置とを所定の軌導に
沿つて移動する前記搬送体で連絡し、前記満ボビ
ンローデイング装置と残糸ボビン自動処理装置と
を同期して作動させるようにした。
Further, in a second invention, the full bobbin rotating device and the remaining yarn bobbin automatic processing device according to the first invention are arranged in a portion of the main conveyance path that is arranged parallel to the longitudinal direction of the spinning machine. The tube changing device, the full bobbin loading device, and the remaining yarn bobbin automatic processing device are arranged in close proximity to each other, and are connected to each other by the conveying body that moves along a predetermined trajectory, and the full bobbin loading device and the remaining yarn bobbin automatic processing device are operated in synchronization.

実施例 以下この発明を具体化した一実施例を図面に従
つて説明する。この実施例の精紡機1は第1,2
図に示すように、クリール2がクリールピラー3
を中心として左右両側に配設されたクリール搬送
路4と、該クリール搬送路4を構成する搬送レー
ルに対して移動可能に懸装された多数の搬送マガ
ジン5とから構成されている。前記各搬送マガジ
ン5には精紡機1に必要な位置関係に配列された
複数個(通常8〜12個)の粗糸巻をそれぞれ吊下
し、精紡機1上の粗糸巻がほぼ空になると使用済
みの残糸ボビンを吊下した搬送マガジン群と満ボ
ビンを吊下した搬送マガジン群とが一斉に交換さ
れるようになつている。
Embodiment An embodiment embodying the present invention will be described below with reference to the drawings. The spinning machine 1 of this embodiment has first and second spinning machines.
As shown in the figure, the creel 2 is connected to the creel pillar 3.
The creel conveyance path 4 is arranged on both sides of the creel conveyance path 4, and a large number of conveyance magazines 5 are movably suspended on the conveyance rails forming the creel conveyance path 4. A plurality of (usually 8 to 12) roving rolls arranged in the positional relationship required for the spinning frame 1 are suspended from each of the transport magazines 5, and used when the roving rolls on the spinning machine 1 are almost empty. The group of transport magazines from which bobbins with used remaining yarn are suspended and the group of transport magazines from which full bobbins are suspended are exchanged at the same time.

精紡機群の周囲にはその両側において前記搬送
路4に接続されるとともに該搬送路4と平行に配
設された待機通路6を有する主搬送路7が配設さ
れている。主搬送路7には前記待機通路6の外側
に該待機通路6と平行に設けられた部分に残糸ボ
ビン自動処理装置8と満ボビンローデイング装置
9とが所定の間隔で配設されている。残糸ボビン
自動処理装置8は第3,4図に示すように残糸ボ
ビン10を吊下した搬送マガジン5を案内する搬
送レール11と対応する位置に配設された残糸ボ
ビン取り外し装置12と、その前方において前記
搬送レール11と直交する方向に延設された排出
装置13と、搬送レール11に沿つて配設され前
記排出装置13により排出された残糸ボビン10
を一定方向(第3,4図における左方)に移送し
ながらボビンから残粗糸を除去する残粗糸除去装
置14と、該残粗糸除去装置14から送り出され
た空ボビン15をその頂部に形成されたフランジ
部において吊下支承して所定位置まで案内するシ
ユータ16と、該シユータ16により案内供給さ
れる空ボビン15を搬送体としてのパレツト17
に立設されたペツグ18に挿入するボビン受渡し
装置19とから構成されている。
A main conveyance path 7 is disposed around the spinning frame group, and is connected to the conveyance path 4 on both sides thereof and has a standby passage 6 arranged parallel to the conveyance path 4. In the main conveyance path 7, a residual yarn bobbin automatic processing device 8 and a full bobbin loading device 9 are arranged at a predetermined interval in a portion provided outside the standby path 6 and parallel to the standby path 6. . As shown in FIGS. 3 and 4, the residual yarn bobbin automatic processing device 8 includes a residual yarn bobbin removal device 12 disposed at a position corresponding to a conveyance rail 11 that guides the conveyance magazine 5 on which the residual yarn bobbin 10 is suspended. , a discharge device 13 extending in a direction orthogonal to the conveyance rail 11 in front thereof, and a remaining yarn bobbin 10 disposed along the conveyance rail 11 and discharged by the discharge device 13.
A remaining roving removing device 14 removes the remaining roving from the bobbin while transferring the remaining roving in a certain direction (to the left in FIGS. 3 and 4), and an empty bobbin 15 sent out from the remaining roving removing device 14 is removed from the top of the bobbin. A shutter 16 is suspended from a flange formed in the flange portion and guided to a predetermined position, and a pallet 17 serves as a conveyor for empty bobbins 15 guided and supplied by the shutter 16.
The bobbin transfer device 19 is inserted into a peg 18 erected in the bobbin.

前記残糸ボビン取り外し装置12は前記搬送マ
ガジン5の進行方向に向かつて上方へ傾斜するよ
うに配設されたボビン押上げコンベア20の作用
により、図示しない間欠送り装置により移動され
る搬送マガジン5のボビンハンガー21に吊下さ
れた残糸ボビン10の底部に当接して該ボビン1
0を上方へ押上げ、ボビンハンガー21から取り
外すようになつている。
The remaining thread bobbin removal device 12 is operated by a bobbin push-up conveyor 20 arranged to be inclined upward in the direction of movement of the transport magazine 5, and removes the transport magazine 5, which is moved by an intermittent feeding device (not shown). The bobbin 1 comes into contact with the bottom of the remaining thread bobbin 10 suspended from the bobbin hanger 21.
0 is pushed upward and removed from the bobbin hanger 21.

ボビン受渡し装置19は第5図に示すように支
持フレーム22の上面に垂直に固定されたシリン
ダ23により昇降されるとともにカム24及びカ
ムローラ25の作用により開閉作動する一対の支
持レール26と、前記シユータ16から供給され
る空ボビン15を受け取り、該空ボビン15を前
記支持レール26と対向する位置に回動配置する
ボビン送り装置27のボビン支承部材28に吊下
された空ボビン15を前記支持レール26の支承
部26aの所定位置まで移送する移送装置29と
を備えている。そして第5図に示すようにパレツ
ト17のペツグ18と対応する位置に4本の空ボ
ビン15が吊下される度にシリンダ23が作動し
て、ペツグ18に空ボビン15が挿入されるとと
もに図示しない間欠送り装置によりパレツト17
がペツグ18の間隔分ずつ前方へ送られるように
なつている。
As shown in FIG. 5, the bobbin transfer device 19 is raised and lowered by a cylinder 23 fixed perpendicularly to the upper surface of a support frame 22, and also includes a pair of support rails 26 that are opened and closed by the action of a cam 24 and a cam roller 25, and the shutter. The empty bobbin 15 suspended from the bobbin support member 28 of the bobbin feeding device 27 receives the empty bobbin 15 supplied from the support rail 26 and rotates the empty bobbin 15 to a position facing the support rail 26. 26 to a predetermined position. As shown in FIG. 5, each time the four empty bobbins 15 are suspended at positions corresponding to the pegs 18 of the pallet 17, the cylinder 23 is actuated, and the empty bobbins 15 are inserted into the pegs 18 and are pallet 17 by intermittent feeding device.
is sent forward by the distance of the pegs 18.

満ボビンローデイング装置9は第6,7図に示
すように搬送レール11に沿つて移動する搬送マ
ガジン5に装備されたボビンハンガー21に満ボ
ビン30を挿入する作業を行うリフター装置31
と、満ボビン30を垂直に積載したパレツト17
から満ボビン30を取り出して前記リフター装置
31まで満ボビン30を水平に移送するための水
平移送装置32と、パレツト17をペツグ18の
間隔分ずつ間欠的に送る作用をなす間欠送り装置
(図示しない)とから構成されている。リフター
装置31は上下方向に立設された一対のガイドレ
ール33に沿つて上下動可能に支承され、搬送マ
ガジン5のボビンハンガー21の配列間隔と対応
した間隔で各列2個合計4個のペツグ34aが装
備された昇降部材34がチエーン35を介して両
ロツド型複動シリンダ36により作動されて昇降
作動するようになつている。
As shown in FIGS. 6 and 7, the full bobbin loading device 9 includes a lifter device 31 that inserts a full bobbin 30 into a bobbin hanger 21 installed on the transport magazine 5 that moves along the transport rail 11.
and a pallet 17 loaded vertically with full bobbins 30.
a horizontal transfer device 32 for taking out a full bobbin 30 from a container and horizontally transferring the full bobbin 30 to the lifter device 31; and an intermittent feeding device (not shown) for intermittently feeding the pallet 17 by the interval of the pegs 18. ). The lifter device 31 is supported so as to be movable up and down along a pair of guide rails 33 vertically installed, and has four pegs, two in each row, at intervals corresponding to the arrangement spacing of the bobbin hangers 21 of the transport magazine 5. An elevating member 34 equipped with a lift member 34a is actuated by a double-rod type double-acting cylinder 36 via a chain 35 to move up and down.

水平移送装置32は断面コ字状をなし搬送レー
ル11と直交する方向に延びる一対の支持レール
37に対して該支持レール37に沿つて横方向へ
の移動可能に配設された一対のトラバーサ38
a,38bを備えている。トラバーサ38a,3
8bの先端部には各一対の把持装置39a,39
bがパレツト17上の満ボビン30の間隔に対応
してそれぞれ設けられている。前記両支持レール
37の間には、前記トラバーサ38a,38bを
両支持レール37に沿つて移動させるためのスク
リユーシヤフト40が正逆回転可能に支持され、
ギヤ等の駆動伝達手段41を介してモータ42に
より正逆両方向へ回動駆動されるようになつてい
る。前記トラバーサ38a,38bの下面には前
記スクリユーシヤフト40の溝40aに係合する
係合ピン(図示しない)が設けられ、スクリユー
シヤフト40の回転により支持レール37に沿つ
て横方向に移動するようになつている。
The horizontal transfer device 32 has a U-shaped cross section and includes a pair of traversers 38 that are disposed to be movable in the lateral direction along a pair of support rails 37 that extend in a direction perpendicular to the transfer rails 11.
a, 38b. Traverser 38a, 3
A pair of gripping devices 39a, 39 are provided at the tip of each 8b.
b are provided corresponding to the intervals between full bobbins 30 on the pallet 17. A screw shaft 40 for moving the traversers 38a and 38b along both the support rails 37 is supported between the support rails 37 so as to be rotatable in forward and reverse directions,
It is configured to be rotatably driven in both forward and reverse directions by a motor 42 via a drive transmission means 41 such as a gear. Engagement pins (not shown) that engage with grooves 40a of the screw shaft 40 are provided on the lower surfaces of the traversers 38a and 38b, and are moved laterally along the support rail 37 as the screw shaft 40 rotates. It's becoming like that.

前記精紡機1の側方には精紡機1と平行に粗紡
機43が設けられている。この粗紡機43は昭和
57年5月24日公告の特公昭57−24414号公報に記
載された装置のように玉揚げ時には満ボビン30
がその駆動手段から分離されて無端状のチエーン
コンベアに装備されたボビンホルダ44の支持筒
44aに嵌装されチエーンコンベアの作動により
コンベアカバー45の上面を移動して、チエーン
コンベアの周回部すなわち粗紡機43の一端にお
いて満ボビン30が自動的に玉揚げされる機構を
備えている。粗紡機43の一端にはボビンが垂直
状態で挿入されるペツグ18を所定間隔で多数立
設された前記パレツト17上に垂直に積載された
空ボビン15を該パレツト17上から取り出すと
ともに、玉揚げされた満ボビン30を前記空ボビ
ン15が取り出されたペツグ18上に受渡す作用
をなす管替え装置46が配設されている。管替え
装置46は第8〜11図に示すようにパレツト1
7上から空ボビン15を垂直状態に保持したまま
一列分同時に取り出し、前記ボビンホルダー44
上へ空ボビン15を1個ずつ供給するための空ボ
ビン供給箱47まで移送する空ボビン移送装置4
8と、前記空ボビン移送装置48に隣接して配設
され、前記チエーンコンベアの周回部に配設され
たボビン排出機構(図示しない)の作用によりボ
ビンホルダー44との係合が解除された満ボビン
30を垂直状態に保持したまま順次前記パレツト
17上方へ移送するとともに下降移動により所定
本数ずつ前記パレツト17上に載置する満ボビン
受渡し装置49と、パレツト17をペツグ18の
間隔ずつ間欠的に送る作用をなす間欠送り装置
(図示しない)とから構成されている。前記空ボ
ビン移送装置48は粗紡機43の一端に配設され
たフレーム50上の前記ボビン供給箱47の配設
位置の延長線上に配設され、シリンダ51により
昇降されるとともに降下時に開放され上昇時に閉
じるように構成された一対のガイドレール52を
備えた空ボビン吊下装置53と、該空ボビン吊下
装置53に吊下された空ボビン15を前記空ボビ
ン供給箱47へと排出する空ボビン排出装置54
とを備えている。
A roving frame 43 is provided on the side of the spinning frame 1 in parallel with the spinning frame 1. This Rover 43 is from the Showa era.
Like the device described in the Japanese Patent Publication No. 57-24414 published on May 24, 1957, when doffing, a full bobbin of 30
is separated from its driving means and fitted into the support cylinder 44a of a bobbin holder 44 equipped on an endless chain conveyor, and is moved on the upper surface of the conveyor cover 45 by the operation of the chain conveyor, and is connected to the revolving part of the chain conveyor, that is, the roving frame. A mechanism is provided at one end of the bobbin 43 to automatically doff the full bobbin 30. At one end of the roving frame 43, a large number of pegs 18 into which bobbins are vertically inserted are vertically installed on the pallet 17.Empty bobbins 15 stacked vertically on the pallet 17 are taken out from the pallet 17 and doffed. A pipe changing device 46 is provided which functions to transfer the filled bobbin 30 onto the peg 18 from which the empty bobbin 15 has been taken out. The pipe changing device 46 replaces the pallet 1 as shown in FIGS. 8 to 11.
While holding the empty bobbins 15 vertically, take out one row of empty bobbins 15 from above at the same time, and place them in the bobbin holder 44.
An empty bobbin transfer device 4 that transfers the empty bobbins 15 upward to an empty bobbin supply box 47 for feeding them one by one.
8, and a full bobbin disengaged from the bobbin holder 44 by the action of a bobbin discharging mechanism (not shown) disposed adjacent to the empty bobbin transfer device 48 and disposed in the circumferential portion of the chain conveyor. A full bobbin transfer device 49 sequentially transfers the bobbins 30 upwardly to the pallet 17 while holding them vertically and places a predetermined number of bobbins on the pallet 17 by downward movement, and a full bobbin transfer device 49 transfers the pallets 17 intermittently at intervals of pegs 18. It is composed of an intermittent feeding device (not shown) that performs a feeding function. The empty bobbin transfer device 48 is disposed on an extension of the position of the bobbin supply box 47 on a frame 50 disposed at one end of the roving frame 43, and is raised and lowered by a cylinder 51, and is opened and raised when descending. an empty bobbin hanging device 53 equipped with a pair of guide rails 52 configured to close when the empty bobbin hanging device 53 closes; Bobbin discharge device 54
It is equipped with

前記満ボビン受渡し装置49は空ボビン移送装
置48の前方でかつ両装置の中心間隔が前記パレ
ツト17のペツグ18の配設間隔と同じとなる位
置において前記空ボビン移送装置48と平行に配
設されている。満ボビン受渡し装置49は前記ボ
ビン排出機構によりボビンホルダ44との係合が
解除された満ボビン30を垂直状態で一時的に支
承保持する満ボビン保持装置55と、満ボビン3
0をそのフランジ部30aにおいて支承するとと
もに昇降作動により所定本数ずつ前記パレツト1
7上のペツグ18に挿入する満ボビン挿入装置5
6と、前記満ボビン保持装置55に支持された満
ボビン30を前記満ボビン挿入装置56まで移送
する満ボビン移送装置57とからなつている。満
ボビン保持装置55は満ボビン30をフランジ部
30aにおいて吊下支承する一対の支持レール5
8と該支持レール58に近接して回動可能に設け
られた一対の支承部材59と、前記ボビン排出機
構のボビン押上げ部材60の作用によりボビンホ
ルダー44上から排出される満ボビン30のフラ
ンジ部30aの周面に当接して満ボビン30を前
記支承部材59まで案内する一対のガイドバー6
1とを備えている。
The full bobbin transfer device 49 is disposed in front of the empty bobbin transfer device 48 and parallel to the empty bobbin transfer device 48 at a position where the distance between the centers of both devices is the same as the spacing between the pegs 18 of the pallet 17. ing. The full bobbin delivery device 49 includes a full bobbin holding device 55 that temporarily supports and holds the full bobbin 30 in a vertical state, which has been disengaged from the bobbin holder 44 by the bobbin discharge mechanism, and a full bobbin 30.
0 is supported at its flange portion 30a, and a predetermined number of pallets 1 are lifted up and down by lifting and lowering operations.
Full bobbin insertion device 5 inserted into peg 18 on 7
6, and a full bobbin transfer device 57 that transfers the full bobbin 30 supported by the full bobbin holding device 55 to the full bobbin insertion device 56. The full bobbin holding device 55 includes a pair of support rails 5 that suspend and support the full bobbin 30 at the flange portion 30a.
8, a pair of support members 59 rotatably provided in the vicinity of the support rail 58, and a flange of the full bobbin 30 discharged from above the bobbin holder 44 by the action of the bobbin push-up member 60 of the bobbin discharge mechanism. A pair of guide bars 6 that come into contact with the circumferential surface of the portion 30a and guide the full bobbin 30 to the support member 59.
1.

満ボビン挿入装置56は前記満ボビン保持装置
55に近接して配設され、支持フレーム62の上
面に固定されたシリンダ63により昇降されると
ともにカム64及びカムローラ65の作用により
開閉作動する一対の支持レール66が装備されて
いる。又、満ボビン移送装置57は満ボビン保持
装置55と満ボビン挿入装置56の一側に設けら
れたブラケツト67間に架設され外周面に係合片
68が所定間隔で突設された無端状のコンベアベ
ルト69により構成されている。そして、満ボビ
ン保持装置55上に吊下された満ボビンを満ボビ
ン挿入装置56の支持レール66上に移送するよ
うになつている。
The full bobbin insertion device 56 is disposed close to the full bobbin holding device 55, and is raised and lowered by a cylinder 63 fixed to the upper surface of the support frame 62, and is a pair of supports that are opened and closed by the action of a cam 64 and a cam roller 65. Equipped with rail 66. The full bobbin transfer device 57 is an endless type that is installed between a bracket 67 provided on one side of the full bobbin holding device 55 and the full bobbin insertion device 56, and has engaging pieces 68 protruding from the outer peripheral surface at predetermined intervals. It is composed of a conveyor belt 69. Then, the full bobbin suspended on the full bobbin holding device 55 is transferred onto the support rail 66 of the full bobbin insertion device 56.

前記のように構成された残糸ボビン自動処理装
置8、満ボビンローデイング装置9及び管替え装
置46間を前記パレツト17で連絡するため残糸
ボビン自動処理装置8及び満ボビンローデイング
装置9の側方には精紡機の長手方向に沿つて延び
るローラコンベア70が又、粗紡機43の側方に
は粗紡機43の長手方向と直交する方向に延びる
ローラコンベア71がそれぞれ配設され、両ロー
ラコンベア70,71の延長線上にはパレツト1
7の移動方向を90度変換するためのターンテーブ
ル72が配設されている。ローラコンベア70,
71はそれぞれ残糸ボビン自動処理装置8、満ボ
ビンローデイング装置9、管替え装置46に対応
して配設されパレツト17を前記各装置に装備さ
れた間欠送り装置へ送る作用をなす送り用のロー
ラコンベア70a,71aと該ローラコンベア7
0a,71aと平行に設けられた搬送用ローラコ
ンベア70b,71bとから構成されている。各
ローラコンベア70a,70b,71a,71b
はそれぞれ独立に駆動される複数台のローラコン
ベアにより構成され、搬送用ローラコンベア70
b,71bはそれぞれ正逆回転駆動可能に構成さ
れている。そして、パレツト17が残糸ボビン自
動処理装置8、満ボビンローテイング装置9、管
替え装置46にそれぞれ装備された間欠送り装置
と対応する位置まで送られた後は、該パレツト1
7と対応する送り用ローラコンベア70a,70
bの駆動が停止されるとともにパレツト17は該
ローラコンベア70a,70bからフリーとなり
前記各間欠送り装置により間欠的に送られるよう
になつている。
In order to connect the remaining yarn bobbin automatic processing device 8, full bobbin loading device 9, and pipe changing device 46 configured as described above through the pallet 17, the remaining yarn bobbin automatic processing device 8 and the full bobbin loading device 9 are connected. A roller conveyor 70 extending along the longitudinal direction of the spinning frame is disposed on the side, and a roller conveyor 71 extending in a direction perpendicular to the longitudinal direction of the roving frame 43 is disposed on the side of the roving frame 43. Pallet 1 is placed on the extension line of conveyors 70 and 71.
A turntable 72 for changing the direction of movement of 7 by 90 degrees is provided. roller conveyor 70,
Reference numerals 71 indicate feeding units which are arranged corresponding to the remaining thread bobbin automatic processing device 8, the full bobbin loading device 9, and the tube changing device 46, respectively, and which serve to send the pallet 17 to the intermittent feeding device equipped with each of the devices. Roller conveyors 70a, 71a and the roller conveyor 7
0a, 71a and conveying roller conveyors 70b, 71b provided in parallel. Each roller conveyor 70a, 70b, 71a, 71b
is composed of a plurality of roller conveyors that are each driven independently, and includes a conveyor roller conveyor 70.
b and 71b are each configured to be capable of being driven in forward and reverse rotation. After the pallet 17 is sent to the position corresponding to the intermittent feeding device installed in the remaining yarn bobbin automatic processing device 8, the full bobbin rotating device 9, and the tube changing device 46, the pallet 1
Feeding roller conveyor 70a, 70 corresponding to 7
When the drive of the roller conveyor b is stopped, the pallet 17 becomes free from the roller conveyors 70a and 70b and is intermittently fed by each of the intermittent feeding devices.

前記一方のローラコンベア70の両端にはパレ
ツト17を送り用ローラコンベアの70aと搬送
用ローラコンベア70bとの間で横移動させるた
めの移動装置73がそれぞれ配設されている。移
動装置73は適宜の手段により昇降される一対の
支持フレーム74と該支持フレーム74に設けら
れた多数の駆動ローラ75とから構成され常には
駆動ローラ75の周面がローラコンベア70のロ
ーラの周面より下方に位置するように支持フレー
ム74が配置され、パレツト17を横方向へ移動
させる場合には駆動ローラ75がパレツト17の
下面に当接してパレツト17とローラコンベア7
0のローラとの接触を解除する位置まで支持フレ
ーム74が上昇される。そしてその後駆動ローラ
75が回動されることによりパレツト17を横方
向へ移動するようになつている。又、粗紡機43
の側方に配設されたローラコンベア71にも所定
位置に移動装置73が配設されている。
At both ends of the one roller conveyor 70, moving devices 73 are disposed, respectively, for laterally moving the pallet 17 between the feeding roller conveyor 70a and the conveying roller conveyor 70b. The moving device 73 is composed of a pair of support frames 74 that are raised and lowered by appropriate means, and a number of drive rollers 75 provided on the support frames 74. The circumferential surface of the drive rollers 75 is always aligned with the circumferential surface of the rollers of the roller conveyor 70. A support frame 74 is disposed so as to be located below the surface, and when the pallet 17 is moved laterally, the drive roller 75 comes into contact with the lower surface of the pallet 17, and the pallet 17 and the roller conveyor 7 are moved.
The support frame 74 is raised to a position where it releases contact with the rollers 0 and 6. Thereafter, the drive roller 75 is rotated to move the pallet 17 laterally. Also, roving machine 43
A moving device 73 is also disposed at a predetermined position on a roller conveyor 71 disposed on the side of the roller conveyor 71 .

次に前記のように構成された装置を用いたボビ
ンの移送方法について説明する。この実施例にお
いては粗紡機43の一端に配設された管替え装置
46により満ボビン30がペツグ18上に挿入さ
れたパレツト17は、送り用ローラコンベア71
aの作用により移動装置73の上方へ各パレツト
17が到着することに移動装置73が作動されて
送り用ローラコンベア71a上から搬送用ローラ
コンベア71b上へと移送される。そして搬送用
ローラコンベア71b上に載置されると搬送用ロ
ーラコンベア71bが作動しパレツト17が移動
装置73と対応する位置から移動する。通常はパ
レツト3台で粗紡機43の1台分の満ボビンを搬
送するので、以下同様してに後続の2台のパレツ
ト17が送り用ローラコンベア71a上から搬送
用ローラコンベア71b上へと移送される。搬送
用ローラコンベア71b上に移送されたパレツト
17は該搬送用ローラコンベア71bにより第
1,12図の矢印P方向へと移送され先頭のパレ
ツト17がターンテーブル72上に移動した時点
で搬送用ローラコンベア71bが停止する。そし
てターンテーブル72が90度回動し、先頭のパレ
ツト17は他方の搬送用ローラコンベア70b上
に移動される。そしてパレツト17が移動装置7
3と対応する位置に到達した時点で移動装置73
が作動しパレツト17は満ボビンローデイング装
置9及び残糸ボビン自動処理装置8と対応する位
置に延設された送り用ローラコンベア70a上へ
と移送される。以下同様にして後続の2台のパレ
ツト17が順次ターンテーブル72及び移動装置
73により送り用ローラコンベア70a上へと移
送される。そして先頭のパレツト17が満ボビン
ローデイング装置9と対応する位置に到達した状
態で待機する。
Next, a method for transferring a bobbin using the apparatus configured as described above will be explained. In this embodiment, the pallet 17 with full bobbins 30 inserted onto the pegs 18 by the tube changing device 46 disposed at one end of the roving frame 43 is transferred to the feeding roller conveyor 71.
When each pallet 17 arrives above the moving device 73 due to the action of a, the moving device 73 is activated and the pallets are transferred from the feeding roller conveyor 71a to the feeding roller conveyor 71b. When the pallet 17 is placed on the conveying roller conveyor 71b, the conveying roller conveyor 71b is activated and the pallet 17 is moved from the position corresponding to the moving device 73. Normally, three pallets transport full bobbins for one roving frame 43, so the following two pallets 17 are similarly transferred from the feeding roller conveyor 71a to the feeding roller conveyor 71b. be done. The pallet 17 transferred onto the transfer roller conveyor 71b is transferred by the transfer roller conveyor 71b in the direction of arrow P in FIGS. Conveyor 71b stops. Then, the turntable 72 rotates 90 degrees, and the first pallet 17 is moved onto the other conveyor roller conveyor 70b. Then, the pallet 17 is transferred to the moving device 7.
When reaching the position corresponding to 3, the moving device 73
is operated, and the pallet 17 is transferred onto a feeding roller conveyor 70a extending at a position corresponding to the full bobbin loading device 9 and the remaining yarn bobbin automatic processing device 8. Thereafter, the following two pallets 17 are sequentially transferred onto the feeding roller conveyor 70a by the turntable 72 and the moving device 73 in the same manner. Then, when the first pallet 17 reaches the position corresponding to the full bobbin loading device 9, it waits.

一方精紡機1のクリール搬送路4に導入された
搬送マガジン群E1の粗糸巻が使用されて精紡機
が新たな満ボビンを要求する信号が発せられる
と、第12図に鎖線で示すように待機通路6上に
満ボビンを吊下した状態で待機していた満ボビン
搬送マガジン群FがトレーラTにより押動されて
残糸ボビン10を吊下した搬送マガジン群E1が
懸装されたクリール搬送路4へと搬入される。第
12図に実線で示す状態からさらにトレーラTが
満ボビン搬送マガジン群Fを押動して満ボビン搬
送マガジン群Fが精紡機1の所定位置まで搬入さ
れることにより、搬送マガジン群E1はクリール
搬送路4から押し出され先頭部分が待機通路6内
へ搬入される。次にトレーラTは搬送路4から逆
方向へ移動して待機通路6内に搬入された搬送マ
ガジン群E1の前端部に達し搬送マガジン群E1
を待機通路6内へと牽引作動する。
On the other hand, when the roving of the transport magazine group E1 introduced into the creel transport path 4 of the spinning frame 1 is used and the spinning machine receives a signal requesting a new full bobbin, the spinning machine waits as shown by the chain line in FIG. The full bobbin transport magazine group F, which was waiting with full bobbins suspended above the passage 6, is pushed by the trailer T, and the creel transport path where the transport magazine group E1 with the remaining thread bobbins 10 suspended is suspended. It will be transported to 4th. From the state shown by the solid line in FIG. 12, the trailer T further pushes the full bobbin transport magazine group F and the full bobbin transport magazine group F is carried to a predetermined position of the spinning machine 1, so that the transport magazine group E1 is moved to the creel. The leading portion pushed out from the conveyance path 4 is carried into the waiting path 6. Next, the trailer T moves in the opposite direction from the transport path 4 and reaches the front end of the transport magazine group E1 carried into the waiting path 6.
is towed into the waiting passage 6.

次に第13図に示すように再びトレーラTが搬
送マガジン群E1を押動すると搬送マガジン群E
1は残糸ボビン自動処理装置8及び満ボビンロー
デイング装置9が配設された主搬送路7へと搬入
される。トレーラTは搬送マガジン群E1の先頭
の搬送マガジン5が残糸ボビン自動処理装置8の
間欠送り装置(図示しない)と対応する位置に到
達した時点でその押動を停止する。次に残糸ボビ
ン自動処理装置8が作動され、その間欠送り装置
の作用により搬送マガジン群E1が順次移送され
残糸ボビン取り外し装置12の作用によりボビン
ハンガー21から順次残糸ボビン10が取りはず
されて排出装置13、残粗糸除去装置14を経て
空ボビン15となつてシユータ16を経てボビン
受渡し装置19へと案内される。
Next, as shown in FIG. 13, when the trailer T pushes the transport magazine group E1 again, the transport magazine group E
1 is carried into the main conveyance path 7 where a residual yarn bobbin automatic processing device 8 and a full bobbin loading device 9 are arranged. The trailer T stops pushing when the leading transport magazine 5 of the transport magazine group E1 reaches a position corresponding to the intermittent feed device (not shown) of the automatic residual yarn bobbin processing device 8. Next, the residual yarn bobbin automatic processing device 8 is activated, and during this time, the transport magazine group E1 is sequentially transferred by the action of the intermittent feed device, and the residual yarn bobbin 10 is sequentially removed from the bobbin hanger 21 by the action of the residual thread bobbin removal device 12. Then, it passes through the discharge device 13 and the remaining roving removing device 14, becomes an empty bobbin 15, and is guided to the bobbin transfer device 19 via the shooter 16.

一方残糸ボビン取り外し装置12により残糸ボ
ビンが取り外された搬送マガジン5は順次満ボビ
ンローデイング装置9側へと移送される。そして
先頭の搬送マガジン5が満ボビンローデイング装
置9と対応する位置に到達すると満ボビンローデ
イング装置9が作動を開始し、水平移送装置32
がパレツト17上の満ボビン30を垂直状態でリ
フター装置31へと移送しリフター装置31の昇
降部材34が満ボビン30を順次搬送マガジン5
のボビンハンガー21へと吊下する。満ボビンロ
ーデイング装置9の作用により全ての満ボビン3
0が取り出されたパレツト17は送り用ローラコ
ンベア70aの作用により順次残糸ボビン自動処
理装置8側へと送られる。そしてパレツト17が
残糸ボビン自動処理装置8のボビン受渡し装置1
9に到達するとボビン受渡し装置19が作動を開
始しパレツト17上のペツグ18に順次空ボビン
15を挿入する。そしてボビン受渡し装置19に
より空ボビン15が一杯に積載された状態でパレ
ツト17が移動装置73まで達すると、送り用ロ
ーラコンベア70aの作動が停止され移動装置7
3が作動してパレツト17を送り用ローラコンベ
ア70a上から搬送用ローラコンベア70b上へ
と移送する。そしてパレツト17が搬送用ローラ
コンベア70bに移送されると、搬送用ローラコ
ンベア70bが作動してパレツト17は第1,1
2,13図の矢印R方向へと搬送される。以下同
様にして順次3台のパレツト17が送り用ローラ
コンベア70a上から搬送用ローラコンベア70
b上へと移送される。そして搬送用ローラコンベ
ア70b、ターンテーブル72を経て粗紡機43
の側方に配設された搬送用ローラコンベア71b
上へと順次移送される。このとき搬送用ローラコ
ンベア71bは前記とは逆方向に回転駆動されパ
レツト17を第1,12,13図の矢印Q方向へ
と搬送する。玉揚げが近付いた粗紡機43後方
(第1,12,13図の左方)に配設された移動
装置73上に先頭のパレツト17が到達すると搬
送用ローラコンベア71bの駆動が停止し移動装
置73が作動してパレツト17が送り用ローラコ
ンベア71a上へと移送される。以下送り用ロー
ラコンベア71、搬送用ローラコンベア71b、
移動装置73が交互に作動して3台のパレツト1
7が送り用ローラコンベア71a上に搬送され玉
揚げ時期まで待機する。
On the other hand, the transport magazine 5 from which the remaining thread bobbin has been removed by the remaining thread bobbin removal device 12 is sequentially transferred to the full bobbin loading device 9 side. When the leading transport magazine 5 reaches the position corresponding to the full bobbin loading device 9, the full bobbin loading device 9 starts operating, and the horizontal transfer device 32
transfers the full bobbins 30 on the pallet 17 vertically to the lifter device 31, and the elevating member 34 of the lifter device 31 sequentially transports the full bobbins 30 to the transport magazine 5.
It is hung from the bobbin hanger 21 of. All the full bobbins 3 are loaded by the action of the full bobbin loading device 9.
The pallet 17 from which the 0's have been taken out is sequentially sent to the residual yarn bobbin automatic processing device 8 side by the action of the feeding roller conveyor 70a. Then, the pallet 17 is transferred to the bobbin transfer device 1 of the residual yarn bobbin automatic processing device 8.
9, the bobbin transfer device 19 starts operating and inserts the empty bobbins 15 into the pegs 18 on the pallet 17 one after another. When the pallet 17 fully loaded with empty bobbins 15 reaches the moving device 73 by the bobbin transfer device 19, the operation of the feeding roller conveyor 70a is stopped and the moving device 7
3 is operated to transfer the pallet 17 from the top of the feeding roller conveyor 70a to the top of the feeding roller conveyor 70b. Then, when the pallet 17 is transferred to the conveying roller conveyor 70b, the conveying roller conveyor 70b is operated and the pallet 17 is transferred to the first
It is conveyed in the direction of arrow R in Figures 2 and 13. Thereafter, in the same manner, three pallets 17 are sequentially moved from the top of the feeding roller conveyor 70a to the feeding roller conveyor 70.
b. Then, it passes through the conveying roller conveyor 70b, the turntable 72, and then the roving frame 43.
Conveying roller conveyor 71b arranged on the side of
They are transferred upwards one after another. At this time, the conveying roller conveyor 71b is rotated in the opposite direction to the above and conveys the pallet 17 in the direction of arrow Q in FIGS. 1, 12, and 13. When the leading pallet 17 reaches the moving device 73 located at the rear of the roving frame 43 (on the left side in Figures 1, 12, and 13) nearing doffing, the drive of the transporting roller conveyor 71b stops and the moving device 73 is operated and the pallet 17 is transferred onto the feeding roller conveyor 71a. Below, the feeding roller conveyor 71, the conveying roller conveyor 71b,
The moving device 73 operates alternately to move the three pallets 1.
7 is conveyed onto the feeding roller conveyor 71a and waits until the time for doffing.

なお、この実施例においてはパレツト17が3
台用いられる場合について説明したが、粗紡機4
3の台数や玉揚げ時間の関係からパレツト17を
6台あるいは9台等任意の台数で用いて満ボビン
及び空ボビンの搬送を行うようにしてもよい。
又、残糸ボビン自動処理装置8と満ボビンローデ
イング装置9とを同一直線状に配置し両装置を連
動して作動させる場合について説明したが残糸ボ
ビン自動処理装置8と満ボビンローデイング装置
9をまつたく独立して配置し残糸ボビン10の取
り外し作業と満ボビン30のローデイング作業と
を別々に行うことももちろん可能である。又、こ
の実施例ではローラコンベア70,71により搬
送されるパレツト17を用いて満ボビン30及び
空ボビン15の搬送を行つたが、ローラコンベア
70,71に代えてチエーンコンベアを設けたり
ローラコンベア70,71を用いずに床に敷設さ
れたレールあるいは床面に埋設されかつ低周波電
流が流されている誘導線に沿つて走行する運搬車
を用いて満ボビン30及び空ボビン15の搬送を
行うようにしてもよい。さらにこの実施例におい
ては搬送マガジン5自体が精紡機1においてクリ
ール2を構成するものについて説明したが、搬送
マガジン5として予備粗糸巻きを吊下して精紡機
1のクリール側方まで搬送する構成の精紡機に適
用することももちろん可能である。
In addition, in this embodiment, the palette 17 is 3
Although we have explained the case where the Rover frame is used,
Depending on the number of pallets 17 and the doffing time, an arbitrary number of pallets 17, such as six or nine pallets, may be used to transport full bobbins and empty bobbins.
In addition, although the case where the automatic residual thread bobbin processing device 8 and the full bobbin loading device 9 are arranged in the same straight line and both devices are operated in conjunction with each other has been described, the automatic residual thread bobbin processing device 8 and the full bobbin loading device Of course, it is also possible to arrange the yarn bobbins 9 independently and to perform the work of removing the remaining yarn bobbin 10 and the work of loading the full bobbin 30 separately. Further, in this embodiment, the full bobbins 30 and the empty bobbins 15 are conveyed using the pallets 17 conveyed by the roller conveyors 70 and 71, but instead of the roller conveyors 70 and 71, a chain conveyor may be provided or the roller conveyors 70 and 71 may be replaced with a chain conveyor. , 71, the full bobbin 30 and the empty bobbin 15 are transported using a transport vehicle that runs along a rail laid on the floor or a guide wire buried in the floor surface and through which a low frequency current is passed. You can do it like this. Furthermore, in this embodiment, the conveyance magazine 5 itself constitutes the creel 2 in the spinning frame 1. However, the conveyance magazine 5 may be configured to hang a preliminary roving winding and convey it to the side of the creel of the spinning frame 1. Of course, it is also possible to apply it to spinning machines.

効 果 以上詳述したようにこの発明によれば粗紡機あ
がりの満ボビンを自動的に精紡機まで搬送し、精
紡機で使用された後の残糸ボビンをその残粗糸を
除去し満ボビンとした後粗紡機まで自動的に搬送
することができるので紡績工場における自動化を
促進することができ、しかも粗紡機側におけるボ
ビンの搬送が搬送体により行われるため、精紡機
側の24時間操業に対応して満ボビンをストツクし
ておく場合に満ボビンを搬送体ごとストツクして
おくことができるのでストツク場所が限定される
ことなくしかもストツク場所の設備費用がわずか
で済むという優れた効果を奏する。
Effects As detailed above, according to the present invention, a full bobbin from a roving frame is automatically conveyed to a spinning machine, and the remaining roving yarn is removed from the bobbin after being used in the spinning machine, and the remaining yarn is removed from the bobbin to form a full bobbin. After that, the bobbins can be automatically transported to the roving frame, which promotes automation in the spinning factory.Furthermore, since bobbins are transported by a conveyor at the roving frame, 24-hour operation on the spinning machine side is possible. When storing full bobbins, the full bobbins can be stored together with the conveyor, which has the excellent effect of not limiting the storage location and requiring only a small cost for equipment at the storage location. .

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明を具体化するための装置を示
す概略平面図、第2図は精紡機とそのクリール部
の概略を示す側面図、第3図は残糸ボビン自動処
理装置の平面図、第4図は同じく残糸ボビン自動
処理装置の概略側面図、第5図はボビン受渡し装
置の一部破断正面図、第6図は満ボビンローデイ
ング装置の一部破断側面図、第7図は第6図のA
―A線における断面図、第8図は管替え装置を示
す平面図、第9図は満ボビン受渡し装置の一部破
断背面図、第10図は空ボビン移送装置を示す一
部破断正面図、第11図は満ボビン受渡し装置の
作用を示す背面図、第12,13図は作用を説明
する平面図である。 精紡機……1、搬送路……4、搬送マガジン…
…5、待機通路……6、主搬送路……7、残糸ボ
ビン自動処理装置……8、満ボビンローデイング
装置……9、搬送体としてのパレツト……17、
ペツグ……18、粗紡機……43、管替え装置…
…46、ローラコンベア……70,71、ターン
テーブル……72、移動装置……73。
Fig. 1 is a schematic plan view showing a device for embodying the present invention, Fig. 2 is a side view schematically showing a spinning machine and its creel section, and Fig. 3 is a plan view of an automatic residual yarn bobbin processing device. 4 is a schematic side view of the automatic residual thread bobbin processing device, FIG. 5 is a partially cutaway front view of the bobbin delivery device, FIG. 6 is a partially cutaway side view of the full bobbin loading device, and FIG. 7 is a partially cutaway side view of the bobbin loading device. A in Figure 6
-A sectional view along line A; FIG. 8 is a plan view showing the pipe changing device; FIG. 9 is a partially cutaway rear view of the full bobbin transfer device; FIG. 10 is a partially cutaway front view showing the empty bobbin transfer device; FIG. 11 is a rear view showing the operation of the full bobbin transfer device, and FIGS. 12 and 13 are plan views illustrating the operation. Spinning machine...1, Conveyance path...4, Conveyance magazine...
...5, Standby path...6, Main conveyance path...7, Automatic residual thread bobbin processing device...8, Full bobbin loading device...9, Pallet as conveyor...17,
Petsug...18, Rover...43, Tube changing device...
...46, roller conveyor...70, 71, turntable...72, moving device...73.

Claims (1)

【特許請求の範囲】 1 満ボビン又は残糸ボビンを吊下して搬送する
搬送マガジンの搬送路を精紡機群の各精紡機の上
方にその長手方向に沿つて配設するとともに該精
紡機群の両側において前記搬送路に接続する主搬
送路を設け、 粗紡機の一端にはボビンが垂直状態で挿入され
るペツグを所定間隔に多数配設した搬送体上に垂
直に積載された空ボビンを該搬送体から取り出す
とともに玉揚げされた満ボビンを前記空ボビンが
取り出されたペツグ上に受け渡す作用をなす管替
え装置を配設し、 前記主搬送路には満ボビンを垂直に積載した搬
送体から満ボビンを取り出して前記搬送マガジン
のボビンハンガーに該満ボビンを挿入する作用を
なす満ボビンローデイング装置と、前記搬送マガ
ジンに吊下された残糸ボビンを取り出し残粗糸を
除去した空ボビンを垂直状態で前記搬送体上に受
け渡す作用をなす残糸ボビン自動処理装置とを前
記搬送体で連絡して粗紡機、精紡機間でホビンを
搬送することを特徴とするボビン搬送方法。 2 前記主搬送路には搬送マガジン群の待機通路
が配設されている特許請求の範囲第1項に記載の
ボビン搬送方法。 3 前記搬送体はローラコンベヤ、チエーンコン
ベヤ等の定められた軌導上を移動するパレツトで
ある特許請求の範囲第1項又は第2項に記載のボ
ビン搬送方法。 4 前記搬送体は床に敷設された誘導線、レール
等に沿つて走行する運搬車である特許請求の範囲
第1項又は第2項に記載のボビン搬送方法。 5 満ボビン又は残糸ボビンを吊下して搬送する
搬送マガジンの搬送路を精紡機群の各精紡機の上
方にその長手方向に沿つて配設するとともに該精
紡機群の両側において前記搬送路に接続する主搬
送路を設け、 粗紡機の一端にはボビンが垂直状態で挿入され
るペツグを所定間隔に多数立設した搬送体上に垂
直に積載された空ボビンを取り出すとともに玉揚
げされた満ボビンを前記空ボビンが取り出された
ペツグ上に受け渡す作用をなす管替え装置を配設
し、 前記主搬送路には前記精紡機の長手方向と平行
に配設された部分に満ボビンを垂直に積載した搬
送体から満ボビンを取り出して前記搬送マガジン
のボビンハンガーに該満ボビンを挿入する作用を
なす満ボビンローデイング装置と、前記搬送マガ
ジンに吊下された残糸ボビンを取り出し残粗糸を
除去した空ボビンを垂直状態で前記搬送体上に受
け渡す作用をなす残糸にボビン自動処理装置とを
所定間隔で配設し、 前記管替え装置と、満ボビンローテイング装置
と、残糸ボビン自動処理装置とを所定の軌道に沿
つて移動する前記搬送体で連絡し、前記満ボビン
ローテイング装置と残糸ボビン自動処理装置とを
同期して作動させることを特徴とするボビン搬送
方法。
[Scope of Claims] 1. A transport path for a transport magazine for suspending and transporting full bobbins or residual thread bobbins is disposed above each spinning machine in a spinning machine group along its longitudinal direction, and the spinning machine group A main conveyance path connected to the conveyance path is provided on both sides of the roving machine, and at one end of the roving machine, empty bobbins are loaded vertically onto a conveyance body having a number of pegs arranged at predetermined intervals into which bobbins are inserted vertically. A tube changing device is provided that functions to transfer the full bobbins taken out from the conveyance body and doffed onto the peg from which the empty bobbins are taken out, and the main conveyance path is provided with a conveyance device in which the full bobbins are vertically loaded. a full bobbin loading device that takes out a full bobbin from the body and inserts the full bobbin into the bobbin hanger of the transport magazine; A method for conveying a bobbin, characterized in that the hobbin is conveyed between a roving frame and a spinning frame by communicating with an automatic residual yarn bobbin processing device, which functions to transfer the bobbin onto the conveying body in a vertical state, through the conveying body. 2. The bobbin transport method according to claim 1, wherein the main transport path is provided with a standby path for a group of transport magazines. 3. The bobbin conveying method according to claim 1 or 2, wherein the conveying body is a pallet that moves on a predetermined trajectory such as a roller conveyor or a chain conveyor. 4. The bobbin transport method according to claim 1 or 2, wherein the transport body is a transport vehicle that runs along a guide line, rail, etc. laid on the floor. 5. A transport path for a transport magazine for suspending and transporting full bobbins or residual thread bobbins is arranged above each spinning machine in the spinning machine group along its longitudinal direction, and the transport path is provided on both sides of the spinning machine group. At one end of the roving machine, a number of pegs into which bobbins are inserted vertically are set up at predetermined intervals, and empty bobbins loaded vertically are taken out and doffed. A tube changing device is provided that functions to transfer the full bobbin onto the peg from which the empty bobbin has been taken out, and the full bobbin is transferred to a portion of the main conveyance path that is arranged parallel to the longitudinal direction of the spinning machine. A full bobbin loading device that takes out a full bobbin from a vertically loaded conveyor and inserts the full bobbin into a bobbin hanger of the conveying magazine; and a full bobbin loading device that takes out the remaining yarn bobbin suspended from the conveying magazine and loads the remaining yarn bobbin. An automatic bobbin processing device is disposed at a predetermined interval on the remaining yarn, which serves to transfer the empty bobbin from which the yarn has been removed onto the conveyor in a vertical state, and the bobbin automatic processing device, the full bobbin rotating device, and the remaining yarn A bobbin conveying method characterized in that the automatic yarn bobbin processing device is connected to the conveying body that moves along a predetermined trajectory, and the full bobbin rotating device and the remaining yarn bobbin automatic processing device are operated in synchronization. .
JP18547583A 1983-10-03 1983-10-03 Method for bobbin transfer Granted JPS6075625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18547583A JPS6075625A (en) 1983-10-03 1983-10-03 Method for bobbin transfer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18547583A JPS6075625A (en) 1983-10-03 1983-10-03 Method for bobbin transfer

Publications (2)

Publication Number Publication Date
JPS6075625A JPS6075625A (en) 1985-04-30
JPS6329017B2 true JPS6329017B2 (en) 1988-06-10

Family

ID=16171412

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18547583A Granted JPS6075625A (en) 1983-10-03 1983-10-03 Method for bobbin transfer

Country Status (1)

Country Link
JP (1) JPS6075625A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3601832C2 (en) * 1986-01-22 1995-04-06 Zinser Textilmaschinen Gmbh Transport system for roving bobbins on spinning machines

Also Published As

Publication number Publication date
JPS6075625A (en) 1985-04-30

Similar Documents

Publication Publication Date Title
JP2552260B2 (en) Transfer method of roving bobbin
JPH0489768A (en) Package carrying method
EP0240473B1 (en) Apparatus for automatically supplying continuous spinning machines with reeled material
JPH08157144A (en) Bobbin carrying system in spinning machine
EP0276569B1 (en) A method and apparatus for transporting articles
JPS6117743B2 (en)
JPH04371455A (en) Processing system for synthetic fiber yarn
JPS6329017B2 (en)
JPS61215725A (en) Method for exchanging roving bobbin between roving and spinning machines
JPH0663150B2 (en) Rover replacement device
US5452571A (en) Winder-to-double twister connecting system
JPS63176270A (en) Bobbin transport device
JPS61211281A (en) Transport method for bobbin of roving transport magazines between course and fine spinning stages
JPH0881840A (en) Method and apparatus for feeding sliver to spinning part of open end spinning frame
JPS61215724A (en) Method for conveying roving bobbin between roving and spinning steps
JP2552259B2 (en) Transfer device for roving bobbin
JPS63165279A (en) Carrying method for roving bobbin
JPH08127924A (en) Method for mounting roving bobbin on bobbin carriage
JPH07189055A (en) Sliver supplying in spinning machine
TW202400500A (en) Bobbin conveying system and bobbin conveying method
JPH07110743B2 (en) Spool machine with multiple spooling stations
JPH0540260U (en) Package carrier
JPS5860030A (en) Cheese-bobbin exchanger
JP2517819B2 (en) Ceiling carrier transport system
JPH0714784B2 (en) Lap feeder