JPS63165279A - Carrying method for roving bobbin - Google Patents

Carrying method for roving bobbin

Info

Publication number
JPS63165279A
JPS63165279A JP31118086A JP31118086A JPS63165279A JP S63165279 A JPS63165279 A JP S63165279A JP 31118086 A JP31118086 A JP 31118086A JP 31118086 A JP31118086 A JP 31118086A JP S63165279 A JPS63165279 A JP S63165279A
Authority
JP
Japan
Prior art keywords
bobbin
rail
roving
carriage
bobbin carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP31118086A
Other languages
Japanese (ja)
Other versions
JPH0653546B2 (en
Inventor
Shunji Ito
俊司 伊藤
Kanehiro Ito
伊藤 兼広
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howa Machinery Ltd
Original Assignee
Howa Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Machinery Ltd filed Critical Howa Machinery Ltd
Priority to JP61311180A priority Critical patent/JPH0653546B2/en
Priority to DE8787311302T priority patent/DE3774864D1/en
Priority to EP87311302A priority patent/EP0276569B1/en
Priority to US07/137,253 priority patent/US4858746A/en
Publication of JPS63165279A publication Critical patent/JPS63165279A/en
Publication of JPH0653546B2 publication Critical patent/JPH0653546B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To reduce damage of a roving and to improve quality of a thread, by a method wherein a roving bobbin 12 is conveyed, in a state to suspend the roving bobbin to the bobbin hanger of a bobbin carriage, to a fine spinning machine installation position through first third rail and an elevating device. CONSTITUTION:A roving bobbin 12 doffed from a roving frame 9 is suspended from a bobbin hanger 29 of a bobbin carriage 24, is moved to the elevator installation position C side along a first rail 35, and is transferred to a third rail 35 of an elevator 5 for support. Thereafter, through drive of a elevating motor 8, the elevator 5 is raised to an upper story 3, the bobbin carriage 24, supported to the third rail 35, is transferred to a second rail 34, and the bobbin carriage is moved to a refine spinning machine installation position B as it is guided by means of the second rail 34, and is fed to a refining machine 19. This constitution reduces damage of a roving on a roving bobbin to improve quality, and enables saving of a labor required for carriage of the roving bobbin.

Description

【発明の詳細な説明】 ffl業上の利用分野 この発明はエレベータ等の昇降装置を備えた工場の或階
層の粗紡機設置位置からその粗紡機から玉揚げした粗糸
ボビンを他の階層の精紡機?j2置位同位置送する粗糸
ボビンの搬送方法に関するものである。
Detailed Description of the Invention Field of Application in the ffl Industry This invention is for transferring roving bobbins doffed from a roving machine installation position on a certain floor of a factory equipped with a lifting device such as an elevator to another floor. A spinning machine? The present invention relates to a method of transporting a roving bobbin to the same position as j2.

従来の技術 従来にあっては粗紡機設置位置で玉揚げした粗糸ボビン
を運搬車の収納箱に収納させ、その運搬車をエレベータ
設置位置に移動させてそのエレベータに載せ、その後運
搬車をエレベータによって精紡機設置の階層に昇降させ
た後、その運搬車を精紡機設置位置に移動させ、その精
紡機設置位置で収納箱から粗糸ボビンを取出してボビン
ハンガーに吊下させている。
Conventional technology In the past, the roving bobbin doffed at the roving machine installation position was stored in the storage box of a transport car, the transport car was moved to the elevator installation position and placed on the elevator, and then the transport car was moved to the elevator installation position. After raising and lowering the spinning frame to the level where the spinning frame is installed, the carrier is moved to the spinning frame installation position, where the roving bobbin is taken out from the storage box and hung on a bobbin hanger.

発明が解決しようとする問題点 前記のように粗糸ボビンを運搬車の収納箱に収納させて
搬送するものでは、収納箱内への粗糸ボビンの収納によ
って粗糸相互或いは粗糸と筒内面とが擦れ合って粗糸が
損傷する問題点があった。
Problems to be Solved by the Invention As described above, in the case where the roving bobbin is stored in a storage box of a transport vehicle and transported, the roving bobbin is stored in the storage box so that the roving thread is not connected to each other or the roving thread and the inner surface of the cylinder. There was a problem that the rovings were damaged due to rubbing against each other.

そこで、前記問題点を解決する為に特公昭54−447
86号公報に記載されているように運搬車に一対のエン
ドレス鎖を回動自在に配設し、それらのエンドレス鎖に
複数の水平支持梁を揺動自在に架設し、それらの水平支
持梁に粗糸ボビンを垂直に挿着するようにしたものが提
案されている。゛ところが、前記公報に記載のものでは
各運搬車にエンドレス鎖等の複雑な装置を必要として搬
送装置のコストが高くなり、しかも運搬車を精紡機設置
位置に運んだり、精紡機設置位置で粗糸ボビンを再びボ
ビンハンガーに吊下させる必要があり、その為に多くの
労力や費用を要する問題点があった。
Therefore, in order to solve the above problems,
As described in Publication No. 86, a pair of endless chains are rotatably arranged on a transport vehicle, and a plurality of horizontal support beams are swingably installed on these endless chains. It has been proposed that the roving bobbin is inserted vertically. However, the method described in the above publication requires complicated equipment such as endless chains for each transport vehicle, which increases the cost of the transport device. There was a problem in that it was necessary to suspend the thread bobbin again on the bobbin hanger, which required a lot of labor and cost.

問題点を解決するための手段 本発明は前記問題点を解決するために、粗紡機から玉揚
げした粗糸ボビンを第1レールに支持されているボビン
キャレージのボビンハンガーに吊下させた後、ボビンキ
ャレージを昇降位置へ直列状態で移動させ、そのボビン
キャレージを直列状態のまま第3レールに渦巻き状に案
内させてその第3レールに支持させ、その後第3レール
を昇降装置によって昇降させて第2レールに接続させ、
然る後ボビンホイ−ルを第3レールから第2レールに移
動させ、そのボビンキャレージを精紡機位置に直列状態
で移動させて粗糸ボビンを吊下状態のまま精紡機位置に
搬送することを特徴としている。
Means for Solving the Problems In order to solve the above-mentioned problems, the present invention aims to solve the above-mentioned problems by suspending the roving bobbin doffed from the roving machine from the bobbin hanger of the bobbin carriage supported by the first rail. , the bobbin carriage is moved in series to the lifting position, the bobbin carriage is spirally guided by the third rail while being in series and supported by the third rail, and then the third rail is lifted and lowered by the lifting device. and connect it to the second rail,
Thereafter, the bobbin wheel is moved from the third rail to the second rail, and the bobbin carriage is moved in series to the spinning frame position to transport the roving bobbin in a suspended state to the spinning frame position. It is a feature.

作用 ボビンキャレージを粗紡機位置に移動させ、そのボビン
キャレージのボビンハンガーに玉揚げした粗糸ボビンを
吊下させた後、ボビンキャレージを第1レールに案内さ
せて昇降位置へ直列状態で移動させ、そのボビンキャレ
ージを直列状態のまま第3レールに渦巻き状に案内させ
て昇降装置内の第3レールに支持させ、その昇降装置を
精紡機設置の階層に昇降させた後、ボビンキャレージを
第3レールから第2レールに案内させて粗糸ボビンを吊
下状態のまま精紡機位置に移動させる。
After moving the working bobbin carriage to the roving machine position and suspending the doffed roving bobbin from the bobbin hanger of the bobbin carriage, the bobbin carriage is guided to the first rail and moved in series to the lifting position. Then, the bobbin carriage is spirally guided by the third rail while being in series and supported by the third rail in the lifting device. After the lifting device is raised and lowered to the level where the spinning machine is installed, the bobbin carriage is moved. The cage is guided from the third rail to the second rail, and the roving bobbin is moved to the spinning frame position in a suspended state.

これにより粗糸ボビンの粗糸が擦れ合うのを少なくでき
る。
This allows the rovings of the roving bobbin to be less likely to rub against each other.

実施例 第1図において、1は紡績工場の建屋で、1階の階層2
と2階の階層3とを備えた2階建ての場合を示している
。4は建屋1に設置しであるエレベータ装置で、本願の
昇降装置を構成している。
Example In Fig. 1, 1 is a building of a textile factory, and the first floor is 2
The case of a two-story building with a floor and a second floor, layer 3, is shown. Reference numeral 4 denotes an elevator device installed in the building 1, which constitutes the elevating device of the present application.

そのエレベータ装置4は周知のように一方がσN放され
ているエレベータ5を昇降機構6によって前記階層2.
3へ昇降させるようにしである。7は昇降機構6のワイ
ヤー、8は昇降モータである。
As is well known, the elevator device 4 moves an elevator 5, one of which is released by σN, to the floor 2 by means of a lifting mechanism 6.
It is designed to be raised and lowered to 3. 7 is a wire of the lifting mechanism 6, and 8 is a lifting motor.

9は階層2の床面2aに設置しである周知の粗紡機で、
第2図に示すように複数台並設されている。前記粗紡機
9前方には自動管替装置10が配設され、後述の第1レ
ールに案内されたボビンキャレージに吊下されている空
ボビンとボビンホイール9aに載置されている粗糸ボビ
ン12とを交換するようにしである。この自動管替装置
10は例えば特開昭57−106729号公報に開示さ
れている一斉管替機13と特開昭58−41919号公
報に開示されているボビン移載装置14とで構成されて
いる。−斉管替機13は第3図に示すように多数のペッ
グ15aを有するベルトコンベヤ15を備え、管替ヘッ
ド16の前後、上下移動によってボビンホイール9a上
の粗糸ボビン12をベツグ15aに挿着し、また別のペ
ッグ15aに挿着されている空ボビンをボビンホイール
9aに挿着するようにしである。ボビン移載装置14は
ペッグ17aを有する昇降体17と交換腕18とを備え
、昇降体17の昇降によって後述のボビンキャレージに
吊下されている空ボビンをペッグ17a上に取外し、そ
のペッグ17a上の空ボビンを交換腕18によって前記
ペッグ15aに挿着し、またペッグ15a上の粗糸ボビ
ン12を交換腕18によってペッグ17aに挿着し、そ
のペッグ17a上の粗糸ボビン12を昇降体17の昇降
によってボビンキャレージのボビンハンガーに吊下させ
るようにしである。なお、前記自動管替装置10の代り
に特公昭51−38814号公報に示されているように
走行式の管替機等を使用したり、従来のように人手によ
って管替するようにしても良い。
9 is a well-known roving machine installed on the floor 2a of floor 2,
As shown in FIG. 2, multiple units are installed in parallel. An automatic tube changer 10 is disposed in front of the roving frame 9, and an empty bobbin suspended from a bobbin carriage guided by a first rail, which will be described later, and a roving bobbin placed on a bobbin wheel 9a. 12 is to be replaced. This automatic tube changer 10 is composed of a simultaneous tube changer 13 disclosed in, for example, Japanese Patent Laid-Open No. 57-106729 and a bobbin transfer device 14 disclosed in Japanese Patent Laid-Open No. 58-41919. There is. - As shown in FIG. 3, the simultaneous pipe changing machine 13 is equipped with a belt conveyor 15 having a large number of pegs 15a, and the roving bobbin 12 on the bobbin wheel 9a is inserted into the pegs 15a by moving the pipe changing head 16 back and forth and up and down. The empty bobbin inserted into another peg 15a is inserted into the bobbin wheel 9a. The bobbin transfer device 14 includes an elevating body 17 having a peg 17a and an exchange arm 18, and removes an empty bobbin suspended from a bobbin carriage (to be described later) onto the peg 17a by raising and lowering the elevating body 17, and removes the empty bobbin from the peg 17a. The upper empty bobbin is inserted into the peg 15a by the exchange arm 18, the roving bobbin 12 on the peg 15a is inserted into the peg 17a by the exchange arm 18, and the roving bobbin 12 on the peg 17a is inserted into the elevating body 17. It is designed to be suspended from the bobbin hanger of the bobbin carriage by lifting and lowering. Note that instead of the automatic pipe changing device 10, a traveling type pipe changing machine or the like as shown in Japanese Patent Publication No. 51-38814 may be used, or the pipes may be changed manually as in the past. good.

19は階層3の床面3aに設置しである周知の精紡機で
、第4図に示すように複数台並設さゎている。各精紡I
a19のクリール2oには第5図に示すように前列ボビ
ンハンガー21と後列ボビンハンガー22が備えられ、
これらのボビンハンガー21.22に粗糸ボビン12を
吊下させるようにしである。
Numeral 19 is a well-known spinning machine installed on the floor 3a of floor 3, and as shown in FIG. 4, a plurality of spinning machines are installed in parallel. Each spinning I
The creel 2o of a19 is equipped with a front row bobbin hanger 21 and a rear row bobbin hanger 22, as shown in FIG.
The roving bobbin 12 is suspended from these bobbin hangers 21 and 22.

次に、23は粗紡機設置位置Aで玉揚げした粗糸ボビン
12を精紡機設置位置Bに搬送する為の粗糸ボビン搬送
装置で、次にこの粗糸ボビン搬送装置23について説明
する。先ず、24は粗糸ボビン12を吊下させる為のボ
ビンキャレージで、第6図、第7図に示すように多数の
キャレージ要素24aを連結しても!成されている。こ
のキャレージ要素24aにおいて、25は棒状のキャレ
ージバーで、上側には一対の支持杆26aが突設され、
それらの支持杆26aに回動自在に取り付けである支持
体26に左右一対の支持ローラ27と前後一対の案内ロ
ーラ28が回動自在に軸支されている。またキャレージ
バー25の上側には後述のボビンハンガーの2ピツチ毎
に図示しない近接体が固着されている。各キャレージバ
−25の下側には周知のボビンハンガー29が所定間隔
あけて6個取着されている。これらのボビンハンガー2
9のI’lfl隔Sは精紡機19のスピンドルピッチの
2倍に設定されている。3oはキャレージバー25相互
を連結する連結片で、両端部がキャレージバー25の端
部に夫々ビン31a、31bによって回動自在に連結さ
れている。前記ピン31a、31bは夫々最端部のボビ
ンハンガー29と同一軸線上に位置され、最端部のボビ
ンハンガ−29同士の間隔Tが前記間隔Sと同じ大きさ
に設定されている。連結片30の横幅はキャレージバ−
25の横幅と同じになるように形成しである。32はボ
ビンキャレージ24の両端部に固着しであるコ字形又は
U字形の保持片で、それらの両端部は平面的に見て最端
部のボビンハンガー29に吊下させた粗糸ボビン12の
周面より外側に位置され、両端部間の間隔Rは粗糸ボビ
ン12の最大径より大きく設定しである。前記キャレー
ジ要素24aの数はボビンハンガー29の総数が少なく
とも粗紡機9のボビンホイール9aの数となるように例
えば粗紡機9が96錘の場合16本に設定しである。
Next, 23 is a roving bobbin conveying device for conveying the roving bobbin 12 doffed at the roving machine installation position A to the fine spinning machine installation position B. Next, this roving bobbin conveying device 23 will be explained. First, 24 is a bobbin carriage for suspending the roving bobbin 12, and as shown in FIGS. 6 and 7, a large number of carriage elements 24a can be connected! has been completed. In this carriage element 24a, 25 is a rod-shaped carriage bar, and a pair of support rods 26a are protruded from the upper side.
A pair of left and right support rollers 27 and a pair of front and rear guide rollers 28 are rotatably supported by a support body 26 which is rotatably attached to the support rods 26a. Further, on the upper side of the carriage bar 25, a proximal body (not shown) is fixed to every two pitches of a bobbin hanger, which will be described later. Six well-known bobbin hangers 29 are attached to the lower side of each carriage bar 25 at predetermined intervals. These bobbin hangers 2
The I'lfl interval S of 9 is set to twice the spindle pitch of the spinning frame 19. Reference numeral 3o denotes a connecting piece that connects the carriage bars 25 to each other, and both ends thereof are rotatably connected to the ends of the carriage bar 25 by bins 31a and 31b, respectively. The pins 31a and 31b are each located on the same axis as the bobbin hanger 29 at the end, and the distance T between the bobbin hangers 29 at the end is set to be the same as the distance S. The width of the connecting piece 30 is the carriage bar.
It is formed to have the same width as 25. Reference numeral 32 denotes U-shaped or U-shaped holding pieces fixed to both ends of the bobbin carriage 24, and both ends of the roving bobbin 12 are suspended from the bobbin hanger 29 at the endmost end in plan view. The roving bobbin 12 is located outside the circumferential surface of the roving bobbin 12, and the distance R between both ends is set to be larger than the maximum diameter of the roving bobbin 12. For example, if the roving frame 9 has 96 spindles, the number of the carriage elements 24a is set to 16 so that the total number of bobbin hangers 29 is at least the number of bobbin wheels 9a of the roving frame 9.

次に、80はボビンキャレージ24を粗紡機設置位置A
から精紡機設置位置Bへ或いはその逆へ移動自在に案内
する搬送レールで、第2図、第4図に示すように粗紡機
設置の階層2における粗紡機設置位置Aとエレベータ設
置位置C(本願における昇降位置として示す)との間の
天井2b近くに配設しである第1レール33と、精紡機
設置の階層3における精紡機設置位置Bとエレベータ設
置位置Cとの間の天井3b近くに配設しである第2レー
ル34と、エレベータ5内に第1レール33と第2レー
ル34に接続可能に配設しである第3レール35とで構
成されている。この搬送レール80は第9図に示すよう
に断面口形に形成され、ボビンキャレージ24の支持ロ
ーラ27を案内する水平方向の一対の支持面80aと案
内ローラ28を案内する垂直方向の一対の案内面80b
とが形成されている。前記第1レール33は粗紡機設置
位置Aとエレベータ設置位置C間の主レール33aと、
粗紡機設置位置Aにおいて各粗紡機9に対応するように
主レール33aから分岐されている分岐レール33bと
、エレベータ設置位置c付近から前記分岐レール33b
までの間において主レール33aから夫々分岐されたバ
ックレール33cとで構成されている。主レール33a
、分岐レール33b及びバックレール33cはボビンキ
ャレージ24を直列状態で案内するように配設され、分
岐レール33bは第3図に示すように昇降体17のペッ
グ17aの真上を通過するように位置されている。また
第2レール34は第2レール34と同様に精紡機設置位
置Bとエレベータ設置位置C間の主レール34aと、精
紡機設置位置Bにおいて各精紡機19のスピンドル列に
対応するように主レール34aから分岐されている予備
レール34bと、エレベータ設置位置C付近から前記予
備レール34bまでの間において主レール34aから夫
々分岐された待機レール34cとで構成されている。主
レール34a、予備レール34b及び待機レール34c
はボビンキャレージ24を直列状態で案内するように配
設され、予備レール34bは第5図に示すようにクリー
ル2oの上部前方に位置されている。
Next, 80 moves the bobbin carriage 24 to the roving machine installation position A.
A transport rail that movably guides the spinning frame from the roving frame installation position B to the spinning frame installation position B or vice versa, as shown in Figures 2 and 4. The first rail 33 is located near the ceiling 2b between the elevators (shown as lifting positions) and the ceiling 3b is located near the ceiling 3b between the spinning machine installation position B and the elevator installation position C on the floor 3 of the spinning machine installation. The second rail 34 is provided inside the elevator 5, and the third rail 35 is provided in the elevator 5 so as to be connectable to the first rail 33 and the second rail 34. As shown in FIG. 9, the conveyance rail 80 has a cross-sectional shape, and includes a pair of horizontal support surfaces 80a for guiding the support roller 27 of the bobbin carriage 24 and a pair of vertical guide surfaces for guiding the guide roller 28. Surface 80b
is formed. The first rail 33 is a main rail 33a between the roving frame installation position A and the elevator installation position C;
A branch rail 33b branched from the main rail 33a corresponding to each roving frame 9 at the roving frame installation position A, and a branch rail 33b branched from the vicinity of the elevator installation position c.
The back rails 33c are branched from the main rail 33a. Main rail 33a
, the branch rail 33b and the back rail 33c are arranged so as to guide the bobbin carriage 24 in series, and the branch rail 33b is arranged so as to pass directly above the peg 17a of the elevating body 17, as shown in FIG. It is located. Similarly to the second rail 34, the second rail 34 includes a main rail 34a between the spinning machine installation position B and the elevator installation position C, and a main rail 34a corresponding to the spindle rows of each spinning machine 19 at the spinning machine installation position B. 34a, and standby rails 34c are branched from the main rail 34a between the vicinity of the elevator installation position C and the preliminary rail 34b. Main rail 34a, spare rail 34b and standby rail 34c
are arranged to guide the bobbin carriage 24 in series, and the spare rail 34b is located in front of the upper part of the creel 2o, as shown in FIG.

また第3レール35は第10図に示すようにエレベータ
5の天井5a近くに渦巻き状に配設され、ボビンキャレ
ージ24を直列状態のまま案内できるようになっている
。この第3レール35の渦巻き状は少なくとも粗紡機9
の玉揚げ1回分の粗糸ボビン12を吊下したボビンキャ
レージ24を収納できるようにその形状が定められてい
る。第3レール35はエレベータ5を階層2.3で昇降
停止させた状態で前記第1レール33及び第2レール3
4に夫々接続されるように位置設定しである。
Further, as shown in FIG. 10, the third rail 35 is arranged in a spiral shape near the ceiling 5a of the elevator 5, so that the bobbin carriage 24 can be guided in a serial state. The spiral shape of this third rail 35 is at least
The shape of the bobbin carriage 24 is determined so as to accommodate a bobbin carriage 24 in which roving bobbins 12 for one round of doffing are suspended. The third rail 35 is connected to the first rail 33 and the second rail 3 while the elevator 5 is stopped moving up and down at the floor 2.3.
4, respectively.

エレベータ5の天井5aの四隅にはブラケット56を介
して案内ローラ57が回動自在に2個ずつ取付けられ、
エレベータ通過用の孔内面5b及び床面2a、3aと天
井2b、3b間に設けた上下レール90に転接するよう
になっている。而してこの案内ローラ57はエレベータ
5を昇降させた際、ボビンキャレージ24を支持した第
3レール35の姿勢保持を行なうと共にエレベータ5の
円滑な移動を保障している。また第3レール35の渦巻
き方向の切れ端付近にはボビンキャレージ24が所定の
収納位置に来たことを検出する図示しない検出器が付設
されている。
Two guide rollers 57 are rotatably attached to each of the four corners of the ceiling 5a of the elevator 5 via brackets 56.
It comes into contact with the inner surface 5b of the hole for passing through the elevator, and the upper and lower rails 90 provided between the floors 2a, 3a and the ceilings 2b, 3b. When the elevator 5 is raised or lowered, the guide roller 57 maintains the posture of the third rail 35 supporting the bobbin carriage 24 and ensures smooth movement of the elevator 5. Further, a detector (not shown) is attached near the end of the third rail 35 in the spiral direction to detect when the bobbin carriage 24 has come to a predetermined storage position.

次に、45は搬送レール80にボビンキャレージ24の
長さより短いピッチ間隔で多数配設しである直列送り装
置で、第8図、第9図に示すように構成されている。こ
の直列送り装置45において、46は搬送レール80の
上面に止着しであるブラケットで1両端部に揺動アーム
47.48が夫々枢着され、それらの揺動アーム47.
48に軸受49,50が取付けられている。前記軸受4
9.50は送りローラ51.52の軸51a、52aを
回動自在に支承している。53は一方の軸受49に取付
けである駆動モータで、軸51aを正逆回転させるよう
にしである。前記揺動アーム47.48の先端部間には
バネ54が張設され、送りローラ51.52間にキャレ
ージバー25が存在するとき送りローラ51.52をキ
ャレージバー25に圧接させるようにしである。なお、
粗紡機設置位置Aの昇降体17近くの直列送り装置45
にはキャレージバー25に設けた図示しない近接体を検
出する近接スイッチ55が付設されている。
Next, reference numeral 45 denotes a series feeding device, which is arranged in large numbers on the conveyance rail 80 at pitch intervals shorter than the length of the bobbin carriage 24, and is constructed as shown in FIGS. 8 and 9. In this serial feeding device 45, reference numeral 46 denotes a bracket fixed to the upper surface of the conveyance rail 80, and swing arms 47 and 48 are pivotally attached to both ends of the swing arms 47 and 48, respectively.
Bearings 49 and 50 are attached to 48. The bearing 4
9.50 rotatably supports shafts 51a and 52a of feed rollers 51.52. A drive motor 53 is attached to one of the bearings 49, and is designed to rotate the shaft 51a in forward and reverse directions. A spring 54 is stretched between the tip ends of the swing arms 47, 48, so that the feed rollers 51, 52 are brought into pressure contact with the carriage bar 25 when the carriage bar 25 is present between the feed rollers 51, 52. In addition,
Serial feed device 45 near the elevating body 17 at the roving machine installation position A
A proximity switch 55 (not shown) is provided on the carriage bar 25 to detect a nearby object.

次に、主レール33aと各分岐レール33bどの分岐点
には夫々第12図に示すような転轍器36aが設けられ
ている。この転轍器36aにおいて、39は搬送レール
8oに枢軸37によって枢着された操作レバー、38は
ボビンキャレージ24の案内ローラ28を案内するよう
に枢軸37に回動自在に取付けられた転轍片で、この転
轍片38は操作レバー39のストッパー39aにばね4
0により当接されて操作レバー39と一体回動するよう
になっている。41は操作レバー39を回動させるエヤ
シリンダで、所要時に転轍片38を実線の位置から仮想
線の位置に切替えるようになっている。42a、42b
は転轍片38の切替を確認するリミットスイッチである
。またメインレール33aとバックレール33cとの夫
々の分岐点にはボビンキャリエージ24を一方向へのみ
案内する略同じ転轍器36b、36cが配設されている
。これらの転轍器36b、36cは第13図、第14図
に示すように回動自在に枢着した転轍片38b、38c
を備え、この転轍片38b、38Cを復帰ばね40b、
40cにより付勢してス1−ッ)ニー39b、39cに
当接させてあり、ボビンキャリエージ24の案内ローラ
28を案内して一方側へ分岐させるようになっている。
Next, a switch 36a as shown in FIG. 12 is provided at each branch point of the main rail 33a and each branch rail 33b. In this switch 36a, reference numeral 39 denotes an operating lever pivotally attached to the conveyor rail 8o by a pivot 37, and 38 denotes a switch rotatably attached to the pivot 37 so as to guide the guide roller 28 of the bobbin carriage 24. This switching piece 38 is connected to the stopper 39a of the operating lever 39 by the spring 4.
0 and rotates together with the operating lever 39. Reference numeral 41 denotes an air cylinder that rotates the operating lever 39, and switches the switching piece 38 from the position shown by the solid line to the position shown by the imaginary line when necessary. 42a, 42b
is a limit switch that confirms switching of the switching piece 38. Furthermore, substantially identical switches 36b and 36c for guiding the bobbin carriage 24 in only one direction are arranged at each branch point between the main rail 33a and the back rail 33c. These switches 36b, 36c are rotatably pivoted switch pieces 38b, 38c as shown in FIGS. 13 and 14.
The switching pieces 38b, 38C are connected to a return spring 40b,
40c, it is brought into contact with the knees 39b and 39c, and guides the guide roller 28 of the bobbin carriage 24 to branch to one side.

なお、主し−ル34a、予備レール34b、及び待機レ
ール34cの夫々の分岐点にも上記転轍器36a、36
b、36cと同様な転轍器44a、44b、44 c 
;/l’設けられている。
The switches 36a and 36 are also installed at the branch points of the main rail 34a, the spare rail 34b, and the standby rail 34c.
Switches 44a, 44b, 44c similar to b, 36c
;/l' is provided.

前記構成のものにあっては、粗紡機9から玉揚げした粗
糸ボビン12を精紡機設置位置Bへ搬送する場合、予め
エレベータ5を粗紡機設置の階層2に下降させ、第3レ
ール35を第3レール33に接続させておく。また粗紡
機9の運転中にボビンキャレージ24をその粗紡機9に
対応する分岐レール33bに移動させておく。粗紡機9
が満管近くになるとそのボビンハンガー29に吊下され
ている空ボビンを昇降体17の昇降によってペッグ17
a上に抜取り、そのペッグ17a上の空ボビンを交換腕
18によってベルトコンベヤ15のペッグ15aに挿着
し、それらの空ボビンを各ボビンホイール9aの前方に
位置させる。その後。
In the structure described above, when transporting the roving bobbin 12 doffed from the roving frame 9 to the spinning frame installation position B, the elevator 5 is lowered in advance to the floor 2 where the roving frame is installed, and the third rail 35 is moved. It is connected to the third rail 33. Further, while the roving frame 9 is in operation, the bobbin carriage 24 is moved to the branch rail 33b corresponding to the roving frame 9. Rover 9
When the bobbin is almost full, the empty bobbin suspended from the bobbin hanger 29 is lifted up and down by the elevating body 17 to peg it to the peg 17.
a, and the empty bobbins on the pegs 17a are inserted into the pegs 15a of the belt conveyor 15 by the exchange arm 18, and these empty bobbins are positioned in front of each bobbin wheel 9a. after that.

粗紡機9が満管になると、粗紡機9の運転が停止した後
自動管替装置10が作動し、管替ヘッド16が移動して
ボビンホイール9a上の粗糸ボビン12を取出してベル
トコンベヤ15上のベツグ15aに挿着させ、その後ベ
ルトコンベヤ15上の随記空ボビンを抜取ってボビンホ
イール9a上に載置させる、その後粗紡機9は再び運転
を開始する。また前記ベルトコンベヤ15上のペッグ1
5aに挿着された粗糸ボビン12は順次交換腕18によ
って昇降体17のペッグ17aに挿着され、その後昇降
体17の昇降によって分岐レール33bに案内されてい
るボビンキャレージ24のボビンハンガー29に吊下さ
れる。なお前記の場合。
When the roving frame 9 becomes full, the operation of the roving frame 9 is stopped and the automatic tube changing device 10 is activated, and the tube changing head 16 moves to take out the roving bobbin 12 on the bobbin wheel 9a and transfer it to the belt conveyor 15. After that, the empty bobbin is removed from the belt conveyor 15 and placed on the bobbin wheel 9a, and then the roving frame 9 starts operating again. Also, the peg 1 on the belt conveyor 15
The roving bobbin 12 inserted into the bobbin 5a is sequentially inserted into the peg 17a of the elevating body 17 by the exchange arm 18, and then the bobbin hanger 29 of the bobbin carriage 24 is guided to the branch rail 33b by the elevating and lowering of the elevating body 17. suspended from In the above case.

昇降体17近くに位置されている直列送り装に45の駆
動モータ53はボビンハンガー29に粗糸ボビン12が
挿着される毎に駆動され、近接スイッチ55が近接体を
検出すると停止され、ボビンキャレージ24をボビンハ
ンガー29の2ピッチ分ずつ間欠移動させる。前記のよ
うにして総ての粗糸ボビン12をボビンハンガー29に
吊下させて交換動作を完了すると、そのことを図示しな
い検出手段によって検出して信号を発信したり、作業者
が確認して指令スイッチを操作すると、その粗紡機9に
対応する分岐レール33b位置、主レール33a位置及
び第3レール35位置に設けである直列送り装置45の
駆動モータ53が作動して送りローラ51を第8図にお
いて反時計方向へ回転させる。これにより送りローラ5
1は送りローラ52との間に挟んでいるキャレージバー
25を移動させる。分岐レール33bと主レール33a
の分岐点近くまで移動するとそのことを図示しない検出
器が検出して転轍器36aのシリンダ41が作動する。
The drive motor 53 of 45 in the series feeding device located near the elevating body 17 is driven every time the roving bobbin 12 is inserted into the bobbin hanger 29, and is stopped when the proximity switch 55 detects a nearby body, and the bobbin is stopped. The carriage 24 is intermittently moved by two pitches of the bobbin hanger 29. When all the roving bobbins 12 are suspended from the bobbin hanger 29 as described above and the exchange operation is completed, a detection means (not shown) detects this and sends a signal, or the operator confirms this. When the command switch is operated, the drive motor 53 of the serial feed device 45, which is provided at the branch rail 33b position, the main rail 33a position, and the third rail 35 position corresponding to the roving frame 9, is activated to move the feed roller 51 to the eighth position. Rotate counterclockwise in the figure. As a result, the feed roller 5
1 moves the carriage bar 25 sandwiched between it and the feed roller 52. Branch rail 33b and main rail 33a
When the vehicle moves close to the branch point, a detector (not shown) detects this and the cylinder 41 of the switch 36a is activated.

これにより転轍片38が第12図の実線位置から仮想線
位置に切換えられ、分岐レール33bに案内されている
ボビンキャレージ24を主レール33a位置に送り出す
。その結果、ボビンキャレージ24のキャレージバー2
5が主レール33a位置の直列送り装置45の送すロー
ラ51.52間に送り込まれて同様に移動される。
As a result, the switching piece 38 is switched from the solid line position in FIG. 12 to the imaginary line position, and the bobbin carriage 24 guided by the branch rail 33b is sent to the main rail 33a position. As a result, the carriage bar 2 of the bobbin carriage 24
5 is fed between the rollers 51 and 52 fed by the serial feeding device 45 at the main rail 33a position and similarly moved.

次に転轍器36cは第14図に示すように転轍片38c
が実線位置状態を保っているため、その後も直列送り装
置45の送りローラ51.52によって主レール33a
に案内されて移動される。
Next, the switch 36c is connected to the switch piece 38c as shown in FIG.
Since the main rail 33a remains in the solid line position, the feed rollers 51 and 52 of the serial feed device 45 continue to move the main rail 33a.
will be guided and moved.

続いてボビンキャレージ24の最先端の案内ローラ28
が転轍器36bの転轍片38bに当接してこれを第13
図の実線位置から仮想線位置に切換えてそのまま主レー
ル33aに沿って移動うされる。この転轍片38bは案
内ローラ28が通過する毎に復帰ばね40bにより復帰
され、ボビンキャレージ24が通過後は図の実線位置状
態を保っている。こうしてボビンキャレージ24が順次
移動され、予め待機していた第3レール3.5内に送り
込まれる。そして更に第3レール位置35の直列送り装
置45によって各キャレージバ−25の案内ローラ28
が渦巻き状の第3レール35に案内されて移動する。な
お、第3レール35位置の直列送り装置45の駆動モー
タ53は図示しない検出器により、ボビンキャレージ2
4が第3レール35に搬入されてから駆動するようにし
ても良い。ボビンキャレージ24がエレベータ5内の第
3レール35にすべて送り込まれ、所定の収納位置に来
るとそのことを図示しない検出器が検出し、直列送り装
置45の駆動モータ53を停止させる。
Next, the leading edge guide roller 28 of the bobbin carriage 24
contacts the switch piece 38b of the switch 36b, causing it to
It switches from the solid line position in the figure to the imaginary line position and moves along the main rail 33a as it is. This switching piece 38b is returned by a return spring 40b every time the guide roller 28 passes, and after the bobbin carriage 24 passes, it maintains the solid line position shown in the figure. In this way, the bobbin carriage 24 is sequentially moved and sent into the third rail 3.5, which has been waiting in advance. Furthermore, the guide rollers 28 of each carriage bar 25 are moved by the series feed device 45 at the third rail position 35.
is guided by the spiral third rail 35 and moves. The drive motor 53 of the serial feed device 45 at the third rail 35 position is connected to the bobbin carriage 2 by a detector (not shown).
4 may be driven after being carried onto the third rail 35. When all of the bobbin carriages 24 are fed to the third rail 35 in the elevator 5 and reach a predetermined storage position, a detector (not shown) detects this and stops the drive motor 53 of the serial feed device 45.

次に、エレベータ5を精紡機設置の階層3に上昇させて
第3レール35を第2レール34に接続させる。その後
第3レール35位置の直列送り装置i!45の駆動モー
タ53の軸51aを逆転させ、送りローラ51.52に
よってボビンキャレージ24が前記と逆方向へ移動され
て第2レール34に向かう。その結果、エレベータ5内
のボビンキャレージ24は再び直列状態に引き延ばされ
、各直列送り装置45によって転轍器44bを経て待機
レール34cへ送り出される。ボビンキャレージ24が
第3レール35から退去すると第3レール位置の直列送
り装置45の駆動モータ53が停止される。その後ボビ
ンキャレージ24は待機レール34cから転轍器44c
を経て精紡機設置位置Bの主レール34aへと搬送され
る。精紡機設置位1itBにおいては、予め粗糸ボビン
12を必要とする精紡機19に対応する予備レール34
b位置の転轍器44aがボビンキャレージ24の案内ロ
ーラ28をその予備レール34bに案内するように切替
えられると共に、その予備レール34b位置の直列送り
装置45の駆動モータ53が駆動されている。従って、
主レール34aを移動されてきたボビンキャレージ24
の各案内ローラ28は前記転轍器44aの転轍片によっ
て案内されて前記予備レール34b位置に移動され、ボ
ビンキャレージ24のボビンハンガー29に吊下されて
いる粗糸ボビン12は第5図に示すように精紡機19の
クリール2oの前列ボビンハンガー21前方に位置され
る。なお主レール34a、予備レール34b及び待機レ
ール34c位置の直列送り装置45の作動はボビンキャ
レージ24が所定位置に移動されると停止される。その
後予備レール34b位置のボビンハンガー29に吊下さ
れている粗糸ボビン12は前列ボビンハンガー21に吊
下されている残糸ボビン11と人手または篠交換機によ
って交換される。その交換後、交換によって残糸ボビン
11が吊下されたボビンキャレージ24は今度は主レー
ル34aを通って前記と略逆の作動によって粗紡機設置
位置Aに戻し移動され、途中でロービングストリッパ7
2によって残糸処理された後、空ボビンを必要としてい
る粗紡機9に対応する分岐レール33bに送り込まれる
Next, the elevator 5 is raised to the floor 3 where the spinning machine is installed, and the third rail 35 is connected to the second rail 34. After that, the serial feed device i at the third rail 35 position! The shaft 51a of the drive motor 53 of 45 is reversely rotated, and the bobbin carriage 24 is moved in the opposite direction to the second rail 34 by the feed rollers 51 and 52. As a result, the bobbin carriages 24 in the elevator 5 are stretched out again in series and are sent out to the standby rail 34c via the switch 44b by each serial feeding device 45. When the bobbin carriage 24 is moved away from the third rail 35, the drive motor 53 of the serial feed device 45 at the third rail position is stopped. After that, the bobbin carriage 24 is moved from the standby rail 34c to the switch 44c.
It is then transported to the main rail 34a at the spinning machine installation position B. At the spinning machine installation position 1itB, a spare rail 34 corresponding to the spinning machine 19 that requires the roving bobbin 12 in advance is installed.
The switch 44a at the b position is switched to guide the guide roller 28 of the bobbin carriage 24 to its spare rail 34b, and the drive motor 53 of the serial feed device 45 at the spare rail 34b position is driven. Therefore,
The bobbin carriage 24 has been moved on the main rail 34a
The guide rollers 28 are guided by the switching pieces of the switch 44a and moved to the preliminary rail 34b position, and the roving bobbin 12 suspended from the bobbin hanger 29 of the bobbin carriage 24 is moved as shown in FIG. As shown in FIG. 2, it is located in front of the front row bobbin hanger 21 of the creel 2o of the spinning frame 19. Note that the operations of the serial feed devices 45 at the main rail 34a, auxiliary rail 34b, and standby rail 34c positions are stopped when the bobbin carriage 24 is moved to a predetermined position. Thereafter, the roving bobbin 12 suspended from the bobbin hanger 29 at the position of the spare rail 34b is replaced with the remaining yarn bobbin 11 suspended from the front row bobbin hanger 21, either manually or by a wire exchanger. After the replacement, the bobbin carriage 24 on which the remaining yarn bobbin 11 is suspended is moved back to the roving frame installation position A through the main rail 34a by an operation substantially reverse to that described above, and the roving stripper 7 is moved along the way.
After the remaining yarn is processed by No. 2, the empty bobbin is sent to the branch rail 33b corresponding to the roving frame 9 that requires an empty bobbin.

なお、待機レール34cはボビンキャレージ24がこの
待機レール34cを移動中に精紡機19から残糸ボビン
11が吊下されたボビンキャレージ24が移動し始めた
ときに待機するレールである。この待機中においては待
機レール34c位置の直列送り装置45は停止し、残糸
ボビン11が吊下されたボビンキャレージ24が転轍器
44cを通過すると再び直列送り装置が作動して自動搬
送される。この待機レール34cと同様な機構がバック
レール33cにおいても付加されており、円滑な自動搬
送システムを構成している。
Note that the standby rail 34c is a rail on which the bobbin carriage 24 stands by when the bobbin carriage 24 on which the remaining yarn bobbin 11 is suspended from the spinning frame 19 starts to move while the bobbin carriage 24 is moving on this standby rail 34c. During this waiting period, the serial feed device 45 at the standby rail 34c position stops, and when the bobbin carriage 24 on which the remaining thread bobbin 11 is suspended passes the switch 44c, the serial feed device is activated again and the bobbin is automatically transported. Ru. A mechanism similar to the standby rail 34c is also added to the back rail 33c, forming a smooth automatic conveyance system.

本願にあっては精紡機位置において、予備レールの代り
にクリールの丙、後列ボビンハンガーの配置場所上方に
クリールレールを夫々配設し、そのクリールレールにボ
ビンキャレージを送り込み。
In the present invention, at the spinning machine position, creel rails are provided above the location of the upper and rear row bobbin hangers of the creel instead of the spare rail, respectively, and the bobbin carriage is fed to the creel rails.

ボビンキャレージのボビンハンガーをクリールのボビン
ハンガーとして利用するようにしても良く。
The bobbin hanger of the bobbin carriage may be used as the bobbin hanger of the creel.

その場合ボビンキャレージのボビンハンガーを2列並設
し、前記クリールレールを精紡機の片側1本にしても良
い。また昇降装置は第3レールを直接昇降させるクレー
ン等で構成しても良く、既設のエレベータに限定される
ものではない。
In that case, two rows of bobbin hangers in the bobbin carriage may be arranged in parallel, and the creel rail may be provided on one side of the spinning machine. Further, the elevating device may be constructed of a crane or the like that directly raises and lowers the third rail, and is not limited to an existing elevator.

発明の効果 以上のように本発明にあっては、第1レールに案内させ
たボビンキャレージのボビンハンガーに粗紡機から玉揚
げした粗糸ボビンを吊下させ、そのボビンキャレージを
第3レールに支持させた後昇降装置を精紡機設置の階層
に昇降させ、その後ボビンキャレージを第2レールに案
内させて精紡機設置位置に移動させ、粗紡機から玉揚げ
した粗糸ボビンを吊下状態で精紡機設置位置に搬送する
ようにしたので、粗糸ボビンを異なる階層へ搬送する場
合でもその粗糸ボビンの粗糸の損傷を少なくできて糸品
質の向上を図ることができ、しかもボビンハンガーに吊
下させた粗糸ボビンを精紡機位置に機械的に搬送できて
粗糸ボビンの搬送や積み降ろしの手間を少なくでき、自
動化による省力化を図ることができる。またボビンキャ
レージの各キャレージ要素を変向自在に連結し、ボビン
キャレージを直列状態のまま第3レールに渦巻き状に案
内させてその第3レールに支持させるようにしたので、
長いボビンキャレージをそのまま狭いスペースの昇降装
置に簡易、迅速に支持させることができ、これにより搬
送時間を短くし得ると共にボビンキャレージ昇降のため
の装置を簡素化できてコスト低減も図ることができる。
Effects of the Invention As described above, in the present invention, the roving bobbin doffed from the roving machine is suspended from the bobbin hanger of the bobbin carriage guided by the first rail, and the bobbin carriage is transferred to the third rail. After supporting it, the lifting device is raised and lowered to the level where the spinning machine is installed, and then the bobbin carriage is guided to the second rail and moved to the spinning machine installation position, and the roving bobbin doffed from the roving frame is suspended. Since the roving bobbin is transported to the spinning machine installation position, even when the roving bobbin is transported to a different floor, damage to the roving thread of the roving bobbin can be reduced and yarn quality can be improved. Since the roving bobbin suspended from the spinning machine can be mechanically transported to the spinning machine position, the labor required for transporting and loading and unloading the roving bobbin can be reduced, and labor savings can be achieved through automation. In addition, each carriage element of the bobbin carriage is connected so as to be freely directional, and the bobbin carriage is spirally guided to the third rail while being in a series state, and is supported by the third rail.
A long bobbin carriage can be easily and quickly supported as it is on a lifting device in a narrow space, which can shorten transportation time and simplify the device for lifting and lowering the bobbin carriage, which can also reduce costs. can.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本願の実施例を示すもので、第1図は紡績工場の
縦断面図、第2図は粗紡機設置の階層の概略平面図、第
3図は粗紡機部分の拡大平面図、第4図は精紡機設置の
階層の概略平面図、第5図は精紡機部分の断面図、第6
図はボビンキャレージの平面図、第7図はボビンキャレ
ージの側面図、第8図は送り装置の平面図、第9図は[
−1X線断面図、第10図は昇降装置設置位置部分の平
面図。 第11図はXI−XI線断面図、第12図、第13図、
第14図は転轍器の平面図である。 2・・・階層、3・・・階層、A・・・粗紡機H置位置
、B・・・精紡機設置位置、C・・・エレベータ設置位
置、9・・粗紡機、12・・・粗糸ボビン、24・・・
ボビンキャレージ、24a・・・キャレージ要素、29
・・・ボビンハンガー、33・・・第1レール、34・
・・第2レール。 35・・・第3レール 特許出願人  豊和工業株式会社 第4図 wIS図 第8図・ I!9図 lNl2図 第13 rl!i
The drawings show an embodiment of the present application, and FIG. 1 is a longitudinal cross-sectional view of a spinning factory, FIG. 2 is a schematic plan view of the level where the roving machine is installed, FIG. 3 is an enlarged plan view of the roving machine part, and FIG. The figure is a schematic plan view of the level where the spinning machine is installed, Figure 5 is a sectional view of the spinning machine part, and Figure 6 is a cross-sectional view of the spinning machine section.
The figure is a plan view of the bobbin carriage, Fig. 7 is a side view of the bobbin carriage, Fig. 8 is a plan view of the feeding device, and Fig. 9 is a plan view of the bobbin carriage.
-1 X-ray sectional view, and FIG. 10 is a plan view of the installation position of the lifting device. Fig. 11 is a sectional view taken along the line XI-XI, Fig. 12, Fig. 13,
FIG. 14 is a plan view of the switch. 2... Floor, 3... Floor, A... Rover H position, B... Fine spinning frame installation position, C... Elevator installation position, 9... Rover frame, 12... Rover Thread bobbin, 24...
Bobbin carriage, 24a... Carriage element, 29
...Bobbin hanger, 33...First rail, 34.
...Second rail. 35...Third rail patent applicant Howa Kogyo Co., Ltd. Figure 4 wIS diagram Figure 8 I! Figure 9 lNl2 Figure 13 rl! i

Claims (1)

【特許請求の範囲】[Claims] 1、工場の或階層の粗紡機位置で玉揚げした粗糸ボビン
を他の階層の精紡機位置に搬送する粗糸ボビンの搬送方
法において、ボビンハンガーを有する複数の各キャレー
ジ要素を変向自在に連結して成るボビンキャレージと、
該ボビンキャレージを粗紡機位置から昇降位置へ搬送し
得るようにしてある第1レールと、ボビンキャレージを
昇降位置から精紡機位置へ搬送し得るようにしてある第
2レールと、ボビンキャレージを渦巻状に案内可能でか
つ上記昇降位置に設置した昇降装置によつて第1レール
と第2レールに接続可能な各位置に昇降させ得るように
してある第3レールを準備し、先ず粗紡機から玉揚げし
た粗糸ボビンを第1レールに支持されているボビンキャ
レージのボビンハンガーに吊下させた後、ボビンキャレ
ージを昇降位置へ直列状態で移動させ、そのボビンキャ
レージを直列状態のまま第3レールに渦巻き状に案内さ
せてその第3レールに支持させ、その後第3レールを昇
降装置によって昇降させて第2レールに接続させ、然る
後ボビンキャレージを第3レールから第2レールに移動
させ、そのボビンキャレージを精紡機位置に直列状態で
移動させて粗糸ボビンを吊下状態のまま精紡機位置に搬
送することを特徴とする粗糸ボビンの搬送方法。
1. In a roving bobbin transport method for transporting roving bobbins doffed at a roving machine position on one floor of a factory to a spinning machine position on another floor, each of the plurality of carriage elements each having a bobbin hanger can be freely changed in direction. A connected bobbin carriage,
a first rail adapted to transport the bobbin carriage from a roving frame position to a lifting position; a second rail adapted to transport the bobbin carriage from a lifting position to a spinning frame position; and a bobbin carriage. A third rail that can be guided in a spiral manner and that can be raised and lowered to each position connectable to the first and second rails by means of a lifting device installed at the lifting and lowering positions is prepared. The doffed roving bobbin is suspended from the bobbin hanger of the bobbin carriage supported by the first rail, and then the bobbin carriage is moved in series to the lifting position. The bobbin carriage is then spirally guided by the third rail and supported by the third rail, and then the third rail is raised and lowered by a lifting device to connect it to the second rail, and then the bobbin carriage is moved from the third rail to the second rail. A method for transporting a roving bobbin, which comprises moving the bobbin onto a rail, moving the bobbin carriage in series to a spinning frame position, and transporting the roving bobbin in a suspended state to the spinning frame position.
JP61311180A 1986-12-27 1986-12-27 Transfer method of roving bobbin Expired - Lifetime JPH0653546B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP61311180A JPH0653546B2 (en) 1986-12-27 1986-12-27 Transfer method of roving bobbin
DE8787311302T DE3774864D1 (en) 1986-12-27 1987-12-22 METHOD AND DEVICE FOR TRANSPORTING ARTICLES.
EP87311302A EP0276569B1 (en) 1986-12-27 1987-12-22 A method and apparatus for transporting articles
US07/137,253 US4858746A (en) 1986-12-27 1987-12-23 Method and apparatus for transporting articles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61311180A JPH0653546B2 (en) 1986-12-27 1986-12-27 Transfer method of roving bobbin

Publications (2)

Publication Number Publication Date
JPS63165279A true JPS63165279A (en) 1988-07-08
JPH0653546B2 JPH0653546B2 (en) 1994-07-20

Family

ID=18014050

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61311180A Expired - Lifetime JPH0653546B2 (en) 1986-12-27 1986-12-27 Transfer method of roving bobbin

Country Status (1)

Country Link
JP (1) JPH0653546B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06135636A (en) * 1992-10-28 1994-05-17 Towa Kogyo Kk Roving feeding device for spinning frame
CN112499201A (en) * 2020-11-12 2021-03-16 合肥工业大学 Three-dimensional model circulating transportation device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5225139A (en) * 1975-08-18 1977-02-24 Kanebo Ltd Method of conveying bobbins of textile machine
JPS5426624A (en) * 1977-07-29 1979-02-28 Feller Ag Method of and device for feeding reading card
JPS60139566U (en) * 1984-02-28 1985-09-14 株式会社ダイフク Trolley transport equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5225139A (en) * 1975-08-18 1977-02-24 Kanebo Ltd Method of conveying bobbins of textile machine
JPS5426624A (en) * 1977-07-29 1979-02-28 Feller Ag Method of and device for feeding reading card
JPS60139566U (en) * 1984-02-28 1985-09-14 株式会社ダイフク Trolley transport equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06135636A (en) * 1992-10-28 1994-05-17 Towa Kogyo Kk Roving feeding device for spinning frame
CN112499201A (en) * 2020-11-12 2021-03-16 合肥工业大学 Three-dimensional model circulating transportation device

Also Published As

Publication number Publication date
JPH0653546B2 (en) 1994-07-20

Similar Documents

Publication Publication Date Title
JP2552260B2 (en) Transfer method of roving bobbin
JP2534727B2 (en) Roving yarn transport system
JPS61111282A (en) Package feeder device to werper
JP2554606B2 (en) Roving bobbin conveyor
US4858746A (en) Method and apparatus for transporting articles
JPH08157144A (en) Bobbin carrying system in spinning machine
JPS6117743B2 (en)
EP0311394A1 (en) Bobbin handling system
JPS63165279A (en) Carrying method for roving bobbin
JPS63176270A (en) Bobbin transport device
JP2552259B2 (en) Transfer device for roving bobbin
JPH04352824A (en) Doffer in roving frame
US5127788A (en) System for transporting bobbins between spinning machines
JPS63101284A (en) Conveyor for roving bobbin
JPH0740535Y2 (en) Transfer device for roving bobbin
JP2725007B2 (en) Roving bobbin conveyor
JPH10331039A (en) Method and apparatus for transferring full robing bobbin and empty robing tube
JPH1121020A (en) Method and system for carrying roving bobbin
JPS62175390A (en) Package supply device for creel
JPS63101285A (en) Conveying method for roving bobbin
JPS6329017B2 (en)
JPH0515809B2 (en)
JPS61215724A (en) Method for conveying roving bobbin between roving and spinning steps
JPS61211281A (en) Transport method for bobbin of roving transport magazines between course and fine spinning stages
JPH1087163A (en) Package carrier system