JPS63224498A - Remote control system - Google Patents

Remote control system

Info

Publication number
JPS63224498A
JPS63224498A JP5684887A JP5684887A JPS63224498A JP S63224498 A JPS63224498 A JP S63224498A JP 5684887 A JP5684887 A JP 5684887A JP 5684887 A JP5684887 A JP 5684887A JP S63224498 A JPS63224498 A JP S63224498A
Authority
JP
Japan
Prior art keywords
initialization
processing system
monitoring device
data
initialization data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5684887A
Other languages
Japanese (ja)
Inventor
Masaaki Nakasuji
中筋 正章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP5684887A priority Critical patent/JPS63224498A/en
Publication of JPS63224498A publication Critical patent/JPS63224498A/en
Pending legal-status Critical Current

Links

Landscapes

  • Selective Calling Equipment (AREA)

Abstract

PURPOSE:To handle abnormality speedily when it occurs and to prevent hardware from being destroyed by providing an initialization data sending part which instructs the initialization of a processing system in a stop state to a monitoring device and also providing a device to be monitored with an initialization signal output part which supplies an initialization signal to the processing system. CONSTITUTION:The monitoring device 10 is provided with the initialization data sending part 13. The initialization data sending part 13 sends out the initialization data to a modulation part 12 when a switch 12 is operated. The device 20 to be monitored, on the other hand, is provided with the initialization signal sending part 27 and a demodulation part 21 receives a carrier detection signal CD to detect whether or not the initialization data is sent from the initialization data sending part 13 of the monitoring device 10. Then when the transmission of the initialization data is detected, the initialization signal is supplied to a CPU 24 without passing through the bus 23 of the processing system 28, etc. Thus, the switch 14 of the monitoring device 10 is operated to initialize the processing system of the device 20 to be monitored, so the abnormal stop of the processing system 28 is handled speedily after the abnormal stop is know on the side of the monitoring device 10.

Description

【発明の詳細な説明】 [発明の目的コ (産業上の利用分野) この発明は、遠隔制御システムに関し、更に詳しくは、
被監視装置に含まれる処理系が停止した場合の初期化に
関するものである。
[Detailed Description of the Invention] [Object of the Invention (Industrial Application Field) This invention relates to a remote control system, and more specifically,
This relates to initialization when the processing system included in the monitored device is stopped.

(従来の技術) 従来の遠隔制御システムは、第3図、又は、第4図に示
される如く構成されていた。監視装置10Aと被監視装
置20Bとが、回線30により接続されている。監視装
置10Aには、データ送信部11が設けられ、データ送
信部11から送られたデータは、変調部12で変調され
て回線30を介して被監視装置2OAの復調部21へ送
信される。復調部21で復調されたデータは、S/P 
(シリアル/パラレル)変換部22へ送られ、ここでパ
ラレルなデータとされ、バス23を介してCPLJ24
へ送られる。CPU24は、バス23を介してデータを
受取り、処理動作を行う。
(Prior Art) A conventional remote control system was configured as shown in FIG. 3 or FIG. 4. The monitoring device 10A and the monitored device 20B are connected through a line 30. The monitoring device 10A is provided with a data transmitting section 11, and the data sent from the data transmitting section 11 is modulated by the modulating section 12 and transmitted via the line 30 to the demodulating section 21 of the monitored device 2OA. The data demodulated by the demodulator 21 is S/P
It is sent to the (serial/parallel) converter 22, where it is converted into parallel data, and sent to the CPLJ24 via the bus 23.
sent to. CPU 24 receives data via bus 23 and performs processing operations.

このような遠隔制御システムにおいては、一時的外来雑
音やプログラムの暴走等によりCP U 24が停止し
た場合を考慮して、CPLJ24に初期化信号を与える
手動のスイッチ25が設けられている。
In such a remote control system, a manual switch 25 is provided to give an initialization signal to the CPLJ 24 in case the CPU 24 stops due to temporary external noise or program runaway.

そこで、CPU24が停止した場合には、スイッチ25
を操作してCP U 24へ初期化信号を与え、CPU
24を再起動することになる。しかしながら、このよう
な遠隔制御システムでは、通常、被監視装置20Aは無
人である場合が多く、しかも、監視装置10Aから遠く
隔れている。このため、スイッチ25を操作して初期化
する迄に時間を要し、異常発生時に迅速な対応ができな
いという欠点がめった。
Therefore, when the CPU 24 stops, the switch 25
An initialization signal is given to the CPU 24 by operating the
24 will be restarted. However, in such a remote control system, the monitored device 20A is usually unmanned and is far away from the monitoring device 10A. For this reason, it takes time to operate the switch 25 to initialize the system, and this often results in a disadvantage that a quick response cannot be taken when an abnormality occurs.

これに対し、第4図の遠隔制御システムでは、被監視装
置20BのCP U 24に、異常停止検出を行ってC
PU24に初期化信号を与える検出部26を付設し、C
P U 24が異常停止した場合、自動的に初期化する
ようにしている。しかしながら、このような遠隔制御シ
ステムでは、監視装置10Aの指令とは無関係に、自動
的に初期化がなされるので、CPU24の停止原因が復
旧不能なものである場合には、停止と初期化とが繰返さ
れ、CP U 24の停止原因によっては、ハードウェ
ア、の破壊が生じる等の不具合があった。
On the other hand, in the remote control system shown in FIG. 4, abnormal stop detection is performed on the CPU 24 of the monitored device 20B.
A detection unit 26 is attached to give an initialization signal to the PU 24, and the C
When the P U 24 stops abnormally, it is automatically initialized. However, in such a remote control system, initialization is automatically performed regardless of the command from the monitoring device 10A, so if the cause of the CPU 24 stopping is unrecoverable, the stopping and initialization will be performed. This is repeated, and depending on the cause of the stoppage of the CPU 24, there may be problems such as destruction of the hardware.

(発明が解決しようとする問題点) 上記のように、従来の遠隔制御システムによると、被監
視装置に手動のスイッチが設けられており、これで初期
化するか、被監視装置に設けられた異常停止を検出する
構成で自動的に初期化を行うかであるので、前者による
と、被監視装置が無人で監視装置から離れた場所にある
場合に、異常発生時に迅速な対応ができない欠点があり
、俊者によると、停止原因が復旧不能なものである場合
には、初期化と停止とが繰返されることになり、場合に
よってはハードウェア、の破壊が進行し、増々事態を悪
化させることがあった。本発明は、このような従来の遠
隔制御システムの欠点に鑑みなされたもので、その目的
は、異常発生時に迅速に対応でき、しかも、的確な初期
化を行うことができ、ハードウェア、の破壊の進行を防
止可能な遠隔制御システムを提供することでおる。
(Problems to be Solved by the Invention) As mentioned above, according to the conventional remote control system, the monitored device is provided with a manual switch, and the monitored device is initialized with this or the The former method has the disadvantage of not being able to respond quickly when an abnormality occurs when the monitored device is unattended and located far from the monitoring device. According to Toshiya, if the cause of the stoppage is unrecoverable, initialization and stoppage will be repeated, and in some cases, the hardware will be destroyed, making the situation even worse. was there. The present invention was developed in view of the shortcomings of conventional remote control systems, and its purpose is to be able to respond quickly when an abnormality occurs, to perform accurate initialization, and to prevent hardware destruction. By providing a remote control system that can prevent the progress of

[発明の構成コ (問題点を解決するための手段) 本発明では、監視装置と、被監視装置とを具備し、前記
被監視装置には、前記監視装置から送られるデータを受
けて処理動作を行う処理系が含まれる遠隔制御システム
の前記監視装置に、停止した前記処理系の初期化を命じ
る初期化データの送出を行う初期化データ送出部を設け
る一方、前記被監視装置に、前記初期化データが送出さ
れたことを一検出した場合、前記処理系へ初期化信号を
与える初期化信号出力部を設けて、遠隔制御システムを
構成したものである。
[Configuration of the Invention (Means for Solving Problems)] The present invention includes a monitoring device and a monitored device, and the monitored device performs a processing operation upon receiving data sent from the monitoring device. The monitoring device of the remote control system that includes the processing system that performs The remote control system is constructed by providing an initialization signal output section that provides an initialization signal to the processing system when it is detected that initialized data has been sent.

(作用) 上記構成によると、監視装置側から初期化データを送っ
て被監視装置の処理系の初期化を行うことになり、監視
装置側のオペレータが適宜、必要なタイミングで初期化
を行うことが可能となる。
(Operation) According to the above configuration, the processing system of the monitored device is initialized by sending initialization data from the monitoring device, and the operator of the monitoring device can perform the initialization at the appropriate timing. becomes possible.

(実施例) 以下、図面を参照して本発明の一実施例を説明する。第
1図は本発明の一実施例のブロック図である。同図にお
いて、第3図、第4図と同一の構成要素には、同一の符
号を付し、その説明を省略する。この実施例における監
視装置10には、初期化データ送出部13が設けられて
いる。初期化データ送出部13は、スイッチ14が操作
されると、変調部12へ初期化データを送出する。実際
上は、データ送信部11から送出されるデータの予め定
められた最大長より十分長い所定期間だけ、キャリアを
送出するように、初期化データ送出部13は、変調部1
2へ制御信号を与えるものである。また、スイッチ14
は、監視装置10の図示せぬ制御盤に設けられているキ
ーボード上の一つのキーで代用される。一方、被監視装
!20には、初期化信号送出部27が設けられ、復調部
21からキャリア検出部@CDを受取って、監視装置1
0の初期化データ送出部13から初期化データが送られ
たかを検出し、初期化データが送られたことを検出する
と、CP U 24へ処理系28のバス23等を介さず
に、初期化信号を与える。即ち、データ送信部11から
データが送られ、変調された信号が送られて来た場合に
は、第2図のaの部分に示されるように、データDが抽
出され、S/P変換部22へ送出されるが、初期化デー
タ送出部13から初期化データが送られた場合には、デ
ータが送られず、第2図すで示されるように、キャリア
の期間T1が、データDが送られてくる場合の予め定め
られた最大長の期間Toより十分長い所定期間とされて
送られてくる。つまり、初期化信号送出部27は、復調
部21から与えられるキャリア検出信@CDが、期間T
。より十分長い期間T (TNTl)を越えてオンとな
ると、初期化信号をCP U 24へ出力する。尚、処
理系28は、通常時には、復調部21から監視装置10
のデータを受取り処理動作するもので、異常時には、停
止し、復調部21からデータを受取らなくなる。また、
処理系28は、動作中を示すデータを、図示せぬ手段を
介して監視装置10へ送っているものとする。
(Example) Hereinafter, an example of the present invention will be described with reference to the drawings. FIG. 1 is a block diagram of one embodiment of the present invention. In this figure, the same components as in FIGS. 3 and 4 are denoted by the same reference numerals, and their explanations will be omitted. The monitoring device 10 in this embodiment is provided with an initialization data sending section 13. The initialization data sending unit 13 sends initialization data to the modulating unit 12 when the switch 14 is operated. In practice, the initialization data transmitting section 13 transmits the carrier to the modulating section 1 so as to transmit the carrier for a predetermined period that is sufficiently longer than the predetermined maximum length of data transmitted from the data transmitting section 11.
This is to give a control signal to 2. In addition, the switch 14
is replaced by one key on a keyboard provided on a control panel (not shown) of the monitoring device 10. On the other hand, the monitored equipment! 20 is provided with an initialization signal sending section 27, which receives the carrier detection section @CD from the demodulation section 21 and transmits the signal to the monitoring device 1.
It is detected whether initialization data has been sent from the initialization data sending unit 13 of 0, and when it is detected that initialization data has been sent, initialization is performed to the CPU 24 without going through the bus 23 of the processing system 28. give a signal. That is, when data is sent from the data transmitter 11 and a modulated signal is sent, data D is extracted and sent to the S/P converter as shown in part a of FIG. However, if the initialization data is sent from the initialization data sending unit 13, the data is not sent, and as shown in FIG. The message is sent for a predetermined period that is sufficiently longer than the predetermined maximum period To when the message is sent. In other words, the initialization signal sending unit 27 receives the carrier detection signal @CD from the demodulating unit 21 for the period T.
. When it is turned on for a sufficiently longer period T (TNTl), it outputs an initialization signal to the CPU 24. Note that the processing system 28 normally processes data from the demodulator 21 to the monitoring device 10.
It receives and processes data from the demodulator 21, and in the event of an abnormality, it stops and no longer receives data from the demodulator 21. Also,
It is assumed that the processing system 28 sends data indicating that it is in operation to the monitoring device 10 via means not shown.

上記のような遠隔制御システムにおいて、処理系28が
通常に動作している場合には、データ送信部11から送
られたデータが変調部12、回線30.復調部21を介
して処理系28に送られ、処理系28はこのデータを受
取り処理動作する(第2図a)。この場合、処理系28
からは、動作中を示すデータが監視装!10へ送られる
から、オペレータは初期化データを送ることはしない。
In the remote control system as described above, when the processing system 28 is operating normally, data sent from the data transmitting section 11 is transmitted to the modulating section 12, the line 30. The data is sent to the processing system 28 via the demodulator 21, and the processing system 28 receives and processes this data (FIG. 2a). In this case, the processing system 28
From there, the data indicating that it is in operation is the monitoring device! 10, the operator does not send any initialization data.

この場合、期間T。In this case, the period T.

のキャリア検出信号CDをオンとして受けるが、Toく
Tであるので、初期化信号送出部27は初期化信号を出
力しない。
The initialization signal sending unit 27 does not output an initialization signal because the carrier detection signal CD is turned on and the initialization signal CD is too high.

この遠隔制御システムの処理系28が異常停止すると、
監視装置10へ動作中を示すデータが送られず、オペレ
ータは異常停止を知る。そこで、オペレータが初期化を
行う場合には、スイッチ14を操作する。これにより、
初期化データ送出部13から初期化データが送出され、
これを受けた変調部12は、キャリアのみを期間T1だ
け送信する。これを受けた復調部21からは、オンの期
間T1のキャリア検出信号CDが出力される(第2図b
)。これを受けた初期化信号送出部27は、受取ったキ
ャリア検出信号CDがオンの期間T1がT1>Tである
ので、CPU24へ初期化信号を出力する。これにより
、CPU24は処理系28の初期化を行い、再度動作す
る。
When the processing system 28 of this remote control system stops abnormally,
Data indicating that the system is in operation is not sent to the monitoring device 10, and the operator knows that the system has stopped abnormally. Therefore, when the operator performs initialization, he operates the switch 14. This results in
Initialization data is sent from the initialization data sending unit 13,
The modulator 12 receiving this transmits only the carrier for a period T1. The demodulator 21 that receives this outputs the carrier detection signal CD of the on period T1 (see Fig. 2b).
). Upon receiving this, the initialization signal sending unit 27 outputs an initialization signal to the CPU 24 because the period T1 during which the received carrier detection signal CD is on is T1>T. Thereby, the CPU 24 initializes the processing system 28 and operates again.

このように、本実施例では、監視装置10のスイッチ1
4を操作して被監視装置20の処理系28の初期化を行
うので、被監視装置20が無人で離れた場所にあっても
、監視装置10側で処理系28の異常停止を知った後は
、迅速な対応が可能となる。
In this way, in this embodiment, the switch 1 of the monitoring device 10
4 to initialize the processing system 28 of the monitored device 20, even if the monitored device 20 is unattended and in a remote location, after the monitoring device 10 learns that the processing system 28 has stopped abnormally. allows for quick response.

尚、本実施例では、キャリアを期間T1 だけ送ること
で、初期化データとしたが(@2図b)、この期間T1
のキャリアを2回(第2図C)または・それ以上送るこ
とで、初期化データとしても良いし、この場合のキャリ
ア相互の間隔W(第2図C〉が所定幅であることを、初
期化データの条件としても良い。また、通常のデータと
して用いない特殊なパターンを有するデータを初期化デ
ータとしても良く、この場合は、初期化データをデータ
送信部11から送り、初期化信号送出部27は、復調部
21がS/P変換部22ヘデータを送る信号線から分岐
してデータを受けるようにする。
In this embodiment, the carrier is sent for the period T1 as initialization data (@2 Figure b), but this period T1
By sending the carrier twice (C in Figure 2) or more, it may be used as initialization data, and in this case, it can be initialized to indicate that the interval W between the carriers (C in Figure 2) is a predetermined width. In addition, data having a special pattern that is not used as normal data may be used as the initialization data. In this case, the initialization data is sent from the data transmitter 11 and the initialization signal transmitter 27 allows the demodulator 21 to branch from the signal line that sends data to the S/P converter 22 to receive data.

[発明の効果] 以上説明したように、本発明によれば、監視装置側から
初期化データを送って処理系の初期化を行うので、被監
視装置まで出向く等の必要がなく、異常停止に対する対
応を迅速に行うことができ、また、処理系の状態をみな
がら初期化を行うことが可能であるから、自動的に初期
化がなされる場合と異なり、ハードウェアの意図せぬ破
壊の進行を防止できる。
[Effects of the Invention] As explained above, according to the present invention, since initialization data is sent from the monitoring device to initialize the processing system, there is no need to go to the monitored device, and there is no need to go to the monitored device. Since it is possible to respond quickly and initialize while checking the status of the processing system, unlike cases where initialization is performed automatically, there is no possibility of unintentional damage to the hardware. can be prevented.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の一実施例のブロック図、第2図は第1
図に示した一実施例を説明するためのフローチャート、
第3図、第4図は従来の遠隔制御システムのブロック図
である。 10・・・監視#A置   13・・・初期化データ送
出部20・・・被監視装@27・・・初期化信号送出部
28・・・処理系 代理人 弁理士 則 近 憲 佑 同  山王 − 第1図 第3図
FIG. 1 is a block diagram of one embodiment of the present invention, and FIG. 2 is a block diagram of an embodiment of the present invention.
A flowchart for explaining one embodiment shown in the figure,
FIGS. 3 and 4 are block diagrams of conventional remote control systems. 10...Monitoring #A position 13...Initialization data sending unit 20...Monitored device @27...Initializing signal sending unit 28...Processing system agent Patent attorney Nori Chika Ken Yudo Sanno - Figure 1 Figure 3

Claims (1)

【特許請求の範囲】 監視装置と、被監視装置とを具備し、前記被監視装置に
は、前記監視装置から送られるデータを受けて処理動作
を行う処理系が含まれる遠隔制御システムにおいて、 前記監視装置に、停止した前記処理系の初期化を命じる
初期化データの送出を行う初期化データ送出部を設ける
一方、前記被監視装置に、前記初期化データが送出され
たことを検出した場合、前記処理系へ初期化信号を与え
る初期化信号出力部を設けたことを特徴とする遠隔制御
システム。
[Scope of Claims] A remote control system comprising a monitoring device and a monitored device, wherein the monitored device includes a processing system that receives data sent from the monitoring device and performs a processing operation, comprising: The monitoring device is provided with an initialization data sending unit that sends initialization data that instructs the stopped processing system to be initialized, and when it is detected that the initialization data is sent to the monitored device, A remote control system comprising: an initialization signal output section that provides an initialization signal to the processing system.
JP5684887A 1987-03-13 1987-03-13 Remote control system Pending JPS63224498A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5684887A JPS63224498A (en) 1987-03-13 1987-03-13 Remote control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5684887A JPS63224498A (en) 1987-03-13 1987-03-13 Remote control system

Publications (1)

Publication Number Publication Date
JPS63224498A true JPS63224498A (en) 1988-09-19

Family

ID=13038835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5684887A Pending JPS63224498A (en) 1987-03-13 1987-03-13 Remote control system

Country Status (1)

Country Link
JP (1) JPS63224498A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02262797A (en) * 1988-12-28 1990-10-25 Nissan Motor Co Ltd Communication equipment for vehicle
JPH06343194A (en) * 1993-06-01 1994-12-13 Nec Corp Monitoring and controlling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02262797A (en) * 1988-12-28 1990-10-25 Nissan Motor Co Ltd Communication equipment for vehicle
JPH06343194A (en) * 1993-06-01 1994-12-13 Nec Corp Monitoring and controlling device

Similar Documents

Publication Publication Date Title
US4506357A (en) Method and apparatus for switching loop type transmission lines
JPS63224498A (en) Remote control system
JPS61295738A (en) Transmission controller
JPS6386698A (en) Remote supervisory and controlling equipment
JP2825556B2 (en) Intruder alarm device
JPS62229341A (en) Initialization system for microprocessor
JP4137304B2 (en) Packet communication network failure detection method
JPH04167142A (en) Fault detection system for information processor
KR0176613B1 (en) Apparatus for communication for fault detecting change of transmission data
JPH01282939A (en) Communication terminal equipment
JPH0735470Y2 (en) Loop type data transmission device
JPH0523529B2 (en)
JPH0516794Y2 (en)
JPH05183605A (en) Hardware control system for serial interface
JPH10207745A (en) Method for confirming inter-processor existence
JPS6383857A (en) Controlling system for processor congestion of multi-processor system
JPH03262339A (en) Transmitter for slave station in time division multi-direction multiplex communication system
JPS62117435A (en) Loop-like network controller
JPH03180950A (en) Computer system
JPH01112851A (en) Data communication system
JPH04314219A (en) Satellite communication system
JPH0377450A (en) Data transmission circuit
JPS63283236A (en) System for switching spare device
JPH01258157A (en) Gpib monitor device
JPS6038952A (en) Communication processing device