JPS63125712A - Wagen removal method in expelling construction method - Google Patents

Wagen removal method in expelling construction method

Info

Publication number
JPS63125712A
JPS63125712A JP27136886A JP27136886A JPS63125712A JP S63125712 A JPS63125712 A JP S63125712A JP 27136886 A JP27136886 A JP 27136886A JP 27136886 A JP27136886 A JP 27136886A JP S63125712 A JPS63125712 A JP S63125712A
Authority
JP
Japan
Prior art keywords
bridge
wagon
construction
hanging
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP27136886A
Other languages
Japanese (ja)
Other versions
JPH041127B2 (en
Inventor
合津 信貞
鈴木 邦男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP27136886A priority Critical patent/JPS63125712A/en
Publication of JPS63125712A publication Critical patent/JPS63125712A/en
Publication of JPH041127B2 publication Critical patent/JPH041127B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明はワーゲンを橋桁建設終了現場で解体せずに橋
梁主塔まで斜材を避けて撤去する、迫出し架設工法にお
けるワーゲンの撤去方法に関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention relates to a method for removing a wagon in an extrusion construction method, in which the wagon is removed to the main bridge tower while avoiding diagonal members at the site where bridge girder construction is completed, without dismantling the wagon. It is something.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

橋梁主塔の両側に橋桁を順次迫出しながら構築する、片
持ち式の迫出し架設工法により斜張橋を建設する方法で
は、構築作業を行う架設作業車、すなわちワーゲンは斜
材の関係で通常全橋桁建設終了現場で解体・撤去される
が、この撤去方法によるとワーゲンの解体作業時にその
構成部材2部品を落下させる危険性があり、橋梁の下方
に道路、鉄道が走っている場合等には何らかの安全対策
を採る必要がある。
In the method of constructing a cable-stayed bridge using the cantilever type extrusion construction method, in which bridge girders are successively extruded from both sides of the main bridge tower, the construction work vehicle that performs the construction work, that is, the wagon, is usually used for diagonal members. All of the bridge girders are dismantled and removed at the site where construction has been completed, but with this removal method, there is a risk that two of the components will fall during the dismantling work of the Volkswagen, and if there is a road or railway running below the bridge, etc. need to take some safety measures.

この発明はこの迫出し架設工法により斜張橋を建設する
方法において、危険を犯さず、安全にワーゲンを撤去す
る目的からなされたもので、ワーゲンをワーゲン本体と
足場を吊る吊柱とに分割し、斜材を避けてそれぞれを後
退させることによりこれを実現しようとするものである
This invention was made for the purpose of safely removing the wagon without incurring any danger in the method of constructing cable-stayed bridges using this protruding construction method. This is achieved by avoiding the diagonal members and retracting them.

〔問題点を解決するための手段〕[Means for solving problems]

本発明では橋桁幅方向に架設される、ワーゲンを構成す
る架設梁の両端部を取り外すことによりワーゲンと斜材
との衝突を回避し、ワーゲンを解体せずに撤去すること
を可能とする。
In the present invention, by removing both ends of the construction beam that constitutes the wagon, which is constructed in the width direction of the bridge girder, collision between the wagon and diagonal members can be avoided, and the wagon can be removed without dismantling it.

架設梁は少なくとも斜材の両外側に位置する張出し部分
だけ取り外されてワーゲンが橋桁上のワーゲン本体と足
場を吊る吊柱とに分割される。
At least the overhanging parts located on both sides of the diagonal members are removed from the construction beam, and the wagon is divided into the wagon main body on the bridge girder and the hanging pillar for suspending the scaffolding.

ワーゲンの後退時に、斜材側外側の橋桁上に仮設レール
を敷設する一方、吊柱の内側にこれを支持し、仮設レー
ル上を走行する車輪を有する支持部材を突設する。
When the wagon retreats, a temporary rail is laid on the bridge girder on the outside of the diagonal member side, and a support member is protruded from inside the hanging pillar and has wheels that run on the temporary rail.

そして吊柱を支持部材で支持した状態で仮設レール上を
走行させながらワーゲン本体とともにそれぞれ橋梁の主
塔まで後退させる。
Then, while the hanging pillars are supported by supporting members and run on temporary rails, they are retreated together with the main body of the wagon to the main tower of the bridge.

〔実 施 例〕〔Example〕

以下本発明を一実施例を示す図面に基づいて説明する。 The present invention will be explained below based on the drawings showing one embodiment.

この発明は第1図のような迫出し架設工法による斜張橋
への建設終了後、第2図のように橋桁a端部に位置する
ワーゲンWをその場で解体せずに主塔すまで斜材Cを避
けて後退させる方法である。
This invention was developed until after the construction of a cable-stayed bridge using the protruding construction method as shown in Fig. 1 is completed, the main tower is installed without dismantling the Wagen W located at the end of the bridge girder a as shown in Fig. 2. This is a method of retreating while avoiding the diagonal member C.

第3図に示すようにワーゲンWは橋桁a上に載る立体ト
ラス構造のワーゲン本体1と足場3を吊る橋桁a両外側
の吊柱2,2とから構成され、ワーゲン本体1と吊柱2
,2とは第4図のように橋桁8幅方向に架設される架設
梁1aにおいて接続されている。
As shown in Fig. 3, the Volkswagen W is composed of a Volkswagen main body 1 with a three-dimensional truss structure that rests on a bridge girder a, and hanging pillars 2, 2 on both outsides of the bridge girder A from which scaffolding 3 is suspended.
, 2 are connected at the construction beam 1a installed in the width direction of the bridge girder 8 as shown in FIG.

ワーゲン本体1の支柱lb下には移動用レールICと車
輪1dが取り付けられており、ワーゲン本体1はこの移
動用レールICと車輪1dによって橋桁a上をその長さ
方向に移動自在とされている。
A moving rail IC and wheels 1d are attached to the bottom of the pillar lb of the main body 1 of the wagon, and the main body 1 of the main vehicle 1 can be moved in its length direction on the bridge girder a by means of the moving rail IC and the wheels 1d. .

次に第4図、第5図によりワーゲンW後退時の作業方法
を説明する。
Next, a working method when reversing the Volkswagen W will be explained with reference to FIGS. 4 and 5.

初めに第4図のように橋桁8幅方向の両端に張られた斜
材Cの両外側に仮設レール4,4を橋桁a長さ方向に敷
設する。
First, as shown in FIG. 4, temporary rails 4, 4 are laid in the length direction of the bridge girder a on both outsides of the diagonal members C stretched at both ends of the bridge girder 8 in the width direction.

この敷設作業と並行して、または敷設後仮設レール4上
を走行可能な車輪5aを有する支持部材5を吊柱2.2
の内側に突設し、これによって吊柱2,2及び足場3を
支持する。
In parallel with this laying work or after laying, the supporting member 5 having wheels 5a that can run on the temporary rail 4 is attached to the hanging pillar 2.2.
The suspension pillars 2, 2 and the scaffolding 3 are supported by this.

続いて第5図のように少なくとも架設梁1aの斜材Cと
交差する部分を取り外してワーゲンWを後退可能とする
。実施例では架設梁1aとともに吊柱2,2の一部も取
り外している。
Subsequently, as shown in FIG. 5, at least the portion of the construction beam 1a that intersects with the diagonal member C is removed to enable the wagon W to retreat. In the embodiment, part of the hanging columns 2, 2 is also removed along with the construction beam 1a.

第4図において中心線の左側は第3図のX−X線断面、
右側はY−Y線断面を示しているが、Y−Y線断面に示
すようにワーゲンWの前面に配置される吊柱2も取り外
される。
In Figure 4, the left side of the center line is the cross section taken along the line X-X in Figure 3;
The right side shows a cross section taken along the line YY, and as shown in the cross section taken along the YY line, the hanging pillar 2 disposed on the front of the Volkswagen W is also removed.

そして第5図の状態でワーゲン本体1と吊柱2.2とを
それぞれ個別に主塔すまで後退させる。
Then, in the state shown in FIG. 5, the wagon main body 1 and the hanging pillars 2.2 are individually retreated to the main tower.

ワーゲン本体1の後退は前進と逆の操作により行われ、
また吊柱2,2はワーゲン本体1の後退と同じく駆動装
置等により後退させられる。
The backward movement of the main body 1 of the Volkswagen is carried out by the reverse operation of the forward movement.
Further, the hanging pillars 2, 2 are moved back by a drive device or the like in the same way as the wagon main body 1 is moved back.

ワーゲン本体1と吊柱2,2は共に主塔すにおいて分割
・解体され、撤去される。
The main body 1 of the wagon and the hanging pillars 2, 2 are both divided and dismantled at the main tower and removed.

〔発明の効果〕〔Effect of the invention〕

この発明は以上の通りであり、ワーゲンを建設終了現場
で解体せずに本体と吊柱とに分割し、それぞれを主塔ま
で後退させるものであるため橋桁の下方に危険を及ぼす
ことな(、安全にワーゲンを解体、撤去することができ
る。
This invention is as described above, and it is possible to divide the Volkswagen into the main body and the hanging pillar without disassembling it at the construction site, and to retreat each part to the main tower, so that there is no risk to the lower part of the bridge girder. You can safely dismantle and remove the Volkswagen.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は斜張橋の建設状態を示した立面図、第2図はそ
の拡大図、第3図は橋桁端部のワーゲンを示した側面図
、第4図はその正面図、第5図はワーゲン後退時の様子
を示した正面図である。 A−・−−−−一斜張橋、a−−−−−−−一橋桁、b
 −−−−−・−主塔、c−−−−−−−−一斜材、w
−−−−−−−−ワーゲン、1−・−ワーゲン本体、l
 a−−−−−−一架設梁、1 b−−−−−−−一支
柱、lc−一・移動用レール、1 d−−−−−−−一
車輪、2・−−一一−−−吊柱、3・・−・−・・−足
場、4・−一−−−−・仮設レール、5−−−−−−一
支持部材、5a−・・・−・・車輪。
Figure 1 is an elevation view showing the construction state of the cable-stayed bridge, Figure 2 is its enlarged view, Figure 3 is a side view showing the wagon at the end of the bridge girder, Figure 4 is its front view, and Figure 5 is The figure is a front view showing the state of the Volkswagen when it is reversing. A---One cable-stayed bridge, a---One bridge girder, b
--------・-Main tower, c---------- diagonal timber, w
----------Wagen, 1---Wagen body, l
a--------1 erection beam, 1 b-----1 pillar, LC-1/transfer rail, 1 d-----1 wheel, 2.--11- --Hanging pillar, 3...Scaffolding, 4.--Temporary rail, 5--Supporting member, 5a--Wheel.

Claims (1)

【特許請求の範囲】[Claims] (1)構築済みの橋桁上に設置され、その長さ方向に移
動自在とされた立体トラス構造のワーゲンにより斜張橋
を建設する迫出し架設工法において、全橋桁建設終了後
、橋桁を吊る斜材両外側の橋桁上に仮設レールを敷設す
るとともに、この仮設レール上を走行する車輪を有する
支持部材を吊柱の内側に突設し、橋桁幅方向に架設され
るワーゲンの架設梁両端の、少なくとも斜材の両外側に
位置する張出し部分を取り外してワーゲンをワーゲン本
体と足場を吊る吊柱とに分割し、吊柱を支持部材で支持
した状態でワーゲン本体とともにそれぞれ個別に橋梁の
主塔まで後退させることを特徴とする迫出し架設工法に
おけるワーゲンの撒去方法。
(1) In the extrusion construction method in which a cable-stayed bridge is constructed using a three-dimensional truss structure that is installed on the bridge girders that have already been constructed and is movable in the length direction, the bridge girder is suspended after the construction of all the bridge girders is completed. Temporary rails are laid on the bridge girders on the outside of both sides of the bridge, and supporting members with wheels that run on these temporary rails are protruded from the inside of the hanging pillars, so that both ends of the construction beams of the wagon that will be erected in the width direction of the bridge girder are installed. At least the overhanging parts located on both outside sides of the diagonal members are removed and the wagon is divided into the wagon main body and the hanging pillar from which the scaffolding is suspended, and with the hanging pillar supported by the support members, each part is individually extended to the main tower of the bridge together with the wagon main body. A method for scattering the wargen in the protruding construction method, which is characterized by retreating.
JP27136886A 1986-11-14 1986-11-14 Wagen removal method in expelling construction method Granted JPS63125712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27136886A JPS63125712A (en) 1986-11-14 1986-11-14 Wagen removal method in expelling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27136886A JPS63125712A (en) 1986-11-14 1986-11-14 Wagen removal method in expelling construction method

Publications (2)

Publication Number Publication Date
JPS63125712A true JPS63125712A (en) 1988-05-28
JPH041127B2 JPH041127B2 (en) 1992-01-10

Family

ID=17499095

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27136886A Granted JPS63125712A (en) 1986-11-14 1986-11-14 Wagen removal method in expelling construction method

Country Status (1)

Country Link
JP (1) JPS63125712A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63201204A (en) * 1987-02-18 1988-08-19 住友建設株式会社 Method for withdrawal of construction working vehicle in oblique tensioned bridge
JP2019031781A (en) * 2017-08-04 2019-02-28 大成建設株式会社 Removal method of cantilevered overhang work vehicle
CN112376451A (en) * 2020-11-17 2021-02-19 上海市基础工程集团有限公司 Dismantling construction method for large-span prestressed concrete cable-stayed bridge

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7267075B2 (en) 2019-04-11 2023-05-01 グローリー株式会社 Deposit/withdrawal device, deposit/withdrawal system, and deposit/withdrawal method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63201204A (en) * 1987-02-18 1988-08-19 住友建設株式会社 Method for withdrawal of construction working vehicle in oblique tensioned bridge
JP2019031781A (en) * 2017-08-04 2019-02-28 大成建設株式会社 Removal method of cantilevered overhang work vehicle
CN112376451A (en) * 2020-11-17 2021-02-19 上海市基础工程集团有限公司 Dismantling construction method for large-span prestressed concrete cable-stayed bridge

Also Published As

Publication number Publication date
JPH041127B2 (en) 1992-01-10

Similar Documents

Publication Publication Date Title
JP5056608B2 (en) Retraction removal method and retraction device for mobile work vehicle for cantilever installation
CN106400701B (en) A kind of list girder low level balanced cantilever assembly Bridge Erector
JP2021070978A (en) Heavy object movement device and heavy object movement method using the heavy object movement device
CN112359733B (en) Beam changing method with foldable beam changing machine
US5940916A (en) Bridge span-by-span construction apparatus and method
DD256890A5 (en) APPENDIX FOR RECORDING OR LOCATING, AND TRANSPORTING GLEISJOCHEN
CN108914776B (en) A basket is hung in construction for municipal works and room are built
CN103147398A (en) Bridge girder erection machine and method for enabling the bridge girder erection machine to transfer among bridges or pass through tunnels
CN110284904A (en) A kind of lining trolley and its construction method
JPS63125712A (en) Wagen removal method in expelling construction method
US3608670A (en) Scaffold tender
DE2555311C3 (en) Device for the section-by-section, free pre-construction of bridge structures made of reinforced or prestressed concrete
JP3606528B2 (en) Mobile suspension scaffold device
JP3718033B2 (en) Precast block erection device
JPS60258311A (en) Construction of high structure
KR100366123B1 (en) Construction Launching System of Bridge Box
JP3605660B2 (en) Precast block erection equipment
JPS63201204A (en) Method for withdrawal of construction working vehicle in oblique tensioned bridge
JPH0350841B2 (en)
RU6759U1 (en) VEHICLE FOR CARRIAGE OF THE MECHANIZED, TWO-LINE, SECTIONAL AXLE
US3239186A (en) Tubular concrete girder construction
JPS5829388B2 (en) Approach work equipment for railroad tracks, etc.
JPS626058A (en) Construction of working vehicle for reparing bridge
DE2660087B1 (en) Device for the section-wise, free front construction of multi-span bridge structures made of reinforced or prestressed concrete
JPH1181242A (en) Precast block installation device