JPS63100113A - Bell-less charging apparatus in blast furnace - Google Patents

Bell-less charging apparatus in blast furnace

Info

Publication number
JPS63100113A
JPS63100113A JP24579486A JP24579486A JPS63100113A JP S63100113 A JPS63100113 A JP S63100113A JP 24579486 A JP24579486 A JP 24579486A JP 24579486 A JP24579486 A JP 24579486A JP S63100113 A JPS63100113 A JP S63100113A
Authority
JP
Japan
Prior art keywords
hopper
ore
coke
furnace
blast furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP24579486A
Other languages
Japanese (ja)
Inventor
Masaaki Sakurai
桜井 雅昭
Kazumasa Wakimoto
一政 脇元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP24579486A priority Critical patent/JPS63100113A/en
Publication of JPS63100113A publication Critical patent/JPS63100113A/en
Pending legal-status Critical Current

Links

Landscapes

  • Blast Furnaces (AREA)

Abstract

PURPOSE:To optically charge multiple kinds of ore, coke, etc., corresponding to the purpose in a bell-less charging apparatus of blast furnace by arranging three pieces or more of hoppers to be possible to supply optically raw materials in the blast furnace at the top side of furnace. CONSTITUTION:In case of charging under mixing multiple kinds of ore, coke, etc., the ore is stored in the hopper 12 and the coke in the hopper 13 and coke having different characteristic from the coke in the hopper 13, ore, sintered ore, lime stone or silica rock, etc., is stored in the hopper 14. And, by opening the hoppers 13 and 14 at the same time, the raw material in the hopper 14 in the coke is mixed. And, by opening the hoppers 12 and 14 at the same time the raw material in the hopper 14 in the core is charged under mixing condition. Further, the fine particle kind of ore in the hopper 12 and the coase particle kind of ore in the hopper 13 and the coke in the hopper 14 are charged respectively and at the same time of charging the ore in the furnace and at the peripheral part of the furnace, the hopper 12 is opened and at the center part of the furnace, the hopper 13 is opened and so distribution of the ore having difference between peripheral part and the center part is obtd.

Description

【発明の詳細な説明】 (産業上の利用分野) 炉内への原料装入物分布の制御可能な高炉のベルレス装
入装置に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial Field of Application) The present invention relates to a bellless charging device for a blast furnace that is capable of controlling the distribution of raw material charges into the furnace.

(従来技術) 炉内に装入されたコークスと鉱石類の芯厚と粒度の半径
方向分布は、装入m層の通気抵抗分布を決め、これによ
ってガス流邑の半径方向の分布が定まる。このため高炉
操業上原料の分布制御は重要なことである。
(Prior Art) The radial distribution of the core thickness and grain size of the coke and ores charged into the furnace determines the ventilation resistance distribution of the charging layer m, which determines the radial distribution of the gas flow. For this reason, controlling the distribution of raw materials is important for blast furnace operation.

ベルレス式装入装置は、一般に高炉の上方にコークス用
ホッパーと鉄鉱石用ホッパとを備え、各原料を旋回シュ
ートから装入するものである。またこの装置を改良した
ものとして、二つのホッパーを同軸に垂直に配置し、円
周バランス制御性を改善した装置が提案されている。
A bellless charging device is generally equipped with a coke hopper and an iron ore hopper above a blast furnace, and each raw material is charged from a rotating chute. Furthermore, as an improved version of this device, a device has been proposed in which two hoppers are arranged coaxially and perpendicularly to improve circumferential balance control.

しかし従来のベルレス装入装置は、いずれもホッパーが
二つであるため、多銘柄の鉱石、コークス等を任意に装
入することが難しく、仮に行っても装入時間を多く要し
、生産能力を阻害する。また多銘柄の鉱石、コークスを
高炉半径方向に任意に装入することができない。
However, because conventional bellless charging equipment has two hoppers, it is difficult to arbitrarily charge various brands of ore, coke, etc., and even if it is done, it takes a long time to charge, and the production capacity is inhibit. Furthermore, it is not possible to arbitrarily charge multiple brands of ore and coke in the radial direction of the blast furnace.

(発明が解決する技術的課題) 本発明は、多銘柄の鉱石、コークス等を目的に応じて任
意に装入して、高炉内の装入物やガス流量分布を所望に
t、1ltlll可能な高炉のベルレス式装入装置を提
供することを目的とする。
(Technical Problems to be Solved by the Invention) The present invention enables the charging of various brands of ore, coke, etc. to be arbitrarily charged according to the purpose, and the charging material and gas flow rate distribution in the blast furnace to be adjusted to the desired value. The purpose of the present invention is to provide a bellless charging device for a blast furnace.

(技術的L?題を解決する手段) 本発明は、高炉炉頂に、原料を高炉内に任急に供給可能
なホッパーを少なくとも3個設けた高炉のベルレス装入
装置であり、少なくとも3個以上設けられたホッパーの
全ての原料装入装置が、同時に炉内へ装入可能な排出υ
1111装置を装備していることを実施態様としている
(Means for Solving the Technical Problem) The present invention is a bellless charging device for a blast furnace, which is provided with at least three hoppers at the top of the blast furnace that can quickly supply raw materials into the blast furnace. All of the raw material charging devices of the hopper installed above can discharge υ that can be charged into the furnace at the same time.
1111 device is equipped.

(発明の詳細な説明) 第1図は高炉のベルレス装入装置を示す。この装置は高
炉炉体11の上方に三個のホッパー12゜13及び14
を装着している。各ホッパーの原料供給口にはそれぞれ
開閉板15が取付けられ、これら開閉板は任意に開閉で
きるようになっている。
(Detailed Description of the Invention) FIG. 1 shows a bellless charging device for a blast furnace. This device has three hoppers 12, 13 and 14 above the blast furnace body 11.
is attached. An opening/closing plate 15 is attached to each raw material supply port of each hopper, and these opening/closing plates can be opened and closed as desired.

一方炉体上部にはホッパーの下方に対応して旋回シュー
ト16が装着され、旋回時に旋回角度を変えていきなが
ら原料を炉内に順次装入するものである。
On the other hand, a rotating chute 16 is attached to the upper part of the furnace body corresponding to the lower part of the hopper, and is used to sequentially charge raw materials into the furnace while changing the rotation angle during the rotation.

しかしてこのベルレス装入装置によれば、ホッパーが三
個あり、ざらに独自に排出制部が可能なので、多銘柄の
鉱石、コークス等を任意に混合装入でき、またこれら原
料を高炉半径方向に任意に分布させることができる。例
えば混合装入を行う場合、ホッパー12に鉱石を、ホッ
パー13にコークスを、ホッパー14にコークス(ホッ
パー13内のコークスとは異なる性状)、鉱石、ベレッ
ト、焼結鉱、石灰石、あるいは珪石等を入れておけば、
ホッパー13.14を同時に開くことにより、コークス
内にホッパー14内の原料を混合することができる。ま
たホッパー12.14を同時に開けば、鉱石中にホッパ
ー14内の原料を混合装入することができる。またホッ
パー12に細かい鉱石の銘柄を、ホッパー13に粗い銘
柄の鉱石を、ホッパー14にコークスを入れておき、高
炉内に鉱石を入れる時に、高炉周辺部については、ホッ
パー12を開け、高炉中心部についてはホッパー13を
開けることにより、鉱石の分布を周辺部と中心部とで異
ならせることができる。
However, according to the bellless charging device, there are three hoppers and the discharge control section can be controlled independently, so it is possible to mix and charge various brands of ore, coke, etc., and to charge these raw materials in the radial direction of the blast furnace. can be arbitrarily distributed. For example, when performing mixed charging, ore is placed in the hopper 12, coke is placed in the hopper 13, coke (different properties from the coke in the hopper 13), ore, pellets, sintered ore, limestone, or silica stone is placed in the hopper 14. If you put it in,
By simultaneously opening the hoppers 13,14, it is possible to mix the raw materials in the hopper 14 into the coke. Moreover, if the hoppers 12 and 14 are opened at the same time, the raw materials in the hoppers 14 can be mixed and charged into the ore. In addition, a fine brand of ore is placed in the hopper 12, a coarse brand of ore is placed in the hopper 13, and coke is placed in the hopper 14. When putting ore into the blast furnace, the hopper 12 is opened for the surrounding area of the blast furnace, and the center of the blast furnace is placed in the hopper 12. By opening the hopper 13, the distribution of ore can be made different between the periphery and the center.

(発明の効果) このように本発明方法によれば、コークス、鉱石等の原
料を混合装入させたり原料の分布を任意のものとするこ
とができるので、ガス流分布を制御して高炉の操業効率
を向上する。なお本発明は、三個のホッパーに限らず四
個以上でもよいことはもちろんである。
(Effects of the Invention) As described above, according to the method of the present invention, raw materials such as coke and ore can be mixed and charged, and the distribution of raw materials can be made arbitrary. Improve operational efficiency. Note that the present invention is not limited to three hoppers, but it goes without saying that four or more hoppers may be used.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明にかかるベルレス装入装置の一例を示す
説明図、第2図は各ホッパーの配置を示す説明図である
。 11・・・炉体、  12,13.14・・・ホッパー
、15・・・開閉板、  16・・・旋回シュート。
FIG. 1 is an explanatory diagram showing an example of a bellless charging device according to the present invention, and FIG. 2 is an explanatory diagram showing the arrangement of each hopper. 11...Furnace body, 12,13.14...Hopper, 15...Opening/closing plate, 16...Swivel chute.

Claims (2)

【特許請求の範囲】[Claims] (1)高炉炉頂に、原料を高炉内に任意に供給可能なホ
ッパーを少なくとも3個設けた高炉のベルレス装入装置
(1) A bellless charging device for a blast furnace, which is provided with at least three hoppers at the top of the blast furnace that can arbitrarily supply raw materials into the blast furnace.
(2)少なくとも3個以上設けられたホッパーの全ての
原料装入装置が、同時に炉内へ装入可能な排出制御装置
を装備している特許請求の範囲第1項記載のベルレス装
入装置。
(2) The bellless charging device according to claim 1, wherein all of the material charging devices of at least three or more hoppers are equipped with a discharge control device that allows material charging into the furnace at the same time.
JP24579486A 1986-10-16 1986-10-16 Bell-less charging apparatus in blast furnace Pending JPS63100113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24579486A JPS63100113A (en) 1986-10-16 1986-10-16 Bell-less charging apparatus in blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24579486A JPS63100113A (en) 1986-10-16 1986-10-16 Bell-less charging apparatus in blast furnace

Publications (1)

Publication Number Publication Date
JPS63100113A true JPS63100113A (en) 1988-05-02

Family

ID=17138928

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24579486A Pending JPS63100113A (en) 1986-10-16 1986-10-16 Bell-less charging apparatus in blast furnace

Country Status (1)

Country Link
JP (1) JPS63100113A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02166208A (en) * 1988-12-21 1990-06-26 Kawasaki Steel Corp Furnace top charging method in bellless blast furnace
CN102230044A (en) * 2010-07-23 2011-11-02 北京首钢机电有限公司 Four-bucket bell-less charging device
JP2016080249A (en) * 2014-10-16 2016-05-16 Jfeエンジニアリング株式会社 Refuse gasification melting device
JP2022083503A (en) * 2020-11-25 2022-06-06 Jfeスチール株式会社 Method for charging raw material into blast furnace

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52122204A (en) * 1976-04-07 1977-10-14 Ishikawajima Harima Heavy Ind Co Ltd Equipment for charging raw materials into blast furnace
JPS60149707A (en) * 1984-01-17 1985-08-07 Nippon Steel Corp Method for charging raw material to blast furnace

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52122204A (en) * 1976-04-07 1977-10-14 Ishikawajima Harima Heavy Ind Co Ltd Equipment for charging raw materials into blast furnace
JPS60149707A (en) * 1984-01-17 1985-08-07 Nippon Steel Corp Method for charging raw material to blast furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02166208A (en) * 1988-12-21 1990-06-26 Kawasaki Steel Corp Furnace top charging method in bellless blast furnace
CN102230044A (en) * 2010-07-23 2011-11-02 北京首钢机电有限公司 Four-bucket bell-less charging device
JP2016080249A (en) * 2014-10-16 2016-05-16 Jfeエンジニアリング株式会社 Refuse gasification melting device
JP2022083503A (en) * 2020-11-25 2022-06-06 Jfeスチール株式会社 Method for charging raw material into blast furnace

Similar Documents

Publication Publication Date Title
JPS63100113A (en) Bell-less charging apparatus in blast furnace
JPS60208404A (en) Method and device for charging raw material to blast furnace
JP3573780B2 (en) Raw material charging method for bellless blast furnace
JPS61149409A (en) Device for controlling grain size distribution of raw material
JPS5662911A (en) Raw material charging method to blast furnace
JPH0421724B2 (en)
JPS61227109A (en) Charging method for blast furnace charge
JPS63204093A (en) Raw material charger to vertical type furnace
JPS60251208A (en) Method for charging raw material to blast furnace
JPS57207104A (en) Charging method for bell-less type blast furnace
SU721493A1 (en) Method of blast furnace charging
JPH02305911A (en) Bell-less type raw material charging method for vertical furnace
JPH0329311Y2 (en)
JP4139578B2 (en) Raw material charging method to blast furnace
JPH0421814Y2 (en)
JPH0128090B2 (en)
JP2723644B2 (en) Blast furnace raw material charging method
RU2007462C1 (en) Process of charging of blast furnace
JP2725318B2 (en) Blast furnace raw material charging method
JPH0754023A (en) Operation of blast furnace
SU992588A1 (en) Through charging device for blast furnace
JPH01500360A (en) Blast furnace charging equipment
JP2808344B2 (en) Blast furnace charging method
JPH02259005A (en) Method for charging raw material in blast furnace
JPH05179320A (en) Raw material charging method for bell-less blast furnace