JPS624082Y2 - - Google Patents

Info

Publication number
JPS624082Y2
JPS624082Y2 JP1980119880U JP11988080U JPS624082Y2 JP S624082 Y2 JPS624082 Y2 JP S624082Y2 JP 1980119880 U JP1980119880 U JP 1980119880U JP 11988080 U JP11988080 U JP 11988080U JP S624082 Y2 JPS624082 Y2 JP S624082Y2
Authority
JP
Japan
Prior art keywords
panel
frame
side wall
floor panel
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1980119880U
Other languages
Japanese (ja)
Other versions
JPS5742014U (en
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP1980119880U priority Critical patent/JPS624082Y2/ja
Publication of JPS5742014U publication Critical patent/JPS5742014U/ja
Application granted granted Critical
Publication of JPS624082Y2 publication Critical patent/JPS624082Y2/ja
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 本考案は、プレハブ住宅等の屋上部において設
置される塔屋(ペントハウス)の側壁パネルの取
付構造に関する。
[Detailed Description of the Invention] The present invention relates to a structure for mounting a side wall panel of a penthouse installed on the roof of a prefabricated house or the like.

従来においては、溝を内部に向けて組まれたフ
レームの両面に外装材を張つて側壁パネルが構成
されており、従つて現場でフレームに内面側から
外面側へ向けてボルトを通すことができないの
で、フレームに穿孔した透孔の内面にナツトを予
め溶着させてあつた。そして、この側壁パネルを
床パネルの上に立て、床パネルの側から側壁パネ
ルの下枠部へ向けてボルトを通し、ボルトを側壁
パネルに溶着されたナツトに螺着させていた。従
つて、側壁パネルと床パネルとを連結する場合に
は、側壁パネルを床パネルの上に立てた状態にお
いて、床パネルの下へ手をいれてボルトを通す孔
が見えない状況で下から上へ向けて床パネルにボ
ルトを挿通させ、床パネルの下でボルトを回して
側壁パネルのフレームに溶着されたナツトに螺合
させなければならず、施工が困難であつた。
Conventionally, side wall panels are constructed by pasting exterior materials on both sides of a frame with grooves facing inward, making it impossible to pass bolts through the frame from the inside to the outside on site. Therefore, a nut was previously welded to the inner surface of the hole drilled in the frame. Then, this side wall panel was erected on a floor panel, and bolts were passed from the floor panel side toward the lower frame of the side wall panel, and the bolts were screwed into nuts welded to the side wall panel. Therefore, when connecting a side wall panel and a floor panel, with the side wall panel standing on the floor panel, put your hand under the floor panel and connect it from bottom to top without being able to see the holes for the bolts. Construction was difficult because it was necessary to insert a bolt through the floor panel towards the side, turn the bolt under the floor panel, and screw it into a nut welded to the frame of the side wall panel.

本考案は叙上の従来例の欠点に鑑みてなされた
ものであり、その目的とするところは側壁パネル
から床パネルへボルトを打つて側壁パネルを取り
付けることができ、施工の容易な塔屋の側壁パネ
ルの取付構造を提供することにある。
This invention was made in view of the drawbacks of the conventional examples mentioned above, and its purpose is to attach the side wall panel to the floor panel by driving bolts from the side wall panel to the floor panel. The purpose is to provide a panel mounting structure.

本考案塔屋の側壁パネルの取付構造は、側壁パ
ネル4,4′のフレーム28をチヤネル鋼により
構成し、このフレーム28の前枠部31や後枠部
等の端縦材のチヤネル鋼の溝を外方に向けてフレ
ーム28外面に上下方向の溝部32を形成し、溝
部32の下端底部に突出したフレーム28の下枠
部33端部に透孔34を穿孔し、床パネル2の側
部に立てた側壁パネル4,4′の溝部32から上
記透孔34にボルト41を挿通してボルト41を
床パネル2に螺着させて成ることを特徴とするも
のである。しかして、側壁パネル4,4′の端縦
材の溝部32からボルト41を入れて下枠材33
から床パネル2へボルト41を打つことができ、
即ち上から下へ向けてボルト41を打つことがで
き、透孔34を目で確認しながらボルト41を通
すことができ、又ボルト41を回して締める作業
も上方から行えて側壁パネル4,4′のボルト止
め施工を容易に行えるものである。
The mounting structure of the side wall panels of the tower house of the present invention is such that the frame 28 of the side wall panels 4, 4' is made of channel steel, and the channel steel grooves of the end vertical members such as the front frame 31 and rear frame of this frame 28 are installed. A vertical groove 32 is formed on the outer surface of the frame 28 facing outward, and a through hole 34 is bored at the end of the lower frame 33 of the frame 28 protruding from the bottom of the lower end of the groove 32. This is characterized in that bolts 41 are inserted into the through holes 34 from the grooves 32 of the upright side wall panels 4, 4', and the bolts 41 are screwed onto the floor panel 2. Then, insert the bolts 41 through the grooves 32 of the end vertical members of the side wall panels 4, 4', and insert the bolts 41 into the lower frame member 33.
Bolts 41 can be driven from to floor panel 2,
That is, the bolts 41 can be driven from the top to the bottom, the bolts 41 can be inserted while visually checking the through holes 34, and the bolts 41 can be turned and tightened from above. ’ can be easily bolted.

以下本考案を添付図により詳述する。図中2は
床パネルを示しある。即ち、チヤネル鋼を組んで
フレーム8を形成し、前方に階段用開口部1を残
してフレーム8の背方上面に床材9を貼着し、更
にフレーム8の前端部上面に左右に亘つて土台1
0を架設してフレーム8の全部の補強を行い、ま
たフレーム8の両側面に夫々結合金物3,3′を
ボルト17とナツト18で複数列に固着させて結
合金物3,3′の上片3a,3a′を上方へ突出さ
せ、結合金物3,3′の上片3a,3a′に夫々透
孔11,11′をあけ、最前列の結合金物3のみ
の透孔11の下にナツト12を溶着させて床パネ
ル2が形成されている。この床パネル2は建物1
3用の屋根パネル14と同じ規格寸法に形成され
ているものであつて、現場において建物13の屋
上部15に敷設された屋根パネル14の間に第3
図のように嵌込まれ、床パネル2のフレーム8と
屋根パネル14のフレーム21との間の隙間に第
5図に示すような形金物16を介し、床パネル
2の下方から形金物16をボルト19とナツト
20で両フレーム8,21に固定して第4図に示
すように床パネル2が屋根パネル14に連結され
る。また床パネル2のフレーム8の後端部は第6
図に示すようなL形金物22を用いて建物13の
壁パネル23上端に固定される。24は屋根梁で
ある。あるいは床パネル2の後端部は第16図の
ように断面略コ字状の床パネル補強材25により
壁パネル23上端に固定しても良い。26は床パ
ネル軒先補強材である。このようにして屋上部1
5に設置された床パネル2の階段用開口部1の下
には第17図に示すように階段用開口部1と連通
するように階段27が設けられている。図中4,
4′は左右1対の側壁パネルであり、チヤネル鋼
により後部が斜め下りとなつた台形状にフレーム
28を形成し、フレーム28の内外に夫々内装材
29と外装材30とを貼着してある。フレーム2
8の前枠部31はチヤネル鋼の溝を外側に向けて
あつて、フレーム28の前部に上下に亘つて溝部
32を形成されており、フレーム28の下枠部3
3の端は溝部32の開口縁まで突出していてここ
に透孔34を穿孔されている。更にフレーム28
の下枠部33には床パネル2の結合金物3′と対
応して等ピツチで透孔34′を穿孔してその上に
ナツト12′を溶着させてある。35は溝部32
の内面側上下と対応する内装材29の角をL状に
切欠して設てた切欠部であり、36はフレーム2
8の縦棧37の上端部内面と対応する内装材29
の上端をU字状に切欠して形成した切欠部であ
り、両切欠部35,36の位置において前枠部3
1もしくは縦棧37に夫々透孔38,39を穿孔
してあり、更に縦棧37の透孔39の内面にはナ
ツト40を溶着してある。しかして床パネル2両
側(即ち、結合金物3,3′)の上面に夫々側壁
パネル4,4′を立て、第7図乃至第9図に示す
ように、溝部32内から下枠部33前端の透孔3
4にボルト41を通して最前列の結合金物3のナ
ツト12を螺着し、側壁パネル4,4′を保持し
つつ更に第10図及び第11図に示すように、残
りの結合金物3′の透孔11′に下方からボルト4
1′を通して下枠部33のナツト12′に螺着して
側壁パネル4,4′を結合金物3,3′に立装固定
する。図中6は背壁パネルであり、チヤネル鋼に
より形成されたフレーム42の内外両面に夫々内
装材43と外装材44とを貼着してあり、予じめ
アルミサツシの窓45を組込んである。また内装
材43の上下左右の四隅をL状に切欠して背壁パ
ネル6の内面四隅に組立作業用の孔46を開口し
てあり、上方の組立作業用の孔46の高さにおい
てフレーム42の両側面に嵌合突部47を突設
し、上下左右の組立作業用の孔46の高さにおい
てフレーム42の両側面及び嵌合突部47の透孔
48を穿孔してある。図中5は左右の一方の出入
り口49を開口したり出入り口付きパネルであ
り、チヤネル鋼で形成したフレーム50の内外に
夫々内装材51と外装材52とを貼着してある。
更にフレーム50の両側面上下には、側壁パネル
4,4′の前端部の切欠部35と対向するように
嵌合突部53を突設し、嵌合突部53とフレーム
50の側面に透孔54を穿孔し、透孔54の裏に
ナツト55を溶着させてある。しかし背壁パネル
6と出入り口付きパネル5は側壁パネル4,4′
間に互いに対向するように立てられるものであ
る。すなわち、第12図に示すように、背壁パネ
ル6の嵌合突部47を側壁パネル4,4′の最も
後方の切欠部36内に上方から嵌込むようにして
背壁パネル6を側壁パネル4,4′間の後部に位
置決めして垂直に立て、上方の組立て作業用の孔
46から上方の透孔48にボルト56を通し、ボ
ルト56を側壁パネル4,4′のナツト40を螺
着させて背壁パネル6の上部を側壁パネル4,
4′に固定する。背壁パネル6の下部の固定は、
例えば、第13図aに示すように、側壁パネル
4,4′の後部の縦棧37の下部及び内装材29
に透孔39′を穿孔してその内面にナツト40″を
溶着し、背壁パネル6の下方の組立て作業用の孔
46から下方の透孔48にボルト56″を通し、
ボルト56″を側壁パネル4,4′のナツト40″
に螺着させるようにすれば良い。あるいは第13
図bに示すように、背壁パネル6のフレーム42
の両側面下部にも嵌合突部47′を突設し、側壁
パネル4,4′の内装材29の後方下部を逆U字
状に切欠いて下方の嵌合突部47′と嵌合する切
欠部36′を設け、背壁パネル6の上下の嵌合突
部47,47′を側壁パネル4,4′の上下の切欠
部36,36′に嵌合させるようにしても良い。
なお、組立て順序は一方の側壁パネル4又は4′
→背壁パネル6→他方の側壁パネル4′又は4で
も差支えない。次に出入り口付きパネル5の両側
上下の嵌合突部53を側壁パネル4,4′の前端
上下の切欠部35内に前方から嵌込むようにして
出入り口付きパネル5の位置決めを行ない、同時
に出入り口付きパネル5の下端を土台10の上に
載置して側壁パネル4,4′間の前部に出入り口
付きパネル5を立て、第8図及び第14図に示す
ように、側壁パネル4,4′の溝部32内から前
枠部31の透孔38にボルト57を通し、このボ
ルト57を出入り口付きパネル5のナツト55に
螺着させて出入り口付きパネル5を側壁パネル
4,4′に固定し、更に土台10から出入り口付
きパネル5下面にボルト58を螺入させて出入り
口付きパネル5を土台10に固定する。図中7は
チヤネル鋼により組込んだフレーム59の上面に
上面板60を貼着させた天井パネルであり、天井
パネル7のフレーム59両側面には側壁パネル
4,4′の切欠部35,36と対向するように複
数個の係合突出部61を突設してあり、各係合突
出部61の位置においてフレーム59に夫々透孔
62,62′を穿孔してあり、最も前方の透孔6
2の内面にはナツト40′を溶着してある。しか
して天井パネル7の係合突出部61を側壁パネル
4,4′上縁の切欠部35,36に上方から嵌め
込んで天井パネル7を背壁パネル6及び出入り口
付きパネル5の上に載置し、側壁パネル4,4′
の溝部32内から前枠部31の透孔38にボルト
56′を通し、天井パネル7の最も前方のナツト
40′に螺着し、天井パネル7の下面から他の透
孔62′にボルト56を通し、側壁パネル4,
4′の縦棧37の上部のナツト40に螺着して天
井パネル7を側壁パネル4,4′に固定する。こ
こで天井パネル7の下面から透孔62′にボルト
56を打てるようにするためには、天井パネル7
の下面板63を後張りするようにしても良く、あ
るいは背壁パネル6のように組立て作業用の孔を
下面板板63に開口するようにしても良い。この
ようにして塔屋Pが構築されることになり、更に
床パネル2の周囲上面の隙間において塔屋Pの室
内側から内装材64を貼つて隙間を隠し、組立て
作業用の孔46も内装材等で隠し、各パネル間の
結合部分にはコーキング材等を充填して水密処理
を施しても良い。また建物13の屋根パネル14
の上方には、第1図に示すように屋根材65が葺
設されるが、このとき天井パネル7の上にも同じ
屋根材65を葺設することができ、また床パネル
2の周囲上面の隙間に沿て塔屋Pの外面に水切り
装置66を取付けて隙間を覆い隠し塔屋P内に雨
水が浸入するのを防止する。出入り口付きパネル
5の出入り口49にはドア67が取付けられ、ま
た天井パネル7には照射器具等を配設しても良い
が、ドア67や照明器具は最初から出入り口付き
パネル5や天井パネル7に取付けてあつても差支
えないものである。更に床パネル2の階段用開口
部1の直接に階段27と連通していない半面には
床材9′を貼つて踊り場を形成される。68は出
入口49付近に設けられた屋上床である。
The present invention will be explained in detail below with reference to the accompanying drawings. In the figure, 2 indicates the floor panel. That is, a frame 8 is formed by assembling channel steel, a flooring material 9 is pasted on the upper back surface of the frame 8 leaving an opening 1 for stairs in the front, and a flooring material 9 is attached to the upper surface of the front end of the frame 8 from left to right. Foundation 1
0 is constructed to reinforce the entire frame 8, and the upper pieces of the joints 3, 3' are secured by fixing the joints 3, 3' in multiple rows to both sides of the frame 8 with bolts 17 and nuts 18, respectively. 3a, 3a' project upward, through-holes 11, 11' are formed in the upper pieces 3a, 3a' of the metal fittings 3, 3', respectively, and a nut 12 is inserted under the through-hole 11 of only the metal fitting 3 in the front row. The floor panel 2 is formed by welding. This floor panel 2 is building 1
The third roof panel 14 is formed to the same standard dimensions as the third roof panel 14.
The shaped hardware 16 is inserted into the gap between the frame 8 of the floor panel 2 and the frame 21 of the roof panel 14 as shown in the figure, and is inserted from below the floor panel 2 through the shaped hardware 16 as shown in FIG. The floor panel 2 is connected to the roof panel 14 by fixing it to both frames 8 and 21 with bolts 19 and nuts 20, as shown in FIG. Also, the rear end of the frame 8 of the floor panel 2 is located at the sixth
It is fixed to the upper end of a wall panel 23 of the building 13 using an L-shaped hardware 22 as shown in the figure. 24 is a roof beam. Alternatively, the rear end of the floor panel 2 may be fixed to the upper end of the wall panel 23 by a floor panel reinforcing member 25 having a substantially U-shaped cross section as shown in FIG. 26 is a floor panel eave reinforcement material. In this way, rooftop 1
As shown in FIG. 17, a staircase 27 is provided below the staircase opening 1 of the floor panel 2 installed in the floor panel 5 so as to communicate with the staircase opening 1. 4 in the figure,
Reference numeral 4' designates a pair of left and right side wall panels, in which a frame 28 is formed of channel steel in the shape of a trapezoid with a diagonally downward slope at the rear, and an interior material 29 and an exterior material 30 are attached to the inside and outside of the frame 28, respectively. be. frame 2
The front frame part 31 of No. 8 has channel steel grooves facing outward, and a groove part 32 is formed vertically in the front part of the frame 28.
The end of 3 protrudes to the opening edge of the groove 32, and a through hole 34 is bored there. Furthermore, frame 28
Through holes 34' are bored at equal pitches in the lower frame portion 33 of the floor panel 2 in correspondence with the metal fittings 3' of the floor panel 2, and nuts 12' are welded thereon. 35 is the groove portion 32
36 is a notch provided by cutting out an L-shaped corner of the interior material 29 corresponding to the upper and lower inner surfaces of the frame 2.
Interior material 29 corresponding to the inner surface of the upper end of the vertical beam 37 of No. 8
This is a notch formed by cutting out the upper end in a U-shape, and the front frame 3 is formed at the positions of both notches 35 and 36.
Through holes 38 and 39 are bored in each of the vertical rods 37 and 1, and a nut 40 is welded to the inner surface of the through hole 39 of the vertical rod 37. Then, the side wall panels 4 and 4' are erected on the upper surfaces of both sides of the floor panel 2 (i.e., the metal fittings 3 and 3'), and the front end of the lower frame part 33 is inserted from inside the groove part 32 as shown in FIGS. 7 to 9. Through hole 3
4 through the bolt 41 and the nut 12 of the front-row metal fitting 3, and while holding the side wall panels 4, 4', as shown in FIGS. Insert bolt 4 into hole 11' from below.
1' and screwed onto nuts 12' of the lower frame portion 33 to vertically fix the side wall panels 4, 4' to the joining metal fittings 3, 3'. Reference numeral 6 in the figure is a back wall panel, in which an interior material 43 and an exterior material 44 are adhered to both the inside and outside surfaces of a frame 42 made of channel steel, and an aluminum sash window 45 is pre-assembled therein. . In addition, holes 46 for assembly work are opened in the four corners of the inner surface of the back wall panel 6 by cutting out the four corners of the interior material 43 in an L shape, and the frame 42 is opened at the height of the holes 46 for assembly work in the upper part. Fitting protrusions 47 are provided protrudingly on both sides of the frame 42, and through holes 48 of the fitting protrusions 47 and on both sides of the frame 42 are bored at the height of the holes 46 for vertical and horizontal assembly operations. In the figure, reference numeral 5 denotes a panel with an entrance/exit opening 49 on either side, and an interior material 51 and an exterior material 52 are adhered to the inside and outside of a frame 50 made of channel steel, respectively.
Furthermore, fitting protrusions 53 are provided on the upper and lower sides of both sides of the frame 50 so as to face the notches 35 at the front ends of the side wall panels 4 and 4'. A hole 54 is bored and a nut 55 is welded to the back of the through hole 54. However, the back wall panel 6 and the doorway panel 5 are the side wall panels 4 and 4'.
They are placed facing each other in between. That is, as shown in FIG. 12, the fitting protrusions 47 of the back wall panel 6 are fitted into the rearmost notches 36 of the side wall panels 4, 4' from above, and the back wall panel 6 is attached to the side wall panels 4, 4'. 4', stand vertically, pass the bolt 56 from the upper assembly hole 46 to the upper through hole 48, and screw the bolt 56 into the nut 40 of the side wall panels 4, 4'. The upper part of the back wall panel 6 is attached to the side wall panel 4,
Fix it at 4'. Fixing the lower part of the back wall panel 6 is as follows:
For example, as shown in FIG.
A through hole 39' is bored in the hole 39', a nut 40'' is welded to the inner surface of the through hole 39', a bolt 56'' is passed from the lower assembly hole 46 of the back wall panel 6 to the lower through hole 48,
Attach the bolt 56" to the nut 40" on the side wall panels 4 and 4'.
All you have to do is screw it on. Or the 13th
As shown in Figure b, the frame 42 of the back wall panel 6
Fitting protrusions 47' are also protruded from the lower parts of both sides of the panel, and the rear lower part of the interior material 29 of the side wall panels 4, 4' is cut out in an inverted U shape to fit with the lower fitting protrusions 47'. A notch 36' may be provided so that the upper and lower fitting protrusions 47, 47' of the back wall panel 6 are fitted into the upper and lower notches 36, 36' of the side wall panels 4, 4'.
The assembly order is one side wall panel 4 or 4'.
→ back wall panel 6 → other side wall panel 4' or 4 may also be used. Next, the panel 5 with an entrance is positioned by fitting the fitting protrusions 53 on both sides and upper and lower sides of the panel 5 with an entrance into the notches 35 on the upper and lower front ends of the side wall panels 4, 4' from the front, and at the same time, the panel 5 with an entrance 5 is positioned. Place the lower end on the base 10 and erect the panel 5 with an entrance and exit at the front between the side wall panels 4 and 4', and as shown in FIGS. Pass the bolt 57 through the through hole 38 of the front frame part 31 from inside 32, screw this bolt 57 into the nut 55 of the panel 5 with an entrance/exit, and fix the panel 5 with an entrance/exit to the side wall panels 4, 4'. A bolt 58 is screwed into the lower surface of the panel 5 with an entrance/exit from 10 to fix the panel 5 with an entrance/exit to the base 10. In the figure, 7 is a ceiling panel in which a top plate 60 is attached to the top surface of a frame 59 assembled with channel steel. A plurality of engaging protrusions 61 are provided to protrude so as to face each other, and through holes 62 and 62' are bored in the frame 59 at the positions of the respective engaging protrusions 61. 6
A nut 40' is welded to the inner surface of 2. Then, the engaging projections 61 of the ceiling panel 7 are fitted into the notches 35, 36 on the upper edges of the side wall panels 4, 4' from above, and the ceiling panel 7 is placed on the back wall panel 6 and the panel 5 with an entrance/exit. and side wall panels 4, 4'
Pass the bolt 56' through the through hole 38 of the front frame part 31 from inside the groove 32 of the ceiling panel 7, screw it into the frontmost nut 40' of the ceiling panel 7, and insert the bolt 56' into the other through hole 62' from the lower surface of the ceiling panel 7. through the side wall panel 4,
The ceiling panel 7 is fixed to the side wall panels 4, 4' by screwing into the nuts 40 at the top of the vertical beams 37 at 4'. Here, in order to be able to drive the bolt 56 into the through hole 62' from the bottom surface of the ceiling panel 7,
The lower plate 63 may be attached later, or holes for assembly work may be opened in the lower plate 63 as in the back wall panel 6. In this way, the tower P is constructed, and the interior material 64 is pasted from the indoor side of the tower P in the gap on the upper surface of the periphery of the floor panel 2 to hide the gap, and the hole 46 for assembly work is also filled with interior material etc. The joints between each panel may be filled with caulking material to make them watertight. Also, the roof panel 14 of the building 13
A roofing material 65 is installed above the ceiling panel 7 as shown in FIG. A draining device 66 is attached to the outer surface of the tower house P along the gap to cover the gap and prevent rainwater from entering the tower house P. A door 67 is attached to the entrance/exit 49 of the panel 5 with an entrance/exit, and irradiation equipment etc. may be installed on the ceiling panel 7, but the door 67 and lighting equipment are not attached to the panel 5 with an entrance/exit or the ceiling panel 7 from the beginning. There is no problem even if it is installed. Furthermore, a landing is formed by pasting flooring material 9' on the half of the stairway opening 1 of the floor panel 2 that does not directly communicate with the stairway 27. 68 is a rooftop floor provided near the entrance/exit 49.

なお、上記実施例では端縦材のうち前枠材31
にのみ本考案を実施したものを説明したが、後枠
材(番号を付さない)にも本考案を実施してもよ
いのは明らかである。
In addition, in the above embodiment, the front frame member 31 among the end vertical members
Although the present invention has been described only for the rear frame material (not numbered), it is obvious that the present invention may be applied to the rear frame material (not numbered).

本考案は叙述の如く側壁パネルのフレームをチ
ヤネル鋼により構成し、このフレームの前枠部や
後枠部等の端縦材のチヤネル鋼の溝を外方に向け
てフレーム外面に上下方向の溝部を形成し、溝部
の下端底部においてフレームの下枠部に透孔を穿
孔し、床パネルの側部に立てた側壁パネルの溝部
から上記透孔にボルトを挿通してボルトを床パネ
ルに螺着させてあるから、予じめ内装材や外装材
を貼着して組上げられている側壁パネルであつて
も側壁パネルの側から床パネルの側へボルトを打
つことができ、すなわち床パネルの下側から上方
へ向けてでなく床パネルの上方から下方へ向けて
ボルトを打つことができ、床パネルと屋根パネル
との間の隙間から手をもぐり込ませてボルトを締
めたりする必要がなく、側壁パネルの取付け作業
を簡単に行なえる利点がある。更に床パネル側か
ら側壁パネル側へ向けてボルトを打たなければな
らない場合にも、先に側壁パネル側から床パネル
側へボルトを打つておくと側壁パネルを簡単に仮
保持でき、補助者の側壁パネルを支える作業を軽
減でき、必要な補助者の数を減らせて省力を図れ
るという利点がある。
As described above, the present invention consists of a side wall panel frame made of channel steel, and vertical grooves are formed on the outer surface of the frame by directing the channel steel grooves of the end vertical members such as the front frame and rear frame of the frame outward. A through hole is formed in the lower frame of the frame at the bottom of the lower end of the groove, and a bolt is inserted into the hole through the groove of the side wall panel erected on the side of the floor panel, and the bolt is screwed into the floor panel. Therefore, even if the side wall panel has been assembled with interior and exterior materials attached in advance, bolts can be driven from the side wall panel side to the floor panel side. Bolts can be driven from the top to the bottom of the floor panel rather than from the side upwards, eliminating the need to insert your hand into the gap between the floor panel and roof panel to tighten the bolts. This has the advantage that the side wall panel installation work can be done easily. Furthermore, even if you have to drive bolts from the floor panel side to the side wall panel side, driving the bolts from the side wall panel side to the floor panel side first will make it easier to temporarily hold the side wall panel, and will require help from an assistant. This has the advantage of reducing the work required to support the side wall panels, reducing the number of required assistants, and saving labor.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案の一実施例を示す背壁パネル側
からの斜視図、第2図は同上の中間施工状態を示
す斜視図、第3図は第2図の分解斜視図、第4図
は同上の床パネルと建物の屋根パネルとの連結方
法を示す断面図、第5図は第4図の分解斜視図、
第6図は床パネルの後端部と壁パネルの上端部と
の連結方法を示す分解斜視図、第7図、第8図及
び第9図は夫々第2図のA部を示す分解斜視図、
一部切欠した正面図及び一部切欠した側面図、第
10図及び第11図は夫々第2図のB部を示す縦
断面図及び一部切欠した側面図、第12図は第2
図のC−C線断面図、第13図a,bは夫々第2
図のD−D線断面の部分の一例及び他例を示す断
面図、第14図は第2図のE部を示す一部切欠し
た正面図、第15図は第2図のF−F線断面図、
第16図は組立てられた塔屋の縦断面図、第17
図は屋上部に塔屋を設置した建物を示す断面図で
ある。 2……床パネル、4,4′……側壁パネル、2
8……フレーム、31……前枠部、32……溝
部、33……下枠部、34……透孔、41……ボ
ルト。
Fig. 1 is a perspective view from the back wall panel side showing an embodiment of the present invention, Fig. 2 is a perspective view showing an intermediate construction state of the same as above, Fig. 3 is an exploded perspective view of Fig. 2, and Fig. 4 is a sectional view showing the method of connecting the floor panel and the roof panel of the building, FIG. 5 is an exploded perspective view of FIG. 4,
FIG. 6 is an exploded perspective view showing how to connect the rear end of the floor panel and the top end of the wall panel, and FIGS. 7, 8, and 9 are exploded perspective views showing section A in FIG. 2, respectively. ,
A partially cutaway front view and a partially cutaway side view, FIGS. 10 and 11 are a vertical cross-sectional view and a partially cutaway side view showing the B section of FIG. 2, respectively, and FIG. 12 is a partially cutaway side view of the
The cross-sectional view taken along the line C-C in the figure, Figures 13a and b are the second
14 is a partially cutaway front view showing section E in FIG. 2, and FIG. 15 is a sectional view taken along line FF in FIG. 2. cross section,
Figure 16 is a vertical sectional view of the assembled tower house, Figure 17
The figure is a sectional view showing a building with a tower on the roof. 2...Floor panel, 4,4'...Side wall panel, 2
8... Frame, 31... Front frame, 32... Groove, 33... Lower frame, 34... Through hole, 41... Bolt.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 側壁パネルのフレームをチヤネル鋼により構成
し、このフレームの前枠部や後枠部等の端縦材の
チヤネル鋼の溝を外方に向けてフレーム外面に上
下方向の溝部を形成し、溝部の下端底部に突出し
たフレームの下枠部端部に透孔を穿孔し、床パネ
ルの側部に立てた側壁パネルの溝部から上記透孔
にボルトを挿通してボルトを床パネルに螺着させ
て成る塔屋の側壁パネルの取付構造。
The frame of the side wall panel is made of channel steel, and the channel steel grooves of the end vertical members such as the front frame and rear frame of this frame are directed outward to form vertical grooves on the outer surface of the frame. A through hole is drilled at the end of the lower frame of the frame that protrudes from the bottom of the lower end, and a bolt is inserted into the through hole through the groove of the side wall panel erected on the side of the floor panel, and the bolt is screwed into the floor panel. The mounting structure of the side wall panels of the tower building.
JP1980119880U 1980-08-22 1980-08-22 Expired JPS624082Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1980119880U JPS624082Y2 (en) 1980-08-22 1980-08-22

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1980119880U JPS624082Y2 (en) 1980-08-22 1980-08-22

Publications (2)

Publication Number Publication Date
JPS5742014U JPS5742014U (en) 1982-03-06
JPS624082Y2 true JPS624082Y2 (en) 1987-01-29

Family

ID=29480536

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1980119880U Expired JPS624082Y2 (en) 1980-08-22 1980-08-22

Country Status (1)

Country Link
JP (1) JPS624082Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2603239B2 (en) * 1987-02-20 1997-04-23 旭化成工業株式会社 Frame

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5244351U (en) * 1975-09-26 1977-03-29

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5835764Y2 (en) * 1978-12-11 1983-08-12 松下電工株式会社 Connection device between exterior wall panels and floor panels on upper and lower floors

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5244351U (en) * 1975-09-26 1977-03-29

Also Published As

Publication number Publication date
JPS5742014U (en) 1982-03-06

Similar Documents

Publication Publication Date Title
US6715248B2 (en) Building curtain wall with sill anchor assembly
US20100083595A1 (en) System for fabricating an aperture in a structure
JPS624082Y2 (en)
JPS6037264B2 (en) tower house
JPS6346816B2 (en)
JPH0681410A (en) Through panel of framework in wooden building
JPS637601Y2 (en)
JPH0347097Y2 (en)
JPH0732679Y2 (en) External wall panel mounting structure
JPS5841310Y2 (en) balcony handrail
JP2815635B2 (en) Building unit with eaves ceiling
JP3355453B2 (en) Structure of a wall with an opening
JPS6210327Y2 (en)
JP2505125B2 (en) Bathroom washbasin unit
JPH0320434Y2 (en)
JPH079998Y2 (en) Opening frame support structure
JPH01127749A (en) External wall panel
JPH0732678Y2 (en) Exterior wall panel
JPH0349032Y2 (en)
JPS6020732Y2 (en) torso difference
JP3037195B2 (en) Eave ceiling mounting structure
AU620475B2 (en) Modular building panel
JPH022870Y2 (en)
JP2500042B2 (en) Door gable mounting structure
JPS6317761Y2 (en)