JPS62233358A - Construction of concrete floor panel - Google Patents

Construction of concrete floor panel

Info

Publication number
JPS62233358A
JPS62233358A JP7621286A JP7621286A JPS62233358A JP S62233358 A JPS62233358 A JP S62233358A JP 7621286 A JP7621286 A JP 7621286A JP 7621286 A JP7621286 A JP 7621286A JP S62233358 A JPS62233358 A JP S62233358A
Authority
JP
Japan
Prior art keywords
concrete floor
concrete
beams
locking
floor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP7621286A
Other languages
Japanese (ja)
Other versions
JPH0623460B2 (en
Inventor
淳 中川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOKEN SEKKEI KENKYUSHO KK
Original Assignee
KOKEN SEKKEI KENKYUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOKEN SEKKEI KENKYUSHO KK filed Critical KOKEN SEKKEI KENKYUSHO KK
Priority to JP7621286A priority Critical patent/JPH0623460B2/en
Publication of JPS62233358A publication Critical patent/JPS62233358A/en
Publication of JPH0623460B2 publication Critical patent/JPH0623460B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、建造物のコンクリート床板の施工法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] This invention relates to a method of constructing concrete floor plates for buildings.

〔従来技術〕[Prior art]

従来、水平支保梁を使用するコンクリート床板の施工法
は、一般に水平支保染上に型枠を設置し、その上に鉄筋
コンクリートの床を打ち、水平支保梁および型枠を撤去
する工法が実施されている。
Conventionally, the method of constructing concrete slabs using horizontal support beams was to install formwork on the horizontal support beams, pour a reinforced concrete floor on top of it, and then remove the horizontal support beams and formwork. There is.

〔この発明が解決すべき問題点〕[Problems to be solved by this invention]

しかしこの従来の工法では、支保梁および型枠の撤去に
手間がかかり、かつ打設された床板の下側において高重
量の支保梁の解体撤去作業をするという作業員による高
所危険作業が必要である等の問題点があった。
However, with this conventional construction method, it is time-consuming to remove the support beams and formwork, and it requires workers to dismantle and remove the heavy support beams under the cast floorboards, which is dangerous work at high places. There were problems such as:

この発明は前述した事情に鑑み創案されたもので、その
目的は型枠の撤去作業を必要とせず、しかも支保梁の撤
去作業を安全かつ容易に行うことができるコンクリート
床板の施工法を提供することにある。
This invention was devised in view of the above-mentioned circumstances, and its purpose is to provide a method for constructing concrete floor plates that does not require the removal of formwork and that allows the removal of support beams to be carried out safely and easily. There is a particular thing.

〔問題点を解決するための手段〕[Means for solving problems]

この発明によれば型枠に堰板を使用して、コンクリート
打設後にコンクリート床板として一体化させる。また堰
板を支持する支保梁は、構造用の梁への係止解除および
解除後の吊り下げ降下撤去を、コンクリート打設後のコ
ンクリート床板上面から行えるようにして、梁間に係止
して架渡すこととする。
According to this invention, a weir plate is used in the formwork and is integrated as a concrete floor plate after concrete is poured. In addition, the support beams that support the weir plates are fixed between the beams so that they can be released from the structural beams and then lowered and removed from the top of the concrete floor plate after concrete is poured. I will give it to you.

そして型枠の撤去作業を無くすと共に、支保梁の撤去作
業を成形後のコンクリート床板上面で作業員が安全かつ
容易に行えるようにしたものである。
This eliminates the work of removing the formwork, and allows workers to safely and easily remove the supporting beams from the top of the formed concrete floor plate.

〔実 施 例〕〔Example〕

以下この発明を図示する実施例によって説明する。 The present invention will be explained below with reference to illustrated embodiments.

まずこの発明方法を行うべく支保梁1を梁2に係止させ
る係止金具3を説明する。
First, the locking fitting 3 for locking the support beam 1 to the beam 2 in order to carry out the method of this invention will be explained.

係止金具3は、支保梁1が取付けられる取付部材4と、
梁2に係止する係止部材5と、この係止部材5の上端面
に立設されており、少なくとも成形されるコンクリート
床板6の厚さと同じ距離の立設長さを有するケーシング
パイプ7、と取付部材4側から取付部材4゜係止部材5
およびケーシングパイプ7内を貫通していると共に、ケ
ーシングパイプ7の立設端に螺合ナツト8により固定さ
れており、ケーシングパイプ7内から突出する先端部に
ローブ9の取付は用孔10aが設けられている吊持用ボ
ルト10とからなっている。(第5図、第6図参照) このような構成からなる係止金具3を使用して、この発
明方法によりコンクリート床板6を施工するに際しては
、まず支保梁lの長手方向両端部に、係止金具3をその
取付部材4にボルト接合することで取付ける。そしてこ
の支保梁1を梁2,2間に、係止金具3の係止部材5を
係止させることで架渡す。(第1図、第5図参照) 次に架渡した支保梁1の上端面上に、堰板11を載置し
て支保梁1で支持されるようにする。その後この堰板1
1上に鉄筋12の配筋等を行ってから、コンクリート1
3の打設を行う。(第2図参照) 次に打設コンクリートが硬化してコンクリート床板6の
成形が完了したら、吊持用ボルト10の取付は用孔LO
aにロー19を巻回して取付ける。その後ナツト8の吊
持用ボルト10への螺合を解除して、ローブ9を人力お
よびウィンチ等の機械力によりケーシングパイプ7内へ
繰り出す。
The locking fitting 3 includes a mounting member 4 to which the support beam 1 is attached;
a locking member 5 that locks onto the beam 2; a casing pipe 7 that is erected on the upper end surface of the locking member 5 and has an erected length that is at least the same distance as the thickness of the concrete floor plate 6 to be formed; and from the mounting member 4 side to the mounting member 4゜locking member 5
It passes through the inside of the casing pipe 7 and is fixed to the standing end of the casing pipe 7 with a screw nut 8, and a hole 10a is provided at the tip end protruding from the inside of the casing pipe 7 for installing the lobe 9. It consists of a suspension bolt 10 which is attached to the suspension bolt 10. (See Figures 5 and 6) When constructing the concrete floor plate 6 by the method of the present invention using the locking metal fittings 3 having such a configuration, first attach the locking metal fittings 3 to both longitudinal ends of the supporting beam l. The fastener 3 is attached to the attachment member 4 by bolting. Then, this support beam 1 is bridged by locking the locking member 5 of the locking fitting 3 between the beams 2, 2. (See FIGS. 1 and 5) Next, the weir plate 11 is placed on the upper end surface of the supporting beam 1 that has been constructed so that it is supported by the supporting beam 1. After that, this weir plate 1
After placing reinforcing bars 12 on top of 1, concrete 1
3. Perform pouring. (See Figure 2) Next, when the poured concrete has hardened and the concrete floor plate 6 has been formed, the suspension bolts 10 are installed in the holes LO.
Wind the row 19 around a and attach it. Thereafter, the nut 8 is unscrewed from the suspension bolt 10, and the lobe 9 is let out into the casing pipe 7 by human power or mechanical power such as a winch.

このことにより吊持用ボルト10は、その頭部tobで
、支保梁1に取付けた取付部材4を支持しながら降下、
即ち支保梁1を吊り下げながら降下させることになる。
As a result, the suspension bolt 10 descends while supporting the mounting member 4 attached to the support beam 1 with its head tob.
That is, the support beam 1 is lowered while being suspended.

(第3図。(Figure 3.

第5図参照) そしてこの降下作業を、第3図、第4図に示すごとく支
保梁1の一端部毎に行うか、または両端部で同時に行う
(図示せず)かして行い、支保梁lを撤去する。なお、
この時に支保梁1と、係止金具3の取付部材4とをビン
接合にて取付ければ、第3図におけるB部の状態となる
ことも容易に対処できる。
(See Figure 5) This lowering work is performed at each end of the support beam 1 as shown in Figures 3 and 4, or at both ends at the same time (not shown). Remove l. In addition,
At this time, if the support beam 1 and the attachment member 4 of the locking metal fitting 3 are attached by a pin joint, the situation shown in section B in FIG. 3 can be easily coped with.

このようにして堰体11を一体化したコンクリート床板
6の施工が完了する。
In this way, construction of the concrete floor plate 6 with the weir body 11 integrated therein is completed.

なお第7図〜第9図は、係止金具3の別態様を示すもの
である。
Note that FIGS. 7 to 9 show other embodiments of the locking metal fitting 3.

第7図のものは、吊持用ボルト10の頭部tabに、支
保梁1を取付ける取付は部10C一体形成したもので、
第1図に示したものに比べて取付部材4が必要なく部品
点数を減らすことができる。
In the one shown in FIG. 7, the mounting portion 10C for attaching the support beam 1 to the head tab of the suspension bolt 10 is integrally formed.
Compared to the one shown in FIG. 1, the mounting member 4 is not required and the number of parts can be reduced.

第8図のものは、吊持用ポル)10の全長をコンクリー
ト床板6の厚みよりも小さくすると共に、吊持用ボルト
10とナフト8とで取付部材4および係止部材5を直接
締付けている。またケーシングパイプ7を太くして、内
部においてナツト8の支持用ボルト10からの螺合解除
作業およびローブ9の取付用孔10への巻回作業を行え
るようにしたものである。
In the one shown in FIG. 8, the total length of the suspension pole 10 is made smaller than the thickness of the concrete floor plate 6, and the mounting member 4 and the locking member 5 are directly tightened with the suspension bolt 10 and napht 8. . Furthermore, the casing pipe 7 is made thicker so that the work of unscrewing the nut 8 from the support bolt 10 and the work of winding the lobe 9 into the mounting hole 10 can be carried out inside.

このようにすると、硬化成形されたコンクリート床板6
の上面から吊持用ボルトlOが突出することなく、コン
クリート床板6上での作業が円満に行えるようになる。
In this way, the hardened concrete floor plate 6
Work on the concrete floor plate 6 can be carried out smoothly without the suspension bolt lO protruding from the upper surface of the concrete floor plate 6.

第9図のものは、係止金具3への支保梁1の取付けを、
取付部材4に取付けた支保梁受はビーム14を介して行
うものである。
The one in Fig. 9 shows how to attach the supporting beam 1 to the locking fitting 3.
The supporting beam receiver is attached to the attachment member 4 via the beam 14.

このようにすると、支保梁受はビーム14がその長手方
向に複数の支保梁1の端部を受けることができるので、
複数の支保梁lを一度に降下撤去させることができる。
In this way, the beam 14 can receive the ends of a plurality of support beams 1 in the longitudinal direction of the support beam receiver, so that
A plurality of supporting beams l can be lowered and removed at the same time.

なお支保梁を梁間に係止して架渡す手段としては、前述
した各実施例のものに限らずに、この発明方法である硬
化形成されたコンクリート床板の上面で支保梁の係止解
除および解除後の吊り下げ降下撤去を行えるものならば
、どのようなものでもよい。         4゜〔
発明の効果〕 この発明は、以上のような構成からなり、次に述べる効
果を有する。
Note that the means for locking the support beams between the beams and constructing the bridge is not limited to the methods described in each of the above-mentioned embodiments. Any type of material may be used as long as it can be lowered and removed later. 4゜〔
Effects of the Invention] The present invention has the above configuration and has the following effects.

コンクリート床板打設用の堰板を支持する支保梁を、効
果形成後のコンクリート床板上面において係止解除およ
び係止解除後の吊り下げ降下作業が行えるようにして、
梁間に係止して架渡したことにより、支保梁の撤去作業
をコンクリート床板上で安全に行うことができる。
The support beam supporting the weir plate for concrete floor slab casting is made to be able to be unlatched on the upper surface of the concrete floor plate after the effect has been formed, and suspended and lowered after the locking is released,
By anchoring the structure between the beams, the removal work of the supporting beams can be carried out safely on the concrete floor plate.

またコンクリート床板の下部で撤去作業を行う時のよう
に、特別な機材を用いることもなく、容易に撤去作業を
行うことができる。
Further, the removal work can be easily carried out without using special equipment, unlike when removing work is carried out below the concrete floorboard.

さらに撤去作業が特別な機材を必要とすることなく、し
かも安全に行えることは、撤去作業を短時間で安価に行
えることとなる。そしてこのことにより、コンクリート
床板の施工作業全体も、短時間かつ安価に行えることと
なる。
Furthermore, the fact that the removal work can be carried out safely without requiring any special equipment means that the removal work can be carried out in a short time and at low cost. As a result, the entire concrete floor slab construction work can be completed in a short time and at low cost.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第4図はこの発明方法によるコンクリート床板
の施工方法を示す工程図、第5図は第2図のA部拡大断
面図、第6図は係止金具を示す斜視図、第7図および第
8図、第9図は係止金具の別態様を示す斜視図および拡
大断面図である。 1・・・・・・支保梁、2・・・・・・梁、3・・・・
・・係止金具、4・・・・・・取付部材、5・・・・・
・係止部材、6・・・・・・コンクリート床板、7・・
・・・・ケーシングパイプ、8・・・・・・ナツト、9
・・・・・・ローブ、1o・・・・・・吊持用ボルト、
10a・・・・・・取付は用孔、10b・・・・・・頭
部、10c・・・・・・取付は部、11・・・用堰板、
12・・・・・・鉄筋、13・旧・・コンクリート、1
4・・・・・・支保梁受はビーム。 第 1 図 113  図 第2図 第4rIJ 第6図     第71!! a8r7!J
Figures 1 to 4 are process diagrams showing the method of constructing concrete floor plates according to the method of the present invention, Figure 5 is an enlarged sectional view of section A in Figure 2, Figure 6 is a perspective view showing the locking fittings, and Figure 7 8 and 9 are a perspective view and an enlarged sectional view showing another embodiment of the locking fitting. 1... Support beam, 2... Beam, 3...
・・Lock fitting, 4・・Mounting member, 5・・・・
- Locking member, 6... Concrete floor plate, 7...
... Casing pipe, 8 ... Nut, 9
......Lobe, 1o...Hanging bolt,
10a... mounting hole, 10b... head, 10c... mounting part, 11... weir plate,
12...Reinforced steel, 13.Old...Concrete, 1
4・・・・・・The supporting beam support is a beam. Figure 1 Figure 113 Figure 2 Figure 4rIJ Figure 6 Figure 71! ! a8r7! J

Claims (1)

【特許請求の範囲】[Claims] (1)コンクリート床板打設用堰板を支持する仮設の支
保梁を梁間に、コンクリート打設後その上面から解除可
能に係止して架渡し、この支保梁の上に前記堰板および
鉄筋を配置した後コンクリートを打設し、 次にコンクリート硬化後前記支保梁の係止 硬化形成されたコンクリート床板上面から解除すると共
に、この係止解除された支保梁を、コンクリート床板上
面から吊り下げ降下させて撤去することを特徴とするコ
ンクリート床板の施工法。
(1) Temporary support beams supporting the weir plates for concrete floor slab placement are releasably locked between the beams after the concrete is poured, and the weir plates and reinforcing bars are placed on top of the support beams. After placement, concrete is poured, and then, after the concrete hardens, the locking of the support beam is released from the top surface of the hardened concrete floor plate, and the released support beam is suspended and lowered from the top surface of the concrete floor plate. A method of constructing concrete floor plates, which is characterized by removing them.
JP7621286A 1986-04-02 1986-04-02 Concrete floor board construction method Expired - Lifetime JPH0623460B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7621286A JPH0623460B2 (en) 1986-04-02 1986-04-02 Concrete floor board construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7621286A JPH0623460B2 (en) 1986-04-02 1986-04-02 Concrete floor board construction method

Publications (2)

Publication Number Publication Date
JPS62233358A true JPS62233358A (en) 1987-10-13
JPH0623460B2 JPH0623460B2 (en) 1994-03-30

Family

ID=13598868

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7621286A Expired - Lifetime JPH0623460B2 (en) 1986-04-02 1986-04-02 Concrete floor board construction method

Country Status (1)

Country Link
JP (1) JPH0623460B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7228467B2 (en) 2019-05-27 2023-02-24 信越化学工業株式会社 Group III compound substrate manufacturing method and Group III compound substrate

Also Published As

Publication number Publication date
JPH0623460B2 (en) 1994-03-30

Similar Documents

Publication Publication Date Title
JPH08199510A (en) Execution method of cast-in-place floor slab section of precast concrete girder and form thereof
JP2005105766A (en) Removable support beam
JPS62233358A (en) Construction of concrete floor panel
JPH0868007A (en) Structure of bridge, and construction method therefor
JPS61176731A (en) Mounting of weight member to concrete structure wall body
JPH0642184A (en) Construction of skeleton using half precast floor board
JPH108710A (en) Scaffolding member
JPS6347206Y2 (en)
JPH0412296Y2 (en)
JP3368360B2 (en) How to install a packer plate for equipment installation
JPS61155504A (en) Floor panel structure
JPS638260B2 (en)
JPS6133173Y2 (en)
JP3194786B2 (en) Precast concrete formwork construction method
JPS6343281Y2 (en)
JPS62242034A (en) Method and apparatus for constructing floor slab
JPS6044473B2 (en) Connection method of main beam reinforcement for extension
JPS58207455A (en) Construction of synthetic floor
JPS628574B2 (en)
JPS62112853A (en) Support apparatus for underground beam
JP2019100032A (en) Form construction method and form unit for lifting
JPS615132A (en) Construction of wall floor
JPH02128045A (en) Construction of intermediate floor of housing
JPS5985073A (en) Casting of first floor slab
JPS62111050A (en) Construction of slab