Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to JP1267687UpriorityCriticalpatent/JPH0226880Y2/ja
Publication of JPS62140000UpublicationCriticalpatent/JPS62140000U/ja
Application grantedgrantedCritical
Publication of JPH0226880Y2publicationCriticalpatent/JPH0226880Y2/ja
Transfer of oil from offshore wells to coast - uses mooring riser with buffer vessel and shuttle tanker so that oil can flow continuously without transfer pipeline (NO-8.10.79)