JPS62121250A - Pillar/beam connection structure - Google Patents
Pillar/beam connection structureInfo
- Publication number
- JPS62121250A JPS62121250A JP25959585A JP25959585A JPS62121250A JP S62121250 A JPS62121250 A JP S62121250A JP 25959585 A JP25959585 A JP 25959585A JP 25959585 A JP25959585 A JP 25959585A JP S62121250 A JPS62121250 A JP S62121250A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- concrete
- column
- columns
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔産業上の利用分野〕
この考案は極めて高い耐震性能を有するフレーム架構の
接合構造に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] This invention relates to a frame structure joint structure having extremely high seismic performance.
円筒状や角筒状の鋼管内にコンクリートを充填したコン
クリート充填鋼管柱が存在する。There are concrete-filled steel pipe columns, which are cylindrical or rectangular steel pipes filled with concrete.
このようなコンクリート充填鋼管柱は高い耐震性能を有
することが知られている。外側の鋼管部分がコンクI7
− トの体積変化を押え、せん断破壊や圧壊を起し難く
するため、従来の鉄筋コンクリート造柱に比べて強度、
ねばり(靭性)が大きくなるためである。It is known that such concrete-filled steel pipe columns have high seismic performance. The outer steel pipe part is Conc I7
− In order to suppress the volume change of the column and make it difficult to cause shear failure or crushing, it is stronger
This is because the stickiness (toughness) increases.
このようなコンクリート充填鋼管柱に梁を接合するには
、鋼管柱の中間部に鉄骨梁を接合するとか、梁を鉄筋コ
ンクリート造として鉄筋を鋼管コンクリート柱に貫通さ
せるという構成が採用されている。In order to connect a beam to such a concrete-filled steel pipe column, a structure is adopted in which a steel beam is connected to the middle part of the steel pipe column, or the beam is made of reinforced concrete and the reinforcing bars are passed through the steel pipe concrete column.
しかしこのいずれの構成であっても応力の流れ、経済性
の点で問題が残っている。However, with either of these configurations, problems remain in terms of stress flow and economic efficiency.
この発明にかかる柱、梁の接合構造は、立設した鋼管上
に梁筋を配筋し、コンクリートを鋼管と梁型枠内に打設
して柱と梁を構築し、該梁上に再び鋼管を立設するもの
である。The joint structure of columns and beams according to the present invention is to construct columns and beams by arranging beam reinforcements on an erected steel pipe, pouring concrete into the steel pipe and beam formwork, and then placing them again on the beams. Steel pipes are installed vertically.
すなわち梁の上下にて鋼管柱を別体とし、梁は鉄筋コン
クリート造として、鋼管柱内のコンクリートと一体化さ
せるものである。従って柱から梁への応力の流れが良好
となるとともに、接合に特別な部材や工事も不曳となっ
て経済的に施工ができる。In other words, the steel pipe columns are separated above and below the beam, and the beam is made of reinforced concrete, which is integrated with the concrete inside the steel pipe column. Therefore, the flow of stress from the columns to the beams is improved, and there is no need to use special materials or construction work for joining, making construction possible economically.
以下図に示す一実施例に基づきこの発明の詳細な説明す
る。The present invention will be described in detail below based on an embodiment shown in the drawings.
基礎、地中梁1を構築する。コンクリートを打設して一
階床2を形成する。基礎1に下部を埋設した柱鉄筋3を
一階床2上に突出させる(牙2図〕。2
柱鉄筋3を内側に嵌挿して鋼管4を一階床2上に立設す
る。鋼管4は円筒状でも角筒状であってもよい(第6図
)。Build the foundation and underground beam 1. First floor floor 2 will be formed by pouring concrete. The column reinforcing bars 3 whose lower part is buried in the foundation 1 are made to protrude above the first floor floor 2 (Fig. 2).2 The column reinforcing bars 3 are inserted inside and the steel pipes 4 are erected above the first floor floor 2.Steel pipes 4 may be cylindrical or rectangular (Fig. 6).
鋼管4上に梁鉄筋5および柱鉄筋6を配筋する。柱筋6
は梁筋5の上下に突出し、下部が前記した鋼管4内に挿
入される。梁鉄筋5周囲には型枠7を組立てる。8は型
枠7を支える仮設サポート梁である(第4図)。Beam reinforcing bars 5 and column reinforcing bars 6 are arranged on the steel pipe 4. Column reinforcement 6
protrudes above and below the beam reinforcement 5, and the lower part is inserted into the steel pipe 4 described above. A formwork 7 is assembled around the beam reinforcing bars 5. 8 is a temporary support beam that supports the formwork 7 (Fig. 4).
コンクリート9を鋼管4及び梁型枠7内に打設する(牙
5図)。Concrete 9 is poured into the steel pipe 4 and beam formwork 7 (Fig. 5).
二階床10を構築した後、床10上に突出した柱鉄筋3
を内側に挿入して鋼管4を立設する。After constructing the second floor floor 10, the column reinforcing bars 3 protruding above the floor 10
is inserted inside and the steel pipe 4 is erected.
その後上述した作業を繰り返す。Then repeat the above operations.
この発明は以上のような構成を有するが、柱鉄筋6は鋼
管コンクリートとの一体化に必要な部分(柱上下部分)
のみに配し、途中は無筋としてもよい。This invention has the above configuration, but the column reinforcing bars 6 are the parts necessary for integration with the steel pipe concrete (the upper and lower parts of the column).
It is also possible to place it on the chisel and leave it unlined in the middle.
この発明は以上のような構成を有し、鋼管上に梁鉄筋を
配筋し、鋼管と梁型枠内にコンクリートを打設するもの
である。従って鋼管内のコンクリートと梁型枠内のコン
クリートが連続して一体化して応力の流れが良好となり
、より大きな耐震性を発揮する。This invention has the above configuration, and beam reinforcing bars are arranged on a steel pipe, and concrete is poured into the steel pipe and the beam formwork. Therefore, the concrete inside the steel pipe and the concrete inside the beam formwork are continuously integrated, resulting in better stress flow and greater earthquake resistance.
また柱は鋼管、梁は従来と同じく梁型枠を使用してコン
クリートを打設するため、鋼管柱と梁を連結する部材や
施工が下層で、経済的に安価となる。In addition, the columns are made of steel pipes, and the beams are cast in concrete using beam formwork, as in the past, so the materials and construction that connect the steel pipe columns and beams are on the lower layer, making it economically cheaper.
矛1図はこの発明の一実施例の縦断面図、第2図〜牙5
図は施工順序縦断面図である。
1・・・・・・基礎、地中梁、3・・・・・・柱鉄筋、
4・・・・・・鋼管、5・・・・・・梁鉄筋、6・・・
・・・柱鉄筋、7・・・・・・型枠、9・・・・・・コ
ンクリート。
第 1 刃Figure 1 is a longitudinal sectional view of an embodiment of the present invention, and Figures 2 to 5 are
The figure is a longitudinal sectional view of the construction sequence. 1...Foundation, underground beam, 3...Column reinforcement,
4... Steel pipe, 5... Beam reinforcing bar, 6...
...Column reinforcement, 7...Formwork, 9...Concrete. 1st blade
Claims (1)
ンクリートを鋼管と梁型枠内に打設して柱と梁を構築し
、該梁上に鋼管を立設し同様に構築していくことを特徴
とする柱、梁の接合構造。Arrange beam reinforcement and connection reinforcement with the column on the erected steel pipe, pour concrete into the steel pipe and beam formwork to construct the column and beam, erect the steel pipe on the beam, and do the same. A joint structure of columns and beams that is characterized by being built continuously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25959585A JPS62121250A (en) | 1985-11-19 | 1985-11-19 | Pillar/beam connection structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP25959585A JPS62121250A (en) | 1985-11-19 | 1985-11-19 | Pillar/beam connection structure |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS62121250A true JPS62121250A (en) | 1987-06-02 |
JPH0481009B2 JPH0481009B2 (en) | 1992-12-22 |
Family
ID=17336290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP25959585A Granted JPS62121250A (en) | 1985-11-19 | 1985-11-19 | Pillar/beam connection structure |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS62121250A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01125439A (en) * | 1987-11-06 | 1989-05-17 | Shimizu Corp | Joining section structure of post and beam |
-
1985
- 1985-11-19 JP JP25959585A patent/JPS62121250A/en active Granted
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01125439A (en) * | 1987-11-06 | 1989-05-17 | Shimizu Corp | Joining section structure of post and beam |
Also Published As
Publication number | Publication date |
---|---|
JPH0481009B2 (en) | 1992-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3690437B2 (en) | Seismic reinforcement structure for existing buildings | |
JP3333788B2 (en) | Prefabricated bridge pier | |
JPS62121250A (en) | Pillar/beam connection structure | |
JPS5829922A (en) | Constructing method for underground outer wall | |
JPH10252187A (en) | Earthquake resistant construction of building structure and construction method thereof | |
JPS6022151B2 (en) | Precast reinforced concrete beam section split vertically | |
JPS61179947A (en) | Steel pipe concrete composite pillar | |
JPS62178634A (en) | Framework construction method of structure | |
JPS6198870A (en) | Construction method of precast reinforced concrete earthquake-proof wall | |
JPS61196035A (en) | Construction of concrete building | |
JPS63184609A (en) | Method for constructing underground continuous wall | |
JP2514859B2 (en) | Precast Steel Reinforced Concrete Concrete Column | |
JPS6351529A (en) | Construction of reinforced concrete underground beam and slab | |
JPS62164931A (en) | Construction method of pillar | |
JPH0762740A (en) | Joint method for precast steel framed reinforced concrete construction pillar and beam | |
JPS61229068A (en) | Underground construction method of building | |
JPS62260967A (en) | Method for assembling reinforcement for reinforced concrete structure | |
JPS62121249A (en) | Construction of pillar/beam connection part | |
JPS62111017A (en) | Double-pile construction work | |
JPH0480419A (en) | Method of erection brace and beam member in underground construction | |
JPH0718681A (en) | Connecting method for precast concrete pillar and foundation section | |
JPS61229067A (en) | Underground construction method of building | |
JPS62170640A (en) | Outer wall structure of building | |
JPS62215778A (en) | Precast reinforced concrete earthquake resistant structure | |
JPH0213694B2 (en) |