JPS6198873A - Transfer and restoration of excavation such as remains - Google Patents

Transfer and restoration of excavation such as remains

Info

Publication number
JPS6198873A
JPS6198873A JP59221814A JP22181484A JPS6198873A JP S6198873 A JPS6198873 A JP S6198873A JP 59221814 A JP59221814 A JP 59221814A JP 22181484 A JP22181484 A JP 22181484A JP S6198873 A JPS6198873 A JP S6198873A
Authority
JP
Japan
Prior art keywords
formwork
cover
block body
relocated
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP59221814A
Other languages
Japanese (ja)
Other versions
JPH0375705B2 (en
Inventor
勝敏 大河内
鎌田 精三
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP59221814A priority Critical patent/JPS6198873A/en
Publication of JPS6198873A publication Critical patent/JPS6198873A/en
Publication of JPH0375705B2 publication Critical patent/JPH0375705B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、遺跡等の保存にかかわる発掘物移設復元方
法の提供に係わる。
[Detailed Description of the Invention] "Field of Industrial Application" The present invention relates to the provision of a method for relocating and restoring excavated objects related to the preservation of ruins, etc.

「従来の技術」 宅地造成や道路工事等で遺跡(住居跡、墳慕等)が出た
場合、文化財保存の見地から関係者から保存の要望が出
されるが、従来の遺跡等の保存は、発掘場所で保存する
場合と別な場所へ移して保存する場合とがある。はとん
どは宅地造成や道路工事で発掘された場合は、発掘場所
での保存はむずかしく、保存が必要な遺跡は、移設して
保存をすることになる。移設に際しては、綿密な調査と
移設計画を立てて実施することになるが、従来は、−担
解体して別の場所にて復元するという方法がとられてい
る。
``Conventional technology'' When ruins (remains of dwellings, burial mounds, etc.) are uncovered due to housing development or road construction, related parties request preservation from the perspective of preserving cultural assets, but conventional preservation of ruins, etc. There are cases where it is preserved at the excavation site and cases where it is moved and preserved at a different location. In most cases, when excavated as part of housing development or road construction, it is difficult to preserve the remains at the excavation site, and the ruins that need to be preserved must be relocated for preservation. When relocating, a thorough investigation and relocation plan must be made, but the conventional method has been to dismantle the structure and restore it at another location.

「発明が解決しようとする問題点」 しかし、この方法では、埋設時の状態ではなく、文化財
としての価値は無くなり、単に元の遺跡の形をしたもの
を復元したというだけである。又、解体に際しては、調
査(−、牢、スケッチ、写真等)に多くの人手と時間を
要し、移設光での復元についても大変な時間と人手が必
要と、なる。一方、この間は、宅地造成や道路工事等の
工事はストップ5・大変↑損失7あ6.・さら60・保
存′)費用9問題でなかなか思うように保存ができてい
ない。
``The problem that the invention seeks to solve'' However, with this method, the ruins are not in their original state when buried, and have no value as cultural assets, but merely restore the original shape of the ruins. In addition, when dismantling the building, it takes a lot of time and manpower to investigate (examining the cell, sketches, photographs, etc.), and it also takes a lot of time and manpower to restore it using relocated lights. On the other hand, during this period, construction work such as residential land development and road construction will be stopped.・Sara 60・Save') I have not been able to save as much as I would like due to the expense 9 problem.

[問題点を解決するための手段」、「作用」本発明は叙
上の事情に鑑みなされたもので、その要旨とするところ
は、移設対象地面の表面並び ・に地中に固結薬液を散
布並びに注入して!呻些を図かり、次いで鋼板又はPC
板の四周型枠を所定高の起立部を残して打ち込むと共に
当該四周型枠の外側を型枠下端より所定の下方にまで掘
り起緊て作業空間を形成し、四周型枠起立部内にクッシ
ョン材を充填し、一方、該作業空間より型枠下端より水
平に底板用鋼板をガイド用ドリル穿孔群穿設のうえ圧入
して底蓋をし、又、型枠上端には鉄製又はPC板上蓋を
し、当該上蓋、底蓋間を差し渡しボルトにて締結してブ
ロック体を構成させ、このブリック体をクレーンで搬送
して移転させ、逆さにおろして底蓋を撤去し、コンクリ
ート打設にて発掘−とコンクリートとを一体化し、この
ブロック体を再度逆さにした状態で該上蓋、型枠、クッ
シ会ン材、目地粘土等の取り除きをして原形復元すると
して、最も注意を要する発掘作業を好適な作業場所に移
してなし得るものとすることにより、原形に変状を与え
ることなく保存し得、且つ発掘作・業を短期間で費用も
安価に出来るものとした点にある。
[Means for solving the problems], "Operation" The present invention was made in view of the above circumstances, and its gist is that the solidified chemical solution is applied to the surface of the ground to be relocated and to the ground. Spray and inject! Aiming to reduce the noise, then steel plate or PC
A four-circumference formwork of the board is driven leaving a standing part of a predetermined height, and the outside of the four-circle formwork is dug up to a predetermined point below the bottom edge of the formwork to form a work space, and a cushioning material is placed inside the four-circumference formwork's standing part. On the other hand, a steel plate for the bottom plate is drilled horizontally from the lower end of the formwork from the working space, and a group of guide drill holes are drilled and then press-fitted to cover the bottom, and a steel or PC board top cover is placed on the upper end of the formwork. Then, the top and bottom covers are fastened with bolts across the body to form a block body, this brick body is transported and relocated using a crane, turned upside down, the bottom cover is removed, and excavated by pouring concrete. This is suitable for excavation work that requires the most care, as the block body is turned upside down again and the top cover, formwork, cushioning material, joint clay, etc. are removed to restore the original shape. By making it possible to move the excavation work to a suitable work site, it is possible to preserve the original form without causing any deformation, and the excavation work can be carried out in a short period of time and at low cost.

、  「実施例」 。, "Example" .

以下、これを図に基づいて詳細に説明する。This will be explained in detail below based on the drawings.

第1図は発掘対象の葺石1.・・・・・・の散在する居
住跡、等の遺跡2の縦断面を、示ル、、本発明はこれ営
所定深度にブロン、り状に切り取り移転してしまおうと
する姿のである。        ゛よって、表層部の
固化強化のため図中矢印の如く固結薬液を散布する。
Figure 1 shows the fukiishi 1 to be excavated. The present invention is intended to cut out a longitudinal section of ruins 2, such as scattered habitation ruins, etc., into a rectangular shape at a predetermined depth and relocate them. Therefore, in order to strengthen the solidification of the surface layer, a solidification chemical solution is sprayed as shown by the arrow in the figure.

当該固結薬液としては、イソシアナート化合物の如き加
水反応型薬液を良しとする。
As the solidifying chemical liquid, a hydrolytic chemical liquid such as an isocyanate compound is preferable.

第2図は表層より下方の地盤を固化強化するためにスト
レ4−ナーパイプ3を差し込み薬液を注入している態様
を示す。
FIG. 2 shows a mode in which a strainer pipe 3 is inserted and a chemical solution is injected in order to solidify and strengthen the ground below the surface layer.

発掘対象の遺跡2は全体“が商化安定したとごろで、第
3図に示す如く鋼板又はPC板の四周型枠4を所定高の
起立部4aを残して打ち込むと共にその外側を型枠4下
端より所定下方にまで掘り起こして溝5を形成する。
The ruins 2 to be excavated have reached a stage where commercialization has been stabilized as a whole, and as shown in Figure 3, a four-circumferential formwork 4 of steel plate or PC board is cast leaving an upright part 4a of a predetermined height, and the outside of the formwork 4 is placed. A groove 5 is formed by digging down to a predetermined level below the lower end.

当該溝5は後述の工程の作業空間となるt第4図は該起
立部4a内に□例えば発泡゛ウレ□タンの如きクッショ
ン材15を充填した状態を示し、この際、■石や住居跡
の土d″和紙16を水にて貼り゛付けると表面保護と充
填のなじみが良い。
The groove 5 will be a working space in the process described later. Figure 4 shows a state in which the upright portion 4a is filled with a cushioning material 15 such as foamed urethane. If you apply the soil d'' Japanese paper 16 with water, the surface will be protected and the filling will blend well.

第5図は該溝5を作業空間として型枠4下端より水平に
ドリルにて穿孔群6.・・・・・・を穿がち底盤をゆる
め、当該穿孔群6.・・・・・・をガイドにして後述の
底板の圧入を容易にする。
FIG. 5 shows a group of holes 6. drilled horizontally from the lower end of the formwork 4 using the groove 5 as a working space. 6. Loosen the bottom plate before drilling the holes in the corresponding hole group 6. . . . is used as a guide to facilitate press-fitting of the bottom plate, which will be described later.

尚、この際、“この部の固結が十分でないことが穿孔の
時判明したりした場合には、図示の如くストレーナ−パ
イプ3を差し込んで゛薬液の補充を行なうとよい。
At this time, if it is found during drilling that this part is not sufficiently consolidated, it is advisable to insert a strainer pipe 3 as shown in the figure to replenish the chemical solution.

第6図は該穿孔群6.・・・・・・をガイドとして底板
用鋼板7を反力盤8に支持させたジ・ヤッキ9で圧入し
て型枠4の底蓋をしている態様を示す。
FIG. 6 shows the perforation group 6. . . . is used as a guide to press-fit the bottom plate steel plate 7 with a jack 9 supported by a reaction plate 8 to cover the bottom of the formwork 4.

これにて二遺跡2は有底箱体内に収容された形となる。With this, the two ruins 2 are housed in a box with a bottom.

第7図は、型枠4上端に鉄製□上蓋10をし、該底蓋と
の間に連結用ボルト11を差し渡たし、締結して、持ち
運び可□能なブロック体を構成した態様を示す、   
 ” ″第8図□は当該ブロック体を所定場所に1股送後、ク
レーン等にて荷卸しの際、逆さにしておろした態様を示
す。         ゛ これは、後述の固結土壌とコンクリートとの起き換え作
業のためである。
Figure 7 shows an embodiment in which an iron □ top lid 10 is placed on the upper end of the formwork 4, and a connecting bolt 11 is inserted between the bottom cover and the bottom lid and fastened to form a portable block body. show,
""Figure 8 □ shows the state in which the block body is transported one step to a predetermined location and then turned upside down and lowered when unloading with a crane or the like.゛This is due to the work to replace the compacted soil with concrete, which will be described later.

第9図は底蓋を撤去しメツシュ13入り等で補強のコン
クリート14を□打設して一体化して、発掘物の安定基
盤上への置□′き換えをした態様を示す。
Fig. 9 shows a mode in which the bottom cover has been removed, reinforcing concrete 14 is placed with mesh 13, etc. to integrate it, and the excavated object has been replaced on a stable foundation.

以後は図示省略するが、゛再度逆さにして正常姿勢に戻
し、上蓋10を撤去したあと、被覆物とじてのクッショ
ン材15、和紙16、目地粘土材12等を取り除けば、
原形復元がなされることとなる。
Although illustrations are omitted from now on, ``After turning it upside down again to return to the normal posture and removing the top cover 10, the cushioning material 15, Japanese paper 16, joint clay material 12, etc. as a covering are removed.
It will be restored to its original form.

第10図a、bは本発明を噴丘17に実施した場合の態
様を示したもので、a図は表層に対する薬液散布、b図
は地中への薬液注入の態様を示す。この場合には通電周
囲は図示の如く低い場合がほとんどであるため底板圧入
作業用の周溝掘削は省略されるものと解される。
Figures 10a and 10b show the embodiment of the present invention applied to the volcanic cone 17, in which Figure a shows the chemical liquid being sprayed on the surface layer, and Figure B shows the chemical liquid injection into the ground. In this case, since the current-carrying area is almost always low as shown in the figure, it is understood that excavating the circumferential groove for press-fitting the bottom plate is omitted.

「発明の効果」 しかして、本発明方法によるならば、従来手段に比し、
解体しないで移設保存するため、原形に変状を与えるこ
となく、保存ができ、しかも、短期間で費用も安くでき
る。
"Effects of the Invention" According to the method of the present invention, compared to conventional means,
Because it is relocated and preserved without being dismantled, it can be preserved without causing any deformation to its original form, and it can also be saved in a short period of time and at low cost.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第9図は本発明工程手順説明図、第10図a、
bは他の対象の場合の初期工程説明図である。 1・・・H石、2・・・遺跡、3・・・ストレーナ−パ
イプ、4・・・型枠、4a・・・起立部、5・・・溝、
6・・・穿孔群、7・・・底板用鋼板、8・・・反力盤
、9・・・ジヤツキ、10・・・鉄製上蓋、1■・・・
連結用ボルト、12・・・目地、13・・・メツシュ、
14・・・コンクリート、15・・・クソソヨン材、1
6・・・和紙、17・・・噴丘。 、?/ΔZ ごシン/勿 ごゾリン勿 j2     1121 マ4t9 Z     11 重層
Figures 1 to 9 are explanatory diagrams of the process steps of the present invention, Figure 10a,
b is an explanatory diagram of the initial process in the case of another object. 1... H stone, 2... Ruins, 3... Strainer pipe, 4... Formwork, 4a... Standing part, 5... Groove,
6... Perforation group, 7... Steel plate for bottom plate, 8... Reaction force plate, 9... Jacket, 10... Iron top cover, 1...
Connection bolt, 12... joint, 13... mesh,
14... Concrete, 15... Fucking Soyon wood, 1
6...Japanese paper, 17...Fountain. ,? /ΔZ Goshin/Nugugozorinmuj2 1121 Ma4t9 Z 11 Multilayer

Claims (1)

【特許請求の範囲】[Claims] 移設対象地面の表面並びに地中に固結薬液を散布並びに
注入して固結化を図かり、次いで鋼板又はPC板の四周
型枠を所定高の起立部を残して打ち込むと共に当該四周
型枠の外側を型枠下端より所定の下方にまで掘り起して
作業空間を形成し、四周型枠起立部内にクッション材を
充填し、一方、該作業空間より型枠下端より水平に底板
用鋼板をガイド用ドリル穿孔群穿設のうえ圧入して底蓋
をし、又、型枠上端には鉄製又はPC板上蓋をし、当該
上蓋、底蓋間を差し渡しボルトにて締結してブロック体
を構成させ、このブロック体をクレーンで搬送して移転
させ、逆さにおろして底蓋を撤去し、コンクリート打設
にて発掘物とコンクリートとを一体化し、このブロック
体を再度逆さにした状態で該上蓋、型枠、クッション材
、目地粘土等の取り除きをして原形復元するとしてなる
ことを特徴とする遺跡等の発掘物移設復元方法。
Consolidation is achieved by spraying and injecting a consolidating chemical into the surface of the ground to be relocated and into the ground. Next, a four-circumference form made of steel plate or PC board is driven in, leaving an upright part of a predetermined height, and the four-circumference form is A working space is formed by excavating the outside to a predetermined level below the lower end of the formwork, and cushioning material is filled in the upright parts of the formwork around the four sides.Meanwhile, the steel plate for the bottom plate is guided horizontally from the lower end of the formwork through the working space. A block body is constructed by drilling a group of drill holes and press-fitting them to cover the bottom cover, and placing an iron or PC plate top cover on the top end of the formwork, and fastening the top cover and bottom cover with bolts across the form. , This block body is transported and relocated using a crane, is lowered upside down, the bottom cover is removed, the excavated object and the concrete are integrated by concrete pouring, and the block body is turned upside down again and the top cover is removed. A method for relocating and restoring excavated objects such as ruins, which is characterized by removing formwork, cushioning material, joint clay, etc., and restoring the original shape.
JP59221814A 1984-10-22 1984-10-22 Transfer and restoration of excavation such as remains Granted JPS6198873A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59221814A JPS6198873A (en) 1984-10-22 1984-10-22 Transfer and restoration of excavation such as remains

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59221814A JPS6198873A (en) 1984-10-22 1984-10-22 Transfer and restoration of excavation such as remains

Publications (2)

Publication Number Publication Date
JPS6198873A true JPS6198873A (en) 1986-05-17
JPH0375705B2 JPH0375705B2 (en) 1991-12-03

Family

ID=16772610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59221814A Granted JPS6198873A (en) 1984-10-22 1984-10-22 Transfer and restoration of excavation such as remains

Country Status (1)

Country Link
JP (1) JPS6198873A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0611754U (en) * 1990-03-15 1994-02-15 小倉クラッチ株式会社 Hose cleaning equipment
WO2004072928A1 (en) * 2003-02-17 2004-08-26 Chiko Co., Ltd. Ground surface recovering method, and recovered surface provided by the method
KR101143254B1 (en) * 2011-02-10 2012-05-14 성덕모 Mold for restoration and relocation of building site remained, and method for restoration and relocation of building site remained using the same
KR102114462B1 (en) * 2019-11-26 2020-05-25 대한민국 The method of field conservation treatment of cultural properties for Separated Multi-Dimensional Storage Case

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5581936A (en) * 1978-12-18 1980-06-20 Kenzaishiya:Kk Moving method of historical relics

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5581936A (en) * 1978-12-18 1980-06-20 Kenzaishiya:Kk Moving method of historical relics

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0611754U (en) * 1990-03-15 1994-02-15 小倉クラッチ株式会社 Hose cleaning equipment
WO2004072928A1 (en) * 2003-02-17 2004-08-26 Chiko Co., Ltd. Ground surface recovering method, and recovered surface provided by the method
KR101143254B1 (en) * 2011-02-10 2012-05-14 성덕모 Mold for restoration and relocation of building site remained, and method for restoration and relocation of building site remained using the same
KR102114462B1 (en) * 2019-11-26 2020-05-25 대한민국 The method of field conservation treatment of cultural properties for Separated Multi-Dimensional Storage Case

Also Published As

Publication number Publication date
JPH0375705B2 (en) 1991-12-03

Similar Documents

Publication Publication Date Title
CN105714834B (en) A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake
JPS6198873A (en) Transfer and restoration of excavation such as remains
JPS5985028A (en) Steel pipe pile and laying work thereof
US20120163923A1 (en) Structure supporting system
JPH0536565B2 (en)
JPH06228947A (en) Construction of landslide protection wall in ground filled up with wastes
JPS63110319A (en) Stabilization work of banking
JP4502343B2 (en) Building foundation method in soft ground
JPS5847527B2 (en) Anti-forming method using soil condensation
JPH04182512A (en) Underground structure and construction method thereof
JP2001159131A (en) Impervious soil improved structure and land-formatin method therefor
JP2657671B2 (en) Reconstruction method for existing structures
JPS6049734B2 (en) How to form a basement
JPS6040694Y2 (en) Gutters on soft ground
JPH06116938A (en) Construction method for strip footing
Zipper et al. Stabilizing reclaimed mines to support buildings and development
JPS61211423A (en) Refilling method of excavated trench
JPS6043495B2 (en) How to build a retaining wall
JPS6161000A (en) Building of garage
JPS598826A (en) Construction of underground wall by excavation of inside of pc plate
JPS6049735B2 (en) How to form a basement
JPS6192235A (en) Fixing of embedded pipe
JPS5980894A (en) Shield construction method and drain apparatus
JPH0546414B2 (en)
JPH02232425A (en) Standard execution method for building