JPS6177585A - Main engine replacing technique for ship - Google Patents

Main engine replacing technique for ship

Info

Publication number
JPS6177585A
JPS6177585A JP59199000A JP19900084A JPS6177585A JP S6177585 A JPS6177585 A JP S6177585A JP 59199000 A JP59199000 A JP 59199000A JP 19900084 A JP19900084 A JP 19900084A JP S6177585 A JPS6177585 A JP S6177585A
Authority
JP
Japan
Prior art keywords
hull
ship
engine room
section
engine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP59199000A
Other languages
Japanese (ja)
Inventor
Tokio Kondo
近藤 時生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP59199000A priority Critical patent/JPS6177585A/en
Publication of JPS6177585A publication Critical patent/JPS6177585A/en
Pending legal-status Critical Current

Links

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

PURPOSE:To simplify replacing work by constructing the hull section of an engine room in which a new main engine is mounted using an existing hull section, removing the engine room section, while leaving the stern accommodation space of the hull delivered in a dock, and inserting the new machine room hull section. CONSTITUTION:To replace a main engine for a ship with an engine room at the lower part of the accommodation space structure on the deck of the hull, a new main engine 11 and a hull structure 12 are previously built in a dock using an existing hull section 10. The hull 19 in which the main engine is replaced with new one is delivered in a dock 20 and an engine room hull section 16 including a main engine 14 is cut and removed while an accommodation space structure 15 and the upper section 17 of an engine room 13 are left behind as the structural material for reinforcement during work. Then a new construction section is inserted and joined. When replacing work is performed, the amount of steel material to be used can be reduced and the whole work period can be shortened.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、居住区構造の下方に機関室をそなえた船舶に
おいてその生機の換装工事々行なう方法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Field of Application] The present invention relates to a method for performing retrofitting work on gray machinery in a ship having an engine room below the accommodation structure.

〔従来の技術〕[Conventional technology]

従来、機関室の上方に居住区構造がそなえられた船舶に
おいて、その主機を換装する工事を行なう際には、第4
図に示すように、主は台、新主機、檄関室、機関室上方
の居住区構造等をそなえるとともに各種の礒装が施され
た船体部分1を予め新造しておく。
Conventionally, when carrying out work to replace the main engine of a ship with a living quarters structure above the engine room, the fourth
As shown in the figure, the main hull is equipped with a platform, a new main engine, a passenger room, a living quarters structure above the engine room, etc., and a new hull section 1 is pre-built with various types of armoring.

そして、主を彫換装工事を施される船舶を入渠させ、そ
の主(幾関を含む機関室および居住区構造等をそなえた
船体部分2を船首部3と船尾部4とから切離した後、ド
ックに注水してこれらの船体部分2.船首部3.および
船尾部・tを浮上させ、新造の船体部分Iと船体部分2
とを取り換える。
Then, the ship whose main body is to be re-engraved is docked, and the main body (hull part 2, which includes the engine room and living quarters structure, etc., is separated from the bow part 3 and the stern part 4, By injecting water into the dock, these hull parts 2, bow 3, and stern part t will be floated, and the newly built hull parts I and 2 will be floated.
Replace with.

次に、再び船体部分1.船詐部3および船尾部・↓を入
渠させてこれらを接合し、主機の換装工事か゛完了する
のである。
Next, again the hull part 1. The ship's stern section 3 and stern section ↓ will be docked and joined together to complete the main engine conversion work.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかしなか呟上述のような従来の主(戊換装工事手段で
は、主(幾か゛そなえられた(幾開室の上方に居住区構
造かあり、機関室のみならず居住区構造をも含む船体部
分1を新造するため、新しい多量の鋼材を必要とすると
ともに、船体部分1を新造するための場所を要し、船体
改造工SV−の範囲か広くなり、11?バラ工事や植装
工事か多大となるという問題点かある。
However, in the conventional main replacement work method as mentioned above, the main (somewhat) is provided (there is a living quarters structure above the open room, and the hull part that includes not only the engine room but also the living quarters structure) In order to newly build 11, a large amount of new steel material is required, and space is required to newly build hull part 1, which increases the scope of hull modification work SV-, and requires a large amount of bulk work and planting work. There is a problem with this.

また、新造する船体部分1の重量ら大きくなり、新造し
た船体部分1と船体部分2とを取り換える際には、船体
部分1,2の入出渠等の作業が繁雑であるとともに、こ
れらの作業のための補強工事か必要であるため、工事期
間ら長くなり、工事量も多大となると1・う問題点らあ
る。
In addition, the weight of the newly built hull section 1 is larger, and when replacing the newly built hull section 1 with the hull section 2, work such as loading and unloading the hull sections 1 and 2 is complicated, and it is difficult to carry out these operations. Since reinforcement work is required for the construction, the construction period will be longer and the amount of work will be large.

本発明は、これらの問題点の解消をはかろうとするしの
で、船舶の主機換装工事に際し、給田の切断、4i会、
取換え作業のための繁雑な入出渠作業を不要とし、取り
換えるべき船体部分をより小さくして、工π量の;伐少
をはかった船舶の主磯換装工法を提供することを目的と
する。
The present invention aims to solve these problems, and therefore, when replacing the main engine of a ship, cutting of the feeder, 4i meeting,
To provide a method for replacing the main rock of a ship, which eliminates the need for complicated docking and docking work for replacement work, makes the hull part to be replaced smaller, and reduces the amount of labor required.

〔問題点を解決するための手段〕[Means for solving problems]

このため本発明の船舶の主(蔑換装工法は、船体上甲板
上に居住区構造をそなえるとともに、同居住区溝遣の下
方に(幾開室をそな兄た船舶について、その玉数を換装
する工事を行なうに際し、予めトンク内において上記船
舶とは別の船舶の既存船体部分を利用しで、同既存船体
部分に新生閤を搭載することによI月尺開室船体部分を
建造しておき、上記主(代を換装されるべき船舶を上記
トンク内へ回着させてか呟同船舶における上記居住区構
造と上記機関室の上部部分とを工事中の補強用構造材と
して残すようにしなから王眠を含んだ機関室船体部分を
船体から切断して側方へ除去し、ついで、予め用意され
た上記の新生(幾を含む機関室船体部分を、上記船体に
その側方から嵌め込み固着することを41徴としている
For this reason, the main construction method of the present invention is to provide a living quarters structure on the upper deck of the ship's hull, and to reduce the number of spaces for ships that have several openings below the living quarters ditch. When carrying out the conversion work, in advance, an existing hull part of a ship other than the above-mentioned ship was used in the tonk, and a new ship was built on the existing hull part to create an open-chamber hull part. Then, the ship to be replaced was moved into the tonk, and the structure of the living quarters and the upper part of the engine room of the ship were left as structural materials for reinforcement during the construction work. Cut the engine room hull part containing the Nishina from the ship's hull and remove it from the side, and then insert the newly prepared engine room hull part including the new one into the ship from the side. The 41 characteristics include fitting and fixing.

〔作 用〕[For production]

上述の本発明の船舶の主機換装工法では、主(ぺを含し
・機関室船体部分のみをこれに見訃う新生はを含んだ既
存の機関室船体部分と取り換えるので、船体の取り換え
部分の重量か軽くなり、繁雑な入出渠等の作業が不要と
なって主(幾の換装工事が容易に行なわれるのである。
In the above-mentioned ship main engine replacement method of the present invention, only the main engine room hull section including the main engine room is replaced with the existing engine room hull section including the new engine room. It is lighter in weight, eliminates the need for complicated work such as entering and exiting drains, and allows for easier retrofitting work.

〔実施例〕〔Example〕

以下、図面により本発明の一実施例としての船舶の主t
H’A装工法について説明すると、第1図はその工法を
説明するだめの平面図、tjS2図はその側面図、第3
図は第1図の■−■矢視断面図である。
Hereinafter, the main body of a ship as an embodiment of the present invention will be explained with reference to the drawings.
To explain the H'A installation method, Figure 1 is a plan view to explain the method, Figure 2 is a side view, and Figure 3 is a side view.
The figure is a sectional view taken along the line ■-■ in FIG.

第1〜3図に示すように、船体19の上甲板上に居住区
構造j5をそなえるとともに、この居住区構造15の下
方に機関室13をそなえた船舶において、機関室13内
の主機14を換装する工事を行なう際、その船1本19
をドック20内に入渠させる前に、このトンク2()内
で予め改造される船体19と頬貝した船体を有する別の
Qg舶の既存船体部分に、新生磯11および図示しない
関連蟻装品等を搭載するととらに、主(幾換装にf=1
随する改造船殻構造12のエボを施すことにより、(幾
開室船体部分10を建造する。
As shown in FIGS. 1 to 3, in a ship that is provided with a living quarters structure j5 on the upper deck of the hull 19 and an engine room 13 below this living quarters structure 15, the main engine 14 in the engine room 13 is When carrying out retrofitting work, one ship19
Before docking in the dock 20, the new Iso 11 and related ant fittings (not shown) are installed on the existing hull of another Qg vessel having the hull 19 to be modified in advance in the tonk 2 () and a shelled hull. etc., the main (f = 1 for several replacements)
By evoking the corresponding modified hull structure 12, a somewhat open hull section 10 is constructed.

そして、換装されるべき船舶の船体19をドック20内
に回着させて据付け、居住区構造15と、機関室13の
上方部17と、同機間室13の一方の舷側部18とを、
工事中の補強用構造材として残すようにしなから、主機
14を含んだ機関室船体部分16を船体19から切断す
る。この後、b代開室船体部分16を、機関室の舷側部
18と反対の舷側方向へ引き出し、船首方向へ移動させ
て除去する。
Then, the hull 19 of the ship to be converted is rotated and installed in the dock 20, and the accommodation structure 15, the upper part 17 of the engine room 13, and one side part 18 of the engine room 13 are installed.
The engine room hull section 16 including the main engine 14 is cut from the hull 19 so as to remain as a reinforcing structural material during construction. Thereafter, the b-opening hull portion 16 is pulled out toward the side opposite to the side portion 18 of the engine room, moved toward the bow, and removed.

次に、ドック20内で切断された機関室船体部分16に
見合うように予め建造された新主機11および関連礒装
品等を含む機関室船体部分10を、船体19の機関室船
体部分16除去位置に船体19の側方から嵌め込み固着
する。
Next, the engine room hull section 10 including the new main engine 11 and related accessories, etc., which was built in advance to match the cut engine room hull section 16 in the dock 20, is removed from the engine room hull section 16 of the hull 19. It is fitted into the position from the side of the hull 19 and fixed.

そして、新造の機関室船体部分10の接合後、船体19
と除去された(幾開室船体部分16とを浮上・出渠させ
、船体19に必要な:A整工事を行ない主機の換装工事
か完了する。
After joining the newly built engine room hull section 10, the hull 19
The hull section 16 which was removed (open hull section 16) will be floated and docked, the necessary A maintenance work will be carried out on the hull 19, and the main engine replacement work will be completed.

なお、必要があれば、除去された機関室船本部分16か
ら主機14および池の付属礒装品を取り除くことにより
、機関室船体部分16を池の船舶の主(幾換装工事に流
用することができる6 」二連の工法により、別の船舶の既存船体部分を新たな
機関室船体部分10として利用することかでき、(攻r
A室船体部分10を新造する必要かなくなるので、新鋼
材の使用量が大幅に削減されるととちに、トンク20内
て′(へ間室船体部分10の建造か行なえ建造用にドッ
ク20以外の場所を使用する必要かなくなり、さらに準
備工事期間か短縮される。
If necessary, by removing the main engine 14 and the attached fittings from the removed engine room main part 16, the engine room hull part 16 can be used for the main part of the ship (replacement work). 6 By using a double construction method, it is possible to use the existing hull section of another ship as a new engine room hull section 10.
Since there is no need to newly build the A-room hull section 10, the amount of new steel used is significantly reduced. There is no need to use another location, and the preparatory work period is further shortened.

そして、(幾間室船体部分1(3か除去された後に、船
1409に残された機関室13の上方部17および舷側
部1しかその上方にある居住区構造15を支持するとと
もに、これらの上方部17.舷側部18および居1主区
溝遣15が補強用構造材として作用し、工事中における
船体19の構造強度か確保され、船体19の補強か不必
要となる。
(After the hull section 1 (3) has been removed, only the upper part 17 and the side part 1 of the engine room 13 left in the ship 1409 support the accommodation structure 15 above them, and The upper part 17, the side part 18, and the main section ditch 15 act as reinforcing structural members, ensuring the structural strength of the hull 19 during construction, making reinforcement of the hull 19 unnecessary.

また、除去する船体部分は居住区構造15を含まず展開
室船体部分16のみつあるため、その重量か軽く、jj
jj開室船間室船体6の除去や新生(民11および関連
蟻装品等を含む機関室船体部分10の嵌め込み作業かf
” yり2()内で・容易に行なえ、従来のように、船
体19゜(幾間室船体部分1Gおよび新造の機関室船体
部分10の人出桑等の作業を行なう必要かなくなり、口
)(木改造工事の範囲か大幅に縮小される。
In addition, since the hull part to be removed does not include the living quarter structure 15 and only the deployment room hull part 16, its weight is light and jj
jj Removal of the open room hull 6 and installation work of the engine room hull part 10 including the civilian 11 and related accessories, etc. f
” It can be easily carried out in Yuri 2 (2), and there is no need to carry out work such as clearing the hull 19° (the cabin hull section 1G and the newly built engine room hull section 10), which was done in the past. ) (The scope of wood remodeling work will be significantly reduced.

また、必要に応して除去された(戊間室船体部分16を
辿の119舶の主1幾換装工事に流用することにより、
工事残材を有効に活用で・きる。
In addition, by diverting the hull section 16 of the Houma chamber, which was removed as necessary, to the main 1 remodeling work of 119 ships,
Construction leftover materials can be used effectively.

なお、必要に応して機関室の上方部17.機関室の舷側
部18等に補強工事を行なってもよい。
In addition, if necessary, the upper part 17 of the engine room. Reinforcement work may be performed on the side part 18 of the engine room, etc.

〔発明の効果〕〔Effect of the invention〕

以上詳述したように、本発明の船舶の主機換装工法によ
れば、船体上甲板上に居住区構造をそなえるとともに、
同居住区構造の下方に機関室をそなえた船舶について、
その主機を換装する工事を行なうに際し、予めトンク内
において上記船舶とは別の船舶の既存船体部分を利用し
で、同既存船体部分に新生区を搭載することにより機関
室船体部分を建造しておき、上記主はを換装されるべき
船舶を上記トンク内へ回着させてから、同船舶における
上記居住区構造と上記は間室の上部部分とを工事中の補
強用構造材として残すようにしなから主((ンを含んだ
機関室船体部分を船体から切断して側方へ除去し、つい
で、予め用意さizだ上記の新生磯を含む機関室船体部
分を、上記船体にその側方から嵌め込み固着するという
簡素な方法で、次のような効果ないし利点を得ることか
できる。
As detailed above, according to the ship main engine replacement method of the present invention, a living quarters structure is provided on the upper deck of the ship, and
Regarding ships with an engine room below the accommodation structure,
When carrying out work to replace the main engine, the engine room hull section was built in advance by using the existing hull section of a different vessel than the above-mentioned vessel in the tonk and installing a new section on the existing hull section. After that, the ship to be replaced with the main hull was moved into the tonk, and the living quarters structure and the upper part of the cabin were left as structural members for reinforcement during construction. Then, cut the engine room hull part containing the main (() from the hull and remove it to the side, and then attach the engine room hull part including the newly prepared rock above to the hull from the side. The following effects and advantages can be obtained by a simple method of fitting and fixing.

(+)別の船舶の既存船体部分を新たな(茂間室船体部
分として利用することかでき、機関室船体部分を新造す
る必要かなくなるので、工事に要する新鋼材の量を犬申
畠(こ肖1Jitて゛きる。
(+) The existing hull section of another ship can be used as the new (Moma room hull section), and there is no need to build a new engine room hull section, so the amount of new steel materials required for the construction can be reduced by Inushinhata ( This photo 1 is complete.

(2)トンク内で主機換装のだめのすべての工事か行な
几るのて°、機関室rJ旧本部分を新たに建造するため
の場所か省かれるとともに、準備工事期間か短縮される
(2) Once all the main engine replacement work has been completed in the tank, the old main engine room rJ area will be saved and the preparatory work period will be shortened.

(3)(幾間室船体部分を除去された後、船体は、(幾
間室の」二方部、舷側部および居1■区構造により、工
1T−中;こおける構造強度か十分に保たれ、船1本を
補強する必要かなくなる。
(3) (After the hull section has been removed, the hull will have sufficient structural strength during construction 1T-; due to the structure of the two sides, the gunwales, and the section of the hull. It will be maintained, and there will be no need to reinforce one ship.

(、・1)工(差を換装するための取り換え部分か必叉
最小限となり、その取り喚乏かドック内て6;易に行な
乏るのて・、繁雑な入出栗等の作業が不要となり、工π
贋か少なくできるととらに、工事範囲か縮小されるので
あり、工期を大幅に短縮できる。
(,・1) Work (replacement parts to replace the difference are required to a minimum, and it is difficult to do it in the dock. 6; Because it is difficult to carry out, complicated work such as loading and unloading is required. No longer needed, no more work
Not only can the number of forgeries be reduced, but the scope of work can be reduced and the construction period can be significantly shortened.

(つ)必要に応して除去された機関室船体部分を池の船
舶の主機換装工事に流用することにより、工事残材を有
効に活用できる。
(1) If necessary, the removed engine room hull parts can be reused for the main engine replacement work of the pond ships, making it possible to effectively utilize the remaining materials from the construction work.

【図面の簡単な説明】[Brief explanation of drawings]

第1〜3図は本発明の一実施例としての船舶の主機換装
工法を示すもので、第1図はその工法を説明するための
平面図、第2図はその側面図、第3図は第1図のlll
−[矢視断面図であり、第、1図は従来の111)舶の
主機換装工法を模式的に示す側面図である。 10・・機関室船体部分、11・・新生機、12・・改
造船殻構造、13・・機関室、1.↓・・主機、15・
・居住区構造、16・・機関室船体部分、17・・機関
室の上方部、18・・機関室の舷fll11部、19・
・船体、20・・ドック。
Figures 1 to 3 show a method for replacing the main engine of a ship as an embodiment of the present invention. Figure 1 is a plan view for explaining the method, Figure 2 is a side view, and Figure 3 is a side view. lll in Figure 1
1 is a side view schematically showing a conventional method for replacing the main engine of a 111) ship. 10. Engine room hull part, 11. New aircraft, 12. Modified hull structure, 13. Engine room, 1. ↓・・Main engine, 15・
・Accommodation area structure, 16. Engine room hull part, 17. Upper part of engine room, 18. 11 full sides of engine room, 19.
・Hull, 20...Dock.

Claims (1)

【特許請求の範囲】[Claims] 船体上甲板上に居住区構造をそなえるとともに、同居住
区構造の下方に機関室をそなえた船舶について、その主
機を換装する工事を行なうに際し、予めドック内におい
て上記船舶とは別の船舶の既存船体部分を利用して、同
既存船体部分に新主機を搭載することにより機関室船体
部分を建造しておき、上記主機を換装されるべき船舶を
上記ドック内へ回着させてから、同船舶における上記居
住区構造と上記機関室の上部部分とを工事中の補強用構
造材として残すようにしながら主機を含んだ機関室船体
部分を船体から切断して側方へ除去し、ついで、予め用
意された上記の新主機を含む機関室船体部分を、上記船
体にその側方から嵌め込み固着することを特徴とする、
船舶の主機換装工法。
When carrying out work to replace the main engine of a ship that has a living quarters structure on the upper deck of the hull and an engine room below the same living quarters structure, it is necessary to carry out construction work to replace the main engine of a ship that is different from the above ship in advance. The engine room hull section is built by using the existing hull section and installing a new main engine into the same existing hull section, and after the ship whose main engine is to be replaced is moved into the dock, the same ship is installed. The engine room hull section containing the main engine was cut from the hull and removed to the side, leaving the above living quarters structure and the upper part of the engine room as structural members for reinforcement during construction, and then prepared in advance. The engine room hull portion containing the new main engine is fitted into the hull from the side and fixed to the hull,
Ship main engine replacement method.
JP59199000A 1984-09-22 1984-09-22 Main engine replacing technique for ship Pending JPS6177585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59199000A JPS6177585A (en) 1984-09-22 1984-09-22 Main engine replacing technique for ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59199000A JPS6177585A (en) 1984-09-22 1984-09-22 Main engine replacing technique for ship

Publications (1)

Publication Number Publication Date
JPS6177585A true JPS6177585A (en) 1986-04-21

Family

ID=16400429

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59199000A Pending JPS6177585A (en) 1984-09-22 1984-09-22 Main engine replacing technique for ship

Country Status (1)

Country Link
JP (1) JPS6177585A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5165359A (en) * 1990-06-08 1992-11-24 Etat Francais Represented By The Delegue General Pour L'armement Pressure tight hull convertible submarine
CN103204221A (en) * 2012-01-12 2013-07-17 江苏新世纪造船有限公司 Water replacement method for marine main engine
CN105752267A (en) * 2016-03-02 2016-07-13 山海关船舶重工有限责任公司 Method for replacing main engine crankshaft of ship

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5165359A (en) * 1990-06-08 1992-11-24 Etat Francais Represented By The Delegue General Pour L'armement Pressure tight hull convertible submarine
CN103204221A (en) * 2012-01-12 2013-07-17 江苏新世纪造船有限公司 Water replacement method for marine main engine
CN105752267A (en) * 2016-03-02 2016-07-13 山海关船舶重工有限责任公司 Method for replacing main engine crankshaft of ship

Similar Documents

Publication Publication Date Title
CN100509543C (en) Rebuilt double hull tanker and method of rebuilding an existing single hull tanker into a rebuilt double hull tanker
CN100519325C (en) Rebuilt double hull tanker and method of rebuilding an existing single hull tanker into a rebuilt double hull tanker
CN101941137B (en) Technology for reducing allowance cutting during ship building
AU2004318006B2 (en) Double-hull vessel converted from a single-hull vessel and method of performing the same
EP0828651B1 (en) Tanker reconstruction
JPS6177585A (en) Main engine replacing technique for ship
CA2357211A1 (en) Marine vessel and method of manufacturing
DE112007000108T5 (en) Flooding method for use in a tandem shipbuilding process
US3797439A (en) Method of outfitting an engine room of a ship
DE2303381A1 (en) SHIP
JPS60240589A (en) Method of replacing main engine of ship
JPS5932578A (en) Reconstruction method of boat into floating dock
US1338246A (en) Sectional ship and method of joining the sections
US3406650A (en) Method for increasing the load capacity of a vessel
JPS5812881A (en) Remodeling procedure of surface floating structure
SU943081A1 (en) Arrangement for assembling floating structure hull
JPS59184083A (en) Method for replacing ship hull of low temperature liquefied gas carrier
JPS6158354B2 (en)
SU1050955A1 (en) Method of producing cylindrical part unit of the ship's hull
JPS60219188A (en) Replacement of bottom outerboard
JPS5948285A (en) Method for reconstructing oil tanker into bulk carrier
JPS60146783A (en) Large-sized block construction method for ship to be repaired or reconstructed
JPH01502896A (en) power boat construction systems
KR20240044743A (en) Exhaust devicr for ballast water in case of emergency
JPH04353095A (en) Cargo oil outflow preventing type tanker with horizontal bulkhead