JPS6131501A - Construction of track beam - Google Patents

Construction of track beam

Info

Publication number
JPS6131501A
JPS6131501A JP14964984A JP14964984A JPS6131501A JP S6131501 A JPS6131501 A JP S6131501A JP 14964984 A JP14964984 A JP 14964984A JP 14964984 A JP14964984 A JP 14964984A JP S6131501 A JPS6131501 A JP S6131501A
Authority
JP
Japan
Prior art keywords
track girder
construction
track
lifting device
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14964984A
Other languages
Japanese (ja)
Other versions
JPH0213081B2 (en
Inventor
剣持 進一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP14964984A priority Critical patent/JPS6131501A/en
Publication of JPS6131501A publication Critical patent/JPS6131501A/en
Publication of JPH0213081B2 publication Critical patent/JPH0213081B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は軌道桁架設工法、特に懸垂型モルレールの軌道
桁を既存道路上圧架設するのに好適な軌道桁架設工法に
関する。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a track girder construction method, and particularly to a track girder construction method suitable for constructing a track girder of a suspended type mole rail on an existing road under pressure.

(従来の技術) 従来この種軌道桁を架設するには、第7図に示すように
、既存道路(05)内に支柱(04)とは別に所定間隔
を隔てて多数の支保工(01)を立設し、この支保工(
Ol)上に順次軌道桁ブロック(02)を自走式トラッ
ククレーン(03)により吊り上げて、支保工(01)
上で組み立ることにより架設していた。
(Prior Art) Conventionally, in order to erect this type of track girder, as shown in Fig. 7, in addition to the supports (04), a large number of supports (01) are installed at predetermined intervals within the existing road (05). This shoring (
A self-propelled truck crane (03) lifts the track girder blocks (02) one by one onto the shoring (01).
It was constructed by assembling on top.

(発明が解決しようとする問題点) 上記従来の架設工法による場合には、作業が多種、煩雑
で、多数の作業員を要し工費及び工期が嵩むのみならず
、支保工(01)の組立、解体及び軌道桁ブロック(0
2)の吊り上げ及び組み立て時における支保工(01)
の倒壊、トラッククレーン(03)の転倒、軌道桁ブロ
ック(02)又はその固着用金具及び工具の落下筒によ
り既存道路(05)を通行中の車両又は歩行者に危害を
与えるおそれがあるとともに危険な高所作業を要する。
(Problems to be Solved by the Invention) In the case of using the above-mentioned conventional erection method, the work is diverse and complicated, and requires a large number of workers, which not only increases the construction cost and construction period, but also increases the construction cost and construction period. , demolition and track girder block (0
2) Support during lifting and assembly (01)
The collapse of the truck crane (03), the fall of the track girder block (02) or its fixing fittings, and falling tools may cause harm to vehicles or pedestrians traveling on the existing road (05), and it is dangerous. Requires high-altitude work.

更に、軌道桁ブロック(02)の吊り上げには75ない
し125トンの大型のトラッククレーン(03)を要す
るためその騒音振動が大きく、又、約13メートルの作
業区域中を必要とするので、道路(05)の巾員に余裕
がない場合や交通量が多い場合には二の工法を採用でき
た〜1゜ (問題点解決のための手段) 本発明は上記問題点に対処するために発明されたもので
、その要旨とするところは連接する複数の既設支柱の頂
部に吊上装置を設置し、予じめ地上で組立てられた軌道
桁を上記吊上装置により一括して吊り上げた後、上記既
設支柱に固定することを特徴とする軌道桁架設工法にあ
る。
Furthermore, lifting the track girder block (02) requires a large truck crane (03) of 75 to 125 tons, which generates large amounts of noise and vibration, and requires a work area of about 13 meters, so it is difficult to lift the track girder block (02). 05) When there is not enough width or there is a lot of traffic, the second construction method can be adopted~1゜(Means for solving the problem) The present invention was invented to deal with the above problem. The gist of this is that a lifting device is installed at the top of a plurality of connected existing supports, and the track girder assembled in advance on the ground is lifted all at once by the lifting device, and then the above-mentioned This is a track girder construction method that is characterized by fixing to existing supports.

(実施例) 以下、本発明を第1図ないし第6図を参照しながら具体
的に説明する。
(Example) The present invention will be specifically described below with reference to FIGS. 1 to 6.

第1図に示すように連接する複数の既設支柱(1)の頂
部に吊上装置(2)をトラッククレーン(3)により吊
り上げて設置固定する。この吊上装置(2)の数は一括
して吊り上げ、かつ、架設される軌道桁が例えば3径間
連続桁であれば4個とする。そして第2図に示すように
複数の軌道桁ブロック(4)を桁下の工事区域(巾約1
0m)内にトレーラ(5)にて搬入し、第3図に示すよ
うにトラッククレーン(6)を用いて連結し地上にて3
径間連続の軌道桁(8)(全長約80m)に予じめ組み
立てる。この軌道桁(8)のキャンバ−等を確認した後
、第4図及び第5図に示すように各吊上装置(2)から
吊り金具(9)を降下して軌道桁(8)の各支点部を支
承して、各支点部を同時に所定高さく約13メートル)
迄垂直に吊り上げる。次いで、第6図に示すように吊上
装置(2)に組み込まれた移動台車を利用して橋軸方向
に沿って水平に縦移動させて支柱(1)の梁に設けた沓
に据付ける。据付けが終了すれば各吊上装置(2)を支
柱(1)より取り外し、次に軌道桁を架設すべき既設支
柱(1)の頂部圧順次取り付け、以後上記作業を繰返す
As shown in FIG. 1, a lifting device (2) is lifted and fixed onto the top of a plurality of connected existing columns (1) using a truck crane (3). The number of lifting devices (2) is four if the track girder is to be lifted all at once and the track girder to be constructed is, for example, a three-span continuous girder. Then, as shown in Figure 2, multiple track girder blocks (4) are installed in the construction area under the girders (width approx.
0m) using a trailer (5), and as shown in Figure 3, connect it using a truck crane (6) and transport it on the ground.
Assemble in advance into a continuous span track girder (8) (total length approximately 80 m). After checking the camber etc. of this track girder (8), as shown in Figures 4 and 5, the hanging fittings (9) are lowered from each lifting device (2) and each of the track girders (8) is (Support the fulcrum part and raise each fulcrum part at the same time to a specified height of approximately 13 meters)
Lift vertically until Next, as shown in Figure 6, using the moving cart built into the lifting device (2), it is moved horizontally and vertically along the bridge axis direction and installed on the shoe provided on the beam of the support column (1). . When the installation is completed, each lifting device (2) is removed from the support (1), and then the top pressure of the existing support (1) on which the track girder is to be erected is sequentially attached, and the above operations are repeated thereafter.

(発明の作用、効果) 本発明においては既設支柱を利用するので支保工の組立
、分解作業が不要であり、また、軌道ブロックを個々に
吊り上げることなく、複数の軌道ブロックを地上で予め
連結した後吊り上げるので、作業が単純になり、作業員
が少くて済むとともに工期及び工費が低減できる。そし
て、軌道桁は地上で連結して組立てられるので、そのキ
ャンバ−の管理や調整が容易であると同時に組立作業を
容易かつ迅速に行いうるとともに危険な高所作業が大巾
に低減できる。そして、従来のように75ないし125
トン程度の大型のトラッククレーンは不要となり45ト
ン程度の比較的小型のトラッククレーンを用いて組み立
て得るので、騒音や振動が少くなるとともに工事区域中
も少くて済む。更に、軌道桁は吊上装置によって吊り上
げられるので、非常に静かで騒音や振動が発生するおそ
れはない。
(Operations and Effects of the Invention) Since the present invention uses existing supports, there is no need to assemble or disassemble the support, and it is also possible to connect multiple track blocks in advance on the ground without lifting each track block individually. Since it is lifted afterward, the work is simple, fewer workers are required, and the construction period and cost can be reduced. Since the track girders are connected and assembled on the ground, it is easy to manage and adjust the camber, and at the same time, the assembly work can be performed easily and quickly, and dangerous work at high places can be greatly reduced. And, as before, 75 to 125
Since a large truck crane of approximately 45 tons is not required and assembly can be performed using a relatively small truck crane of approximately 45 tons, noise and vibration are reduced, and the amount of space in the construction area is also reduced. Furthermore, since the track girder is lifted by a lifting device, it is very quiet and there is no risk of generating noise or vibration.

かくして、道路の重置に余裕がない場合や交通量の多い
場合或は市街路においても軌道桁の架設が可能となる。
In this way, it is possible to construct track girders even when there is no room for overlapping roads, when there is a lot of traffic, or on city streets.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図ないし第6図はそれぞれ本発明の異る工程を示す
外観図、第7図は従来の工法を示す外観図である。 既設支柱・・・(1)      吊上装置・・・(2
)軌道桁・・・(8) 復代理人 弁理士岡本重文 外3名
FIGS. 1 to 6 are external views showing different steps of the present invention, and FIG. 7 is an external view showing a conventional construction method. Existing support column...(1) Lifting device...(2)
) Orbit girder... (8) Sub-agents Patent attorney Shigefumi Okamoto and 3 others

Claims (1)

【特許請求の範囲】[Claims] 連接する複数の既設支柱の頂部に吊上装置を設置し、予
じめ地上で組立てられた軌道桁を上記吊上装置により一
括して吊り上げた後、上記既設支柱に固定することを特
徴とする軌道桁架設工法。
A lifting device is installed at the top of a plurality of connected existing columns, and the track girders assembled in advance on the ground are lifted all at once by the lifting device, and then fixed to the existing columns. Track girder construction method.
JP14964984A 1984-07-20 1984-07-20 Construction of track beam Granted JPS6131501A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14964984A JPS6131501A (en) 1984-07-20 1984-07-20 Construction of track beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14964984A JPS6131501A (en) 1984-07-20 1984-07-20 Construction of track beam

Publications (2)

Publication Number Publication Date
JPS6131501A true JPS6131501A (en) 1986-02-14
JPH0213081B2 JPH0213081B2 (en) 1990-04-03

Family

ID=15479835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14964984A Granted JPS6131501A (en) 1984-07-20 1984-07-20 Construction of track beam

Country Status (1)

Country Link
JP (1) JPS6131501A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020012670A (en) * 2000-08-08 2002-02-20 김정현 A Bridge Establishing Method Using Fabricated Jack Support Unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020012670A (en) * 2000-08-08 2002-02-20 김정현 A Bridge Establishing Method Using Fabricated Jack Support Unit

Also Published As

Publication number Publication date
JPH0213081B2 (en) 1990-04-03

Similar Documents

Publication Publication Date Title
JP2007321473A (en) Rebuilding method for bridge
JP2000230205A (en) Elevated track construction method and device
JP7265967B2 (en) Cantilever device for bridge construction and bridge construction and demolition method
JPS6131501A (en) Construction of track beam
JPS6367349A (en) New construction on existing facilities
JP2772158B2 (en) Bridge girder erection method
JP2001098512A (en) Method for erecting and removing road striding bridge by frame with jack device
JP2950726B2 (en) Construction method of multi-layer suspension structure
JPH0312172B2 (en)
JPS62185905A (en) Moving type mold frame construction method of slab of high bridge
CN116623550A (en) Double-box continuous steel box girder construction method
JP3318133B2 (en) How to build artificial ground
JPH0649810A (en) Method of removing bridge crossbeam
JP3848758B2 (en) Construction method for direct suspension of structures
JPS6138066A (en) Assembling of suspension scaffold
JPS6217206A (en) Short-time construction of shelter
JPH0959924A (en) Slab form construction method
JPS6018508Y2 (en) Hanging scaffolding device
JPS6319301A (en) Method for temporarily constructing branch girder of suspension monorail
JPS6152305B2 (en)
JPS603363A (en) Construction of precast concrete large beam
CN113323295A (en) Method for installing roof structure of steel structure factory building
JP2755043B2 (en) How to install long structures
JPH03212564A (en) Jacking up method and device
JPH0342367B2 (en)

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term