JPH0649810A - Method of removing bridge crossbeam - Google Patents

Method of removing bridge crossbeam

Info

Publication number
JPH0649810A
JPH0649810A JP21874292A JP21874292A JPH0649810A JP H0649810 A JPH0649810 A JP H0649810A JP 21874292 A JP21874292 A JP 21874292A JP 21874292 A JP21874292 A JP 21874292A JP H0649810 A JPH0649810 A JP H0649810A
Authority
JP
Japan
Prior art keywords
bridge
road
garter
crossbeam
support member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP21874292A
Other languages
Japanese (ja)
Inventor
Teruo Takatsu
輝男 高津
Koji Sakura
孝治 佐倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP21874292A priority Critical patent/JPH0649810A/en
Publication of JPH0649810A publication Critical patent/JPH0649810A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To enable a bridge crossbeam to be removed in a short time, inexpensively and safely. CONSTITUTION:A bridge crossbeam 5 is taken away to a specified location by means of suspending the crossbeam 5, which both ends are cut off, from supporting members 21, 22 which travel on rails fixed on girders 13, 14 built on both side of the crossbeam 5 to be removed. The girders 13, 14 are then removed. Thus a bridge crossbeam can be removed within a short time, with less expense and with safety.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は高速道路上に掛け渡した
橋等の橋梁を撤去するための橋梁の撤去方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bridge removing method for removing a bridge such as a bridge spanned on a highway.

【0002】[0002]

【従来の技術】例えば高速道路の構築に際し、高速道路
相互及び一般道路と高速道路との間で立体交差部が数多
く建設されることとなり、その際は、道路の上に直交す
る道路のための橋梁が構築されることとなる。
2. Description of the Related Art For example, when constructing a highway, a number of grade intersections will be constructed between highways and between general roads and highways. The bridge will be constructed.

【0003】一方、近年の交通量の増大に対応するた
め、道路の車線を増やすために拡幅工事が増加してい
る。その際には、その道路上に構築された橋梁を撤去
し、道路を拡幅し、再び橋梁を新設することが行われ
る。
On the other hand, in order to cope with the increase in traffic volume in recent years, widening work is increasing to increase the lanes of roads. At that time, the bridge constructed on the road will be removed, the road will be widened, and a new bridge will be constructed again.

【0004】このような橋梁の撤去に際しては、振動や
衝撃を利用した破砕工法がとられることが、工事に際し
て大きな騒音や振動を生じ、人家の多い工事としては不
向きであった。
When such a bridge is removed, a crushing method utilizing vibration or shock is used, which causes great noise and vibration during the construction, which is not suitable for construction with many houses.

【0005】そのため、工事現場に大型クレーンを輸送
し、それにより橋梁を持ち上げ方向に支持しつつ橋の両
端を分断し、橋梁をクレーンで持ち上げつつ道路側部に
移動させ、その後分断解体を行なうことが提案されてい
る。
Therefore, it is necessary to transport a large crane to the construction site, thereby supporting the bridge in the lifting direction to divide both ends of the bridge, lifting the bridge with the crane and moving it to the side of the road, and then performing the disassembly and disassembly. Is proposed.

【0006】[0006]

【発明が解決しようとする課題】上記のような、橋梁の
分断による撤去工法においては、最初工事を行なう個所
の通行止めを行ない、クレーン車を現場に走行させ、ク
レーン車により橋梁を持ち上げるための準備施工をし、
次いで橋の両端を分断し、クレーンで橋梁を搬出し、各
種後片付けをした後、クレーン車を退去させ、道路の使
用開放を行なうという手順で作業を行なうこととなる。
In the removal method by dividing the bridge as described above, the place where the first construction is to be performed is closed, the crane truck is made to travel to the site, and the preparation for lifting the bridge by the crane truck is made. Construction,
Next, the both ends of the bridge will be divided, the bridge will be carried out with a crane, after various cleaning up, the crane truck will be withdrawn, and the road will be opened for use.

【0007】そのため、上記工法では約12時間高速道
路を通行止めとする必要があり、例えば、東名高速道路
等の主幹道路では著しい交通停滞を生じ、また高速道路
の通行料収入も大きく減少することとなる。
Therefore, the above method requires that the highway be closed for about 12 hours. For example, a major road such as the Tomei Expressway will cause a significant traffic stagnation, and the toll revenue of the highway will be greatly reduced. Become.

【0008】したがって、本発明は、短時間に安価にか
つ安全に橋梁を撤去することができる橋梁撤去方法を提
供することを目的とする。
Therefore, it is an object of the present invention to provide a bridge removing method capable of removing a bridge safely at low cost in a short time.

【0009】[0009]

【課題を解決するための手段】本発明は、上記課題を解
決するため、撤去する橋梁の両側にレール付きガーター
を掛け渡し、両ガーターのレール上を走行する支持部材
により両端を分断した橋梁を吊り下げて走行して橋梁を
所定位置に撤去し、次いでガーターを撤去するようにし
たものであり、それにより短時間に安価にかつ安全に橋
梁を撤去できるようにしたものである。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention provides a bridge whose both ends are separated by a supporting member that runs on the rails of both garters, with garters with rails laid on both sides of the bridge to be removed. It is designed so that the bridge can be removed in a predetermined position by suspending and traveling, and then the garter can be removed, thereby making it possible to remove the bridge safely at low cost in a short time.

【0010】[0010]

【作用】本発明は、上記のように構成したので、橋梁の
撤去に際しては、最初撤去する橋の両側にクレーン車等
によりレール付きのガーターを掛け渡し、両ガーターの
レール上を走行する支持部材を適宜の個数走行させ、支
持部材に橋梁を支持させ、この時に橋梁の両端をワイヤ
ーソー等により分断するか、あるいは上記作業の前に予
め既存の状態で橋が落下しないよう橋の両端を分断して
おいた橋梁を吊り下げて所定位置に橋梁を撤去し、その
後クレーン車等によりガーターを撤去することにより橋
梁の撤去作業は終了する。
Since the present invention is configured as described above, when removing a bridge, a garter with rails is hung on both sides of the bridge to be removed first by a crane vehicle or the like, and a supporting member that runs on the rails of both garters is supported. Run the appropriate number of bridges to support the bridge on the support member, and at this time divide both ends of the bridge with a wire saw, or divide both ends of the bridge so that the bridge does not fall in the existing state before the above work. The bridge removal work will be completed by suspending the bridge and removing it at a predetermined position, and then removing the garter with a crane vehicle.

【0011】[0011]

【実施例】本発明の実施例を図面に沿って説明する。図
1、図2に示すように、高速道路等の道路1には、その
道路と立体交差するため橋2が掛けられ、橋2は、道路
1の両側の支柱3,4に支持された橋梁5を主体として
構成されている。支柱3,4は図中、道路の利用側の土
砂、岩塊6用の擁壁の機能を有する橋2の基礎をなし、
橋梁の支持溝をなしている。
Embodiments of the present invention will be described with reference to the drawings. As shown in FIG. 1 and FIG. 2, a bridge 2 is hung on a road 1 such as a highway because it crosses the road, and the bridge 2 is a bridge supported by columns 3 and 4 on both sides of the road 1. 5 is the main component. The pillars 3 and 4 form the foundation of the bridge 2 having the function of a retaining wall for the earth and sand and rock mass 6 on the road side in the figure,
It forms a support groove for the bridge.

【0012】このような道路1の交通量の増加により車
線を増やす際には、道路巾を広くしなければならず、そ
のためには、橋2をかけ替える必要がある。そのために
は、現在かけられている橋梁5を撤去しなければならな
いが、その際には最初支柱3,4と橋梁5を分離する必
要があり、支柱3,4の上端を水平にカットし、水平分
断部7,8を形成する。また、撤去すべき橋梁を最低限
の長さとし、しかも上記のように支柱3,4の上端に水
平分断部7,8を形成しても橋梁5が落下しない長さと
して、ワイヤーソーイング工法又はその他の方法により
垂直分断部10,11を形成する。そのほか必要に応
じ、ガード12等の橋2の付帯設備の一部を分断し、あ
るいは予め撤去する。これらの工事中は道路1の車の走
行に影響を与えることがないので、道路2が高速道路の
場合は通行止めを行なう必要がなく、営業を続けること
ができる。なお、以降の作業に際しては道路2を通行止
めとする。
When the number of lanes is increased by increasing the traffic volume on the road 1 as described above, it is necessary to widen the width of the road, and for that purpose, it is necessary to replace the bridge 2. For that purpose, the bridge 5 currently being applied must be removed, but at that time it is necessary to first separate the pillars 3 and 4 from the bridge 5, and the upper ends of the pillars 3 and 4 are cut horizontally, The horizontal dividing parts 7 and 8 are formed. In addition, the length of the bridge to be removed should be the minimum length, and the length of the bridge 5 should not drop even if the horizontal dividing portions 7 and 8 are formed on the upper ends of the columns 3 and 4 as described above. The vertical dividing portions 10 and 11 are formed by the above method. In addition, part of the incidental equipment of the bridge 2 such as the guard 12 may be divided or removed in advance if necessary. Since the vehicles on the road 1 are not affected during the construction work, it is not necessary to close the road 2 when the road 2 is a highway, and the business can be continued. In addition, the road 2 will be closed during the subsequent work.

【0013】次いで、図3に示すように、撤去予定の橋
梁5の両側に互いに平行に、第1ガーター13と第2ガ
ーター14とをクレーン車等のクレーン15により掛け
渡す。その際、図7に示すように、ガーターの安定的支
持のため基礎部材16を設置しておいても良い。ガータ
ー5は、図5にしめすように、断面口型の構造材からな
り、上面17にはレール18をその軸線方向に沿って固
定している。ガーターの長さは撤去のために、分断され
た橋梁5の2倍より少し長い程度が好ましいが、クレー
ン車の許容荷重や運搬性、作業性のため支柱3,4間の
長さ以上にはできない場合には、同じ長さ程度の橋梁を
後で接続しても良い。
Next, as shown in FIG. 3, the first garter 13 and the second garter 14 are bridged in parallel with each other on both sides of the bridge 5 to be removed by a crane 15 such as a mobile crane. At that time, as shown in FIG. 7, a base member 16 may be installed for stable support of the garter. As shown in FIG. 5, the garter 5 is made of a structural material having a mouth-shaped cross section, and a rail 18 is fixed to the upper surface 17 along the axial direction thereof. The length of the garter is preferably a little longer than twice the length of the divided bridge 5 for removal, but it is more than the length between the columns 3 and 4 for the allowable load of the crane vehicle, transportability and workability. If this is not possible, bridges of the same length may be connected later.

【0014】次いで、橋の両側に設けたガーター13,
14のレール18上に車輪20が位置する支持部材2
1,22を乗せ、第1支持部材21を支柱3側に走行さ
せ、第2支持部材22を支柱4側に位置させる。支持部
材21の上部には、油圧ジャッキ23を図中3個設けて
おり、各油圧ジャッキ23を貫通するボルト24を油圧
により上下動可能としている。支持部材21の走行に際
しては、予めボルト24を挿通する孔25を橋梁5に設
けておき、この孔の直上に支持部材21を停止させる。
油圧ジャッキ23の作動を解除し、ボルト24を降下さ
せ、孔25を貫通させた後、ナット26を架橋5の下側
に螺合して固定する。第2支持部材22にも同様に油圧
ジャッキ及びボルトを有し、前記第1支持部材と同様に
橋梁に予め形成した孔にボルトを挿通しナットで止め
る。
Next, the garters 13 provided on both sides of the bridge,
Support member 2 in which wheels 20 are located on rails 14 of 14
1, 2 are mounted, the first support member 21 is moved to the support column 3 side, and the second support member 22 is positioned on the support column 4 side. Three hydraulic jacks 23 are provided in the upper part of the support member 21, and bolts 24 penetrating each hydraulic jack 23 can be moved up and down by hydraulic pressure. When the support member 21 travels, a hole 25 through which the bolt 24 is inserted is provided in the bridge 5 in advance, and the support member 21 is stopped immediately above this hole.
The operation of the hydraulic jack 23 is released, the bolt 24 is lowered, the hole 25 is penetrated, and then the nut 26 is screwed and fixed to the lower side of the bridge 5. Similarly, the second support member 22 also has a hydraulic jack and a bolt, and like the first support member, the bolt is inserted through a hole previously formed in the bridge and fixed with a nut.

【0015】第1支持部材21及び第2支持部材22の
油圧ジャッキ23を作動し、ボルト24を押し上げる
と、予め両端を分断されている橋梁5は持ち上げられ、
ガーター13,14間の高さの範囲内に保持される。
When the hydraulic jacks 23 of the first support member 21 and the second support member 22 are actuated and the bolts 24 are pushed up, the bridge 5 whose both ends have been divided beforehand is lifted,
It is kept within the height range between the garters 13, 14.

【0016】図7に示すように、支持部材により保持さ
れた橋梁は、第1支持部材21をウインチ等により引く
ことにより道路1の上方からその範囲外の位置に運搬さ
れ撤去される。次いでガーター13,14をクレーン車
で撤去することにより道路1は通行可能となる。
As shown in FIG. 7, the bridge held by the support member is transported from above the road 1 to a position outside the range by pulling the first support member 21 with a winch or the like and removed. Then, by removing the garters 13 and 14 with a crane truck, the road 1 becomes passable.

【0017】なお、上記橋梁の撤去に際し、図4に示す
ように、ガーター13,14間にレール26を施設して
おき、橋梁を支持部材で運搬する際、万が一落下するこ
とがあっても大きな被害を及ぼさないよう、安全策を講
じても良い。
When the bridge is removed, as shown in FIG. 4, a rail 26 is installed between the garters 13 and 14, and when the bridge is carried by a supporting member, it may be dropped if it should happen. You may take safety measures to prevent damage.

【0018】また、本発明による上記橋梁の撤去方法
は、高速道路上の橋梁に限らず、各種の橋梁の撤去に採
用することが可能である。
The method for removing a bridge according to the present invention can be applied not only to bridges on highways but also to various bridges.

【0019】[0019]

【発明の効果】本発明は上記のようにしてなるので、橋
梁の撤去作業に際して橋梁の下の道路等の通行止めを行
なう前に、予め最も作業時間を要する橋梁両端の分断作
業を行なっておくことができ、それ以降の作業時のみ通
行止めとすれば良く、通行止め時間を短時間とすること
ができ、交通の妨げとなる時間を短縮できるほか、その
道路が高速道路の場合は通行料収入の減少を極力小さく
することが可能となる。また、その撤去作業は、ガータ
ーに確実に支持しつつ撤去できるので、安全に行なうこ
とができる。
EFFECTS OF THE INVENTION Since the present invention is constructed as described above, before the road work under the bridge is closed during the work of removing the bridge, the work of dividing both ends of the bridge, which requires the most work time, should be performed in advance. It is possible to do so, and it is only necessary to close the road during the subsequent work, which can shorten the time of road closure, shorten the time that obstructs traffic, and reduces toll revenue if the road is a highway. Can be made as small as possible. In addition, the removal work can be performed safely because it can be removed while securely supporting the garter.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明により撤去する橋の側面図である。FIG. 1 is a side view of a bridge to be removed according to the present invention.

【図2】同平面図である。FIG. 2 is a plan view of the same.

【図3】本発明によるガーター架設時の平面図である。FIG. 3 is a plan view of the garter installed according to the present invention.

【図4】同、支持部材配設時の平面図である。FIG. 4 is a plan view of the same when a support member is provided.

【図5】同、ガーターの斜視図である。FIG. 5 is a perspective view of the garter of the same.

【図6】同、橋梁吊り上げ時の側面図である。FIG. 6 is a side view of the same when the bridge is lifted.

【図7】同、橋梁撤去時の正面図である。FIG. 7 is a front view of the same when the bridge is removed.

【符号の説明】[Explanation of symbols]

1 道路 2 橋 3 支柱 4 支柱 5 橋梁 7 水平分断部 8 水平分断部 10 垂直分断部 11 垂直分断部 13 第1ガーター 14 第2ガーター 15 クレーン 18 レール 20 車輪 21 支持部材 22 支持部材 23 油圧ジャッキ 24 ボルト 25 孔 26 ナット 1 Road 2 Bridge 3 Strut 4 Strut 5 Bridge 7 Horizontal Separation Part 8 Horizontal Separation Part 10 Vertical Separation Part 11 Vertical Separation Part 13 First Garter 14 Second Garter 15 Crane 18 Rail 20 Wheel 21 Supporting Member 22 Supporting Member 23 Hydraulic Jack 24 Bolt 25 Hole 26 Nut

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】撤去する橋梁の両側にレール付きガーター
を掛け渡し、両ガーターのレール上を走行する支持部材
により両端を分断した橋梁を吊り下げて走行して橋梁を
所定位置に撤去し、次いでガーターを撤去することを特
徴とする橋梁の撤去方法。
1. A garter with rails is laid on both sides of the bridge to be removed, and the bridge whose both ends are separated by a supporting member that runs on the rails of both garters is hung and run to remove the bridge at a predetermined position. A method of removing a bridge characterized by removing a garter.
JP21874292A 1992-07-27 1992-07-27 Method of removing bridge crossbeam Pending JPH0649810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21874292A JPH0649810A (en) 1992-07-27 1992-07-27 Method of removing bridge crossbeam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21874292A JPH0649810A (en) 1992-07-27 1992-07-27 Method of removing bridge crossbeam

Publications (1)

Publication Number Publication Date
JPH0649810A true JPH0649810A (en) 1994-02-22

Family

ID=16724715

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21874292A Pending JPH0649810A (en) 1992-07-27 1992-07-27 Method of removing bridge crossbeam

Country Status (1)

Country Link
JP (1) JPH0649810A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669902A (en) * 2013-12-31 2014-03-26 中建铁路建设有限公司 Cast-in-place beam support truss integral dropping and dismounting tool and construction method thereof
US8761947B2 (en) 2010-06-30 2014-06-24 Mitsubishi Electric Research Laboratories, Inc. System and method for reducing lateral vibration in elevator systems
CN114108502A (en) * 2021-11-16 2022-03-01 中铁广州工程局集团有限公司 Construction method for synchronously dismantling multiple transverse overbridges of suspension bridge catwalk

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8761947B2 (en) 2010-06-30 2014-06-24 Mitsubishi Electric Research Laboratories, Inc. System and method for reducing lateral vibration in elevator systems
CN103669902A (en) * 2013-12-31 2014-03-26 中建铁路建设有限公司 Cast-in-place beam support truss integral dropping and dismounting tool and construction method thereof
CN114108502A (en) * 2021-11-16 2022-03-01 中铁广州工程局集团有限公司 Construction method for synchronously dismantling multiple transverse overbridges of suspension bridge catwalk
CN114108502B (en) * 2021-11-16 2024-03-15 中铁广州工程局集团有限公司 Synchronous dismantling construction method for multiple transverse overpasses of suspension bridge catwalk

Similar Documents

Publication Publication Date Title
JP6081117B2 (en) How to remove existing bridge and update existing bridge
US4301565A (en) Method and system for the removal and replacement of a bridge
CN107558494A (en) A kind of Underground Station structure and its method of construction
CN113089510A (en) Method for dismantling reinforced concrete continuous box girder overpass bridge
JPH11131427A (en) Floor board replacing machine for concrete bridge
CN105735139A (en) Supporting system for construction of cast-in-situ box beam in overpass and construction method of box beam
JP3954869B2 (en) Bridge girder replacement method
KR100571525B1 (en) Expansion method of a bridge using concrete structure
CN113931091A (en) Construction method for dismantling wide-width continuous beam of business line of overpass railway
KR20090098180A (en) Method for broadening width of existing bridge without temporary road
CN111270618B (en) Bridge reconstruction construction method based on half-width traffic protection
CN112921838A (en) Method for dismantling suspension line non-hinge rib arch bridge
US3301146A (en) By-pass structure
JPH0649810A (en) Method of removing bridge crossbeam
KR101234090B1 (en) Method for changing girder of railway plate girder bridge
KR100793956B1 (en) Construction of plate girder railway bridge and there of method
US6795992B2 (en) Bridge construction method
JP4685341B2 (en) Viaduct construction method
JP3349463B2 (en) How to install additional girder
KR100699022B1 (en) A railroad bridge repair method used low and longer girder
JP2001098512A (en) Method for erecting and removing road striding bridge by frame with jack device
KR101016152B1 (en) Rapid Replacement Method and Apparatus Using Pulling-Up Facility and Scaffold Truss with Wheels under the Bottom of Existing and Replacing Bridges
JPS60258311A (en) Construction of high structure
JPH10237823A (en) Method for replacing overhead bridge
JP4339778B2 (en) How to remove a bridge