JPS61194532A - Process control system for development of software - Google Patents
Process control system for development of softwareInfo
- Publication number
- JPS61194532A JPS61194532A JP3445585A JP3445585A JPS61194532A JP S61194532 A JPS61194532 A JP S61194532A JP 3445585 A JP3445585 A JP 3445585A JP 3445585 A JP3445585 A JP 3445585A JP S61194532 A JPS61194532 A JP S61194532A
- Authority
- JP
- Japan
- Prior art keywords
- software
- program
- development
- manufacturing
- charge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Feedback Control In General (AREA)
Abstract
Description
【発明の詳細な説明】
[発明の技術分野]
本発明は、ソフトウェア開発における工程管理方式に関
する。DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a process management method in software development.
[発明の技術的背景]
ソフトウェアの開発もハードウェアと同様に設計、製造
、検査といった工程を経て行われる。しかし、ソフトウ
ェアの場合、ハードウェアと違って各工程が完全に標準
化されていないと共に、ハードウェアと違って製造物の
形態が明確でない為、製造の実態を正確に把握すること
が困難となっている。この為、工程管理は管理者が各担
当者に各担当工程の進捗の度合を聞いて工程表に記入す
る方式によって行われており、製造と工程とが完全に分
離されて管理されていた。[Technical Background of the Invention] Like hardware, software development is performed through processes such as design, manufacturing, and inspection. However, in the case of software, unlike hardware, each process is not completely standardized, and unlike hardware, the form of the product is not clear, making it difficult to accurately grasp the actual state of manufacturing. There is. For this reason, process control was carried out by a system in which the manager asked each person in charge about the degree of progress of each process in charge and entered it in a process chart, and manufacturing and processes were completely separated and managed.
[背景技術の問題点]
従って、従来の工程管理方式では、製造工程の実績を正
しくとらえることができず、納期間近かになって工程の
遅れに気付くことも少なくなく、ソフトウェア(製造物
)の品質が落ちたり、設計宙などの保守資料が雑になる
という欠点があった。[Problems in the background art] Therefore, with conventional process control methods, it is not possible to accurately capture the performance of the manufacturing process, and delays in the process are often noticed near the delivery deadline, resulting in problems with software (manufactured products). The disadvantages were that the quality deteriorated and the maintenance materials such as design documents became sloppy.
[発明の目的]
本発明の目的は、上記の欠点に鑑み、ソフトウェアの製
造工程上の実績を容易かつ正確に把握することができる
ソフトウェア開発における工程管理方武を提供すること
にある。[Object of the Invention] In view of the above-mentioned drawbacks, an object of the present invention is to provide a process control method for software development that allows easy and accurate understanding of the performance of software manufacturing processes.
[発明の概要] 、
本発明は、ソフトつ1ア製造工程及び製造環境を設定す
る工程管理プログラムと、設定された上記ソフトウェア
製造工程及び製造環境に従って製造を支援し且つ製造工
程の実績を収集する開発シナリオプログラムと、前記工
程管理プログラムの設定情報及び前記開発シナリオプロ
グラムの収集実績を格納するデータベース記憶手段と、
前記開発シナリオプログラムの支援等によって製造され
たソフトウェア製造物を格納する成果物蓄積手段とを具
備して成るソフトウェア開発における王、程管理方式を
採用することにより、上記目的を達成するものである。[Summary of the Invention] The present invention provides a process management program that sets a software manufacturing process and manufacturing environment, and supports manufacturing and collects the results of the manufacturing process according to the set software manufacturing process and manufacturing environment. a database storage means for storing a development scenario program, setting information of the process management program, and collection results of the development scenario program;
The above object is achieved by adopting a process management method in software development, which includes a product storage means for storing software products manufactured with the support of the development scenario program.
[発明の実施例]
以下本発明の一実施例を図面を参照しつつ説明する。第
1図は本発明のソフトウェア開発にお(プる■程管理方
式を適用したソフトウェア開発システムの一実施例を示
したブロック図である。本システムは、ソフトウェア製
造の環境設定やソフトウェア製造の工程を管理する工程
管理プログラム1と、ソフトウェア製造環境やソフトウ
ェア製造T稈の情報を蓄積するデータベース2と、ソフ
トウェア製造手順の提示やソフトウェア製造支援をする
と共にソフトウェア製造実績を収集する開発シナリオプ
ログラム3と、ラフ1製造物ア製造物を格納する複数の
成果物ファイル4から成っている。[Embodiment of the Invention] An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing an embodiment of a software development system in which the process management method of the present invention is applied to software development. A process management program 1 that manages the software manufacturing environment, a database 2 that accumulates information on the software manufacturing environment and software manufacturing T-culm, and a development scenario program 3 that presents software manufacturing procedures, supports software manufacturing, and collects software manufacturing results. Rough product 1 consists of a plurality of product files 4 that store products.
次に本実施例の動作について説明する。まず、ソフトウ
ニ・アを開発するプロジェクトチームが発足し、工程管
理プログラム1を使ってプロジェクト情報、ソフトウェ
ア製造環境(使用するファイル、ツール等)やソフトウ
ェア工程プロセス(システム設計、プログラム設計、製
造等)を設定する。工程管理プログラム1は上記設定さ
れた情報を総てデータベース2にプロジェクト単位ごと
に格納する。開発シナリオプログラム3は工程管理プロ
グラム1で設定したソフトウェア製造環境をデータベー
ス2より入手し、ソフトウェアの開発作業を進めている
各担当者のソフトウェア製造を支援する。開発シナリオ
プログラム3はこの支援上向時に各工程及び各担当者の
ソフトウェア製造実績をデータベース2に格納する。又
、上記の様に開発シナリオプログラム3の支援で製造さ
れたソフトウェアは開発シナリオプログラム3によって
成果物ファイル4へ格納される。Next, the operation of this embodiment will be explained. First, a project team to develop the software was established, and using process management program 1, project information, software production environment (files used, tools, etc.) and software process (system design, program design, manufacturing, etc.) were established. Set. The process management program 1 stores all the above set information in the database 2 for each project. The development scenario program 3 obtains the software manufacturing environment set in the process management program 1 from the database 2, and supports software manufacturing by each person in charge of software development work. The development scenario program 3 stores the software manufacturing results of each process and each person in charge in the database 2 at the time of this support improvement. Further, the software manufactured with the support of the development scenario program 3 as described above is stored in the product file 4 by the development scenario program 3.
第2′INは上記データベースの格納領域の模式図であ
る。工程管理プログラム1によってプロジェクトと工程
プロセスの登録を行なうと、これに関するデータがデー
タベース2に符号イで示すごとく店き込まれる。即ち、
最初のフィールドにはプロジェクトID(インデクスデ
ータ)が、次のフィールドには工程のプロセス名が書き
込まれ、又他のフィールドには工程情報等が書き込まれ
る。2'IN is a schematic diagram of the storage area of the database. When a project and a process are registered using the process management program 1, data related thereto is stored in the database 2 as shown by the symbol A. That is,
The project ID (index data) is written in the first field, the process name of the process is written in the next field, and process information etc. are written in the other fields.
結局、前記プロジェクトIDをキーとして当該ソフトウ
ェア開発の蚕体工程、細評工程(業務単位とプログラム
単位)が登録される。In the end, the detailed process and review process (work unit and program unit) of the software development are registered using the project ID as a key.
開発シナリオプログラム3はソフトウェア製造時の各担
当者の作成プログラムのステップ数から機械的に実績を
読み取り、これをデータベース2に格納する。あるいは
開発シナリオプログラム3= 4−
は各担当者の作業内容を担当者に提示して、担当者が実
績登録しやすいように導き、登録(各担当者によってイ
ンプットされた)された実績をデータベース2に格納す
る。The development scenario program 3 mechanically reads the results from the number of steps in the program created by each person in charge during software production, and stores this in the database 2. Alternatively, the development scenario program 3 = 4- presents the work contents of each person in charge to the person in charge, guides the person in charge to easily register the results, and stores the registered results (inputted by each person in charge) in the database 2. Store in.
本実施例によれば、ソフトウェア製造とソフトウェア工
程管理とを第2図の所で述べたごとく機械的に結合して
、各工程担当者の実績をデータベース2に格納してある
為、管理者はこのデータベース2を検索することにより
製造工程上の実績を容易・且つ正確に把握することがで
き、ソフトウェア(製造物)の品質を向上させることが
できると共に、設計書等の保守資料の充実等も図ること
ができる。又、工程管理プロ・ダラム1によりソフトウ
ェア開発における製造工程を標準化することができる。According to this embodiment, software manufacturing and software process management are mechanically combined as described in FIG. By searching this database 2, it is possible to easily and accurately understand the performance of the manufacturing process, improve the quality of software (manufactured products), and improve maintenance materials such as design documents. can be achieved. Additionally, the process management program Durham 1 can standardize the manufacturing process in software development.
更に、工程管理プログラム1により製造環境を設定する
ことによって成果物ファイル4を容易に管理することが
できる。又、開発シナリオプログラム3により製造を円
滑に行なって生産性を向上させることができる。Further, by setting the manufacturing environment using the process management program 1, the product files 4 can be easily managed. Further, the development scenario program 3 allows smooth manufacturing and improves productivity.
[発明の効果]
以−1−記述したごとく、本発明のソノトウ1ア製造し
=a月ノる王程管理f)式によれば、[稈管理プログラ
ムによって設定されたソノトウ1ア製造「稈や製造環境
に基づいて、開発シノ−リΔプログラム3が各世当者の
ソノ1〜ウエアの製造を克援夛るとハ(、二、各4目当
者の実績を前記丁程管理ブ【]ダラムの情報に基づいで
f−タヘースに登録1−ることにより、ソノ1〜つ丁ア
の製造F捏上の実績を容易1つ1確に把握し得る効果が
ある。[Effects of the Invention] As described below-1-1, according to the formula of the present invention where sonoto 1a production = a month's management f), [sonoto 1a production set by the culm management program "culm Based on the manufacturing environment and manufacturing environment, the development synori Δ program 3 will assist each person in the production of clothing from 1 to 3. [] By registering in F-Tahes based on Durham's information, it is possible to easily and accurately grasp the track record of manufacturing F fabrication of Sono 1 to Tsu Ding.
第1図は本発明のソノ1〜つLア聞介にお(JるT程管
理す式を適用したソフトウェア開発シスデムの一実施例
を示したブロック図、第2図は第1図(に示したデータ
ベースのデータ格納領域模式図である。
1・・・工程管理ブ[]グラム 2・・・データベ
ース3・・・聞介シノリA−10グラム
4・・・成東物ファイルFIG. 1 is a block diagram showing an embodiment of a software development system to which the method of managing the software of the present invention is applied, and FIG. It is a schematic diagram of the data storage area of the shown database. 1...Process management block []gram 2...Database 3...Monsuke Shinori A-10gram 4...Seitomono file
Claims (1)
プログラムと、設定された上記ソフトウェア製造工程及
び製造環境に従って製造を支援し且つ製造工程の実績を
収集する開発シナリオプログラムと、前記工程管理プロ
グラムの設定情報及び前記開発シナリオプログラムの収
集実績を格納するデータベース記憶手段と、前記開発シ
ナリオプログラムの支援等によって製造されたソフトウ
ェア製造物を格納する成果物蓄積手段とを具備して成る
ことを特徴とするソフトウェア開発における工程管理方
式。a process management program that sets the software manufacturing process and manufacturing environment; a development scenario program that supports manufacturing and collects the results of the manufacturing process according to the set software manufacturing process and manufacturing environment; In software development, the invention comprises a database storage means for storing collection results of the development scenario program, and a product storage means for storing software products manufactured with support of the development scenario program, etc. Process control method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3445585A JPS61194532A (en) | 1985-02-25 | 1985-02-25 | Process control system for development of software |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3445585A JPS61194532A (en) | 1985-02-25 | 1985-02-25 | Process control system for development of software |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS61194532A true JPS61194532A (en) | 1986-08-28 |
Family
ID=12414719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3445585A Pending JPS61194532A (en) | 1985-02-25 | 1985-02-25 | Process control system for development of software |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61194532A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0448327A2 (en) * | 1990-03-19 | 1991-09-25 | Hitachi, Ltd. | Work scheduling method and system |
US5144555A (en) * | 1989-11-16 | 1992-09-01 | Hitachi, Ltd. | Method and apparatus for supporting of making formatted document |
US5535388A (en) * | 1991-08-21 | 1996-07-09 | Hitachi, Ltd. | Apparatus for dynamically collecting and editing management information during a software development process |
-
1985
- 1985-02-25 JP JP3445585A patent/JPS61194532A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5144555A (en) * | 1989-11-16 | 1992-09-01 | Hitachi, Ltd. | Method and apparatus for supporting of making formatted document |
EP0448327A2 (en) * | 1990-03-19 | 1991-09-25 | Hitachi, Ltd. | Work scheduling method and system |
US5535388A (en) * | 1991-08-21 | 1996-07-09 | Hitachi, Ltd. | Apparatus for dynamically collecting and editing management information during a software development process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2008097236A (en) | Program, method, and device for supporting group work analysis | |
CN101650800A (en) | Method and device for updating task content in project task plan system | |
CN109033523A (en) | A kind of Assembly process specification generation System and method for based on three-dimensional CAD model | |
CN107609077A (en) | Wlding approaches to IM | |
JPS61194532A (en) | Process control system for development of software | |
JP4040764B2 (en) | Gene motif extraction processing apparatus, gene motif extraction processing method, and recording medium storing gene motif extraction processing program | |
JP3867470B2 (en) | Document history management apparatus and document history management method | |
JPH06348720A (en) | Production development control display device | |
JP2003196435A (en) | Business flow creation support method and system for it | |
JPH08234977A (en) | Manifold progress management system for software project | |
JPH0193843A (en) | System for coupling table | |
JPH05233238A (en) | Software maintenance resource management system | |
JPH08329150A (en) | Manufacturing process managing system | |
JP3234713B2 (en) | Schedule management method and schedule management device | |
JP3521822B2 (en) | Electronic report device and machine-readable recording medium recording program | |
JPH06266541A (en) | Version management method for product | |
TW578077B (en) | Apparatus wholesale list updating method and system | |
JP3295826B2 (en) | Part number input and display method in man-hour management system | |
JPH0448330A (en) | Software parts control system | |
JPH0561880A (en) | Automatic process condition presenting system | |
CN118037214A (en) | Offline data editing system and use method | |
JPS6013496B2 (en) | Recovery starting point control method for each extent | |
JPH01140484A (en) | Information managing method for recording medium | |
JPH05233247A (en) | Method and device for managing software developing process | |
JPH0480822A (en) | Progress control system for software job |