JPS61109825A - Foundation construction for foundation beam and the like - Google Patents

Foundation construction for foundation beam and the like

Info

Publication number
JPS61109825A
JPS61109825A JP23140384A JP23140384A JPS61109825A JP S61109825 A JPS61109825 A JP S61109825A JP 23140384 A JP23140384 A JP 23140384A JP 23140384 A JP23140384 A JP 23140384A JP S61109825 A JPS61109825 A JP S61109825A
Authority
JP
Japan
Prior art keywords
reinforcing bars
concrete
struts
holder
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23140384A
Other languages
Japanese (ja)
Inventor
Tsutomu Hayamizu
速水 努
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Original Assignee
Shimizu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd filed Critical Shimizu Construction Co Ltd
Priority to JP23140384A priority Critical patent/JPS61109825A/en
Publication of JPS61109825A publication Critical patent/JPS61109825A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

PURPOSE:To reuse parts economically in the construction of foundation by a method in which struts are erectly provided on a base slab, a holder is attached to the struts, reinforcing bars are set on the holder, a formwork is set on the outside of them, concrete is placed into the formwork, and the struts and the holder are removed out. CONSTITUTION:Struts 3 are detachably set on a fixed base slab 2, and a holder 6 is horizontally attached detachably to the upper parts of the struts 3. Reinforcing bars 7a and 7c are supported on the holder, other reinforcing bars are set to assemble them, and a formwork 8 is set on the outside of them. Concrete 10 is placed to a level at which the assembled reinforcing bars 7 can stand by themselves, and the holder is removed out of the struts 3. The struts 3 are removed from the base slab 2, and concrete 10 is again placed. Since the struts 3 and the holder 6 can be removed, they can be repeatedly utilized.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、基礎梁鉄筋、基礎柱鉄筋等の鉄筋を足場無し
に組み立てて施工する基礎施工法に関する0 (従来の技術) 従来、この種の施工法として実公昭59−30130号
公報に示すものがある。この施工法は、捨てコンクIJ
 −ト上に座板を載置固定し、この座板上面に立設した
縦管の上端部に水平支承杆を水平状態に挿着し、この支
承杆上に例えば基礎梁の上部鉄筋を支持し、この鉄筋に
スターラップを掛回し、このスターラップの下部で下部
鉄筋全保持して鉄筋全組み立て、その後鉄筋の外側に組
込んだ型枠内にコンクリート全打設し、鉄筋及び縦管、
水平支承杆を埋込んだ状態で施工を完了するものである
Detailed Description of the Invention (Industrial Application Field) The present invention relates to a foundation construction method in which reinforcing bars such as foundation beam reinforcing bars and foundation column reinforcing bars are assembled and constructed without scaffolding. As a construction method, there is a method shown in Japanese Utility Model Publication No. 59-30130. This construction method is used for disposable concrete IJ.
- A seat plate is placed and fixed on top of the seat plate, and a horizontal support rod is horizontally inserted into the upper end of a vertical pipe erected on the top of this seat plate, and the upper reinforcing bar of a foundation beam, for example, is supported on this support rod. Then, a stirrup is hung around this reinforcing bar, all of the lower reinforcing bars are held at the bottom of this stirrup, and all of the reinforcing bars are assembled.Then, all of the concrete is poured into the formwork built outside the reinforcing bars, and the reinforcing bars, vertical pipes,
Construction is completed with the horizontal bearing rods embedded.

(発明が解決しようとする問題点) しかしながら従来例によると、鉄筋と共に縦管や支承杆
も同時に埋殺しするため、部材の再利用の観点から、こ
の施工法は改善すべきものである。
(Problems to be Solved by the Invention) However, according to the conventional example, vertical pipes and bearing rods are buried at the same time as reinforcing bars, so this construction method should be improved from the viewpoint of reusing members.

(問題点を解決するための手段) 本発明は、捨てコンクリート1で固定したベース板2上
に支柱3を取外し可能に立設し、立設した後支柱の上部
に保持具6を水平に取外し可能に取9付け、この保持具
上で鉄筋7a、17c((J持し、さらにこの鉄筋に別
の鉄筋7b、7c。
(Means for Solving the Problems) The present invention includes a structure in which a support 3 is removably erected on a base plate 2 fixed with a concrete concrete 1, and a holder 6 is horizontally removed from the top of the support after the support is erected. Attach the reinforcing bars 7a, 17c (J-holding, and then attach other reinforcing bars 7b, 7c to this holder).

17a 、17b’i配筋して基礎梁等の鉄筋を組立て
、その後組立鉄筋7,17の外側に型枠8を組込んでか
ら、コンクリート10の1次打設作業として1次コンク
リート打設高さHまで、すなわちコンクリートによって
上記組立鉄筋7,17が自立できるレベルまで打設し、
その後保持具6,6a?支柱3から外し、支柱をベース
板2から外して組立鉄筋外方へ抜出し、そして第2次打
設作業として再びコンクリート10を所定高さまで打込
み、コノクリート養生後脱型するものである。保持具6
は、支柱3に予め取り付けておいてもよい。
17a, 17b'i Reinforcement is arranged and the reinforcing bars such as foundation beams are assembled, and then the formwork 8 is assembled outside the assembled reinforcing bars 7 and 17, and then the primary concrete pouring height is set as the primary pouring work of the concrete 10. Concrete is poured to a level where the assembled reinforcing bars 7 and 17 can stand on their own.
After that, the holders 6, 6a? The concrete 10 is removed from the support 3, the support is removed from the base plate 2, and the assembled reinforcing bars are pulled out to the outside.As a second pouring operation, concrete 10 is poured again to a predetermined height, and after the conocrete is cured, it is removed from the mold. Holder 6
may be attached to the support column 3 in advance.

(実施例) 以下本発明の一実施例として基礎梁の施工に適用した場
合を第1A〜IE図及び第2図全参照して説明する。
(Embodiment) Hereinafter, as an embodiment of the present invention, a case where the present invention is applied to construction of a foundation beam will be described with reference to all of FIGS. 1A to IE and FIG. 2.

まず、第1A図に示すように割ぐり石S上に捨てコンク
リートlt−打設して、割ぐ9石上に所定間隔装置いて
設置しであるベース板2をそれぞれ埋設する。この時、
ベース板2に立てである接続管2aの上端部は捨てコン
クリート1の上面より突出させる。
First, as shown in FIG. 1A, concrete is placed on top of the cracked stones S, and base plates 2, which are placed at predetermined intervals, are buried on each of the nine cut stones. At this time,
The upper end of the connecting pipe 2a standing on the base plate 2 is made to protrude from the upper surface of the sacrificial concrete 1.

ついで、第1B図に示すように接続管2aに支柱である
支柱管3の下端を被嵌して支柱管をペース板2上に立設
する。この支柱管の上端部には予めU字状の固定金具4
(第2図)が止めねじ5で固定してあり、この金具の端
部に水平杆であるかんざし筋6を水平に支持しである。
Next, as shown in FIG. 1B, the lower end of the strut tube 3, which is a strut, is fitted into the connecting tube 2a, and the strut tube is erected on the pace plate 2. A U-shaped fixing fitting 4 is attached to the upper end of this support tube.
(Fig. 2) is fixed with a set screw 5, and a hairpin 6, which is a horizontal rod, is horizontally supported at the end of this metal fitting.

支柱管3を立設した後に、止めねじ5を緩めて固定金具
4を上下動させて、かんざし筋6の高さ調整を必要に応
じて行う。勿論、予め高さ調整しである場合はこの調整
作業は不要である。
After the strut pipe 3 is erected, the set screw 5 is loosened and the fixture 4 is moved up and down to adjust the height of the hairpins 6 as necessary. Of course, if the height has been adjusted in advance, this adjustment work is not necessary.

その後、第1C図及び第2図に示すように力)んざし筋
6上に4本の上端筋7a全並列状態に掛は渡し、この上
端筋にスターラップ7bを掛は吊し、スターラップの下
部に下端筋7Cを掛は渡した後、各鉄筋の接合部を固定
手段で固定して組立鉄筋7を形成する。この時、組立鉄
筋7はかんざし筋6で吊持状態となる。
Thereafter, as shown in FIGS. 1C and 2, the four upper end reinforcements 7a are placed in parallel on the pintail reinforcement 6, and the stirrup 7b is suspended from the upper end reinforcement, and the stirrup After passing the lower end reinforcing bars 7C to the lower part of the reinforcing bars, the joints of each reinforcing bars are fixed by fixing means to form the assembled reinforcing bars 7. At this time, the assembled reinforcing bars 7 are suspended by the hairpins 6.

鉄筋組立て後、第1D図に示すように組立鉄筋7の外側
に型枠8を組立て、両型枠間を締付は具9で固定し、固
定後型枠内にコンクIJ −ト102打設する。コンク
IJ −ト10が、第1E図に示すように組立鉄筋7の
下部がコンクリートによって埋まりこの鉄筋が自立でき
る高さH″!で達した時点で、打設作業を一旦停止し、
止めねじ5を緩めて固定具4及びかんざし筋6を支柱管
3カ・ら外し、その後支柱管全矢印方向に引いてコンク
リート10から抜出し、組立鉄筋上方へ取出す。ベース
板2はコンクリート10内に残す。取出し後、再びコン
ク’J −ト10 i型枠8内に打設して組立鉄筋7を
完全に埋込む。最後に、コンクリートの養生後に型枠8
を脱型する。
After assembling the reinforcing bars, as shown in Fig. 1D, formwork 8 is assembled on the outside of the assembled reinforcing bars 7, and the two formworks are fixed with tightening tool 9. After fixing, concrete IJ-te 102 is poured into the formwork. do. As shown in Fig. 1E, when the concrete IJ-t 10 reaches a height H''! where the lower part of the assembled reinforcing bar 7 is buried in concrete and the reinforcing bar can stand on its own, the pouring work is temporarily stopped.
Loosen the setscrews 5 to remove the fixtures 4 and hairpins 6 from the support pipes 3, then pull the support pipes in all directions of the arrows to remove them from the concrete 10 and take them out above the assembled reinforcing bars. The base plate 2 remains in the concrete 10. After taking it out, it is poured into the concrete formwork 8 again to completely embed the assembly reinforcing bars 7. Finally, after curing the concrete, formwork 8
Remove the mold.

第3A図および第3B図は基礎柱の施工例を示すもので
、この場合は、第3A図に示すように地表上に敷設した
割ぐり石Sの上に捨てコンクリート1でベース板2を埋
込み、接続管2aに支柱管3を連結して立設し、その後
支柱管に止めねじ5゜5aで取り付けた固定金具6.6
a’!i7介してそれぞれ2本のかんざし筋6,6aを
上下2段に十字状に支持する。そして第3B図に示すよ
うに、両かんざし筋6,6aにそれぞれ捨てフープ(上
側のフープ17cのみ図示)を水平状態に固定し、これ
らフープの角部に柱主筋17a f配筋してから、主筋
の外周に段階的にフープ17bt掛回して組立鉄筋17
を形成する。以後、図示しないが鉄筋17の周囲に型枠
を建込み、型枠内にコンクIJ −トを途中まで打設し
てから、止めねじ5.5aを緩るめて固定具4,4a及
びかんざし筋6,6aを外し、支柱管3をベース板2か
ら取出し、その後コンクリートの再打設を行う。
Figures 3A and 3B show examples of construction of foundation columns. In this case, as shown in Figure 3A, the base plate 2 is embedded with concrete 1 on top of the cut stone S laid on the ground surface. , the supporting pipe 3 is connected to the connecting pipe 2a and installed upright, and then the fixing fitting 6.6 is attached to the supporting pipe with a set screw 5°5a.
a'! The two hairpins 6 and 6a are each supported in a cross shape in upper and lower two stages via i7. Then, as shown in FIG. 3B, sacrificial hoops (only the upper hoop 17c is shown) are fixed horizontally to both the hairpin reinforcements 6 and 6a, and the main column reinforcements 17a to 17f are arranged at the corners of these hoops, and then Assemble reinforcing bars 17 by hanging hoops 17b in stages around the outer circumference of the main bars.
form. Thereafter, although not shown, a formwork is erected around the reinforcing bars 17, concrete IJ-te is cast halfway into the formwork, and then the fixing screws 5.5a are loosened and the fixtures 4, 4a and hairpins are attached. The reinforcements 6 and 6a are removed, the support pipe 3 is taken out from the base plate 2, and then concrete is poured again.

(発明の効果) 本発明によれば、コンクリート打設途中で、支柱及び鉄
筋の保持杆を取外し、その後コンクリートの再打設を行
うものであるから、支柱や保持杆のくり返し・利用が行
えて、経済的となる。
(Effects of the Invention) According to the present invention, the supporting rods and reinforcing rods are removed during concrete pouring, and then the concrete is poured again, so the supporting rods and the supporting rods can be repeatedly used. , it becomes economical.

【図面の簡単な説明】[Brief explanation of drawings]

第1A図乃至第1E図は基礎梁の施工例を示す工程図、 第2図は組立鉄筋を保持杆で支持している状態を示す拡
大斜視図、 第3A図及び第3B図は基礎柱の施工例を示す鉄筋組立
てまでの工程図である。 1・・捨てコンクリート、2・・・ベース板、3・・・
支柱、6.6a・・・保持具、7.17・・・組立鉄筋
、8・型枠、10・・コンクリート、H・・・1次コン
クリート打設高さ。 以上 特許出願人  清水建設株式会社 鬼IA因  鬼16図  鬼1C図 第1D図  鬼1E図 1  :捨1]〉クリート 2  : τ−ス板 3 :支社 +7:Jll立鉄筋
Figures 1A to 1E are process diagrams showing construction examples of foundation beams, Figure 2 is an enlarged perspective view showing assembled reinforcing bars being supported by retaining rods, and Figures 3A and 3B are of foundation columns. It is a process diagram up to reinforcing bar assembly showing a construction example. 1. Discarded concrete, 2. Base board, 3.
Pillar, 6.6a... Holder, 7.17... Assembly reinforcing bar, 8. Formwork, 10... Concrete, H... Primary concrete placement height. Applicant for the above patents: Shimizu Corporation Oni IA Cause Oni 16 Fig. 1C Fig. 1D Oni 1E Fig. 1 : Suse 1]> Cleat 2: τ-S plate 3: Branch office + 7: Jll vertical reinforcing bar

Claims (1)

【特許請求の範囲】[Claims] 捨てコンクリートで固定したベース板上に支柱を取外し
可能に立設し、立設後支柱に取外し可能に取り付けた保
持具で鉄筋を水平に支持し、さらにこの鉄筋に別の鉄筋
を配筋して鉄筋を組立て、その後組立鉄筋の外側に型枠
を組込んでからこの型枠内にコンクリートをこのコンク
リートによつて上記組立鉄筋が自立できるレベルまで打
設し、その後保持具を支柱から取外し、支柱をベース板
から外し組立鉄筋外方へ抜出して、そして再びコンクリ
ートを所定高さまで打込み、コンクリート養生後脱型す
ることを特徴とする基礎梁等の基礎施工法。
The pillars are removably erected on a base plate fixed with waste concrete, and after being erected, the reinforcing bars are supported horizontally using holders that are removably attached to the pillars, and other reinforcing bars are arranged on these reinforcing bars. After assembling the reinforcing bars, a formwork is assembled on the outside of the assembled reinforcing bars, and concrete is poured into the formwork to a level where the assembled reinforcing bars can stand on their own.Then, the retainer is removed from the support, and the support is removed. A foundation construction method for foundation beams, etc., characterized by removing the reinforcing bars from the base plate, pulling them out to the outside of the assembled reinforcing bars, pouring concrete again to a predetermined height, and removing the mold after curing the concrete.
JP23140384A 1984-11-05 1984-11-05 Foundation construction for foundation beam and the like Pending JPS61109825A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23140384A JPS61109825A (en) 1984-11-05 1984-11-05 Foundation construction for foundation beam and the like

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23140384A JPS61109825A (en) 1984-11-05 1984-11-05 Foundation construction for foundation beam and the like

Publications (1)

Publication Number Publication Date
JPS61109825A true JPS61109825A (en) 1986-05-28

Family

ID=16923055

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23140384A Pending JPS61109825A (en) 1984-11-05 1984-11-05 Foundation construction for foundation beam and the like

Country Status (1)

Country Link
JP (1) JPS61109825A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2667888A1 (en) * 1990-10-15 1992-04-17 Sogea Method for producing foundation elements in situ, mould and concrete for implementing it
ITVR20100206A1 (en) * 2010-10-29 2012-04-30 Sar Costruzioni Prefabbricate S R L FOUNDATION STRUCTURE PARTICULARLY FOR PREFABRICATED BUILDINGS

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56115466A (en) * 1980-02-18 1981-09-10 Kunimoto Shokai Method of supporting reinforced assembled body* etc* for foundation beam

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56115466A (en) * 1980-02-18 1981-09-10 Kunimoto Shokai Method of supporting reinforced assembled body* etc* for foundation beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2667888A1 (en) * 1990-10-15 1992-04-17 Sogea Method for producing foundation elements in situ, mould and concrete for implementing it
ITVR20100206A1 (en) * 2010-10-29 2012-04-30 Sar Costruzioni Prefabbricate S R L FOUNDATION STRUCTURE PARTICULARLY FOR PREFABRICATED BUILDINGS

Similar Documents

Publication Publication Date Title
KR100777153B1 (en) Construction method of boundary stone
JP3342891B2 (en) Construction method of horizontal beam erected on columnar structure
JPS61109825A (en) Foundation construction for foundation beam and the like
JPH01290806A (en) Construction method for bridge
JPH1150653A (en) Supporting frame of scaffold plate and fitting and removing method therefor and construction for reinforced concrete wall by use thereof
JP2000257264A (en) Cast-in-place construction method for pc structure
JPH09296565A (en) Precast concrete column, its manufacture, and execution method
JP2867141B2 (en) Mounting and dismantling method of work scaffold in step-up method
JPS58185856A (en) Support for use with working scaffold for constructing src structural beam
JPH0128186Y2 (en)
JPH09111721A (en) Execution method and structure of bridge pier
JPH01142131A (en) Placing of concrete
JP3114071B2 (en) Embedded type leg anchoring method for steel columns
JP3281421B2 (en) Construction method of horizontal beam erected on tower
JPH09316900A (en) Top-down construction method
JPH07259332A (en) Method of driving insert for separator in semi-processed good precast concrete slab
CN105926857A (en) Prefabricated pier and application of prefabricated pier to high-rise reversed beam overhanging scaffold construction
JPS6133172Y2 (en)
JP3098107B2 (en) Underground beam construction method
JPH0270862A (en) Execution method of steel-sheet lined cylindrical reinforced concrete structure
JPH1025891A (en) Concrete form device and column constructing method using the same
JPS61212438A (en) Production of footing reinforcing bar column
JPS6349773B2 (en)
JPH10205131A (en) Device and method for curing concrete of foundation
JPH0925636A (en) Reinforcement suspension frame