JPS61106808A - Costruction of cable - Google Patents

Costruction of cable

Info

Publication number
JPS61106808A
JPS61106808A JP22846684A JP22846684A JPS61106808A JP S61106808 A JPS61106808 A JP S61106808A JP 22846684 A JP22846684 A JP 22846684A JP 22846684 A JP22846684 A JP 22846684A JP S61106808 A JPS61106808 A JP S61106808A
Authority
JP
Japan
Prior art keywords
cable
wire
pull rod
rod
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP22846684A
Other languages
Japanese (ja)
Other versions
JPH0478761B2 (en
Inventor
義人 田中
原口 俊男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Wire Co Ltd
Original Assignee
Shinko Wire Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Wire Co Ltd filed Critical Shinko Wire Co Ltd
Priority to JP22846684A priority Critical patent/JPS61106808A/en
Publication of JPS61106808A publication Critical patent/JPS61106808A/en
Publication of JPH0478761B2 publication Critical patent/JPH0478761B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明はケーブルの架設方法の改良に関り′るもので
ある。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to an improvement in a cable installation method.

(従来技術) 従来、斜張橋等の吊り構造物のケーブル架設において、
ケーブルを定着点まで引込む方法として、つぎのような
方法が採用されている。すなわち、ケーブルの一方の端
末具に、外周にねじを有するプルロッドを9!!、着さ
せ、ケーブルの他端を設置すべき位置の構造物に固定さ
せた状態で、上記プルロッドを端末具用ベアリングプレ
ートおよびガイド部材に貫通させてジヤツキによりプル
ロッドを介してケーブルに張力を加えた後、端末具をベ
アリングプレートに係止させるようにしている。この方
法では、ケーブルの自重によりケーブルに大きなたわみ
が生じるためにプルロッドをガイド部材に貫通させるの
に大きな張力が必要となり、またプルロッドも長くしな
ければならないという問題がある。
(Prior art) Conventionally, when installing cables for suspended structures such as cable-stayed bridges,
The following method is used to pull the cable to the anchoring point. In other words, attach a pull rod with a thread on the outer periphery to one end of the cable. ! , and with the other end of the cable fixed to the structure at the location where it should be installed, the pull rod was passed through the terminal bearing plate and the guide member, and tension was applied to the cable via the pull rod with jacks. After that, the terminal fitting is locked to the bearing plate. This method has the problem that a large amount of deflection occurs in the cable due to its own weight, so a large tension force is required to pass the pull rod through the guide member, and the pull rod also has to be long.

そこで、プルロッドをガイド部材まで引込むのに要する
力を軽減ざ「る手段として、第10図に示ずように、ケ
ーブル1の一方の端末具10を塔11の所定位置に固定
させ、ケーブル1の中間部をトラッククレーン14によ
って支持してケープ、、     /L/”″”焦線゛
″″1状態°゛°実線゛″″1状態″゛たるみを減少さ
せ、これによってケーブル張設長さpまでの引込み量Δ
Ωができるだけ小さくなるように端末具20を桁13に
接近させている。また第11図に示ずように、ケーブル
1の上方に架設用部材15を張設し、これによってケー
ブル1の中間部を支持したり、あるいは桁13を張出し
工法で架設する場合、ジヤツキ16で桁13の端部を所
定位置より高く持ち上げてΔρを小さくす゛る方法も採
用されている。これらの方法によるとぎは、それ自体、
余分な装置や作業が必要となり、またプルロッドも相当
に長いものが必要であった。
Therefore, as a means to reduce the force required to pull the pull rod to the guide member, as shown in FIG. The intermediate part is supported by a truck crane 14 to reduce the slack of the cape, /L/"""focal line"""1 state""°solid line """1 state"", thereby reducing the cable tension length p. Retraction amount Δ up to
The terminal fitting 20 is brought close to the girder 13 so that Ω is as small as possible. In addition, as shown in FIG. 11, when an erection member 15 is stretched above the cable 1 to support the middle part of the cable 1, or when the girder 13 is constructed by an overhanging method, the jacks 16 A method of reducing Δρ by raising the end of the girder 13 higher than a predetermined position has also been adopted. Sharpening by these methods is itself
Extra equipment and labor were required, and the pull rods were also quite long.

ざらに従来法では、仮引込用線材としてのストランドを
係止する手段として、接触面の11!擦抵抗を利用した
係止部材を用いているために、引込み操作の確実性がな
いという問題があった。すなわちケーブルの架設中に、
ストランドにはその表面に傷がついたり錆が発生したり
することが避けられず、これによって係止部材との間の
接触面の摩擦係数が大幅に変化することになり、また複
数本の′″5″’ t’l[1HIk″′31 ’A 
’) G”Off h< ! L; 8 L、 a  
 。
In the conventional method, 11! of the contact surface is used as a means for locking the strand as a temporary lead wire. Since a locking member using frictional resistance is used, there is a problem in that the retracting operation is not reliable. In other words, during cable installation,
It is inevitable that the surface of the strand will be scratched or rusted, which will significantly change the coefficient of friction of the contact surface between the strand and the locking member. ``5'''t'l[1HIk'''31'A
')G"Offh<!L; 8 L, a
.

から係止部材の圧着力が一定とならず、このため   
 □摩擦抵抗(係止力)にバラツキが生じることになり
、これによって係止部材がスリップすることになる。こ
のスリップにより架設途中のケーブルが他の構造物に衝
突したりして危険な状態になるため、従来はスリップ′
の防止のために非常に手間のかかる管理を行っていた。
Because of this, the crimping force of the locking member is not constant.
□Frictional resistance (locking force) will vary, which will cause the locking member to slip. This slip could cause the cable in the middle of installation to collide with other structures, creating a dangerous situation.
In order to prevent this, extremely time-consuming management was carried out.

(発明の目的) この発明はこのような技術的背景のもとになされたもの
であり、従来のような余分な作業は必要なく、かつプル
ロッドの長さも従来より大幅に短(することができて、
スリップを確実に防止することができる方法を提供する
ものである。
(Objective of the Invention) This invention was made against this technical background, and it does not require any extra work as in the past, and the length of the pull rod can also be made significantly shorter than in the past. hand,
The present invention provides a method that can reliably prevent slips.

(発明の構成〉 この発明は、ケーブルの一方の端末具に、外周にねじを
有するプルロッドを螺着させ、ケーブルの他端を設置す
べぎ位置の構造物に固定させた状態で上記プルロッドを
端末具用ベアリングプレートおよびガイド部材に貫通さ
せ、ジヤツキによりプルロッドを介してケアプルに張力
を加えた後、端末具をベアリングプレートに係止させる
方法において、プルロッドの端部には上記プルロッドよ
り線径の細い仮引込用線材を接続し、上記仮引込用線材
にはこの線材と機械的に結合する係止部材を取付け、上
記ジヤツキにより係止部材および仮引込用線拐を介して
プルロッドをガイド部材中に引込み、ついでジヤツキに
よりプルロッドを介してケーブルに張力を加えるように
したものである。
(Structure of the Invention) In the present invention, a pull rod having a thread on the outer periphery is screwed onto one end of the cable, and the pull rod is connected to the end of the cable while the other end of the cable is fixed to a structure at the installation position. In this method, the terminal tool is fixed to the bearing plate after penetrating the care pull through the bearing plate of the tool and the guide member and applying tension to the care pull via the pull rod using jacks. A temporary lead-in wire is connected, a locking member mechanically coupled to the wire is attached to the temporary lead-in wire, and the pull rod is inserted into the guide member through the locking member and the temporary lead-in wire by the jack. The cable is pulled in and then jacked to apply tension to the cable via a pull rod.

(実施例) 第1図はこの発明の実施に用いる装置を示し、ケーブル
1の端末具20にはカップラ17を介してプルロッド2
の一端が結合され、プルロッド2の他端には仮引込用線
材(中径ボルト)6の一端のアンカーヘッド68がカッ
プラ21を介して結合され、中径ボルト6の他端にはさ
らに仮引込用線材(細径ボルト)9の一端のアンカーヘ
ッド91がカップラ69を介して結合されている。中径
ボルト6はプルロッド2より細いボルトで形成されてい
る。
(Embodiment) FIG. 1 shows an apparatus used for carrying out the present invention, in which a pull rod 2 is connected to a terminal fitting 20 of a cable 1 via a coupler 17.
One end of the pull rod 2 is connected to the other end of the pull rod 2, and an anchor head 68 at one end of a wire for temporary drawing (medium diameter bolt) 6 is connected via a coupler 21, and the other end of the medium diameter bolt 6 is further connected to a temporary drawing wire (medium diameter bolt) 6. An anchor head 91 at one end of the wire rod (small diameter bolt) 9 is coupled via a coupler 69. The medium diameter bolt 6 is formed of a bolt thinner than the pull rod 2.

端末具2oを最終的に固定させるベアリングプレート3
には端末具20を貫通させる穴30が形成されるととも
に、その周囲にはガイド部材4を結合させるためのボル
ト穴31が形成されている。
Bearing plate 3 that finally fixes the terminal tool 2o
A hole 30 is formed in the hole 30 through which the terminal fitting 20 passes, and a bolt hole 31 for connecting the guide member 4 is formed around the hole 30 .

ガイド部材4は一対の側板41と端板42と2枚の中間
板43とからなり、端板42および中間板43にはそれ
ぞれプルロッド2が貫通する穴40が形成され、また側
板端部にはボルト嵌入部45が形成され、このボルト嵌
入部45にボルト47を嵌入させて、ボルト穴31にね
じ込むことによってガイド部材4をベアリングプレート
3に結合させる。またガイド部材4の端板42にはボル
ト穴44を貫通するボルト46によってジヤツキ5を結
合ざぽている。
The guide member 4 consists of a pair of side plates 41, an end plate 42, and two intermediate plates 43, each of which has a hole 40 through which the pull rod 2 passes. A bolt fitting part 45 is formed, and a bolt 47 is fitted into this bolt fitting part 45 and screwed into the bolt hole 31 to couple the guide member 4 to the bearing plate 3. Further, a jack 5 is connected to the end plate 42 of the guide member 4 by a bolt 46 passing through a bolt hole 44.

ガイド部材4の端板42と中間板43との間にはプルロ
ッド2と螺合する第1のナツト99および線材6.−9
用の係止手段7が配置されている。
Between the end plate 42 and the intermediate plate 43 of the guide member 4 are a first nut 99 and a wire rod 6. which are screwed together with the pull rod 2. -9
Locking means 7 are arranged for this purpose.

この係止手段7は細径ボルト9および中径ボルト6が貫
通ずる穴73を有する支持板72と、細径ボルト9に螺
着されるナツト74および中径ポルj、   61″’
a ’t’L 6 t ′″75′!″”’ 6 a 
Or°゛6・そして第2図に示すように穴73を貫通す
る中径ボルト6に螺着されたナツト75を支持板72で
支持するようにしている。細径ボルト9が穴73に貫通
されている際には、それに螺着されたナツト74がナツ
ト75を介して支持板72に支持されることになる。な
お、支持板72に複数個の穴を形成しているのは、プル
ロッド2に複数本の仮引込用線材を接続させた場合に利
用するためである。
This locking means 7 includes a support plate 72 having a hole 73 through which the small diameter bolt 9 and the medium diameter bolt 6 pass, a nut 74 screwed onto the small diameter bolt 9, and a medium diameter hole 61''.
a 't'L 6 t '''75'!''''' 6 a
As shown in FIG. 2, a nut 75 screwed onto a medium-diameter bolt 6 passing through a hole 73 is supported by a support plate 72. When the small diameter bolt 9 is passed through the hole 73, the nut 74 screwed therein is supported by the support plate 72 via the nut 75. Note that the reason why the plurality of holes are formed in the support plate 72 is to use them when a plurality of temporary lead-in wires are connected to the pull rod 2.

またプルロッド2の他端には仮引込用線材6゜9の代り
に、仮引込用線材として中径PC鋼より線60および細
径PC鋼より線90を用いてもよく、この場合中径PC
5iより線6oの一端のアンカーヘッド63がカップラ
21を介して結合され、中径PC鋼より線60の他端に
細径pcuAより線90がカップラ69を介して結合さ
れる。また中径PC鋼より線60には所定間隔でストッ
パ61が固着され、細径PC鋼より線90には所定間隔
でストッパ93が固着されている。そしてこの仮引込用
線材は、第3図に示すように、ストッパ61は支持板7
2の穴73を貫通し、一対の部材からなる環状のワッシ
ャ62を介して支持板72に支持されるようにしている
Further, instead of the temporary lead-in wire rod 6°9, a medium-diameter PC steel wire 60 and a small-diameter PC steel wire 90 may be used as temporary lead-in wires at the other end of the pull rod 2.
An anchor head 63 at one end of the 5i stranded wire 6o is coupled via a coupler 21, and a small diameter pcuA stranded wire 90 is coupled to the other end of the medium diameter PC steel stranded wire 60 via a coupler 69. Further, stoppers 61 are fixed to the medium-diameter PC steel stranded wire 60 at predetermined intervals, and stoppers 93 are fixed to the small-diameter PC steel stranded wire 90 at predetermined intervals. Then, as shown in FIG. 3, this temporary lead-in wire rod
It penetrates through the hole 73 of No. 2 and is supported by the support plate 72 via an annular washer 62 made of a pair of members.

ジヤツキ5にはプルロッド2が貫通する穴50が形成さ
れ、・ピストンロッド51の端面にはプルロッド2に螺
着される第2のナツト19と、係止手段8とが配置され
、この係止手段8は係止手段7と同様に、細径ボルト9
および中径ボルト6が貫通する穴83を有する支持板8
2と、細径ボルト9に螺着されるナツト84および中径
ボルト6に螺着されるナツト85とからなっている。
A hole 50 through which the pull rod 2 passes is formed in the jack 5. A second nut 19 that is screwed onto the pull rod 2 and a locking means 8 are arranged on the end surface of the piston rod 51. 8 is a small diameter bolt 9 similar to the locking means 7.
and a support plate 8 having a hole 83 through which the medium-diameter bolt 6 passes.
2, a nut 84 screwed onto the small diameter bolt 9, and a nut 85 screwed onto the medium diameter bolt 6.

つぎに上記装置を用いたケーブルの張設方法を説明する
。まず、ケーブル1の一端を第4図に示すように、塔1
1の所定位置に固定させ、ケーブル1の他端部側にはベ
アリングプレート3に適宜の取付は部材33を取付けて
これを桁13の所定位置に固定させ、図示しないウィン
チでケーブル1の端部を引き寄せてIlll小径ト9を
ガイド部材4およびジヤツキ5に貫通させる。
Next, a cable tensioning method using the above device will be explained. First, connect one end of the cable 1 to the tower 1 as shown in FIG.
At the other end of the cable 1, attach a member 33 to the bearing plate 3 and fix it at a predetermined position on the girder 13. is pulled to pass the small diameter hole 9 through the guide member 4 and jack 5.

上記引込みに際してケーブル1は自重によってたるみ(
ナグH)が生じ、このため仮引込用線材に曲げ変形が生
じることになる。この変形は仮引込用線材の引込み閣が
小さいほど大ぎく(曲率半径Rが小さり)、すなわち引
込みmが増大するほど変形量は小さくなる。いずれにし
でも、仮引込用線材には連続して曲げ応力が作用し、従
って引込みがスムーズに行われるには、それに対応する
曲げ変形が生じることが必要となる。例えば、ケーブル
1の長さしが200m程度の場合には曲率半径Rが30
00 mm程度の曲げ変形が生じることが必要になる。
When the cable 1 is pulled in as described above, it becomes slack due to its own weight (
Nag H) occurs, which causes bending deformation in the temporary lead-in wire. This deformation becomes greater as the retraction distance of the temporary lead-in wire rod becomes smaller (the radius of curvature R becomes smaller), that is, as the retraction m increases, the amount of deformation becomes smaller. In any case, bending stress continuously acts on the temporary drawing wire, and therefore, in order to smoothly draw the wire, a corresponding bending deformation must occur. For example, if the length of cable 1 is about 200 m, the radius of curvature R is 30 m.
It is necessary that a bending deformation of about 0.00 mm occurs.

従って、この程度の曲げ変形が生じる太さに仮引込用線
材を設定する必要があり、このため上記のように仮引込
用線材をプルロッド2よりも細り設定している。
Therefore, it is necessary to set the temporary lead-in wire to a thickness that will cause this degree of bending deformation, and for this reason, the temporary lead-in wire is set to be thinner than the pull rod 2 as described above.

第5図に示すように、係止手段7.8によって細径ボル
ト9を保持した状態でジヤツキ5を駆動さ才、ピストン
ロッド51゛を突出させて第6図に示す状態にし、この
状態から係止手段7をナツト99に当接する位置ま−で
後退さけるとともに、ピストンロッド51を没入さけた
摂、係止手段8をピストンロッド51の端面に当接させ
る。この作動の繰返しでピストンロッド51の1ストロ
一ク分ずつ断続的に細径ボルト9の引込みを行い、それ
に続いて中径ボルト6の引込みも同様の操作で行う。こ
の操作において、係止手段は線材に対して機械的に結合
されたナツトとそれを支持する支持板とから構成されて
いるために、摩擦接触による従来のヂIIツクと異なり
、すべり等のトラブルが生じるおぞれはなく、確実なf
il’動を行うことができる。
As shown in FIG. 5, while the small diameter bolt 9 is held by the locking means 7.8, the jack 5 is driven to project the piston rod 51' into the state shown in FIG. 6, and from this state. While the locking means 7 is moved back to a position where it contacts the nut 99, the locking means 8 is brought into contact with the end surface of the piston rod 51 without recessing the piston rod 51. By repeating this operation, the small diameter bolt 9 is intermittently retracted by one stroke of the piston rod 51, and subsequently the medium diameter bolt 6 is retracted in the same manner. In this operation, the locking means is composed of a nut mechanically connected to the wire and a support plate that supports it, so unlike conventional locks that rely on frictional contact, problems such as slipping can occur. There is no sleet that occurs, and there is a certain f
il' movements can be performed.

プルロッド2の先端が中間板43を通過すると、第7図
に示すようにナツト99をプルロッド2に螺着させ、中
径ボルト6に螺着するナツト85とナツト99とによっ
て上記のピストンロッド51の1ストロ一ク分ずつの・
引込み操作を行う。プルロッド2の先端がジヤツキ5ふ
ら突出するとカップラ21をゆるめて中径ボルト6を取
外し、第8図に示すようにナツト19をプルロッド2の
先端部に螺着させる。そしてジヤツキ5を操作し、ナツ
ト19と99とによりプルロッド2を引込み、’   
   i9fgk、*tようci*g20$所定(7)
(Q10.ニーaするとシムプレート35を側方から差
し込んで端末具20をベアリングプレート3に支持させ
た後、ガイド部材4およびプルロッド2をそれぞれ取外
す。
When the tip of the pull rod 2 passes through the intermediate plate 43, a nut 99 is screwed onto the pull rod 2 as shown in FIG. One stroke per stroke.
Perform a pull-in operation. When the tip of the pull rod 2 protrudes by the jack 5, the coupler 21 is loosened, the medium diameter bolt 6 is removed, and the nut 19 is screwed onto the tip of the pull rod 2 as shown in FIG. Then, operate the jack 5, pull the pull rod 2 with the nuts 19 and 99, and
i9fgk, *tyoci*g20$ prescribed (7)
(Q10. After kneeing, insert the shim plate 35 from the side to support the terminal fitting 20 on the bearing plate 3, and then remove the guide member 4 and pull rod 2.

以上の操作は仮引込用線材として中径ボルト6および細
径ボルト9を用いた場合について説明したが、中径PC
鋼より線60および細径PC鋼より線90を用いた場合
も同様である。また、中径ボルト6と細径ボルト9とを
直列に接続したものを用いる代りに、細径ボルト9を複
数本並列にして用いるようにしてもよい。この場合も引
込みの際の仮引込用線材に付与される曲げ変形に対応す
ることができることは勿論である。
The above operation was explained for the case where the medium diameter bolt 6 and the small diameter bolt 9 were used as the temporary lead-in wire, but the medium diameter PC
The same applies to the case where the steel stranded wire 60 and the small diameter PC steel stranded wire 90 are used. Furthermore, instead of using the medium-diameter bolt 6 and the small-diameter bolt 9 connected in series, a plurality of small-diameter bolts 9 may be used in parallel. Of course, in this case as well, it is possible to cope with the bending deformation imparted to the temporary drawing wire during drawing.

(発明の効果) 以上説明したように、この発明はプルロッドの端部にプ
ルロッドより線径の細い仮引込用線材を接続し、この線
材には係止部材を線材に対して機械的に結合するように
取付け、ジ1!ツキによりケーブルに張力を加えるよう
にしたものであり、ブルロッドによる引込みまでの仮引
込みをプルロッド用のものと同じ装置によって行うこと
ができるために仮設用部材等の余分な装置や作業は必要
なく、ケーブルの架設を容易に行うことができる。
(Effects of the Invention) As explained above, in the present invention, a temporary lead-in wire rod having a wire diameter smaller than that of the pull rod is connected to the end of the pull rod, and a locking member is mechanically connected to the wire rod. Install it as shown, Ji1! Tension is applied to the cable using a pull rod, and the temporary retraction until the pull rod is used can be performed using the same device as the pull rod, so there is no need for extra equipment or work such as temporary members. Cables can be easily installed.

また仮引込用線材の利用によってケーブルの端末具をベ
アリングプレートの近くまで引込むことができるために
、プルロッドの長さも短くすることができる。
Furthermore, since the cable terminal can be pulled in close to the bearing plate by using the temporary lead-in wire, the length of the pull rod can also be shortened.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明を実施する装置の1例を示ず分解斜視
図、第2図は係止手段の斜視図、第3図は係止手段の他
の例を示す斜視図、第4図はケーブル架設過程の説明図
、M5図〜第9図は引込み工程を示す断面図、第10図
および第11図はそれぞれ従来法を説明するためのケー
ブル張設過程の説明図である。 1・・・ケーブル、2・・・プルロッド、3・・・ベア
リングプレート、4・・・ガイ1ζ2部材、5・・・ジ
ヤツキ、7゜8・・・係止手段、6,9,60.90・
・・仮引込用線材。 特許出願人     神鋼鋼線工業株式会社第  2 
 図 第  3  図 第  4  図 第  5  図 第  6  図 第  8  図 第10図
Fig. 1 is an exploded perspective view showing one example of a device for implementing the present invention, Fig. 2 is a perspective view of a locking means, Fig. 3 is a perspective view showing another example of the locking means, and Fig. 4 1 is an explanatory diagram of the cable installation process, FIGS. M5 to 9 are sectional views showing the pulling process, and FIGS. 10 and 11 are explanatory diagrams of the cable installation process to explain the conventional method. DESCRIPTION OF SYMBOLS 1... Cable, 2... Pull rod, 3... Bearing plate, 4... Guy 1ζ2 member, 5... Jacket, 7° 8... Locking means, 6, 9, 60.90・
・Wire for temporary lead-in. Patent applicant: Shinko Wire Industry Co., Ltd. No. 2
Figure 3 Figure 4 Figure 5 Figure 6 Figure 8 Figure 10

Claims (1)

【特許請求の範囲】 1、ケーブルの一方の端末具に、外周にねじを有するプ
ルロッドを螺着させ、ケーブルの他端を設置すべき位置
の構造物に固定させた状態で上記プルロッドを端末具用
ベアリングプレートおよびガイド部材に貫通させ、ジャ
ッキによりプルロッドを介してケーブルに張力を加えた
後、端末具をベアリングプレートに係止させる方法にお
いて、プルロッドの端部には上記プルロッドより線径の
細い仮引込用線材を接続し、上記仮引込用線材にはこの
線材と機械的に結合する係止部材を取付け、上記ジャッ
キにより係止部材および仮引込用線材を介してプルロッ
ドをガイド部材中に引込み、ついでジャッキによりプル
ロッドを介してケーブルに張力を加えることを特徴とす
るケーブルの架設方法。 2、上記線材としてボルトを使用し、係止部材としてナ
ットを使用したことを特徴とする特許請求の範囲第1項
記載のケーブルの架設方法。 3、上記線材としてPC鋼より線、係止部材として上記
PC鋼より線に所定間隔で固着させたストッパを使用し
たことを特徴とする特許請求の範囲第1項記載のケーブ
ルの架設方法。 4、上記線材として、複数本の互いに線径の異なる線材
をプルロッドの側から他方の側へ順次細くなるように接
続したものを使用したことを特徴とする特許請求の範囲
第1項記載のケーブルの架設方法。
[Claims] 1. A pull rod having a thread on the outer periphery is screwed onto one terminal of the cable, and the pull rod is attached to the terminal with the other end of the cable fixed to the structure at the location where it is to be installed. In this method, the cable is passed through the bearing plate and the guide member, and tension is applied to the cable via the pull rod by a jack, and then the terminal fitting is locked to the bearing plate. Connecting a lead-in wire, attaching a locking member mechanically coupled to the wire to the temporary lead-in wire, and pulling the pull rod into the guide member using the jack via the locking member and the temporary lead-in wire; A cable installation method characterized in that a jack is then used to apply tension to the cable via a pull rod. 2. The method of constructing a cable according to claim 1, wherein a bolt is used as the wire rod and a nut is used as the locking member. 3. The method of constructing a cable according to claim 1, characterized in that the wire rod is a prestressed steel strand, and the locking member is a stopper fixed to the prestressed steel strand at a predetermined interval. 4. The cable according to claim 1, wherein a plurality of wires having different diameters are connected so as to become thinner from the pull rod side to the other side as the wire rod. construction method.
JP22846684A 1984-10-29 1984-10-29 Costruction of cable Granted JPS61106808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22846684A JPS61106808A (en) 1984-10-29 1984-10-29 Costruction of cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22846684A JPS61106808A (en) 1984-10-29 1984-10-29 Costruction of cable

Publications (2)

Publication Number Publication Date
JPS61106808A true JPS61106808A (en) 1986-05-24
JPH0478761B2 JPH0478761B2 (en) 1992-12-14

Family

ID=16876918

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22846684A Granted JPS61106808A (en) 1984-10-29 1984-10-29 Costruction of cable

Country Status (1)

Country Link
JP (1) JPS61106808A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171619A (en) * 1991-12-25 1993-07-09 Hitachi Zosen Corp Setting of skew bridge cable

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826441A (en) * 1981-08-10 1983-02-16 Nippon Telegr & Teleph Corp <Ntt> Ion implanting device
JPS60164503A (en) * 1984-02-03 1985-08-27 株式会社大滝油圧 Method and apparatus for pulling in main cable in construction of suspension bridge

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826441A (en) * 1981-08-10 1983-02-16 Nippon Telegr & Teleph Corp <Ntt> Ion implanting device
JPS60164503A (en) * 1984-02-03 1985-08-27 株式会社大滝油圧 Method and apparatus for pulling in main cable in construction of suspension bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171619A (en) * 1991-12-25 1993-07-09 Hitachi Zosen Corp Setting of skew bridge cable

Also Published As

Publication number Publication date
JPH0478761B2 (en) 1992-12-14

Similar Documents

Publication Publication Date Title
EP0017616B1 (en) Process and apparatus for laying and fastening heavy electrical cables
JP2000054321A (en) Installation of oblique cable
KR102596614B1 (en) Strand anchorage structure of cable-stayed bridge and anchoring method thereof
JPS61106808A (en) Costruction of cable
JPS5952608B2 (en) Long-distance electric wire extension method
CN110761196A (en) Adjustable catwalk anchoring and connecting device
CN212621853U (en) Cable head connecting device for submarine cable tension bending test
US2783024A (en) Bar gripping means for use in the production of prestressed concrete
JP2018193837A (en) Damper fitting method
JP2958241B2 (en) Tensioning material erection method and erection drawing device
JPH11193633A (en) Fixing method for end part of cable
CN216663808U (en) Prestressed anchor cable
WO2023173588A1 (en) Construction method for splay cable sleeve of suspension bridge
CN205304104U (en) A anchor clamps for cable laying
CN112886481A (en) Cable laying method for internal climbing tower crane
CN116207620B (en) Transverse stretching device for cable terminal head
JPS59173406A (en) Construction of cable
JPH047213Y2 (en)
JPH0380203B2 (en)
JP2562006B2 (en) Method for sending PC steel strands in cable-stayed bridge and connecting metal fittings for PC steel strands
JP2810853B2 (en) How to install diagonal cable
JPH0463608B2 (en)
JP4466357B2 (en) Steel pipe longitudinal connection method
JPS6259765A (en) Method and apparatus for pre-tensioning pc steel material bundle
JPH0641704B2 (en) FRP rope tension fixing method

Legal Events

Date Code Title Description
EXPY Cancellation because of completion of term